Heathrow Terminal 5 Project Success or Failure?- a tale of two halves 8th May 2009 Dr David Hancock PhD MBA BEng CEng FRSA FIMMM RRP Chartered FCIPD David Hancock Consulting
Agenda ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
“ The uncertainty of outcome, whether positive or negative threat, of actions and events. It is the combination of likelihood and impact, including perceived importance.” (HM Treasury, The Orange Book, 2004) A statistical certainty? What is meant by a Risk?
Evaluating A Risk ,[object Object],[object Object],[object Object],[object Object]
Scoring and Traffic Light Notation L I K 5 E L I 4 H O O 3 D 2 1 1 2 3 4 5 SEVERITY LDA Legal Impact 1  Improvement notice 2  Prohibition notice. 3  Prosecution with fine. 4  Directors charged with Corporate killing, fraud etc.. 5  Directors charged with Corporate killing, fraud etc.. LDA Reputation Impact 1  No press coverage 2  Minor, local reputation damage. 3  Major, local reputation damage. 4  National adverse media coverage. 5  International adverse media coverage Financial 1  £ thousands 2  £ tens of 3  £ hundreds of 4  £  Millions 5  £ tens of millions thousands thousands Descriptor 1  Improbable 2  Unlikely 3  Less likely than not 4  Likely 5  Probable Likelihood Descriptor 1  Minor 2  Moderate 3  Significant 4  Substantial 5  Catastrophic Impact LDA Output Targets 1  Exactly meets targets 2  Significantly meets targets 3  Meets 50% of targets 4  partially meets targets 5  Does not meet  targets Health & Safety 1  Negligible injuries 2  Minor injuries 3  Major injuries 4  Single fatality 5  Multiple fatalities Schedule 1  Day 2  Week 3  Month 4  Year 5  Years
The Risk Process Set Objectives Monitor the risks Report movement of the risk Identify Threats and Opportunities to Objectives Assess the risks associated with each threat and  opportunity ( Inherent ) and  map exposure (PxC) Consider actions to manage risk terminate, tolerate, treat, transfer Reassess the risk  ( Residual ) and remap  (PxC) in light of actions  in place
Response to risk… the 4 Ts Terminate – Do things differently and thus remove the risk Tolerate  – Nothing can be done at a reasonable cost to mitigate the risk or the likelihood and impact are at a reasonable level Treat – Take action to control the risk either by reducing the likelihood of the risk developing or limiting the impact it will have on the project Transfer   – Some of the financial risk may be transferable via insurance or contractual arrangements or accepted by third parties
Risk and Opportunity
Risk Assessment ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
What is Risk? (Part 2) ,[object Object],[object Object],[object Object],[object Object]
Understanding what is meant by project success is crucial
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],What are the particular challenges?
Project Failures ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Why was T5 Different? Where we want to  be
Terminal 5 Project - Background The Public Inquiry into the proposal to build a fifth terminal at Heathrow Airport started in May 1995 and finally finished after having sat for 525 days, in March 1999, making it the longest public inquiry in British planning history and at a cost of £80m in legal fees.  The report was submitted to the UK Government 20 th  December 2000. Planning costs at risk were £320m. The decision to go ahead was given on 20 th  November 2001 by Stephen Byers transport secretary and the terminal is expected to be completed by 04:00 on 30 March 2008.
Terminal 5 Project – What? ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Terminal 5 Project - Orientation Terminal 4 Terminal 1 Terminal 2 Terminal 3 Terminal 5
Terminal 5 Project - Orientation
Terminal 5 Project - Orientation
The Vision ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
The Project Organisations Rod  Eddington Chief Executive John  Rishton Chief Financial Officer Mike  Street Director Customer Service and Operations Robert  Boyle Director of Commercial Planning Paul  Coby  Chief Information Officer Lloyd Cromwell Griffiths Director of Flight Operations Martin  George Commercial Director Alan  Mcdonald  Engineering Director Robert  Webb QC General Counsel Neil Robertson Director For People
Environment – October 1994 Canteen & Welfare Units Cambourne House
