TN Basic ED Course 2013
Real Estate Development & Reuse
SITES and BUILDINGS
• The Internet and technology play a significant role –
you are being looked at without your knowledge
• Most projects start out looking for an existing building
• Shovel-ready sites give a competitive advantage
The prospect is looking for a location
with the fewest
?????
Site Selection Process
RISKS!
Site Selection Process
Sample Consulting is working on behalf of a confidential client that seeks to
identify a community and site for a North American manufacturing operation.
The search area for this confidential project includes a multi-state area. The
states, counties and local/regional jurisdictions that receive this Request for
Information (RFI) have been qualified for the project through pre-screening.
Estimated Project Investment:
Our client is anticipating hiring 300 to 500 employees and investing $200 million
in capital, not including investments in the site and site development.
ALL SUBMISSIONS SHOULD BE SENT DIRECTLY TO SAMPLE CONSULTING. SUBMIT THE
TOP THREE (3) SITES PER COUNTY ONLY. IF MORE THAN THREE SITES PER COUNTY
ARE SUBMITTED, ONLY THE FIRST THREE RECEIVED WILL BE REVIEWED. IT IS
ACCEPTABLE FOR ONE OR ALL OF YOUR THREE SITES SUBMITTED TO BE PROXIMIALLY
ADJACENT TO ONE OF THE COUNTIES APPROVED THROUGH THE PRESCREENING
PROCESS AND LISTED IN THE SET OF ELIGIBLE COUNITES (SENT TO YOU UNDER
SEPARATE COVER).
Project Sample
Key Project Drivers:
• A labor force with the education and experience to support this operation
• Access to reliable, high quality utilities and infrastructure
• Proximity to a major interstate highway (within 10 miles)
• Convenient access to a modern transportation network
• A business and regulatory environment that will support the timely
development of this project
• Compatible setting, zoning (suited for manufacturing), and surroundings
• Access to an airport with small parcel and cargo services strongly
preferred
• Competitive overall operating, real estate, and utility costs (electric)
• Competitive incentives and access to relevant training programs
• Access to government agencies experienced with the attraction,
development, permitting, and operations of distribution facilities
The RFI (Request for Information)
Please provide the following information on each of the available site(s) you are proposing:
• Location, including address, community name, population, and distance to Interstate and
appropriate airport (please provide airport name);
• Map identifying site boundary and local and regional location;
• Site size (acreage, etc.);
• Date available;
• Present use and user;
• Past use(s) and user(s);
• Surrounding uses;
• Zoning (provide applicable ordinances, and verify suitability)
• Photographs;
• Map showing utility and road infrastructure servicing the site;
• Depiction/description of known or potential easements;
• Names of utility-service providers;
• Site ownership, and demonstrable intent/willingness to sell;
• Land asking price, indicating/reflecting market rate commissions;
• Property tax rates, including millage rate and assessment ratio.
The RFI (Request for Information)
Site Requirements:
Suitable Available Site and Site Specifications
The primary requirement for an existing site to be suitable for Project Sample is the site’s
potential for manufacturing. We are interested in evaluating only those sites that meet this
criterion and are otherwise generally consistent with the specifications below.
• Site Size:Minimum of 62 acres, and up to 76 acres (of useable acreage)
• Dimensions:Rectangular/square site preferred, with a maximum length to width ratio of 1.5 to 1
• Special Site Characteristics:Standard soil load bearing characteristics, no wetlands, flat terrain
with no hills, ravines or quarries. The site must have no known environmental concerns. Dual
carriage way access is preferred, wastewater treatment is necessary, and the adjoining uses
must be odor free
• Building Size:400,000 sqft, expandable to 600,000 sqft. 75% for production, 15% for offices,
5% for warehousing, and 5% for pilot plant / R&D
• Ceiling height:Minimum 55’ to 60’ preferred
• Car parking: 200 spaces, tentatively
• Fire protection: ESFR sprinkler system
• Electric:2.23 million kWh/month usage, 24 hour operation. Electricity
primarily used for chillers, HVAC, compressors, and process equipment. The
load cannot be interruptible and a dual feed may be required
• Water supply:Municipal water supply with dual 14” lines required. 400 million
gallons per year usage for boilers, process water, and as an ingredient.
Water pressure must be constant. The company is willing to consider use of
a septic tank or other private disposal system
• Wastewater:275 million gallons annually, will contain some clean in place
detergents
• Natural gas:3.06 million therms annually, primarily used for boilers and
HVAC. Service must be constant, natural gas with propane backup
• Telecom:Fiber optic access; T-1 connectivity
• Zoning:Compatible with manufacturing and distribution
Site Requirements:
Suitable Available Site and Site Specifications
• ECD launched the Tennessee Premier Sites program in Spring 2012 to certify
high-quality sites across the state through a respected national site selection
firm
• ECD will aggressively market Premier Sites to site selection consultants and
companies, helping create a level playing field for all high-quality sites across
the state
• Austin Group was selected for the project.
Tennessee Premier Sites
What can be a deal breaker?
Deal Breakers
1. Infrastructure Costs
2. Not having a site action plan
3. Lack of answers and data and info
4. Uncontrolled site – who owns it?
5. Lack of community leadership
6. Poorly maintained site
7. Unknowns?
Deal Breakers
Toyota, MS
Hyundai, AL
VW, TN
Questions?
Questions?
Thank You!

