Page - 1 -
200KT/Y Pig Iron Project
Technical Proposal
Project No.:
Contact: Mr. Guo ke/郭 珂
Email: guoke1207@hotmail.com Skype: guoke896884090
Mobile:+86 13299042234 Website:www.xinliyejin.com
April 2015
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 2
ChapterⅠGeneral 
1.1 Production scale and products solution
1.1.1 Production scale
After the completion of the project, the final product is annual output of
200,000 tons cast iron.
Annual output of the project intermediate product is annual output of
360,000 tons sintered ore.
1.1.2 Product solutions
Annual output of 200,000 tons of cast iron L10 steel
1.1.3 Main equipments
Sintering: 1 * 36m2
sintering machine;
Blast furnace iron making: 2 * 80m3
;
Facilities: power supply system, water supply and drainage system,
gas system, air compressor station, dust, ventilation and air conditioning
system, test center.
1.2 Main project brief
1.2.1 Sintering
1.2.1.1 Process overview
This project adopts one set of 36m2
belt sintering machine, without
India company sintering raw material for sintering experiment condition,
referring with China similar sintering experience, 1 * 36m2
sintering machine
design adopts co-efficiency of 1.35t/m2
・h and 42.6t/ set・h with an annual
output of 35.8 * 104
tons finished sintered ore sinter, the sintered ore is
R2=0.95~1.05 (this project adopts 1.05), the sintered ore size 5~100mm ,
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 3
wherein, >50mm is less than 5%,<5mm is less than 10%.
Sintering process is from fuel and flux, iron containing material
acceptance to finished sinter output; including: raw material acceptance and
transportation, fuel crushing, batching, first mixing, second mixing, material
spreading, ignition and sintering, hot ore crushing, screening, cooling and
finished product output; at the same time with draw dust and ash, silencer
and other facilities.
1.2.1.2 Iron containing raw material requirement
(1) Iron containing raw material
The iron containing raw materials for the 1 * 36m2
sintering workshop is
Indian refined ore and blast furnace groove screened retiring ore, with grain
size of 0 ~ 8mm and low chemical composition fluctuation.
(2)Fusion
Appropriate particle size of limestone, dolomite, and lime are adopted
as flux.
(3) Fuel
Solid fuel for sintering is screened power coke from the blast furnace
groove. The grain size for factory acceptance is <5mm, and then crushed
to particle size of 3 ~ 0mm for sintering material and anthracite can be as
supplement when the broken coke is not sufficient, factory acceptance size
should be controlled <25mm.
Sintering gas fuel is blast furnace gas, and as fuel for preheat stove,
blast furnace gas calorific value is 3349.4kJ/Nm3
, the contact pressure at the
main sintering building is greater than 5000Pa, dust compression is under
50mg/m3
1 * 36m2
sintering all input raw materials, fuel and the physical
characteristics as shown for table 1.2-1:
Table 1.2-1 Original fuel supply and incoming conditions
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 4
1.2.2 Iron making
1.2.2.1 Workshop consists
Iron making plant includes 2X80m3
blast furnaces, blast furnace material
bin and top feeding system, furnace gas system, hot blast stove system,
tapping field system, cast iron machine system.
The project products are annual output of 200,000 tons of iron and all
cast iron ingots. Annual water slag production: 100,000 tons of, as building
material. An annual output of 13,000 tons of gas ash is for sintering batching
by vehicle. Blast furnace gas production is 4.11 * 108Nm3, 1.9 * 108Nm3 for
the hot blast stove, and 0.38 * 108Nm3 for sintering machine, cast iron and
other user.
1.2.2.2 Iron making advanced technology
A. Blast furnace adoption of water-cooled carbon furnace hearth
with ceramic cups, long life of hearth bottom, molten iron thermal energy.
B. Top combustion hot blast stove ceramic burner, air temperature is
1100 , the dome cone ball type hot blast stove.℃
C. Blast furnace gas with dry bag dust removal, low energy
consumption, low water consumption.
Chemical composition fluctuation (%)Items
Spec.
Dry supply
(×104
t/a)
Size
(mm)
Bulk density
(t/m3
)
Water
(%) Fe SiO2 Alkalinity
Fine iron powder 37.94 8~0 2.2 =10 ±0.5 ±0.2 ±0.05
Returning ore 1.58 5~0 1.8 =10 — — —
Lime stone 2.36 3~0 0.55 =3
Quick lime 1.26 3~0 0.55 — — —
Fuel 2.15 40~0 0.55 =10 — — —
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 5
1.2.2.3 Blast furnace technology index
Table 1.2-2 Blast furnace technology indexes
No Index items Unit Value
I Blast furnace
1 Blast furnace nominal capacity m3
2X80
2 Using co-efficiency tHM/m3
·d 3.0
3 Coke rate Kg/t·Fe 700
4 Working rate Days 350
II Production output(per year)
1 Molten iron 104
t/a 20
2 Blast water slag 104
t/a 10
3 Blast furnace gas 108
Nm3
/a 2.21
4 Coke powder 104
t/a 0.7
5 Screened sintered ore 104
t/a 2.1
III Raw material and fuel consumption (per year)
1 Sintered ore 104
t/a 35.8
2 Coke 104
t/a 13.29
3 Coal 104
t/a 2.1
1.2.3 Power supply
Each workshop installation load
No. Item 10KV start 380v start
1 Sintering workshop 1600kw 1278kw
2 Iron making workshop load 2000kw 1268kw
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 6
Sub total 3600kw 2546kw
1.2.4 Water supply and drainage
(1) Water and supplement water amount
1) Sintering production water is 114 m3
/ h, net circulating water is 85 m3
/
h, water production consumption 26 m3
/ h, water circulation supplement 3 m3
/ h. Water circulation rate of cooling water system is 96.6%.
2) Blast furnace part design and production water is 2220 m3
/ h, among
which net circulating water is 900 m3
/ h, blast furnace water slag of turbid
circulating water is 800 m3
/ h, cast iron turbidity water cycle volume is 300 m3
/ h, water circulation supplement 120 m3
/ h.
1.2.5 Ventilation dust removal
The project ventilation and dust removal system include:
(1) Sintering end and finished product screen dust removal
Sintering machine tail and close to its production equipment
configuration of dust and gas are concentrated to the tail dust removal system
for processing.
(2) Fuel dust removal system
Fuel in the process of crushing, transshipment produces large amounts
of coal powder, coke powder, a dust removal system is designed for the fuel
and broken.
(3) Quick lime warehouse top dust removal system
Quick lime warehouse adopts pneumatic conveying, dedusting
ventilation facilities are installed at the top of the lime bin.
(4) Blast furnace ore tank dust removal system
Places such as blast furnace ore tank under the vibrating feeder,
vibrating screen, weighing hopper and tape the feeding have plenty of dust,
so that trough dust removal system settings of the airtight drawing fan is
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 7
designed to prevent the spread of the dust.
(5) Blast furnace dust iron removal
Blast furnace dust removal mainly solves the smoke and dust at the
tapping process of the blast furnace iron mouth iron field, the iron blast
furnace dust removal system is set in order to effectively control the large
amount of smoke tapping process and mitigate the effects of high
temperature thermal radiation for operators, above the point of taphole is set
with a dust drawing fan.
1.2.6 Fuel gas
This project design fuel gas facilities includes blast furnace gas supply
facilities.
(1) Blast furnace gas
Blast furnace gas main users are sintering machine, hot blast stove, and
blast furnace gas is produced from the blast furnace workshop, outlet from
the net the main gas pipe.
1.2.7 Thermal
This project thermodynamic facilities design mainly includes: blast
furnace blower room, blast furnace air supply pipe, air compressor station
and compressed air pipes.
(1) The blast furnace blower room are indoor and outdoor sets, main fan
is set with blower, gas station, next to the machine line, cooling water pipe,
the fan in and out of the air pipe line; auxiliary layout is set with high and low
voltage transformer room, operation room, outdoor air filter, wind inlet and
outlet pipe and circulating pipe, and muffler, two blast furnaces adopt two sets
in operation and one set for preparation arrangement.
(2) Air compressor station
The air required in project is produced from air compressor station.
Compressed air is mainly used in open hole machine, hydraulic blocking slag
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 8
machine, cast iron machine, blowing dust removal system and equipment,
etc.
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 9
Chapter II Project construction technology process
2.1 Sintering process
2.1.1 Iron containing raw material requirement
2.1.1.1 Iron containing raw material
The iron containing raw materials for the 1 * 36m2
sintering workshop is
Indian refined ore and blast furnace groove screened returning ore, with grain
size of 0 ~ 8mm and low chemical composition fluctuation.
2.1.1.2 Fusion
Appropriate particle sizes of limestone, dolomite, lime are adopted as
flux.
2.1.1.3 Fuel
Solid fuel for sintering is screened power coke from the blast furnace
groove. The grain size for factory acceptance is <5mm, and then crushed
to particle size of 3 ~ 0mm for sintering material and anthracite can be as
supplement when the broken coke is not sufficient, factory acceptance size
should be controlled <25mm.
Sintering gas fuel is blast furnace gas, and as fuel for preheat stove,
blast furnace gas calorific value is 3349.4kJ/Nm3
, the contact pressure at the
main sintering building is greater than 5000Pa, and the dust concentration is
less than 50mg /m3.
1 * 36m2
sintering all input raw materials, fuel and the physical
characteristics as shown for table 2.1-1:
Table 2.1-1 Original fuel supply and incoming conditions
Chemical composition fluctuation (%)Items
Spec.
Dry supply
(×104
t/a)
Size
(mm)
Bulk density
(t/m3
)
Water
