SlideShare ist ein Scribd-Unternehmen logo
1 von 19
1
    © 1994 – 2011 Fieldbus Foundation
User Layer – Blocks and Device Descriptions
                                                                         HMI
                                       Values
                                       are read from
                                       the device.          Descriptions
                  User Layer                                are obtained from the DD.

              Alerts                 Mode


    Inputs              Algorithm           Outputs
                         e.g. AI

                  Function Block


                                                            PV Units
                       Transducer
                        e.g. Level                            PV

                Transducer Block



                  COMMUNICATION                                        COMMUNICATION
                     STACK                                                STACK


                 PHYSICAL LAYER                                        PHYSICAL LAYER



                                                       PV
2
                                                                               © 1994 – 2011 Fieldbus Foundation
Device Interoperability Test and Registration


                            Function
                             Block
    Transducer
       Block




                                                                         
                                                                         Registered
                 Device                                                   Device

Communication
   Stack
                                       Interoperability Tester



                                                                        Registered DD
            Device Description
                   (DD)

    3
                                                                 © 1994 – 2011 Fieldbus Foundation
FOUNDATION for ROM Development

                                  FB            TB           DD




                                        H1 + HSE
      Basic Control            Advanced Control              Remote Operations Management

Analog Input              Analog Alarm                      Large Point Count Remote Devices
Analog Output             Arithmetic                        64 Channel Discrete Input/Output
Bias & Gain               Deadtime                          16 Channel Analog Input/Output
Control Selector          Device Control                    Wired HART ® Connectivity
Discrete Input            8 Channel Discrete Input/Output   Wireless Connectivity
Discrete Output           Flexible Function Block               Wireless HSE Backhaul
Manual Loader             Input Selector                        Wireless Field Devices
PD Control                Integrator                                    WirelessHART®
PID Control               Lead/Lag                                      ISA100.11a
Ratio Control             Setpoint Ramp Generator
                          Signal Characterizer
                          Splitter
    Safety Instrumented
                          Timer
         Functions

4
                                                                                 © 1994 – 2011 Fieldbus Foundation
FOUNDATION for ROM Development Phases




5
                                        © 1994 – 2011 Fieldbus Foundation
FOUNDATION for ROM Development Teams
                                      Host
              HSE Remote I/O
               HSE-RIO Team                        Fieldbus Foundation – ISA Cooperation
                                                         ISA100.15 Working Group
    •   Large Point Count Device
    •   Multi-channel I/O
                                                          Wireless HSE Backhaul
    •   Wired HART Block


                           FOUNDATION for ROM Device



Conventional
                                              WirelessHART        ISA100.11a
    I/O
                  H1
                        Wired
                        HART
                                             Wireless Sensor Integration Team
6
                                                                        © 1994 – 2011 Fieldbus Foundation
FOUNDATION for ROM Development – HSE RIO
 Configuration                                                            Operation
 1. User configures Expected Tags in Association Block                     Real-time process data published as configured
 2. ROM Device instantiates appropriate Transducer Blocks                       Control
       e.g. RIO, HART, WirelessHART, ISA100.11a                                 HMI
 3. ROM Device changes TB Tag to Expected Tag                                   Asset Management
 4. TB are connected to FBs.                                               Device diagnostics are reported as configured
 5. FB links and device diagnostics are configured                              Control
                                                                                HMI
                                           AB_001; Expd_Tag=TIC_334            Asset Management
                                                                                Maintenance
           Association Block               AB_002; Expd_Tag=TIC_335   
                 (AB)                       …
                                           AB_003; Expd_Tag=TIC_336

                                           AB_nnn; Expd_Tag=TIC_nnn
                                                                      
                                 2048




                                        TBAI
                                     TB Tag = “TIC_336”   
                                                                          
                TBAI                                                                              Data + Status

                TB Tag = “TIC_336”                                              FBMAI          Device Diagnostics

 TBAI                                                                        FB Tag = “Tank_1”

TB Tag = “TIC_334”   
   7
                                                                                                  © 1994 – 2011 Fieldbus Foundation
Device Diagnostics                                                                   Function
                                                                                Failure
                                                                                                   Check




                                                                                Out of          Maintenance
                                                                             Specification       Required




                                                                             Wired or Wireless HSE

                                                                           FOUNDATION for ROM Device

 Utilizes advanced diagnostic capabilities of intelligent devices
 4 standard “status signals” categories are available
 Mapping of diagnostics in status signals configurable by user      I/O
 Enables condition-based maintenance – automatic work orders                 H1           HART
 Optimizes maintenance functions
 Detailed information available on demand

                                                                                                             Wireless
   8
                                                                                          © 1994 – 2011 Fieldbus Foundation
Device Diagnostics Example




                                       H1 + HSE




    Device Memory    Device Internal              Calibration Has          Plugged
         Error      Temperature High                  Drifted            Impulse line

9
                                                                    © 1994 – 2011 Fieldbus Foundation
FOUNDATION for ROM – HSE RIO Timeline

2007
Specification Team Kickoff Meeting                                 Jan

2008
Draft Preliminary Specifications                                   Oct

2009
Validation Team Kickoff Meeting                                    Feb
Laboratory Validation Testing - Conventional I/O                   Aug, Dec

