SlideShare a Scribd company logo
1 of 27
Challenging Design: Foundations for Tall Buildings Helen Chow & Frances Badelow
Presentation Outline ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Introduction ,[object Object],[object Object],[object Object],Data from Council on Tall Buildings and Urban Habitat
Design Team Project Principal Project Manager Design Engineer
Foundation Systems – Piled Raft ,[object Object],[object Object],[object Object]
Design Issues ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Design Process ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Foundation Design ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Limit State Design Criteria: Serviceability Limit State (SLS) (Unfactored Load) :  max  all  max       all   Displacement  Angular Distortion
Foundation Performance ,[object Object],[object Object],[object Object],[object Object]
Foundation Performance ,[object Object],[object Object],[object Object],[object Object]
Incheon 151 Tower, Korea ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Incheon 151 Tower ,[object Object],[object Object],[object Object]
Incheon 151 Tower ,[object Object],~ 30m ~ 20m
Incheon 151 Tower ,[object Object],[object Object],Ground Conditions
Incheon 151 Tower Foundation Design
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Incheon 151 Tower 88m 77.5m
Incheon 151 Tower ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
PLAXIS 3D - Vertical Loading 200m 200m 100m Incheon 151 Tower
Incheon 151 Tower PLAXIS 3D GARP – Overall Settlement = 0.067m Differential Settlement = 1/2600 Angular Distortion = 0.07°  Settlement of Foundation 600m Foundation
Incheon Tower ,[object Object],[object Object]
Nakheel Tall Tower, Dubai Nakheel Incheon Burj Dubai
Nakheel Tall Tower ,[object Object],[object Object],[object Object],Sand 20m <2.5m Gypsum >75m Cemented Carbonate Siltstone
Nakheel Tall Tower ,[object Object],[object Object],[object Object],[object Object]
Nakheel Tall Tower ,[object Object],[object Object],[object Object],[object Object],[object Object]
Nakheel Tall Tower ,[object Object],[object Object],[object Object],[object Object],[object Object],1000m
Conclusion ,[object Object],[object Object],[object Object]
Thank You

More Related Content

What's hot

TAIPEI 101, CASE STUDY
TAIPEI 101, CASE STUDY TAIPEI 101, CASE STUDY
TAIPEI 101, CASE STUDY Rifquthsb1
 
Structural systems in high rise buildings
Structural systems in high rise buildingsStructural systems in high rise buildings
Structural systems in high rise buildingsKarthik Suresh
 
High-rise structural systems
High-rise structural systemsHigh-rise structural systems
High-rise structural systemsAkshay Revekar
 
high rise building construction
high rise building constructionhigh rise building construction
high rise building constructionAditya Sanyal
 
High rise building study & report
High rise building study & reportHigh rise building study & report
High rise building study & reportMithu hossain
 
High rise buildings
High rise buildingsHigh rise buildings
High rise buildingsAnas Adel
 
Structural systems in high rise building and analysis methods
Structural systems in high rise building and analysis methodsStructural systems in high rise building and analysis methods
Structural systems in high rise building and analysis methodsDP NITHIN
 
Prefabrication types and Applications explained
Prefabrication types and Applications explainedPrefabrication types and Applications explained
Prefabrication types and Applications explainedEyad Reda
 
Long span structure
Long span structureLong span structure
Long span structureSakshiGadakh
 
HIGH RISE BUILDING REPORT.pdf
HIGH RISE BUILDING REPORT.pdfHIGH RISE BUILDING REPORT.pdf
HIGH RISE BUILDING REPORT.pdfMohammad Salman
 
Prefabrication​ structure ppt
Prefabrication​ structure pptPrefabrication​ structure ppt
Prefabrication​ structure pptAbhishekM45
 
Construction of Burj Al Arab, Dubai
Construction of Burj Al Arab, DubaiConstruction of Burj Al Arab, Dubai
Construction of Burj Al Arab, DubaiAr. Md Shahroz Alam
 
A building with a difference 'Taipei 101'
A building with a difference 'Taipei 101'A building with a difference 'Taipei 101'
A building with a difference 'Taipei 101'Abheek Khajuria
 

