BangBangBangBang Na -Na -Na -Na -
BangBangBangBang PakongPakongPakongPakong
Expressway,Expressway,Expressway,Expressway,
Bangkok,Bangkok,Bangkok,Bangkok,
ThailandThailandThailandThailand
struction took about nine
months before production of
the first elements began. In
addition to the usual facilities
such as workers' camps, can-
teen, offices and laboratories,
there are carpentry, mechanical
and welding workshops, a
central store and a rebar cutting
and bending area.
Three basic types of single-cell
box segments were produced
using the match casting
method:
• Approximately 22,100 D6
elements for the six-lane
mainline with a deck
27.20 m wide and 2.60 m
high with a transportation
weight of up to 100 t.
• Approximately 12,200 D2
elements, and 2,300 D3
elements for the two-lane
and three-lane access and
exit ramps with varying slab
widths of up to 15.60 m and
a maximum weight of 65 t.
• About 3,900 rectangular box
girder elements of the portal
frame beams of the sub-
structures.
Furthermore, about 30,000
other prefabricated reinforced
concrete parts of lesser im-
portance were produced at the
yard.
The storage area for segments
and precast parts of all kinds
was approximately 26 hectares.
This corresponds to a produc-
tion of seven weeks
Below some main quantities:
• total concrete 1,100,000 m³
• total reinforcement 134,000
t, up to 250 t/day were fixed
• total transverse prestressing
steel 15,000 t, on the aver-
age 26 t/day were stressed
• maximum output of seg-
ments per day / month: 65 /
1,800 units
• total workforce in two shifts
(eleven hours): 3,500 men
Contract Value:
USD (m) 834.7
Construction Period:
08/1995 - 01/2000
Client:
Expressway and
Rapid Transit Authority
of Thailand
Services:
Design and construction
of a 55 km long 2x3 lane
expressway
The elevated Bang Na Ex-
pressway with six traffic lanes
and a length of 55 km was built
to ease traffic congestion be-
tween Greater Bangkok and
Chonburi. The project com-
prises a bridge surface of 1.9
million m² by use of segmental
precast hollow boxes. Alto-
gether approximately 40,000
elements were used for the
superstructure, all produced at
a casting yard at Bang Bo.
About 4.5 km away from the
Expressway, on an area of 65
hectares, the precasting plant
was constructed. The marshy
terrain together with access
roads had to be completely
developed for the production
and transportation of the heavy
prefabricated concrete parts.
The entire production area is
founded on reinforced con-
crete driven piles and surfaced
with a cast-in-place concrete
slab. Altogether, the following
quantities were used: 370,000
m of driven piles 30x30 cm,
900,000 m³ of soil filling,
100,000 m³ of concrete, 7,600 t
of reinforcing steel. Its con- B A U A K T I E N G E S E L L S C H A F T
Reg.39-BB-604-19.6.825-01

More Related Content

Viewers also liked

Primo Meeting dei gestori di Laboratori Urbani
Primo Meeting dei gestori di Laboratori UrbaniPrimo Meeting dei gestori di Laboratori Urbani
Primo Meeting dei gestori di Laboratori Urbanibollenti spiriti
 
THE FACTORY URBAN LAB - COSA DOVEVA ESSERE
THE FACTORY URBAN LAB - COSA DOVEVA ESSERETHE FACTORY URBAN LAB - COSA DOVEVA ESSERE
THE FACTORY URBAN LAB - COSA DOVEVA ESSEREMeetupMottola
 
Azeite de oliva conquistou o paladar do brasileiro
Azeite de oliva conquistou o paladar do brasileiroAzeite de oliva conquistou o paladar do brasileiro
Azeite de oliva conquistou o paladar do brasileiroAgricultura Sao Paulo
 
Diapositivas pasado simple
Diapositivas pasado simpleDiapositivas pasado simple
Diapositivas pasado simplejairo adrian
 

Viewers also liked (7)

Primo Meeting dei gestori di Laboratori Urbani
Primo Meeting dei gestori di Laboratori UrbaniPrimo Meeting dei gestori di Laboratori Urbani
Primo Meeting dei gestori di Laboratori Urbani
 
Proposal Table.
Proposal Table.Proposal Table.
Proposal Table.
 
Motivation
MotivationMotivation
Motivation
 
THE FACTORY URBAN LAB - COSA DOVEVA ESSERE
THE FACTORY URBAN LAB - COSA DOVEVA ESSERETHE FACTORY URBAN LAB - COSA DOVEVA ESSERE
THE FACTORY URBAN LAB - COSA DOVEVA ESSERE
 
Azeite de oliva conquistou o paladar do brasileiro
Azeite de oliva conquistou o paladar do brasileiroAzeite de oliva conquistou o paladar do brasileiro
Azeite de oliva conquistou o paladar do brasileiro
 
Diapositivas pasado simple
Diapositivas pasado simpleDiapositivas pasado simple
Diapositivas pasado simple
 
