SlideShare ist ein Scribd-Unternehmen logo
1 von 44
Downloaden Sie, um offline zu lesen
A NEW MODEL FOR COLLABORATION
An Introduction to BS 11000
Paul R Greenwood
Managing Director
Greenwood Consultants
London Constructing Excellence Club
8th April 2014, London Capital Club
8th April 2014GCR-LCEC005 Rev 1 Page 2 © Greenwood Consultants Limited 2014
What is Your Partnering Temperature?
• Partnering Charter + Traditional Contract
• Commitment to working together
• Traditional form of contract eg. JCT
• Non-Confrontational Contract
• Non-confrontational form of contract eg. NEC (ECC)
• No special mechanisms
• Project Partnering
• Partnering Charter + Objectives + Incentivisation
• Non-confrontational form of contract
eg. NEC, Opt C (Target), Opt X12 (Part’), Opt X20 (KPIs)
• Strategic Partnering
• Objectives + Incentivisation + Dispute Prevention +
• Strategic alliance agreement or term contract
eg. SAA + PPC 2000 or TPC 2005
8th April 2014GCR-LCEC005 Rev 1 Page 3 © Greenwood Consultants Limited 2014
Agenda
• The CE Approach to Collaborative Working
• Latham and Egan Reports
• Background to BS 11000
• The BS 11000 Framework
• Stages 1 to 8
• BS 11000 Themes
• BS 11000 Benefits
• BS 11000 Application
The Constructing Excellence
Approach to
Collaborative Working
8th April 2014GCR-LCEC005 Rev 1 Page 5 © Greenwood Consultants Limited 2014
Drivers for Partnering in the UK
‘Constructing the Team’, Sir Michael Latham, 1994.
‘Rethinking Constructing’, The Construction Task Force, Chaired by Sir John Egan, 1998.
8th April 2014GCR-LCEC005 Rev 1 Page 6 © Greenwood Consultants Limited 2014
Egan 5-4-7
Drivers for
Change
Committed Leadership
Focus on the Customer
Product Team Integration
Quality-Driven Agenda
Commitment to People
Product
Development
Partnering
the
Supply Chain
Project
Implementation
Production of
Components
Improving the
Project Process
Capital Cost -10%
Construction Time -10%
Predictability +20%
Defects -20%
Accidents -20%
Productivity +10%
Turnover & Profits +10%
Targets for
Improvement
‘M4I Strategy Model’,
Movement for Innovation (M4I), Anniversary Report, 1999
8th April 2014GCR-LCEC005 Rev 1 Page 7 © Greenwood Consultants Limited 2014
Three Overriding Principles
‘Collaborative Working - The Principles’,
Constructing Excellence, 2011
• Common Vision
and Leadership
• Collaborative culture
and behaviours
• Collaborative processes
and tools
8th April 2014GCR-LCEC005 Rev 1 Page 8 © Greenwood Consultants Limited 2014
Six Critical Success Factors
‘Collaborative Working - The Principles’,
Constructing Excellence, 2011
• Early involvement
• Selection by value
• Aligned commercial arrangements
• Common processes and tools
• Performance measurement
• Long-term relationships
8th April 2014GCR-LCEC005 Rev 1 Page 10 © Greenwood Consultants Limited 2014
Toolkits
Background to BS 11000
8th April 2014GCR-LCEC005 Rev 1 Page 12 © Greenwood Consultants Limited 2014
What is BS 11000?
• “ a strategic framework
to establish and improve
collaborative relationships
in organisations of all sizes.”
• From concept to disengagement
• Developed by DTI/CBI
Partnership Sourcing Ltd
• First national standard of its type
8th April 2014GCR-LCEC005 Rev 1 Page 13 © Greenwood Consultants Limited 2014
What is BS 11000?
• Part 1
- Framework Specification
• What = ‘shall’
• Part 2
- Guide to Part 1
• Why
• How
8th April 2014GCR-LCEC005 Rev 1 Page 14 © Greenwood Consultants Limited 2014
Applicable Relationships
• Single programme or project
• Individual relationship
• Multiple relationships
• Particular types of relationships
•
“... where collaboration can open
new strategic opportunities”
“ potential for improvement
through the adoption of a
collaborative relationship”
Collaborative
Relationship
Management
Supply
-Chain
Internal
Partners
External
Partners
Clients/
Customers
Based on ‘Multi-Dimensional Relationships’ (aka North-South Diagram),
BS 11000-1:2010 Collaborative Business Relationships - Part 1.
8th April 2014GCR-LCEC005 Rev 1 Page 15 © Greenwood Consultants Limited 2014
Timeline
90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15
‘Constructing
the Team’
Latham
‘Rethinking
Construction’
Egan
‘Accelerating
Change’
Strategic
Forum
PPC 2000
Contract
ACA
TPC 2005
Contract
ACA
NEC
Partnering
Option X12
New
Engineering
Contract
ICE
BSI PAS
11000
BS 11000-1
(Standard)
BS 11000-2
(Guide)
ISO 11000
Committee
First
Certifications
by BSI
Formation of
Partnership
Sourcing Ltd
by DTI & CBI
Launch of
the CRAFT
Programme
‘Guide to
Partnering’
MOD
‘Building Down
Barriers’
MOD
8th April 2014GCR-LCEC005 Rev 1 Page 16 © Greenwood Consultants Limited 2014
Early Adopters
• PAS 11000
• Aerospace
• BS 11000
• Defence
• Rail
• Facilities
•
• EMCOR, Lockheed Martin,
Raytheon Systems, NATS
• MOD, Boeing, Fujitsu, HP
• Network Rail, Babcock Rail,
Balfour Beatty, Colas,
Costain, Hochtief, Rail Tech
• Babcock, Capita, Mouchel
•
The
BS 11000
Model
Phase 1
Strategic
Stage 3 Internal Assessment
Stage 1 Awareness
Stage 2 Knowledge
Phase 3
Management
Stage 8 Exit Strategy
Stage 7 Staying Together
Phase 2
Engagement
Stage 6 Value Creation
Stage 5 Working Together
Stage 4 Partner Selection
8th April 2014GCR-LCEC005 Rev 1 Page 18 © Greenwood Consultants Limited 2014
Phase 1 Strategic
Phase 1
Strategic
Stage 3 Internal Assessment
Stage 1 Awareness
Stage 2 Knowledge
Phase 3
Management
Stage 8 Exit Strategy
Stage 7 Staying Together
Phase 2
Engagement
Stage 6 Value Creation
Stage 5 Working Together
Stage 4 Partner Selection
Development of
strategic
commitment to
collaborative
working, based
upon a thorough
understanding of
the opportunities,
benefits, risks and
constraints of this
approach
8th April 2014GCR-LCEC005 Rev 1 Page 19 © Greenwood Consultants Limited 2014
Phase 2 Engagement
Phase 1
Strategic
Stage 3 Internal Assessment
Stage 1 Awareness
Stage 2 Knowledge
Phase 3
Management
Stage 8 Exit Strategy
Stage 7 Staying Together
Phase 2
Engagement
Stage 6 Value Creation
Stage 5 Working Together
Stage 4 Partner Selection
Selection of
committed
partners and the
establishment of
joint objectives,
structures,
processes and
systems for
creating new
value
8th April 2014GCR-LCEC005 Rev 1 Page 20 © Greenwood Consultants Limited 2014
Phase 3 Management
Phase 1
Strategic
Stage 3 Internal Assessment
Stage 1 Awareness
Stage 2 Knowledge
Phase 3
Management
Stage 8 Exit Strategy
Stage 7 Staying Together
Phase 2
Engagement
Stage 6 Value Creation
Stage 5 Working Together
Stage 4 Partner Selection
Management of
the joint value-
creating
relationship and
systematic
disengagement
8th April 2014GCR-LCEC005 Rev 1 Page 21 © Greenwood Consultants Limited 2014
Stage 1 Awareness
Development of
awareness and
the overall
strategic
approach to
collaborative
working
Phase 1
Strategic
Stage 3 Internal Assessment
Stage 1 Awareness
Stage 2 Knowledge
Phase 3
Management
Stage 8 Exit Strategy
Stage 7 Staying Together
Phase 2
Engagement
Stage 6 Value Creation
Stage 5 Working Together
Stage 4 Partner Selection
8th April 2014GCR-LCEC005 Rev 1 Page 22 © Greenwood Consultants Limited 2014
Stage 1 Awareness
• Senior executive
• Policy
• Objectives
• Value
• Identification and segmentation
of business relationships
• Resources, competencies
and behaviours
• Initial risk assessment
• Implementation plan
• Documentation
• Initiating the relationship
management plan
8th April 2014GCR-LCEC005 Rev 1 Page 23 © Greenwood Consultants Limited 2014
Stage 2 Knowledge
Establishment of
a body of
knowledge and
the development
of a specific
strategy, business
case and
implementation
plan for each
identified
opportunity
Phase 1
Strategic
Stage 3 Internal Assessment
Stage 1 Awareness
Stage 2 Knowledge
Phase 3
Management
Stage 8 Exit Strategy
Stage 7 Staying Together
Phase 2
Engagement
Stage 6 Value Creation
Stage 5 Working Together
Stage 4 Partner Selection
8th April 2014GCR-LCEC005 Rev 1 Page 24 © Greenwood Consultants Limited 2014
Stage 2 Knowledge
• Developing a specific business
strategy [drivers and objectives]