What's hot (20)

TAIPEI 101, CASE STUDY
TAIPEI 101, CASE STUDY TAIPEI 101, CASE STUDY
TAIPEI 101, CASE STUDY
 
Structural systems in high rise buildings
Structural systems in high rise buildingsStructural systems in high rise buildings
Structural systems in high rise buildings
 
High-rise structural systems
High-rise structural systemsHigh-rise structural systems
High-rise structural systems
 
Prefabricated structures
Prefabricated structuresPrefabricated structures
Prefabricated structures
 
High rise buildings
High rise buildingsHigh rise buildings
High rise buildings
 
high rise building construction
high rise building constructionhigh rise building construction
high rise building construction
 
High rise building study & report
High rise building study & reportHigh rise building study & report
High rise building study & report
 
High rise buildings
High rise buildingsHigh rise buildings
High rise buildings
 
Structural systems in high rise building and analysis methods
Structural systems in high rise building and analysis methodsStructural systems in high rise building and analysis methods
Structural systems in high rise building and analysis methods
 
Precast-concrete Details
Precast-concrete DetailsPrecast-concrete Details
Precast-concrete Details
 
Taipei 101
Taipei 101Taipei 101
Taipei 101
 
Prefabrication types and Applications explained
Prefabrication types and Applications explainedPrefabrication types and Applications explained
Prefabrication types and Applications explained
 
presentation ON TALL BUILDING
 presentation ON TALL BUILDING presentation ON TALL BUILDING
presentation ON TALL BUILDING
 
High rise buildings
High rise buildingsHigh rise buildings
High rise buildings
 
Long span structure
Long span structureLong span structure
Long span structure
 
HIGH RISE BUILDING REPORT.pdf
HIGH RISE BUILDING REPORT.pdfHIGH RISE BUILDING REPORT.pdf
HIGH RISE BUILDING REPORT.pdf
 
Prefabrication​ structure ppt
Prefabrication​ structure pptPrefabrication​ structure ppt
Prefabrication​ structure ppt
 
Construction of Burj Al Arab, Dubai
Construction of Burj Al Arab, DubaiConstruction of Burj Al Arab, Dubai
Construction of Burj Al Arab, Dubai
 
A building with a difference 'Taipei 101'
A building with a difference 'Taipei 101'A building with a difference 'Taipei 101'
A building with a difference 'Taipei 101'
 
LIGHTWEIGHT CONSTRUCTIONS-'MEMBRANES' in Light wight and Membrane structures
 LIGHTWEIGHT CONSTRUCTIONS-'MEMBRANES' in Light wight and Membrane structures LIGHTWEIGHT CONSTRUCTIONS-'MEMBRANES' in Light wight and Membrane structures
LIGHTWEIGHT CONSTRUCTIONS-'MEMBRANES' in Light wight and Membrane structures
 

Similar to ICWES15 - Challenging Design: Foundations for Tall Buildings. Presented by Ms Frances Badelow, AUST & Ms Helen Chow, AUST

CCTV Building, A Structural Design Overview
CCTV Building, A Structural Design OverviewCCTV Building, A Structural Design Overview
CCTV Building, A Structural Design OverviewPeter Bach
 
Modeling procedure and Case study of ‘Gocheok Sky Dome’
Modeling procedure and Case study of  ‘Gocheok Sky Dome’Modeling procedure and Case study of  ‘Gocheok Sky Dome’
Modeling procedure and Case study of ‘Gocheok Sky Dome’chandrashekhar lakavath
 
IRJET- A Study on Seismic Analysis of RC Framed Structures on Varying Slo...
IRJET-  	  A Study on Seismic Analysis of RC Framed Structures on Varying Slo...IRJET-  	  A Study on Seismic Analysis of RC Framed Structures on Varying Slo...
IRJET- A Study on Seismic Analysis of RC Framed Structures on Varying Slo...IRJET Journal
 
P.e.b. mini project report
P.e.b. mini project reportP.e.b. mini project report
P.e.b. mini project reportShubham Parab
 
