City of ToledoBennett Area Sanitary & Storm Sewer System Evaluation Project Public Meeting February 8, 2006
Bennett Area Sanitary & Storm Sewer Evaluation Project Purpose of the Project Part of On-Going Sewer Work Regulated by Ohio Environmental Protective Agency and U.S.EPA Eliminate Sanitary Sewer Overflows to Environment Reduce Basement Back-Ups Maintain Sewer System Infrastructure Area Recommended by Previous Flow Monitoring Study
Bennett Area Sanitary & Storm Sewer Evaluation Project 1999 City Wide Sewer Flow Monitoring Study 50 Flow Meters Installed Through the City Prioritized Worst Areas with Inflow/Infiltration Problems Bennett Road Area is the 4th Project Previous Projects Point Place Area Parkside Area River Road Area
Bennett Area Sanitary & Storm Sewer Evaluation Project Project Area Map
Bennett Area Sanitary & Storm Sewer Evaluation Project Study Area Has Both Combined Sewer and Separate Sewer Areas
Bennett Area Sanitary & Storm Sewer Evaluation Project Project Schedule Project Began on December 1, 2005 Field Work Beginning February 2006 and Continue to December 2006 Draft Report Due to City on March 1, 2007
Bennett Area Sanitary & Storm Sewer Evaluation Project Project Description Public Information Program and Questionnaire Flow Monitoring Sanitary Manhole, Storm Manhole and Catch Basin Inspection Smoke and Dye Testing Sump Pump Monitoring Closed Circuit Television Inspection (CCTV) and Cleaning Hydraulic Modeling of Storm and Sanitary Sewers Report
Bennett Area Sanitary & Storm Sewer Evaluation Project Public Information Program and Questionnaires Public Meetings Informational Fliers Questionnaires Door Hangers for Smoke Testing Project Hotline Number is 1-800-862-1450
Bennett Area Sanitary & Storm Sewer Evaluation Project Flow Monitoring 12 Flow Monitors 4 Rain Gauges 3 Month Period
Bennett Area Sanitary & Storm Sewer Evaluation Project Sanitary Manhole, Storm Manhole and Catch Basin Inspection Inspect and Photograph all Storm and Sanitary Structures Update City Database Develop Geodatabase for Storm Sewer
Bennett Area Sanitary & Storm Sewer Evaluation Project SmokeTesting Notification Process Residential Door Hanger Notices Daily Police/Fire Departments Designated City Contact Testing Uses Blowers to Introduce Smoke into the Sewer System Document Areas Where Smoke Escapes
Bennett Area Sanitary & Storm Sewer Evaluation Project SmokeTesting Smoke Test Entire Study Area
Bennett Area Sanitary & Storm Sewer Evaluation Project Examples of Expected Smoke Testing Results Smoke Emitting from Downspouts, Area Drains, Catch Basins, Lawn Areas, Near House Foundations Field Staff will be walking in rear yards Smoke Blower on Manholes (possibly in rear yards)
Bennett Area Sanitary & Storm Sewer Evaluation Project Smoke Testing Procedure
Bennett Area Sanitary & Storm Sewer Evaluation Project Residential Dye Testing Procedure
Bennett Area Sanitary & Storm Sewer Evaluation Project Dye Testing Catch Basins Dye Test All Catch Basins in Study Area Dye may be seen in streams and creeks
Bennett Area Sanitary & Storm Sewer Evaluation Project Sump Pump Monitoring Install Event Recorders 	at 6 to 8 Homes Coordinate with 	Rain Gauges Houses selected by Public (Questionnaires)
Bennett Area Sanitary & Storm Sewer Evaluation Project Sanitary and Storm Sewer Cleaning and Inspection Clean and Inspect All Sanitary and Storm Sewers
Bennett Area Sanitary & Storm Sewer Evaluation Project Hydraulic Modeling of Sanitary and Storm Sewer System Computer Modeling of both Storm and Sanitary Sewer System Surveying of Storm Sewer Manhole Lids
Bennett Area Sanitary & Storm Sewer Evaluation Project Report Report of Findings Submitted to City City to Report Findings to USEPA/OEPA Report Will Make Suggestions to Improve Sanitary Sewer System Operations Recommendations May Include: Sewer Rehabilitation Sewer Separation Relief Sewers Pump Stations Remove Downspouts
Bennett Area Sanitary & Storm Sewer Evaluation Project Project Issues Work in Backyards Where Manholes are Located Work Vehicles (Trucks) in Streets Traffic Disruption Field Crews Working on Both Public and Private Property Communication Addressing Sewer Problems
Bennett Area Sanitary & Storm Sewer Evaluation Project Field Staff and Work Area Identification All Field Staff will have Project Identification Cards All Field Staff will use Proper Traffic/Safety Cones All Field Staff will wear Florescent Safety Vests at All Times
Bennett Area Sanitary & Storm Sewer Evaluation Project Project Contacts Project Hotline  Phone Number is 1800-862-1450 Recording- Leave your name and number and someone will return your call CLIC (City Line Information Center) Phone Number is 1-419-240-1000
Bennett Area Sanitary & Storm Sewer Evaluation Project Questions ? Thank You for Coming and Participating in this Important City of Toledo Division of Engineering Project!