• Competence and training
• Knowledge capture, creation
and management
• Knowledge sharing
• Strategy and business case
development
• Risk management process
• Implementation plan
• Relationship management plan
8th April 2014GCR-LCEC005 Rev 1 Page 25 © Greenwood Consultants Limited 2014
Stage 3 Internal Assessment
Undertaking a
structured
assessment of
the capability and
maturity to
successfully
engage in a
collaborative
initiative
Phase 1
Strategic
Stage 3 Internal Assessment
Stage 1 Awareness
Stage 2 Knowledge
Phase 3
Management
Stage 8 Exit Strategy
Stage 7 Staying Together
Phase 2
Engagement
Stage 6 Value Creation
Stage 5 Working Together
Stage 4 Partner Selection
8th April 2014GCR-LCEC005 Rev 1 Page 26 © Greenwood Consultants Limited 2014
Stage 3 Internal Assessment
• Self assessment
• Collaborative leadership
• Partner selection criteria
• The challenge of alignment
• Consolidating the next steps
through internal action plan
• SER review
• Relationship management plan
8th April 2014GCR-LCEC005 Rev 1 Page 27 © Greenwood Consultants Limited 2014
Stage 4 Partner Selection
Undertaking a
structured
approach to the
identification,
evaluation and
selection of
appropriate
partners
Phase 1
Strategic
Stage 3 Internal Assessment
Stage 1 Awareness
Stage 2 Knowledge
Phase 3
Management
Stage 8 Exit Strategy
Stage 7 Staying Together
Phase 2
Engagement
Stage 6 Value Creation
Stage 5 Working Together
Stage 4 Partner Selection
8th April 2014GCR-LCEC005 Rev 1 Page 28 © Greenwood Consultants Limited 2014
Stage 4 Partner Selection
• Nominate potential
collaborative partners
• Partner evaluation and
selection action plans
• Creating joint objectives
• Negotiating for collaboration
• Partner selection
• Relationship management plan
8th April 2014GCR-LCEC005 Rev 1 Page 29 © Greenwood Consultants Limited 2014
Stage 5 Working Together
Establishing the
right platform for
collaborative
working
Phase 1
Strategic
Stage 3 Internal Assessment
Stage 1 Awareness
Stage 2 Knowledge
Phase 3
Management
Stage 8 Exit Strategy
Stage 7 Staying Together
Phase 2
Engagement
Stage 6 Value Creation
Stage 5 Working Together
Stage 4 Partner Selection
8th April 2014GCR-LCEC005 Rev 1 Page 30 © Greenwood Consultants Limited 2014
Stage 5 Working Together
• Governance
• Organizational structure
• Joint knowledge management
• Communications management
• Joint risk management
• Business process management
• Contracting arrangements
• Performance measurement
• Improvement
• Relationship management plan
8th April 2014GCR-LCEC005 Rev 1 Page 31 © Greenwood Consultants Limited 2014
Stage 6 Value Creation
Establishing
approaches that
seek to build
additional value
out of the joint
relationship
Phase 1
Strategic
Stage 3 Internal Assessment
Stage 1 Awareness
Stage 2 Knowledge
Phase 3
Management
Stage 8 Exit Strategy
Stage 7 Staying Together
Phase 2
Engagement
Stage 6 Value Creation
Stage 5 Working Together
Stage 4 Partner Selection
8th April 2014GCR-LCEC005 Rev 1 Page 32 © Greenwood Consultants Limited 2014
Stage 6 [Additional] Value Creation
• Establishing a value creation
programme
• Improvement team
• Improvement target setting
• Value drivers
• Learning from experience
• Initiating the innovation
process
• Relationship management plan
8th April 2014GCR-LCEC005 Rev 1 Page 33 © Greenwood Consultants Limited 2014
Stage 7 Staying Together
Ongoing joint
management of
collaborative
initiatives
Phase 1
Strategic
Stage 3 Internal Assessment
Stage 1 Awareness
Stage 2 Knowledge
Phase 3
Management
Stage 8 Exit Strategy
Stage 7 Staying Together
Phase 2
Engagement
Stage 6 Value Creation
Stage 5 Working Together
Stage 4 Partner Selection
8th April 2014GCR-LCEC005 Rev 1 Page 34 © Greenwood Consultants Limited 2014
Stage 7 Staying Together
• Monitoring and measuring the
relationship
• Ongoing management
• Continual innovation
• Maintaining behaviours
and trust
• Delivering performance
• Analysis of results
• Issue resolution
• Joint exit strategy
• Relationship management plan
8th April 2014GCR-LCEC005 Rev 1 Page 35 © Greenwood Consultants Limited 2014
Stage 8 Exit Strategy
Developing and
maintaining an
effective strategy
for
disengagement
Phase 1
Strategic
Stage 3 Internal Assessment
Stage 1 Awareness
Stage 2 Knowledge
Phase 3
Management
Stage 8 Exit Strategy
Stage 7 Staying Together
Phase 2
Engagement
Stage 6 Value Creation
Stage 5 Working Together
Stage 4 Partner Selection
8th April 2014GCR-LCEC005 Rev 1 Page 36 © Greenwood Consultants Limited 2014
Stage 8 Exit Strategy
• Establishing and maintaining
a joint exit strategy
• Analysis of exit strategy
• Evaluating changes
• Initiating the process
• Business continuity
and transition
• Future opportunities
• Relationship management plan
8th April 2014GCR-LCEC005 Rev 1 Page 37 © Greenwood Consultants Limited 2014
BS 11000 Themes
• Leadership
• Objectives
• Competence and Behaviour
• Value Management
• Risk Management
• Knowledge Management
• Governance
• Exit Strategy
8th April 2014GCR-LCEC005 Rev 1 Page 38 © Greenwood Consultants Limited 2014
BS 11000 Benefits
• Neutral consistent framework
• Collaborative language
• Change programme
• Management system
Basis for gap analysis
• Identifies key value creation issues
• Leadership, competence and behaviour
• Value, risk and knowledge management
• Meshes different business
cultures, structures and systems
• Public - private - third sectors
• Large - medium - small businesses
• Provides mechanism
for value creation
Reduces risk
Reduces time to
implement
Improves
probability of
success
Improves overall
value
BS 11000 Application
8th April 2014GCR-LCEC005 Rev 1 Page 40 © Greenwood Consultants Limited 2014
Stage 1 Awareness
Stage 2 Knowledge
Phase 1
Strategic
3 months
Phase 2
Engagement
Stage 3 Internal Assessment
Stage 4 Partner Selection
3 months
Stage 6 Value Creation
Stage 5 Working Together6 months
Stage 8 Exit Strategy
Stage 7 Staying TogetherPhase 3
Management
12 months
24 months
27 to 30 months
Stage 2 System Compliance
Stage 1 System AdequacyPhase X
Certification
3 to 6 months
‘Craft Overview’,
Partnership Sourcing Limited, July 2007
8th April 2014GCR-LCEC005 Rev 1 Page 41 © Greenwood Consultants Limited 2014
Simplified Implementation
• Identify benefits
• Where could CW add value?
• Identify scope and resources
• Build knowledge
• Identify the gaps
• Outline a plan and budget
• Obtain authorisation
• Business case
• Integrate new processes and systems
• Implement new process
• Stages 1 to 6 on new relationship?
• Stages 7 to 8 on extant relationship?
• Obtain validation
• Certification
8th April 2014GCR-LCEC005 Rev 1 Page 42 © Greenwood Consultants Limited 2014
BS 11000-1 Certification
• Assessment
• 186 requirements
• Standard two stage process
• Certification Bodies
BSI
• 4 pilot certifications to PAS 11000-1
• >55 certifications to BS 11000-1 [Jan 2014]
• >120 organisations "actively preparing for certification“ [Jan 2014]
Lloyds
• First certification 2013 [Jan 2014]
Others
• Accreditation
• Maintains standards across Certification Bodies
• Not yet available [following publication of ISO 11000?]
a milestone, not the goal
8th April 2014GCR-LCEC005 Rev 1 Page 43 © Greenwood Consultants Limited 2014
Conclusions
• Collaboration does not happen by chance
• 95% perspiration, 5% inspiration
• Driving a partnered relationship takes more time [up-front] - not less
• Established construction-specific models
• Toolkits
• Contracts
• BS 11000
• Universal language and application
• Change programme
• Management system
• Compatible with construction contracts
its about culture and behaviour
Q&A
PGreenwood@GreenwoodConsultants.com
GreenwoodConsultants.com
@GreenwoodCLtd
8th April 2014GCR-LCEC005 Rev 1 Page 45 © Greenwood Consultants Limited 2014
Major
Projects
Our Services
Process
Review and
Improvement
Management
Systems
Organisation
and Process
Design and
Reengineering
Performance
Measurement
and
Improvement
Facilitation
Collaborative
Business
and Project
Relationships