Keep it Flowing! Culvert Design 20: Design, Durability & Applications
Keep it Flowing! Culvert Design 20: Design, Durability & ApplicationsKeep it Flowing! Culvert Design 20: Design, Durability & Applications
Keep it Flowing! Culvert Design 20: Design, Durability & ApplicationsCommunications Branding
 
IRJET- Numerical Study on Behaviour of Non-Tower Building Attached with Tower
IRJET- Numerical Study on Behaviour of Non-Tower Building Attached with TowerIRJET- Numerical Study on Behaviour of Non-Tower Building Attached with Tower
IRJET- Numerical Study on Behaviour of Non-Tower Building Attached with TowerIRJET Journal
 
Harlem Park Building Design Project
Harlem Park Building Design ProjectHarlem Park Building Design Project
Harlem Park Building Design ProjectEd Guerra, P.E.
 
Dynamic Response of Offshore Articulated Tower-Under Airy and Stokes Theories
Dynamic Response of Offshore Articulated Tower-Under Airy and Stokes TheoriesDynamic Response of Offshore Articulated Tower-Under Airy and Stokes Theories
Dynamic Response of Offshore Articulated Tower-Under Airy and Stokes TheoriesIRJET Journal
 
Calculation note 29 11-2014
Calculation note 29 11-2014Calculation note 29 11-2014
Calculation note 29 11-2014Khaled Eid
 
02_Practical_Design_Balanced_Cantilever_Bridges_Piyush_R1.pdf
02_Practical_Design_Balanced_Cantilever_Bridges_Piyush_R1.pdf02_Practical_Design_Balanced_Cantilever_Bridges_Piyush_R1.pdf
02_Practical_Design_Balanced_Cantilever_Bridges_Piyush_R1.pdfpulakrajpadhai
 
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...Firdaurs Abdullah
 
IMPROVING THE STRUCTURAL EFFICIENCY OF STEEL TRUSSES BY COMPARATIVE STUDY
IMPROVING THE STRUCTURAL EFFICIENCY OF STEEL TRUSSES BY COMPARATIVE STUDYIMPROVING THE STRUCTURAL EFFICIENCY OF STEEL TRUSSES BY COMPARATIVE STUDY
IMPROVING THE STRUCTURAL EFFICIENCY OF STEEL TRUSSES BY COMPARATIVE STUDYIRJET Journal
 
Group 2 , ce471
Group 2  ,  ce471Group 2  ,  ce471
Group 2 , ce471ktx500
 

Similar to ICWES15 - Challenging Design: Foundations for Tall Buildings. Presented by Ms Frances Badelow, AUST & Ms Helen Chow, AUST (20)

CCTV Building, A Structural Design Overview
CCTV Building, A Structural Design OverviewCCTV Building, A Structural Design Overview
CCTV Building, A Structural Design Overview
 
Lec.1 introduction
Lec.1   introductionLec.1   introduction
Lec.1 introduction
 
ACE special structures
ACE special structuresACE special structures
ACE special structures
 
Modeling procedure and Case study of ‘Gocheok Sky Dome’
Modeling procedure and Case study of  ‘Gocheok Sky Dome’Modeling procedure and Case study of  ‘Gocheok Sky Dome’
Modeling procedure and Case study of ‘Gocheok Sky Dome’
 
CCTVHeadquarters.pdf
CCTVHeadquarters.pdfCCTVHeadquarters.pdf
CCTVHeadquarters.pdf
 
IRJET- A Study on Seismic Analysis of RC Framed Structures on Varying Slo...
IRJET-  	  A Study on Seismic Analysis of RC Framed Structures on Varying Slo...IRJET-  	  A Study on Seismic Analysis of RC Framed Structures on Varying Slo...
IRJET- A Study on Seismic Analysis of RC Framed Structures on Varying Slo...
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
P.e.b. mini project report
P.e.b. mini project reportP.e.b. mini project report
P.e.b. mini project report
 
Keep it Flowing! Culvert Design 20: Design, Durability & Applications
Keep it Flowing! Culvert Design 20: Design, Durability & ApplicationsKeep it Flowing! Culvert Design 20: Design, Durability & Applications
Keep it Flowing! Culvert Design 20: Design, Durability & Applications
 
