MRP
Supply Chain Management
Presentation
on
By:
Hassan Ali (11IN53)
Assigned by:
Dr. Anwaruddin Tanwri
Department of Industrial Engineering & Management
Mehran University of Engineering & Technology,
Jamshoro
Outline
MRP History
Introduction to MRP
Objectives of MRP
Inputs/Requirements to MRP
MRP Example
Benefits of MRP
Drawbacks of MRP
Industry Applications
History
 Till early1960’s reorder point (ROP) systems was
used by organizations.
 A predefined level of components is used to
Reorder.
 Not actually when needed.
 Results in high inventory.
 In late 1960’s several production and planning
software systems were made and MRP was one of
them.
Materials requirements planning (MRP)
 Computer-based information system for ordering and
scheduling of dependent demand inventories (such as
raw materials, component parts, and subassemblies
that will be used in the production of a finished
product).
 It is a production planning process that starts from the
demand for finished products (independent demand)
and plans the production step by step of
subassemblies and parts (dependent demand).
 MRP is a means for determining the number of parts,
components, and materials needed to produce a
product.
 MRP provides time scheduling information specifying
when each of the materials, parts, and components
should be ordered or produced.
Independent Demand v/s Dependent Demand
Independent Demand Dependent Demand
◦ Is the demand for
finished products.
◦ Does not depend on
the demand of other
products.
◦ Needs to be
forecasted.
◦ Is the demand derived
from finished products.
◦ Is the demand for
component parts based
on the number of end
items being produced
and is managed by the
MRP system.
Objectives of MRP
“getting the right materials to the right place at the right
time”.
Thus, MRP is designed to answer three questions:
◦ what is needed?
◦ how much is needed?
◦ and when is it needed?
◦ The art of balancing supply and demand is critical
to any organization.
◦ The MRP is a powerful planning tool that enables
organization to satisfy customer requirements,
while maintaining optimal inventory levels.
Overall View of the Inputs to a Standard MRP Program
and the Reports Generated by the Program
MR
P
Master
Productio
n
Schedule
Bill of
Materials
Inventory
Record
files
Main inputs/Requirements to MRP
Master Production Schedule
• The MPS is a time-phased plan of finished products
that will meet the demand on time, within the
organization’s capacity.
• The master production schedule expresses,
 What we intend to make?
 How much we intend to make?
 When we intend to make?
• The CP checks to make sure the scheduled work
load profile is feasible.
BOM (Bill of Materials)
• A list of subassemblies, components, and raw
materials, and their respective quantities required to
produce specific end items.
• The bill of Materials file contains the complete
product description, listing materials, parts, and
components but also the sequence in which the
product is created.
• The BOM file is often called the product structure
file or product tree because it shows how a product
is put together. It contains the information to identify
each item and the quantity used per unit of the item
of which it is a part.
BOM Example
A(2) B(1)
D(5)C(2)
X
C(3)
Inventory records file
• Computerized record-keeping system for the
inventory status of all subassemblies, components,
and raw materials.
• The MRP program accesses the status segment of
the file according to specific time periods. These
files are accessed as needed during the program
run.
Primary MRP Reports