Weitere ähnliche Inhalte

Was ist angesagt?

Success, maturity, matrices and portfolio presentation by Robert Buttrick
Success, maturity, matrices and portfolio presentation by Robert ButtrickSuccess, maturity, matrices and portfolio presentation by Robert Buttrick
Success, maturity, matrices and portfolio presentation by Robert ButtrickAssociation for Project Management
 
Construction Futures Wales - Collaborative Bidding 5 - BSI
Construction Futures Wales - Collaborative Bidding 5 - BSIConstruction Futures Wales - Collaborative Bidding 5 - BSI
Construction Futures Wales - Collaborative Bidding 5 - BSIRae Davies
 
CFW Domestic Sprinkler Regulations - Bafsa Fire Sprinkler Wales
CFW Domestic Sprinkler Regulations - Bafsa Fire Sprinkler WalesCFW Domestic Sprinkler Regulations - Bafsa Fire Sprinkler Wales
CFW Domestic Sprinkler Regulations - Bafsa Fire Sprinkler WalesRae Davies
 
Con services presentation ub dor english
Con services presentation ub dor englishCon services presentation ub dor english
Con services presentation ub dor englishBayar Tsend
 
Portfolio management: creating initial building blocks: David Airey, Haringey...
Portfolio management: creating initial building blocks: David Airey, Haringey...Portfolio management: creating initial building blocks: David Airey, Haringey...
Portfolio management: creating initial building blocks: David Airey, Haringey...Association for Project Management
 