Heathrow Express Collapse Record fine after tunnel collapse One of the worst civil engineering disasters for 25 years. Builder Balfour Beatty has been fined a record £1.2m for the collapse of a tunnel at Heathrow Airport, which put lives at risk and caused the cancellation of hundreds of flights.  The tunnel collapsed in the early hours of October 21, 1994. Fortunately no-one was in the tunnel at the time.  However, the court was told that the collapse could have crushed to death people using the nearby Piccadilly tube line and the judge hearing the case, Justice Peter Cresswell, said it was "luck more than judgment" that this did not happen.  Huge crater   The collapse could have ended in real disaster. The engineering disaster caused a huge crater to appear between the airport's two main runways and caused damage to car parks and buildings. It took months to clear up the damage. The collapse occurred during the construction of a tunnel for the Heathrow Express Rail Link.  Balfour Beatty pleaded guilty to failing to ensure the safety of both its employees and members of the public. Austrian engineering firm Geoconsult, which was responsible for monitoring the progress of the Heathrow Express Link, was also fined £500,000. The judge ordered both companies to pay a further £100,00 each in costs.  Terrible disaster  Justice Cresswell said: "This was one of the worst civil engineering disasters in the United Kingdom in the last quarter of a century. The tunnels were being built below part of the world's busiest international airport and there was considerable potential for harm."  Both firms were found guilty of falling "seriously short" of the appropriate standards and reasonable steps, resulting in serious breaches of the Health and Safety Regulations.  Martin Thurgood, of the Health and Safety Executive, told the BBC: "This level of fine sends a clear message to the industry, whether (to) the client's designers, contractors or sub-contractors, that they do need to take full account of workers safety and public safety in the way in which they go about their business."  Balfour Beatty, based in Edinburgh, is one of the UK's largest building groups, and is part of the engineering group BICC. It said it deeply regretted the accident. The tunnel's collapse delayed the opening of the Heathrow Express by six months and caused long hold ups on part of the Jubilee line extension, where engineers were using similar building techniques.
Understanding what is meant by project success is crucial
BAA Risk Principles ,[object Object],[object Object],[object Object],[object Object]
Risk and Opportunity
Risk Assessment ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
T5 Agreement
Behavioural Contract
Problem Areas ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Problem Solving Problem Solution Gather Data Analyse Data Formulate Solution Implement Solution “ TAME” Problems can be solved by linear or “waterfall” process Time since beginning
Systems Complexity ,[object Object],[object Object]
“ MESSES ”   meet the following criteria: Organisational Complexity  - clusters of interrelated or interdependent problems, or systems of problems. Messes  are puzzles; rather than solving them we  resolve   their complexities. Cannot be solved in relative isolation from one another .
Behavioural Complexity ,[object Object],[object Object]
“ WICKED PROBLEMS ”   are characterised by: An  evolving set of interlocking issues and constraints  - no definitive statement of the problem (no understanding of the problem until the solution has been developed). Many   stakeholders  - the problem solving process is fundamentally social (getting the right answer is not as important as having stakeholders accept the solution). The constraints  (resources, politics)  change with time  - stakeholders come and go, change their minds or change the rules. Since there is no definitive Problem there is no definitive Solution .
Wickedness Time since beginning “ WICKED”  Problems  cannot  be solved by linear or “waterfall” process Problem Solution
Wicked Problem Solving Because of the number of stakeholders, changing constraints and dynamics of the problem, there is no ideal solution-it is “as good as it gets” or “good enough” The Problem solving process ends when resource (time, money energy etc.) runs out! Therefore we need a different approach when handling risk with respect to problems which are not Tame Resolving  “ WICKED MESSES ”   is “ SATISFICING ”  (H. Simon 1956)
Risk Management
[object Object],[object Object],[object Object],[object Object]
Operations – So what happened? ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Operations – So what happened? ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Operations – So what happened? ,[object Object],[object Object],[object Object]
Why might this be?
British Airways Financial Highlights
BAA Terminal 5 Project Costs Multiplex losses £183 million Multiplex sues Cleveland steel for £38 million counter case for £22.6 million Multiplex sues FA for £150 million (Settled at £36 million)  Multiplex sued by shareholders for £40 million Multiplex sues designer Mott MacDonald for £253 million ** Costs at project end * Costs at contract signing Costs Original (millions) Costs Final (millions) Costs Claims (millions) Opening Costs (millions) Terminal 5 £4,200 £4,200 0 £10 ? Wembley £326.5 *£445 £900 **£757 £36 (£291) 0
Terminal 5 – The future?
“ When all you have is a hammer, everything looks like a nail ” .  Japanese Proverb “ Successful problem solving requires finding the right solution to the right problem. We fail more often because we solve the wrong problem than because we get the wrong solution to the right problem”.  Russell Ackoff, 1974
Any Questions ? [email_address]