Geotechnical Investigation
Geotechnical InvestigationGeotechnical Investigation
Geotechnical Investigation
 
IRJET- Numerical Study on Behaviour of Non-Tower Building Attached with Tower
IRJET- Numerical Study on Behaviour of Non-Tower Building Attached with TowerIRJET- Numerical Study on Behaviour of Non-Tower Building Attached with Tower
IRJET- Numerical Study on Behaviour of Non-Tower Building Attached with Tower
 
Harlem Park Building Design Project
Harlem Park Building Design ProjectHarlem Park Building Design Project
Harlem Park Building Design Project
 
Dynamic Response of Offshore Articulated Tower-Under Airy and Stokes Theories
Dynamic Response of Offshore Articulated Tower-Under Airy and Stokes TheoriesDynamic Response of Offshore Articulated Tower-Under Airy and Stokes Theories
Dynamic Response of Offshore Articulated Tower-Under Airy and Stokes Theories
 
seminar.pptx
seminar.pptxseminar.pptx
seminar.pptx
 
Calculation note 29 11-2014
Calculation note 29 11-2014Calculation note 29 11-2014
Calculation note 29 11-2014
 
swati structure.ipt
swati structure.iptswati structure.ipt
swati structure.ipt
 
02_Practical_Design_Balanced_Cantilever_Bridges_Piyush_R1.pdf
02_Practical_Design_Balanced_Cantilever_Bridges_Piyush_R1.pdf02_Practical_Design_Balanced_Cantilever_Bridges_Piyush_R1.pdf
02_Practical_Design_Balanced_Cantilever_Bridges_Piyush_R1.pdf
 
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
 
IMPROVING THE STRUCTURAL EFFICIENCY OF STEEL TRUSSES BY COMPARATIVE STUDY
IMPROVING THE STRUCTURAL EFFICIENCY OF STEEL TRUSSES BY COMPARATIVE STUDYIMPROVING THE STRUCTURAL EFFICIENCY OF STEEL TRUSSES BY COMPARATIVE STUDY
IMPROVING THE STRUCTURAL EFFICIENCY OF STEEL TRUSSES BY COMPARATIVE STUDY
 
Group 2 , ce471
Group 2  ,  ce471Group 2  ,  ce471
Group 2 , ce471
 

More from Engineers Australia

Where to From Here - Oil and Gas in WA
Where to From Here - Oil and Gas in WAWhere to From Here - Oil and Gas in WA
Where to From Here - Oil and Gas in WAEngineers Australia
 
Jacobs Recent changes to transmission line design standards and the impact on...
Jacobs Recent changes to transmission line design standards and the impact on...Jacobs Recent changes to transmission line design standards and the impact on...
Jacobs Recent changes to transmission line design standards and the impact on...Engineers Australia
 
Cyber supply chain risk management ASDE
Cyber supply chain risk management   ASDECyber supply chain risk management   ASDE
Cyber supply chain risk management ASDEEngineers Australia
 
Timber Connections reduced by Geoff Boughton
Timber Connections reduced by Geoff BoughtonTimber Connections reduced by Geoff Boughton
Timber Connections reduced by Geoff BoughtonEngineers Australia
 
Connecting to the future: how transport will shape the City of Fremantle
Connecting to the future: how transport will shape the City of FremantleConnecting to the future: how transport will shape the City of Fremantle
Connecting to the future: how transport will shape the City of FremantleEngineers Australia
 
Green schemes 2012_npe_eo_y lecture perth v9
Green schemes 2012_npe_eo_y lecture perth v9Green schemes 2012_npe_eo_y lecture perth v9
Green schemes 2012_npe_eo_y lecture perth v9Engineers Australia
 
Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...
Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...
Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...Engineers Australia
 
Pilbara rfa ea presentation v3.2 1
Pilbara rfa ea presentation v3.2 1Pilbara rfa ea presentation v3.2 1
Pilbara rfa ea presentation v3.2 1Engineers Australia
 