CFW Supply Chain Event - Contract Law - Berry Smith LLP
CFW Supply Chain Event - Contract Law - Berry Smith LLPCFW Supply Chain Event - Contract Law - Berry Smith LLP
CFW Supply Chain Event - Contract Law - Berry Smith LLPRae Davies
 
Knowledge audit sikm leaders forum march 2019
Knowledge audit sikm leaders forum march 2019Knowledge audit sikm leaders forum march 2019
Knowledge audit sikm leaders forum march 2019plambe
 
International marine contractors association vision & strategy
International marine contractors association vision & strategyInternational marine contractors association vision & strategy
International marine contractors association vision & strategyDr Lendy Spires
 
Meet the Awards Winners: Responsible Business Awards Workshop Presentation
Meet the Awards Winners: Responsible Business Awards Workshop PresentationMeet the Awards Winners: Responsible Business Awards Workshop Presentation
Meet the Awards Winners: Responsible Business Awards Workshop PresentationEloise Sochanik
 

Was ist angesagt? (20)

Programme Management – Formula E webinar
Programme Management – Formula E webinarProgramme Management – Formula E webinar
Programme Management – Formula E webinar
 
Crossrail: lessons in governance
Crossrail: lessons in governanceCrossrail: lessons in governance
Crossrail: lessons in governance
 
Success, maturity, matrices and portfolio presentation by Robert Buttrick
Success, maturity, matrices and portfolio presentation by Robert ButtrickSuccess, maturity, matrices and portfolio presentation by Robert Buttrick
Success, maturity, matrices and portfolio presentation by Robert Buttrick
 
Construction Futures Wales - Collaborative Bidding 5 - BSI
Construction Futures Wales - Collaborative Bidding 5 - BSIConstruction Futures Wales - Collaborative Bidding 5 - BSI
Construction Futures Wales - Collaborative Bidding 5 - BSI
 
Pfm SIG portfolio optimisation April 2013 (Stephen Parrett)
Pfm SIG  portfolio optimisation April 2013 (Stephen Parrett)Pfm SIG  portfolio optimisation April 2013 (Stephen Parrett)
Pfm SIG portfolio optimisation April 2013 (Stephen Parrett)
 
APM Portfolio Management SIG AGM 2015
APM Portfolio Management SIG AGM 2015APM Portfolio Management SIG AGM 2015
APM Portfolio Management SIG AGM 2015
 
Portfolio Management SIG conference 2015 overview
Portfolio Management SIG conference 2015 overviewPortfolio Management SIG conference 2015 overview
Portfolio Management SIG conference 2015 overview
 
Making the hard decisions webinar, 16 June 2020
Making the hard decisions webinar, 16 June 2020Making the hard decisions webinar, 16 June 2020
Making the hard decisions webinar, 16 June 2020
 
Creating and sustaining an environment for success
Creating and sustaining an environment for successCreating and sustaining an environment for success
Creating and sustaining an environment for success
 
CFW Domestic Sprinkler Regulations - Bafsa Fire Sprinkler Wales
CFW Domestic Sprinkler Regulations - Bafsa Fire Sprinkler WalesCFW Domestic Sprinkler Regulations - Bafsa Fire Sprinkler Wales
CFW Domestic Sprinkler Regulations - Bafsa Fire Sprinkler Wales
 
Standards institutions of Nepal
Standards institutions of NepalStandards institutions of Nepal
Standards institutions of Nepal
 
City of London Corporation case study
City of London Corporation case studyCity of London Corporation case study
City of London Corporation case study
 
Developing the Ofgem portfolio - Julie Black
Developing the Ofgem portfolio - Julie BlackDeveloping the Ofgem portfolio - Julie Black
Developing the Ofgem portfolio - Julie Black
 
Con services presentation ub dor english
Con services presentation ub dor englishCon services presentation ub dor english
Con services presentation ub dor english
 
Commissioning for impact, think PRUB!, 2 May 2018, London
Commissioning for impact, think PRUB!, 2 May 2018, LondonCommissioning for impact, think PRUB!, 2 May 2018, London
Commissioning for impact, think PRUB!, 2 May 2018, London
 
Portfolio management: creating initial building blocks: David Airey, Haringey...
Portfolio management: creating initial building blocks: David Airey, Haringey...Portfolio management: creating initial building blocks: David Airey, Haringey...
Portfolio management: creating initial building blocks: David Airey, Haringey...
 
CFW Supply Chain Event - Contract Law - Berry Smith LLP
CFW Supply Chain Event - Contract Law - Berry Smith LLPCFW Supply Chain Event - Contract Law - Berry Smith LLP
CFW Supply Chain Event - Contract Law - Berry Smith LLP
 
Knowledge audit sikm leaders forum march 2019
Knowledge audit sikm leaders forum march 2019Knowledge audit sikm leaders forum march 2019
Knowledge audit sikm leaders forum march 2019
 
International marine contractors association vision & strategy
International marine contractors association vision & strategyInternational marine contractors association vision & strategy
International marine contractors association vision & strategy
 
Meet the Awards Winners: Responsible Business Awards Workshop Presentation
Meet the Awards Winners: Responsible Business Awards Workshop PresentationMeet the Awards Winners: Responsible Business Awards Workshop Presentation
Meet the Awards Winners: Responsible Business Awards Workshop Presentation
 

Andere mochten auch

Whitepaper: From Resistance to Partnership: Operators shift into monetising OTT
Whitepaper: From Resistance to Partnership: Operators shift into monetising OTTWhitepaper: From Resistance to Partnership: Operators shift into monetising OTT
Whitepaper: From Resistance to Partnership: Operators shift into monetising OTTtyntec
 
Partnering to Build Customer Relationships
Partnering to Build Customer RelationshipsPartnering to Build Customer Relationships
Partnering to Build Customer RelationshipsMehmet Cihangir
 
Bringing it all together - how the BBC is delivering major change
Bringing it all together - how the BBC is delivering major changeBringing it all together - how the BBC is delivering major change
Bringing it all together - how the BBC is delivering major changeAssociation for Project Management
 
Collaboration, sharing knowledge & improving delivery within the public sector
Collaboration, sharing knowledge & improving delivery within the public sectorCollaboration, sharing knowledge & improving delivery within the public sector
Collaboration, sharing knowledge & improving delivery within the public sectorAssociation for Project Management
 
Partnering for Competition: External Partnership
Partnering for Competition: External PartnershipPartnering for Competition: External Partnership
Partnering for Competition: External PartnershipJeanie Arnoco
 
Partnering for Competition:Internal Partnership
Partnering for Competition:Internal PartnershipPartnering for Competition:Internal Partnership
Partnering for Competition:Internal PartnershipJeanie Arnoco
 

Andere mochten auch (8)