(%) Fe SiO2 Alkalinity
Fine iron powder 37.94 8~0 2.2 =10 ±0.5 ±0.2 ±0.05
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 10
2.1.2 Design scale, working system and the product plan
2.1.2.1 Factory design scale
This project adopts one set of36m2
belt sintering machine, without India
company sintering raw material for sintering experiment condition, referring
with China similar sintering experience, 1 * 36m2
sintering machine design
adopts co-efficiency of 1.35t/m2
・h and 42.6t/ set・h with an annual output of
35.8 * 104
tons finished sintered ore sinter, the sintered ore is R2=0.95~1.05
(this project adopts 1.05), the sintered ore size 5~100mm , wherein, >
50mm is less than 5%,<5mm is less than 10%.
2.1.2.2 Working system
The system ofsintering workshop work for continuous work, daily
three shifts , each shift 8 hours, calendar operation rate of 87.7%, which is
equivalent to 320 working days.
2.1.2.3 Product plan
According to the assumption of the raw material conditions and quality
requirements of blast furnace sintering, 1 x 36 m2
sintering workshop
production of finished sinter is assumed to the chemical composition shown in
the following table 2.1-4.
Table 2.1-4: Finished sintered ore chemical composition reference
Chemicals TFe P S FeO CaO SiO2 MgO Al2O3 CaO/SiO2
Content % 63.5 0.05 0.025 5.5 8.47 4.97 1.71 1.82 1.7
The physical properties of sintered ore:
Returning ore 1.58 5~0 1.8 =10 — — —
Lime stone 2.36 3~0 0.55 =3
Quick lime 1.26 3~0 0.55 — — —
Fuel 2.15 40~0 0.55 =10 — — —
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 11
Strength of sintered ore: ISO tumbler index (+6.3mm): = 60%;
The finished sintered ore temperature =150℃.
2.1.3 Main technology brief
Sintering process is from fuel and flux, iron containing material
acceptance to finished sinter output; including: raw material acceptance and
transportation, fuel crushing, batching, first mixing, second mixing, material
spreading, ignition and sintering, hot ore crushing, screening, cooling and
finished product output; at the same time with draw dust and ash, silencer
and other facilities.
2.1.3.1 Fuel, fusion, reception and storage of iron content material
Fuel (coke powder and anthracite), fusion(limestone), iron content raw
materials (fine iron powder, returning ore) shall be received by raw material
tape machine, and unloaded through the feeding trolley tape machine
into each designated proportioning bin.
Quick lime is transported to the batching chamber by forklift into
the batching ore bin.
2.1.3.2 Fuel crushing
In order to ensure the qualified sintering fuelparticle size of (0 ~
3mm), the fuel crashing design adopts one open circuit crushing process.
Fuel (broken coal or coke) in fuel intermediate bin shall be fed through
motor vibration feeder in the lower part of hopper evenly into the tape
machine, before fuel entering the crusher, iron is removed through iron
remover fixed at the top of the belt machine in order to ensure the
normal work of the crusher. Followed by the belt machine, the fuel is
transported to four roll crusher (φ750X500) crusher, crushed to the size of
0 ~ 3mm, after crushing less than 3mm is > 80% of fuel the amount.
2.1.3.3 Batching
Iron content raw material and fuelshall be batched to a certain
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 12
proportion according to the requirements of iron making, the sintering
chemical composition and supply situation of raw materials.
In order to ensure the correct batching, ingredients of original fueldesign
adopts separate centralized weight proportioning, automatic batching system
controlled by computer. Of which: raw materials batching uses the "disk
feeder +electronic belt scale (uniform)" ; fuel batching uses electronic belt
scale (self modulation) ingredients, limestone with "electronic belt scale"
way of feeding, if quick lime needed, the silencer shall be used.
Sintered ore returns to the batching chamber; dust from the head dust
removal, expand the precipitator and the step sintering machine ashpipe
falls into the water sealed groove and the wet material is added to
the mixture on by belt conveyor. The material mixing belt transports them to
the drum mixer for mixing and granulating.
2.1.3.4 Mixing and granulating
Mixing and granulating adopt two sections, mixing equipment is drum
mixing:primary mixing is mainly for the purpose of blending, water addition,
mixing time is ~2.96 min, equipment specification φ2.2 x 7 m; secondary is
mainly water adjustment to the suitable humidity for pelletizing,mixing time is
~2.96 min, equipment specificationφ2.2 x 7 m.
2.1.3.5 Material spreading
After blending pelletizing mixture is convoyed to the sintering machine
at the top of the mixing silo and spread by the circular roller feeder and seven
roller feeder. the circular roller feeder and seven roller feeder device will
spread the mixture evenly on the sintering belt. The thickness of the layers on
the sintering machine is about 520 ~ 600 mm.
2.1.3.6 Ignition and sintering
Sintering ignition adopts hot stove, using blast furnace gas ignition,
micro negative pressure ignition process, furnace hearth pressure is micro
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 13
positive pressure.
Preheating ignition plane at the holding furnace is a fan, lower part of
furnace adopts open box cover structure, roof for the ceiling. Furnace cover
closely holds the hearth.
Due to the low calorific value of the blast furnace gas, in order to ensure
the combustion temperature and the quality of combustion, the design adopts
preheating furnace using blast furnace gas ignition combustion to preheating
air to 400 ~ 450 ℃. At the same time, ignition design high-efficiency
energy-saving hot stove is adopted in order to reduce gas consumption and
solid fuel consumption. Two rows of blast furnace gas ignition burning mouth
are set at the ignition section of the roof, the blast furnace gas and the
preheated air are mixed by the vortex inside the burner and spewing burning,
ensures good surface quality and higher ignition sinter yield.
The ignition section (along the sintering machine rotation direction) is
followed by heat preservation section in order to improve the heat
preservation effect, the roof is lower than the ignition period to guarantee the
ignition material layer can continue combustion to improve the quality of
sintering.
The ignition temperature is 1150 + 50 ℃, the ignition time 1 min,
preservation temperature 600 ~ 800 ℃, holding time 1 ~ 1.5 min.
The sintering machine adopts negative pressure drawing thick layer.
The sintering machine on the mixture after ignitionis negative pressure
drawing sintering.
2.1.3.7 Main drawing head and nose dust removal system
In order to prevent environmental pollution, prolong the service life of
the equipment and reduce the waste of raw material, special exhaust blower
fan is adopted for the sintering. At the same time two stages dust removal
(expand precipitator + head filter) are set in front of the fan, the flue gas after
sintering purification by dust removal system, the concentration of flue dust
emissions < 50 mg/m3
, the collected dust shall be recycled as raw material.
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 14
Main drawing system is composed of bellows, smoke collecting ring,
horn flue, drawing pipe, expanding dust removal, the nose filter, main exhaust
fan and chimney.
Expanding dust specification is 3350×4500; the nose filter is 70 m2
four
bag dust removals. The dust from the sintering machine discharging pipe,
expanding filter and its head precipitator dust is discharged into the water seal
tank, and the water seal scraper scrapes the bottom of the channel of the
plaster together, and discharges the wet material to the to belt mixture and
then into the mixing machine room to participate in the pelletizing.
Main exhaustion drawing negative pressure is 14 KPa, air volume 3600
Nm3
/ min. To reduce the noise, a silencer is set on fan outlet piping.
Sintering main chimney’s height is 60m with diameter of 2.5m (inner
diameter).
2.1.3.8 Sintering crushing
The design of sintered cake crushing equipment adopts f 1100 x 1620
single roll crusher. The sintered ore cake discharged from sintering machine
tail chute shall be crushed to less than 100 mm by roll crusher.
2.1.3.9 Hot sintered ore screen and cooling
After crushed sintered ore shall directly fall into SZR1545 hot sinter ore
vibrating sieve for screening, hot screen will screen out fine material part (less
than 5 mm hot return mine) from the hot sintered ore to ensure the
permeability of sinter cooling needs and reduce the resistance and dust
emission in the cooling machine, and can reduce powder ore into blast
furnace.
The ore from heat return under rating sieve bunker shall be storage to
the returning bin, and PZ17 speed regulationdevice shall batch the
ingredients to mix the disc feeder belt, and then the material shall be sent to
pelletization for new sintering cycle.
The hot sinter greater than 5 mm on the hot sieve shall be sent to blast
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 15
belt cooler, three sets of ventilation cooling machines are set, after cooling the
sintered ore temperature shall be less than 120 .℃
2.1.3.10 Convoy and storage of sintered ore
Sintered product ore after cooling shall go into 3# transferring station
and meet the requirement of direct transportation to the blast furnace groove
and transportation to the outside.
2.1.4 Composition and configuration of main workshops
2.1.4.1Acceptance of raw material and fuel
All the iron content materials, fuel and flux shall be accepted by raw
materials open storage field, storages, and then loaded to join the mixing
tank, lime powder directly to the mixing tank by gas transportation.
2.1.4.2 Fuel preparation system
In this design, is a fuel with the intermediate bin, fuel crushing chamber,