• Planned orders to be released at a future time.
• Order release notices to execute the planned
orders.
• Cancellations or suspensions of open orders due to
cancellation or suspension of orders on the master
production schedule.
• Inventory status data.
Secondary MRP Reports
• Planning reports, for example, forecasting inventory
requirements over a period of time.
• Performance reports used to determine agreement
between actual and programmed usage and costs.
• Exception reports used to point out serious
discrepancies, such as late or overdue orders.
A(2) B(1)
D(5)C(2)
X
C(3)
Item On-Hand Lead Time (Weeks)
X 50 2
A 75 3
B 25 1
C 10 2
D 20 2
Requirements include 95 units (80 firm orders and 15
forecast) of X in week 10
MRP Example
A(2)
X
week 1 2 3 4 5 6 7 8 9 10
X Gross requirements 95
LT=2 Scheduled receipts
Proj. avail. balance 50 50 50 50 50 50 50 50 50 50
On- Net requirements 45
hand Planned order receipt 45
50 Planner order release 45
A Gross requirements 90
LT=3 Scheduled receipts
Proj. avail. balance 75 75 75 75 75 75 75 75
On- Net requirements 15
hand Planned order receipt 15
75 Planner order release 15
B Gross requirements 45
LT=1 Scheduled receipts
Proj. avail. balance 25 25 25 25 25 25 25 25
On- Net requirements 20
hand Planned order receipt 20
25 Planner order release 20
C Gross requirements 45 40
LT=2 Scheduled receipts
Proj. avail. balance 10 10 10 10 10
On- Net requirements 35 40
hand Planned order receipt 35 40
10 Planner order release 35 40
D Gross requirements 100
LT=2 Scheduled receipts
Proj. avail. balance 20 20 20 20 20 20 20
On- Net requirements 80
hand Planned order receipt 80
20 Planner order release 80
It takes 2
A’s for
each X
Day: 1 2 3 4 5 6 7 8 9 10
X Gross requirements 95
LT=2 Scheduled receipts
Proj. avail. balance 50 50 50 50 50 50 50 50 50 50
On- Net requirements 45
hand Planned order receipt 45
50 Planner order release 45
A Gross requirements 90
LT=3 Scheduled receipts
Proj. avail. balance 75 75 75 75 75 75 75 75
On- Net requirements 15
hand Planned order receipt 15
75 Planner order release 15
B Gross requirements 45
LT=1 Scheduled receipts
Proj. avail. balance 25 25 25 25 25 25 25 25
On- Net requirements 20
hand Planned order receipt 20
25 Planner order release 20
C Gross requirements 45 40
LT=2 Scheduled receipts
Proj. avail. balance 10 10 10 10 10
On- Net requirements 35 40
hand Planned order receipt 35 40
10 Planner order release 35 40
D Gross requirements 100
LT=2 Scheduled receipts
Proj. avail. balance 20 20 20 20 20 20 20
On- Net requirements 80
hand Planned order receipt 80
20 Planner order release 80
B(1)A(2)
X
It takes 1
B for each
X
A(2) B(1)
X
C(3)
Day: 1 2 3 4 5 6 7 8 9 10
X Gross requirements 95
LT=2 Scheduled receipts
Proj. avail. balance 50 50 50 50 50 50 50 50 50 50
On- Net requirements 45
hand Planned order receipt 45
50 Planner order release 45
A Gross requirements 90
LT=3 Scheduled receipts
Proj. avail. balance 75 75 75 75 75 75 75 75
On- Net requirements 15
hand Planned order receipt 15
75 Planner order release 15
B Gross requirements 45
LT=1 Scheduled receipts
Proj. avail. balance 25 25 25 25 25 25 25 25
On- Net requirements 20
hand Planned order receipt 20
25 Planner order release 20
C Gross requirements 45 40
LT=2 Scheduled receipts
Proj. avail. balance 10 10 10 10 10
On- Net requirements 35 40
hand Planned order receipt 35 40
10 Planner order release 35 40
D Gross requirements 100
LT=2 Scheduled receipts
Proj. avail. balance 20 20 20 20 20 20 20
On- Net requirements 80
hand Planned order receipt 80
20 Planner order release 80
It takes 3 C’s
