ThinkBike Washington, DC/Final Session
Program
Welcome by Pex Langenberg, Transport Counselor, Dutch
Embassy
Remarks from Congressmen Earl Blumentauer, Tom Petry
Remarks from Gabe Klein, DDOT
Summary of the teams by
Team Orange
Team Blue
General remarks
Q&A
Closing words by Pex Langenberg and Jim Sebastian, DDOT
ThinkBike
November 16, 2010
Team Orange
L&M
U.S. vs. Netherlands
American trip patterns are not
dramatically longer than the
Dutch
Most trips are less than 4 miles
long
20 minutes by bike!
But bike use in the U.S. is much
less
0%
18%
35%
53%
70%
Netherlands U.S.
56%
70%
Trips Less Than 4 miles/7.5 km
0%
8%
15%
23%
30%
Netherlands U.S.
1%
26%
Bicycle Mode Share
WHY?
Sources: Cycling in the Netherlands, Fiets Beraad, Mobility Study 2007. U.S. National Household Travel Survey, 2009, and FHWA
Office of Policy
Policy Differences between DC and Netherlands
– Cost of getting a drivers license
– Price of gasoline
– Price/availability of parking
– Excise taxes on automobile purchases
– Lack of buses to school
Goals/recommendations for the workshop
Apply Dutch principles of bicycle facility design to Downtown Washington, DC
Design high quality bikeway for the downtown
– Continuous
– Signature “marquee” facility
– Bi-directional
Bikeway as a transportation connection
Focus on bikeway design for L and M Streets NW, between Metropolitan Branch
Trail and Georgetown
Extend livability principles beyond bikeways linking neighborhoods, retail, and
economic development
Project: Creating the Crosstown Bikeway
as a Regional Transportation Connection
L and M Streets
From Met Branch trail to Georgetown
Workshop process
Presentations by Dutch experts
Surveyed L & M Streets
Reviewed maps
Brainstormed
Created design treatments
Integrated Downtown Network
Design focuses on L & M Street
Key piece to create an integrated
network:
– North-Souths
– Diagonals (e.g., Mass. Ave.,
Connecticut Ave.)
L & M should be part of an
overall bikeway network
throughout city
L&M can be pilot projects
– Create a larger network,
– Set robust design precedents
Rock Creek
Park Trail to
Northwest
Met Branch
Trail to
Silver
Spring
Mount
Vernon Trail
Capital
Crescent
and
C&O Trails
Custis
Trail
Key Connections to Regional Trail Network
Diagonal intersection crossing (L Street @ Mass. Ave.)
L Street cross section
L Street Intersection treatment
L Street/15th Street – Cycle Track to Cycle Track
M Street
Treat M Street as sub-sections of like blocks
“Woone
rf”
Living
Zone
Golden
Triangle
Thoma
s Circle
West End
AAD
T: 16-22
K
10-13
K
8-10K
Cross section – Thomas Circle to Connecticut Ave.
Cross section – Connecticut Ave. to 23rd Street
Dealing with conflicts – parking garages
Issues/Areas of concern
Snow clearance/maintenance of way
Turning movements
Coordinating freight/delivery to manage traffic/bike conflicts
Accommodating parking garage entrances
Signalization/timing to manage oncoming traffic for contraflows
Qualities of the facility (meta-lessons)
Bi-directional
– Dutch wisdom: “bikes flow like water”
– Even in a one way facility, bicyclists will
go in both directions in a separated
facility
Located on side where outer bikes travel
with direction of auto traffic
Be consistent with, and improve 15th St.
cycletrack
Montreal cycle track with different treatment
Materials and treatments
Use materials and colors to differentiate bike space
Extend Dutch home zone concepts to Downtown
Emphasize 25 mph speed limit
Enhance public space/quality of life at key
intersections with the Avenues
Create a neighborhood zone along M Street
between
New Hampshire Avenue and Georgetown
Extend the amount and quality of the public space
such as at M Street and Connecticut Ave.
Implementation – Begin Small
Short term
Paint
Plastic bollards
Lane markings
Long term
Hard core physical treatments
Medians
Curb and sidewalk changes
ThinkBike Washington, DC/Team Blue
M Street Existing Conditions
M Street Recommendations
•One-way cycle track on both sides of the street
•Cycle tracks buffered by a landscape strip with street trees
•Bicycle signals at intersections with high right turn volumes
•Unique right-turn configuration
•Streetcar and stations on a median alignment
M Street Cross Section
Amsterdam – Bike Lane Crossing
M Street Intersection Example
37
I Street Recommendations
•Bicycle boulevard principles
•Possibly limit through-volumes by
restricting traffic every 2-3 blocks
•Traffic calming measures, for example
pedestrian refuge islands
•Green wave configuration
•Option for bicycle tunnel configuration
on I Street and South Capitol Street
•Colored bicycle lanes
I Street Cross Section A
I Street Existing Conditions
I Street SW Intersection Revision
I Street Cross Section B
I Street SE Missing Connection
I Street Connection
I Street & South Capitol Street
I Street & South Capitol Street
I Street & South Capitol Street
4th	
  Street	
  Bicycle
Lanes	
  –	
  North	
  South	
  Route	
  
