Oboni Riskope Associates Inc.

                                                                                   www.riskope.com


                                                                               500-1045 Howe Street

                                                                          Vancouver, B.C., V6Z 2A9



On time, on budget, in control, showing your leadership with sustainable
capital expenditure, even during recessions and economic, financial
crises.

Riskope can also help you solve insurance denial situations adding value to you
existing risk assessments, risk registers, ERM in an ingenious way.

By Franco & Cesar Oboni, Oboni Riskope Associates Inc. Vancouver, www.riskope.com

We will use for this discussion Operation Ten (OT) belonging to our client AAA Inc. (AAA)
(names, locations and risk names have been altered to respect client's confidentiality), let's say a
large production facility which of course uses external transportation networks, commercial
wharves, and receives energy, supplies and chemical from the “world” to work in its processing
plant. What this industry actually produces, its geographic location etc. does not matter, for this
discussion. Whether OT is a project (Project Risk Assessment), possibly at Pre-feasibility or
Feasibility stage, or a thriving Operation (Operational Risk Assessment), the approach will be
conceptually the same.

OT/AAA Management formulated an explicit request to Riskope's (www.riskope.com) to deliver a
risk based decision making (RBDM) support study: “The assessment will consider the particular
environment, specific location and activities of OT's facilities to mitigate risks to the environment to
a tolerable level and to establish a conceptual framework to support decisions regarding the
remediation of ***** sites. In particular, the Action Plans will be mainly targeted to OT's decision
makers and should answer practical questions... ”

Riskope started by studying the Status Quo, including the level of awareness, understanding and
sophistication of OT/AAA and concluded that they were at par with the international consensus and
standard operating practices (SOPs) in the area of risk assessment and prioritization. It was
however, obvious that those SOPs were not giving Management the guidance they were seeking.

A stepped approach, tested and proven over the years by Riskope, was deployed. The result of
Riskope's study brought the following befits and results:

   •   The prevalent critical risks were brought forward in a clear, rational and defensible way.
   •   The number of critical issues was shown to be smaller than originally evaluated at Status
       Quo.
   •   The insurance portfolio was shown to be poorly balanced and adjustments were proposed.
   •   The new priority list let Management make better decisions in mitigative investments


(c)Oboni Riskope Associates Inc.                                                           Page 1 of 8
allotment and freed moneys that could be better allocated elsewhere.
   •   The methodology allows rational updating of the probabilities when new data are gathered.

In the following sections we will go point by point through the stepped approach.


Status Quo Analysis: Risk Assessment/Management Approach before
Riskope's Deployment

In accordance to widespread, common practices, Operation Ten (OT) uses an indexed matrix
approach (some people call this a “heat map”, others “risk landscape”/”Paysage risque”) to
prioritize risks compiled in a risk register (prepared with a commercial software) in view of their
management. As there are no standardized versions (ISO 31000, COSO (ERM), ONR 490000 1
guidelines do not enforce a method) of this empirical approach, and indexes are often evaluated
using verbal approximations, qualitative concepts, it is necessary to briefly summarize AAA's own
“rules” before going into any further discussion.

AAA's system uses a 5x5 classes (frequency x severity) matrix defined as follows.

                Classification        Level                     Characterization
                 Frequency              1         1 failure in over 100 years
                                        2         1 failure in 10 to 100 years
                                        3         1 failure in 5 to 10 years
                                        4         1 failure in 1 to 5 years
                                        5         more than 1 failure per year

                   Severity             1         $0 to $1,000,000 in costs
                                        2         $1,000,000 to $5,000,000 in costs
                                        3         $5,000,000 to $15,000,000 in costs
                                        4         $15,000,000 to $50,000,000 in costs
                                        5         more than $50,000,000 in costs

As a side note, the idea of using frequencies instead of probabilities (or annual probabilities) can
lead to some confusion and misleading results. For example, a risk might not have any frequency
(typically isolated terrorist attack, change in legislation), yet a non negligible probability to hit in
the next future. A severe rainfall might have a low frequency, but a high probability of occurrence
with the current climate change.

As it can be seen below, stepped thresholds have been selected by AAA to define four levels of
attention (criticality) of risks in the matrix: Severe, High, Medium, Low.

                                                           Frequency
                                            1        2         3          4         5
                                 1          L        L         L          M         M
                                 2          L        M         M          M         H
                  Severity       3          L        M         M          H         H
                                 4          M        M         H          H         S
                                 5          M        H         H          S         S




1)http://foboni.wordpress.com/2010/02/17/a-discussion-of-the-latest-coso-paper-on-the-
development-of-organizations-resiliency-to-risk/ , http://foboni.wordpress.com/2010/11/10/new-iso-
31000-risk-management-principles-and-guidelines/

(c)Oboni Riskope Associates Inc.                                                             Page 2 of 8
A rule based on the value of the multiplication between the frequency and the severity indexes has
indeed been established by AAA as displayed in the following scheme.



                                       min        max                 Risk Rating   Freq * Sev
                 Severe     S          20          25               S = Severe        > 19
                   High     H          10          19               H = High        10 TO 19
                Medium      M           4           9               M = Medium       4 TO 9
                   Low      L           0           3               L = Low            <4



Interestingly, OT's Risk registers delivered to Riskope (www.riskope.com) had risk ratings of the
H,M,L categories, but none in the Severe class. For example:

   •   Quake has severity x frequency (2 x 2)=4 which give Medium, ranked in the same class as
       Traffic Accidents (5 x 1), Acid or Diesel Oil spills (3 x 3).
   •   Supplier's acid delivery is rated as High (3 x 4=12), together with fire at Powerhouse (2 x 5),
       Explosion at Boiler (2x 5), HLP leak (2 x 5).