Smart grid - Do they fit into real networks ver 1
Smart grid  - Do they fit into real networks ver 1Smart grid  - Do they fit into real networks ver 1
Smart grid - Do they fit into real networks ver 1Engineers Australia
 
Arc flash August 2012 IE Aust JEEP
Arc flash  August 2012   IE Aust JEEPArc flash  August 2012   IE Aust JEEP
Arc flash August 2012 IE Aust JEEPEngineers Australia
 
121108 MD smart grid and renewable energy integration 1
121108 MD smart grid and renewable energy integration 1121108 MD smart grid and renewable energy integration 1
121108 MD smart grid and renewable energy integration 1Engineers Australia
 
Pavement materials and design in western australia by geoffrey cocks
Pavement materials and design in western australia by geoffrey cocksPavement materials and design in western australia by geoffrey cocks
Pavement materials and design in western australia by geoffrey cocksEngineers Australia
 
Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems Engineers Australia
 
The EPCM of writing tenders: How engineers can successfully build compelling ...
The EPCM of writing tenders: How engineers can successfully build compelling ...The EPCM of writing tenders: How engineers can successfully build compelling ...
The EPCM of writing tenders: How engineers can successfully build compelling ...Engineers Australia
 
Bid write presentation engineers australia & spe 7 feb12-1
Bid write presentation   engineers australia & spe 7 feb12-1Bid write presentation   engineers australia & spe 7 feb12-1
Bid write presentation engineers australia & spe 7 feb12-1Engineers Australia
 
EA / ATSE joint seminar Engineering for Extreme Natural Events
EA / ATSE joint seminar Engineering for Extreme Natural EventsEA / ATSE joint seminar Engineering for Extreme Natural Events
EA / ATSE joint seminar Engineering for Extreme Natural EventsEngineers Australia
 
Freight and public transport planning initiatives conference 24 november 2011
Freight and public transport planning initiatives conference 24 november 2011Freight and public transport planning initiatives conference 24 november 2011
Freight and public transport planning initiatives conference 24 november 2011Engineers Australia
 
How to write a research paper. By Gareth Forbes, Curtin University and Engine...
How to write a research paper. By Gareth Forbes, Curtin University and Engine...How to write a research paper. By Gareth Forbes, Curtin University and Engine...
How to write a research paper. By Gareth Forbes, Curtin University and Engine...Engineers Australia
 
How to write a research paper. By Mark Bush
How to write a research paper. By Mark BushHow to write a research paper. By Mark Bush
How to write a research paper. By Mark BushEngineers Australia
 

More from Engineers Australia (20)

Where to From Here - Oil and Gas in WA
Where to From Here - Oil and Gas in WAWhere to From Here - Oil and Gas in WA
Where to From Here - Oil and Gas in WA
 
Jacobs Recent changes to transmission line design standards and the impact on...
Jacobs Recent changes to transmission line design standards and the impact on...Jacobs Recent changes to transmission line design standards and the impact on...
Jacobs Recent changes to transmission line design standards and the impact on...
 
Cyber supply chain risk management ASDE
Cyber supply chain risk management   ASDECyber supply chain risk management   ASDE
Cyber supply chain risk management ASDE
 
Timber Connections reduced by Geoff Boughton
Timber Connections reduced by Geoff BoughtonTimber Connections reduced by Geoff Boughton
Timber Connections reduced by Geoff Boughton
 
Connecting to the future: how transport will shape the City of Fremantle
Connecting to the future: how transport will shape the City of FremantleConnecting to the future: how transport will shape the City of Fremantle
Connecting to the future: how transport will shape the City of Fremantle
 
Green schemes 2012_npe_eo_y lecture perth v9
Green schemes 2012_npe_eo_y lecture perth v9Green schemes 2012_npe_eo_y lecture perth v9
Green schemes 2012_npe_eo_y lecture perth v9
 
Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...
Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...
Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...
 