Weitere ähnliche Inhalte

Andere mochten auch

Andere mochten auch (6)

Investment Tools-Jamie Stitt-TN Economic Development Finance Course
Investment Tools-Jamie Stitt-TN Economic Development Finance CourseInvestment Tools-Jamie Stitt-TN Economic Development Finance Course
Investment Tools-Jamie Stitt-TN Economic Development Finance Course
 
Business Retention and Expansion, TN Basic Economic Development Course 2013
Business Retention and Expansion, TN Basic Economic Development Course 2013Business Retention and Expansion, TN Basic Economic Development Course 2013
Business Retention and Expansion, TN Basic Economic Development Course 2013
 
Managing for Excellence-Outcome-Based Performance for the Economic Developmen...
Managing for Excellence-Outcome-Based Performance for the Economic Developmen...Managing for Excellence-Outcome-Based Performance for the Economic Developmen...
Managing for Excellence-Outcome-Based Performance for the Economic Developmen...
 
Economic Development Finance, TN Basic Economic Development Course 2013
Economic Development Finance, TN Basic Economic Development Course 2013Economic Development Finance, TN Basic Economic Development Course 2013
Economic Development Finance, TN Basic Economic Development Course 2013
 
BID CE WORKSHOP 1 - Session 01 - Introduction
BID CE WORKSHOP 1 -  Session 01 - IntroductionBID CE WORKSHOP 1 -  Session 01 - Introduction
BID CE WORKSHOP 1 - Session 01 - Introduction
 
Cdg 35 actualites statutaires
Cdg 35 actualites statutairesCdg 35 actualites statutaires
Cdg 35 actualites statutaires
 

Ähnlich wie Real Estate Development and Reuse (part 2), TN Basic Economic Development Course 2013

Ähnlich wie Real Estate Development and Reuse (part 2), TN Basic Economic Development Course 2013 (20)

Gemmen- Industrial Site Certification & Site Readiness
Gemmen- Industrial Site Certification & Site ReadinessGemmen- Industrial Site Certification & Site Readiness
Gemmen- Industrial Site Certification & Site Readiness
 
Wireless Infrastructure Solutions
Wireless Infrastructure SolutionsWireless Infrastructure Solutions
Wireless Infrastructure Solutions
 
150615 Wainfleet SPC Guidelines
150615 Wainfleet SPC Guidelines150615 Wainfleet SPC Guidelines
150615 Wainfleet SPC Guidelines
 
2_plant_location.ppt
2_plant_location.ppt2_plant_location.ppt
2_plant_location.ppt
 
Storage methods and location systems
Storage methods and location systemsStorage methods and location systems
Storage methods and location systems
 
JAGDISH Updated
JAGDISH UpdatedJAGDISH Updated
JAGDISH Updated
 
Architectural Professional Practice - Site الممارسة المهنية المعمارية - الموقع
Architectural Professional Practice - Site الممارسة المهنية المعمارية - الموقعArchitectural Professional Practice - Site الممارسة المهنية المعمارية - الموقع
Architectural Professional Practice - Site الممارسة المهنية المعمارية - الموقع
 
Plugging In Oregon: Community Charging Rebates Program by JR Anderson
Plugging In Oregon: Community Charging Rebates Program by JR AndersonPlugging In Oregon: Community Charging Rebates Program by JR Anderson
Plugging In Oregon: Community Charging Rebates Program by JR Anderson
 