Weitere ähnliche Inhalte

Andere mochten auch

Great Passage Storm Sewer Improvement Project
Great Passage Storm Sewer Improvement ProjectGreat Passage Storm Sewer Improvement Project
Great Passage Storm Sewer Improvement ProjectFairfax County
 
Storm drain markers
Storm drain markersStorm drain markers
Storm drain markerskkopchick
 
PLAN PARCIAL DE DESARROLLO URBANO DISTRITO 10
PLAN PARCIAL DE DESARROLLO URBANO DISTRITO 10PLAN PARCIAL DE DESARROLLO URBANO DISTRITO 10
PLAN PARCIAL DE DESARROLLO URBANO DISTRITO 10Octaviano Figueroa
 
Webinar: Storm Sewer & Culvert Solutions: Applications & Best Practices
Webinar: Storm Sewer & Culvert Solutions: Applications & Best PracticesWebinar: Storm Sewer & Culvert Solutions: Applications & Best Practices
Webinar: Storm Sewer & Culvert Solutions: Applications & Best PracticesCommunications Branding
 
TMSAMS-Final Public Meeting Presentation: 10-4-2011
TMSAMS-Final Public Meeting Presentation: 10-4-2011TMSAMS-Final Public Meeting Presentation: 10-4-2011
TMSAMS-Final Public Meeting Presentation: 10-4-2011Fairfax County
 
Clogged storm drains are contributing to street flooding in Miami Beach
Clogged storm drains are contributing to street flooding in Miami BeachClogged storm drains are contributing to street flooding in Miami Beach
Clogged storm drains are contributing to street flooding in Miami BeachVolunteerCleanup.Org
 
Stormwater BMPs
Stormwater BMPsStormwater BMPs
Stormwater BMPsMario Cruz
 
Marketing Public Health Through Social Media
Marketing Public Health Through Social MediaMarketing Public Health Through Social Media
Marketing Public Health Through Social MediaAngela Connor
 
San Elijo Hills Drainage Diversion storm drain line ‘n’ 1
San Elijo Hills Drainage Diversion storm drain line ‘n’  1San Elijo Hills Drainage Diversion storm drain line ‘n’  1
San Elijo Hills Drainage Diversion storm drain line ‘n’ 1talerco
 
Stormwater management presentation slides
Stormwater management presentation slidesStormwater management presentation slides
Stormwater management presentation slidesDoreen Yeo
 

Andere mochten auch (16)

Great Passage Storm Sewer Improvement Project
Great Passage Storm Sewer Improvement ProjectGreat Passage Storm Sewer Improvement Project
Great Passage Storm Sewer Improvement Project
 
Storm drain markers
Storm drain markersStorm drain markers
Storm drain markers
 
PLAN PARCIAL DE DESARROLLO URBANO DISTRITO 10
PLAN PARCIAL DE DESARROLLO URBANO DISTRITO 10PLAN PARCIAL DE DESARROLLO URBANO DISTRITO 10
PLAN PARCIAL DE DESARROLLO URBANO DISTRITO 10
 
