Presented by H. Wannenmacher ; GGE 2016
WATER INGRESS AND
REDUCTION MEASURES
IN THE HRT OF UMA OYA MPP.
Project Information – Sri Lanka
Uma Oya Multipurpose Project Head Race Tunnel
500 m
1000 m
L= 15‘000 m
Water Inflow and Consequences
Dez 2014: Water Inflow of 370 l/s
Drainage of aquifer with settlements and
falling dry of wells on the surface
Water Inflow per Section :
24. Dez. 2014 – 370 l/s
Mai . 2015 – 170 l/s
Okt. 2015 – 20 l/s
Water Inflow and Consequences
Grouting
Grouting Works: Initial Works- Work Preparation
Grouting Works: Initial Works
Injektionsserie
Dichtinjektion Versalstollen II
Injektionsschema A
Dichtinjektion Versalstollen II
Injektionsschema B
Grouting Works: Initial Works
Wash Out Effects of Invert Mortar
Wash Out Effects of Pea Gravel
Sealing of Joints
The completion of initial works is a demand to start rock mass grouting !
• .
Grouting Works: Initial Works
Grouting Works: Rock Mass Grouting
Grouting Works: Rock Mass Grouting
• Water Pressure Relief before and after the grouting works
Grouting Works: Rock Mass Grouting
Grouting Criteria:
àPmax : 10 bar (above actual ground water pressure)
àVmax : 1000 l per 3 m borehole
àTotal Amount: 565‘000 l for 600 m tunnel section
(cement based grout mixes)
Takk!
Thank you for your audience!

Weitere ähnliche Inhalte

Ähnlich wie Hydro 2016 wannenmacher

Management & mitigation of groundwater infiltration within underground excava...
Management & mitigation of groundwater infiltration within underground excava...Management & mitigation of groundwater infiltration within underground excava...
Management & mitigation of groundwater infiltration within underground excava...Angelo Indelicato
 
19-07-06 Scheme Description details
19-07-06 Scheme Description details19-07-06 Scheme Description details
19-07-06 Scheme Description detailsAonghus Murray
 
Leaside - Laird Construction Liaison Committee Meeting - July 2017
Leaside - Laird Construction Liaison Committee Meeting  - July 2017Leaside - Laird Construction Liaison Committee Meeting  - July 2017
Leaside - Laird Construction Liaison Committee Meeting - July 2017Crosstown TO
 
Kevin Quigley Portfolio Condensed
Kevin Quigley Portfolio CondensedKevin Quigley Portfolio Condensed
Kevin Quigley Portfolio Condensedkevin quigley
 
Town of Scitutate job story Underground Construction 10-1-15
Town of Scitutate job story Underground Construction 10-1-15Town of Scitutate job story Underground Construction 10-1-15
Town of Scitutate job story Underground Construction 10-1-15Ryan Johnson
 
Controlling Water On Construction Sites
Controlling Water On Construction SitesControlling Water On Construction Sites
Controlling Water On Construction SitesMartin Preene
 
15.PROJECT REPORT - UWSSRP1 - MASVINGO final draft
15.PROJECT REPORT - UWSSRP1 - MASVINGO final draft15.PROJECT REPORT - UWSSRP1 - MASVINGO final draft
15.PROJECT REPORT - UWSSRP1 - MASVINGO final draftLloyd Farai Fende
 
PPT CAVITY Tunnel P1 610M--05.02.2021.pptx
PPT CAVITY Tunnel P1 610M--05.02.2021.pptxPPT CAVITY Tunnel P1 610M--05.02.2021.pptx
PPT CAVITY Tunnel P1 610M--05.02.2021.pptxAGNIVORAY1
 
Mahakali Bridge Project Presentation (2077 chaitra 11)
Mahakali Bridge Project Presentation (2077 chaitra 11)Mahakali Bridge Project Presentation (2077 chaitra 11)
Mahakali Bridge Project Presentation (2077 chaitra 11)Rabindra Shrestha
 

Ähnlich wie Hydro 2016 wannenmacher (15)

Management & mitigation of groundwater infiltration within underground excava...
Management & mitigation of groundwater infiltration within underground excava...Management & mitigation of groundwater infiltration within underground excava...
Management & mitigation of groundwater infiltration within underground excava...
 
