SlideShare ist ein Scribd-Unternehmen logo
1 von 1
Downloaden Sie, um offline zu lesen
DCL ENGINEERING GROUP
DCL E ng ineer i ng G ro up – T he I nno v at iv e E dg e in E ng ineer i ng So lutio ns
27 Malta Street
Fairfield East
NSW 2165
Ph: (02) 9754 1300
Fax: (02) 9754 1400
www.dcleng.com.au
Technical Bulletin
Arc Spray - Armatures
No: 20 00 1
Issu ed: 2 00 7
CLIENT QUOTE;- “We contacted DCL Engineering for advice on refurbishing an electric
rotor with a 0.25mm bend in the shaft. It was decided that they would HVOF the full length
of the journal and machine out the bend. DCL were very accommodating in meeting our
requirements to turn the job round urgently. We have no hesitation in recommending DCL”.
This rotor arrived at our workshop with
an unknown amount of bend in it. It
was set up in a lathe and checked for
run-out. A steady band was cut inboard
of the bend and a new centre
machined.
The bent journal was then arc sprayed
along its full length, including the
keyway.
With the new centre running true to the
shaft inboard of the bend, it is possible
to metal spray and machine out any
bend.
The journal to the right has been HVOF
and finished on three positions with 420
stst metal spray and finish ground,
including the keyway journal.
For further information or assistance with your specific application please contact Greg Green
0418 167 666 at the DCL Engineering Group.

Weitere ähnliche Inhalte

Andere mochten auch

Oração para despertar cedo seicho no ie do brasil
Oração para despertar cedo   seicho no ie do brasilOração para despertar cedo   seicho no ie do brasil
Oração para despertar cedo seicho no ie do brasilCristina Ferreira
 
zeroPoverty launches the pilot phase of its rural electrification in India
zeroPoverty launches the pilot phase of its rural electrification in IndiazeroPoverty launches the pilot phase of its rural electrification in India
zeroPoverty launches the pilot phase of its rural electrification in IndiaArun Amirtham
 
Aplicando estrategias
Aplicando estrategiasAplicando estrategias
Aplicando estrategiasmartinmarcial
 
Job Certificate -PASAKA, INC.
Job Certificate -PASAKA, INC.Job Certificate -PASAKA, INC.
Job Certificate -PASAKA, INC.olive blasabas
 
LEADS job experience certificate
LEADS job experience certificateLEADS job experience certificate
LEADS job experience certificateZahidur Rahman
 
South India Fam Tour - 2016
South India Fam Tour  - 2016 South India Fam Tour  - 2016
South India Fam Tour - 2016 Indo Asia Tours
 
Best B.Sc in Physics distance education service provider India @9278888356
Best  B.Sc in Physics distance education service provider India @9278888356Best  B.Sc in Physics distance education service provider India @9278888356
Best B.Sc in Physics distance education service provider India @9278888356path2career
 

Andere mochten auch (9)

PSY 550 FINAL EXAM
PSY 550 FINAL EXAMPSY 550 FINAL EXAM
PSY 550 FINAL EXAM
 
Oração para despertar cedo seicho no ie do brasil
Oração para despertar cedo   seicho no ie do brasilOração para despertar cedo   seicho no ie do brasil
Oração para despertar cedo seicho no ie do brasil
 
zeroPoverty launches the pilot phase of its rural electrification in India
zeroPoverty launches the pilot phase of its rural electrification in IndiazeroPoverty launches the pilot phase of its rural electrification in India
zeroPoverty launches the pilot phase of its rural electrification in India
 
Aplicando estrategias
Aplicando estrategiasAplicando estrategias
Aplicando estrategias
 
Nota para imprensa 08 2012
Nota para imprensa 08 2012Nota para imprensa 08 2012
Nota para imprensa 08 2012
 
Job Certificate -PASAKA, INC.
Job Certificate -PASAKA, INC.Job Certificate -PASAKA, INC.
Job Certificate -PASAKA, INC.
 
