SlideShare a Scribd company logo
1 of 46
Integration
 Integ ation of Mic osoft P oject EPM
                Microsoft Project
 with SAP

 HR Integration with ResourceLink
 PS/PM/CO/CATS Integration with PSLink

© TPG The Project Group GmbH             Slide 1
Topics
 T i

    About TPG The Project Group
    Why integrating EPM with SAP?
    Business backgrounds f MSP/SAP i
     B i      b k        d for         integration
                                               i
    Excursion: Project Management in SAP
    TPG I t
         Integration S
                 ti  Scenarios
                            i
    Technical Backgrounds and Roadmap




© The Project Group GmbH                             Slide 2
Our company – TPG Th Project Group
 O                 The P j t G

     Our Locations
         Headquarters in Munich Germany and Offices in Mainz
          and Dortmund
         Subsidiaries USA (PA), UK and Austria
     Our Business focus: Project Management and
      Project Management Software
     Our Partnerships and Certifications
         Microsoft Gold
          Certified Partner
         SAP certified product
          (TPG PSLink)
          (           k)
         Worldwide product implementation partners
          (Australia, Brazil, Denmark, Israel, South Africa,
          Singapore, Thailand)
© The Project Group GmbH                                        Slide 3
TPG W ld id S b idi i
     Worldwide Subsidiaries and P t
                              d Partners




© The Project Group GmbH                   Slide 4
Our products and services
 O      d t     d     i

     Products
         TPG PSLink                Integration MSP with SAP
         TPG ResourceLink          Import HR to MSP
         TPG MTA                   Milestone Trend Analysis
         TPG ProjectLink           Soft Links between Projects
         TPG Ti
              TimeSheet E t d
                  Sh t Extender E
                                Extension of MSP time sheets
                                      i    f      i    h
     Services
         Consulting for PM software solutions
         Implementation of Microsoft EPM / PPM
         Implementation of TPG products
            p                   p
         Training
         Maintenance and Support



© The Project Group GmbH                                          Slide 5
TPG Customers (selection)
     C t       ( l ti )




© The Project Group GmbH     Slide 6
Why linking SAP with Microsoft EPM?



© TPG The Project Group GmbH           Slide 7
Role b
 R l based approach
         d        h

     Each participant uses the proper tool
         Finance and HR manager in ERP system
         PMO, project manager and members in Microsoft EPM
     No “shadow accounting”
         compared to using SAP only …
         … with all the “personal plans” in Excel and Project
     Acceptance of the overall system




© The Project Group GmbH                                         Slide 8
The best
 Th b t cost / benefit ratio
           t b     fit   ti

     High efficiency for PM and PMO
         Best productivity with Project Interface
         No extra efforts to prepare financial data
     Up-to-Date data for finance
         No efforts to collect financial data
         Accurate and most current forecasts and actuals
     Offline and server-connected work
     No double data
      N d bl d t entry   t
         Automatic and user triggered synchronization
         No unneeded redundancies
     Employees report in ONE place


© The Project Group GmbH                                    Slide 9
Accurate financial reports
 A     t fi     i l      t

     Project data in finance reports
         Reliable information for decisions
         Enable combined top-down / bottom-up budgeting
     Valid company presentation
         Ensure SOX compliancy with up-to-date project cost
             forecasts
             f      t




© The Project Group GmbH                                       Slide 10
Business backgrounds
 for MSP/SAP integration
 f           i t    ti



© TPG The Project Group GmbH   Slide 11
Integration levels of Enterprise Projects
 and Core Processes
Enterprise role                 Projects: Microsoft           Core processes:
                                EPM Technology                ERP system (SAP)

                                                               Strategic view :
 Upper                                                         indicators, customer
                                 Overall portfolio,            profitability,
 Management                    KPI, strategic decisions        strategic direction
                                                               (SAP CO, FI, BW,…)


                                                               Controlling view :
                           Portfolios, milestones, budgets,
 PMO,                                                          budgets, cost centers,
                           centralized resource planning,
                                                  p     g,
 departments                                                   revenues, purchasing
                                                               revenues purchasing,
                                    risks, problems,
                                                               customer management
                              change management etc.
                                                               (SAP PS, CO, SD ...)


                                                               Project view:
 Project
                           Operational project management,     staff resources,
 managers,
                                     supervision               unit costs
 teams
                                                               (SAP PS HR CATS)
                                                                      PS, HR,



© The Project Group GmbH                                                                Slide 12
Roles and Tools within Project Life Cycle
 R l     dT l     ithi P j t Lif C l




© The Project Group GmbH                     Slide 13
Important Questions to Ask Upfront (1/3)


Project Server
                           Which data should be exchanged?


                                          ????
                              Resources, schedules, work,
                                costs, budgets, actuals,
                                 material,
                                 material long text …
                                          ????


                                                             SAP


Project Client

© The Project Group GmbH                                           Slide 14
Important Questions to Ask Upfront (2/3)
 I    t tQ     ti    t A kU f     t

     Role based
      Role-based data exchange
         Who is planning with what tool?
         Who needs which data?
         Who has to supply which data?
         Who has access to which data?


     Process-based data exchange
         How does a sale become a project?
         Where are projects created first?
         Which data should be synchronized during transitions
          between phases?
         What rules have to be considered?