19-07-06 Scheme Description details
19-07-06 Scheme Description details19-07-06 Scheme Description details
19-07-06 Scheme Description details
 
ANP DAM PPT Dt 30-10-2022 EE.pptx
ANP DAM PPT Dt 30-10-2022 EE.pptxANP DAM PPT Dt 30-10-2022 EE.pptx
ANP DAM PPT Dt 30-10-2022 EE.pptx
 
injo slip update
injo slip updateinjo slip update
injo slip update
 
Leaside - Laird Construction Liaison Committee Meeting - July 2017
Leaside - Laird Construction Liaison Committee Meeting  - July 2017Leaside - Laird Construction Liaison Committee Meeting  - July 2017
Leaside - Laird Construction Liaison Committee Meeting - July 2017
 
Kevin Quigley Portfolio Condensed
Kevin Quigley Portfolio CondensedKevin Quigley Portfolio Condensed
Kevin Quigley Portfolio Condensed
 
Town of Scitutate job story Underground Construction 10-1-15
Town of Scitutate job story Underground Construction 10-1-15Town of Scitutate job story Underground Construction 10-1-15
Town of Scitutate job story Underground Construction 10-1-15
 
Controlling Water On Construction Sites
Controlling Water On Construction SitesControlling Water On Construction Sites
Controlling Water On Construction Sites
 
CV Mirani Sb Color
CV Mirani Sb ColorCV Mirani Sb Color
CV Mirani Sb Color
 
1 sethi
1 sethi1 sethi
1 sethi
 
Pms presentation
Pms presentationPms presentation
Pms presentation
 
Tsps
TspsTsps
Tsps
 
15.PROJECT REPORT - UWSSRP1 - MASVINGO final draft
15.PROJECT REPORT - UWSSRP1 - MASVINGO final draft15.PROJECT REPORT - UWSSRP1 - MASVINGO final draft
15.PROJECT REPORT - UWSSRP1 - MASVINGO final draft
 
PPT CAVITY Tunnel P1 610M--05.02.2021.pptx
PPT CAVITY Tunnel P1 610M--05.02.2021.pptxPPT CAVITY Tunnel P1 610M--05.02.2021.pptx
PPT CAVITY Tunnel P1 610M--05.02.2021.pptx
 
Mahakali Bridge Project Presentation (2077 chaitra 11)
Mahakali Bridge Project Presentation (2077 chaitra 11)Mahakali Bridge Project Presentation (2077 chaitra 11)
Mahakali Bridge Project Presentation (2077 chaitra 11)
 

Mehr von Helmut Wannenmacher

Baulos SBT3.1: Bohr- und Injektionsarbeiten für den Schacht Sommerau 2
Baulos SBT3.1: Bohr- und Injektionsarbeiten für den Schacht Sommerau 2Baulos SBT3.1: Bohr- und Injektionsarbeiten für den Schacht Sommerau 2
Baulos SBT3.1: Bohr- und Injektionsarbeiten für den Schacht Sommerau 2Helmut Wannenmacher
 
Control of operational and technical aspects of grouting works in tunnelling ...
Control of operational and technical aspects of grouting works in tunnelling ...Control of operational and technical aspects of grouting works in tunnelling ...
Control of operational and technical aspects of grouting works in tunnelling ...Helmut Wannenmacher
 
Operational analyses of pressure tunnel and shaft grouting operations
Operational analyses of pressure tunnel  and shaft grouting operationsOperational analyses of pressure tunnel  and shaft grouting operations
Operational analyses of pressure tunnel and shaft grouting operationsHelmut Wannenmacher
 
LARGE TBM PROJECTS IN SWITZERLAND – EXPERIENCE AND STATE OF THE ART
LARGE TBM PROJECTS IN SWITZERLAND – EXPERIENCE AND STATE OF THE ARTLARGE TBM PROJECTS IN SWITZERLAND – EXPERIENCE AND STATE OF THE ART
LARGE TBM PROJECTS IN SWITZERLAND – EXPERIENCE AND STATE OF THE ARTHelmut Wannenmacher
 
Underground Excavation Behavior of the Queenston Formation
Underground Excavation Behavior of the Queenston FormationUnderground Excavation Behavior of the Queenston Formation
Underground Excavation Behavior of the Queenston FormationHelmut Wannenmacher
 
Aspects of pressure tunnel lining with special focus on pre-stressed pressure...
Aspects of pressure tunnel lining with special focus on pre-stressed pressure...Aspects of pressure tunnel lining with special focus on pre-stressed pressure...
Aspects of pressure tunnel lining with special focus on pre-stressed pressure...Helmut Wannenmacher
 