Webinar: Storm Sewer & Culvert Solutions: Applications & Best Practices
Webinar: Storm Sewer & Culvert Solutions: Applications & Best PracticesWebinar: Storm Sewer & Culvert Solutions: Applications & Best Practices
Webinar: Storm Sewer & Culvert Solutions: Applications & Best Practices
 
TMSAMS-Final Public Meeting Presentation: 10-4-2011
TMSAMS-Final Public Meeting Presentation: 10-4-2011TMSAMS-Final Public Meeting Presentation: 10-4-2011
TMSAMS-Final Public Meeting Presentation: 10-4-2011
 
Clogged storm drains are contributing to street flooding in Miami Beach
Clogged storm drains are contributing to street flooding in Miami BeachClogged storm drains are contributing to street flooding in Miami Beach
Clogged storm drains are contributing to street flooding in Miami Beach
 
How Stormwater Treatment Trains Work
How Stormwater Treatment Trains WorkHow Stormwater Treatment Trains Work
How Stormwater Treatment Trains Work
 
StormCon 2014
StormCon 2014StormCon 2014
StormCon 2014
 
Stormwater BMPs
Stormwater BMPsStormwater BMPs
Stormwater BMPs
 
Marketing Public Health Through Social Media
Marketing Public Health Through Social MediaMarketing Public Health Through Social Media
Marketing Public Health Through Social Media
 
Rehabilitación eng1 02
Rehabilitación eng1 02Rehabilitación eng1 02
Rehabilitación eng1 02
 
San Elijo Hills Drainage Diversion storm drain line ‘n’ 1
San Elijo Hills Drainage Diversion storm drain line ‘n’  1San Elijo Hills Drainage Diversion storm drain line ‘n’  1
San Elijo Hills Drainage Diversion storm drain line ‘n’ 1
 
L 5and l-6 sewer design
L 5and l-6 sewer designL 5and l-6 sewer design
L 5and l-6 sewer design
 
Stormwater management presentation slides
Stormwater management presentation slidesStormwater management presentation slides
Stormwater management presentation slides
 
Sewerage System
Sewerage SystemSewerage System
Sewerage System
 
Storm water drainage
Storm water drainageStorm water drainage
Storm water drainage
 

Ähnlich wie SSES Bennett Area 2-8-06

City Council August 2, 2011 Stormwater-Street Sweeping Presentation
City Council August 2, 2011 Stormwater-Street Sweeping PresentationCity Council August 2, 2011 Stormwater-Street Sweeping Presentation
City Council August 2, 2011 Stormwater-Street Sweeping PresentationCity of San Angelo Texas
 
Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017Crosstown TO
 
Eia of township and area development projects
Eia of township and area development projectsEia of township and area development projects
Eia of township and area development projectsSandeep Kumar
 
Three County Fairgrounds Stormwater Drainage Report 11-03-2010
Three County Fairgrounds Stormwater Drainage Report 11-03-2010Three County Fairgrounds Stormwater Drainage Report 11-03-2010
Three County Fairgrounds Stormwater Drainage Report 11-03-2010Adam Cohen
 
MASEFinalReport (2)
MASEFinalReport (2)MASEFinalReport (2)
MASEFinalReport (2)Sunil Satish
 
Torrey pines road corridor study final
Torrey pines road corridor study finalTorrey pines road corridor study final
Torrey pines road corridor study finalkday1
 
2011HSTS contractor meeting (Van Wert)
2011HSTS contractor meeting (Van Wert)2011HSTS contractor meeting (Van Wert)
2011HSTS contractor meeting (Van Wert)Jason Menchhofer
 
Richland co. installer mtg. 12 10-10
Richland co. installer mtg. 12 10-10Richland co. installer mtg. 12 10-10
Richland co. installer mtg. 12 10-10Jason Menchhofer
 