© The Project Group GmbH                                         Slide 15
Important Questions to Ask Upfront (3/3)
 I    t tQ     ti    t A kU f     t

     Which is the lead system, SAP or Microsoft
                         system
      Project?
     Which data are managed in which system?
                            g           y
     Is synchronization performed automatically or
      manually?
     Hardware and software requirements of an
      integration solution?
     …




© The Project Group GmbH                              Slide 16
Design goals for integration
 D i       l f    i t    ti

     Flexible process configuration
     Flexible role and rights configuration
         Based on Microsoft Project user management
                                j             g
     Bidirectional synchronization
     Leading system on field level
             g y
     Manual and automatic (scheduled) synchronization
     Integration with PS, CO, HR and/or CATS
          g
         But also flexible extension to other modules




© The Project Group GmbH                                 Slide 17
Excursion:
Project Management in SAP



© TPG The Project Group GmbH   Slide 18
PM in SAP – 3 approaches
    i                 h

     PS
         The traditional Project System in SAP R/3, SAP Enterprise
          and ECC (Enterprise Core Components)
         Comparable with MSP
              p
         Deep Integration in other modules (CO, HR, SD …)
         Addresses project accountants
     cProjects
            Part of PLM Collaboration Engineering
            Addresses project managers
            Independent of SAP R/3, SAP E t
             I d      d t f      R/3       Enterprise or mySAP ERP
                                                  i        SAP
            Connects with PS and other modules
     xRPM
         Top level portfolio planning
         Integrates data from different sources (SAP mod., MSP etc.)
         Offers reporting, portfolio p
                   p     g, p         planning and resource capacity
                                             g                p    y
             management

© The Project Group GmbH                                                Slide 19
SAP PM Architecture Overview
        A hit t      O    i


                            SAP Enterprise Portal


            SAP xRPM Core                 SAP BI (Business
            SAP cProjects
                    j                       Warehouse) )




      ECC FI,
          FI,                                        Other
                           ECC PS     CATS
       HR …                                         Sources

© The Project Group GmbH                                      Slide 20
Using SAP PM solutions
 U i            l ti

 Pros
 P                                  Cons
                                    C

     Rich functionality               User interface still not
     Detailed, status based            adopted
      business rules                   Performance issues
     Very good interaction of PS      Not flexible enough
      with ERP processes (CO,           (e.g. work offline, user
      MM etc )
          etc.)                         defined customizing)
     Company wide, controlling        Enterprise features not
      integrated reports
          g        p                    easy to use
     High Level Consolidation          (esp. for PMOs)
                                       EPM scenarios difficult
                                        to deploy

© The Project Group GmbH                                           Slide 21
Overview: The TPG I t
 O    i    Th      Integrations Scenario
                          ti    S     i

                             Microsoft Portfolio Server
                Microsoft EPM and SQL Reporting services / SAP BW


                                    Manager
                                     PMO

  Microsoft Project                            SAP R/3 / Enterprise /
  EPM                                          MySAP ERP
                                               with CO PS
                                                    CO,
                                               HR, CATS


  PMO,
                                              Manager,
  p j
  project manager,
              g ,
                                              Controller,
                                              Controller
  Team member
                                              Dept. manager
© The Project Group GmbH                                                Slide 22
TPG Integration Scenarios



© TPG The Project Group GmbH   Slide 23
Functional scope related to integration




© The Project Group GmbH                  Slide 24
Which integration areas are covered?
 Whi h i t    ti                   d?

                                Basic data


                           Structures, networks,
                           St   t        t   k
                              PM-orders etc.
      SAP R/3
                              Forecast work,
                            costs and revenues     Microsoft
            Or                                      Project
                                                     EPM
                              Time Postings
       ECC 6.0
                               Actual Costs


                           Any other information


© The Project Group GmbH                                       Slide 25
Scenario 1: Update Enterprise Resource Pool
              TPG ResourceLink



   HR / DS System                 TPG           Microsoft Project
• SAP
                              ResourceLink            EPM
• Navision
• Active Directory
                            Update Enterprise
• LDAP
   DAP                      Resources
                            R
• Any other DS or ERP




 © The Project Group GmbH                                           Slide 26
Scenario 1: A hit t
 S     i 1 Architecture and f t
                          d features

     Import of Resource data into Microsoft Project
      Server
         Create, activate, deactivate and delete resources
         Update of existing resources
         Update outline code field definitions


                               SAP         File
               Navision                               Active Directory

       LDAP                                                    SQL Server
                                     Mapping
                                ResourceLink


                             Microsoft P j t
                             Mi       ft Project
                           Enterprise Resource Pool
© The Project Group GmbH                                                    Slide 27
Scenario 2: U d t structures
 S     i 2 Update t     t




         SAP PS                TPG PSLink      Microsoft Project
                                                     EPM



                           Create and Update
                           PD and WBS




© The Project Group GmbH                                           Slide 28
Scenario 2: M
 S     i 2 Mapping options
               i     ti

1:1 high level
1 1 hi h l   l               No direct t k
                             N di    t task
mapping                      mapping




© The Project Group GmbH                      Slide 29
Scenario 3: Update Forecasts to SAP
 S     i 3 U d t F         t t




    SAP PS/CO                  TPG PSLink               Microsoft Project
                                                              EPM


                           Update forecasts to SAP
                           activity input and primary
                             ti it i    t d i
                           cost planning




© The Project Group GmbH                                                    Slide 30
Scenario 4: Synch SAP network activities
 S     i 4 S     h       t   k   ti iti




         SAP PS                TPG PSLink            Microsoft
                                                      Project
                                                       EPM


                           Read / Create /
                           Update networks,
                           activities and elements




© The Project Group GmbH                                         Slide 31
Scenario 4: Example for activity element
             mapping




© The Project Group GmbH                    Slide 32
Use case 5: Read, create and update
             Plant Maintenance orders


        SAP PM                 TPG PSLink           Microsoft
                                                     Project
                                                      EPM

                           Read / Create / update
                           PM-orders, operations
                           and components




© The Project Group GmbH                                        Slide 33
Scenario 6: Synch ti
 S     i 6 S     h time postings with CATS
                           ti     ith




     SAP CATS                  TPG PSLink         Microsoft Project
                                                        EPM



                           Read / Create /
                           Update CATS postings




© The Project Group GmbH                                              Slide 34
Scenario 7: Synch time postings with
             CO allocation documents




       SAP CO                  TPG PSLink          Microsoft Project
                                                         EPM



                           Update postings to CO
                           allocation documents




© The Project Group GmbH                                               Slide 35
Scenario 8: Exchange any data to any RFC




SAP (any module)                TPG PSLink       Microsoft Project
                                                EPM or SharePoint