fuel transfer station, finished product warehouse and related belt conveyor
system.
Fuel crushing chamber is 7.5 mX7.5 m multi-storey buildings. The
chamber is divided into three platforms: + 7.50 m platform with - 1 tape head
department, tape machine with a RCY - P65 permanent magnetic iron
remover hanging above the feeding point; + 3.00 m platform layout with 4
PG -f 750 x 500 four roll fuel crusher, and hole for equipment maintenance
hoist; + / - 0.00 m surface layout land with crusher discharging tape machine.
The room maintenance equipment is set with a 5 t electric single-beam
bridge crane.
2.1.4.3 Raw material storage house, batching room and lime bin
Raw material storage house is 72 m x 11.5 m, batching room main span
is 72 m x 6.5 m , arranged with auxiliary lime warehouse 6 m * 6 m, 6 m x
10.8 m lime digestive chamber and transit , all buildings is an organic whole
design. Raw material storage house is set with three iron refinery ore
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 16
grooves, one ore returning groove, one lime stone groove, one dolomite
groove, and the fuel groove, batching room has 12 ore bins altogether,
including: 1 # as fuel intermediate storage bin, # 2 ~ # 6 for iron concentrate
storage bin, 7 # for ore returning bin #, 8 # ~ 9 # for finished product flux ore
storage bin, 10 ~ 11 # for the finished product bin, 12 # for quick lime storage
bin.
Materials in 1 # ~# 9 storage bin shall be grasped by bridge crane from
raw material storehouse to the bin; 10 # ~#11 storage bin set with - 4
reversible tape machine for the fuel into two bins; 12 # lime bin storage bin
receiving the quick lime through the pneumatic conveying pipe. To stabilize
the mixing tank level, each material bin is equipped with material level meter,
which is continuous on-line measurement. In order to prevent the material
flow blockage, storage bin has vibrator or air cannons under them.
Table 2.1-7:1 * 36m2 sintering batching bin volume calculation
Ore groove
No.
Materials Qty
Each
Volume
(m3)
Total effective
volume
(m3)
Bulk
weight
(t/m3)
Total
storage
(t)
Material
consumption
(t/h)
Storage time
(h)
1 Fuel 1 55 55 0.6 33 9 3.6
2~6 Iron refined ore 5 51 255 2.20 561 43.33 12.9
7 Returning ore 1 51 51 1.80 91.8 5.22 17.6
8~9 fuel 2 63 126 0.6 75.6 3.4 22.2
10 Lime stone 1 63 63 1.6 100.8 2.98 33
11 Dolomite 1 63 63 1.6 100.8 3.18 31.6
12 Quick lime 1 54 54 0.6 32.4 2.14 15.1
Fuel under the feeding intermediate bin is fed through the "feed trough
+TZG-50-130F vibrating feeder", and unloaded on the burning -1 belt
conveyor to the warehouse ±0.00m platform, and transported to the crushing
chamber for crushing.
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 17
Iron containing material batching adopts "PZ17 disk feeder +B650
electronic belt weigher (fixed speed, uniform)" , flux and fuel batching by
B650 electronic belt weigher (drag from speed), lime by "GY type impeller
feeder + electronic spiral scale + digester" .
The batching chamber consists of two platforms: +10.00m platform for
batching bin platform with the main layout of burning -4 reversible belt
conveyers; all the batching devices and burning -1 tape end frame are
arranged in positions on the ground under the 0.00m. Lime bin top is set with
a +12.00m operating platform and dust collector, digestive equipment and
digestive device are arranged under the bin.
The room is set with 2T electric hoist and 2T manual monorail car each
one as a lifting and maintenance tools.
2.1.6. First mixture chamber
First mixture chamber is 8m * 13.2m, ±0.00m with a 2200 x 7000
cylinder mixing machine on the ground buildings, the installation angle is 1.5
degrees, the cylinder center line and the feeding tape machine are coaxial
arrangement in order to ensure smooth material flow and the funnel not easy
to be blocked.
The chamber is provided with two platforms: the tape feeding machine
is arranged on the +5.00m platform, the drum mixing machine and its driving
device, mixer discharging belt is located in the 0.00m on the ground. At the
top of the plant at the same time, set up two sets of 5T electric hoist for
equipment repair.
2.1.6.5 Second mixture chamber
Second mixture chamber is 8m * 13.2m, ±0.00m with a 2200 x 7000
cylinder mixing machine on the ground buildings, the installation angle is 1.5
degrees, the cylinder center line and the feeding tape machine are coaxial
arrangement in order to ensure smooth material flow and the funnel not easy
to be blocked.
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 18
The chamber is provided with two platforms: the tape feeding machine
is arranged on the +5.00m platform, the drum mixing machine and its driving
device, mixer discharging belt is located in the 0.00m on the ground. At the
top of the plant at the same time, set up two sets of 5T electric hoist for
equipment repair.
2.1.6.6 Sintering main workshop
The main sintering building is a multi-storey building with length 53.25m,
width 12M, consists of six layers: The sixth layers of the +20.80m platform is
set with mixing-4 adhesive tape machine, mixing bunker under the platform;
the fifth layer +13.90m platform as the main sintering platform layout, with
main operating room and dry oil station; the fourth layer +10.60m platform
with single roll crusher; the third +9.80m platform with sintering machine and
single roller operating room; the second layer +6.10m platform with
SZR1545 hot vibrate screen; the first layer + 0.00m with air blower, water
seal and corresponding water seal zipper machine groove, and PZ17 hot
returning ore disk feeder.
The head of sintering machine is equipped with 3350 x 4500 precipitator
and 70m2
four electrostatic precipitator each one, all the dust discharging
pipeline and sintering flue ash falling pipe is directly inserted into the water
tank water seal zipper to improve the environment and avoid air leakage.
The main equipment of sintering room is set with one 5T electric single
girder crane and a 1t electric hoist (maintenance of mixed -4 tape machine).
2.1.6.7 Belt cooling chamber
The sintering discharging machine is arranged with 42m2
blast belt
cooling machine at its end, Belt cooling chamber is divided into four layers:
the fourth layers +8.207m platform with the belt cooling machine
transmission device; the third layer +5.577m platform with cooler head and
equipment overhaul hoisting hole; the second layer +1.80m platform with
cooling belt discharging and equipment overhaul hoisting hole; the first
0.00m plane is open layer. Take the rest with coolers strip layout. Belt
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 19
cooling machine is set with three sets of G4-73-11D blowers.
The cooling belt machine maintenance equipment is 5T electric single
girder crane.
2.1.6.8 Main drawing fan chamber
The main exhauster chamber is 12m * 24m, equipped with a SJ3600
main fan with inlet electric valve and outlet silencer.
The workshop is divided into two platforms: 0.00m planar is fan base
and lubricating station, and have maintenance space on both sides; +1.75m
platform for equipment operation and maintenanceplatform, with wind
damper actuators placed; at the same time, a small platform 8.200m placed
with high tank. Building insulation measures and design considered.
The room is equipped with a 10t single beam bridge crane hook for
equipment repair.
2.1.7.4 Sintering machine
Table 2.1-10 main technical parameters of 36m2 sintering machine
1 Effective sintering area 36m2
2 Effective sintering length 24m
3 Tail wheel center distance 33.8m
4 Tail wheel diameter 2775.5mm
5 Tail wheel speed 0.131~0.394 r/min
6 Effective size of the trolley 1000×1500×620mm
7 Trolley speed 1.142~3.435 m/min
8 Maximum thickness of material layer 600mm
9 Output 40×104
t/A
10 Main drive motor Type No. Y132M-6
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 20
Power 5.5 kW
Rotating speed 960~320 r/min
Specifications f800×1540
Motor type Y112M-611 Roller feeder
Power 4kW
Specifications f128×1590
Motor type Y90S-412 Seven roller feeder
Power 1.1 kW
2.1.7.5 Single roll crusher
Single roll crusher specifications should be compatible with the sintering
machine, sintering trolley mainly depends on the discharge width, the design
adopts F1100×1620mm single roll crusher with the following advantages:
uniform broken particle size; main wear parts (gear roller crown, the① ②
grate plate) is convenient to replace, shorten the repair time, ensure the
operation safety, improve working conditions; main shaft adopts water③
cooling, roll drive end is provided with a safety device, improves the service
life.
Single roll crusher performance is as follows:
Maximum feed size: 1500 x 1000 x 250mm;
Discharge size: = 100mm;
Speed gear roller: 4.9r/min;
Processing capacity: 60 to 100t/h
2.1.7.6 Hot vibrate screen
Thermal mineral vibrating screen with 1.5m * 4.5m, the performance is
as follows:
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 21
Screen angle: 5 °;
Screen size: 7 x 33mm;
Particle size: less than 100 mm;
Max capacity: 150 t/h
2.1.7.7 Belt cooling machine
Table 2.1-11 42m2
main belt cooling machine technical parameter stable
1 Effective cooling area 42 m2
2 Trolley speed 0.3~0.6m/min
3 Material thickness 1m
4 Process capacity 96t/h
5 Material bulk density 1.6t/m2
6 Feed temperature 700~800℃
7 Discharge temperature <120℃
8 Cooling time 45~90min
9 Cooling machine angle 12°
10 Trolley width 1500mm
11 Trolley effective length 700mm
12 Trolley sideboard height 1060mm
13 Trolley quantity 112pcs
Type No. Z2-72
Power 13kW
Rotating speed 1000 r/min
14 Main drive motor
Working term Continuous
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 22
Type No. CS165
Speed ratio 2953.28
Center distance 1650mm15 Reducer
Maximum
torque
100 kN·m
Type No. G4 - 73 No 11D
Wind pressure 3411 Pa
Wind volume 69427m3