More Related Content

What's hot

MS Project Presentation
MS Project PresentationMS Project Presentation
MS Project Presentation
Khem Singh
 
5. project activity and risk planning
5. project activity and risk planning5. project activity and risk planning
5. project activity and risk planning
Jeanette C. Patindol
 
PMBOK 7th Edition What is Changing?
PMBOK 7th Edition What is Changing?PMBOK 7th Edition What is Changing?

What's hot (20)

Project Management Plan - Group Presentation
Project Management Plan - Group PresentationProject Management Plan - Group Presentation
Project Management Plan - Group Presentation
 
MS Project Presentation
MS Project PresentationMS Project Presentation
MS Project Presentation
 
Easy steps to network construction and critical path determination
Easy steps to network construction and critical path determinationEasy steps to network construction and critical path determination
Easy steps to network construction and critical path determination
 
Project Portfolio Management
Project Portfolio ManagementProject Portfolio Management
Project Portfolio Management
 
Construction project risk management
Construction project risk managementConstruction project risk management
Construction project risk management
 
Project planning and control
Project planning and controlProject planning and control
Project planning and control
 
Project management
Project managementProject management
Project management
 
Strategic Innovation - Tools and Techniques
Strategic Innovation - Tools and TechniquesStrategic Innovation - Tools and Techniques
Strategic Innovation - Tools and Techniques
 
Problem Solving
Problem SolvingProblem Solving
Problem Solving
 
PMP Lecture 1: Introduction to Project Management
PMP Lecture 1: Introduction to Project ManagementPMP Lecture 1: Introduction to Project Management
PMP Lecture 1: Introduction to Project Management
 
Agile Project Management for PMP's
Agile Project Management for PMP'sAgile Project Management for PMP's
Agile Project Management for PMP's
 
Programme management and project evaluation
Programme management and project evaluationProgramme management and project evaluation
Programme management and project evaluation
 
5. project activity and risk planning
5. project activity and risk planning5. project activity and risk planning
5. project activity and risk planning
 
Project Management case analysis
Project Management case analysisProject Management case analysis
Project Management case analysis
 
Case study for project management-Triple constraints
Case study for project management-Triple constraintsCase study for project management-Triple constraints
Case study for project management-Triple constraints
 
PMBOK 7th Edition What is Changing?
PMBOK 7th Edition What is Changing?PMBOK 7th Edition What is Changing?
PMBOK 7th Edition What is Changing?
 
Project audit
Project auditProject audit
Project audit
 
Project Scope Management
Project Scope ManagementProject Scope Management
Project Scope Management
 
Project Management: Importance in Detail
Project Management: Importance in DetailProject Management: Importance in Detail
Project Management: Importance in Detail
 
Project management case study
Project management case studyProject management case study
Project management case study
 

Viewers also liked

London heathrow airport
London heathrow airportLondon heathrow airport
London heathrow airport
Zaheer Minhas
 
Heathrow booklet for release_final
Heathrow booklet for release_finalHeathrow booklet for release_final
Heathrow booklet for release_final
Jessica Ryan
 