AAA's original rating of OT's 50 risks scenario split them into 0 Severe, 14 High, 25 Medium and
11 Low risks. Do you remember the old saying about “crying for wolf”? Well, with 14 High, 25
Medium, the usual reaction of Management is to say: “too many to cope, let's wait”, or any one of
the sixteen excuses we have discussed elsewhere2.

The indexed matrix approach usually gives useful snapshots of the operation “risk panorama”, but it
doesn't have the ability to deliver clear guidance in the selection of risks priorities, to define if
mitigation plans are sufficient or not3. As a matter of fact, the problem of expenditure on safety
measures is indeed one of allocation of resources and cost-effectiveness which has to be based on
the whole spectrum of possible events, instead of the Maximum Credible Event, ALE (Annual Loss
Expected) or some other deterministic parameter only. (Lee's loss prevention in the process
industries: hazard identification, assessment, and control, Volume 1, Frank P. Lees).


Riskope's Approach. STEP 1: Defining Risk Tolerability

As it has been discussed and demonstrated in various occasions 4, the Management objectives can
only be reached if a clear definition of the tolerability thresholds of an organization is carried out.

A series of four proprietary questions designed to allow the definition of tolerability was used in a
facilitated workshop with key personnel, including the CFO. Riskope also undertook the task of
matching the replies to those questions with AAA's empirical stepped matrix thresholds, so as to
define a tolerability threshold that could be used for rational and transparent prioritization.




2)http://foboni.wordpress.com/2009/11/12/one-world-16-common-human-traits-2/
3)http://foboni.wordpress.com/2010/06/08/bp-crisis-rational-analysis-what-bp-did-not-perform/
4)http://www.slideshare.net/Foboni/generalized-tolerability-and-risk-based-decision-making-
examples-19-oct-5554686

(c)Oboni Riskope Associates Inc.                                                                 Page 3 of 8
Riskope's Approach. STEP 2: Converting Risk Register Data into Usable
Data

In order to move forward Riskope had to convert OT's matrix frequencies into probabilities, and
eliminated the useless and confusing indexes. Once the indexes were eliminated it became possible
to evaluate “real” risks, as the product of probability and consequences, expressed in monetary
terms, and plot them in a probability-Consequences (Losses) diagram.

That diagram (Probability (vertical axis, a number between nil and one)- Consequences (horizontal
axis, dollars)) is displayed in Figure 1, with all OT's Risk Register scenarios, the newly defined
tolerability curve plugged in. As it can be noted, the curve follows the steps of the matrix threshold
(yellow-red limit) classes displayed here in log-log scale (reason for which the width and thickness
of the boxes decreases from bottom left to top right).




Figure 1. The original matrix cells are shown on a log-log probability-consequences plot, together
with the newly developed OT's tolerability curve.

The “total” risk for each scenario can be calculated, and when applicable, it is possible to evaluate
which portion of that risk lies above the tolerability as depicted in Figure 2.




Figure 2. When probability and consequences of a scenario are evaluated, the total risk is equal (p*C)
to the surface of the rectangle (sum of orange and blue areas). The blue area is the tolerable part of
that scenario, the orange part is the intolerable portion. NB: the log-log scale requires some attention
when interpreting the relative size of surfaces, as shown in the bar diagram at the right, in decimal
scale.


(c)Oboni Riskope Associates Inc.                                                           Page 4 of 8
The bar graph below, in Figure 3 shows, as an example, a small portion of the risks from OT's
original Risk Register, with in blue the tolerable part, the intolerable part in orange, and the total
risk equal to the sum of the blue and orange bar.




Figure 3. A small part of OT's original Risk Register, with, for each scenario, tolerable and intolerable
risk partition.

If we plot risks from highest down to the lowest, the chart in the next page represents the first 20
risks (Figure 4).

We can easily see from Figure 4 that even though some risks scenarios are overall higher (blue and
orange bar), the size of the intolerable part (orange bar) may lead to a completely different
prioritization and respective allocation of mitigative resources.




(c)Oboni Riskope Associates Inc.                                                             Page 5 of 8
Figure 4. OT's largest total risks, in decreasing order from left to right.



Riskope's Approach. STEP 3: Rational Prioritization of Risks

Rational and transparent prioritization is indeed achieved when risks (above tolerability) are ranked
in decreasing order of intolerable portion (only the orange bars), even if the overall risk is higher,
leading to the graph displayed in Figure 5, next page.




 (c)Oboni Riskope Associates Inc.                                                        Page 6 of 8
Figure 5. OT's Risk Register risks are now ranked in decreasing order (from left to right) of their
intolerable part.

At this point it becomes interesting to compare the relative value of the risks' intolerable part for the
allocation of resources regarding mitigations measures.




Figure 6. Relative values of the intolerable part of OT's risks.

 (c)Oboni Riskope Associates Inc.                                                           Page 7 of 8
We can see from Figure 6 that five OT's scenarios count for 83% of the total intolerable risks.

We could therefore state, at first sight, that for every dollar spend for mitigation measure around 80
cents should be spent equally (or in relative proportions) for the 5 “first” risks, then the remaining
20 cents should be split equally amongst the next 16 risks. 30 scenarios should not even be
considered at this time.

In other words, among the 50 risks scenario present in OT's Risk Register, 5 should be allotted 80 %
of the resources and 15 others should employ 20% while the remaining 30 should not even be
considered before the first 20 are not brought below the tolerability curve.

When the implementation of mitigative measures will change the risks panorama, the prioritization
will change and it will be very easy to update the rankings with the new rational allotments.

Conclusions

By using a newly developed OT's tolerability curve, which complies with AAA matrix classes
thresholds, and using the intolerable part of risks as a rating parameter, we determined a new rating
which allows for more rational capital and efforts allotment.