to	
  Mall	
  /	
  Pennsylvania	
  Ave
2	
  Way	
  Cycle	
  Track
Anacos@a	
  River	
  
Trail
Fort	
  McNair
4th	
  St.	
  Bike	
  Lanes
Maintain	
  On-­‐street	
  Parking
P	
  St	
  at	
  4th	
  St	
  SW	
  –	
  Bike	
  Lanes	
  to	
  Mall,	
  
Cycle	
  Path	
  &	
  River	
  Trail	
  Access
Cyclists	
  Stop	
  
Here
P Street SW

P Street SW – 2 Way Cycle Track with
Buffer
Navy-entrances
P Street SW (Bus Route west of Half
St)

P Street SW - 2 Way Cycle Path with Buffer
(vs lanes)
P St at South Capital, River Trail
on 2nd St Potomac Ave & Douglas
Bridge Access
Anacostia
River
Trail
To Capital
Bike
Share /
Stadium
Existing
Potomac
Ave Bike Lanes
P Street Cycle Track
P St at South Capital,
Potomac Ave & Douglas
Bridge Access
Signage for SW
Waterfront /
National Mall and
Waterfront Metro
Signage Douglas
Bridge / Riverwalk
Trail / Eastern
Market / Navy Yard
Metro / S Capitol Trail
Bicycles Yield to
Pedestrians Signage
& Advance
SignalizationBicycles /
Pedestrian Advance
Signal Intervals
SW and Stadium Area Improvements
4th Street bike lanes north of P Street to Mall/
Pennsylvania Ave.
P Street bicycle track (River Trail to South Capital)
South Capital bicycle track (Potomac Ave to P St)
Potomac Ave/Frederick Douglas Bridge/River Trail
access, signage connects to existing bike lanes and
new bicycle tracks
Cycle Track as Anacostia River Trail on 2nd St
Lead Bicycle / Pedestrian Signal Interval across
Potomac Ave & P Street at South Capitol
Major Bicycle/Pedestrian Crossroads
ThinkBike Washington, DC/Recommendations
The	
  Dutch	
  taught	
  us:	
  Think	
  BIG	
  for	
  Cycling
• Biking	
  helps	
  the	
  environment,	
  reduces	
  stress,	
  traffic,	
  and	
  gives	
  you	
  joy
• Bike	
  infrastructure	
  and	
  smart	
  street	
  design	
  encourages	
  bicycling,	
  and	
  reduces	
  
conflict	
  with	
  automobiles
• Bicycle	
  infrastructure	
  doesn’t	
  have	
  to	
  be	
  expensive	
  –	
  a	
  can	
  of	
  paint	
  goes	
  a	
  
long	
  way
• Bikes	
  flow	
  like	
  water	
  –	
  and	
  we	
  should	
  design	
  for	
  it
• Think	
  about	
  a	
  whole	
  bicycle	
  network,	
  not	
  just	
  two	
  routes	
  (M	
  and	
  L,	
  NW)	
  	
  
• Some	
  routes	
  must	
  be	
  fabulous	
  and	
  have	
  priority	
  (green	
  waves)
• Other	
  routes	
  can	
  be	
  bike-­‐safe	
  but	
  don’t	
  require	
  big	
  changes
• Balancing	
  legal	
  liability	
  between	
  motorists	
  and	
  bicyclists	
  encourages	
  safety	
  
and	
  efficiency
63
M and L Streets (NW) recommendations
64
•M	
  and	
  L	
  Streets	
  can	
  become	
  a	
  key	
  cross-­‐town	
  bike	
  connec@on	
  
between	
  exis@ng	
  trails	
  and	
  paths
•Two	
  direc@ons	
  cycle	
  path	
  over	
  the	
  whole	
  route	
  