Whitepaper: From Resistance to Partnership: Operators shift into monetising OTT
Whitepaper: From Resistance to Partnership: Operators shift into monetising OTTWhitepaper: From Resistance to Partnership: Operators shift into monetising OTT
Whitepaper: From Resistance to Partnership: Operators shift into monetising OTT
 
MIT Hacking Medicine Business Models
MIT Hacking Medicine Business Models MIT Hacking Medicine Business Models
MIT Hacking Medicine Business Models
 
Partnering to Build Customer Relationships
Partnering to Build Customer RelationshipsPartnering to Build Customer Relationships
Partnering to Build Customer Relationships
 
Bringing it all together - how the BBC is delivering major change
Bringing it all together - how the BBC is delivering major changeBringing it all together - how the BBC is delivering major change
Bringing it all together - how the BBC is delivering major change
 
Collaboration, sharing knowledge & improving delivery within the public sector
Collaboration, sharing knowledge & improving delivery within the public sectorCollaboration, sharing knowledge & improving delivery within the public sector
Collaboration, sharing knowledge & improving delivery within the public sector
 
Partnering for Competition: External Partnership
Partnering for Competition: External PartnershipPartnering for Competition: External Partnership
Partnering for Competition: External Partnership
 
Partnering for Competition:Internal Partnership
Partnering for Competition:Internal PartnershipPartnering for Competition:Internal Partnership
Partnering for Competition:Internal Partnership
 
The Amazon Partner Network
The Amazon Partner NetworkThe Amazon Partner Network
The Amazon Partner Network
 

Ähnlich wie An Introduction to BS 11000 - A New Model for Collaboration

Using Internal Benchmarking to drive change on CSR
Using Internal Benchmarking to drive change on CSRUsing Internal Benchmarking to drive change on CSR
Using Internal Benchmarking to drive change on CSRDwayne Baraka
 
Internal Benchmarking for CSR at Legal & General
Internal Benchmarking for CSR at Legal & GeneralInternal Benchmarking for CSR at Legal & General
Internal Benchmarking for CSR at Legal & Generalvaluecsr
 
'BIM and the Future Workforce' - Collaborative Working, a presentation by Pau...
'BIM and the Future Workforce' - Collaborative Working, a presentation by Pau...'BIM and the Future Workforce' - Collaborative Working, a presentation by Pau...
'BIM and the Future Workforce' - Collaborative Working, a presentation by Pau...Constructing Excellence Kent Branch
 
ned-presentation-project-management.pdf
ned-presentation-project-management.pdfned-presentation-project-management.pdf
ned-presentation-project-management.pdfBENALI Idriss
 
Successful change - good culture and governance matter Conference - Boris Luc...
Successful change - good culture and governance matter Conference - Boris Luc...Successful change - good culture and governance matter Conference - Boris Luc...
Successful change - good culture and governance matter Conference - Boris Luc...Association for Project Management
 
Megger SAP BPC v6
Megger SAP BPC v6 Megger SAP BPC v6
Megger SAP BPC v6 Carl Adams
 
Ardent Partners - The State of Strategic Sourcing 2015
Ardent Partners - The State of Strategic Sourcing 2015Ardent Partners - The State of Strategic Sourcing 2015
Ardent Partners - The State of Strategic Sourcing 2015Zycus
 
Jumpstarting the M&A Integration Process
Jumpstarting the M&A Integration ProcessJumpstarting the M&A Integration Process
Jumpstarting the M&A Integration ProcessScottMadden, Inc.
 
20210113 Lean In Government Harrisburg Conf Agile Governance at Scale Craeg S...
20210113 Lean In Government Harrisburg Conf Agile Governance at Scale Craeg S...20210113 Lean In Government Harrisburg Conf Agile Governance at Scale Craeg S...
20210113 Lean In Government Harrisburg Conf Agile Governance at Scale Craeg S...Craeg Strong
 
SAP BPC driving efficiency in planning and performance management
SAP BPC driving efficiency in planning and performance managementSAP BPC driving efficiency in planning and performance management
SAP BPC driving efficiency in planning and performance managementCarl Adams
 
The PMO Value - Emma-Ruth Arnaz-Pemberton | Project Challenge March 2018
The PMO Value - Emma-Ruth Arnaz-Pemberton | Project Challenge March 2018The PMO Value - Emma-Ruth Arnaz-Pemberton | Project Challenge March 2018
The PMO Value - Emma-Ruth Arnaz-Pemberton | Project Challenge March 2018Wellingtone
 
APM Benefits Summit 2017 - Enhancing performance in complex projects through ...
APM Benefits Summit 2017 - Enhancing performance in complex projects through ...APM Benefits Summit 2017 - Enhancing performance in complex projects through ...
APM Benefits Summit 2017 - Enhancing performance in complex projects through ...Association for Project Management
 

Ähnlich wie An Introduction to BS 11000 - A New Model for Collaboration (20)

BS 11000 and the Link to PPC 2000
BS 11000 and the Link to PPC 2000BS 11000 and the Link to PPC 2000
BS 11000 and the Link to PPC 2000
 
Using Internal Benchmarking to drive change on CSR
Using Internal Benchmarking to drive change on CSRUsing Internal Benchmarking to drive change on CSR
Using Internal Benchmarking to drive change on CSR
 
Internal Benchmarking for CSR at Legal & General
Internal Benchmarking for CSR at Legal & GeneralInternal Benchmarking for CSR at Legal & General
Internal Benchmarking for CSR at Legal & General
 
'BIM and the Future Workforce' - Collaborative Working, a presentation by Pau...
'BIM and the Future Workforce' - Collaborative Working, a presentation by Pau...'BIM and the Future Workforce' - Collaborative Working, a presentation by Pau...
'BIM and the Future Workforce' - Collaborative Working, a presentation by Pau...
 
ned-presentation-project-management.pdf
ned-presentation-project-management.pdfned-presentation-project-management.pdf
ned-presentation-project-management.pdf
 
KPI Course slides
KPI Course slidesKPI Course slides
KPI Course slides
 
Successful change - good culture and governance matter Conference - Boris Luc...
Successful change - good culture and governance matter Conference - Boris Luc...Successful change - good culture and governance matter Conference - Boris Luc...
Successful change - good culture and governance matter Conference - Boris Luc...
 
2 shaun skene export
2 shaun skene export2 shaun skene export
2 shaun skene export
 
QuantiMetrics: Case Studies
QuantiMetrics: Case StudiesQuantiMetrics: Case Studies
QuantiMetrics: Case Studies
 
Megger SAP BPC v6
Megger SAP BPC v6 Megger SAP BPC v6
Megger SAP BPC v6
 
Ardent Partners - The State of Strategic Sourcing 2015
Ardent Partners - The State of Strategic Sourcing 2015Ardent Partners - The State of Strategic Sourcing 2015
Ardent Partners - The State of Strategic Sourcing 2015
 
How Does Your PMO Measure Up?
How Does Your PMO Measure Up?How Does Your PMO Measure Up?
How Does Your PMO Measure Up?
 