Testing Sociotechnical Systems: Heathrow Terminal 5
Testing Sociotechnical Systems: Heathrow Terminal 5Testing Sociotechnical Systems: Heathrow Terminal 5
Testing Sociotechnical Systems: Heathrow Terminal 5
John Rooksby
 
Terminal 3_Indira Gandhi International Airport
Terminal 3_Indira Gandhi International AirportTerminal 3_Indira Gandhi International Airport
Terminal 3_Indira Gandhi International Airport
Ankita Kolamkar
 
Case study British Airways
Case study British AirwaysCase study British Airways
Case study British Airways
Ilyas Bouhad
 
Strategic planning for managers
Strategic planning for managersStrategic planning for managers
Strategic planning for managers
Zaini Ithnin
 

Viewers also liked (20)

London heathrow airport
London heathrow airportLondon heathrow airport
London heathrow airport
 
Heathrow airport Presentation by Ayisha Irshad
Heathrow airport Presentation by Ayisha IrshadHeathrow airport Presentation by Ayisha Irshad
Heathrow airport Presentation by Ayisha Irshad
 
Stakeholder (heathrow airport)
Stakeholder (heathrow airport)Stakeholder (heathrow airport)
Stakeholder (heathrow airport)
 
Managing Government Projects
Managing Government ProjectsManaging Government Projects
Managing Government Projects
 
Project Controls Expo, Oct 2012 - Planning – How to Succeed Hints and Tips fr...
Project Controls Expo, Oct 2012 - Planning – How to Succeed Hints and Tips fr...Project Controls Expo, Oct 2012 - Planning – How to Succeed Hints and Tips fr...
Project Controls Expo, Oct 2012 - Planning – How to Succeed Hints and Tips fr...
 
Heathrow booklet for release_final
Heathrow booklet for release_finalHeathrow booklet for release_final
Heathrow booklet for release_final
 
Kandla port
Kandla portKandla port
Kandla port
 
Testing Sociotechnical Systems: Heathrow Terminal 5
Testing Sociotechnical Systems: Heathrow Terminal 5Testing Sociotechnical Systems: Heathrow Terminal 5
Testing Sociotechnical Systems: Heathrow Terminal 5
 
Heathrow Airport - Refurbishment of Terminal 1
Heathrow Airport - Refurbishment of Terminal 1Heathrow Airport - Refurbishment of Terminal 1
Heathrow Airport - Refurbishment of Terminal 1
 
Kandala port view
Kandala port viewKandala port view
Kandala port view
 
The Effect of the Recession on Partnering in the Construction Sector
The Effect of the Recession on Partnering in the Construction SectorThe Effect of the Recession on Partnering in the Construction Sector
The Effect of the Recession on Partnering in the Construction Sector
 
Terminal 3_Indira Gandhi International Airport
Terminal 3_Indira Gandhi International AirportTerminal 3_Indira Gandhi International Airport
Terminal 3_Indira Gandhi International Airport
 
Risk management
Risk managementRisk management
Risk management
 
Case study British Airways
Case study British AirwaysCase study British Airways
Case study British Airways
 
Indira Gandhi International Airport
Indira Gandhi International AirportIndira Gandhi International Airport
Indira Gandhi International Airport
 
Nairobi Airport fire - Crises Management 2.0 Case Study and Analysis #Jkia #J...
Nairobi Airport fire - Crises Management 2.0 Case Study and Analysis #Jkia #J...Nairobi Airport fire - Crises Management 2.0 Case Study and Analysis #Jkia #J...
Nairobi Airport fire - Crises Management 2.0 Case Study and Analysis #Jkia #J...
 
Strategic planning for managers
Strategic planning for managersStrategic planning for managers
Strategic planning for managers
 
Analysis of 11 greatest supply chain disasters
Analysis of 11 greatest supply chain disastersAnalysis of 11 greatest supply chain disasters
Analysis of 11 greatest supply chain disasters
 
IoTの規格標準化動向とデバイスWebAPI
IoTの規格標準化動向とデバイスWebAPIIoTの規格標準化動向とデバイスWebAPI
IoTの規格標準化動向とデバイスWebAPI
 
Chapter 7 managing risk
Chapter 7   managing riskChapter 7   managing risk
Chapter 7 managing risk
 

Similar to Heathrow Terminal 5 - Success or Failure?