Plantlocationandlayoutplanning
PlantlocationandlayoutplanningPlantlocationandlayoutplanning
Plantlocationandlayoutplanning
 
DEVNET-1145 How APIs are Driving City Digitization
DEVNET-1145	How APIs are Driving City DigitizationDEVNET-1145	How APIs are Driving City Digitization
DEVNET-1145 How APIs are Driving City Digitization
 
Building GovCon Indirect Rates
Building GovCon Indirect RatesBuilding GovCon Indirect Rates
Building GovCon Indirect Rates
 
Encoursa Webinar - Building GovCon Indirect Rates
Encoursa Webinar - Building GovCon Indirect RatesEncoursa Webinar - Building GovCon Indirect Rates
Encoursa Webinar - Building GovCon Indirect Rates
 
RV 2014: Space Exploration: Innovative Parking Tools + Strategies
RV 2014: Space Exploration: Innovative Parking Tools + StrategiesRV 2014: Space Exploration: Innovative Parking Tools + Strategies
RV 2014: Space Exploration: Innovative Parking Tools + Strategies
 
Redevelopment
RedevelopmentRedevelopment
Redevelopment
 
Infrastructure Levy rate setting workshop.pptx
Infrastructure Levy rate setting workshop.pptxInfrastructure Levy rate setting workshop.pptx
Infrastructure Levy rate setting workshop.pptx
 
Infrastructure Levy Technical Consultation (Workshop 1 Setting rates and char...
Infrastructure Levy Technical Consultation (Workshop 1 Setting rates and char...Infrastructure Levy Technical Consultation (Workshop 1 Setting rates and char...
Infrastructure Levy Technical Consultation (Workshop 1 Setting rates and char...
 
Electrifying City Fleets by Randal Kaufman
Electrifying City Fleets by Randal KaufmanElectrifying City Fleets by Randal Kaufman
Electrifying City Fleets by Randal Kaufman
 
What's Next for Uber
What's Next for Uber What's Next for Uber
What's Next for Uber
 
Broadband Grant Workshop - PSC (Oneida County)
Broadband Grant Workshop - PSC (Oneida County)Broadband Grant Workshop - PSC (Oneida County)
Broadband Grant Workshop - PSC (Oneida County)
 
PSC Broadband Grant Workshop September 2014
PSC Broadband Grant Workshop September 2014PSC Broadband Grant Workshop September 2014
PSC Broadband Grant Workshop September 2014
 

Mehr von University of Tennessee-Center for Industrial Services-Economic Development

Mehr von University of Tennessee-Center for Industrial Services-Economic Development (18)

Investment Tools-Ira Weinstein-TN Economic Development Finance Course
Investment Tools-Ira Weinstein-TN Economic Development Finance CourseInvestment Tools-Ira Weinstein-TN Economic Development Finance Course
Investment Tools-Ira Weinstein-TN Economic Development Finance Course
 
Bonds and Basics-Lauren Lowe-TN Economic Development Finance Course
Bonds and Basics-Lauren Lowe-TN Economic Development Finance CourseBonds and Basics-Lauren Lowe-TN Economic Development Finance Course
Bonds and Basics-Lauren Lowe-TN Economic Development Finance Course
 
Access to Capital-TN Economic Development Finance Course
Access to Capital-TN Economic Development Finance CourseAccess to Capital-TN Economic Development Finance Course
Access to Capital-TN Economic Development Finance Course
 
Investment Tools-TN Economic Development Finance Course
Investment Tools-TN Economic Development Finance CourseInvestment Tools-TN Economic Development Finance Course
Investment Tools-TN Economic Development Finance Course
 
Targeted Tools-TN Economic Development Finance Course
Targeted Tools-TN Economic Development Finance CourseTargeted Tools-TN Economic Development Finance Course
Targeted Tools-TN Economic Development Finance Course
 
Support Tools-TN Economic Development Finance Course
Support Tools-TN Economic Development Finance CourseSupport Tools-TN Economic Development Finance Course
Support Tools-TN Economic Development Finance Course
 
Understanding Economic Development Finance-TN Economic Development Finance Co...
Understanding Economic Development Finance-TN Economic Development Finance Co...Understanding Economic Development Finance-TN Economic Development Finance Co...
Understanding Economic Development Finance-TN Economic Development Finance Co...
 