Following the new rating it can be seen that among those 50 risks, 5 should be allotted 80 % of the
resources and 15 others should employ 20% while the remaining 30 should not even be considered
before the first 20 are not brought below the tolerability curve. This is way more focused and
rational than OT/AAA's original rating of the same 50 risks which split into 0 Severe, 14 High, 25
Medium and 11 Low risks,

If we look at a comparison, that's 5 risks sharing 80% of the available resources, against 14 risks
sharing an unspecified percentage of the available resources. Or 15 risks sharing 20% of the
available resources, instead than 25 risks sharing an unspecified percentage of the same. One other
way of seeing it? Well, if OT's Management have to mitigate 5 risks instead of 14, they will be
keener to do so, and it will be done faster, as they do not feel overwhelmed.

In this paper, we have shown how your “standard” risk approach (risk assessments, risk
register, ERM) that your peers and superiors already understand and “own” can be turned into a
cutting edge competitive advantage, freeing capitals for business and production development,
leading to more easily defensible, justifiable decisions. In other words, the mantra is: stop
wasting moneys and efforts in security measures that do not pay off, over-investing in some
mitigations and, may be, under invest in others, with, in both cases, potentially devastating
unjustified consequences. Our metric is consistent, unambiguous, and provides context for better
understanding your organization's risks.

Here you have a summary of the benefits yielded by the approach :
   • The prevalent critical risks were brought forward in a clear, rational and defensible way.
   • The number of critical issues was shown to be smaller than originally evaluated at Status
       Quo.
   • The insurance portfolio was shown to be poorly balanced and adjustments were proposed.
   • The new priority list let Management make better decisions in mitigative investments'
       allotment and freed moneys that could be better allocated elsewhere.
   • The methodology allows rational updating of the probabilities when new data are gathered.


(c)Oboni Riskope Associates Inc.                                                         Page 8 of 8

Weitere ähnliche Inhalte

Andere mochten auch

Relational Patterns in OWL and their application to OBO
Relational Patterns in OWL and their application to OBORelational Patterns in OWL and their application to OBO
Relational Patterns in OWL and their application to OBOMichel Dumontier
 
55 ways to get more energy
55 ways to get more energy55 ways to get more energy
55 ways to get more energyHome
 
Vinyl sulfones: Click applications in bioconjugation. The resurgence of a che...
Vinyl sulfones: Click applications in bioconjugation. The resurgence of a che...Vinyl sulfones: Click applications in bioconjugation. The resurgence of a che...
Vinyl sulfones: Click applications in bioconjugation. The resurgence of a che...Fernando Hernandez-Mateo
 
Intro to Social Media
Intro to Social MediaIntro to Social Media
Intro to Social MediaSascha Funk
 
Business Teaming
Business TeamingBusiness Teaming
Business TeamingBob Shark
 
Conducting Remote Task-Based Usability Testing on Your Mobile Website
Conducting Remote Task-Based Usability Testing on Your Mobile WebsiteConducting Remote Task-Based Usability Testing on Your Mobile Website
Conducting Remote Task-Based Usability Testing on Your Mobile WebsiteUserZoom
 
Web 2.0, Nederlandse Spoorwegen En Proefstation Leiden
Web 2.0, Nederlandse Spoorwegen En Proefstation LeidenWeb 2.0, Nederlandse Spoorwegen En Proefstation Leiden
Web 2.0, Nederlandse Spoorwegen En Proefstation LeidenCoenDirkx
 
D4 I Framework Web
D4 I Framework WebD4 I Framework Web
D4 I Framework WebIain Sanders
 
Hermeneus Euskaraz - Jakintza Librea
Hermeneus Euskaraz - Jakintza LibreaHermeneus Euskaraz - Jakintza Librea
Hermeneus Euskaraz - Jakintza LibreaXabi del Rey
 
OpenSource Big Data Platform - Flamingo v7
OpenSource Big Data Platform - Flamingo v7OpenSource Big Data Platform - Flamingo v7
OpenSource Big Data Platform - Flamingo v7BYOUNG GON KIM
 
Katere so vaše prioritete?
Katere so vaše prioritete?Katere so vaše prioritete?
Katere so vaše prioritete?Damjana Kocjanc
 
My Powerpoint
My PowerpointMy Powerpoint
My PowerpointUruguayo
 
web pre-10.pdf
web pre-10.pdfweb pre-10.pdf
web pre-10.pdfs1160122
 
Wm Credentials
Wm CredentialsWm Credentials
Wm Credentialspikwik
 

Andere mochten auch (20)

Los gansos
Los gansosLos gansos
Los gansos
 
Relational Patterns in OWL and their application to OBO
Relational Patterns in OWL and their application to OBORelational Patterns in OWL and their application to OBO
Relational Patterns in OWL and their application to OBO
 
Digital
DigitalDigital
Digital
 
55 ways to get more energy
55 ways to get more energy55 ways to get more energy
55 ways to get more energy
 
Vinyl sulfones: Click applications in bioconjugation. The resurgence of a che...
Vinyl sulfones: Click applications in bioconjugation. The resurgence of a che...Vinyl sulfones: Click applications in bioconjugation. The resurgence of a che...
Vinyl sulfones: Click applications in bioconjugation. The resurgence of a che...
 