Energy contracts & disputes presentation slides - 25 September 2012
Energy contracts & disputes presentation slides - 25 September 2012Energy contracts & disputes presentation slides - 25 September 2012
Energy contracts & disputes presentation slides - 25 September 2012
Eversheds Sutherland
 
Green Investing: Towards a Clean Energy Infrastructure
Green Investing: Towards a Clean Energy InfrastructureGreen Investing: Towards a Clean Energy Infrastructure
Green Investing: Towards a Clean Energy Infrastructure
Andy Dabydeen
 
Hpht direct new: Improving safety in HPHT
Hpht direct new: Improving safety in HPHTHpht direct new: Improving safety in HPHT
Hpht direct new: Improving safety in HPHT
HPHT Wells Summit
 
State senate transpo hearings 11 13-13 backgroundpaper
State senate transpo hearings 11 13-13 backgroundpaperState senate transpo hearings 11 13-13 backgroundpaper
State senate transpo hearings 11 13-13 backgroundpaper
peggydrouet
 
Environmental Impact Assessment (Eia)
Environmental Impact Assessment (Eia)Environmental Impact Assessment (Eia)
Environmental Impact Assessment (Eia)
Melissa Dudas
 

Similar to Heathrow Terminal 5 - Success or Failure? (20)

Heathrow Expansion Plan.pptx
Heathrow Expansion Plan.pptxHeathrow Expansion Plan.pptx
Heathrow Expansion Plan.pptx
 
PM_singles
PM_singlesPM_singles
PM_singles
 
Impact of climate change on London's economy - summary slides
Impact of climate change on London's economy - summary slidesImpact of climate change on London's economy - summary slides
Impact of climate change on London's economy - summary slides
 
Improving Megaproject Performance (2011)
Improving Megaproject Performance (2011)Improving Megaproject Performance (2011)
Improving Megaproject Performance (2011)
 
Prakhar gupta risk analysis report
Prakhar gupta risk analysis reportPrakhar gupta risk analysis report
Prakhar gupta risk analysis report
 
Climate Change and Infrastructure Summit Synthesis Report
Climate Change and Infrastructure Summit Synthesis ReportClimate Change and Infrastructure Summit Synthesis Report
Climate Change and Infrastructure Summit Synthesis Report
 
Presentation Wind Energy 2016
Presentation Wind Energy 2016Presentation Wind Energy 2016
Presentation Wind Energy 2016
 
Energy contracts & disputes presentation slides - 25 September 2012
Energy contracts & disputes presentation slides - 25 September 2012Energy contracts & disputes presentation slides - 25 September 2012
Energy contracts & disputes presentation slides - 25 September 2012
 
The Channel Tunnel
The Channel TunnelThe Channel Tunnel
The Channel Tunnel
 
52 a risk-management_approach_to_a_successful_infrastructure_project
52 a risk-management_approach_to_a_successful_infrastructure_project52 a risk-management_approach_to_a_successful_infrastructure_project
52 a risk-management_approach_to_a_successful_infrastructure_project
 
Project Control Staff – Make or Buy? by "Mike Laws - Project Controls Manager...
Project Control Staff – Make or Buy? by "Mike Laws - Project Controls Manager...Project Control Staff – Make or Buy? by "Mike Laws - Project Controls Manager...
Project Control Staff – Make or Buy? by "Mike Laws - Project Controls Manager...
 