for each A
A(2) B(1)
C(2)
X
C(3)
Day: 1 2 3 4 5 6 7 8 9 10
X Gross requirements 95
LT=2 Scheduled receipts
Proj. avail. balance 50 50 50 50 50 50 50 50 50 50
On- Net requirements 45
hand Planned order receipt 45
50 Planner order release 45
A Gross requirements 90
LT=3 Scheduled receipts
Proj. avail. balance 75 75 75 75 75 75 75 75
On- Net requirements 15
hand Planned order receipt 15
75 Planner order release 15
B Gross requirements 45
LT=1 Scheduled receipts
Proj. avail. balance 25 25 25 25 25 25 25 25
On- Net requirements 20
hand Planned order receipt 20
25 Planner order release 20
C Gross requirements 45 40
LT=2 Scheduled receipts
Proj. avail. balance 10 10 10 10 10
On- Net requirements 35 40
hand Planned order receipt 35 40
10 Planner order release 35 40
D Gross requirements 100
LT=2 Scheduled receipts
Proj. avail. balance 20 20 20 20 20 20 20
On- Net requirements 80
hand Planned order receipt 80
20 Planner order release 80
It takes 2
C’s for
each B
A(2) B(1)
D(5)C(2)
X
C(3)
Day: 1 2 3 4 5 6 7 8 9 10
X Gross requirements 95
LT=2 Scheduled receipts
Proj. avail. balance 50 50 50 50 50 50 50 50 50 50
On- Net requirements 45
hand Planned order receipt 45
50 Planner order release 45
A Gross requirements 90
LT=3 Scheduled receipts
Proj. avail. balance 75 75 75 75 75 75 75 75
On- Net requirements 15
hand Planned order receipt 15
75 Planner order release 15
B Gross requirements 45
LT=1 Scheduled receipts
Proj. avail. balance 25 25 25 25 25 25 25 25
On- Net requirements 20
hand Planned order receipt 20
25 Planner order release 20
C Gross requirements 45 40
LT=2 Scheduled receipts
Proj. avail. balance 10 10 10 10 10
On- Net requirements 35 40
hand Planned order receipt 35 40
10 Planner order release 35 40
D Gross requirements 100
LT=2 Scheduled receipts
Proj. avail. balance 20 20 20 20 20 20 20
On- Net requirements 80
hand Planned order receipt 80
20 Planner order release 80
It takes 5 D’s
for each B
MRP 21
Safety stocks in MRP systems
 Need for safety stocks:
 Variations in demand due to end-item forecast
errors and inventory errors
 Variations in supply – both lead-times and
quantities
 Since demand is not random, traditional statistical
techniques do not apply.
 Options to provide safety factors:
 Fixed quantity buffer stocks
 Safety lead-time
 Increase gross requirements
MRP 22
Safety stocks in MRP systems (cont.)
 Fixed quantity buffer stocks
 Good rule of thumb: Set buffer = max. demand likely
in a single period
 Never generate order solely to replenish buffer
stocks
 Safety time method
 Simply order early
 Distorts LTs and priorities
 Better than buffer stocks for items with infrequent
demand
 Also better for purchases outside company
 Increase in gross requirements
 Should be done at end item level only so that
 Components available in matched sets
 Safety stocks are not duplicated at different levels
Benefits of MRP
 To minimize inventory levels.
 To minimize the associated carrying costs.
 Track material requirements.
 Compute quantities needed as safety stock.
 Allocate production time among various
products.
 Plan for future capacity needs.
 More competitive pricing.
 Lower selling price.
 Improved customer service.
 Faster response to market demands.
 Increased flexibility to change the master
schedule.
 Reduced setup and tear-down costs.
 Reduced idle time.
Drawbacks Of MRP
 It relies upon accurate input information.
 Wrong inputs may results in missing parts and
excessive order quantities.
 It is time consuming.
 It is costly to implement
Industry Application and Expected Results
MRP