Intro to Social Media
Intro to Social MediaIntro to Social Media
Intro to Social Media
 
Business Teaming
Business TeamingBusiness Teaming
Business Teaming
 
Conducting Remote Task-Based Usability Testing on Your Mobile Website
Conducting Remote Task-Based Usability Testing on Your Mobile WebsiteConducting Remote Task-Based Usability Testing on Your Mobile Website
Conducting Remote Task-Based Usability Testing on Your Mobile Website
 
Fig geometricz
Fig geometriczFig geometricz
Fig geometricz
 
Web 2.0, Nederlandse Spoorwegen En Proefstation Leiden
Web 2.0, Nederlandse Spoorwegen En Proefstation LeidenWeb 2.0, Nederlandse Spoorwegen En Proefstation Leiden
Web 2.0, Nederlandse Spoorwegen En Proefstation Leiden
 
Walt Disney Quotes
Walt Disney QuotesWalt Disney Quotes
Walt Disney Quotes
 
Storyboard definition
Storyboard definitionStoryboard definition
Storyboard definition
 
D4 I Framework Web
D4 I Framework WebD4 I Framework Web
D4 I Framework Web
 
Hermeneus Euskaraz - Jakintza Librea
Hermeneus Euskaraz - Jakintza LibreaHermeneus Euskaraz - Jakintza Librea
Hermeneus Euskaraz - Jakintza Librea
 
OpenSource Big Data Platform - Flamingo v7
OpenSource Big Data Platform - Flamingo v7OpenSource Big Data Platform - Flamingo v7
OpenSource Big Data Platform - Flamingo v7
 
Katere so vaše prioritete?
Katere so vaše prioritete?Katere so vaše prioritete?
Katere so vaše prioritete?
 
Portfolio
PortfolioPortfolio
Portfolio
 
My Powerpoint
My PowerpointMy Powerpoint
My Powerpoint
 
web pre-10.pdf
web pre-10.pdfweb pre-10.pdf
web pre-10.pdf
 
Wm Credentials
Wm CredentialsWm Credentials
Wm Credentials
 

Ähnlich wie Tolerability and Decision Making Discussion

Positioning project, programme and portfolio risk
Positioning project, programme and portfolio risk Positioning project, programme and portfolio risk
Positioning project, programme and portfolio risk Dr David Hancock
 
Risk parity revolution
Risk parity revolutionRisk parity revolution
Risk parity revolutionZakMaymin
 
Assessing & measuring operational risk
Assessing & measuring operational riskAssessing & measuring operational risk
Assessing & measuring operational riskUjjwal 'Shanu'
 
Assessing measuring oprisksama-khan011805
Assessing measuring oprisksama-khan011805Assessing measuring oprisksama-khan011805
Assessing measuring oprisksama-khan011805Ujjwal 'Shanu'
 
Risk Management Insight FAIR(FACTOR ANA.docx
Risk Management Insight       FAIR(FACTOR ANA.docxRisk Management Insight       FAIR(FACTOR ANA.docx
Risk Management Insight FAIR(FACTOR ANA.docxmadlynplamondon
 
bài giảng về qtrrtc chương 12 risk management and financial institution
bài giảng về qtrrtc chương 12 risk management and financial institutionbài giảng về qtrrtc chương 12 risk management and financial institution
bài giảng về qtrrtc chương 12 risk management and financial institutionPhngUyn130600
 
Page 1 of 9 This material is only for the use of stud.docx
Page 1 of 9  This material is only for the use of stud.docxPage 1 of 9  This material is only for the use of stud.docx
Page 1 of 9 This material is only for the use of stud.docxkarlhennesey
 
Risk Management Insight FAIR(FACTOR AN.docx
Risk Management Insight        FAIR(FACTOR AN.docxRisk Management Insight        FAIR(FACTOR AN.docx
Risk Management Insight FAIR(FACTOR AN.docxpoulterbarbara
 
Risk Management Insight FAIR(FACTOR ANA
           Risk Management Insight       FAIR(FACTOR ANA           Risk Management Insight       FAIR(FACTOR ANA
Risk Management Insight FAIR(FACTOR ANAtroutmanboris
 
Risk Management Insight FAIR(FACTOR AN.docx
Risk Management Insight        FAIR(FACTOR AN.docxRisk Management Insight        FAIR(FACTOR AN.docx
Risk Management Insight FAIR(FACTOR AN.docxadkinspaige22
 
Risk Management Insight FAIR(FACTOR AN.docx
           Risk Management Insight        FAIR(FACTOR AN.docx           Risk Management Insight        FAIR(FACTOR AN.docx
Risk Management Insight FAIR(FACTOR AN.docxboadverna
 
Risk Management Insight FAIR(FACTOR AN.docx
Risk Management Insight        FAIR(FACTOR AN.docxRisk Management Insight        FAIR(FACTOR AN.docx
Risk Management Insight FAIR(FACTOR AN.docxgertrudebellgrove
 
Risk Management Insight FAIR(FACTOR ANA.docx
Risk Management Insight       FAIR(FACTOR ANA.docxRisk Management Insight       FAIR(FACTOR ANA.docx
Risk Management Insight FAIR(FACTOR ANA.docxgertrudebellgrove
 
Risk Management Insight FAIR(FACTOR AN.docx
Risk Management Insight        FAIR(FACTOR AN.docxRisk Management Insight        FAIR(FACTOR AN.docx
Risk Management Insight FAIR(FACTOR AN.docxtarifarmarie
 
5242020 Originality Reporthttpsucumberlands.blackboar.docx
5242020 Originality Reporthttpsucumberlands.blackboar.docx5242020 Originality Reporthttpsucumberlands.blackboar.docx
5242020 Originality Reporthttpsucumberlands.blackboar.docxBHANU281672
 
ERM and value added risk management.docx
ERM and value added risk management.docxERM and value added risk management.docx
ERM and value added risk management.docxbkbk37
 
Monitoring Systemic Risk with V-Lab - Robert Engle - June 25 2013
Monitoring Systemic Risk with V-Lab - Robert Engle - June 25 2013Monitoring Systemic Risk with V-Lab - Robert Engle - June 25 2013
Monitoring Systemic Risk with V-Lab - Robert Engle - June 25 2013SYRTO Project
 