2010
 Laboratory Validation Testing - Conventional I/O                  Mar
 Laboratory Validation Testing - Wired HART         `              Jun, Sep
 Preliminary Specifications – Conventional I/O                     Dec

2011
 Final Specifications – Conventional I/O                           Apr
         Association Block
         64 Channel Discrete Input/Output
         16 Channel Analog Input/Output
  10
                                                         © 1994 – 2011 Fieldbus Foundation
FOUNDATION for ROM – WirelessHART Integration

            Association Block
                  (AB)
                                                                                             Data + Status
                                 2048
                                                                                    FB     Device Diagnostics



                                   TBHART
                                   TB Tag = “HART_5”


                      TBLL
          TB Tag = “HART_LIVE_LIST_GW_1”
                                                                                    GW_1
Gateway      Expected    Network                                                                     Network Address 9
               Tag       Address        Status
 GW_1        HART_5          5          Good                    Network Address 5
                                                                                                                Network Address 10
 GW_1        HART_7          7           Bad
                                                       Mesh
 GW_1        HART_9          9          Good           Status                                             Network Address 11
                                                                       Network Address 7
 GW_1        HART_10       10           Good

 GW_1        HART_11       11            Bad

                                                                                WirelessHART Mesh
  11
                                                                                                 © 1994 – 2011 Fieldbus Foundation
FOUNDATION for ROM - WirelessHART® Integration

2010
Lab Validation Testing – WirelessHART Parameter Mapping                  Nov

2011
 Lab Validation Testing – WirelessHART Parameter Mapping                 Mar
    Lab Validation Testing – WirelessHART Live List                      Jun
    Preliminary Specification - HART and WirelessHART                    Aug


2012
 Final Specification – HART and WirelessHART                             Jan




12
                                                            © 1994 – 2011 Fieldbus Foundation
FOUNDATION for ROM – Wireless Backhaul Model

                     CCD - Set of devices

                     BHI - Provides isolation and security of communications flows

                     BSP - Provides connectivity between CCD’s




               IF1 - Physical interface to the backhaul technology

               IF2 - Protected data flowing across the backhaul - authentication, authorization, encryption

               IF3 - Physical interface to CCD

               IF4 - Transparent end-to-end communication between CCDs

               IF5 - Management - Configuration of IF1-IF3 and BHI functions




13
                                                                                     © 1994 – 2011 Fieldbus Foundation
FOUNDATION for ROM – Wireless Backhaul Security
Overlay                Secure
            Endpoint            Endpoint   Overlay
                       Tunnel




                                                Secure Tunnel




14
                                                                © 1994 – 2011 Fieldbus Foundation
FOUNDATION for ROM – Wireless Backhaul Security

             Overlay                 Secure
                       Endpoint                   Endpoint   Overlay
                                     Tunnel




            PV                                                     PV




                                       IF2
                                  #8%%0@!!(%0




15
                                                                        © 1994 – 2011 Fieldbus Foundation
FOUNDATION for ROM - Wireless Backhaul

2009
Backhaul Uses Cases and Requirements Completed                              Jan
Backhaul Request for Information (RFI) Development                          Feb - Oct
Review of RFI Responses by ISA100.15                                        Dec

2010
RFI Gap Analysis Competed                                                   Feb
Backhaul Security Modeling using ISA99 Methods                              Apr
First Wireless HSE Backhaul to Conventional I/O Operational                 Aug
First Wireless HSE Backhaul to WirelessHART Operational                     Nov

2011
 Backhaul Architecture Model review by ISA100.15 – Interfaces, Security Mar
 Backhaul Architecture Model review by ISA100.15 – Flow Control         May
 Backhaul Architecture Model approved by ISA100.15 (Unanimous)          Oct


2012
 Wireless HSE Backhaul Profiles

  16
                                                                  © 1994 – 2011 Fieldbus Foundation
FOUNDATION for ROM - Wireless Backhaul Profiles

   Applications           Design             Demonstration                     Release
  Requirements                                 Validation

                          Backhaul
                        Technologies




                                                                               System
    (DEMO WG)           HSE Wireless                                         Engineering
                                            Profiles for HSE
                                            Profiles for HSE
 Remote Operations     Backhaul Design                                        Guideline
                                             Operation on
                                              Operation on
Management End-User     Specification      Wireless Backhaul
                                           Wireless Backhaul
    Applications




                          Backhaul
                      Architecture Model
                                                                        17




   17
                                                               © 1994 – 2011 Fieldbus Foundation
FOUNDATION for ROM – ISA100.11a Integration

           Association Block
                 (AB)
                                                                                             Data + Status
                                 2048
                                                                                    FB     Device Diagnostics



                                    TBISA
                                    TB Tag = “ISA_5”


                      TBLL
          TB Tag = “ISA_LIVE_LIST_GW_1”
                                                                                    GW_1
Gateway     Expected    Network                                                                      Network Address 9
              Tag       Address         Status
 GW_1         ISA_5          5          Good                    Network Address 5
                                                                                                                Network Address 10
 GW_1         ISA_7          7          Good
                                                       Mesh
 GW_1         ISA_9          9          Good           Status                                             Network Address 11
                                                                       Network Address 7
 GW_1        ISA_10        10            Bad