                            Any data with any
                            BAPI /RFC




 © The Project Group GmbH                                            Slide 36
© The Project Group GmbH   Slide 37
TPG PSLink
Technical Backgrounds and Roadmap



© TPG The Project Group GmbH        Slide 38
TPG PSLink architecture
      PSLi k    hit t
                                                       PSLink Server Framework

SAP R/3                                                     Basic services
                   BAPI/RF or Net
                                                (session handling, logging, user rights etc.)            MSP Server
ECC 6.0
                                                                                                        2003 or 2007
                                                             Connectors
                                          SAP Access         WBS                   TPG Project
                         FC


    HR                                    Framework                                  Access
                                                             Networks
                                                             PM Orders             Framework
                                           PSLink SAP                                                     MSP DB
  CATS                                     object model      Forecast cost         TPG Project Server        +
                                tweaver




                                           SAP .Net          and revenues          object model
                                                                                                          external
     PS                                    Connector                               Direct DB PDS          sources
                                                             Timesheets
                                           SAP DCOM                                Operations PSI
                                           Connector
    PM                                                       RFC


    CO
                     RFC Extensions




                                                             Client Interface

 Others
                                                             Server Interface                            MSP Prof.
                                              User Interface                         AddIn
                                           (Menu, History
                                           (Menu History, Logs etc )
                                                               etc.)            using Project Client
                                                                                    object model

                                                       PSLink Client Framework
 © The Project Group GmbH                                                                                              Slide 39
TPG PSLink architecture
      PSLi k    hit t
                                   PSLink Server Framework                  Microsoft
                                                                          Project Server
                                                                             j
                                           Basic
                                           B i services
                                                   i
                                                                           2003, 2007
SAP R/3                     SAP Access                                       or 2010
ECC 6.0                     Framework                     TPG Project
                                            Connectors      Access
                               Other                      Framework
3rd pty app
                            frameworks

                                            Web Service




           Third party                    TPG PSLink         TPG PSLink
           web service                   Add-In Client       Web Client
           applications
       (SharePoint, SAP…)
       (Sh   P i     SAP )



                                          MSP Prof.           Microsoft
                                                             SharePoint
                                                               /PWA
 © The Project Group GmbH                                                                  Slide 40
TPG PSLink C fi
     PSLi k Configuration example
                     ti        l
                           <job>
                            <id>MasterSynchPDandWBS</id>
                            <shortDesc>Sync PD and WBS</shortDesc>
                            <sort>3</sort>
                             ...
                            <securityGroups><group>Executives</group></securityGroups>
                            <actions>
                                 <trycatch>
                                     <try>
                                         ...
                                         <QueryProject>
                                             <query> SELECT P.EnterpriseTextFields('SAPProjectDef') AS PSPID,
                                                          P.Name
                                                          P Name as Description
                                                                    Description,
                                                          SUBSTRING(P.EnterpriseTextFields('SAPProfile'),1,7)
                                                                    AS Project_Profile,
                                                          TO_DATETIME(P.InfoStartDate.Date) AS StartDate,
                                                          TO_DATETIME(P.InfoFinishDate.Date) AS FinishDate
                                                FROM Projects P
                                                WHERE P.EnterpriseFlagFields('SynchToSAP')
                                                          AND P.EnterpriseTextFields('MSPStatus')= '3 Active'
                                             </query>
                                             <output>
                                                <getProperty name="outputTable" target="Parameters.PDTable"/>
                                                 g     p y            p            g
                                                </output>
                                             </QueryProject>

                                             <If>
                                                <condition>Parameters.PDTable.Rows.Count > 0</condition>
                                                <thenJobId>JobSynchPD</thenJobId>
                                             </If>
                                       ...

© The Project Group GmbH                                                                                        Slide 41
TPG PSLink Hi t
                              PSLi k History and R d
                                               d Roadmap
                                                                                                                                                                                      v 2010
                                                                                                                                                                                      on EPM 2010
                                                                                                                                                       v 2007
                                                                                                                      v 3.1                                                           Additional
                                                                                                                                                       on EPM 2007


                                                     ontrolling Edition (CE)
                                                                               v 3.0                                  EPM 2003
                                                                                                                                                                                      features:
                                                                               EPM 2003                                                                                               Portfolio
                                                                                                                                                       Additional                     integration
                                                                      n                                               Integrates both                  features:                      New fields




                                                                                                                                                                         PSLin 2010
                                                                               New platform                           PSLink SE and CE                 New time sheet                 SharePoint
                                                                               Extensive configuration




                                                                                                                                         PSLink 2007
                                                                                                                                                       integration                    Connector




                                                                                                         PSLink 3.1
                                                                                                                      Enhanced config
                  SE)




                                                                                                                                                       Server events
                                 v 1.5




                                                                                                                                                                             nk
                                                                               High level integration                 More use cases




                                                                                                                3
                                                                                                                                                       WSS workflows
                                                              g
 tandard Edition (S




                                 MSP 2000                                      - Flexible WBS synch                                                    Budget and cost
                                                                               - Forecasts                            New connectors:                  resources
                                 Editing rules                                 - CATS integration
                                 through MSP                                                                          - Network
                                                                               - Report data                          - CO alloc docs
                                 events
                                                    Co




                                                                                                                      - xRPM
         E




                                 COM Add-In
                                        dd
                        v 1.0
                        MSP 98             v 2.0                                v 3.0
                                           EPM 2002/3                           EPM 2003
                        Down-Upload
                        D     U l d
St




                        Rules check        Server based                         Better logging
                        Locking            All PS objects                       and configuration
                        mechanism                                               New wizard



                        1999       2000             2002/3                          2004                2006                       2007                                    2009               2010

                         © The Project Group GmbH                                                                                                                                                    Slide 42
Summary and Integration Benefits



© TPG The Project Group GmbH       Slide 43
Features of TPG PSLi k and ResourceLink
 F t       f     PSLink   dR        Li k