TN Business Retention & Expansion Course 2013 Case Study Documents
TN Business Retention & Expansion Course 2013 Case Study DocumentsTN Business Retention & Expansion Course 2013 Case Study Documents
TN Business Retention & Expansion Course 2013 Case Study Documents
 
TN Business Retention & Expansion Course 2013 - Experts Panel - Jamie Stitt P...
TN Business Retention & Expansion Course 2013 - Experts Panel - Jamie Stitt P...TN Business Retention & Expansion Course 2013 - Experts Panel - Jamie Stitt P...
TN Business Retention & Expansion Course 2013 - Experts Panel - Jamie Stitt P...
 
TN Business Retention & Expansion Course 2013 - Experts Panel - Judith Hill P...
TN Business Retention & Expansion Course 2013 - Experts Panel - Judith Hill P...TN Business Retention & Expansion Course 2013 - Experts Panel - Judith Hill P...
TN Business Retention & Expansion Course 2013 - Experts Panel - Judith Hill P...
 
TN Business Retention & Expansion Course 2013 - Experts Panel - Jennifer Haga...
TN Business Retention & Expansion Course 2013 - Experts Panel - Jennifer Haga...TN Business Retention & Expansion Course 2013 - Experts Panel - Jennifer Haga...
TN Business Retention & Expansion Course 2013 - Experts Panel - Jennifer Haga...
 
TN Business Retention & Expansion Course 2013 Day 1 Presentation
TN Business Retention & Expansion Course 2013 Day 1 PresentationTN Business Retention & Expansion Course 2013 Day 1 Presentation
TN Business Retention & Expansion Course 2013 Day 1 Presentation
 
Entrepreneurship and Small Business Development, 2103 Tennessee Basic Economi...
Entrepreneurship and Small Business Development, 2103 Tennessee Basic Economi...Entrepreneurship and Small Business Development, 2103 Tennessee Basic Economi...
Entrepreneurship and Small Business Development, 2103 Tennessee Basic Economi...
 
Real Estate Development and Reuse (part 1), TN Basic Economic Development Cou...
Real Estate Development and Reuse (part 1), TN Basic Economic Development Cou...Real Estate Development and Reuse (part 1), TN Basic Economic Development Cou...
Real Estate Development and Reuse (part 1), TN Basic Economic Development Cou...
 
Community Research and Analysis, TN Basic Economic Development Course 2013
Community Research and Analysis, TN Basic Economic Development Course 2013Community Research and Analysis, TN Basic Economic Development Course 2013
Community Research and Analysis, TN Basic Economic Development Course 2013
 
Strategic Planning, TN Basic Economic Development Course 2013
Strategic Planning, TN Basic Economic Development Course 2013Strategic Planning, TN Basic Economic Development Course 2013
Strategic Planning, TN Basic Economic Development Course 2013
 
Education and Workforce Development, TN Basic Economic Development Course 2013
Education and Workforce Development, TN Basic Economic Development Course 2013Education and Workforce Development, TN Basic Economic Development Course 2013
Education and Workforce Development, TN Basic Economic Development Course 2013
 
Trends in Economic Development, TN Basic Economic Development Course 2013
Trends in Economic Development, TN Basic Economic Development Course 2013Trends in Economic Development, TN Basic Economic Development Course 2013
Trends in Economic Development, TN Basic Economic Development Course 2013
 

Kürzlich hochgeladen

The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
KarakKing
 

Kürzlich hochgeladen (20)

How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
Philosophy of china and it's charactistics
Philosophy of china and it's charactisticsPhilosophy of china and it's charactistics
Philosophy of china and it's charactistics
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptx
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Tatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf artsTatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf arts
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 

Real Estate Development and Reuse (part 2), TN Basic Economic Development Course 2013