 GW_1        ISA_11        11           Good

                                                                                    ISA100.11a Mesh
  18
                                                                                                 © 1994 – 2011 Fieldbus Foundation
FOUNDATION for ROM - ISA100.11a Integration

2010
Specification Team Kickoff Meeting                                  Oct
Initial ISA100.11a Integration Architecture                         Dec

2011
 ISA100.11a Integration Architecture Completed                      Mar
 ISA100.11a Integration Design                                      Jun
 ISA100.11 Draft Preliminary Specification – Revision 1             Aug
 ISA100.11 Draft Preliminary Specification – Revision 2             Sep
 First Wireless HSE Backhaul to ISA100.11a Operational              Sep
 ISA100.11 Draft Preliminary Specification – Revision 3             Nov

2012
 Lab Validation Testing - ISA100.11a                                1Q
 Preliminary Specification – ISA100.11a                             3Q
 Final Specification – ISA100.11a                                   4Q


   19
                                                           © 1994 – 2011 Fieldbus Foundation

Weitere ähnliche Inhalte

Was ist angesagt?

Uspto reexamination request - update - december 5th to december 11th, 2012 ...
Uspto   reexamination request - update - december 5th to december 11th, 2012 ...Uspto   reexamination request - update - december 5th to december 11th, 2012 ...
Uspto reexamination request - update - december 5th to december 11th, 2012 ...InvnTree IP Services Pvt. Ltd.
 
Matrix eternity mex presentation
Matrix eternity mex presentationMatrix eternity mex presentation
Matrix eternity mex presentationmatrixtelesol
 
ICE Presentation: Integrated Component Characterization Environment
ICE Presentation: Integrated Component Characterization EnvironmentICE Presentation: Integrated Component Characterization Environment
ICE Presentation: Integrated Component Characterization EnvironmentNMDG NV
 
A jade implemented mobile agent based host platform security
A jade implemented mobile agent based host platform securityA jade implemented mobile agent based host platform security
A jade implemented mobile agent based host platform securityAlexander Decker
 
Delta V Control System Overview
Delta V Control System OverviewDelta V Control System Overview
Delta V Control System OverviewSumeet Goel
 
IGEP BERLIN
IGEP BERLIN IGEP BERLIN
IGEP BERLIN Isee Bcn
 
IXXAT--Industrial Ethernet Challenges/Solutions: Embedded World 2010
IXXAT--Industrial Ethernet Challenges/Solutions: Embedded World 2010IXXAT--Industrial Ethernet Challenges/Solutions: Embedded World 2010
IXXAT--Industrial Ethernet Challenges/Solutions: Embedded World 2010Altera Corporation
 
Adv. FPGA Motor Control--EBV & Univ. of Koln: Embedded World 2010
Adv. FPGA Motor Control--EBV & Univ. of Koln: Embedded World 2010Adv. FPGA Motor Control--EBV & Univ. of Koln: Embedded World 2010
Adv. FPGA Motor Control--EBV & Univ. of Koln: Embedded World 2010Altera Corporation
 
Pepperl+Fuchs 2011 Emerson Global Users Exchange fieldbus presentation
Pepperl+Fuchs  2011 Emerson Global Users Exchange fieldbus presentationPepperl+Fuchs  2011 Emerson Global Users Exchange fieldbus presentation
Pepperl+Fuchs 2011 Emerson Global Users Exchange fieldbus presentationKristen_Barbour_PF
 
Benefits of Using FPGAs for Embedded Processing: Embedded World 2010
Benefits of Using FPGAs for Embedded Processing: Embedded World 2010Benefits of Using FPGAs for Embedded Processing: Embedded World 2010
Benefits of Using FPGAs for Embedded Processing: Embedded World 2010Altera Corporation
 
Airspan air harmony_brochure_0211_d
Airspan air harmony_brochure_0211_dAirspan air harmony_brochure_0211_d
Airspan air harmony_brochure_0211_dDaud Suleiman
 
Delta ia hmi-dop100-c_en_20201230_web
Delta ia hmi-dop100-c_en_20201230_webDelta ia hmi-dop100-c_en_20201230_web
Delta ia hmi-dop100-c_en_20201230_webCarlosVeraColombia
 

Was ist angesagt? (20)

Uspto reexamination request - update - december 5th to december 11th, 2012 ...
Uspto   reexamination request - update - december 5th to december 11th, 2012 ...Uspto   reexamination request - update - december 5th to december 11th, 2012 ...
Uspto reexamination request - update - december 5th to december 11th, 2012 ...
 