Pilbara rfa ea presentation v3.2 1
Pilbara rfa ea presentation v3.2 1Pilbara rfa ea presentation v3.2 1
Pilbara rfa ea presentation v3.2 1
 
Smart grid - Do they fit into real networks ver 1
Smart grid  - Do they fit into real networks ver 1Smart grid  - Do they fit into real networks ver 1
Smart grid - Do they fit into real networks ver 1
 
Arc flash August 2012 IE Aust JEEP
Arc flash  August 2012   IE Aust JEEPArc flash  August 2012   IE Aust JEEP
Arc flash August 2012 IE Aust JEEP
 
121108 MD smart grid and renewable energy integration 1
121108 MD smart grid and renewable energy integration 1121108 MD smart grid and renewable energy integration 1
121108 MD smart grid and renewable energy integration 1
 
Pavement materials and design in western australia by geoffrey cocks
Pavement materials and design in western australia by geoffrey cocksPavement materials and design in western australia by geoffrey cocks
Pavement materials and design in western australia by geoffrey cocks
 
Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems
 
The EPCM of writing tenders: How engineers can successfully build compelling ...
The EPCM of writing tenders: How engineers can successfully build compelling ...The EPCM of writing tenders: How engineers can successfully build compelling ...
The EPCM of writing tenders: How engineers can successfully build compelling ...
 
Bid write presentation engineers australia & spe 7 feb12-1
Bid write presentation   engineers australia & spe 7 feb12-1Bid write presentation   engineers australia & spe 7 feb12-1
Bid write presentation engineers australia & spe 7 feb12-1
 
111125 IChemE Palmer
111125 IChemE Palmer111125 IChemE Palmer
111125 IChemE Palmer
 
EA / ATSE joint seminar Engineering for Extreme Natural Events
EA / ATSE joint seminar Engineering for Extreme Natural EventsEA / ATSE joint seminar Engineering for Extreme Natural Events
EA / ATSE joint seminar Engineering for Extreme Natural Events
 
Freight and public transport planning initiatives conference 24 november 2011
Freight and public transport planning initiatives conference 24 november 2011Freight and public transport planning initiatives conference 24 november 2011
Freight and public transport planning initiatives conference 24 november 2011
 
How to write a research paper. By Gareth Forbes, Curtin University and Engine...
How to write a research paper. By Gareth Forbes, Curtin University and Engine...How to write a research paper. By Gareth Forbes, Curtin University and Engine...
How to write a research paper. By Gareth Forbes, Curtin University and Engine...
 
How to write a research paper. By Mark Bush
How to write a research paper. By Mark BushHow to write a research paper. By Mark Bush
How to write a research paper. By Mark Bush
 

Recently uploaded

Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilV3cube
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsRoshan Dwivedi
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 

Recently uploaded (20)

Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of Brazil
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 

ICWES15 - Challenging Design: Foundations for Tall Buildings. Presented by Ms Frances Badelow, AUST & Ms Helen Chow, AUST