Landfill Compliance Monitoring: Achieving Long Term Efficiency
Landfill Compliance Monitoring: Achieving Long Term EfficiencyLandfill Compliance Monitoring: Achieving Long Term Efficiency
Landfill Compliance Monitoring: Achieving Long Term EfficiencyHydroTerra Pty Ltd
 
CPAC Meeting 4-18-06
CPAC Meeting 4-18-06CPAC Meeting 4-18-06
CPAC Meeting 4-18-06HartTWI
 
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...The Piedmont Environmental Council
 
Hayfield Road Pipe Conveyance System January 2021
Hayfield Road Pipe Conveyance System January 2021Hayfield Road Pipe Conveyance System January 2021
Hayfield Road Pipe Conveyance System January 2021Fairfax County
 
Lectre 1- Real INTRO and SEWER DESIGFN.pptx
Lectre 1- Real INTRO and SEWER DESIGFN.pptxLectre 1- Real INTRO and SEWER DESIGFN.pptx
Lectre 1- Real INTRO and SEWER DESIGFN.pptxAsnelTiffa
 
Hydrology and hydraulics for design design
Hydrology and hydraulics for design designHydrology and hydraulics for design design
Hydrology and hydraulics for design designavirup naskar
 

Ähnlich wie SSES Bennett Area 2-8-06 (20)

City Council August 2, 2011 Stormwater-Street Sweeping Presentation
City Council August 2, 2011 Stormwater-Street Sweeping PresentationCity Council August 2, 2011 Stormwater-Street Sweeping Presentation
City Council August 2, 2011 Stormwater-Street Sweeping Presentation
 
Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017
 
Trenchless Rehabilitation of Sewer & Water Networks
Trenchless Rehabilitation of Sewer & Water NetworksTrenchless Rehabilitation of Sewer & Water Networks
Trenchless Rehabilitation of Sewer & Water Networks
 
Eia of township and area development projects
Eia of township and area development projectsEia of township and area development projects
Eia of township and area development projects
 
Three County Fairgrounds Stormwater Drainage Report 11-03-2010
Three County Fairgrounds Stormwater Drainage Report 11-03-2010Three County Fairgrounds Stormwater Drainage Report 11-03-2010
Three County Fairgrounds Stormwater Drainage Report 11-03-2010
 
MASEFinalReport (2)
MASEFinalReport (2)MASEFinalReport (2)
MASEFinalReport (2)
 
Torrey pines road corridor study final
Torrey pines road corridor study finalTorrey pines road corridor study final
Torrey pines road corridor study final
 
2011HSTS contractor meeting (Van Wert)
2011HSTS contractor meeting (Van Wert)2011HSTS contractor meeting (Van Wert)
2011HSTS contractor meeting (Van Wert)
 
CLARK PE RESUME
CLARK PE RESUMECLARK PE RESUME
CLARK PE RESUME
 
Richland co. installer mtg. 12 10-10
Richland co. installer mtg. 12 10-10Richland co. installer mtg. 12 10-10
Richland co. installer mtg. 12 10-10
 
Landfill Compliance Monitoring: Achieving Long Term Efficiency
Landfill Compliance Monitoring: Achieving Long Term EfficiencyLandfill Compliance Monitoring: Achieving Long Term Efficiency
Landfill Compliance Monitoring: Achieving Long Term Efficiency
 
CPAC Meeting 4-18-06
CPAC Meeting 4-18-06CPAC Meeting 4-18-06
CPAC Meeting 4-18-06
 
Area 38 pic 1 final presentation
Area 38 pic 1   final presentationArea 38 pic 1   final presentation
Area 38 pic 1 final presentation
 
Rural Drinking Water
Rural Drinking WaterRural Drinking Water
Rural Drinking Water
 
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...
 