Matrix eternity mex presentation
Matrix eternity mex presentationMatrix eternity mex presentation
Matrix eternity mex presentation
 
PLC
PLCPLC
PLC
 
E zcall all_spec_sheets
E zcall all_spec_sheetsE zcall all_spec_sheets
E zcall all_spec_sheets
 
ICE Presentation: Integrated Component Characterization Environment
ICE Presentation: Integrated Component Characterization EnvironmentICE Presentation: Integrated Component Characterization Environment
ICE Presentation: Integrated Component Characterization Environment
 
A jade implemented mobile agent based host platform security
A jade implemented mobile agent based host platform securityA jade implemented mobile agent based host platform security
A jade implemented mobile agent based host platform security
 
Delta V Control System Overview
Delta V Control System OverviewDelta V Control System Overview
Delta V Control System Overview
 
Ia cf3000 prg-c-r1
Ia cf3000 prg-c-r1Ia cf3000 prg-c-r1
Ia cf3000 prg-c-r1
 
IGEP BERLIN
IGEP BERLIN IGEP BERLIN
IGEP BERLIN
 
L4100
L4100L4100
L4100
 
IXXAT--Industrial Ethernet Challenges/Solutions: Embedded World 2010
IXXAT--Industrial Ethernet Challenges/Solutions: Embedded World 2010IXXAT--Industrial Ethernet Challenges/Solutions: Embedded World 2010
IXXAT--Industrial Ethernet Challenges/Solutions: Embedded World 2010
 
Intrond
IntrondIntrond
Intrond
 
Innovator cx brochure
Innovator cx brochureInnovator cx brochure
Innovator cx brochure
 
Adv. FPGA Motor Control--EBV & Univ. of Koln: Embedded World 2010
Adv. FPGA Motor Control--EBV & Univ. of Koln: Embedded World 2010Adv. FPGA Motor Control--EBV & Univ. of Koln: Embedded World 2010
Adv. FPGA Motor Control--EBV & Univ. of Koln: Embedded World 2010
 
Jda foqa briefing slide view
Jda foqa briefing slide viewJda foqa briefing slide view
Jda foqa briefing slide view
 
Pepperl+Fuchs 2011 Emerson Global Users Exchange fieldbus presentation
Pepperl+Fuchs  2011 Emerson Global Users Exchange fieldbus presentationPepperl+Fuchs  2011 Emerson Global Users Exchange fieldbus presentation
Pepperl+Fuchs 2011 Emerson Global Users Exchange fieldbus presentation
 
Introndplus
IntrondplusIntrondplus
Introndplus
 
Benefits of Using FPGAs for Embedded Processing: Embedded World 2010
Benefits of Using FPGAs for Embedded Processing: Embedded World 2010Benefits of Using FPGAs for Embedded Processing: Embedded World 2010
Benefits of Using FPGAs for Embedded Processing: Embedded World 2010
 
Airspan air harmony_brochure_0211_d
Airspan air harmony_brochure_0211_dAirspan air harmony_brochure_0211_d
Airspan air harmony_brochure_0211_d
 
Delta ia hmi-dop100-c_en_20201230_web
Delta ia hmi-dop100-c_en_20201230_webDelta ia hmi-dop100-c_en_20201230_web
Delta ia hmi-dop100-c_en_20201230_web
 

Ähnlich wie 03 foundation for rom development program 11 18-11

8 Dave Glanzer Technology Update
8 Dave Glanzer Technology Update8 Dave Glanzer Technology Update
8 Dave Glanzer Technology UpdateFieldComm Group
 
Centros de contacto: las demandas y requerimientos del mercado
Centros de contacto: las demandas y requerimientos del mercadoCentros de contacto: las demandas y requerimientos del mercado
Centros de contacto: las demandas y requerimientos del mercadoMundo Contact
 
Foundation for rom user perspective 1 18-12
Foundation for rom user perspective 1 18-12Foundation for rom user perspective 1 18-12
Foundation for rom user perspective 1 18-12FieldComm Group
 
K Two Asset Tracking Solutions Impre 090225
K Two Asset Tracking Solutions Impre 090225K Two Asset Tracking Solutions Impre 090225
K Two Asset Tracking Solutions Impre 090225guest497a4b
 
Dave glanzer fieldbus foundation english
Dave glanzer fieldbus foundation englishDave glanzer fieldbus foundation english
Dave glanzer fieldbus foundation englishFieldComm Group
 
IP Ethernet
IP EthernetIP Ethernet
IP EthernetSILKAN
 
Flex Stack Rapid Prototyping System
Flex Stack Rapid Prototyping SystemFlex Stack Rapid Prototyping System
Flex Stack Rapid Prototyping Systemfrankp617
 
Perspectives and Case Studies on Effective Theatre Base Service Management
Perspectives and Case Studies on Effective Theatre Base Service ManagementPerspectives and Case Studies on Effective Theatre Base Service Management
Perspectives and Case Studies on Effective Theatre Base Service ManagementIBMGovernmentCA
 
Ble boise codecamp
Ble boise codecampBle boise codecamp
Ble boise codecampChip Keyes
 
respond_to :voice - the convergence of voice and web interfaces with Rails an...
respond_to :voice - the convergence of voice and web interfaces with Rails an...respond_to :voice - the convergence of voice and web interfaces with Rails an...
respond_to :voice - the convergence of voice and web interfaces with Rails an...jpalley
 
Technology Disruption Brings New VAS Opportunities
Technology Disruption Brings New VAS OpportunitiesTechnology Disruption Brings New VAS Opportunities
Technology Disruption Brings New VAS OpportunitiesRadisys Corporation
 
Sample of product development
Sample of product developmentSample of product development
Sample of product developmentTransit-Protect
 
Wba1 Ibbt General Presentation
Wba1  Ibbt General PresentationWba1  Ibbt General Presentation
Wba1 Ibbt General Presentationimec.archive
 