Der Einfluss von Gebirgsparametern auf die Penetration
Der Einfluss von Gebirgsparametern auf die Penetration Der Einfluss von Gebirgsparametern auf die Penetration
Der Einfluss von Gebirgsparametern auf die Penetration Helmut Wannenmacher
 
Challenges during Design and Construction of an Underground Chip Factory (Waf...
Challenges during Design and Construction of an Underground Chip Factory (Waf...Challenges during Design and Construction of an Underground Chip Factory (Waf...
Challenges during Design and Construction of an Underground Chip Factory (Waf...Helmut Wannenmacher
 
Unexpected performance and cost factors for hard rock TBM. Analyses of specif...
Unexpected performance and cost factors for hard rock TBM. Analyses of specif...Unexpected performance and cost factors for hard rock TBM. Analyses of specif...
Unexpected performance and cost factors for hard rock TBM. Analyses of specif...Helmut Wannenmacher
 
The Niagara Tunnel Facility Project
The Niagara Tunnel Facility ProjectThe Niagara Tunnel Facility Project
The Niagara Tunnel Facility ProjectHelmut Wannenmacher
 

Mehr von Helmut Wannenmacher (10)

Baulos SBT3.1: Bohr- und Injektionsarbeiten für den Schacht Sommerau 2
Baulos SBT3.1: Bohr- und Injektionsarbeiten für den Schacht Sommerau 2Baulos SBT3.1: Bohr- und Injektionsarbeiten für den Schacht Sommerau 2
Baulos SBT3.1: Bohr- und Injektionsarbeiten für den Schacht Sommerau 2
 
Control of operational and technical aspects of grouting works in tunnelling ...
Control of operational and technical aspects of grouting works in tunnelling ...Control of operational and technical aspects of grouting works in tunnelling ...
Control of operational and technical aspects of grouting works in tunnelling ...
 
Operational analyses of pressure tunnel and shaft grouting operations
Operational analyses of pressure tunnel  and shaft grouting operationsOperational analyses of pressure tunnel  and shaft grouting operations
Operational analyses of pressure tunnel and shaft grouting operations
 
LARGE TBM PROJECTS IN SWITZERLAND – EXPERIENCE AND STATE OF THE ART
LARGE TBM PROJECTS IN SWITZERLAND – EXPERIENCE AND STATE OF THE ARTLARGE TBM PROJECTS IN SWITZERLAND – EXPERIENCE AND STATE OF THE ART
LARGE TBM PROJECTS IN SWITZERLAND – EXPERIENCE AND STATE OF THE ART
 
Underground Excavation Behavior of the Queenston Formation
Underground Excavation Behavior of the Queenston FormationUnderground Excavation Behavior of the Queenston Formation
Underground Excavation Behavior of the Queenston Formation
 
Aspects of pressure tunnel lining with special focus on pre-stressed pressure...
Aspects of pressure tunnel lining with special focus on pre-stressed pressure...Aspects of pressure tunnel lining with special focus on pre-stressed pressure...
Aspects of pressure tunnel lining with special focus on pre-stressed pressure...
 
Der Einfluss von Gebirgsparametern auf die Penetration
Der Einfluss von Gebirgsparametern auf die Penetration Der Einfluss von Gebirgsparametern auf die Penetration
Der Einfluss von Gebirgsparametern auf die Penetration
 
Challenges during Design and Construction of an Underground Chip Factory (Waf...
Challenges during Design and Construction of an Underground Chip Factory (Waf...Challenges during Design and Construction of an Underground Chip Factory (Waf...
Challenges during Design and Construction of an Underground Chip Factory (Waf...
 
Unexpected performance and cost factors for hard rock TBM. Analyses of specif...
Unexpected performance and cost factors for hard rock TBM. Analyses of specif...Unexpected performance and cost factors for hard rock TBM. Analyses of specif...
Unexpected performance and cost factors for hard rock TBM. Analyses of specif...
 
The Niagara Tunnel Facility Project
The Niagara Tunnel Facility ProjectThe Niagara Tunnel Facility Project
The Niagara Tunnel Facility Project
 

Kürzlich hochgeladen

scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...HenryBriggs2
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadhamedmustafa094
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projectssmsksolar
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stageAbc194748
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 

Kürzlich hochgeladen (20)

scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stage
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 

Hydro 2016 wannenmacher