Tunnelling & underground design (Topic3-geotechnical data baseline reports)
Tunnelling & underground design (Topic3-geotechnical data baseline reports)Tunnelling & underground design (Topic3-geotechnical data baseline reports)
Tunnelling & underground design (Topic3-geotechnical data baseline reports)
 
TDW Innovations™ Magazine VOL. VII, NO. 1 | 2015
TDW Innovations™ Magazine VOL. VII, NO. 1 | 2015TDW Innovations™ Magazine VOL. VII, NO. 1 | 2015
TDW Innovations™ Magazine VOL. VII, NO. 1 | 2015
 
Green Investing Report
Green Investing ReportGreen Investing Report
Green Investing Report
 
Green Investing: Towards a Clean Energy Infrastructure
Green Investing: Towards a Clean Energy InfrastructureGreen Investing: Towards a Clean Energy Infrastructure
Green Investing: Towards a Clean Energy Infrastructure
 
Hpht direct new: Improving safety in HPHT
Hpht direct new: Improving safety in HPHTHpht direct new: Improving safety in HPHT
Hpht direct new: Improving safety in HPHT
 
State senate transpo hearings 11 13-13 backgroundpaper
State senate transpo hearings 11 13-13 backgroundpaperState senate transpo hearings 11 13-13 backgroundpaper
State senate transpo hearings 11 13-13 backgroundpaper
 
Heathrow airport expansion consultation
Heathrow airport expansion consultationHeathrow airport expansion consultation
Heathrow airport expansion consultation
 
Portfolio, programme and project risk (Peter Campbell)
Portfolio, programme and project risk (Peter Campbell)Portfolio, programme and project risk (Peter Campbell)
Portfolio, programme and project risk (Peter Campbell)
 
Environmental Impact Assessment (Eia)
Environmental Impact Assessment (Eia)Environmental Impact Assessment (Eia)
Environmental Impact Assessment (Eia)
 

More from Dr David Hancock

The application of the ‘New Sciences’ to Risk and Project Management
The application of the ‘New Sciences’ to Risk and Project ManagementThe application of the ‘New Sciences’ to Risk and Project Management
The application of the ‘New Sciences’ to Risk and Project Management
Dr David Hancock
 

More from Dr David Hancock (11)

Positioning project, programme and portfolio risk
Positioning project, programme and portfolio risk Positioning project, programme and portfolio risk
Positioning project, programme and portfolio risk
 
Risk Leadership
Risk LeadershipRisk Leadership
Risk Leadership
 
Public Sector Enterprise Risk Management
Public Sector Enterprise Risk ManagementPublic Sector Enterprise Risk Management
Public Sector Enterprise Risk Management
 
The application of the ‘New Sciences’ to Risk and Project Management
The application of the ‘New Sciences’ to Risk and Project ManagementThe application of the ‘New Sciences’ to Risk and Project Management
The application of the ‘New Sciences’ to Risk and Project Management
 
Banja Luka
Banja LukaBanja Luka
Banja Luka
 
Playing For Gold! (And Black)
Playing For Gold! (And Black)Playing For Gold! (And Black)
Playing For Gold! (And Black)
 
Masters Programme On RM
Masters Programme On RMMasters Programme On RM
Masters Programme On RM
 
Cipfa Workshops Scotland
Cipfa Workshops ScotlandCipfa Workshops Scotland
Cipfa Workshops Scotland
 
Fundamentals Of Risk Management
Fundamentals Of Risk ManagementFundamentals Of Risk Management
Fundamentals Of Risk Management
 
Reflections on lessons learnt from projects
Reflections on lessons learnt from projectsReflections on lessons learnt from projects
Reflections on lessons learnt from projects
 
Where next for the Enterprise Risk Manager
Where next for the Enterprise Risk ManagerWhere next for the Enterprise Risk Manager
Where next for the Enterprise Risk Manager
 

Recently uploaded

Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
dollysharma2066
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Sheetaleventcompany
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
lizamodels9
 

Recently uploaded (20)

Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Whitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
Whitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLWhitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
Whitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceMalegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 

Heathrow Terminal 5 - Success or Failure?