Wba1 Ibbt General Presentation
Wba1  Ibbt General PresentationWba1  Ibbt General Presentation
Wba1 Ibbt General Presentationimec.archive
 

Ähnlich wie 03 foundation for rom development program 11 18-11 (20)

8 Dave Glanzer Technology Update
8 Dave Glanzer Technology Update8 Dave Glanzer Technology Update
8 Dave Glanzer Technology Update
 
Centros de contacto: las demandas y requerimientos del mercado
Centros de contacto: las demandas y requerimientos del mercadoCentros de contacto: las demandas y requerimientos del mercado
Centros de contacto: las demandas y requerimientos del mercado
 
Foundation for rom user perspective 1 18-12
Foundation for rom user perspective 1 18-12Foundation for rom user perspective 1 18-12
Foundation for rom user perspective 1 18-12
 
K Two Asset Tracking Solutions Impre 090225
K Two Asset Tracking Solutions Impre 090225K Two Asset Tracking Solutions Impre 090225
K Two Asset Tracking Solutions Impre 090225
 
Synopsys jul1411
Synopsys jul1411Synopsys jul1411
Synopsys jul1411
 
Dave glanzer fieldbus foundation english
Dave glanzer fieldbus foundation englishDave glanzer fieldbus foundation english
Dave glanzer fieldbus foundation english
 
Safety Monitoring system for a manufacturing workstation using Web Service Te...
Safety Monitoring system for a manufacturing workstation using Web Service Te...Safety Monitoring system for a manufacturing workstation using Web Service Te...
Safety Monitoring system for a manufacturing workstation using Web Service Te...
 
IP Ethernet
IP EthernetIP Ethernet
IP Ethernet
 
Flex Stack Rapid Prototyping System
Flex Stack Rapid Prototyping SystemFlex Stack Rapid Prototyping System
Flex Stack Rapid Prototyping System
 
Perspectives and Case Studies on Effective Theatre Base Service Management
Perspectives and Case Studies on Effective Theatre Base Service ManagementPerspectives and Case Studies on Effective Theatre Base Service Management
Perspectives and Case Studies on Effective Theatre Base Service Management
 
Ble boise codecamp
Ble boise codecampBle boise codecamp
Ble boise codecamp
 
respond_to :voice - the convergence of voice and web interfaces with Rails an...
respond_to :voice - the convergence of voice and web interfaces with Rails an...respond_to :voice - the convergence of voice and web interfaces with Rails an...
respond_to :voice - the convergence of voice and web interfaces with Rails an...
 
User manual ramon
User manual  ramon User manual  ramon
User manual ramon
 
Hybrid Programmable Forwarding Planes: BoF Session
Hybrid Programmable Forwarding Planes: BoF SessionHybrid Programmable Forwarding Planes: BoF Session
Hybrid Programmable Forwarding Planes: BoF Session
 
Technology Disruption Brings New VAS Opportunities
Technology Disruption Brings New VAS OpportunitiesTechnology Disruption Brings New VAS Opportunities
Technology Disruption Brings New VAS Opportunities
 
Sample of product development
Sample of product developmentSample of product development
Sample of product development
 
Wba1 Ibbt General Presentation
Wba1  Ibbt General PresentationWba1  Ibbt General Presentation
Wba1 Ibbt General Presentation
 
Wba1 Ibbt General Presentation
Wba1  Ibbt General PresentationWba1  Ibbt General Presentation
Wba1 Ibbt General Presentation
 
10 fn s13
10 fn s1310 fn s13
10 fn s13
 
10 fn s13
10 fn s1310 fn s13
10 fn s13
 

Mehr von FieldComm Group

Fieldbus Foundation Celebrates 20 Years!
Fieldbus Foundation Celebrates 20 Years!Fieldbus Foundation Celebrates 20 Years!
Fieldbus Foundation Celebrates 20 Years!FieldComm Group
 
Foundation for rom 2013 14 presentation
Foundation for rom 2013 14 presentationFoundation for rom 2013 14 presentation
Foundation for rom 2013 14 presentationFieldComm Group
 
Automation mumbai 2013 fieldbus update
Automation mumbai 2013 fieldbus updateAutomation mumbai 2013 fieldbus update
Automation mumbai 2013 fieldbus updateFieldComm Group
 
Realizing the Potential of Intelligent Device Management
Realizing the Potential of Intelligent Device ManagementRealizing the Potential of Intelligent Device Management
Realizing the Potential of Intelligent Device ManagementFieldComm Group
 
Benefits of foundation in the operational phase
Benefits of foundation in the operational phaseBenefits of foundation in the operational phase
Benefits of foundation in the operational phaseFieldComm Group
 
The Fieldbus Diagnostics Difference
The Fieldbus Diagnostics DifferenceThe Fieldbus Diagnostics Difference
The Fieldbus Diagnostics DifferenceFieldComm Group
 
Training and Education Presentation
Training and Education PresentationTraining and Education Presentation
Training and Education PresentationFieldComm Group
 
Andreas Agostin Installation Solutions
Andreas Agostin Installation SolutionsAndreas Agostin Installation Solutions
Andreas Agostin Installation SolutionsFieldComm Group
 