Chhattisgarh agriculture
Chhattisgarh agricultureChhattisgarh agriculture
Chhattisgarh agriculture
 

Similar to E-3-31 Bang Na - Bang Pakong Expressway Bangkok Thailand

lmrc presentation
lmrc presentationlmrc presentation
lmrc presentationATUL SHUKLA
 
The Akashi Kaikyo bridge - longest suspension bridge in the world
The Akashi Kaikyo bridge - longest suspension bridge in the worldThe Akashi Kaikyo bridge - longest suspension bridge in the world
The Akashi Kaikyo bridge - longest suspension bridge in the worldADARSH _
 
Theodosios Skortsis - Portfolio v5.1
Theodosios Skortsis - Portfolio v5.1Theodosios Skortsis - Portfolio v5.1
Theodosios Skortsis - Portfolio v5.1Theodosios Skortsis
 
UMAID IQBAL SEMINAR.pptx
UMAID IQBAL SEMINAR.pptxUMAID IQBAL SEMINAR.pptx
UMAID IQBAL SEMINAR.pptxPraveendubey82
 
Caledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open HouseCaledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open HouseCrosstown TO
 
PHC pile Installation methods
PHC  pile Installation methodsPHC  pile Installation methods
PHC pile Installation methodsHalim Rahman
 
Design of flyover elements
Design of flyover elementsDesign of flyover elements
Design of flyover elementssubbu lakshmi
 
Re development works at east kidwai nagar, New Delhi
Re development works at east kidwai nagar, New DelhiRe development works at east kidwai nagar, New Delhi
Re development works at east kidwai nagar, New DelhiJaspreet singh
 
Busan geoje fixed link
Busan   geoje fixed linkBusan   geoje fixed link
Busan geoje fixed linkVicky Matwan
 
Construction of limited height subway/elimination of level crossings
Construction of limited height subway/elimination of level crossingsConstruction of limited height subway/elimination of level crossings
Construction of limited height subway/elimination of level crossingsShivamSharma979
 
Innovative solution for crossing larger spaces like railway yard
Innovative solution for crossing larger spaces like railway yardInnovative solution for crossing larger spaces like railway yard
Innovative solution for crossing larger spaces like railway yardRajesh Prasad
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18Rajesh Prasad
 
Introduction to railway engineering
Introduction to railway engineeringIntroduction to railway engineering
Introduction to railway engineeringMuhammad Taimur Khan
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18Rajesh Prasad
 
Uses of Larsa 4 d and Lusas 4 D models for Implementation of Cable Stayed ...
Uses of Larsa   4 d and Lusas  4 D models for Implementation of Cable Stayed ...Uses of Larsa   4 d and Lusas  4 D models for Implementation of Cable Stayed ...
Uses of Larsa 4 d and Lusas 4 D models for Implementation of Cable Stayed ...Rajesh Prasad
 
Seikan tunnel - The Longest Underwater Rail Tunnel
Seikan tunnel - The Longest Underwater Rail TunnelSeikan tunnel - The Longest Underwater Rail Tunnel
Seikan tunnel - The Longest Underwater Rail TunnelJuhi Aggarwal
 
Development Of Tipper Unloading Mechanism
Development Of Tipper Unloading MechanismDevelopment Of Tipper Unloading Mechanism
Development Of Tipper Unloading MechanismIRJET Journal
 

Similar to E-3-31 Bang Na - Bang Pakong Expressway Bangkok Thailand (20)

lmrc presentation
lmrc presentationlmrc presentation
lmrc presentation
 
The Akashi Kaikyo bridge - longest suspension bridge in the world
The Akashi Kaikyo bridge - longest suspension bridge in the worldThe Akashi Kaikyo bridge - longest suspension bridge in the world
The Akashi Kaikyo bridge - longest suspension bridge in the world
 
Theodosios Skortsis - Portfolio v5.1
Theodosios Skortsis - Portfolio v5.1Theodosios Skortsis - Portfolio v5.1
Theodosios Skortsis - Portfolio v5.1
 
laos-tj-2016
laos-tj-2016laos-tj-2016
laos-tj-2016
 
UMAID IQBAL SEMINAR.pptx
UMAID IQBAL SEMINAR.pptxUMAID IQBAL SEMINAR.pptx
UMAID IQBAL SEMINAR.pptx
 
Caledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open HouseCaledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open House
 
PHC pile Installation methods
PHC  pile Installation methodsPHC  pile Installation methods
PHC pile Installation methods
 
Design of flyover elements
Design of flyover elementsDesign of flyover elements
Design of flyover elements
 
Re development works at east kidwai nagar, New Delhi
Re development works at east kidwai nagar, New DelhiRe development works at east kidwai nagar, New Delhi
Re development works at east kidwai nagar, New Delhi
 
Busan geoje fixed link
Busan   geoje fixed linkBusan   geoje fixed link
Busan geoje fixed link
 
Construction of limited height subway/elimination of level crossings
Construction of limited height subway/elimination of level crossingsConstruction of limited height subway/elimination of level crossings
Construction of limited height subway/elimination of level crossings
 