     Extensively configurable products
         for integration of Microsoft EPM and SharePoint
             with SAP HR, PS, PM, CO, CATS and other modules
     Support a plethora of customer cases
         Project is the tool for detailed planning
         SAP i th t l f
              is the tool for controlling
                                 t lli
         Therefore minimal redundancies
     Bidirectional data exchange
     Manual, triggered or scheduled synch
     Rights management based on MSP groups
     Detailed logging
     Rapid deployment

© The Project Group GmbH                                       Slide 44
Integration Benefits
 I t    ti   B   fit

     No double data entry
     Offline work with SAP data
     Each participant works with the proper tool
         Accountants and HR manager in ERP system
         PMO, project manager and members in MSP
     Controlling forecasts contain also project data
         Valid company presentation
     Employees report in ONE place
     Reports are more meaningful
         Contain d
                  data f
                       from the other system
                             h    h
     Workflows can span over both systems


© The Project Group GmbH                                Slide 45
Partner in Poland:        Tel: +48 (22) 465 97 76
   FirstON SA                Fax: +48 (22) 490 79 67
   www.FirstON.pl            biuro@FirstON.pl



    The Project Group GmbH   Fon: +49 (89) 61 55 93 - 30
    Destouchesstr. 68        Fax: +49 (89) 61 55 93 - 40
    80796 Munich             info@TheProjectGroup.de
                             info@TheProjectGroup de
    Germany                  www.TheProjectGroup.de




© The Project Group GmbH                                   Slide 46

More Related Content

Viewers also liked

Cabalgando a la bestia: una experiencia de rediseño legacy
Cabalgando a la bestia: una experiencia de rediseño legacyCabalgando a la bestia: una experiencia de rediseño legacy
Cabalgando a la bestia: una experiencia de rediseño legacyDiego Fontdevila
 
(0531-981-01-90) HASANPAŞA ANTİKA ESKİ EŞYA-KİTAP-PLAK-MOBİLYA-HALI+ALANLAR+A...
(0531-981-01-90) HASANPAŞA ANTİKA ESKİ EŞYA-KİTAP-PLAK-MOBİLYA-HALI+ALANLAR+A...(0531-981-01-90) HASANPAŞA ANTİKA ESKİ EŞYA-KİTAP-PLAK-MOBİLYA-HALI+ALANLAR+A...
(0531-981-01-90) HASANPAŞA ANTİKA ESKİ EŞYA-KİTAP-PLAK-MOBİLYA-HALI+ALANLAR+A...antika alanlar
 
Audrey Mandela: Public Sector Information Policy: On the Right Track?
Audrey Mandela: Public Sector Information Policy: On the Right Track?Audrey Mandela: Public Sector Information Policy: On the Right Track?
Audrey Mandela: Public Sector Information Policy: On the Right Track?AGI Geocommunity
 
ENJ-100 Módulo 1 los principios del proceso y debido proceso de ley - Herrami...
ENJ-100 Módulo 1 los principios del proceso y debido proceso de ley - Herrami...ENJ-100 Módulo 1 los principios del proceso y debido proceso de ley - Herrami...
ENJ-100 Módulo 1 los principios del proceso y debido proceso de ley - Herrami...ENJ
 
Solar Pump Applications in South asia
Solar Pump Applications in South asiaSolar Pump Applications in South asia
Solar Pump Applications in South asiatiger power yan
 
4 fundamental shifts you need to succeed in digital
4 fundamental shifts you need to succeed in digital4 fundamental shifts you need to succeed in digital
4 fundamental shifts you need to succeed in digitalMarcel Santilli
 
MikumiKids Catechese Kerstactie 2009
MikumiKids Catechese Kerstactie 2009MikumiKids Catechese Kerstactie 2009
MikumiKids Catechese Kerstactie 2009MikumiKids
 
Проект по внесенню змін до р 40
Проект по внесенню змін до р 40Проект по внесенню змін до р 40
Проект по внесенню змін до р 40antikorzp
 
Formulas and Equations
Formulas and EquationsFormulas and Equations
Formulas and EquationsLumen Learning
 

Viewers also liked (11)

Cabalgando a la bestia: una experiencia de rediseño legacy
Cabalgando a la bestia: una experiencia de rediseño legacyCabalgando a la bestia: una experiencia de rediseño legacy
Cabalgando a la bestia: una experiencia de rediseño legacy
 
logo_larger
logo_largerlogo_larger
logo_larger
 
Santa Ceia
Santa CeiaSanta Ceia
Santa Ceia
 
(0531-981-01-90) HASANPAŞA ANTİKA ESKİ EŞYA-KİTAP-PLAK-MOBİLYA-HALI+ALANLAR+A...
(0531-981-01-90) HASANPAŞA ANTİKA ESKİ EŞYA-KİTAP-PLAK-MOBİLYA-HALI+ALANLAR+A...(0531-981-01-90) HASANPAŞA ANTİKA ESKİ EŞYA-KİTAP-PLAK-MOBİLYA-HALI+ALANLAR+A...
(0531-981-01-90) HASANPAŞA ANTİKA ESKİ EŞYA-KİTAP-PLAK-MOBİLYA-HALI+ALANLAR+A...
 
Audrey Mandela: Public Sector Information Policy: On the Right Track?
Audrey Mandela: Public Sector Information Policy: On the Right Track?Audrey Mandela: Public Sector Information Policy: On the Right Track?
Audrey Mandela: Public Sector Information Policy: On the Right Track?
 
ENJ-100 Módulo 1 los principios del proceso y debido proceso de ley - Herrami...
ENJ-100 Módulo 1 los principios del proceso y debido proceso de ley - Herrami...ENJ-100 Módulo 1 los principios del proceso y debido proceso de ley - Herrami...
ENJ-100 Módulo 1 los principios del proceso y debido proceso de ley - Herrami...
 