Editor's Notes

  1. First, we will have a brief introduction of foundation system for tall buildings, then we will talk about the key design issues and design processes. After that, we will look at 2 cases – Incheon Tower in South Korea and Nakheel tall tower in Dubai. For the Incheon Tower, Coffey was appointed as the geotechnical designer and for Nakheel tower, we were appointed as geotechnical peer reviewer.
  2. In the past 2 decades, the number of buildings with a height in excess of 200m is increasing. Predictions from council on tall buildings and urban habitat show that by next year, the total number of tall buildings will reach 680 and 83 of them are supertalls which are over 300m high. The design of these supertalls are challenging as the traditional design approach cannot be applied with confidence. It is necessary to come up with some innovative design approach for the design of a cost effective foundation to satisfy the long term performance requirements.
  3. Now, we look at the structure of our tall building design team, at the top, we have a project principal who is responsible for the supervision of the design team, review design process and provide technical advice to the team and clients. The next level is the project manager. The project manager will be responsible for the preparation of proposal and cost estimation of the design services, interact with clients and supervise the design process. Then the next level is the design engineers who will be responsible for the interpretation of test data, development of geotechnical models and undertaking foundation analyses.
  4. Piled rafts are a cost-effective form of foundation for tall buildings as the raft and piles can combine to transfer the applied load from the structure to the supporting soil. By placing the piles strategically, the overall and differential settlement can be controlled, therefore, the piles are often used as settlement reducers. In this case the load carried by the piles is considered as a secondary issue in the design.
  5. The design issues that need to be addressed in the design of tall building foundation. The ultimate capacity of the foundation subjected to vertical, horizontal and moment loading combinations. The influence of cyclic nature of wind and earthquake on foundation capacity and movements. The overall settlement and the differential settlement within the footprint of the building and the differential settlement between the high rise and low rise areas. Sharing of loads between the raft and piles and the distribution of load along the piles. If excavation is required for the construction of pile cap, it may impose external ground movement which could induce additional load and movement to the pile. Earthquake can cause serious damage to buildings, so it is necessary to assess the response of the structure foundation system to earthquake excitation and the possibility of liquefaction of the surrounding soil supporting the foundation. Lastly, is the dynamic response of the structure foundation to wind induced forces.
  6. Before carrying out the foundation design, we need to have a well planned design process. The design process has to include several phases: The first phase is subsurface exploration to carry out a desktop study of all available geotechnical data including previous site investigations and geotechnical engineering recommendations in the vicinity of the site. Then to perform site specific geotechnical investigation to explore the soil strata profile, groundwater conditions and perform in-situ and laboratory testing to get the soil properties. The second phase is foundation design. In this phase, first we have to develop geotechnical models based on the available geotechnical information from Phase 1. Then we can carry out preliminary foundation design using simplified geotechnical models and simple analysis method. Upon receiving the geotechnical information from the site specific geotechnical investigation and structural loads from structural engineers, we can then revise the geotechnical models and perform detailed design to assess the performance of the foundation under different loading conditions. If excavation is required during construction, we have to design the retention system to control groundwater inflow. Then we need to carry out and assessment on the impacts of construction on adjacent properties and other facilities within the site. Lastly, is to carry out an assessment of seismicity of the site including changes in soil and rock conditions during earthquakes and possible effects on the foundation system.
  7. Limit state design is used for the foundation design. The ultimate limit state in which the design strength has to be greater than or equal to the design action. The design strength is calculated by applying a reduction factor f to the ultimate strength. For the serviceability limit state (SLS), the settlement and augular distortion or rotation of the foundation under working load have to be less than the allowable values
  8. Incheon Tower is a super high rise twin tower proposed to be constructed in Songdo in South Korea. Each tower consists of 151 storeys with a height of 600m and basements of approximately 8.5m deep. The 2 towers is connected by three skybridges. The geotechnical designer is Coffey in associated with Jin-Young ENC in South Korea, the structural designer is Thornton Tomasetti and the architect is John Portman and associates. For this project Frances was the project manager and Helen was the design engineer.
  9. The tower is to be constructed on reclaimed land comprised of approximately 8m of loose sand and sandy silt underlain by approximately 20m of soft to firm marine silty clay, followed by 2m of medium dense to dense silty sand and then the residual soil and weathered rock. The rock material within about 50m from the surface have been affected by weathering and the strength has reduced to a very weak rock or a soil like material.
  10. This figure shows the inferred contours of the soft rock surface. Based on the borehole data, the top of the soft rock surface within the foundation footprint has a variation of up to 40m. To capture the variation of ground conditions, the footprint of the tower was divided into 8 zones with the appropriate geotechnical models and parameters.