Innovative solution for crossing larger spaces like railway yard
Innovative solution for crossing larger spaces like railway yardInnovative solution for crossing larger spaces like railway yard
Innovative solution for crossing larger spaces like railway yard
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
 
Introduction to railway engineering
Introduction to railway engineeringIntroduction to railway engineering
Introduction to railway engineering
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
 
Uses of Larsa 4 d and Lusas 4 D models for Implementation of Cable Stayed ...
Uses of Larsa   4 d and Lusas  4 D models for Implementation of Cable Stayed ...Uses of Larsa   4 d and Lusas  4 D models for Implementation of Cable Stayed ...
Uses of Larsa 4 d and Lusas 4 D models for Implementation of Cable Stayed ...
 
Tunnel PDF.pdf
Tunnel PDF.pdfTunnel PDF.pdf
Tunnel PDF.pdf
 
Seikan tunnel - The Longest Underwater Rail Tunnel
Seikan tunnel - The Longest Underwater Rail TunnelSeikan tunnel - The Longest Underwater Rail Tunnel
Seikan tunnel - The Longest Underwater Rail Tunnel
 
Development Of Tipper Unloading Mechanism
Development Of Tipper Unloading MechanismDevelopment Of Tipper Unloading Mechanism
Development Of Tipper Unloading Mechanism
 
Transportation Engineering
Transportation EngineeringTransportation Engineering
Transportation Engineering
 

More from Georg Venhorst

More from Georg Venhorst (6)

The Norwegian Road PPP Programme - Söhngen.pdf
The Norwegian Road PPP Programme - Söhngen.pdfThe Norwegian Road PPP Programme - Söhngen.pdf
The Norwegian Road PPP Programme - Söhngen.pdf
 
Wien Sammelkanal
Wien SammelkanalWien Sammelkanal
Wien Sammelkanal
 
19-6-818-00-A
19-6-818-00-A19-6-818-00-A
19-6-818-00-A
 
28-1-712-00
28-1-712-0028-1-712-00
28-1-712-00
 
Stadion München
Stadion MünchenStadion München
Stadion München
 
MyThuan
MyThuanMyThuan
MyThuan
 

E-3-31 Bang Na - Bang Pakong Expressway Bangkok Thailand

  • 1. BangBangBangBang Na -Na -Na -Na - BangBangBangBang PakongPakongPakongPakong Expressway,Expressway,Expressway,Expressway, Bangkok,Bangkok,Bangkok,Bangkok, ThailandThailandThailandThailand struction took about nine months before production of the first elements began. In addition to the usual facilities such as workers' camps, can- teen, offices and laboratories, there are carpentry, mechanical and welding workshops, a central store and a rebar cutting and bending area. Three basic types of single-cell box segments were produced using the match casting method: • Approximately 22,100 D6 elements for the six-lane mainline with a deck 27.20 m wide and 2.60 m high with a transportation weight of up to 100 t. • Approximately 12,200 D2 elements, and 2,300 D3 elements for the two-lane and three-lane access and exit ramps with varying slab widths of up to 15.60 m and a maximum weight of 65 t. • About 3,900 rectangular box girder elements of the portal frame beams of the sub- structures. Furthermore, about 30,000 other prefabricated reinforced concrete parts of lesser im- portance were produced at the yard. The storage area for segments and precast parts of all kinds was approximately 26 hectares. This corresponds to a produc- tion of seven weeks Below some main quantities: • total concrete 1,100,000 m³ • total reinforcement 134,000 t, up to 250 t/day were fixed • total transverse prestressing steel 15,000 t, on the aver- age 26 t/day were stressed • maximum output of seg- ments per day / month: 65 / 1,800 units • total workforce in two shifts (eleven hours): 3,500 men Contract Value: USD (m) 834.7 Construction Period: 08/1995 - 01/2000 Client: Expressway and Rapid Transit Authority of Thailand Services: Design and construction of a 55 km long 2x3 lane expressway The elevated Bang Na Ex- pressway with six traffic lanes and a length of 55 km was built to ease traffic congestion be- tween Greater Bangkok and Chonburi. The project com- prises a bridge surface of 1.9 million m² by use of segmental precast hollow boxes. Alto- gether approximately 40,000 elements were used for the superstructure, all produced at a casting yard at Bang Bo. About 4.5 km away from the Expressway, on an area of 65 hectares, the precasting plant was constructed. The marshy terrain together with access roads had to be completely developed for the production and transportation of the heavy prefabricated concrete parts. The entire production area is founded on reinforced con- crete driven piles and surfaced with a cast-in-place concrete slab. Altogether, the following quantities were used: 370,000 m of driven piles 30x30 cm, 900,000 m³ of soil filling, 100,000 m³ of concrete, 7,600 t of reinforcing steel. Its con- B A U A K T I E N G E S E L L S C H A F T Reg.39-BB-604-19.6.825-01