Solar Pump Applications in South asia
Solar Pump Applications in South asiaSolar Pump Applications in South asia
Solar Pump Applications in South asia
 
4 fundamental shifts you need to succeed in digital
4 fundamental shifts you need to succeed in digital4 fundamental shifts you need to succeed in digital
4 fundamental shifts you need to succeed in digital
 
MikumiKids Catechese Kerstactie 2009
MikumiKids Catechese Kerstactie 2009MikumiKids Catechese Kerstactie 2009
MikumiKids Catechese Kerstactie 2009
 
Проект по внесенню змін до р 40
Проект по внесенню змін до р 40Проект по внесенню змін до р 40
Проект по внесенню змін до р 40
 
Formulas and Equations
Formulas and EquationsFormulas and Equations
Formulas and Equations
 

Similar to EPM_SAP_Integration_TPG_PSLink_FirstON

Nicolas Schobinger | Business Transformation Academy - Post Merger Integratio...
Nicolas Schobinger | Business Transformation Academy - Post Merger Integratio...Nicolas Schobinger | Business Transformation Academy - Post Merger Integratio...
Nicolas Schobinger | Business Transformation Academy - Post Merger Integratio...Nicolas Schobinger
 
Company Resource Planning
Company Resource PlanningCompany Resource Planning
Company Resource PlanningDaniele Pinto
 
Key Considerations While Rolling Out Denodo Platform
Key Considerations While Rolling Out Denodo PlatformKey Considerations While Rolling Out Denodo Platform
Key Considerations While Rolling Out Denodo PlatformDenodo
 
Project management in pharmaceutical generic industry basics and standards
Project management in pharmaceutical generic industry basics and standardsProject management in pharmaceutical generic industry basics and standards
Project management in pharmaceutical generic industry basics and standardsJayesh Khatri
 
Considerations in Selecting and Protecting Your IT Investment
Considerations in Selecting and Protecting Your IT InvestmentConsiderations in Selecting and Protecting Your IT Investment
Considerations in Selecting and Protecting Your IT InvestmentHelene Heller, PMP
 
IMT Lecture:Creating Project Plans To Focus Product Development.Mm Biztel 13 ...
IMT Lecture:Creating Project Plans To Focus Product Development.Mm Biztel 13 ...IMT Lecture:Creating Project Plans To Focus Product Development.Mm Biztel 13 ...
IMT Lecture:Creating Project Plans To Focus Product Development.Mm Biztel 13 ...Djadja Sardjana
 
Is PPM Enough?
Is PPM Enough?Is PPM Enough?
Is PPM Enough?Digite Inc
 
New Business Development Proposal - Adding Project Portfolio Management (PPM)...
New Business Development Proposal - Adding Project Portfolio Management (PPM)...New Business Development Proposal - Adding Project Portfolio Management (PPM)...
New Business Development Proposal - Adding Project Portfolio Management (PPM)...Rolly Perreaux, PMP
 
Connected Project Management in the Oil, Gas & Chemicals Industry
Connected Project Management in the Oil, Gas & Chemicals Industry Connected Project Management in the Oil, Gas & Chemicals Industry
Connected Project Management in the Oil, Gas & Chemicals Industry Ashwin Menon
 
Project Management PowerPoint PPT Content Modern Sample
Project Management PowerPoint PPT Content Modern SampleProject Management PowerPoint PPT Content Modern Sample
Project Management PowerPoint PPT Content Modern SampleAndrew Schwartz
 
Case Study Alfmeier Präzision SE - English
Case Study Alfmeier Präzision SE - EnglishCase Study Alfmeier Präzision SE - English
Case Study Alfmeier Präzision SE - EnglishTPG The Project Group
 
Nagios Conference 2011 - Christian Mies - German Health Insurance Company Ref...
Nagios Conference 2011 - Christian Mies - German Health Insurance Company Ref...Nagios Conference 2011 - Christian Mies - German Health Insurance Company Ref...
Nagios Conference 2011 - Christian Mies - German Health Insurance Company Ref...Nagios
 
The Forrester Wave BPM Suites 2013
The Forrester Wave BPM Suites 2013The Forrester Wave BPM Suites 2013
The Forrester Wave BPM Suites 2013Luciano Gomes
 
Socially synergistic enterprises 10 june m. baron
Socially synergistic enterprises 10 june m. baronSocially synergistic enterprises 10 june m. baron
Socially synergistic enterprises 10 june m. baronMarcel Baron
 

Similar to EPM_SAP_Integration_TPG_PSLink_FirstON (20)

Priklenk Final
Priklenk FinalPriklenk Final
Priklenk Final
 
Nicolas Schobinger | Business Transformation Academy - Post Merger Integratio...
Nicolas Schobinger | Business Transformation Academy - Post Merger Integratio...Nicolas Schobinger | Business Transformation Academy - Post Merger Integratio...
Nicolas Schobinger | Business Transformation Academy - Post Merger Integratio...
 
Company Resource Planning
Company Resource PlanningCompany Resource Planning
Company Resource Planning
 
Key Considerations While Rolling Out Denodo Platform
Key Considerations While Rolling Out Denodo PlatformKey Considerations While Rolling Out Denodo Platform
Key Considerations While Rolling Out Denodo Platform
 
2012-11-14 Proj Mgmt Acctg Systems
2012-11-14 Proj Mgmt Acctg Systems2012-11-14 Proj Mgmt Acctg Systems
2012-11-14 Proj Mgmt Acctg Systems
 
Project management in pharmaceutical generic industry basics and standards
Project management in pharmaceutical generic industry basics and standardsProject management in pharmaceutical generic industry basics and standards
Project management in pharmaceutical generic industry basics and standards
 
2012-10-11 Solutions for Proj Driven Orgs
2012-10-11 Solutions for Proj Driven Orgs2012-10-11 Solutions for Proj Driven Orgs
2012-10-11 Solutions for Proj Driven Orgs
 
Considerations in Selecting and Protecting Your IT Investment
Considerations in Selecting and Protecting Your IT InvestmentConsiderations in Selecting and Protecting Your IT Investment
Considerations in Selecting and Protecting Your IT Investment
 
IMT Lecture:Creating Project Plans To Focus Product Development.Mm Biztel 13 ...
IMT Lecture:Creating Project Plans To Focus Product Development.Mm Biztel 13 ...IMT Lecture:Creating Project Plans To Focus Product Development.Mm Biztel 13 ...
IMT Lecture:Creating Project Plans To Focus Product Development.Mm Biztel 13 ...
 