Utah's Air quality Program
Utah's Air quality ProgramUtah's Air quality Program
Utah's Air quality Program
 
Hayfield Road Pipe Conveyance System January 2021
Hayfield Road Pipe Conveyance System January 2021Hayfield Road Pipe Conveyance System January 2021
Hayfield Road Pipe Conveyance System January 2021
 
Presentation2
Presentation2Presentation2
Presentation2
 
Lectre 1- Real INTRO and SEWER DESIGFN.pptx
Lectre 1- Real INTRO and SEWER DESIGFN.pptxLectre 1- Real INTRO and SEWER DESIGFN.pptx
Lectre 1- Real INTRO and SEWER DESIGFN.pptx
 
Hydrology and hydraulics for design design
Hydrology and hydraulics for design designHydrology and hydraulics for design design
Hydrology and hydraulics for design design
 

Mehr von HartTWI

LTCP Meeting 9-16-04
LTCP Meeting 9-16-04LTCP Meeting 9-16-04
LTCP Meeting 9-16-04HartTWI
 
SSES Presentation
SSES PresentationSSES Presentation
SSES PresentationHartTWI
 
SSES Wheeling 9-4-08
SSES Wheeling 9-4-08SSES Wheeling 9-4-08
SSES Wheeling 9-4-08HartTWI
 
SSES New York/Ash 9-9-08
SSES New York/Ash 9-9-08SSES New York/Ash 9-9-08
SSES New York/Ash 9-9-08HartTWI
 
SSES Williams/Knapp 9-11-08
SSES Williams/Knapp 9-11-08SSES Williams/Knapp 9-11-08
SSES Williams/Knapp 9-11-08HartTWI
 
SSES Woodsdale/Highland 9-3-08
SSES Woodsdale/Highland 9-3-08SSES Woodsdale/Highland 9-3-08
SSES Woodsdale/Highland 9-3-08HartTWI
 
River Road Meeting 7-22-04
River Road Meeting 7-22-04River Road Meeting 7-22-04
River Road Meeting 7-22-04HartTWI
 
River Road Meeting 6-24-04
River Road Meeting 6-24-04River Road Meeting 6-24-04
River Road Meeting 6-24-04HartTWI
 
River Road Meeting 11-10-04
River Road Meeting 11-10-04River Road Meeting 11-10-04
River Road Meeting 11-10-04HartTWI
 
River Road Meeting 3-10-05
River Road Meeting 3-10-05River Road Meeting 3-10-05
River Road Meeting 3-10-05HartTWI
 
Point Place Meeting 9-14-05
Point Place Meeting 9-14-05Point Place Meeting 9-14-05
Point Place Meeting 9-14-05HartTWI
 
Point Place Meeting 2-8-06
Point Place Meeting 2-8-06Point Place Meeting 2-8-06
Point Place Meeting 2-8-06HartTWI
 
Point Place Meeting 7-19-05
Point Place Meeting 7-19-05Point Place Meeting 7-19-05
Point Place Meeting 7-19-05HartTWI
 
Point Place Meeting 4-5-06
Point Place Meeting 4-5-06Point Place Meeting 4-5-06
Point Place Meeting 4-5-06HartTWI
 
Point Place/Edgewater 2-3-05
Point Place/Edgewater 2-3-05Point Place/Edgewater 2-3-05
Point Place/Edgewater 2-3-05HartTWI
 
CPAC Meeting 9-25-06
CPAC Meeting 9-25-06CPAC Meeting 9-25-06
CPAC Meeting 9-25-06HartTWI
 
CPAC Meeting 11-1-05
CPAC Meeting 11-1-05CPAC Meeting 11-1-05
CPAC Meeting 11-1-05HartTWI
 
CPAC Meeting 6-12-06
CPAC Meeting 6-12-06CPAC Meeting 6-12-06
CPAC Meeting 6-12-06HartTWI
 
CPAC Meeting 9-27-05
CPAC Meeting 9-27-05CPAC Meeting 9-27-05
CPAC Meeting 9-27-05HartTWI
 
CPAC Meeting 5-17-05
CPAC Meeting 5-17-05CPAC Meeting 5-17-05
CPAC Meeting 5-17-05HartTWI
 

Mehr von HartTWI (20)

LTCP Meeting 9-16-04
LTCP Meeting 9-16-04LTCP Meeting 9-16-04
LTCP Meeting 9-16-04
 
SSES Presentation
SSES PresentationSSES Presentation
SSES Presentation
 
SSES Wheeling 9-4-08
SSES Wheeling 9-4-08SSES Wheeling 9-4-08
SSES Wheeling 9-4-08
 