Introduction to FAIR Risk Methodology – Global CISO Forum 2019 – Donna Gall...
Introduction to FAIR Risk Methodology – Global CISO Forum 2019  –  Donna Gall...Introduction to FAIR Risk Methodology – Global CISO Forum 2019  –  Donna Gall...
Introduction to FAIR Risk Methodology – Global CISO Forum 2019 – Donna Gall...EC-Council
 

Ähnlich wie Tolerability and Decision Making Discussion (20)

Positioning project, programme and portfolio risk
Positioning project, programme and portfolio risk Positioning project, programme and portfolio risk
Positioning project, programme and portfolio risk
 
Risk parity revolution
Risk parity revolutionRisk parity revolution
Risk parity revolution
 
Assessing & measuring operational risk
Assessing & measuring operational riskAssessing & measuring operational risk
Assessing & measuring operational risk
 
Assessing measuring oprisksama-khan011805
Assessing measuring oprisksama-khan011805Assessing measuring oprisksama-khan011805
Assessing measuring oprisksama-khan011805
 
Risk Management Insight FAIR(FACTOR ANA.docx
Risk Management Insight       FAIR(FACTOR ANA.docxRisk Management Insight       FAIR(FACTOR ANA.docx
Risk Management Insight FAIR(FACTOR ANA.docx
 
bài giảng về qtrrtc chương 12 risk management and financial institution
bài giảng về qtrrtc chương 12 risk management and financial institutionbài giảng về qtrrtc chương 12 risk management and financial institution
bài giảng về qtrrtc chương 12 risk management and financial institution
 
Page 1 of 9 This material is only for the use of stud.docx
Page 1 of 9  This material is only for the use of stud.docxPage 1 of 9  This material is only for the use of stud.docx
Page 1 of 9 This material is only for the use of stud.docx
 
Risk Management Insight FAIR(FACTOR AN.docx
Risk Management Insight        FAIR(FACTOR AN.docxRisk Management Insight        FAIR(FACTOR AN.docx
Risk Management Insight FAIR(FACTOR AN.docx
 
Risk Management Insight FAIR(FACTOR ANA
           Risk Management Insight       FAIR(FACTOR ANA           Risk Management Insight       FAIR(FACTOR ANA
Risk Management Insight FAIR(FACTOR ANA
 
Risk Management Insight FAIR(FACTOR AN.docx
Risk Management Insight        FAIR(FACTOR AN.docxRisk Management Insight        FAIR(FACTOR AN.docx
Risk Management Insight FAIR(FACTOR AN.docx
 
Risk Management Insight FAIR(FACTOR AN.docx
           Risk Management Insight        FAIR(FACTOR AN.docx           Risk Management Insight        FAIR(FACTOR AN.docx
Risk Management Insight FAIR(FACTOR AN.docx
 
Risk Management Insight FAIR(FACTOR AN.docx
Risk Management Insight        FAIR(FACTOR AN.docxRisk Management Insight        FAIR(FACTOR AN.docx
Risk Management Insight FAIR(FACTOR AN.docx
 
Risk Management Insight FAIR(FACTOR ANA.docx
Risk Management Insight       FAIR(FACTOR ANA.docxRisk Management Insight       FAIR(FACTOR ANA.docx
Risk Management Insight FAIR(FACTOR ANA.docx
 
Risk Management Insight FAIR(FACTOR AN.docx
Risk Management Insight        FAIR(FACTOR AN.docxRisk Management Insight        FAIR(FACTOR AN.docx
Risk Management Insight FAIR(FACTOR AN.docx
 
5242020 Originality Reporthttpsucumberlands.blackboar.docx
5242020 Originality Reporthttpsucumberlands.blackboar.docx5242020 Originality Reporthttpsucumberlands.blackboar.docx
5242020 Originality Reporthttpsucumberlands.blackboar.docx
 
Risk Ana
Risk AnaRisk Ana
Risk Ana
 
ERM and value added risk management.docx
ERM and value added risk management.docxERM and value added risk management.docx
ERM and value added risk management.docx
 
Monitoring Systemic Risk with V-Lab - Robert Engle - June 25 2013
Monitoring Systemic Risk with V-Lab - Robert Engle - June 25 2013Monitoring Systemic Risk with V-Lab - Robert Engle - June 25 2013
Monitoring Systemic Risk with V-Lab - Robert Engle - June 25 2013
 
Mining 012 riskope is it true that pi_gs
Mining 012 riskope  is it true that pi_gsMining 012 riskope  is it true that pi_gs
Mining 012 riskope is it true that pi_gs
 
Introduction to FAIR Risk Methodology – Global CISO Forum 2019 – Donna Gall...
Introduction to FAIR Risk Methodology – Global CISO Forum 2019  –  Donna Gall...Introduction to FAIR Risk Methodology – Global CISO Forum 2019  –  Donna Gall...
Introduction to FAIR Risk Methodology – Global CISO Forum 2019 – Donna Gall...
 

Mehr von Oboni Riskope Associates Inc.

Riskope 5 days course on Risk and Crisis Management for top managers and key ...
Riskope 5 days course on Risk and Crisis Management for top managers and key ...Riskope 5 days course on Risk and Crisis Management for top managers and key ...
Riskope 5 days course on Risk and Crisis Management for top managers and key ...Oboni Riskope Associates Inc.
 
Balangero asbestos mine dumps restoration a few years after, in the aftermath...
Balangero asbestos mine dumps restoration a few years after, in the aftermath...Balangero asbestos mine dumps restoration a few years after, in the aftermath...
Balangero asbestos mine dumps restoration a few years after, in the aftermath...Oboni Riskope Associates Inc.
 