LEADS job experience certificate
LEADS job experience certificateLEADS job experience certificate
LEADS job experience certificate
 
South India Fam Tour - 2016
South India Fam Tour  - 2016 South India Fam Tour  - 2016
South India Fam Tour - 2016
 
Best B.Sc in Physics distance education service provider India @9278888356
Best  B.Sc in Physics distance education service provider India @9278888356Best  B.Sc in Physics distance education service provider India @9278888356
Best B.Sc in Physics distance education service provider India @9278888356
 

Ähnlich wie Tech Bulletin DCLEG - 20001 Arc Spray Armatures

Tech Bulletin DCLEG - 85813 Bearing and Seal Diameters
Tech Bulletin DCLEG - 85813 Bearing and Seal DiametersTech Bulletin DCLEG - 85813 Bearing and Seal Diameters
Tech Bulletin DCLEG - 85813 Bearing and Seal DiametersGreg Green
 
Tech Bulletin DCLEG - 81111 Pulp and Paper
Tech Bulletin DCLEG - 81111 Pulp and PaperTech Bulletin DCLEG - 81111 Pulp and Paper
Tech Bulletin DCLEG - 81111 Pulp and PaperGreg Green
 
Tech Bulletin DCLEG - 21951 Pump Refurbishment
Tech Bulletin DCLEG - 21951 Pump RefurbishmentTech Bulletin DCLEG - 21951 Pump Refurbishment
Tech Bulletin DCLEG - 21951 Pump RefurbishmentGreg Green
 
Portable Electric Band Saw Case Study by CS Unitec
Portable Electric Band Saw Case Study by CS UnitecPortable Electric Band Saw Case Study by CS Unitec
Portable Electric Band Saw Case Study by CS UnitecCS Unitec
 
The Eddlington Centre, Eddlington, Doncaster
The Eddlington Centre, Eddlington, DoncasterThe Eddlington Centre, Eddlington, Doncaster
The Eddlington Centre, Eddlington, DoncasterMartyn Watkinson
 
Schneider Electric Services_Modernization and Upgrade Solutions.pptx
Schneider Electric Services_Modernization and Upgrade Solutions.pptxSchneider Electric Services_Modernization and Upgrade Solutions.pptx
Schneider Electric Services_Modernization and Upgrade Solutions.pptxSchneider Electric
 
KinetIQ Solutions Capability Statement
KinetIQ Solutions Capability StatementKinetIQ Solutions Capability Statement
KinetIQ Solutions Capability StatementRay Salmons
 
Zinfra Group Australia: Power Brochure
Zinfra Group Australia: Power BrochureZinfra Group Australia: Power Brochure
Zinfra Group Australia: Power BrochureZinfra Group
 
Boddington Project Case study
Boddington Project Case studyBoddington Project Case study
Boddington Project Case studyCLEMENT Guillaume
 
Compliance Contracting Brochure
Compliance Contracting Brochure Compliance Contracting Brochure
Compliance Contracting Brochure Paul Wagner
 
Final Presentation Talha (1).pptx
Final Presentation Talha (1).pptxFinal Presentation Talha (1).pptx
Final Presentation Talha (1).pptxTalhaAbdulRehman2
 
E profiil references
E profiil referencesE profiil references
E profiil referencesheavyindustry
 
S Burke CV 2015
S Burke CV 2015S Burke CV 2015
S Burke CV 2015Sean Burke
 

Ähnlich wie Tech Bulletin DCLEG - 20001 Arc Spray Armatures (20)

Tech Bulletin DCLEG - 85813 Bearing and Seal Diameters
Tech Bulletin DCLEG - 85813 Bearing and Seal DiametersTech Bulletin DCLEG - 85813 Bearing and Seal Diameters
Tech Bulletin DCLEG - 85813 Bearing and Seal Diameters
 
Tech Bulletin DCLEG - 81111 Pulp and Paper
Tech Bulletin DCLEG - 81111 Pulp and PaperTech Bulletin DCLEG - 81111 Pulp and Paper
Tech Bulletin DCLEG - 81111 Pulp and Paper
 
Tech Bulletin DCLEG - 21951 Pump Refurbishment
Tech Bulletin DCLEG - 21951 Pump RefurbishmentTech Bulletin DCLEG - 21951 Pump Refurbishment
Tech Bulletin DCLEG - 21951 Pump Refurbishment
 
