3. Time Line
4:00pm 911 notifies Ute Water about water on the road at 25 Rd & I Rd
4:50pm 911 notifies GVWU of Breach
5:00pm GVWU divert water to Persigo & Indian Washes
7:00pm GVWU attempt to Shore-up Breach
7:30pm GVDD Called by GVIC
7:45pm Water is flowing over 25 & I Road 3” deep
8:00pm Canal is at full breach
8:30pm GVWU departs to shut canal down
8:45 pm TV crews at 25 & I Road
9:00pm Canal water level reduced
9:15pm GVDD and GVIC feel Situation is stable
9:30pm GVWU prepares Tunnel 3 for closure
9:30pm Storm Hits desert North of I Road and East of 27 Road
10:00m GVWU begins Tunnel 3 closure
10:30pm City Streets notified of water at 26 ½ Rd & Catalina Dr
4. Time Line
10:30pm 911 notifies GVIC there are high waters
10:30pm Water is flowing over 25 & I Road 12” deep
11:00pm GVWUA finalizes Tunnel 3 closure
12:30am Street crews finish clean up at Catalina Dr
1:00am City crews realize Canal has continued to breach
2:00am 911 notifies Road & Bridge and City Streets of excessive water
2:45am Threat to City Market fuel tanks assessed
3:00am Water flows begin to dissipate
6:ooam GVDD & GVIC employees notice extent of flooding on way to work
7:00am All agencies mobilize employees and equipment
9:00am City/521/GVDD find situation on Leach Creek & Gov Highline Canal
Tuesday GVWU learn of the Perfect Storm
Thursday Finish breach repair
Friday Water returned to the Canal
5. 4:00pm
Ute Water gets a call Daryl Moore
from 911 finds canal
beginning to
breach
Water on the Road!
6. Canal Breach Government Highline
Canal at its beginning
stages
9. Shortly before
Houston, We have a
5pm problem
911 notifies GVWU of a
possible breach and
instructs them to call Ute
Water for details
10. Between 5pm & 6pm GVWU diverts water
deploy employees & equipment
100+cfs diverted to Persigo Wash
80-100cfs diverted to Indian Wash
Adjust check structures East of breach
The Government Highline Canal was flowing 574cfs at Indian Wash Monday morning
Normal flow at Indian Wash is 650cfs
12. 7:30 PM
GVDD gets a call for GVIC about a breach in the
Government Highline east of 25 Road.
GVDD responds by putting personnel on notice that
equipment may be needed to help with debris
removal.
GVDD Checks North Cochran Wash from 24 ½ and H
Road to and including Leach Creek to South of the
Riverside Parkway
All Crossings are taking the increased flow, situation
appears stable
13. 7:45pm
Water overtopping 25 & I road 3” deep
8:00pm
Government Highline Canal at full breach
Stable and controlled with water management
14. 8:30pm
GVWU adjusts check structure West of breach
GVWU departs to shut canal down
16. 9:00pm
• Canal water level
reduced and Breach is full
but situation is stable!
• City Parks at Canyon
View aware of situation
• GVDD checks GVIC
crossings with GVIC and,
again, all crossings on
North Cochran Wash are
handling the increased
flow
17. 9:15pm All is Well
• GVWU communicates to GVDD & GVIC the breach situation
is controlled and GVDD & GVIC after checking
downstream crossings agree to the stability of the
conditions
• GVDD has employees “stand down” all is stable and
assistance with repairs can begin in the morning
• Employees drive through a heavy rain on the way home
18. GVWU prepares
9:30pm Tunnel 3 for closure
Sluice the Dam of debris
Lower the pond above the dam
19. A heavy rainstorm pounds the
9:30pm desert along Leach Creek North
of I Road and East of 27 Road
20. Leach Creek under the Government Highline
Leach Creek Canal is partially plugged and runs down the
ROW and spills into the already crippled Canal
two miles upstream from the breach
I Road
Overview Road
21. Looking North at Leach Leach Creek
Creek from Government
Highline Canal
22. Leach Creek spills into the
Government Highline Canal leaving
Debris
large amounts of debris behind
Debris
3x60” CMP
23. Debris left behind by
overflowing Leach
Creek on the North side
of the Canal
32. 10:30pm 911 notifies GVIC there are high waters.
GVIC doesn’t realize this is a new issue,
and still maintains the situation is
under control
The water is now 12”
deep over 25 & I Road
34. 12:30am City crews finish removing
mud and debris at
26 ½ Rd & Catalina Dr
35. Property owner just
finished major
landscaping on this corner
Catalina Drive
36. 1:00am
Street Crews realize Canal
has additional waters
entering the breach
37. 1:30am
GVWU employees returning from dam are amazed at
amount of water flowing across 24 road and the deeper
water over 25 & I road.
Canal road to breach was impassable due to the wet,
slick, and muddy conditions in the dark
38. 2:00am
911 notifies Road &
Bridge and City Streets
of excessive water
Alert!!!
25 Road & I Road
•3’ deep pavement undercut
833 24 ½ Road
•50’ exposed gas line
•10’x150’x8’ washout
•2.5 days to repair
2438 H Road
•Exposed telephone line
•1.5 days to repair
39. 24 ½ Road
•50’ exposed gas line
•10’x150’x8’ washout
•2.5 days to repair
40. Flooding along 24 Road
2:00am
Water overtopping G Road
The West portion of the Canyon View Park parking lot was flooded
Water overtopping F ½ Road
Water crossing 24 Road into 24Road Video Store parking from
there into the parking lots of
The Black Bear Diner
Starbucks
Holiday Inn Express
C&F (Loco) Food Store
Water overtopping Patterson on the East side then into Sutherlands
Water was to the top of the concrete fuel pump islands at City Market
41. Water was to the top of
2:45am the concrete fuel pump
islands
Threat to City Market
fuel tanks assessed
42. 3:00am Water flows begin
to dissipate
Water ceases to overtop
G Road
F ½ Road
Patterson Road
50% of 24 Rd between Patterson Rd & G Rd under water
Street crews begin cleaning mud & debris from arterial
streets
6:30am GVDD & GVIC made aware of the
extent of flooding from employees
on their way to work
43. All agencies Deploy
7:ooam
All agencies deploy employees and equipment for
cleanup and repair except city streets whom continued
through the night with their efforts.
County Road & Bridge
Ute Water
GVIC
GVWU
GVDD
521 Drainage Authority
44. 9:00am GVWU note
the breach is 3
times the size
City/521/GVDD find
situation on Leach Creek
and Government Highline
Canal
45. Tuesday GVWU learns of
“Perfect Storm”
GVWU learns that the heavy rainfall occurring
Monday evening caused damage to the North bank of
the canal as the rain runoff sheet flowed off the desert
and into the canal at the area designated “Spill” (for the
purpose of this presentation)
47. Friday July 15
Water back in canal
North bank of canal at Leach Creek is repaired & rip rapped
Breach repair is complete and stable
Arterial streets cleaned of debris
Canal check structures reset
Water users had water by Saturday 16
Continued cleaning South of Spill on Leach Creek until
dispute with property owner
GVIC removed debris from Appleton Flume
70. Summary for GVDD
Better notification
Balance of resources
Mapping consistency
Identification of Increased Hazard Areas
On going debris cleaning and flow line maintenance
Natural stream maintenance & encroachment enforcement
Detention in upper basins
EIS on Walker Field runway