  • 1. Heathrow Terminal 5 Project Success or Failure?- a tale of two halves 8th May 2009 Dr David Hancock PhD MBA BEng CEng FRSA FIMMM RRP Chartered FCIPD David Hancock Consulting
  • 2.
  • 3. “ The uncertainty of outcome, whether positive or negative threat, of actions and events. It is the combination of likelihood and impact, including perceived importance.” (HM Treasury, The Orange Book, 2004) A statistical certainty? What is meant by a Risk?
  • 4.
  • 5. Scoring and Traffic Light Notation L I K 5 E L I 4 H O O 3 D 2 1 1 2 3 4 5 SEVERITY LDA Legal Impact 1 Improvement notice 2 Prohibition notice. 3 Prosecution with fine. 4 Directors charged with Corporate killing, fraud etc.. 5 Directors charged with Corporate killing, fraud etc.. LDA Reputation Impact 1 No press coverage 2 Minor, local reputation damage. 3 Major, local reputation damage. 4 National adverse media coverage. 5 International adverse media coverage Financial 1 £ thousands 2 £ tens of 3 £ hundreds of 4 £ Millions 5 £ tens of millions thousands thousands Descriptor 1 Improbable 2 Unlikely 3 Less likely than not 4 Likely 5 Probable Likelihood Descriptor 1 Minor 2 Moderate 3 Significant 4 Substantial 5 Catastrophic Impact LDA Output Targets 1 Exactly meets targets 2 Significantly meets targets 3 Meets 50% of targets 4 partially meets targets 5 Does not meet targets Health & Safety 1 Negligible injuries 2 Minor injuries 3 Major injuries 4 Single fatality 5 Multiple fatalities Schedule 1 Day 2 Week 3 Month 4 Year 5 Years
  • 6. The Risk Process Set Objectives Monitor the risks Report movement of the risk Identify Threats and Opportunities to Objectives Assess the risks associated with each threat and opportunity ( Inherent ) and map exposure (PxC) Consider actions to manage risk terminate, tolerate, treat, transfer Reassess the risk ( Residual ) and remap (PxC) in light of actions in place
  • 7. Response to risk… the 4 Ts Terminate – Do things differently and thus remove the risk Tolerate – Nothing can be done at a reasonable cost to mitigate the risk or the likelihood and impact are at a reasonable level Treat – Take action to control the risk either by reducing the likelihood of the risk developing or limiting the impact it will have on the project Transfer – Some of the financial risk may be transferable via insurance or contractual arrangements or accepted by third parties
  • 9.
  • 10.
  • 11. Understanding what is meant by project success is crucial
  • 12.
  • 13.
  • 14. Why was T5 Different? Where we want to be
  • 15. Terminal 5 Project - Background The Public Inquiry into the proposal to build a fifth terminal at Heathrow Airport started in May 1995 and finally finished after having sat for 525 days, in March 1999, making it the longest public inquiry in British planning history and at a cost of £80m in legal fees. The report was submitted to the UK Government 20 th December 2000. Planning costs at risk were £320m. The decision to go ahead was given on 20 th November 2001 by Stephen Byers transport secretary and the terminal is expected to be completed by 04:00 on 30 March 2008.
  • 16.
  • 17. Terminal 5 Project - Orientation Terminal 4 Terminal 1 Terminal 2 Terminal 3 Terminal 5
  • 18. Terminal 5 Project - Orientation
  • 19. Terminal 5 Project - Orientation
  • 20.
  • 21. The Project Organisations Rod Eddington Chief Executive John Rishton Chief Financial Officer Mike Street Director Customer Service and Operations Robert Boyle Director of Commercial Planning Paul Coby Chief Information Officer Lloyd Cromwell Griffiths Director of Flight Operations Martin George Commercial Director Alan Mcdonald Engineering Director Robert Webb QC General Counsel Neil Robertson Director For People
  • 22. Environment – October 1994 Canteen & Welfare Units Cambourne House