/h
16 Cooling fan
Quantity 3 台
Type No. Y280M-4
Power 90 kW17 Fan motor
Rotating speed 1450 r/min
2.1.7.8 Main drawing fan
The design adopts SJ3600-1.033/0.893 centrifugal sintering fan as the
following parameters:
Table2.1-12: SJ3600 centrifugal sintering fan parameters
1 Inlet flow: 3600 m3
/min (working condition)
2 Inlet pressure: 87.57 kPa
3 Inlet temperature: 150 ℃
4 Outlet pressure: 101.33 kPa
5 Static pressure: 13.76 kPa
6 Spindle speed: 1485 r/min
7 Fan rotation direction Counterclockwise
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 23
(from the motor side view)
Power: 1250 kW
8 Auxiliary motor
Voltage rating: 6 kV
2.1.7.9 Electrostatic precipitator
One set of 70m2
horizontal four electric field of electrostatic removal device.
2.1.8 Preheat stove
Ignition and preserve furnace main performance specifications
Table 2.1-11 Preheating and ignition furnace technical performance
No. Items Parameters Unit Remarks
1 Ignition furnace structure
Ignition and preserve
furnace
2 Fuel
Blast furnace gas
3349.4
kJ /Nm3
3
Furnace gas duct junction
pressure
6000~8000 Pa
4
Air temperature of
preheated ignition furnace
400~450 ℃
5
Preheating and ignition
furnace pressure
-10~0 Pa
6 Ignition temperature 1100±50 ℃
7 Ignition time 1 min
8 Holding time 1~1.5 min
9
Heat preservation
temperature
600~800 ℃
10 Sintering ore blast furnace 210 MJ/t
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 24
No. Items Parameters Unit Remarks
gas consumption
11
Ignition furnace gas
consumption
3200 m3
/h
12
Ignition furnace air
consumption
2570 m3
/h
13
Preheating furnace gas
consumption
1800 m3
/h
14
Preheating furnace air
consumption
1800 m3
/h
2.2 Iron making process
2.2.1 Overview
The current advanced technology using iron works, in accordance with
the design, high yield, low consumption principles of longevity. Annual
production of 200,000 tons of ironcan give full play to the procedure and
process of production.
Blast furnace material structure adopts 100% sintered ore with
comprehensive consideration of the India local conditions and the production
cost, the production operation and management convenience, cost and
other factors, design principle of burden structure is low cost and ease of
procurement,.
The application of distributed control system. The hot blast furnace,
blast furnace, slot in the main control room.
The equipment can carry out remote operation on the computer, also
can be operated manually in the equipment side.
2.2.2 Workshop composition and process flow
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 25
2.2.2.1 Workshops
The iron making blast furnace includes 2X80m3, high silo and feeding
system, gross furnace gas system, hot blast stove system, casting system,
cast iron machine system, slag treatment system, pulverized coal injection
system, dust removal system.
Sinter ore transportation, coke, lump ore transported to the
comprehensive transfer station, single rowmaterial bin, two belt conveyors
separately for each bin discharging hopper, because of comprehensive
transfer station’s three connection hopper, the high bin on the belt conveyor
can be switched to each other, when a fault occurs, the other a belt conveyor
can replace its function in a short time, leave enough time to repair.
In order to improve the furnace hopper is high, work environment, a
furnace dust removal system, dust removal system on material, two sets of
operating room together are compact arranged with investment saving,
convenient operation and management.
When the next process is on maintenance of iron or failure, in order to
buffer, iron machine shall digest molten iron in the blast furnace. Cast iron
machine is set with tank repair room, which can make full use of the hoist
capacity with lower investment.
Coal gas dust removal by the gravity dust and nitrogen blowback bag
filter
2.2.3 Raw material and fuel condition
Raw material is sintering ore, lump ore. Fuel is coke, coal.
2.2.3.1 Sintering
Table 2.2-1 Sinter ore composition table
Chemical TFe P S FeO CaO SiO2 MgO Al2O3 CaO/SiO2
Content% 63.8 0.05 0.025 5.5 8.47 4.97 1.71 1.82 1.7
Size: 5 ~ 70mm
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 26
Annual requirement: 350,000 tons
Transportation mode of: the transport belt conveyer
2.2.3.3 Coke
Table 2.2-3 Coke quality
Moisture Ash Volatile S
Fixed
carbon
M40 M10 CRI CSR
4.52 12.14 1.20 0.62 82.13 89.10 5.60 33% 59%
Size: 5 ~ 50mm
Annual requirement: 117,600 tons
Mode of transportation: belt conveyor to transport from the yard of high
material bin
2.2.4 products and by-products
The main products is hot casting metal, the byproduct is water, gas, gas
ash
2.2.4.1 Molten iron
Table 2.2-6 Molten ironcomposition table
Chemical C Si Mn P S
% 4.0~4.5% 0.4~0.5% =0.10% 0.03~0.06%
Molten iron temperature: 1430 ℃
Annual output: 200,000 tons, cast iron machine block.
2.2.4.2 Water slag
Table 2.2-7 Water slag composition table
SiO2 CaO Al2O3 MgO FeO S MnO CaO/SiO2
32.51 37.74 15.15 8.81 0.32 1.05 1.16
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 27
Annual output: 100,000 tons
Mode of transportation: slag before furnace is by water flushing filter, filter
bottom pool is by motor grab ransport.
2.2.4.3 Furnace gas
Table 2.2-8 Furnace gas composition table
CO2 CO N2 H2 CH4 O2
19.314 22.714 56.243 0.729 0.686 0.314
Gas temperature: ~ 120 ℃
Gas pressure: 6 kpa
Annual output: 2.12 x 108 Nm3
(the amount of gas pipeline network,
dosage of hot blast stove excluded,)
The mode of transportation: the gas pipeline
2.2.4.4 Gas ash
Blast furnace gross gas dust removal is in gravity precipitator,
Annual output: 13,000 tons
The mode of transportation: dump truck transport to the truck, delivered
to sintering.
2.2.5 Power consumption parameters
Table 2.2-9 Power consumption table
Tons of iron consumption Annualconsumption
Items
Unit Consumption Unit Consumption
Electricity kwh 920000 kwh 2300
Compressed air Nm3
172000 Nm3
430
Nitrogen Nm3
200000 Nm3
500
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 28
Tons of iron consumption Annualconsumption
Items
Unit Consumption Unit Consumption
Water m3
28000 m3
70
2.2.6 Main production operation indicators
Table 2.2-10 Production operation index table
No Index items Unit Value
I Blast furnace
1 Blast furnace nominal volume m3
2X80
2 Utilization co-efficiency tHM/m3
·d 3.0
3 Coke ratio Kg/t·Fe 700
4 Annual working days days 350
II Annual output
1 Molten iron output 104
t/a 20
2 Water slag 104
t/a 10
3 Blast furnace gas 108
Nm3
/a
2.21 (Hot blast stove
consumptionexcluded)
4 Powder coke 104
t/a
(Return to the sintering
workshop)
5 Screened sintered ore 104
t/a
(Return to the sintering
workshop)
Ⅲ Raw material and fuel consumption(Annual)
1 Sintered ore 104
t/a 35.8
2 Coke 104
t/a 11.79
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 29
2.2.7 Iron making process facilities
2.2.7.1 High position material hopper and top charging system
Blast furnace sinter ore, ore, mixed ore, coke shall be transported to high
position material hopper by belt conveyor, there are gates under the hopper,
the materials shall go through the feeder vibration screening into their
respective weighing hopper by the belt conveyor weighing hopper and then
into the left and right 1.5m3
intermediate weighing hopper, hopper bottom
gate shall open according to the program and unload the material into 1.3 m3
skip, skip shall unload the material into the furnace according to the
requirements of the program, then open and close the small bell, big bell in
turn according to the requirements of furnace iron making process under the
control of the program, the material shall be spread in the blast furnace throat
according to the requirements of the cloth. Go round and begin again,
complete the loading process for the blast furnace.
Sintering ore, lump ore, mixed ore, coke are added to the h igh position
material hopper, screened before the weighing hopper. Coke (5~20mm) can
be added when the mixed ore in the normal production, manganese or fluorite
should be added when abnormal production for cleaning the furnace.
Each blast furnace has two coke bins, the effective volume of coke bin is
180m3
; 3 sintering ore bins with total effective volume of 270m3
; one flux bin,
the effective volume of each compartment 90m3
.
Blast furnace system with double bell top, Vu=6m3
, the flexible spreading
furnace top pressure 0.06Mpa, mature and reliable, high work rate.
2.2.7.2 Blast furnace system
The design of blast furnace life is 5 years.
Based on the 2X80m3
blast furnace design and practice experience
combined with the raw material and fuel condition, in order to improve the
permeability of blast furnace, the lower part of blast furnace volume is
increased properly, the dead iron layer thickness heightened, the stack height
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 30
reduced, stocky in design.
Outside furnace cooling form.
Furnace throat steel brick bar structure.
Comprehensive air cooling furnace bottom
One layer half graphite baked carbon brick bottom, two porous baked
carbon brick layers.
The tuyere is equipped with 8 sets of high alumina brick.
Iron mouth adopts with 1 sets of high aluminum brick.
Slag hole adopts with 1 sets of high alumina brick.
The lower part of the body adopts high aluminum brick by brick, the
upper shaft.
The furnace body structure for the frame structure adopts with 1 taphole
and 1 slag outlet.
The main product is molten iron, single blast furnace daily output is 240t
ladle molten iron, the byproducts is gas and water slag, single blast furnace
water slag is 165t, single blast furnace daily gas output is 5.9 x 104
Nm.
Table 2.2-11 Parameters of Blast Furnace Inside
Items Sign Unit Parameters
Nominal volume  Vu m3
80
Hearth diameter  D mm 2100
Waist diameter  D mm 3800
Throat diameter  d1 mm 3400
Effective height  Hu mm 12690
Dead iron layer  h0 mm 308