Oboni Riskope Conference on Risk Based Decision Making in Bogotà, Colombia
Oboni Riskope Conference on Risk Based Decision Making in Bogotà, ColombiaOboni Riskope Conference on Risk Based Decision Making in Bogotà, Colombia
Oboni Riskope Conference on Risk Based Decision Making in Bogotà, ColombiaOboni Riskope Associates Inc.
 
Rims Metal and Mining Session talk by F+C Oboni, Riskope
Rims Metal and Mining Session talk by F+C Oboni, RiskopeRims Metal and Mining Session talk by F+C Oboni, Riskope
Rims Metal and Mining Session talk by F+C Oboni, RiskopeOboni Riskope Associates Inc.
 

Mehr von Oboni Riskope Associates Inc. (20)

Riskope new web site announcement
Riskope new web site announcementRiskope new web site announcement
Riskope new web site announcement
 
Rational Risk and Crisis Management Course
Rational Risk and Crisis Management CourseRational Risk and Crisis Management Course
Rational Risk and Crisis Management Course
 
Cim2013 oboni oboni_zabolotoniuk
Cim2013 oboni oboni_zabolotoniukCim2013 oboni oboni_zabolotoniuk
Cim2013 oboni oboni_zabolotoniuk
 
Riskope 5 days course on Risk and Crisis Management for top managers and key ...
Riskope 5 days course on Risk and Crisis Management for top managers and key ...Riskope 5 days course on Risk and Crisis Management for top managers and key ...
Riskope 5 days course on Risk and Crisis Management for top managers and key ...
 
Riskope for christmas 2012
Riskope for christmas 2012Riskope for christmas 2012
Riskope for christmas 2012
 
Ore cockpit castellano
Ore cockpit castellanoOre cockpit castellano
Ore cockpit castellano
 
Bogota 02 10-011 Risk Management Mining Summit
Bogota 02 10-011 Risk Management Mining SummitBogota 02 10-011 Risk Management Mining Summit
Bogota 02 10-011 Risk Management Mining Summit
 
Balangero asbestos mine dumps restoration a few years after, in the aftermath...
Balangero asbestos mine dumps restoration a few years after, in the aftermath...Balangero asbestos mine dumps restoration a few years after, in the aftermath...
Balangero asbestos mine dumps restoration a few years after, in the aftermath...
 
Oboni Riskope Conference on Risk Based Decision Making in Bogotà, Colombia
Oboni Riskope Conference on Risk Based Decision Making in Bogotà, ColombiaOboni Riskope Conference on Risk Based Decision Making in Bogotà, Colombia
Oboni Riskope Conference on Risk Based Decision Making in Bogotà, Colombia
 
Review ICS Guidelines
Review ICS GuidelinesReview ICS Guidelines
Review ICS Guidelines
 
Cassass presentation WLF2 Rome
Cassass presentation WLF2 RomeCassass presentation WLF2 Rome
Cassass presentation WLF2 Rome
 
Road Safety- Sicurezza Stradale
Road Safety- Sicurezza StradaleRoad Safety- Sicurezza Stradale
Road Safety- Sicurezza Stradale
 
Rims Metal and Mining Session talk by F+C Oboni, Riskope
Rims Metal and Mining Session talk by F+C Oboni, RiskopeRims Metal and Mining Session talk by F+C Oboni, Riskope
Rims Metal and Mining Session talk by F+C Oboni, Riskope
 
Rims Metals and Mining Session
Rims Metals and Mining Session Rims Metals and Mining Session
Rims Metals and Mining Session
 
Force Majeure: a Time Bomb
Force Majeure: a Time BombForce Majeure: a Time Bomb
Force Majeure: a Time Bomb
 
Oboni02 castellano
Oboni02 castellanoOboni02 castellano
Oboni02 castellano
 
Oboni01 castellano
Oboni01 castellanoOboni01 castellano
Oboni01 castellano
 
Cda esm waste oil disposal application part 2
Cda esm waste oil disposal application part 2Cda esm waste oil disposal application part 2
Cda esm waste oil disposal application part 2
 
Force Majeure Clause in Contracts
Force Majeure Clause in ContractsForce Majeure Clause in Contracts
Force Majeure Clause in Contracts
 
Comparing Alternatives Using CDA-ESM
Comparing Alternatives Using CDA-ESMComparing Alternatives Using CDA-ESM
Comparing Alternatives Using CDA-ESM
 

Kürzlich hochgeladen

FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Sheetaleventcompany
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...daisycvs
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noidadlhescort
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...amitlee9823
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 

Kürzlich hochgeladen (20)

FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 

Tolerability and Decision Making Discussion

  • 1. Oboni Riskope Associates Inc. www.riskope.com 500-1045 Howe Street Vancouver, B.C., V6Z 2A9 On time, on budget, in control, showing your leadership with sustainable capital expenditure, even during recessions and economic, financial crises. Riskope can also help you solve insurance denial situations adding value to you existing risk assessments, risk registers, ERM in an ingenious way. By Franco & Cesar Oboni, Oboni Riskope Associates Inc. Vancouver, www.riskope.com We will use for this discussion Operation Ten (OT) belonging to our client AAA Inc. (AAA) (names, locations and risk names have been altered to respect client's confidentiality), let's say a large production facility which of course uses external transportation networks, commercial wharves, and receives energy, supplies and chemical from the “world” to work in its processing plant. What this industry actually produces, its geographic location etc. does not matter, for this discussion. Whether OT is a project (Project Risk Assessment), possibly at Pre-feasibility or Feasibility stage, or a thriving Operation (Operational Risk Assessment), the approach will be conceptually the same. OT/AAA Management formulated an explicit request to Riskope's (www.riskope.com) to deliver a risk based decision making (RBDM) support study: “The assessment will consider the particular environment, specific location and activities of OT's facilities to mitigate risks to the environment to a tolerable level and to establish a conceptual framework to support decisions regarding the remediation of ***** sites. In particular, the Action Plans will be mainly targeted to OT's decision makers and should answer practical questions... ” Riskope started by studying the Status Quo, including the level of awareness, understanding and sophistication of OT/AAA and concluded that they were at par with the international consensus and standard operating practices (SOPs) in the area of risk assessment and prioritization. It was however, obvious that those SOPs were not giving Management the guidance they were seeking. A stepped approach, tested and proven over the years by Riskope, was deployed. The result of Riskope's study brought the following befits and results: • The prevalent critical risks were brought forward in a clear, rational and defensible way. • The number of critical issues was shown to be smaller than originally evaluated at Status Quo. • The insurance portfolio was shown to be poorly balanced and adjustments were proposed. • The new priority list let Management make better decisions in mitigative investments (c)Oboni Riskope Associates Inc. Page 1 of 8
  • 2. allotment and freed moneys that could be better allocated elsewhere. • The methodology allows rational updating of the probabilities when new data are gathered. In the following sections we will go point by point through the stepped approach. Status Quo Analysis: Risk Assessment/Management Approach before Riskope's Deployment In accordance to widespread, common practices, Operation Ten (OT) uses an indexed matrix approach (some people call this a “heat map”, others “risk landscape”/”Paysage risque”) to prioritize risks compiled in a risk register (prepared with a commercial software) in view of their management. As there are no standardized versions (ISO 31000, COSO (ERM), ONR 490000 1 guidelines do not enforce a method) of this empirical approach, and indexes are often evaluated using verbal approximations, qualitative concepts, it is necessary to briefly summarize AAA's own “rules” before going into any further discussion. AAA's system uses a 5x5 classes (frequency x severity) matrix defined as follows. Classification Level Characterization Frequency 1 1 failure in over 100 years 2 1 failure in 10 to 100 years 3 1 failure in 5 to 10 years 4 1 failure in 1 to 5 years 5 more than 1 failure per year Severity 1 $0 to $1,000,000 in costs 2 $1,000,000 to $5,000,000 in costs 3 $5,000,000 to $15,000,000 in costs 4 $15,000,000 to $50,000,000 in costs 5 more than $50,000,000 in costs As a side note, the idea of using frequencies instead of probabilities (or annual probabilities) can lead to some confusion and misleading results. For example, a risk might not have any frequency (typically isolated terrorist attack, change in legislation), yet a non negligible probability to hit in the next future. A severe rainfall might have a low frequency, but a high probability of occurrence with the current climate change. As it can be seen below, stepped thresholds have been selected by AAA to define four levels of attention (criticality) of risks in the matrix: Severe, High, Medium, Low. Frequency 1 2 3 4 5 1 L L L M M 2 L M M M H Severity 3 L M M H H 4 M M H H S 5 M H H S S 1)http://foboni.wordpress.com/2010/02/17/a-discussion-of-the-latest-coso-paper-on-the- development-of-organizations-resiliency-to-risk/ , http://foboni.wordpress.com/2010/11/10/new-iso- 31000-risk-management-principles-and-guidelines/ (c)Oboni Riskope Associates Inc. Page 2 of 8
  • 3. A rule based on the value of the multiplication between the frequency and the severity indexes has indeed been established by AAA as displayed in the following scheme. min max Risk Rating Freq * Sev Severe S 20 25 S = Severe > 19 High H 10 19 H = High 10 TO 19 Medium M 4 9 M = Medium 4 TO 9 Low L 0 3 L = Low <4 Interestingly, OT's Risk registers delivered to Riskope (www.riskope.com) had risk ratings of the H,M,L categories, but none in the Severe class. For example: • Quake has severity x frequency (2 x 2)=4 which give Medium, ranked in the same class as Traffic Accidents (5 x 1), Acid or Diesel Oil spills (3 x 3). • Supplier's acid delivery is rated as High (3 x 4=12), together with fire at Powerhouse (2 x 5), Explosion at Boiler (2x 5), HLP leak (2 x 5). AAA's original rating of OT's 50 risks scenario split them into 0 Severe, 14 High, 25 Medium and 11 Low risks. Do you remember the old saying about “crying for wolf”? Well, with 14 High, 25 Medium, the usual reaction of Management is to say: “too many to cope, let's wait”, or any one of the sixteen excuses we have discussed elsewhere2. The indexed matrix approach usually gives useful snapshots of the operation “risk panorama”, but it doesn't have the ability to deliver clear guidance in the selection of risks priorities, to define if mitigation plans are sufficient or not3. As a matter of fact, the problem of expenditure on safety measures is indeed one of allocation of resources and cost-effectiveness which has to be based on the whole spectrum of possible events, instead of the Maximum Credible Event, ALE (Annual Loss Expected) or some other deterministic parameter only. (Lee's loss prevention in the process industries: hazard identification, assessment, and control, Volume 1, Frank P. Lees). Riskope's Approach. STEP 1: Defining Risk Tolerability As it has been discussed and demonstrated in various occasions 4, the Management objectives can only be reached if a clear definition of the tolerability thresholds of an organization is carried out. A series of four proprietary questions designed to allow the definition of tolerability was used in a facilitated workshop with key personnel, including the CFO. Riskope also undertook the task of matching the replies to those questions with AAA's empirical stepped matrix thresholds, so as to define a tolerability threshold that could be used for rational and transparent prioritization. 2)http://foboni.wordpress.com/2009/11/12/one-world-16-common-human-traits-2/ 3)http://foboni.wordpress.com/2010/06/08/bp-crisis-rational-analysis-what-bp-did-not-perform/ 4)http://www.slideshare.net/Foboni/generalized-tolerability-and-risk-based-decision-making- examples-19-oct-5554686 (c)Oboni Riskope Associates Inc. Page 3 of 8