  • 23. Heathrow Express Collapse Record fine after tunnel collapse One of the worst civil engineering disasters for 25 years. Builder Balfour Beatty has been fined a record £1.2m for the collapse of a tunnel at Heathrow Airport, which put lives at risk and caused the cancellation of hundreds of flights. The tunnel collapsed in the early hours of October 21, 1994. Fortunately no-one was in the tunnel at the time. However, the court was told that the collapse could have crushed to death people using the nearby Piccadilly tube line and the judge hearing the case, Justice Peter Cresswell, said it was "luck more than judgment" that this did not happen. Huge crater The collapse could have ended in real disaster. The engineering disaster caused a huge crater to appear between the airport's two main runways and caused damage to car parks and buildings. It took months to clear up the damage. The collapse occurred during the construction of a tunnel for the Heathrow Express Rail Link. Balfour Beatty pleaded guilty to failing to ensure the safety of both its employees and members of the public. Austrian engineering firm Geoconsult, which was responsible for monitoring the progress of the Heathrow Express Link, was also fined £500,000. The judge ordered both companies to pay a further £100,00 each in costs. Terrible disaster Justice Cresswell said: "This was one of the worst civil engineering disasters in the United Kingdom in the last quarter of a century. The tunnels were being built below part of the world's busiest international airport and there was considerable potential for harm." Both firms were found guilty of falling "seriously short" of the appropriate standards and reasonable steps, resulting in serious breaches of the Health and Safety Regulations. Martin Thurgood, of the Health and Safety Executive, told the BBC: "This level of fine sends a clear message to the industry, whether (to) the client's designers, contractors or sub-contractors, that they do need to take full account of workers safety and public safety in the way in which they go about their business." Balfour Beatty, based in Edinburgh, is one of the UK's largest building groups, and is part of the engineering group BICC. It said it deeply regretted the accident. The tunnel's collapse delayed the opening of the Heathrow Express by six months and caused long hold ups on part of the Jubilee line extension, where engineers were using similar building techniques.
  • 24. Understanding what is meant by project success is crucial
  • 25.
  • 27.
  • 30.
  • 31. Problem Solving Problem Solution Gather Data Analyse Data Formulate Solution Implement Solution “ TAME” Problems can be solved by linear or “waterfall” process Time since beginning
  • 32.
  • 33. “ MESSES ” meet the following criteria: Organisational Complexity - clusters of interrelated or interdependent problems, or systems of problems. Messes are puzzles; rather than solving them we resolve their complexities. Cannot be solved in relative isolation from one another .
  • 34.
  • 35. “ WICKED PROBLEMS ” are characterised by: An evolving set of interlocking issues and constraints - no definitive statement of the problem (no understanding of the problem until the solution has been developed). Many stakeholders - the problem solving process is fundamentally social (getting the right answer is not as important as having stakeholders accept the solution). The constraints (resources, politics) change with time - stakeholders come and go, change their minds or change the rules. Since there is no definitive Problem there is no definitive Solution .
  • 36. Wickedness Time since beginning “ WICKED” Problems cannot be solved by linear or “waterfall” process Problem Solution
  • 37. Wicked Problem Solving Because of the number of stakeholders, changing constraints and dynamics of the problem, there is no ideal solution-it is “as good as it gets” or “good enough” The Problem solving process ends when resource (time, money energy etc.) runs out! Therefore we need a different approach when handling risk with respect to problems which are not Tame Resolving “ WICKED MESSES ” is “ SATISFICING ” (H. Simon 1956)
  • 39.
  • 40.
  • 41.
  • 42.
  • 45. BAA Terminal 5 Project Costs Multiplex losses £183 million Multiplex sues Cleveland steel for £38 million counter case for £22.6 million Multiplex sues FA for £150 million (Settled at £36 million) Multiplex sued by shareholders for £40 million Multiplex sues designer Mott MacDonald for £253 million ** Costs at project end * Costs at contract signing Costs Original (millions) Costs Final (millions) Costs Claims (millions) Opening Costs (millions) Terminal 5 £4,200 £4,200 0 £10 ? Wembley £326.5 *£445 £900 **£757 £36 (£291) 0
  • 46. Terminal 5 – The future?
  • 47. “ When all you have is a hammer, everything looks like a nail ” . Japanese Proverb “ Successful problem solving requires finding the right solution to the right problem. We fail more often because we solve the wrong problem than because we get the wrong solution to the right problem”. Russell Ackoff, 1974