SSES New York/Ash 9-9-08
SSES New York/Ash 9-9-08SSES New York/Ash 9-9-08
SSES New York/Ash 9-9-08
 
SSES Williams/Knapp 9-11-08
SSES Williams/Knapp 9-11-08SSES Williams/Knapp 9-11-08
SSES Williams/Knapp 9-11-08
 
SSES Woodsdale/Highland 9-3-08
SSES Woodsdale/Highland 9-3-08SSES Woodsdale/Highland 9-3-08
SSES Woodsdale/Highland 9-3-08
 
River Road Meeting 7-22-04
River Road Meeting 7-22-04River Road Meeting 7-22-04
River Road Meeting 7-22-04
 
River Road Meeting 6-24-04
River Road Meeting 6-24-04River Road Meeting 6-24-04
River Road Meeting 6-24-04
 
River Road Meeting 11-10-04
River Road Meeting 11-10-04River Road Meeting 11-10-04
River Road Meeting 11-10-04
 
River Road Meeting 3-10-05
River Road Meeting 3-10-05River Road Meeting 3-10-05
River Road Meeting 3-10-05
 
Point Place Meeting 9-14-05
Point Place Meeting 9-14-05Point Place Meeting 9-14-05
Point Place Meeting 9-14-05
 
Point Place Meeting 2-8-06
Point Place Meeting 2-8-06Point Place Meeting 2-8-06
Point Place Meeting 2-8-06
 
Point Place Meeting 7-19-05
Point Place Meeting 7-19-05Point Place Meeting 7-19-05
Point Place Meeting 7-19-05
 
Point Place Meeting 4-5-06
Point Place Meeting 4-5-06Point Place Meeting 4-5-06
Point Place Meeting 4-5-06
 
Point Place/Edgewater 2-3-05
Point Place/Edgewater 2-3-05Point Place/Edgewater 2-3-05
Point Place/Edgewater 2-3-05
 
CPAC Meeting 9-25-06
CPAC Meeting 9-25-06CPAC Meeting 9-25-06
CPAC Meeting 9-25-06
 
CPAC Meeting 11-1-05
CPAC Meeting 11-1-05CPAC Meeting 11-1-05
CPAC Meeting 11-1-05
 
CPAC Meeting 6-12-06
CPAC Meeting 6-12-06CPAC Meeting 6-12-06
CPAC Meeting 6-12-06
 
CPAC Meeting 9-27-05
CPAC Meeting 9-27-05CPAC Meeting 9-27-05
CPAC Meeting 9-27-05
 
CPAC Meeting 5-17-05
CPAC Meeting 5-17-05CPAC Meeting 5-17-05
CPAC Meeting 5-17-05
 