More Related Content

What's hot

Mrp and lot sizing techniques
Mrp and lot sizing techniquesMrp and lot sizing techniques
Mrp and lot sizing techniques
Anand Ellur
 
Om lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_sies
Om lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_siesOm lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_sies
Om lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_sies
videoaakash15
 
Mrp systems & scheduling
Mrp systems & schedulingMrp systems & scheduling
Mrp systems & scheduling
varun0610
 

What's hot (20)

Material Requirement Planning (MRP)
Material Requirement Planning (MRP)Material Requirement Planning (MRP)
Material Requirement Planning (MRP)
 
SAP ATP check for Sales Order
SAP ATP check for Sales OrderSAP ATP check for Sales Order
SAP ATP check for Sales Order
 
Mrp 1
Mrp 1Mrp 1
Mrp 1
 
MATERIAL REQUIREMENTS PLANNING (MRP)
MATERIAL REQUIREMENTS PLANNING (MRP)MATERIAL REQUIREMENTS PLANNING (MRP)
MATERIAL REQUIREMENTS PLANNING (MRP)
 
Planned order release
Planned order releasePlanned order release
Planned order release
 
Prerequisites of ppc
Prerequisites of ppcPrerequisites of ppc
Prerequisites of ppc
 
Lorraine Centeno 04192015
Lorraine Centeno 04192015Lorraine Centeno 04192015
Lorraine Centeno 04192015
 
Ch07
Ch07Ch07
Ch07
 
Material requirement planning - Production and Operation Management
Material requirement planning - Production and Operation ManagementMaterial requirement planning - Production and Operation Management
Material requirement planning - Production and Operation Management
 
Mrp structure
Mrp structureMrp structure
Mrp structure
 
Autoparts234
Autoparts234Autoparts234
Autoparts234
 
Mrp and lot sizing techniques
Mrp and lot sizing techniquesMrp and lot sizing techniques
Mrp and lot sizing techniques
 
Om lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_sies
Om lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_siesOm lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_sies
Om lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_sies
 
Mrp systems & scheduling
Mrp systems & schedulingMrp systems & scheduling
Mrp systems & scheduling
 
Doing More With Less
Doing More With LessDoing More With Less
Doing More With Less
 
Scps -materials_requirements_planning
Scps  -materials_requirements_planningScps  -materials_requirements_planning
Scps -materials_requirements_planning
 
Sap pp org
Sap pp orgSap pp org
Sap pp org
 
A Simple Case Study of Material Requirement Planning
A Simple Case Study of Material Requirement PlanningA Simple Case Study of Material Requirement Planning
A Simple Case Study of Material Requirement Planning
 
Amir Nabil Abdo C.V
Amir Nabil Abdo C.VAmir Nabil Abdo C.V
Amir Nabil Abdo C.V
 
MRP
MRPMRP
MRP
 

Viewers also liked (7)

4. materials requirement planning
4. materials requirement planning4. materials requirement planning
4. materials requirement planning
 
Materials requirements planning
Materials requirements planningMaterials requirements planning
Materials requirements planning
 
MRP
MRPMRP
MRP
 
Inventory management
Inventory managementInventory management
Inventory management
 
Inventory Control Final Ppt
Inventory Control Final PptInventory Control Final Ppt
Inventory Control Final Ppt
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentation
 
Inventory planning & control
Inventory planning & controlInventory planning & control
Inventory planning & control
 

Similar to MRP

Operations Management Material Requirements Planning (MRP)
Operations ManagementMaterial Requirements Planning (MRP)Operations ManagementMaterial Requirements Planning (MRP)
Operations Management Material Requirements Planning (MRP)
Mostafa Ewees
 
Module11. Material requirement plan..pdf
Module11. Material requirement plan..pdfModule11. Material requirement plan..pdf
Module11. Material requirement plan..pdf
JOHN PAUL ROBERTO
 
Mrp 1 deepak 12mt07ind009
Mrp 1 deepak 12mt07ind009Mrp 1 deepak 12mt07ind009
Mrp 1 deepak 12mt07ind009
Akash Maurya
 
manufacturing resource planning
manufacturing resource planningmanufacturing resource planning
manufacturing resource planning
Dinesh Nikam
 
System Kaizen Approach May 2015
System Kaizen Approach May 2015System Kaizen Approach May 2015
System Kaizen Approach May 2015
exerciselean
 

Similar to MRP (20)

5089529.ppt
5089529.ppt5089529.ppt
5089529.ppt
 
Operations Management Material Requirements Planning (MRP)
Operations ManagementMaterial Requirements Planning (MRP)Operations ManagementMaterial Requirements Planning (MRP)
Operations Management Material Requirements Planning (MRP)
 
MRP in English
MRP in EnglishMRP in English
MRP in English
 
Module11. Material requirement plan..pdf
Module11. Material requirement plan..pdfModule11. Material requirement plan..pdf
Module11. Material requirement plan..pdf
 
MRP and ERP
MRP and ERPMRP and ERP
MRP and ERP
 
Mrp
MrpMrp
Mrp
 
Mrp
MrpMrp
Mrp
 
Chapter 5_OM
Chapter 5_OMChapter 5_OM
Chapter 5_OM
 
Material requirements planning & erp ppt @ bec doms
Material requirements planning & erp  ppt @ bec domsMaterial requirements planning & erp  ppt @ bec doms
Material requirements planning & erp ppt @ bec doms
 