Portable Electric Band Saw Case Study by CS Unitec
Portable Electric Band Saw Case Study by CS UnitecPortable Electric Band Saw Case Study by CS Unitec
Portable Electric Band Saw Case Study by CS Unitec
 
The Eddlington Centre, Eddlington, Doncaster
The Eddlington Centre, Eddlington, DoncasterThe Eddlington Centre, Eddlington, Doncaster
The Eddlington Centre, Eddlington, Doncaster
 
Diosynth Electrical Upgrade
Diosynth Electrical UpgradeDiosynth Electrical Upgrade
Diosynth Electrical Upgrade
 
CESC LTD. TRAINING REPORT
CESC LTD. TRAINING REPORTCESC LTD. TRAINING REPORT
CESC LTD. TRAINING REPORT
 
Schneider Electric Services_Modernization and Upgrade Solutions.pptx
Schneider Electric Services_Modernization and Upgrade Solutions.pptxSchneider Electric Services_Modernization and Upgrade Solutions.pptx
Schneider Electric Services_Modernization and Upgrade Solutions.pptx
 
P&B Weir Portable Earthing - Line End Clamps
P&B Weir Portable Earthing - Line End ClampsP&B Weir Portable Earthing - Line End Clamps
P&B Weir Portable Earthing - Line End Clamps
 
KinetIQ Solutions Capability Statement
KinetIQ Solutions Capability StatementKinetIQ Solutions Capability Statement
KinetIQ Solutions Capability Statement
 
PLS 2017: Erskine Bridge Electrical and Lighting Refurbishment
PLS 2017: Erskine Bridge Electrical and Lighting RefurbishmentPLS 2017: Erskine Bridge Electrical and Lighting Refurbishment
PLS 2017: Erskine Bridge Electrical and Lighting Refurbishment
 
Zinfra Group Australia: Power Brochure
Zinfra Group Australia: Power BrochureZinfra Group Australia: Power Brochure
Zinfra Group Australia: Power Brochure
 
Boddington Project Case study
Boddington Project Case studyBoddington Project Case study
Boddington Project Case study
 
Compliance Contracting Brochure
Compliance Contracting Brochure Compliance Contracting Brochure
Compliance Contracting Brochure
 
Final Presentation Talha (1).pptx
Final Presentation Talha (1).pptxFinal Presentation Talha (1).pptx
Final Presentation Talha (1).pptx
 
Emt megatherm a site visit report
Emt megatherm a site visit reportEmt megatherm a site visit report
Emt megatherm a site visit report
 
Harish aggarwal
Harish aggarwalHarish aggarwal
Harish aggarwal
 
E profiil references
E profiil referencesE profiil references
E profiil references
 
CV J LOWTHER WORD
CV J LOWTHER WORDCV J LOWTHER WORD
CV J LOWTHER WORD
 
S Burke CV 2015
S Burke CV 2015S Burke CV 2015
S Burke CV 2015
 

Tech Bulletin DCLEG - 20001 Arc Spray Armatures

  • 1. DCL ENGINEERING GROUP DCL E ng ineer i ng G ro up – T he I nno v at iv e E dg e in E ng ineer i ng So lutio ns 27 Malta Street Fairfield East NSW 2165 Ph: (02) 9754 1300 Fax: (02) 9754 1400 www.dcleng.com.au Technical Bulletin Arc Spray - Armatures No: 20 00 1 Issu ed: 2 00 7 CLIENT QUOTE;- “We contacted DCL Engineering for advice on refurbishing an electric rotor with a 0.25mm bend in the shaft. It was decided that they would HVOF the full length of the journal and machine out the bend. DCL were very accommodating in meeting our requirements to turn the job round urgently. We have no hesitation in recommending DCL”. This rotor arrived at our workshop with an unknown amount of bend in it. It was set up in a lathe and checked for run-out. A steady band was cut inboard of the bend and a new centre machined. The bent journal was then arc sprayed along its full length, including the keyway. With the new centre running true to the shaft inboard of the bend, it is possible to metal spray and machine out any bend. The journal to the right has been HVOF and finished on three positions with 420 stst metal spray and finish ground, including the keyway journal. For further information or assistance with your specific application please contact Greg Green 0418 167 666 at the DCL Engineering Group.