Is PPM Enough?
Is PPM Enough?Is PPM Enough?
Is PPM Enough?
 
Rajendra shankarappa
Rajendra shankarappaRajendra shankarappa
Rajendra shankarappa
 
New Business Development Proposal - Adding Project Portfolio Management (PPM)...
New Business Development Proposal - Adding Project Portfolio Management (PPM)...New Business Development Proposal - Adding Project Portfolio Management (PPM)...
New Business Development Proposal - Adding Project Portfolio Management (PPM)...
 
2013-03-14 Professional Services Seminar
2013-03-14 Professional Services Seminar2013-03-14 Professional Services Seminar
2013-03-14 Professional Services Seminar
 
Microsoft Webinar Q&A session
Microsoft Webinar Q&A sessionMicrosoft Webinar Q&A session
Microsoft Webinar Q&A session
 
Connected Project Management in the Oil, Gas & Chemicals Industry
Connected Project Management in the Oil, Gas & Chemicals Industry Connected Project Management in the Oil, Gas & Chemicals Industry
Connected Project Management in the Oil, Gas & Chemicals Industry
 
Project Management PowerPoint PPT Content Modern Sample
Project Management PowerPoint PPT Content Modern SampleProject Management PowerPoint PPT Content Modern Sample
Project Management PowerPoint PPT Content Modern Sample
 
Case Study Alfmeier Präzision SE - English
Case Study Alfmeier Präzision SE - EnglishCase Study Alfmeier Präzision SE - English
Case Study Alfmeier Präzision SE - English
 
Nagios Conference 2011 - Christian Mies - German Health Insurance Company Ref...
Nagios Conference 2011 - Christian Mies - German Health Insurance Company Ref...Nagios Conference 2011 - Christian Mies - German Health Insurance Company Ref...
Nagios Conference 2011 - Christian Mies - German Health Insurance Company Ref...
 
The Forrester Wave BPM Suites 2013
The Forrester Wave BPM Suites 2013The Forrester Wave BPM Suites 2013
The Forrester Wave BPM Suites 2013
 
Socially synergistic enterprises 10 june m. baron
Socially synergistic enterprises 10 june m. baronSocially synergistic enterprises 10 june m. baron
Socially synergistic enterprises 10 june m. baron
 

Recently uploaded

Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxsaniyaimamuddin
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 

Recently uploaded (20)

Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 

EPM_SAP_Integration_TPG_PSLink_FirstON

  • 1. Integration Integ ation of Mic osoft P oject EPM Microsoft Project with SAP HR Integration with ResourceLink PS/PM/CO/CATS Integration with PSLink © TPG The Project Group GmbH Slide 1
  • 2. Topics T i  About TPG The Project Group  Why integrating EPM with SAP?  Business backgrounds f MSP/SAP i B i b k d for integration i  Excursion: Project Management in SAP  TPG I t Integration S ti Scenarios i  Technical Backgrounds and Roadmap © The Project Group GmbH Slide 2
  • 3. Our company – TPG Th Project Group O The P j t G  Our Locations  Headquarters in Munich Germany and Offices in Mainz and Dortmund  Subsidiaries USA (PA), UK and Austria  Our Business focus: Project Management and Project Management Software  Our Partnerships and Certifications  Microsoft Gold Certified Partner  SAP certified product (TPG PSLink) ( k)  Worldwide product implementation partners (Australia, Brazil, Denmark, Israel, South Africa, Singapore, Thailand) © The Project Group GmbH Slide 3
  • 4. TPG W ld id S b idi i Worldwide Subsidiaries and P t d Partners © The Project Group GmbH Slide 4
  • 5. Our products and services O d t d i  Products  TPG PSLink Integration MSP with SAP  TPG ResourceLink Import HR to MSP  TPG MTA Milestone Trend Analysis  TPG ProjectLink Soft Links between Projects  TPG Ti TimeSheet E t d Sh t Extender E Extension of MSP time sheets i f i h  Services  Consulting for PM software solutions  Implementation of Microsoft EPM / PPM  Implementation of TPG products p p  Training  Maintenance and Support © The Project Group GmbH Slide 5
  • 6. TPG Customers (selection) C t ( l ti ) © The Project Group GmbH Slide 6
  • 7. Why linking SAP with Microsoft EPM? © TPG The Project Group GmbH Slide 7
  • 8. Role b R l based approach d h  Each participant uses the proper tool  Finance and HR manager in ERP system  PMO, project manager and members in Microsoft EPM  No “shadow accounting”  compared to using SAP only …  … with all the “personal plans” in Excel and Project  Acceptance of the overall system © The Project Group GmbH Slide 8
  • 9. The best Th b t cost / benefit ratio t b fit ti  High efficiency for PM and PMO  Best productivity with Project Interface  No extra efforts to prepare financial data  Up-to-Date data for finance  No efforts to collect financial data  Accurate and most current forecasts and actuals  Offline and server-connected work  No double data N d bl d t entry t  Automatic and user triggered synchronization  No unneeded redundancies  Employees report in ONE place © The Project Group GmbH Slide 9
  • 10. Accurate financial reports A t fi i l t  Project data in finance reports  Reliable information for decisions  Enable combined top-down / bottom-up budgeting  Valid company presentation  Ensure SOX compliancy with up-to-date project cost forecasts f t © The Project Group GmbH Slide 10
  • 11. Business backgrounds for MSP/SAP integration f i t ti © TPG The Project Group GmbH Slide 11
  • 12. Integration levels of Enterprise Projects and Core Processes Enterprise role Projects: Microsoft Core processes: EPM Technology ERP system (SAP) Strategic view : Upper indicators, customer Overall portfolio, profitability, Management KPI, strategic decisions strategic direction (SAP CO, FI, BW,…) Controlling view : Portfolios, milestones, budgets, PMO, budgets, cost centers, centralized resource planning, p g, departments revenues, purchasing revenues purchasing, risks, problems, customer management change management etc. (SAP PS, CO, SD ...) Project view: Project Operational project management, staff resources, managers, supervision unit costs teams (SAP PS HR CATS) PS, HR, © The Project Group GmbH Slide 12
  • 13. Roles and Tools within Project Life Cycle R l dT l ithi P j t Lif C l © The Project Group GmbH Slide 13
  • 14. Important Questions to Ask Upfront (1/3) Project Server Which data should be exchanged? ???? Resources, schedules, work, costs, budgets, actuals, material, material long text … ???? SAP Project Client © The Project Group GmbH Slide 14
  • 15. Important Questions to Ask Upfront (2/3) I t tQ ti t A kU f t  Role based Role-based data exchange  Who is planning with what tool?  Who needs which data?  Who has to supply which data?  Who has access to which data?  Process-based data exchange  How does a sale become a project?  Where are projects created first?  Which data should be synchronized during transitions between phases?  What rules have to be considered? © The Project Group GmbH Slide 15
  • 16. Important Questions to Ask Upfront (3/3) I t tQ ti t A kU f t  Which is the lead system, SAP or Microsoft system Project?  Which data are managed in which system? g y  Is synchronization performed automatically or manually?  Hardware and software requirements of an integration solution?  … © The Project Group GmbH Slide 16
  • 17. Design goals for integration D i l f i t ti  Flexible process configuration  Flexible role and rights configuration  Based on Microsoft Project user management j g  Bidirectional synchronization  Leading system on field level g y  Manual and automatic (scheduled) synchronization  Integration with PS, CO, HR and/or CATS g  But also flexible extension to other modules © The Project Group GmbH Slide 17
  • 18. Excursion: Project Management in SAP © TPG The Project Group GmbH Slide 18
  • 19. PM in SAP – 3 approaches i h  PS  The traditional Project System in SAP R/3, SAP Enterprise and ECC (Enterprise Core Components)  Comparable with MSP p  Deep Integration in other modules (CO, HR, SD …)  Addresses project accountants  cProjects  Part of PLM Collaboration Engineering  Addresses project managers  Independent of SAP R/3, SAP E t I d d t f R/3 Enterprise or mySAP ERP i SAP  Connects with PS and other modules  xRPM  Top level portfolio planning  Integrates data from different sources (SAP mod., MSP etc.)  Offers reporting, portfolio p p g, p planning and resource capacity g p y management © The Project Group GmbH Slide 19
  • 20. SAP PM Architecture Overview A hit t O i SAP Enterprise Portal SAP xRPM Core SAP BI (Business SAP cProjects j Warehouse) ) ECC FI, FI, Other ECC PS CATS HR … Sources © The Project Group GmbH Slide 20
  • 21. Using SAP PM solutions U i l ti Pros P Cons C  Rich functionality  User interface still not  Detailed, status based adopted business rules  Performance issues  Very good interaction of PS  Not flexible enough with ERP processes (CO, (e.g. work offline, user MM etc ) etc.) defined customizing)  Company wide, controlling  Enterprise features not integrated reports g p easy to use  High Level Consolidation (esp. for PMOs)  EPM scenarios difficult to deploy © The Project Group GmbH Slide 21
  • 22. Overview: The TPG I t O i Th Integrations Scenario ti S i Microsoft Portfolio Server Microsoft EPM and SQL Reporting services / SAP BW Manager PMO Microsoft Project SAP R/3 / Enterprise / EPM MySAP ERP with CO PS CO, HR, CATS PMO, Manager, p j project manager, g , Controller, Controller Team member Dept. manager © The Project Group GmbH Slide 22
  • 23. TPG Integration Scenarios © TPG The Project Group GmbH Slide 23
