Suggested Mandatory Data
Optional Data
Data for Model Calibrations
Goal-Question-Metrics Approach
3. Data Collection – What to Collect?
This powerpoint lists what project data needs to be
collected for different purposes.
First part lists mandatory data and suggested optional
data.
Second part lists data needed for model calibration
Last part: we categorize the data using the GQM
approach.
After setting a goal and questions, the GQM approach defines
the metrics and data points which are needed to be collected.
These lists are also synchronized with sources such as ISBSG
Database, USC COCOMO Project Database and QSM data
collection documents available on the Internet
4. Suggested Mandatory Data
Project name including version/
increment/ release if applicable
Project manager name and contact
information
Company/department information
Submitter name and contact information
Submission date
5. Suggested Mandatory Data
Estimation model used including the model parameter
used
Project type/domain
Project lifecycle
Project standard – if applicable
Equivalent SLOC or other sizing depending on the model
Counting convention used, e.g. logical or physical SLOC
and counting technique used e.g. counting tool
Estimated Effort
Estimated Schedule
6. Suggested Mandatory Data
Actual Effort (person months)
Actual Schedule (months)
Project memo field for free text
Project start date
Reference to any additional project files if
applicable.
Team size information
7. Suggested Mandatory Data
Final environmental adjustment factor
Final scaling adjustment factor
Hours per Months
Product complexity measure of description
Development tools
Data quality qualifier (a to f) to measure the
quality of the data.
Development type e.g. new development or
enhancement
8. Suggested Mandatory Data
It is highly recommended to store a
copy of the entire project type/domain,
lifecycle and standard definition and
estimation model. Definitions and model
parameters change over time which
makes it necessary to store a copy of the
definitions along with the project which
used them for later retrieval.
9. Suggested Optional Data
Estimated total defects and if possible a breakdown
(requirements, design, coding, documentation, bad fixes
defects etc)
Actual total defects and if possible a breakdown
(requirements, design, coding, documentation, bad fixes
defects etc)
Environment factors list with ratings and ratings
mapping
Scaling factors list with ratings and ratings mapping
Project estimated end date
Project actual end date
10. Suggested Optional Data
Effort by phase
Total effort in person hours
Effort by phase
Schedule by phase, e.g. Waterfall: requirements,
design, code, test, total.
Number of people (and job functions) working in
each phase (average or maximum)
Sizing data such as FP count, Internet point,
bottom up
Sizing methodology parameter
11. Suggested Optional Data
Volume/size information for all components,
breakdown: new, reused, COTS and REVL.
Programming language composition per
component and unadjusted FP count
Description of the programming language used
(IDE heavy? Etc).
Sizing methodology parameter definitions:
Methodology used (name such as function points)
List of factors and weights
12. Data for Model Calibrations
COCOMO’s calibration routine needs the
following inputs to calibration A and C
Actual Effort, Schedule
Number of projects used
EAF (Environmental Factor overall) or all individual
factors
Exponent Base (driven by the model)
Overall Scaling Factor or all individual factors
KSLOC
HPM
13. Goal/Question/Metric
The Goal/Question/Metric (GQM) Paradigm is a
mechanism that provides a framework for
developing a metrics program.
It was developed at the University of Maryland
as a mechanism for formalizing the tasks of
characterization, planning, construction,
analysis, learning and feedback.
The GQM paradigm was developed for all types
of studies, particularly studies concerned with
improvement issues. The paradigm does not
provide specific goals but rather a framework for
stating goals and refining them into questions to
provide a specification for the data needed to
help achieve the goals.
14. Goal/Question/Metric
The GQM paradigm consists of three steps:
1. Generate a set of goals
2. Derive a set of questions
3. Develop a set of metrics
The next pages list several Goals, Questions and
their needed metrics/data points. It can be used
to determine what project data needs to be
collected.
15. Goal/Question/Metric
Main Goal: Improve the Software Process
Goal: Improve Productivity
Question: What are the overall and subgroup productivities?
Metric: SLOC/person-month (overall and subgroup averages).
Productivity should be calculated from actuals.
Question: What is the productivity per activity?
Metric: SLOC/person-month per activity.
Question: Is productivity increasing over time?
Metric: overall productivity trends (multiple projects).
16. Goal/Question/Metric
Main Goal: Improve the Software Process
Goal: Improve Quality
Question: What is the overall and subgroup defect densities?
Metrics: Defects/KSLOC
Question: How many defects are introduced by type?
Metric: Percent of defects introduced per type. A project type
must be specified
Question: What defect types occur the most?
Metric: Defect type percentages ordered by magnitude
17. Goal/Question/Metric
Main Goal: Improve software process
predictability
Goal: Improve Effort Predictability
Question: How accurate are effort estimates?
Metric: actual vs. estimated effort