  11. The performance of the foundation was assessed using the different computer programs. Program CLAP was used to assess the overall stability under ultimate load combinations. Program GARP was used to assess the foundation settlement under vertical and moment loadings. Finite Element Program PLAXIS 3D was used to carry out an independent check of the foundation settlement under vertical and horizontal loads.
  12. The foundation has a bow tie shape. It consists of a 5.5m thick raft supported by 172 piles with a diameter of 2.5m. The raft is embedded into the ground with the base located at about 14m below the ground surface. The length of piles varies between 36m to 66m with a minimum socket length of 2 times pile diameters into soft rock.
  13. GARP was used as the main design tool for the settlement assessment under vertical loading. In the GARP model, the piled raft is in contact with the underlying soil but not with the surrounding soil. The overall settlement under the unfactored dead and live loads was 67mm with a differential settlement of 34mm. In PLAXIS 3D, 2 cases were considered. Case 1 is similar to the GARP analysis in which the piled raft is in contact with the underlying soil only. For case 2, the piled raft is embedded in which the raft is in contact with the underlying soil and the soil surrounding the raft. The basement walls were modelled in the analysis.
  14. This is the mesh used for the PLAXIS analysis, the dark blue elements represent the basement walls supporting the sides of excavation. The soil layers are modelled as Mohr-Coulomb material to allow for non-linear behaviour. Point loads were applied at the column locations and uniform loads were applied at the corewall locations. This plot shows the load displacement curve for both cases. The solid line is the displacement for case 1 and the dotted line is the displacement for case 2. We can see that the displacement is reduced when the resistance of the surrounding soil is considered.
  15. The performance of the foundation under horizontal loading is a critical issue in the design. Program CLAP was used to assess the lateral stiffness of the pile group in which the raft is not in contact with the underlying soil. The lateral stiffness of the raft and basement wall were calculated separately. From CLAP analysis, the lateral deflection of the pile group was 22mm. Again, PLAXIS 3D was used as an independent check. Three cases were considered. Cases 1 and 2 were the same as for the vertical load, case 3 was the for a pile group only.
  16. The performance of the foundation under horizontal loading is a critical issue in the design as the building is subjected to very high wind load. This load will then transfer to the foundation. Program CLAP was used to assess the lateral stiffness of the pile group in which the raft is not in contact with the underlying soil. The lateral stiffness of the raft and basement wall were calculated separately. From CLAP analysis, the lateral deflection of the pile group was 22mm. Again, PLAXIS 3D was used as an independent check. Three cases were considered. Cases 1 and 2 were the same as for the vertical load, case 3 was the for a pile group only.
  17. For this project, Coffey was appointed as geotechnical peer reviewer. Frances was responsible for setting up the peer review process and review the geotechnical designers report and foundation design method provided by the foundation designer. I was responsible for undertaking independent analyses for the foundation system proposed by the foundation designers.
  18. Nakheel Tower is one of the multi-billion dollar projects in Dubai. The tower is proposed to have more than 200 storeys high with a height exceeding 1km. This tower will be one of the centre pieces of Nakheel Harbour. Now we look at the ground conditions. The geotechnical profile consists of 20m thick sand layer underlain by cemented carbonate siltstone with gypsum layers up to 2.5m thick occurring at depths greater than 75m below ground level.
  19. One of the main features observed from the material was the existence of bond yield strength that controls the compressibility of the material. If the imposed stress on the ground is less than the bond yield strength, the soil will behave as a very stiff material otherwise, the compressibility would increase which results in excessive settlement. Therefore, in the foundation design, the stress on the ground has to be limit to be below the bond yield strength.
  20. The foundation consists of a raft with a thickness varies up to a maximum of 8m supported by a total of 392 barrettes. The sizes of the barrettes are 2.8m x 1.2m and 2.8m x 1.5m and the length of the barrettes are 37m 42m and 72m.
  21. As the geotechnical peer reviewer, we are involved in reviewing the geotechnical designer’s report and the foundation design method provided by the geotechnical designer. Then we have to develop independent geotechnical models based on the available geotechnical data and undertaking independent analyses for the foundation under different loading conditions. In the independent analyses, Program CLAP and PIGS were used to assess the overall stability of foundation under ultimate limit state load combinations. Program GARP was used to assess the settlement under serviceability loads and PLAXIS 2D was used as a check for the GARP results. In PLAXIS 2D analysis, an asymmetric model was used and the barrettes were modelled as equivalent circular rings. From GARP analysis, the maximum settlement was 95mm which agreed well with the settlement from the designer.
  22. In conclusion, we have discuss about the key design issues that are required to be addressed and the design process that needs to be considered in the foundation design for super tall buildings. It is necessary to have a good understanding of the ground conditions in the development of geotechnical models and parameters. In the design, the performance of the foundation under lateral loads is a critical issue, therefore special consideration has to be given in adopting the parameters for assessing the lateral response. In the past few decades, female engineers have been involved in different aspect of engineering and they are often given the opportunity to undertake different roles in major projects.