How to measure performance and improvement?
How to measure performance and improvement?How to measure performance and improvement?
How to measure performance and improvement?
 
"Clienting" - Governance model and challenges
"Clienting" - Governance model and challenges"Clienting" - Governance model and challenges
"Clienting" - Governance model and challenges
 
Jumpstarting the M&A Integration Process
Jumpstarting the M&A Integration ProcessJumpstarting the M&A Integration Process
Jumpstarting the M&A Integration Process
 
20210113 Lean In Government Harrisburg Conf Agile Governance at Scale Craeg S...
20210113 Lean In Government Harrisburg Conf Agile Governance at Scale Craeg S...20210113 Lean In Government Harrisburg Conf Agile Governance at Scale Craeg S...
20210113 Lean In Government Harrisburg Conf Agile Governance at Scale Craeg S...
 
RPP presentation by Emma Carroll-Walsh on 20th October 2016
RPP presentation by Emma Carroll-Walsh on 20th October 2016RPP presentation by Emma Carroll-Walsh on 20th October 2016
RPP presentation by Emma Carroll-Walsh on 20th October 2016
 
SAP BPC driving efficiency in planning and performance management
SAP BPC driving efficiency in planning and performance managementSAP BPC driving efficiency in planning and performance management
SAP BPC driving efficiency in planning and performance management
 
The PMO Value - Emma-Ruth Arnaz-Pemberton | Project Challenge March 2018
The PMO Value - Emma-Ruth Arnaz-Pemberton | Project Challenge March 2018The PMO Value - Emma-Ruth Arnaz-Pemberton | Project Challenge March 2018
The PMO Value - Emma-Ruth Arnaz-Pemberton | Project Challenge March 2018
 
APM Benefits Summit 2017 - Enhancing performance in complex projects through ...
APM Benefits Summit 2017 - Enhancing performance in complex projects through ...APM Benefits Summit 2017 - Enhancing performance in complex projects through ...
APM Benefits Summit 2017 - Enhancing performance in complex projects through ...
 

Kürzlich hochgeladen

Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 DelhiCall Girls in Delhi
 
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...Suhani Kapoor
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 

Kürzlich hochgeladen (20)

Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
 
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 

An Introduction to BS 11000 - A New Model for Collaboration

  • 1. A NEW MODEL FOR COLLABORATION An Introduction to BS 11000 Paul R Greenwood Managing Director Greenwood Consultants London Constructing Excellence Club 8th April 2014, London Capital Club
  • 2. 8th April 2014GCR-LCEC005 Rev 1 Page 2 © Greenwood Consultants Limited 2014 What is Your Partnering Temperature? • Partnering Charter + Traditional Contract • Commitment to working together • Traditional form of contract eg. JCT • Non-Confrontational Contract • Non-confrontational form of contract eg. NEC (ECC) • No special mechanisms • Project Partnering • Partnering Charter + Objectives + Incentivisation • Non-confrontational form of contract eg. NEC, Opt C (Target), Opt X12 (Part’), Opt X20 (KPIs) • Strategic Partnering • Objectives + Incentivisation + Dispute Prevention + • Strategic alliance agreement or term contract eg. SAA + PPC 2000 or TPC 2005
  • 3. 8th April 2014GCR-LCEC005 Rev 1 Page 3 © Greenwood Consultants Limited 2014 Agenda • The CE Approach to Collaborative Working • Latham and Egan Reports • Background to BS 11000 • The BS 11000 Framework • Stages 1 to 8 • BS 11000 Themes • BS 11000 Benefits • BS 11000 Application
  • 4. The Constructing Excellence Approach to Collaborative Working
  • 5. 8th April 2014GCR-LCEC005 Rev 1 Page 5 © Greenwood Consultants Limited 2014 Drivers for Partnering in the UK ‘Constructing the Team’, Sir Michael Latham, 1994. ‘Rethinking Constructing’, The Construction Task Force, Chaired by Sir John Egan, 1998.
  • 6. 8th April 2014GCR-LCEC005 Rev 1 Page 6 © Greenwood Consultants Limited 2014 Egan 5-4-7 Drivers for Change Committed Leadership Focus on the Customer Product Team Integration Quality-Driven Agenda Commitment to People Product Development Partnering the Supply Chain Project Implementation Production of Components Improving the Project Process Capital Cost -10% Construction Time -10% Predictability +20% Defects -20% Accidents -20% Productivity +10% Turnover & Profits +10% Targets for Improvement ‘M4I Strategy Model’, Movement for Innovation (M4I), Anniversary Report, 1999
  • 7. 8th April 2014GCR-LCEC005 Rev 1 Page 7 © Greenwood Consultants Limited 2014 Three Overriding Principles ‘Collaborative Working - The Principles’, Constructing Excellence, 2011 • Common Vision and Leadership • Collaborative culture and behaviours • Collaborative processes and tools
  • 8. 8th April 2014GCR-LCEC005 Rev 1 Page 8 © Greenwood Consultants Limited 2014 Six Critical Success Factors ‘Collaborative Working - The Principles’, Constructing Excellence, 2011 • Early involvement • Selection by value • Aligned commercial arrangements • Common processes and tools • Performance measurement • Long-term relationships
  • 9. 8th April 2014GCR-LCEC005 Rev 1 Page 10 © Greenwood Consultants Limited 2014 Toolkits
  • 11. 8th April 2014GCR-LCEC005 Rev 1 Page 12 © Greenwood Consultants Limited 2014 What is BS 11000? • “ a strategic framework to establish and improve collaborative relationships in organisations of all sizes.” • From concept to disengagement • Developed by DTI/CBI Partnership Sourcing Ltd • First national standard of its type
  • 12. 8th April 2014GCR-LCEC005 Rev 1 Page 13 © Greenwood Consultants Limited 2014 What is BS 11000? • Part 1 - Framework Specification • What = ‘shall’ • Part 2 - Guide to Part 1 • Why • How
  • 13. 8th April 2014GCR-LCEC005 Rev 1 Page 14 © Greenwood Consultants Limited 2014 Applicable Relationships • Single programme or project • Individual relationship • Multiple relationships • Particular types of relationships • “... where collaboration can open new strategic opportunities” “ potential for improvement through the adoption of a collaborative relationship” Collaborative Relationship Management Supply -Chain Internal Partners External Partners Clients/ Customers Based on ‘Multi-Dimensional Relationships’ (aka North-South Diagram), BS 11000-1:2010 Collaborative Business Relationships - Part 1.
  • 14. 8th April 2014GCR-LCEC005 Rev 1 Page 15 © Greenwood Consultants Limited 2014 Timeline 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 ‘Constructing the Team’ Latham ‘Rethinking Construction’ Egan ‘Accelerating Change’ Strategic Forum PPC 2000 Contract ACA TPC 2005 Contract ACA NEC Partnering Option X12 New Engineering Contract ICE BSI PAS 11000 BS 11000-1 (Standard) BS 11000-2 (Guide) ISO 11000 Committee First Certifications by BSI Formation of Partnership Sourcing Ltd by DTI & CBI Launch of the CRAFT Programme ‘Guide to Partnering’ MOD ‘Building Down Barriers’ MOD
  • 15. 8th April 2014GCR-LCEC005 Rev 1 Page 16 © Greenwood Consultants Limited 2014 Early Adopters • PAS 11000 • Aerospace • BS 11000 • Defence • Rail • Facilities • • EMCOR, Lockheed Martin, Raytheon Systems, NATS • MOD, Boeing, Fujitsu, HP • Network Rail, Babcock Rail, Balfour Beatty, Colas, Costain, Hochtief, Rail Tech • Babcock, Capita, Mouchel •
  • 16. The BS 11000 Model Phase 1 Strategic Stage 3 Internal Assessment Stage 1 Awareness Stage 2 Knowledge Phase 3 Management Stage 8 Exit Strategy Stage 7 Staying Together Phase 2 Engagement Stage 6 Value Creation Stage 5 Working Together Stage 4 Partner Selection
  • 17. 8th April 2014GCR-LCEC005 Rev 1 Page 18 © Greenwood Consultants Limited 2014 Phase 1 Strategic Phase 1 Strategic Stage 3 Internal Assessment Stage 1 Awareness Stage 2 Knowledge Phase 3 Management Stage 8 Exit Strategy Stage 7 Staying Together Phase 2 Engagement Stage 6 Value Creation Stage 5 Working Together Stage 4 Partner Selection Development of strategic commitment to collaborative working, based upon a thorough understanding of the opportunities, benefits, risks and constraints of this approach
  • 18. 8th April 2014GCR-LCEC005 Rev 1 Page 19 © Greenwood Consultants Limited 2014 Phase 2 Engagement Phase 1 Strategic Stage 3 Internal Assessment Stage 1 Awareness Stage 2 Knowledge Phase 3 Management Stage 8 Exit Strategy Stage 7 Staying Together Phase 2 Engagement Stage 6 Value Creation Stage 5 Working Together Stage 4 Partner Selection Selection of committed partners and the establishment of joint objectives, structures, processes and systems for creating new value
  • 19. 8th April 2014GCR-LCEC005 Rev 1 Page 20 © Greenwood Consultants Limited 2014 Phase 3 Management Phase 1 Strategic Stage 3 Internal Assessment Stage 1 Awareness Stage 2 Knowledge Phase 3 Management Stage 8 Exit Strategy Stage 7 Staying Together Phase 2 Engagement Stage 6 Value Creation Stage 5 Working Together Stage 4 Partner Selection Management of the joint value- creating relationship and systematic disengagement
  • 20. 8th April 2014GCR-LCEC005 Rev 1 Page 21 © Greenwood Consultants Limited 2014 Stage 1 Awareness Development of awareness and the overall strategic approach to collaborative working Phase 1 Strategic Stage 3 Internal Assessment Stage 1 Awareness Stage 2 Knowledge Phase 3 Management Stage 8 Exit Strategy Stage 7 Staying Together Phase 2 Engagement Stage 6 Value Creation Stage 5 Working Together Stage 4 Partner Selection
  • 21. 8th April 2014GCR-LCEC005 Rev 1 Page 22 © Greenwood Consultants Limited 2014 Stage 1 Awareness • Senior executive • Policy • Objectives • Value • Identification and segmentation of business relationships • Resources, competencies and behaviours • Initial risk assessment • Implementation plan • Documentation • Initiating the relationship management plan
  • 22. 8th April 2014GCR-LCEC005 Rev 1 Page 23 © Greenwood Consultants Limited 2014 Stage 2 Knowledge Establishment of a body of knowledge and the development of a specific strategy, business case and implementation plan for each identified opportunity Phase 1 Strategic Stage 3 Internal Assessment Stage 1 Awareness Stage 2 Knowledge Phase 3 Management Stage 8 Exit Strategy Stage 7 Staying Together Phase 2 Engagement Stage 6 Value Creation Stage 5 Working Together Stage 4 Partner Selection