Hearth height  h1 mm 2100
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 31
Items Sign Unit Parameters
Waist height  h3 mm 1000
Throat height  h5 mm 1300
Bosh Angle  a 81°35’
Furnace body angle  ß 83°55’
Number of iron tapping  Piece 1
Slag outlet number  Piece 1
Tuyere number  Piece 8
Ratio of height to diameter  Hu/D 3.34
2.2.7.3 Hot blast stove system
The life of hot blast stove design is 5 years without a major overhaul.
Three sets of top combustion hot blast stoves are responsible for
providing hot air, wind temperature 1100 , two℃ for burning and one for
sending working system. The chimney height is 45m. Single hot blast stove is
110 tons.
2.2.7.4 Raw gas system
The top of the furnace descending pipe diameter is 900mm. The gravity
dust collector is for coarse dust, cylinder diameter 4000. In order to reduce a
second time pollution when the ash is discharging, ash storage silo adopts
artificial gravity humidification dust cleaning.
2.2.7.5 The tapping system
Both in the tapping hole are respectively arranged on a hydraulic mud
gun and a pneumatic tapping machine.
Tap hole and slag outlet are arranged with industrial camera, BF main
control room can monitor.
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 32
Tapping field is designed with a 5T crane, LK=13.5m. Rail surface
elevation 9.2m.
Tapping field periodically the blast furnace molten iron and slag tapping,
12~15 times a day, two blast furnaces shares a 35 meter double chain wheel
cast iron machine, furnace water slag is in the form of water rushing slag with
bottom filter method.
Tapping field is equipped with dust removal, which is for dust produced
skimmer, iron slag ditch with the negative pressure ventilation.
Dust collected by the dust catcher shall be wetted and transported by car
to sintering workshop or sinter material.
The blast furnace water supply and drainage is divided into four systems:
1. The furnace outside cooling wall, the wind cold slag in sets of two
sets of hydraulic station for the medium pressure, furnace cooling water.
2. Three sets of tuyere, top water spray is pressure cooling water.
3. Platform furnace cleaning spray water and later stage offurnace shell
low pressure cooling water.
4. Furnace flushing slag water is turbid circulating water.
2.2.7.6 Cast iron machine
During the rotary furnace maintenance, the excess iron shall be sent into
iron cast machine, cast iron machine capacity is 80t/d, can digest the daily
output of the blast furnace.
2.2.7.7 Slag treatment system
Blast furnace slag after water quenching, the water mixture shall go
through the slag flushing channel into the bottom of filtering pool, filtering pool
is set with two sedimentationpools, one for use and one for preparation, slag
and water can be separated and water slag shall be transported by car
bucket.
3.2 Process control and automation instrumentation
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 33
3.2.1 Sintering workshop
3.2.1.1 Raw materials storage chamber and batching room
(1) 8# ~ 11# bin is by material dragging scale belt control, belt width
650mm, weighing range from 0 to 5t/h.
(2) 2# ~ 7# batching belt scale weight control, belt width 650mm,
weighing range from 0 to 60t/h.
(3) 12# lime spiral quantitative feeding weigher control, weighing range:
0 ~ 3 t/h.
(4) 14 bin (1intermediate fuel bin, 4fuel and flux bins, 6 iron content
material bins, 1 lime bin, 1main sintering workshop bin, 1sintered ore bin)
with material level meter, continuous online measurement, and high and low
level alarm.
All the test parameters shall be input in the microcomputer control
system.
3.2.1.2 Finished sintered ore metering
Finished sintered ore is position detection, detection position is set on
finished-1 tape machine, display in the main control room with display, record,
the cumulative. Weighing range is 0 ~ 35 meters double chain wheel cast iron
machine.
3.2.1.3 Main building part
All the test parameters shall be input into PLC, the control system shares
PLC with professional electric control system. The computer is located in the
main building control room.
(1) When the gas mains pressure and low pressure alarms, it shall be
quickly cut off.
(2) Ignition furnace temperature automatic adjustment
(3) Ratio regulation of the ignition furnace gas flow and hot blast stove
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 34
(4) Ignition furnace gas flow display
(5) Ignition furnace gas pressure display
(6) Hot blast stove inner temperature display
(7) Hot blast furnace gas flow and air flow ratio control
(8) Hot blast furnace gas flow display
(9) Hot blast furnace gas pressure display
(10) Hot blast stove air flow
(11) Hot blast stove air pressure display
(12) Blast stove pipe pressure display
(13) Hot blast stove pipe temperature display and over temperature
alarm interlock with open hot air relief valve
(14)Hot blast furnace gas flow display
(15) No. 1, No. 2, No. 8, No. 11 and No. 12 sintering bellows
temperature display
(16) No. 1, No. 2, No. 8, No. 11 and No. 12 sintering bellows pressure
display
(17) Sintering flue gas temperature display, record
(18) Sintering flue gas pressure display, record
(19) First mixture, second mixture moisture detection.
3.2.1.4 Ventilation fan room
In order to facilitate the control of the main plant control system, the
entrance room temperature, pressure, flow detection signal of the main fan
ventilation system shall be input in the microcomputer control system of the
main building. All the parameters of main drawing fan room will enter the
ventilation room control displayed by the type III instrument panel.
(1) Main exhaust blower entrance temperature display, record
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 35
(2)Main exhaust blower entrance pressure display, record
(3) Main exhaust blower entrance flow display, record
(4) Main exhaust blower entrance door operation
(5) Cooling water pressure display and alarm
(6)Oil pressure display and alarm
(7) Fan bearing temperature alarm
3.2.1.5 Machine tail dust removal part
Dust removal part of the automatic control is type III instrument panel
display.
(1) Dust removal entrance flow display
(2) Dust removal entrance pressure display
(3) Dust removal entrance temperature display
(4)Dust removaloutlet flow display
(5) Dust removal outlet pressure display
(6) Dust removal temperature of collector display
(7) Blower manual valve operation
3.2.1.6 Water pump part
The pump automatic control is type III instrument panel display
(1) The clean water cycle pool, clean circulating heat water sink pool
level remote display, with high and low water level alarm device
(2) The clean water cycle pool, supply pipe flow, pressure, temperature
detection
(3) The clean water cycle pool to the tower’s flow, pressure,
temperature measurement
3.2.2 Iron making workshop
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 36
3.2.2.1 Overview
Automation instrument consists of two parts: field instrumentation and
control system, adoption of PLC as the control system and use the instrument,
electrical integration plan.
3.2.2.2 Design scope
(1)Blast furnace main body
(2) Under groove and feeding system
(3) Gas dedusting
(4)Hot blast stove
(5) Blower station
(6) Circulating water pump station
(7) Water cinder flushing system
(8) Ore groove cleaning system
3.2.2.3 Measurement and control
1) Blast furnace main body
(1) Furnace top pressure measurement, control
(2) Top tank pressure measurement, the lower limit of interlock
(3) Top tank pressure control
(4) Sealing box pressure measurement
(5) Pressure controlof gas tight box
(6) Nitrogen tank pressure, low alarm limit
(7)Nitrogen pipe flow measurement
(8) Furnace top (riser) temperature measurement, high limit alarm
(9) Furnace top tank temperature measurement, high limit alarm
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 37
(10) Airtight box temperature measurement, high limit alarm
(11)Cooling wall temperature measurement, high limit alarm
(12)Furnace ling temperature measurement, high limit alarm
(13) Furnace bottom temperature measurement, high limit alarm
(14) Furnace foundation temperature measurement, high limit alarm
(15) Hot blast temperature measurement, control
(16) Air pressure measurement
(17) Furnace body cooling pipe temperature, pressure and flow
measurement, pressure low limit alarm
(18) Tuyere outlet cooling water temperature, pressure and flow
measurement, pressure low alarm limit
(19) Furnace top of the cooling water temperature, pressure and
flow measurement, pressure low alarm limit
(20) Returning water temperature measurement, high limit alarm
(21) Gravity dust removal measurement, high / low limit alarm
2) Under groove tank and feeding system
(22) Sinter weighing hopper weighing
(23) Intermediate ore hopper weighing
(24) Coke hopper weighing
(25) Hydraulic station hydraulic measuring and alarm
3) Gas dedusting
(1)Main entrance of raw gas temperature measurement
(2) Gas Entrance / exit duct pressure measurement
(3) Single box inlet / outlet gas pressure measurement
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 38
(4) Net gas duct temperature, pressure measurement
(5)Net gas pressure measurement of pressure regulating valve
(6) Nitrogen header pressure measurement
(7) Nitrogen gas valve reduced pressure measuring
(8) Cooling water pipe pressure measurement
(9) Ash hopper material level measurement
4) Hot air furnace
(10) Cooling water inlet temperature, pressure, pipe flow
measurement, pressure low alarm
(11) Cold air inlet duct temperature, pressure, flow measurement,
pressure low alarm and interlock
(12) Flue gas heat exchanger before / after temperature and pressure
measurement
(13)Flue, flue gas temperature measurement, high limit alarm
(14) Air preheated before / after the flue gas temperature, pressure
measurement