SSES Bennett Area 2-8-06

  • 1. City of ToledoBennett Area Sanitary & Storm Sewer System Evaluation Project Public Meeting February 8, 2006
  • 2. Bennett Area Sanitary & Storm Sewer Evaluation Project Purpose of the Project Part of On-Going Sewer Work Regulated by Ohio Environmental Protective Agency and U.S.EPA Eliminate Sanitary Sewer Overflows to Environment Reduce Basement Back-Ups Maintain Sewer System Infrastructure Area Recommended by Previous Flow Monitoring Study
  • 3. Bennett Area Sanitary & Storm Sewer Evaluation Project 1999 City Wide Sewer Flow Monitoring Study 50 Flow Meters Installed Through the City Prioritized Worst Areas with Inflow/Infiltration Problems Bennett Road Area is the 4th Project Previous Projects Point Place Area Parkside Area River Road Area
  • 4. Bennett Area Sanitary & Storm Sewer Evaluation Project Project Area Map
  • 5. Bennett Area Sanitary & Storm Sewer Evaluation Project Study Area Has Both Combined Sewer and Separate Sewer Areas
  • 6. Bennett Area Sanitary & Storm Sewer Evaluation Project Project Schedule Project Began on December 1, 2005 Field Work Beginning February 2006 and Continue to December 2006 Draft Report Due to City on March 1, 2007
  • 7. Bennett Area Sanitary & Storm Sewer Evaluation Project Project Description Public Information Program and Questionnaire Flow Monitoring Sanitary Manhole, Storm Manhole and Catch Basin Inspection Smoke and Dye Testing Sump Pump Monitoring Closed Circuit Television Inspection (CCTV) and Cleaning Hydraulic Modeling of Storm and Sanitary Sewers Report
  • 8. Bennett Area Sanitary & Storm Sewer Evaluation Project Public Information Program and Questionnaires Public Meetings Informational Fliers Questionnaires Door Hangers for Smoke Testing Project Hotline Number is 1-800-862-1450
  • 9. Bennett Area Sanitary & Storm Sewer Evaluation Project Flow Monitoring 12 Flow Monitors 4 Rain Gauges 3 Month Period
  • 10. Bennett Area Sanitary & Storm Sewer Evaluation Project Sanitary Manhole, Storm Manhole and Catch Basin Inspection Inspect and Photograph all Storm and Sanitary Structures Update City Database Develop Geodatabase for Storm Sewer
  • 11. Bennett Area Sanitary & Storm Sewer Evaluation Project SmokeTesting Notification Process Residential Door Hanger Notices Daily Police/Fire Departments Designated City Contact Testing Uses Blowers to Introduce Smoke into the Sewer System Document Areas Where Smoke Escapes
  • 12. Bennett Area Sanitary & Storm Sewer Evaluation Project SmokeTesting Smoke Test Entire Study Area
  • 13. Bennett Area Sanitary & Storm Sewer Evaluation Project Examples of Expected Smoke Testing Results Smoke Emitting from Downspouts, Area Drains, Catch Basins, Lawn Areas, Near House Foundations Field Staff will be walking in rear yards Smoke Blower on Manholes (possibly in rear yards)
  • 14. Bennett Area Sanitary & Storm Sewer Evaluation Project Smoke Testing Procedure
  • 15. Bennett Area Sanitary & Storm Sewer Evaluation Project Residential Dye Testing Procedure
  • 16. Bennett Area Sanitary & Storm Sewer Evaluation Project Dye Testing Catch Basins Dye Test All Catch Basins in Study Area Dye may be seen in streams and creeks
  • 17. Bennett Area Sanitary & Storm Sewer Evaluation Project Sump Pump Monitoring Install Event Recorders at 6 to 8 Homes Coordinate with Rain Gauges Houses selected by Public (Questionnaires)
  • 18. Bennett Area Sanitary & Storm Sewer Evaluation Project Sanitary and Storm Sewer Cleaning and Inspection Clean and Inspect All Sanitary and Storm Sewers
  • 19. Bennett Area Sanitary & Storm Sewer Evaluation Project Hydraulic Modeling of Sanitary and Storm Sewer System Computer Modeling of both Storm and Sanitary Sewer System Surveying of Storm Sewer Manhole Lids
  • 20. Bennett Area Sanitary & Storm Sewer Evaluation Project Report Report of Findings Submitted to City City to Report Findings to USEPA/OEPA Report Will Make Suggestions to Improve Sanitary Sewer System Operations Recommendations May Include: Sewer Rehabilitation Sewer Separation Relief Sewers Pump Stations Remove Downspouts
  • 21. Bennett Area Sanitary & Storm Sewer Evaluation Project Project Issues Work in Backyards Where Manholes are Located Work Vehicles (Trucks) in Streets Traffic Disruption Field Crews Working on Both Public and Private Property Communication Addressing Sewer Problems
  • 22. Bennett Area Sanitary & Storm Sewer Evaluation Project Field Staff and Work Area Identification All Field Staff will have Project Identification Cards All Field Staff will use Proper Traffic/Safety Cones All Field Staff will wear Florescent Safety Vests at All Times
  • 23. Bennett Area Sanitary & Storm Sewer Evaluation Project Project Contacts Project Hotline Phone Number is 1800-862-1450 Recording- Leave your name and number and someone will return your call CLIC (City Line Information Center) Phone Number is 1-419-240-1000