Jonas Berge Advances in Fieldbus Technology
Jonas Berge Advances in Fieldbus TechnologyJonas Berge Advances in Fieldbus Technology
Jonas Berge Advances in Fieldbus TechnologyFieldComm Group
 
FOUNDATION Fieldbus Moving Forward
FOUNDATION Fieldbus Moving ForwardFOUNDATION Fieldbus Moving Forward
FOUNDATION Fieldbus Moving ForwardFieldComm Group
 
Arasu Thanigai Commissioning Solutions
Arasu Thanigai Commissioning SolutionsArasu Thanigai Commissioning Solutions
Arasu Thanigai Commissioning SolutionsFieldComm Group
 
Cenpes ff rom demo overview renato ogeda - petrobras
Cenpes ff rom demo overview   renato ogeda - petrobrasCenpes ff rom demo overview   renato ogeda - petrobras
Cenpes ff rom demo overview renato ogeda - petrobrasFieldComm Group
 
Cenpes ff rom demo wireless backhaul edgar hofmann - petrobras
Cenpes ff rom demo wireless backhaul   edgar hofmann - petrobrasCenpes ff rom demo wireless backhaul   edgar hofmann - petrobras
Cenpes ff rom demo wireless backhaul edgar hofmann - petrobrasFieldComm Group
 
Petrobras rom demonstration miguel borges - petrobras
Petrobras rom demonstration   miguel borges - petrobrasPetrobras rom demonstration   miguel borges - petrobras
Petrobras rom demonstration miguel borges - petrobrasFieldComm Group
 
Interoperable ROM DCS Integration
Interoperable ROM DCS IntegrationInteroperable ROM DCS Integration
Interoperable ROM DCS IntegrationFieldComm Group
 
FOUNDATION for ROM - Petrobras Event
FOUNDATION for ROM - Petrobras EventFOUNDATION for ROM - Petrobras Event
FOUNDATION for ROM - Petrobras EventFieldComm Group
 
FOUNDATION for ROM End User Perspective
FOUNDATION for ROM End User PerspectiveFOUNDATION for ROM End User Perspective
FOUNDATION for ROM End User PerspectiveFieldComm Group
 
1 Ling Rong - Keynote Presentation Chinese
1 Ling Rong - Keynote Presentation Chinese1 Ling Rong - Keynote Presentation Chinese
1 Ling Rong - Keynote Presentation ChineseFieldComm Group
 

Mehr von FieldComm Group (20)

Fieldbus Foundation Celebrates 20 Years!
Fieldbus Foundation Celebrates 20 Years!Fieldbus Foundation Celebrates 20 Years!
Fieldbus Foundation Celebrates 20 Years!
 
Foundation for rom 2013 14 presentation
Foundation for rom 2013 14 presentationFoundation for rom 2013 14 presentation
Foundation for rom 2013 14 presentation
 
Automation mumbai 2013 fieldbus update
Automation mumbai 2013 fieldbus updateAutomation mumbai 2013 fieldbus update
Automation mumbai 2013 fieldbus update
 
Realizing the Potential of Intelligent Device Management
Realizing the Potential of Intelligent Device ManagementRealizing the Potential of Intelligent Device Management
Realizing the Potential of Intelligent Device Management
 
Benefits of foundation in the operational phase
Benefits of foundation in the operational phaseBenefits of foundation in the operational phase
Benefits of foundation in the operational phase
 
2013 Fieldbus Update
2013 Fieldbus Update2013 Fieldbus Update
2013 Fieldbus Update
 
The Fieldbus Diagnostics Difference
The Fieldbus Diagnostics DifferenceThe Fieldbus Diagnostics Difference
The Fieldbus Diagnostics Difference
 
Training and Education Presentation
Training and Education PresentationTraining and Education Presentation
Training and Education Presentation
 
Andreas Agostin Installation Solutions
Andreas Agostin Installation SolutionsAndreas Agostin Installation Solutions
Andreas Agostin Installation Solutions
 
Jonas Berge Advances in Fieldbus Technology
Jonas Berge Advances in Fieldbus TechnologyJonas Berge Advances in Fieldbus Technology
Jonas Berge Advances in Fieldbus Technology
 
FOUNDATION Fieldbus Moving Forward
FOUNDATION Fieldbus Moving ForwardFOUNDATION Fieldbus Moving Forward
FOUNDATION Fieldbus Moving Forward
 
Arasu Thanigai Commissioning Solutions
Arasu Thanigai Commissioning SolutionsArasu Thanigai Commissioning Solutions
Arasu Thanigai Commissioning Solutions
 
Sf taga3 a
Sf taga3 aSf taga3 a
Sf taga3 a
 
Cenpes ff rom demo overview renato ogeda - petrobras
Cenpes ff rom demo overview   renato ogeda - petrobrasCenpes ff rom demo overview   renato ogeda - petrobras
Cenpes ff rom demo overview renato ogeda - petrobras
 
Cenpes ff rom demo wireless backhaul edgar hofmann - petrobras
Cenpes ff rom demo wireless backhaul   edgar hofmann - petrobrasCenpes ff rom demo wireless backhaul   edgar hofmann - petrobras
Cenpes ff rom demo wireless backhaul edgar hofmann - petrobras
 