  • 24. Functional scope related to integration © The Project Group GmbH Slide 24
  • 25. Which integration areas are covered? Whi h i t ti d? Basic data Structures, networks, St t t k PM-orders etc. SAP R/3 Forecast work, costs and revenues Microsoft Or Project EPM Time Postings ECC 6.0 Actual Costs Any other information © The Project Group GmbH Slide 25
  • 26. Scenario 1: Update Enterprise Resource Pool TPG ResourceLink HR / DS System TPG Microsoft Project • SAP ResourceLink EPM • Navision • Active Directory Update Enterprise • LDAP DAP Resources R • Any other DS or ERP © The Project Group GmbH Slide 26
  • 27. Scenario 1: A hit t S i 1 Architecture and f t d features  Import of Resource data into Microsoft Project Server  Create, activate, deactivate and delete resources  Update of existing resources  Update outline code field definitions SAP File Navision Active Directory LDAP SQL Server Mapping ResourceLink Microsoft P j t Mi ft Project Enterprise Resource Pool © The Project Group GmbH Slide 27
  • 28. Scenario 2: U d t structures S i 2 Update t t SAP PS TPG PSLink Microsoft Project EPM Create and Update PD and WBS © The Project Group GmbH Slide 28
  • 29. Scenario 2: M S i 2 Mapping options i ti 1:1 high level 1 1 hi h l l No direct t k N di t task mapping mapping © The Project Group GmbH Slide 29
  • 30. Scenario 3: Update Forecasts to SAP S i 3 U d t F t t SAP PS/CO TPG PSLink Microsoft Project EPM Update forecasts to SAP activity input and primary ti it i t d i cost planning © The Project Group GmbH Slide 30
  • 31. Scenario 4: Synch SAP network activities S i 4 S h t k ti iti SAP PS TPG PSLink Microsoft Project EPM Read / Create / Update networks, activities and elements © The Project Group GmbH Slide 31
  • 32. Scenario 4: Example for activity element mapping © The Project Group GmbH Slide 32
  • 33. Use case 5: Read, create and update Plant Maintenance orders SAP PM TPG PSLink Microsoft Project EPM Read / Create / update PM-orders, operations and components © The Project Group GmbH Slide 33
  • 34. Scenario 6: Synch ti S i 6 S h time postings with CATS ti ith SAP CATS TPG PSLink Microsoft Project EPM Read / Create / Update CATS postings © The Project Group GmbH Slide 34
  • 35. Scenario 7: Synch time postings with CO allocation documents SAP CO TPG PSLink Microsoft Project EPM Update postings to CO allocation documents © The Project Group GmbH Slide 35
  • 36. Scenario 8: Exchange any data to any RFC SAP (any module) TPG PSLink Microsoft Project EPM or SharePoint Any data with any BAPI /RFC © The Project Group GmbH Slide 36
  • 37. © The Project Group GmbH Slide 37
  • 38. TPG PSLink Technical Backgrounds and Roadmap © TPG The Project Group GmbH Slide 38
  • 39. TPG PSLink architecture PSLi k hit t PSLink Server Framework SAP R/3 Basic services BAPI/RF or Net (session handling, logging, user rights etc.) MSP Server ECC 6.0 2003 or 2007 Connectors SAP Access WBS TPG Project FC HR Framework Access Networks PM Orders Framework PSLink SAP MSP DB CATS object model Forecast cost TPG Project Server + tweaver SAP .Net and revenues object model external PS Connector Direct DB PDS sources Timesheets SAP DCOM Operations PSI Connector PM RFC CO RFC Extensions Client Interface Others Server Interface MSP Prof. User Interface AddIn (Menu, History (Menu History, Logs etc ) etc.) using Project Client object model PSLink Client Framework © The Project Group GmbH Slide 39
  • 40. TPG PSLink architecture PSLi k hit t PSLink Server Framework Microsoft Project Server j Basic B i services i 2003, 2007 SAP R/3 SAP Access or 2010 ECC 6.0 Framework TPG Project Connectors Access Other Framework 3rd pty app frameworks Web Service Third party TPG PSLink TPG PSLink web service Add-In Client Web Client applications (SharePoint, SAP…) (Sh P i SAP ) MSP Prof. Microsoft SharePoint /PWA © The Project Group GmbH Slide 40
  • 41. TPG PSLink C fi PSLi k Configuration example ti l <job> <id>MasterSynchPDandWBS</id> <shortDesc>Sync PD and WBS</shortDesc> <sort>3</sort> ... <securityGroups><group>Executives</group></securityGroups> <actions> <trycatch> <try> ... <QueryProject> <query> SELECT P.EnterpriseTextFields('SAPProjectDef') AS PSPID, P.Name P Name as Description Description, SUBSTRING(P.EnterpriseTextFields('SAPProfile'),1,7) AS Project_Profile, TO_DATETIME(P.InfoStartDate.Date) AS StartDate, TO_DATETIME(P.InfoFinishDate.Date) AS FinishDate FROM Projects P WHERE P.EnterpriseFlagFields('SynchToSAP') AND P.EnterpriseTextFields('MSPStatus')= '3 Active' </query> <output> <getProperty name="outputTable" target="Parameters.PDTable"/> g p y p g </output> </QueryProject> <If> <condition>Parameters.PDTable.Rows.Count > 0</condition> <thenJobId>JobSynchPD</thenJobId> </If> ... © The Project Group GmbH Slide 41
  • 42. TPG PSLink Hi t PSLi k History and R d d Roadmap v 2010 on EPM 2010 v 2007 v 3.1 Additional on EPM 2007 ontrolling Edition (CE) v 3.0 EPM 2003 features: EPM 2003 Portfolio Additional integration n Integrates both features: New fields PSLin 2010 New platform PSLink SE and CE New time sheet SharePoint Extensive configuration PSLink 2007 integration Connector PSLink 3.1 Enhanced config SE) Server events v 1.5 nk High level integration More use cases 3 WSS workflows g tandard Edition (S MSP 2000 - Flexible WBS synch Budget and cost - Forecasts New connectors: resources Editing rules - CATS integration through MSP - Network - Report data - CO alloc docs events Co - xRPM E COM Add-In dd v 1.0 MSP 98 v 2.0 v 3.0 EPM 2002/3 EPM 2003 Down-Upload D U l d St Rules check Server based Better logging Locking All PS objects and configuration mechanism New wizard 1999 2000 2002/3 2004 2006 2007 2009 2010 © The Project Group GmbH Slide 42
  • 43. Summary and Integration Benefits © TPG The Project Group GmbH Slide 43
  • 44. Features of TPG PSLi k and ResourceLink F t f PSLink dR Li k  Extensively configurable products  for integration of Microsoft EPM and SharePoint with SAP HR, PS, PM, CO, CATS and other modules  Support a plethora of customer cases  Project is the tool for detailed planning  SAP i th t l f is the tool for controlling t lli  Therefore minimal redundancies  Bidirectional data exchange  Manual, triggered or scheduled synch  Rights management based on MSP groups  Detailed logging  Rapid deployment © The Project Group GmbH Slide 44
  • 45. Integration Benefits I t ti B fit  No double data entry  Offline work with SAP data  Each participant works with the proper tool  Accountants and HR manager in ERP system  PMO, project manager and members in MSP  Controlling forecasts contain also project data  Valid company presentation  Employees report in ONE place  Reports are more meaningful  Contain d data f from the other system h h  Workflows can span over both systems © The Project Group GmbH Slide 45
  • 46. Partner in Poland: Tel: +48 (22) 465 97 76 FirstON SA Fax: +48 (22) 490 79 67 www.FirstON.pl biuro@FirstON.pl The Project Group GmbH Fon: +49 (89) 61 55 93 - 30 Destouchesstr. 68 Fax: +49 (89) 61 55 93 - 40 80796 Munich info@TheProjectGroup.de info@TheProjectGroup de Germany www.TheProjectGroup.de © The Project Group GmbH Slide 46