  • 4. Riskope's Approach. STEP 2: Converting Risk Register Data into Usable Data In order to move forward Riskope had to convert OT's matrix frequencies into probabilities, and eliminated the useless and confusing indexes. Once the indexes were eliminated it became possible to evaluate “real” risks, as the product of probability and consequences, expressed in monetary terms, and plot them in a probability-Consequences (Losses) diagram. That diagram (Probability (vertical axis, a number between nil and one)- Consequences (horizontal axis, dollars)) is displayed in Figure 1, with all OT's Risk Register scenarios, the newly defined tolerability curve plugged in. As it can be noted, the curve follows the steps of the matrix threshold (yellow-red limit) classes displayed here in log-log scale (reason for which the width and thickness of the boxes decreases from bottom left to top right). Figure 1. The original matrix cells are shown on a log-log probability-consequences plot, together with the newly developed OT's tolerability curve. The “total” risk for each scenario can be calculated, and when applicable, it is possible to evaluate which portion of that risk lies above the tolerability as depicted in Figure 2. Figure 2. When probability and consequences of a scenario are evaluated, the total risk is equal (p*C) to the surface of the rectangle (sum of orange and blue areas). The blue area is the tolerable part of that scenario, the orange part is the intolerable portion. NB: the log-log scale requires some attention when interpreting the relative size of surfaces, as shown in the bar diagram at the right, in decimal scale. (c)Oboni Riskope Associates Inc. Page 4 of 8
  • 5. The bar graph below, in Figure 3 shows, as an example, a small portion of the risks from OT's original Risk Register, with in blue the tolerable part, the intolerable part in orange, and the total risk equal to the sum of the blue and orange bar. Figure 3. A small part of OT's original Risk Register, with, for each scenario, tolerable and intolerable risk partition. If we plot risks from highest down to the lowest, the chart in the next page represents the first 20 risks (Figure 4). We can easily see from Figure 4 that even though some risks scenarios are overall higher (blue and orange bar), the size of the intolerable part (orange bar) may lead to a completely different prioritization and respective allocation of mitigative resources. (c)Oboni Riskope Associates Inc. Page 5 of 8
  • 6. Figure 4. OT's largest total risks, in decreasing order from left to right. Riskope's Approach. STEP 3: Rational Prioritization of Risks Rational and transparent prioritization is indeed achieved when risks (above tolerability) are ranked in decreasing order of intolerable portion (only the orange bars), even if the overall risk is higher, leading to the graph displayed in Figure 5, next page. (c)Oboni Riskope Associates Inc. Page 6 of 8
  • 7. Figure 5. OT's Risk Register risks are now ranked in decreasing order (from left to right) of their intolerable part. At this point it becomes interesting to compare the relative value of the risks' intolerable part for the allocation of resources regarding mitigations measures. Figure 6. Relative values of the intolerable part of OT's risks. (c)Oboni Riskope Associates Inc. Page 7 of 8
  • 8. We can see from Figure 6 that five OT's scenarios count for 83% of the total intolerable risks. We could therefore state, at first sight, that for every dollar spend for mitigation measure around 80 cents should be spent equally (or in relative proportions) for the 5 “first” risks, then the remaining 20 cents should be split equally amongst the next 16 risks. 30 scenarios should not even be considered at this time. In other words, among the 50 risks scenario present in OT's Risk Register, 5 should be allotted 80 % of the resources and 15 others should employ 20% while the remaining 30 should not even be considered before the first 20 are not brought below the tolerability curve. When the implementation of mitigative measures will change the risks panorama, the prioritization will change and it will be very easy to update the rankings with the new rational allotments. Conclusions By using a newly developed OT's tolerability curve, which complies with AAA matrix classes thresholds, and using the intolerable part of risks as a rating parameter, we determined a new rating which allows for more rational capital and efforts allotment. Following the new rating it can be seen that among those 50 risks, 5 should be allotted 80 % of the resources and 15 others should employ 20% while the remaining 30 should not even be considered before the first 20 are not brought below the tolerability curve. This is way more focused and rational than OT/AAA's original rating of the same 50 risks which split into 0 Severe, 14 High, 25 Medium and 11 Low risks, If we look at a comparison, that's 5 risks sharing 80% of the available resources, against 14 risks sharing an unspecified percentage of the available resources. Or 15 risks sharing 20% of the available resources, instead than 25 risks sharing an unspecified percentage of the same. One other way of seeing it? Well, if OT's Management have to mitigate 5 risks instead of 14, they will be keener to do so, and it will be done faster, as they do not feel overwhelmed. In this paper, we have shown how your “standard” risk approach (risk assessments, risk register, ERM) that your peers and superiors already understand and “own” can be turned into a cutting edge competitive advantage, freeing capitals for business and production development, leading to more easily defensible, justifiable decisions. In other words, the mantra is: stop wasting moneys and efforts in security measures that do not pay off, over-investing in some mitigations and, may be, under invest in others, with, in both cases, potentially devastating unjustified consequences. Our metric is consistent, unambiguous, and provides context for better understanding your organization's risks. Here you have a summary of the benefits yielded by the approach : • The prevalent critical risks were brought forward in a clear, rational and defensible way. • The number of critical issues was shown to be smaller than originally evaluated at Status Quo. • The insurance portfolio was shown to be poorly balanced and adjustments were proposed. • The new priority list let Management make better decisions in mitigative investments' allotment and freed moneys that could be better allocated elsewhere. • The methodology allows rational updating of the probabilities when new data are gathered. (c)Oboni Riskope Associates Inc. Page 8 of 8