(15) Hot - blast stove temperature measurement, control and high
limit alarm
(16)Hot blast stove combustioncontrol
(17) Hot air furnace top pressure measurement
(18)Cold wind valve front / rear differential pressure measurement
(19)Flue valve front / rear differential pressure measurement
(20) Blast furnace gas duct pressure measurement and control, high /
low limit alarm
5) Blower station (mechanical and electrical integration)
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 39
(1) Air supply system
(21) Filter differential pressure measurement, high limit alarm
(22) Fan inlet pressure, temperature measurement
(23) Fan pressure, temperature, flow rate measurement
(2) Oil system
(24) Oil temperature, pressure, pressure low alarm limit
(25) Oil filter before / after measuring differential pressure, high alarm
limit
(26) Oil level, oil temperature measurement, low oil level alarm
(3) Cooling water system
(27)Cooling water inlet pressure, low alarm limit
(28) Cooling water pressure, temperature measurement, temperature
high alarm
(4) Blower fan
(29) air blower bearing temperature measurement, high alarm limit
(30) Blower shaft displacement measurement, high limit alarm,
interlocks
(31) Stator temperature, high alarm limit measurement
(32) Fan anti surge control
6) Center circulation water pump station
(33)Blast furnace clean circulation water temperature, pressure, flow
detection
(34)Blast furnace clean circulation water column temperature,
pressure detection
(35) Tuyere small sleeve net ring water to water temperature,
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 40
pressure, flow detection
(36) Filter clean circulation water tower duct pressure detection
(37) the net ring water tank, clean circulating water heat sink, security
water tower water level detection
7) Water rushing slag system
(38) Blast furnace pipes turbid circulating water slag temperature,
pressure and flow rate of water mains detection
(39)Blast furnace slag pump room water level detection
8) Ore groove dust removalsystem
(40) Ore trough dust collector pressure measurement
(41) Ore trough collector pressure measurement
3.2.2.4 Controlling room
1) Blast furnace tapping side is located in the central control room.
2) Blower station PLC cabinet, blower station circulating pump station
instrument cabinets are placed in their own operating room.
3.2.2.5 Power supply
Instrument power supply adopts 380/220V three-phase four wire AC
power supply, the total capacity is about 20kVA, PLC system and some
instruments are equipped with uninterruptible power supply (UPS), 15
minutes after the blackout, the sustainable power will be supplied (UPS and
electrical combination).
3.6.1 Sintering
3.6.1.1 Blast furnace gas
The project is proposed of 1 * 36m2
sintering workshop, sintering
machine heating is from blast furnace gas. Parameters are as followed:
Gas pressure = 6kPa;
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 41
Gas calorific value 3140 to 3350Kcal/Nm3
;
Consumption: ~ 5000 Nm3
/h;
Dust content of gas <10mg/m3.
According to the above parameters, sintering gas pipe is determined
with a diameter of 426 mm x 6, into the plant before the gas pipeline are
respectively arranged with gas special manual butterfly valve and the valve
with manhole platform, gas pipeline end is arranged with purging device
3.6.1.2 Nitrogen
Gas pipeline purging medium is nitrogen, consumption volume is
110m3
/h, pressure is 0.3 ~ 0.5MPa, diameter f 57 * 3.5 is chosen.
3.6.2.3. Gas pipeline:
The nitrogen needs for the production is 22Nm3
/min, pressure 0.7Mpa,
the gas has blowing (intermittent), the kiln top cylinder (intermittent), bag filter
reverse blowing (intermittent), active lime pneumatic conveying (continuous),
instrumentation, valve purge (intermittent).
3.6.3 Iron making
2 x 80m3
blast furnaces, the gas facilities are mainly dry bag dust
removal facilities of gas;
3.6.3.1 Dry bag dust removal facilities
2 x 80m3
blast furnace, the dry cloth bag dust removing technology of
blast furnace gas purification
⑴ Design conditions
Blast furnace volume: 80m3
;
Pig iron production for steelmaking: 20 * 104
t;
Gas generating quantity: 5.22 * 104
m3
/h, 6.55 * 104
m3
/h;
Furnace gas top pressure: 30 ~ 100KPa;
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 42
Furnace top gas temperature: 120 ~ 280 degrees;
Waste gas dust content: 10g/m3
;
The net gas duct pressure: 6KPa.
(2) Blast furnace gas dry bag dust removal process
A. Gas system
Gravity dust collector (iron making process) ? bag filter dust removal?
clean gas duct ? muffler, ? gate valve ? butterfly cut off valve ? gas pipe
net.
B. Pulse bag dedust removal system
Application of nitrogen pulse dust cleaning, nitrogen pressure 0.4 ~
0.5MPa, consumption (intermittent use) ~ 5m3
/min, 6 ~ 9 times / day.
C. Bag filter ash discharging system
This design uses a centralized ashdischarging mode: dust collecting
bucket? upper pneumatic valve, ? middle lower ash bucket? lower
pneumatic ball valve? feeder? ash conveyer? bucket elevator? large dust
bin? dust humidifier ? ash automobile sinotrans.
D. Bag leak detection system
This design has the bag breakage detection, the clean gas duct is
provided with 1 set of automatic gas line leak detector; each boxof the dust
removaloutlet are respectively arranged with gas automatic online detector
and manual sampling detection point.
(3) Blast furnace gas dry bag dust removal temperature and control
valve
(a) When the normal operation of blast furnace
When the normal operation of blast furnace, gas temperature entering
the bag type dust collector is 100 =T=280 , the gas flow through the bag℃ ℃
filter and purified (purified gas dust content to ensure that the value is less
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 43
than or equal to 10mg/m3
), and then enters into the clean gas duct through
the gate valve and shut-off valve, extra gas shall be diffused naturally.
(b) When the non normal operation of blast furnace
When the blast furnace is in the non normal operation, gas temperature
will be in 250 =T=450℃ ℃ or T<120 .℃ When normal working temperature of
raw gas into the bag filter is too high or too low, that will affect the bag, if the
gas temperature is too high, it will damage the bag; if the gas temperature is
too low, it will make the dust condensed and attached to the bag, causing dust
removal and cleaning difficulties.
When the waste gas is too high (300℃~450 ), the blast furnace℃
gravity dust removal device shall start water cooling measures, so that the
gas temperature is =250 into the bag filter bag dust collector℃ to ensure
normal work; when the gas temperature is too low =120 ), gas diffusion℃
process at the top gravity dust collector will start to prevent low temperature
gas into the bag filter bag and damage and condensation.
In order to prevent the gas in the bag type dust collector in dews, when
the temperature is too low, the gas into the dry dust removal system will be
cut off, considering gas releasing technology ,The design of the gas pipeline,
bag dust removal facilities will be thermal insulation;
(c)Bag filter outlet and inlet pipe are provided with pneumatic butterfly
valve and hydraulic valve to cut off the gas for bag dust removalon
maintenance.
(4) Main equipment selection
A. Bag dust removal materials: new FMS (FMS) filter.
B. Bag box number and size
Box number: 5, single row layout;
Box size: F2800mm x 17700mm;
Bag size: F130mmX 6000mm;
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 44
Each box bag number: 130 pieces;
Totalbags: 850 pieces;
Each box filter area: 327.4m2
;
Dust collector filter total area; 1637m2
During normal operation of bag filter load: 27.29 ~ 31.2m3
/m2
.h.
C. Pulse dust cleaning devices
Pulse valve total number: 50;
Each box number: 10 pulse valve;
Pulse jet blowing nitrogen pressure 0.4 ~ 0.5MPa.
D Other devices
Buried scraper conveying machine 1 set;
Bucket type lifting machine 1 set;
Dust humidifying machine 1 set;
20m3
large dust bin 1;
E. Pressure regulating valve group (with a silencer) 1;
(5)Main technical and economic indexes
Gas processing capacity: 6.15×104
~5.22×104
m3
/h;
Clean gas dust content: =10mg /m3
;
Clean calorific value: 3344KJ/m3
;
Ash content recovery: ~ 0.7t/h (dry basis);
Power consumption
Water: 3t/h, intermittent use;
Power: 50Kwh/h; intermittent use
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Cell phone: 0086 132 9904 2234 Email: guoke1207@hotmail.com
Page 45
Nitrogen: 5m3
/min (pulse cleaning), continuous use, 6 ~ 9 times / day;
3.7 Thermal power facilities
3.7.1 Iron making
3.7.1.1 Overview
The 2X80m3
level of blast furnace, the thermal power facilities includes
blast furnace blower room, blast pipe, air compressor and compressed air
pipe.
3.7.1.2 Blower room
The newly built blast furnace blower room arrangement is three models
of C-430-2.4 centrifugal blower, the working system is dual-use
one-preparation, and the fan outlet air volume is 430m 3/min, the blower
outlet pressure of 0.14Mpa to the blast furnace. (Equipment order shall
prevail the above model, parameters of the equipment.)
3.7.1.3 Heat pipe
Blast furnace workshop heat pipe includes:
(1) The blast wind inletting pipe;
The blast wind inletting pipe starts from blower room to the end of iron
making technology platform. According to the professional requirements of
iron making process, pipe flow volume is designed by 430Nm3
/min, pipe
specifications are D530 x 6, the material is Q235-B, the design pressure is
0.45Mpa. Erection method adopts independent support overhead laying, the
upper part of the support structure is steel structure.
XI’AN XINLI METALLURGICAL EQUIPMENT ENGINEERING CO., LTD. 
NO.16 C DISTRICT, XIAN PIONEERING PARK, NO. 69 JINYE RD, XI’AN HI-TECH   
INDUSTRIES DEVELOPMENT ZONE, XI’AN CITY, P.R.CHINA
Email: guoke1207@hotmail.com Cell phone: 0086 132 9904 2234
Page 46