  • 23. 8th April 2014GCR-LCEC005 Rev 1 Page 24 © Greenwood Consultants Limited 2014 Stage 2 Knowledge • Developing a specific business strategy [drivers and objectives] • Competence and training • Knowledge capture, creation and management • Knowledge sharing • Strategy and business case development • Risk management process • Implementation plan • Relationship management plan
  • 24. 8th April 2014GCR-LCEC005 Rev 1 Page 25 © Greenwood Consultants Limited 2014 Stage 3 Internal Assessment Undertaking a structured assessment of the capability and maturity to successfully engage in a collaborative initiative Phase 1 Strategic Stage 3 Internal Assessment Stage 1 Awareness Stage 2 Knowledge Phase 3 Management Stage 8 Exit Strategy Stage 7 Staying Together Phase 2 Engagement Stage 6 Value Creation Stage 5 Working Together Stage 4 Partner Selection
  • 25. 8th April 2014GCR-LCEC005 Rev 1 Page 26 © Greenwood Consultants Limited 2014 Stage 3 Internal Assessment • Self assessment • Collaborative leadership • Partner selection criteria • The challenge of alignment • Consolidating the next steps through internal action plan • SER review • Relationship management plan
  • 26. 8th April 2014GCR-LCEC005 Rev 1 Page 27 © Greenwood Consultants Limited 2014 Stage 4 Partner Selection Undertaking a structured approach to the identification, evaluation and selection of appropriate partners Phase 1 Strategic Stage 3 Internal Assessment Stage 1 Awareness Stage 2 Knowledge Phase 3 Management Stage 8 Exit Strategy Stage 7 Staying Together Phase 2 Engagement Stage 6 Value Creation Stage 5 Working Together Stage 4 Partner Selection
  • 27. 8th April 2014GCR-LCEC005 Rev 1 Page 28 © Greenwood Consultants Limited 2014 Stage 4 Partner Selection • Nominate potential collaborative partners • Partner evaluation and selection action plans • Creating joint objectives • Negotiating for collaboration • Partner selection • Relationship management plan
  • 28. 8th April 2014GCR-LCEC005 Rev 1 Page 29 © Greenwood Consultants Limited 2014 Stage 5 Working Together Establishing the right platform for collaborative working Phase 1 Strategic Stage 3 Internal Assessment Stage 1 Awareness Stage 2 Knowledge Phase 3 Management Stage 8 Exit Strategy Stage 7 Staying Together Phase 2 Engagement Stage 6 Value Creation Stage 5 Working Together Stage 4 Partner Selection
  • 29. 8th April 2014GCR-LCEC005 Rev 1 Page 30 © Greenwood Consultants Limited 2014 Stage 5 Working Together • Governance • Organizational structure • Joint knowledge management • Communications management • Joint risk management • Business process management • Contracting arrangements • Performance measurement • Improvement • Relationship management plan
  • 30. 8th April 2014GCR-LCEC005 Rev 1 Page 31 © Greenwood Consultants Limited 2014 Stage 6 Value Creation Establishing approaches that seek to build additional value out of the joint relationship Phase 1 Strategic Stage 3 Internal Assessment Stage 1 Awareness Stage 2 Knowledge Phase 3 Management Stage 8 Exit Strategy Stage 7 Staying Together Phase 2 Engagement Stage 6 Value Creation Stage 5 Working Together Stage 4 Partner Selection
  • 31. 8th April 2014GCR-LCEC005 Rev 1 Page 32 © Greenwood Consultants Limited 2014 Stage 6 [Additional] Value Creation • Establishing a value creation programme • Improvement team • Improvement target setting • Value drivers • Learning from experience • Initiating the innovation process • Relationship management plan
  • 32. 8th April 2014GCR-LCEC005 Rev 1 Page 33 © Greenwood Consultants Limited 2014 Stage 7 Staying Together Ongoing joint management of collaborative initiatives Phase 1 Strategic Stage 3 Internal Assessment Stage 1 Awareness Stage 2 Knowledge Phase 3 Management Stage 8 Exit Strategy Stage 7 Staying Together Phase 2 Engagement Stage 6 Value Creation Stage 5 Working Together Stage 4 Partner Selection
  • 33. 8th April 2014GCR-LCEC005 Rev 1 Page 34 © Greenwood Consultants Limited 2014 Stage 7 Staying Together • Monitoring and measuring the relationship • Ongoing management • Continual innovation • Maintaining behaviours and trust • Delivering performance • Analysis of results • Issue resolution • Joint exit strategy • Relationship management plan
  • 34. 8th April 2014GCR-LCEC005 Rev 1 Page 35 © Greenwood Consultants Limited 2014 Stage 8 Exit Strategy Developing and maintaining an effective strategy for disengagement Phase 1 Strategic Stage 3 Internal Assessment Stage 1 Awareness Stage 2 Knowledge Phase 3 Management Stage 8 Exit Strategy Stage 7 Staying Together Phase 2 Engagement Stage 6 Value Creation Stage 5 Working Together Stage 4 Partner Selection
  • 35. 8th April 2014GCR-LCEC005 Rev 1 Page 36 © Greenwood Consultants Limited 2014 Stage 8 Exit Strategy • Establishing and maintaining a joint exit strategy • Analysis of exit strategy • Evaluating changes • Initiating the process • Business continuity and transition • Future opportunities • Relationship management plan
  • 36. 8th April 2014GCR-LCEC005 Rev 1 Page 37 © Greenwood Consultants Limited 2014 BS 11000 Themes • Leadership • Objectives • Competence and Behaviour • Value Management • Risk Management • Knowledge Management • Governance • Exit Strategy
  • 37. 8th April 2014GCR-LCEC005 Rev 1 Page 38 © Greenwood Consultants Limited 2014 BS 11000 Benefits • Neutral consistent framework • Collaborative language • Change programme • Management system Basis for gap analysis • Identifies key value creation issues • Leadership, competence and behaviour • Value, risk and knowledge management • Meshes different business cultures, structures and systems • Public - private - third sectors • Large - medium - small businesses • Provides mechanism for value creation Reduces risk Reduces time to implement Improves probability of success Improves overall value
  • 39. 8th April 2014GCR-LCEC005 Rev 1 Page 40 © Greenwood Consultants Limited 2014 Stage 1 Awareness Stage 2 Knowledge Phase 1 Strategic 3 months Phase 2 Engagement Stage 3 Internal Assessment Stage 4 Partner Selection 3 months Stage 6 Value Creation Stage 5 Working Together6 months Stage 8 Exit Strategy Stage 7 Staying TogetherPhase 3 Management 12 months 24 months 27 to 30 months Stage 2 System Compliance Stage 1 System AdequacyPhase X Certification 3 to 6 months ‘Craft Overview’, Partnership Sourcing Limited, July 2007
  • 40. 8th April 2014GCR-LCEC005 Rev 1 Page 41 © Greenwood Consultants Limited 2014 Simplified Implementation • Identify benefits • Where could CW add value? • Identify scope and resources • Build knowledge • Identify the gaps • Outline a plan and budget • Obtain authorisation • Business case • Integrate new processes and systems • Implement new process • Stages 1 to 6 on new relationship? • Stages 7 to 8 on extant relationship? • Obtain validation • Certification
  • 41. 8th April 2014GCR-LCEC005 Rev 1 Page 42 © Greenwood Consultants Limited 2014 BS 11000-1 Certification • Assessment • 186 requirements • Standard two stage process • Certification Bodies BSI • 4 pilot certifications to PAS 11000-1 • >55 certifications to BS 11000-1 [Jan 2014] • >120 organisations "actively preparing for certification“ [Jan 2014] Lloyds • First certification 2013 [Jan 2014] Others • Accreditation • Maintains standards across Certification Bodies • Not yet available [following publication of ISO 11000?] a milestone, not the goal
  • 42. 8th April 2014GCR-LCEC005 Rev 1 Page 43 © Greenwood Consultants Limited 2014 Conclusions • Collaboration does not happen by chance • 95% perspiration, 5% inspiration • Driving a partnered relationship takes more time [up-front] - not less • Established construction-specific models • Toolkits • Contracts • BS 11000 • Universal language and application • Change programme • Management system • Compatible with construction contracts its about culture and behaviour
  • 44. 8th April 2014GCR-LCEC005 Rev 1 Page 45 © Greenwood Consultants Limited 2014 Major Projects Our Services Process Review and Improvement Management Systems Organisation and Process Design and Reengineering Performance Measurement and Improvement Facilitation Collaborative Business and Project Relationships