Mrp 1 deepak 12mt07ind009
Mrp 1 deepak 12mt07ind009Mrp 1 deepak 12mt07ind009
Mrp 1 deepak 12mt07ind009
 
Resource Requirement Planning
Resource Requirement PlanningResource Requirement Planning
Resource Requirement Planning
 
Mrpmep
MrpmepMrpmep
Mrpmep
 
Managing productions across Supply Chain
Managing productions across Supply ChainManaging productions across Supply Chain
Managing productions across Supply Chain
 
manufacturing resource planning
manufacturing resource planningmanufacturing resource planning
manufacturing resource planning
 
Heizer 14
Heizer 14Heizer 14
Heizer 14
 
5 MRP.ppt
5 MRP.ppt5 MRP.ppt
5 MRP.ppt
 
5 MRP.ppt
5 MRP.ppt5 MRP.ppt
5 MRP.ppt
 
Demand Flow Technology workshop - Lean manufacturing
Demand Flow Technology workshop - Lean manufacturingDemand Flow Technology workshop - Lean manufacturing
Demand Flow Technology workshop - Lean manufacturing
 
System Kaizen Approach May 2015
System Kaizen Approach May 2015System Kaizen Approach May 2015
System Kaizen Approach May 2015
 
Logistics management 3 Production Management MRP
Logistics management 3  Production Management MRPLogistics management 3  Production Management MRP
Logistics management 3 Production Management MRP
 

Recently uploaded

FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 

Recently uploaded (20)

FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 

MRP

  • 1. MRP Supply Chain Management Presentation on By: Hassan Ali (11IN53) Assigned by: Dr. Anwaruddin Tanwri Department of Industrial Engineering & Management Mehran University of Engineering & Technology, Jamshoro
  • 2. Outline MRP History Introduction to MRP Objectives of MRP Inputs/Requirements to MRP MRP Example Benefits of MRP Drawbacks of MRP Industry Applications
  • 3. History  Till early1960’s reorder point (ROP) systems was used by organizations.  A predefined level of components is used to Reorder.  Not actually when needed.  Results in high inventory.  In late 1960’s several production and planning software systems were made and MRP was one of them.
  • 4. Materials requirements planning (MRP)  Computer-based information system for ordering and scheduling of dependent demand inventories (such as raw materials, component parts, and subassemblies that will be used in the production of a finished product).  It is a production planning process that starts from the demand for finished products (independent demand) and plans the production step by step of subassemblies and parts (dependent demand).  MRP is a means for determining the number of parts, components, and materials needed to produce a product.  MRP provides time scheduling information specifying when each of the materials, parts, and components should be ordered or produced.
  • 5. Independent Demand v/s Dependent Demand Independent Demand Dependent Demand ◦ Is the demand for finished products. ◦ Does not depend on the demand of other products. ◦ Needs to be forecasted. ◦ Is the demand derived from finished products. ◦ Is the demand for component parts based on the number of end items being produced and is managed by the MRP system.
  • 6. Objectives of MRP “getting the right materials to the right place at the right time”. Thus, MRP is designed to answer three questions: ◦ what is needed? ◦ how much is needed? ◦ and when is it needed? ◦ The art of balancing supply and demand is critical to any organization. ◦ The MRP is a powerful planning tool that enables organization to satisfy customer requirements, while maintaining optimal inventory levels.
  • 7. Overall View of the Inputs to a Standard MRP Program and the Reports Generated by the Program
  • 9. Master Production Schedule • The MPS is a time-phased plan of finished products that will meet the demand on time, within the organization’s capacity. • The master production schedule expresses,  What we intend to make?  How much we intend to make?  When we intend to make? • The CP checks to make sure the scheduled work load profile is feasible.
  • 10. BOM (Bill of Materials) • A list of subassemblies, components, and raw materials, and their respective quantities required to produce specific end items. • The bill of Materials file contains the complete product description, listing materials, parts, and components but also the sequence in which the product is created. • The BOM file is often called the product structure file or product tree because it shows how a product is put together. It contains the information to identify each item and the quantity used per unit of the item of which it is a part.
  • 12. Inventory records file • Computerized record-keeping system for the inventory status of all subassemblies, components, and raw materials. • The MRP program accesses the status segment of the file according to specific time periods. These files are accessed as needed during the program run.
  • 13. Primary MRP Reports • Planned orders to be released at a future time. • Order release notices to execute the planned orders. • Cancellations or suspensions of open orders due to cancellation or suspension of orders on the master production schedule. • Inventory status data.
  • 14. Secondary MRP Reports • Planning reports, for example, forecasting inventory requirements over a period of time. • Performance reports used to determine agreement between actual and programmed usage and costs. • Exception reports used to point out serious discrepancies, such as late or overdue orders.
  • 15. A(2) B(1) D(5)C(2) X C(3) Item On-Hand Lead Time (Weeks) X 50 2 A 75 3 B 25 1 C 10 2 D 20 2 Requirements include 95 units (80 firm orders and 15 forecast) of X in week 10 MRP Example
  • 16. A(2) X week 1 2 3 4 5 6 7 8 9 10 X Gross requirements 95 LT=2 Scheduled receipts Proj. avail. balance 50 50 50 50 50 50 50 50 50 50 On- Net requirements 45 hand Planned order receipt 45 50 Planner order release 45 A Gross requirements 90 LT=3 Scheduled receipts Proj. avail. balance 75 75 75 75 75 75 75 75 On- Net requirements 15 hand Planned order receipt 15 75 Planner order release 15 B Gross requirements 45 LT=1 Scheduled receipts Proj. avail. balance 25 25 25 25 25 25 25 25 On- Net requirements 20 hand Planned order receipt 20 25 Planner order release 20 C Gross requirements 45 40 LT=2 Scheduled receipts Proj. avail. balance 10 10 10 10 10 On- Net requirements 35 40 hand Planned order receipt 35 40 10 Planner order release 35 40 D Gross requirements 100 LT=2 Scheduled receipts Proj. avail. balance 20 20 20 20 20 20 20 On- Net requirements 80 hand Planned order receipt 80 20 Planner order release 80 It takes 2 A’s for each X