Weitere ähnliche Inhalte

Was ist angesagt?

ethanol production from crude glycerol
ethanol production from crude glycerol ethanol production from crude glycerol
ethanol production from crude glycerol Sonia Patel
 
L pac presentation
L pac presentationL pac presentation
L pac presentationSonia Patel
 
Cokemaking in an Integrated Steel Works - Technology, Location and Greenhouse...
Cokemaking in an Integrated Steel Works - Technology, Location and Greenhouse...Cokemaking in an Integrated Steel Works - Technology, Location and Greenhouse...
Cokemaking in an Integrated Steel Works - Technology, Location and Greenhouse...Smithers Apex
 
Petcoke Fired Aluminum Melting Furnace
Petcoke Fired Aluminum Melting FurnacePetcoke Fired Aluminum Melting Furnace
Petcoke Fired Aluminum Melting Furnacepankaj chauhan
 
Petcoke furnace die casting furnace
Petcoke furnace die casting furnacePetcoke furnace die casting furnace
Petcoke furnace die casting furnacepankaj chauhan
 
PPT ON COKE PREPARATION
PPT ON COKE PREPARATIONPPT ON COKE PREPARATION
PPT ON COKE PREPARATIONNIT SRINAGAR
 
Lime kiln principles and operations
Lime kiln principles and operationsLime kiln principles and operations
Lime kiln principles and operationscesar hernandez
 
Mangalam Alloy Ltd Industrial report
Mangalam Alloy Ltd Industrial reportMangalam Alloy Ltd Industrial report
Mangalam Alloy Ltd Industrial reportaman1312
 
Industrial Training Report on Blast Furnace
Industrial Training Report on Blast FurnaceIndustrial Training Report on Blast Furnace
Industrial Training Report on Blast FurnaceShani Kumar Singh
 
Blending with high moisture coal an approach
Blending with high moisture coal  an approachBlending with high moisture coal  an approach
Blending with high moisture coal an approachDr. Pradip Chanda
 
Up-gradtion of Coal By Blending Method
Up-gradtion of Coal By Blending MethodUp-gradtion of Coal By Blending Method
Up-gradtion of Coal By Blending MethodAbhishek Garai
 
2.a.2 lime production gb2013
2.a.2 lime production gb20132.a.2 lime production gb2013
2.a.2 lime production gb2013cesar hernandez
 
Blending coal new delhi
Blending coal new delhi Blending coal new delhi
Blending coal new delhi Arun Dash
 
emission factors for continuous fixed chimney bull trench brick kiln (fcbtk) ...
emission factors for continuous fixed chimney bull trench brick kiln (fcbtk) ...emission factors for continuous fixed chimney bull trench brick kiln (fcbtk) ...
emission factors for continuous fixed chimney bull trench brick kiln (fcbtk) ...INFOGAIN PUBLICATION
 

Was ist angesagt? (19)

ethanol production from crude glycerol
ethanol production from crude glycerol ethanol production from crude glycerol
ethanol production from crude glycerol
 
F53022933
F53022933F53022933
F53022933
 
L pac presentation
L pac presentationL pac presentation
L pac presentation
 
Cokemaking in an Integrated Steel Works - Technology, Location and Greenhouse...
Cokemaking in an Integrated Steel Works - Technology, Location and Greenhouse...Cokemaking in an Integrated Steel Works - Technology, Location and Greenhouse...
Cokemaking in an Integrated Steel Works - Technology, Location and Greenhouse...
 
Petcoke Fired Aluminum Melting Furnace
Petcoke Fired Aluminum Melting FurnacePetcoke Fired Aluminum Melting Furnace
Petcoke Fired Aluminum Melting Furnace
 
Petcoke furnace die casting furnace
Petcoke furnace die casting furnacePetcoke furnace die casting furnace
Petcoke furnace die casting furnace
 
Petroleum Coke
Petroleum CokePetroleum Coke
Petroleum Coke
 
PPT ON COKE PREPARATION
PPT ON COKE PREPARATIONPPT ON COKE PREPARATION
PPT ON COKE PREPARATION
 
Lime kiln principles and operations
Lime kiln principles and operationsLime kiln principles and operations
Lime kiln principles and operations
 
Mangalam Alloy Ltd Industrial report
Mangalam Alloy Ltd Industrial reportMangalam Alloy Ltd Industrial report
Mangalam Alloy Ltd Industrial report
 
Industrial Training Report on Blast Furnace
Industrial Training Report on Blast FurnaceIndustrial Training Report on Blast Furnace
Industrial Training Report on Blast Furnace
 
Fuels-Dr. Surendran Parambadath
Fuels-Dr. Surendran ParambadathFuels-Dr. Surendran Parambadath
Fuels-Dr. Surendran Parambadath
 
Blending with high moisture coal an approach
Blending with high moisture coal  an approachBlending with high moisture coal  an approach
Blending with high moisture coal an approach
 
Coke oven
Coke ovenCoke oven
Coke oven
 
Carbon for Steel Making
Carbon for Steel MakingCarbon for Steel Making
Carbon for Steel Making
 
Up-gradtion of Coal By Blending Method
Up-gradtion of Coal By Blending MethodUp-gradtion of Coal By Blending Method
Up-gradtion of Coal By Blending Method
 
2.a.2 lime production gb2013
2.a.2 lime production gb20132.a.2 lime production gb2013
2.a.2 lime production gb2013
 
Blending coal new delhi
Blending coal new delhi Blending coal new delhi
Blending coal new delhi
 
emission factors for continuous fixed chimney bull trench brick kiln (fcbtk) ...
emission factors for continuous fixed chimney bull trench brick kiln (fcbtk) ...emission factors for continuous fixed chimney bull trench brick kiln (fcbtk) ...
emission factors for continuous fixed chimney bull trench brick kiln (fcbtk) ...
 

Andere mochten auch

Update on the Smallholder Pig Value Chains Development in Uganda (SPVCD) Project
Update on the Smallholder Pig Value Chains Development in Uganda (SPVCD) ProjectUpdate on the Smallholder Pig Value Chains Development in Uganda (SPVCD) Project
Update on the Smallholder Pig Value Chains Development in Uganda (SPVCD) ProjectILRI
 
Kirloskar Brothers Limited, Kirloskarvadi Plant
Kirloskar Brothers Limited, Kirloskarvadi PlantKirloskar Brothers Limited, Kirloskarvadi Plant
Kirloskar Brothers Limited, Kirloskarvadi PlantIndia Water Portal
 
Lift off 3 workbook
Lift off  3  workbookLift off  3  workbook
Lift off 3 workbooktamma07
 
Catalog of nail file
Catalog of nail fileCatalog of nail file
Catalog of nail fileCSSTORM
 
Mb880 CAN BUS manual-How to Use MB880 CAN BUS Auto Scanner
Mb880 CAN BUS manual-How to Use MB880 CAN BUS Auto ScannerMb880 CAN BUS manual-How to Use MB880 CAN BUS Auto Scanner
Mb880 CAN BUS manual-How to Use MB880 CAN BUS Auto ScannerBill Zhao
 
Catalog of scissors&nipper
Catalog of scissors&nipperCatalog of scissors&nipper
Catalog of scissors&nipperCSSTORM
 
James Nimmo CV -2015-E&I-
James Nimmo CV -2015-E&I-James Nimmo CV -2015-E&I-
James Nimmo CV -2015-E&I-Stevie Nimmo
 
Marine engineering valve and cock
Marine engineering valve and cockMarine engineering valve and cock
Marine engineering valve and cockZeeshan Ahmed
 
GW-1-750IF Induction Furnace
GW-1-750IF Induction FurnaceGW-1-750IF Induction Furnace
GW-1-750IF Induction FurnaceGuo ke
 
Overview Drug, Alternative Medicines, Medical Devices Registration in Pakistan
Overview Drug, Alternative Medicines, Medical Devices Registration in PakistanOverview Drug, Alternative Medicines, Medical Devices Registration in Pakistan
Overview Drug, Alternative Medicines, Medical Devices Registration in PakistanMuhammad Ali Jehangir
 
Solar panels business plan (fyp)
Solar panels   business plan (fyp)Solar panels   business plan (fyp)
Solar panels business plan (fyp)Saad Munir
 
03 magnesium and magnesium alloys
03 magnesium and magnesium alloys03 magnesium and magnesium alloys
03 magnesium and magnesium alloyscha3068
 
Poroduction Of Terry Towe L
Poroduction  Of  Terry  Towe LPoroduction  Of  Terry  Towe L
Poroduction Of Terry Towe LZulker Nayen
 
Tools hardware vol.10
Tools hardware vol.10Tools hardware vol.10
Tools hardware vol.10sally xu
 
Amalgam past,present& future-I
Amalgam past,present& future-IAmalgam past,present& future-I
Amalgam past,present& future-IAshish Choudhary
 
A Project Feasibility Study for the Establishment of E&J Farms
A Project Feasibility Study for the Establishment of E&J FarmsA Project Feasibility Study for the Establishment of E&J Farms
A Project Feasibility Study for the Establishment of E&J FarmsJandel Gimeno
 

Andere mochten auch (20)

Update on the Smallholder Pig Value Chains Development in Uganda (SPVCD) Project
Update on the Smallholder Pig Value Chains Development in Uganda (SPVCD) ProjectUpdate on the Smallholder Pig Value Chains Development in Uganda (SPVCD) Project
Update on the Smallholder Pig Value Chains Development in Uganda (SPVCD) Project
 
D900 manual v1.30
D900 manual v1.30D900 manual v1.30
D900 manual v1.30
 
Kirloskar Brothers Limited, Kirloskarvadi Plant
Kirloskar Brothers Limited, Kirloskarvadi PlantKirloskar Brothers Limited, Kirloskarvadi Plant
Kirloskar Brothers Limited, Kirloskarvadi Plant
 
Kirloskar group
Kirloskar groupKirloskar group
Kirloskar group
 
Lift off 3 workbook
Lift off  3  workbookLift off  3  workbook
Lift off 3 workbook
 
Catalog of nail file
Catalog of nail fileCatalog of nail file
Catalog of nail file
 