Petrobras rom demonstration miguel borges - petrobras
Petrobras rom demonstration   miguel borges - petrobrasPetrobras rom demonstration   miguel borges - petrobras
Petrobras rom demonstration miguel borges - petrobras
 
Interoperable ROM DCS Integration
Interoperable ROM DCS IntegrationInteroperable ROM DCS Integration
Interoperable ROM DCS Integration
 
FOUNDATION for ROM - Petrobras Event
FOUNDATION for ROM - Petrobras EventFOUNDATION for ROM - Petrobras Event
FOUNDATION for ROM - Petrobras Event
 
FOUNDATION for ROM End User Perspective
FOUNDATION for ROM End User PerspectiveFOUNDATION for ROM End User Perspective
FOUNDATION for ROM End User Perspective
 
1 Ling Rong - Keynote Presentation Chinese
1 Ling Rong - Keynote Presentation Chinese1 Ling Rong - Keynote Presentation Chinese
1 Ling Rong - Keynote Presentation Chinese
 

Kürzlich hochgeladen

NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...ShrutiBose4
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 

Kürzlich hochgeladen (20)

NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 

03 foundation for rom development program 11 18-11

  • 1. 1 © 1994 – 2011 Fieldbus Foundation
  • 2. User Layer – Blocks and Device Descriptions HMI Values are read from the device. Descriptions User Layer are obtained from the DD. Alerts Mode Inputs Algorithm Outputs e.g. AI Function Block PV Units Transducer e.g. Level PV Transducer Block COMMUNICATION COMMUNICATION STACK STACK PHYSICAL LAYER PHYSICAL LAYER PV 2 © 1994 – 2011 Fieldbus Foundation
  • 3. Device Interoperability Test and Registration Function Block Transducer Block  Registered Device Device Communication Stack Interoperability Tester Registered DD Device Description (DD) 3 © 1994 – 2011 Fieldbus Foundation
  • 4. FOUNDATION for ROM Development FB TB DD H1 + HSE Basic Control Advanced Control Remote Operations Management Analog Input Analog Alarm Large Point Count Remote Devices Analog Output Arithmetic 64 Channel Discrete Input/Output Bias & Gain Deadtime 16 Channel Analog Input/Output Control Selector Device Control Wired HART ® Connectivity Discrete Input 8 Channel Discrete Input/Output Wireless Connectivity Discrete Output Flexible Function Block Wireless HSE Backhaul Manual Loader Input Selector Wireless Field Devices PD Control Integrator WirelessHART® PID Control Lead/Lag ISA100.11a Ratio Control Setpoint Ramp Generator Signal Characterizer Splitter Safety Instrumented Timer Functions 4 © 1994 – 2011 Fieldbus Foundation
  • 5. FOUNDATION for ROM Development Phases 5 © 1994 – 2011 Fieldbus Foundation
  • 6. FOUNDATION for ROM Development Teams Host HSE Remote I/O HSE-RIO Team Fieldbus Foundation – ISA Cooperation ISA100.15 Working Group • Large Point Count Device • Multi-channel I/O Wireless HSE Backhaul • Wired HART Block FOUNDATION for ROM Device Conventional WirelessHART ISA100.11a I/O H1 Wired HART Wireless Sensor Integration Team 6 © 1994 – 2011 Fieldbus Foundation
  • 7. FOUNDATION for ROM Development – HSE RIO Configuration Operation 1. User configures Expected Tags in Association Block  Real-time process data published as configured 2. ROM Device instantiates appropriate Transducer Blocks  Control e.g. RIO, HART, WirelessHART, ISA100.11a  HMI 3. ROM Device changes TB Tag to Expected Tag  Asset Management 4. TB are connected to FBs.  Device diagnostics are reported as configured 5. FB links and device diagnostics are configured  Control  HMI AB_001; Expd_Tag=TIC_334   Asset Management  Maintenance Association Block AB_002; Expd_Tag=TIC_335  (AB) … AB_003; Expd_Tag=TIC_336 AB_nnn; Expd_Tag=TIC_nnn  2048  TBAI TB Tag = “TIC_336”    TBAI  Data + Status TB Tag = “TIC_336”   FBMAI  Device Diagnostics  TBAI FB Tag = “Tank_1” TB Tag = “TIC_334”  7 © 1994 – 2011 Fieldbus Foundation
  • 8. Device Diagnostics Function Failure Check Out of Maintenance Specification Required Wired or Wireless HSE FOUNDATION for ROM Device  Utilizes advanced diagnostic capabilities of intelligent devices  4 standard “status signals” categories are available  Mapping of diagnostics in status signals configurable by user I/O  Enables condition-based maintenance – automatic work orders H1 HART  Optimizes maintenance functions  Detailed information available on demand Wireless 8 © 1994 – 2011 Fieldbus Foundation
  • 9. Device Diagnostics Example H1 + HSE Device Memory Device Internal Calibration Has Plugged Error Temperature High Drifted Impulse line 9 © 1994 – 2011 Fieldbus Foundation