  • 17. Day: 1 2 3 4 5 6 7 8 9 10 X Gross requirements 95 LT=2 Scheduled receipts Proj. avail. balance 50 50 50 50 50 50 50 50 50 50 On- Net requirements 45 hand Planned order receipt 45 50 Planner order release 45 A Gross requirements 90 LT=3 Scheduled receipts Proj. avail. balance 75 75 75 75 75 75 75 75 On- Net requirements 15 hand Planned order receipt 15 75 Planner order release 15 B Gross requirements 45 LT=1 Scheduled receipts Proj. avail. balance 25 25 25 25 25 25 25 25 On- Net requirements 20 hand Planned order receipt 20 25 Planner order release 20 C Gross requirements 45 40 LT=2 Scheduled receipts Proj. avail. balance 10 10 10 10 10 On- Net requirements 35 40 hand Planned order receipt 35 40 10 Planner order release 35 40 D Gross requirements 100 LT=2 Scheduled receipts Proj. avail. balance 20 20 20 20 20 20 20 On- Net requirements 80 hand Planned order receipt 80 20 Planner order release 80 B(1)A(2) X It takes 1 B for each X
  • 18. A(2) B(1) X C(3) Day: 1 2 3 4 5 6 7 8 9 10 X Gross requirements 95 LT=2 Scheduled receipts Proj. avail. balance 50 50 50 50 50 50 50 50 50 50 On- Net requirements 45 hand Planned order receipt 45 50 Planner order release 45 A Gross requirements 90 LT=3 Scheduled receipts Proj. avail. balance 75 75 75 75 75 75 75 75 On- Net requirements 15 hand Planned order receipt 15 75 Planner order release 15 B Gross requirements 45 LT=1 Scheduled receipts Proj. avail. balance 25 25 25 25 25 25 25 25 On- Net requirements 20 hand Planned order receipt 20 25 Planner order release 20 C Gross requirements 45 40 LT=2 Scheduled receipts Proj. avail. balance 10 10 10 10 10 On- Net requirements 35 40 hand Planned order receipt 35 40 10 Planner order release 35 40 D Gross requirements 100 LT=2 Scheduled receipts Proj. avail. balance 20 20 20 20 20 20 20 On- Net requirements 80 hand Planned order receipt 80 20 Planner order release 80 It takes 3 C’s for each A
  • 19. A(2) B(1) C(2) X C(3) Day: 1 2 3 4 5 6 7 8 9 10 X Gross requirements 95 LT=2 Scheduled receipts Proj. avail. balance 50 50 50 50 50 50 50 50 50 50 On- Net requirements 45 hand Planned order receipt 45 50 Planner order release 45 A Gross requirements 90 LT=3 Scheduled receipts Proj. avail. balance 75 75 75 75 75 75 75 75 On- Net requirements 15 hand Planned order receipt 15 75 Planner order release 15 B Gross requirements 45 LT=1 Scheduled receipts Proj. avail. balance 25 25 25 25 25 25 25 25 On- Net requirements 20 hand Planned order receipt 20 25 Planner order release 20 C Gross requirements 45 40 LT=2 Scheduled receipts Proj. avail. balance 10 10 10 10 10 On- Net requirements 35 40 hand Planned order receipt 35 40 10 Planner order release 35 40 D Gross requirements 100 LT=2 Scheduled receipts Proj. avail. balance 20 20 20 20 20 20 20 On- Net requirements 80 hand Planned order receipt 80 20 Planner order release 80 It takes 2 C’s for each B
  • 20. A(2) B(1) D(5)C(2) X C(3) Day: 1 2 3 4 5 6 7 8 9 10 X Gross requirements 95 LT=2 Scheduled receipts Proj. avail. balance 50 50 50 50 50 50 50 50 50 50 On- Net requirements 45 hand Planned order receipt 45 50 Planner order release 45 A Gross requirements 90 LT=3 Scheduled receipts Proj. avail. balance 75 75 75 75 75 75 75 75 On- Net requirements 15 hand Planned order receipt 15 75 Planner order release 15 B Gross requirements 45 LT=1 Scheduled receipts Proj. avail. balance 25 25 25 25 25 25 25 25 On- Net requirements 20 hand Planned order receipt 20 25 Planner order release 20 C Gross requirements 45 40 LT=2 Scheduled receipts Proj. avail. balance 10 10 10 10 10 On- Net requirements 35 40 hand Planned order receipt 35 40 10 Planner order release 35 40 D Gross requirements 100 LT=2 Scheduled receipts Proj. avail. balance 20 20 20 20 20 20 20 On- Net requirements 80 hand Planned order receipt 80 20 Planner order release 80 It takes 5 D’s for each B
  • 21. MRP 21 Safety stocks in MRP systems  Need for safety stocks:  Variations in demand due to end-item forecast errors and inventory errors  Variations in supply – both lead-times and quantities  Since demand is not random, traditional statistical techniques do not apply.  Options to provide safety factors:  Fixed quantity buffer stocks  Safety lead-time  Increase gross requirements
  • 22. MRP 22 Safety stocks in MRP systems (cont.)  Fixed quantity buffer stocks  Good rule of thumb: Set buffer = max. demand likely in a single period  Never generate order solely to replenish buffer stocks  Safety time method  Simply order early  Distorts LTs and priorities  Better than buffer stocks for items with infrequent demand  Also better for purchases outside company  Increase in gross requirements  Should be done at end item level only so that  Components available in matched sets  Safety stocks are not duplicated at different levels
  • 23. Benefits of MRP  To minimize inventory levels.  To minimize the associated carrying costs.  Track material requirements.  Compute quantities needed as safety stock.  Allocate production time among various products.  Plan for future capacity needs.  More competitive pricing.  Lower selling price.  Improved customer service.  Faster response to market demands.  Increased flexibility to change the master schedule.  Reduced setup and tear-down costs.  Reduced idle time.
  • 24. Drawbacks Of MRP  It relies upon accurate input information.  Wrong inputs may results in missing parts and excessive order quantities.  It is time consuming.  It is costly to implement
  • 25. Industry Application and Expected Results