Mb880 CAN BUS manual-How to Use MB880 CAN BUS Auto Scanner
Mb880 CAN BUS manual-How to Use MB880 CAN BUS Auto ScannerMb880 CAN BUS manual-How to Use MB880 CAN BUS Auto Scanner
Mb880 CAN BUS manual-How to Use MB880 CAN BUS Auto Scanner
 
Basics of pulp bleaching
Basics of pulp bleachingBasics of pulp bleaching
Basics of pulp bleaching
 
Catalog of scissors&nipper
Catalog of scissors&nipperCatalog of scissors&nipper
Catalog of scissors&nipper
 
James Nimmo CV -2015-E&I-
James Nimmo CV -2015-E&I-James Nimmo CV -2015-E&I-
James Nimmo CV -2015-E&I-
 
Marine engineering valve and cock
Marine engineering valve and cockMarine engineering valve and cock
Marine engineering valve and cock
 
GW-1-750IF Induction Furnace
GW-1-750IF Induction FurnaceGW-1-750IF Induction Furnace
GW-1-750IF Induction Furnace
 
Kirloskar group
Kirloskar group Kirloskar group
Kirloskar group
 
Overview Drug, Alternative Medicines, Medical Devices Registration in Pakistan
Overview Drug, Alternative Medicines, Medical Devices Registration in PakistanOverview Drug, Alternative Medicines, Medical Devices Registration in Pakistan
Overview Drug, Alternative Medicines, Medical Devices Registration in Pakistan
 
Solar panels business plan (fyp)
Solar panels   business plan (fyp)Solar panels   business plan (fyp)
Solar panels business plan (fyp)
 
03 magnesium and magnesium alloys
03 magnesium and magnesium alloys03 magnesium and magnesium alloys
03 magnesium and magnesium alloys
 
Poroduction Of Terry Towe L
Poroduction  Of  Terry  Towe LPoroduction  Of  Terry  Towe L
Poroduction Of Terry Towe L
 
Tools hardware vol.10
Tools hardware vol.10Tools hardware vol.10
Tools hardware vol.10
 
Amalgam past,present& future-I
Amalgam past,present& future-IAmalgam past,present& future-I
Amalgam past,present& future-I
 
A Project Feasibility Study for the Establishment of E&J Farms
A Project Feasibility Study for the Establishment of E&J FarmsA Project Feasibility Study for the Establishment of E&J Farms
A Project Feasibility Study for the Establishment of E&J Farms
 

Ähnlich wie Proposal of 200KT PIG IRON PROJECT

500 TPD Mn ORE SINTER PLANT
500 TPD Mn ORE SINTER PLANT500 TPD Mn ORE SINTER PLANT
500 TPD Mn ORE SINTER PLANTGuo ke
 
Sponge Iron Plant.pdf
Sponge Iron Plant.pdfSponge Iron Plant.pdf
Sponge Iron Plant.pdfGary Li
 
Horizontal chain grate steam boiler
Horizontal chain grate steam boilerHorizontal chain grate steam boiler
Horizontal chain grate steam boilerxindagroup1
 
40KTPA ELECTRODE PASTE PROJECT TECHNICAL PROPOSAL
40KTPA ELECTRODE PASTE PROJECT TECHNICAL PROPOSAL40KTPA ELECTRODE PASTE PROJECT TECHNICAL PROPOSAL
40KTPA ELECTRODE PASTE PROJECT TECHNICAL PROPOSALGuo ke
 
Computation of Theoretical Heat of Formation in a Kiln Using Fortran Language
Computation of Theoretical Heat of Formation in a Kiln Using Fortran LanguageComputation of Theoretical Heat of Formation in a Kiln Using Fortran Language
Computation of Theoretical Heat of Formation in a Kiln Using Fortran LanguageIOSR Journals
 
Visakhapatnam steel plant
Visakhapatnam steel plantVisakhapatnam steel plant
Visakhapatnam steel plantVenkata Swamy
 
Design and Fabrication of Crucible Furnaces by using Black Smithy Setup
Design and Fabrication of Crucible Furnaces by using Black Smithy SetupDesign and Fabrication of Crucible Furnaces by using Black Smithy Setup
Design and Fabrication of Crucible Furnaces by using Black Smithy SetupDr. Amarjeet Singh
 
Design And Fabrication Of Iron Ore Sintering Machine
Design And Fabrication Of Iron Ore Sintering MachineDesign And Fabrication Of Iron Ore Sintering Machine
Design And Fabrication Of Iron Ore Sintering MachineAlbin Cherian
 
Presentation of thermal_power_plant
Presentation of thermal_power_plantPresentation of thermal_power_plant
Presentation of thermal_power_plantprakash2704
 
FGX&FX Dry Coal Separation Sytem (2020) Long.pptx
FGX&FX Dry Coal Separation Sytem (2020) Long.pptxFGX&FX Dry Coal Separation Sytem (2020) Long.pptx
FGX&FX Dry Coal Separation Sytem (2020) Long.pptxSuaEcologiaMineria
 
What i learnt as an intern by Ihsan Wassan
What i learnt as an intern by Ihsan Wassan What i learnt as an intern by Ihsan Wassan
What i learnt as an intern by Ihsan Wassan Ihsan Wassan
 

Ähnlich wie Proposal of 200KT PIG IRON PROJECT (20)

500 TPD Mn ORE SINTER PLANT
500 TPD Mn ORE SINTER PLANT500 TPD Mn ORE SINTER PLANT
500 TPD Mn ORE SINTER PLANT
 
Sponge Iron Plant.pdf
Sponge Iron Plant.pdfSponge Iron Plant.pdf
Sponge Iron Plant.pdf
 
Horizontal chain grate steam boiler
Horizontal chain grate steam boilerHorizontal chain grate steam boiler
Horizontal chain grate steam boiler
 
Steam Power Plant
Steam Power PlantSteam Power Plant
Steam Power Plant
 
40KTPA ELECTRODE PASTE PROJECT TECHNICAL PROPOSAL
40KTPA ELECTRODE PASTE PROJECT TECHNICAL PROPOSAL40KTPA ELECTRODE PASTE PROJECT TECHNICAL PROPOSAL
40KTPA ELECTRODE PASTE PROJECT TECHNICAL PROPOSAL
 
Computation of Theoretical Heat of Formation in a Kiln Using Fortran Language
Computation of Theoretical Heat of Formation in a Kiln Using Fortran LanguageComputation of Theoretical Heat of Formation in a Kiln Using Fortran Language
Computation of Theoretical Heat of Formation in a Kiln Using Fortran Language
 
Jonathan Mulosa ET'Al
Jonathan Mulosa ET'AlJonathan Mulosa ET'Al
Jonathan Mulosa ET'Al
 
Visakhapatnam steel plant
Visakhapatnam steel plantVisakhapatnam steel plant
Visakhapatnam steel plant
 
Design and Fabrication of Crucible Furnaces by using Black Smithy Setup
Design and Fabrication of Crucible Furnaces by using Black Smithy SetupDesign and Fabrication of Crucible Furnaces by using Black Smithy Setup
Design and Fabrication of Crucible Furnaces by using Black Smithy Setup
 
Presentation final 2.0
Presentation final 2.0Presentation final 2.0
Presentation final 2.0
 
Design And Fabrication Of Iron Ore Sintering Machine
Design And Fabrication Of Iron Ore Sintering MachineDesign And Fabrication Of Iron Ore Sintering Machine
Design And Fabrication Of Iron Ore Sintering Machine
 
Presentation of thermal_power_plant
Presentation of thermal_power_plantPresentation of thermal_power_plant
Presentation of thermal_power_plant
 
presentation
presentationpresentation
presentation
 
FGX&FX Dry Coal Separation Sytem (2020) Long.pptx
FGX&FX Dry Coal Separation Sytem (2020) Long.pptxFGX&FX Dry Coal Separation Sytem (2020) Long.pptx
FGX&FX Dry Coal Separation Sytem (2020) Long.pptx
 
Ap 4 presentation
Ap 4 presentationAp 4 presentation
Ap 4 presentation
 
topsoe_ammonia_4_start_up_worlds_largest_ammonia_plant.pdf
topsoe_ammonia_4_start_up_worlds_largest_ammonia_plant.pdftopsoe_ammonia_4_start_up_worlds_largest_ammonia_plant.pdf
topsoe_ammonia_4_start_up_worlds_largest_ammonia_plant.pdf
 
Commissioning ammonia_plant Kaltim 2000.pdf
Commissioning ammonia_plant Kaltim 2000.pdfCommissioning ammonia_plant Kaltim 2000.pdf
Commissioning ammonia_plant Kaltim 2000.pdf
 
haldor topsoe ammonia plant startup document
haldor topsoe ammonia plant startup documenthaldor topsoe ammonia plant startup document
haldor topsoe ammonia plant startup document
 
PRESENTATION ON HYDROGEN GAS PRODUCTION BY PARTIAL OXIDATION OF HEAVY FUEL OI...
PRESENTATION ON HYDROGEN GAS PRODUCTION BY PARTIAL OXIDATION OF HEAVY FUEL OI...PRESENTATION ON HYDROGEN GAS PRODUCTION BY PARTIAL OXIDATION OF HEAVY FUEL OI...
PRESENTATION ON HYDROGEN GAS PRODUCTION BY PARTIAL OXIDATION OF HEAVY FUEL OI...
 
What i learnt as an intern by Ihsan Wassan
What i learnt as an intern by Ihsan Wassan What i learnt as an intern by Ihsan Wassan
What i learnt as an intern by Ihsan Wassan
 

Proposal of 200KT PIG IRON PROJECT