  • 10. FOUNDATION for ROM – HSE RIO Timeline 2007 Specification Team Kickoff Meeting Jan 2008 Draft Preliminary Specifications Oct 2009 Validation Team Kickoff Meeting Feb Laboratory Validation Testing - Conventional I/O Aug, Dec 2010  Laboratory Validation Testing - Conventional I/O Mar  Laboratory Validation Testing - Wired HART ` Jun, Sep  Preliminary Specifications – Conventional I/O Dec 2011  Final Specifications – Conventional I/O Apr  Association Block  64 Channel Discrete Input/Output  16 Channel Analog Input/Output 10 © 1994 – 2011 Fieldbus Foundation
  • 11. FOUNDATION for ROM – WirelessHART Integration Association Block (AB) Data + Status 2048 FB Device Diagnostics TBHART TB Tag = “HART_5” TBLL TB Tag = “HART_LIVE_LIST_GW_1” GW_1 Gateway Expected Network Network Address 9 Tag Address Status GW_1 HART_5 5 Good Network Address 5 Network Address 10 GW_1 HART_7 7 Bad Mesh GW_1 HART_9 9 Good Status Network Address 11 Network Address 7 GW_1 HART_10 10 Good GW_1 HART_11 11 Bad WirelessHART Mesh 11 © 1994 – 2011 Fieldbus Foundation
  • 12. FOUNDATION for ROM - WirelessHART® Integration 2010 Lab Validation Testing – WirelessHART Parameter Mapping Nov 2011  Lab Validation Testing – WirelessHART Parameter Mapping Mar  Lab Validation Testing – WirelessHART Live List Jun  Preliminary Specification - HART and WirelessHART Aug 2012  Final Specification – HART and WirelessHART Jan 12 © 1994 – 2011 Fieldbus Foundation
  • 13. FOUNDATION for ROM – Wireless Backhaul Model CCD - Set of devices BHI - Provides isolation and security of communications flows BSP - Provides connectivity between CCD’s IF1 - Physical interface to the backhaul technology IF2 - Protected data flowing across the backhaul - authentication, authorization, encryption IF3 - Physical interface to CCD IF4 - Transparent end-to-end communication between CCDs IF5 - Management - Configuration of IF1-IF3 and BHI functions 13 © 1994 – 2011 Fieldbus Foundation
  • 14. FOUNDATION for ROM – Wireless Backhaul Security Overlay Secure Endpoint Endpoint Overlay Tunnel Secure Tunnel 14 © 1994 – 2011 Fieldbus Foundation
  • 15. FOUNDATION for ROM – Wireless Backhaul Security Overlay Secure Endpoint Endpoint Overlay Tunnel PV PV IF2 #8%%0@!!(%0 15 © 1994 – 2011 Fieldbus Foundation
  • 16. FOUNDATION for ROM - Wireless Backhaul 2009 Backhaul Uses Cases and Requirements Completed Jan Backhaul Request for Information (RFI) Development Feb - Oct Review of RFI Responses by ISA100.15 Dec 2010 RFI Gap Analysis Competed Feb Backhaul Security Modeling using ISA99 Methods Apr First Wireless HSE Backhaul to Conventional I/O Operational Aug First Wireless HSE Backhaul to WirelessHART Operational Nov 2011  Backhaul Architecture Model review by ISA100.15 – Interfaces, Security Mar  Backhaul Architecture Model review by ISA100.15 – Flow Control May  Backhaul Architecture Model approved by ISA100.15 (Unanimous) Oct 2012  Wireless HSE Backhaul Profiles 16 © 1994 – 2011 Fieldbus Foundation
  • 17. FOUNDATION for ROM - Wireless Backhaul Profiles Applications Design Demonstration Release Requirements Validation Backhaul Technologies System (DEMO WG) HSE Wireless Engineering Profiles for HSE Profiles for HSE Remote Operations Backhaul Design Guideline Operation on Operation on Management End-User Specification Wireless Backhaul Wireless Backhaul Applications Backhaul Architecture Model 17 17 © 1994 – 2011 Fieldbus Foundation
  • 18. FOUNDATION for ROM – ISA100.11a Integration Association Block (AB) Data + Status 2048 FB Device Diagnostics TBISA TB Tag = “ISA_5” TBLL TB Tag = “ISA_LIVE_LIST_GW_1” GW_1 Gateway Expected Network Network Address 9 Tag Address Status GW_1 ISA_5 5 Good Network Address 5 Network Address 10 GW_1 ISA_7 7 Good Mesh GW_1 ISA_9 9 Good Status Network Address 11 Network Address 7 GW_1 ISA_10 10 Bad GW_1 ISA_11 11 Good ISA100.11a Mesh 18 © 1994 – 2011 Fieldbus Foundation
  • 19. FOUNDATION for ROM - ISA100.11a Integration 2010 Specification Team Kickoff Meeting Oct Initial ISA100.11a Integration Architecture Dec 2011  ISA100.11a Integration Architecture Completed Mar  ISA100.11a Integration Design Jun  ISA100.11 Draft Preliminary Specification – Revision 1 Aug  ISA100.11 Draft Preliminary Specification – Revision 2 Sep  First Wireless HSE Backhaul to ISA100.11a Operational Sep  ISA100.11 Draft Preliminary Specification – Revision 3 Nov 2012  Lab Validation Testing - ISA100.11a 1Q  Preliminary Specification – ISA100.11a 3Q  Final Specification – ISA100.11a 4Q 19 © 1994 – 2011 Fieldbus Foundation