  • 1. TN Basic ED Course 2013 Real Estate Development & Reuse SITES and BUILDINGS
  • 2. • The Internet and technology play a significant role – you are being looked at without your knowledge • Most projects start out looking for an existing building • Shovel-ready sites give a competitive advantage The prospect is looking for a location with the fewest ????? Site Selection Process
  • 4. Sample Consulting is working on behalf of a confidential client that seeks to identify a community and site for a North American manufacturing operation. The search area for this confidential project includes a multi-state area. The states, counties and local/regional jurisdictions that receive this Request for Information (RFI) have been qualified for the project through pre-screening. Estimated Project Investment: Our client is anticipating hiring 300 to 500 employees and investing $200 million in capital, not including investments in the site and site development. ALL SUBMISSIONS SHOULD BE SENT DIRECTLY TO SAMPLE CONSULTING. SUBMIT THE TOP THREE (3) SITES PER COUNTY ONLY. IF MORE THAN THREE SITES PER COUNTY ARE SUBMITTED, ONLY THE FIRST THREE RECEIVED WILL BE REVIEWED. IT IS ACCEPTABLE FOR ONE OR ALL OF YOUR THREE SITES SUBMITTED TO BE PROXIMIALLY ADJACENT TO ONE OF THE COUNTIES APPROVED THROUGH THE PRESCREENING PROCESS AND LISTED IN THE SET OF ELIGIBLE COUNITES (SENT TO YOU UNDER SEPARATE COVER). Project Sample
  • 5. Key Project Drivers: • A labor force with the education and experience to support this operation • Access to reliable, high quality utilities and infrastructure • Proximity to a major interstate highway (within 10 miles) • Convenient access to a modern transportation network • A business and regulatory environment that will support the timely development of this project • Compatible setting, zoning (suited for manufacturing), and surroundings • Access to an airport with small parcel and cargo services strongly preferred • Competitive overall operating, real estate, and utility costs (electric) • Competitive incentives and access to relevant training programs • Access to government agencies experienced with the attraction, development, permitting, and operations of distribution facilities The RFI (Request for Information)
  • 6. Please provide the following information on each of the available site(s) you are proposing: • Location, including address, community name, population, and distance to Interstate and appropriate airport (please provide airport name); • Map identifying site boundary and local and regional location; • Site size (acreage, etc.); • Date available; • Present use and user; • Past use(s) and user(s); • Surrounding uses; • Zoning (provide applicable ordinances, and verify suitability) • Photographs; • Map showing utility and road infrastructure servicing the site; • Depiction/description of known or potential easements; • Names of utility-service providers; • Site ownership, and demonstrable intent/willingness to sell; • Land asking price, indicating/reflecting market rate commissions; • Property tax rates, including millage rate and assessment ratio. The RFI (Request for Information)
  • 7. Site Requirements: Suitable Available Site and Site Specifications The primary requirement for an existing site to be suitable for Project Sample is the site’s potential for manufacturing. We are interested in evaluating only those sites that meet this criterion and are otherwise generally consistent with the specifications below. • Site Size:Minimum of 62 acres, and up to 76 acres (of useable acreage) • Dimensions:Rectangular/square site preferred, with a maximum length to width ratio of 1.5 to 1 • Special Site Characteristics:Standard soil load bearing characteristics, no wetlands, flat terrain with no hills, ravines or quarries. The site must have no known environmental concerns. Dual carriage way access is preferred, wastewater treatment is necessary, and the adjoining uses must be odor free • Building Size:400,000 sqft, expandable to 600,000 sqft. 75% for production, 15% for offices, 5% for warehousing, and 5% for pilot plant / R&D • Ceiling height:Minimum 55’ to 60’ preferred • Car parking: 200 spaces, tentatively • Fire protection: ESFR sprinkler system
  • 8. • Electric:2.23 million kWh/month usage, 24 hour operation. Electricity primarily used for chillers, HVAC, compressors, and process equipment. The load cannot be interruptible and a dual feed may be required • Water supply:Municipal water supply with dual 14” lines required. 400 million gallons per year usage for boilers, process water, and as an ingredient. Water pressure must be constant. The company is willing to consider use of a septic tank or other private disposal system • Wastewater:275 million gallons annually, will contain some clean in place detergents • Natural gas:3.06 million therms annually, primarily used for boilers and HVAC. Service must be constant, natural gas with propane backup • Telecom:Fiber optic access; T-1 connectivity • Zoning:Compatible with manufacturing and distribution Site Requirements: Suitable Available Site and Site Specifications
  • 9. • ECD launched the Tennessee Premier Sites program in Spring 2012 to certify high-quality sites across the state through a respected national site selection firm • ECD will aggressively market Premier Sites to site selection consultants and companies, helping create a level playing field for all high-quality sites across the state • Austin Group was selected for the project. Tennessee Premier Sites
  • 10. What can be a deal breaker? Deal Breakers
  • 11. 1. Infrastructure Costs 2. Not having a site action plan 3. Lack of answers and data and info 4. Uncontrolled site – who owns it? 5. Lack of community leadership 6. Poorly maintained site 7. Unknowns? Deal Breakers

Hinweis der Redaktion

  1. Proof only
  2. Proof only