•In	
  the	
  CBD,	
  on-­‐street	
  parking	
  can	
  be	
  rearranged	
  to	
  protect	
  
cycling
•In	
  neighborhoods,	
  fewer	
  lanes	
  are	
  needed	
  for	
  automobile	
  traffic
•Right	
  turn	
  bike	
  boxes	
  at	
  the	
  intersec@ons
•Innova@ve	
  feature	
  2-­‐stage	
  le[	
  turn	
  box
•Colored	
  pavement	
  for	
  cycle	
  path	
  at	
  the	
  intersec@ons
•Special	
  	
  signal	
  phasing	
  for	
  cyclist
I Street recommendations
1.Bicycle boulevard principles
2.Possibly limit through-volumes by restricting traffic
every 2-3 blocks
3.Traffic calming measures, for example pedestrian
refuge islands
4.Green wave configuration
5.Option for bicycle tunnel configuration on I Street and
South Capitol Street
6.Colored bicycle lanes
M Street recommendations
1.One-way cycle track on both sides of the street
2.Cycle tracks buffered by a landscape strip with
street trees
3.Bicycle signals at intersections with high right turn
volumes
4. Unique right-turn configuration
5.Streetcar and stations on a median alignment
Southwest and Stadium Area
Improvements
•4th Street bike lanes north of P Street to Mall/Pennsylvania Ave.
•P Street bicycle track (River Trail to South Capital)
•South Capital bicycle track (Potomac Ave to P St)
•Potomac Ave/Frederick Douglas Bridge/River Trail access,
signage connects to existing bike lanes and new bicycle
tracks
•Cycle Track as Anacostia River Trail on 2nd St
•Lead Bicycle / Pedestrian Signal Interval across Potomac Ave &
P Street at South Capitol
•Major Bicycle/Pedestrian Crossroads
Outreach Ideas
1.Target people who do not bike yet
2.“Try a bike” class (WABA, bike
shops, DDOT)
3.Work with churches, health
centers, youth centers, doctors,
nurses
Outreach Ideas
1.Provide free trial on Capital Bikeshare
or discount annual membership
2.Hold classes and do outreach at
Universities, community colleges
3.Target areas around new bikeways
4.Bike education at schools
5.Banners
Education Ideas
More/Better Driver training
(In the Netherlands, 18 years old, 40
classes, 5 questions on bicycling on
exam)
Colored bike lanes
Radio ads, internet videos
Reduce speeding (enforcement,
traffic calming)
Enforcement
1.Lights (for bicyclists)
2.Citations to cars (speeding)
3.More police on bikes
4.Waive ticket fee for bicyclists who if
they agree to take a class
5.Points on your drivers license for
bicycle violations
Other Policies
1.More/better wayfinding signs
2.Make driving/parking more expensive
•In NL, gas is $9/gallon
•In NL, parking is $20/day
3.More surveys/counting of bicyclists

Weitere ähnliche Inhalte

Was ist angesagt?

Bbp Presentation
Bbp PresentationBbp Presentation
Bbp Presentation
laluz914
 

Was ist angesagt? (19)

Fulton Market Streetscape Public Meeting 12/10/2014
Fulton Market Streetscape Public Meeting 12/10/2014Fulton Market Streetscape Public Meeting 12/10/2014
Fulton Market Streetscape Public Meeting 12/10/2014
 
Bbp Presentation
Bbp PresentationBbp Presentation
Bbp Presentation
 
Design of the Marmion Way Corridor
Design of the Marmion Way CorridorDesign of the Marmion Way Corridor
Design of the Marmion Way Corridor
 
Streamlining Hoddle Street
Streamlining Hoddle StreetStreamlining Hoddle Street
Streamlining Hoddle Street
 
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
 
Steeles Avenue East Bridge Study PIC 1
Steeles Avenue East Bridge Study PIC 1Steeles Avenue East Bridge Study PIC 1
Steeles Avenue East Bridge Study PIC 1
 
Arlington, Virginia's Transportation Future
Arlington, Virginia's Transportation FutureArlington, Virginia's Transportation Future
Arlington, Virginia's Transportation Future
 
July 21, 2021 TARC Virtual Workshop
July 21, 2021 TARC Virtual WorkshopJuly 21, 2021 TARC Virtual Workshop
July 21, 2021 TARC Virtual Workshop
 
Wellington St Upgrade
Wellington St UpgradeWellington St Upgrade
Wellington St Upgrade
 
Urban design ppt - 21 09-16
Urban design ppt - 21 09-16Urban design ppt - 21 09-16
Urban design ppt - 21 09-16
 
September 15, 2021 TARC Virtual Workshop
September 15, 2021 TARC Virtual WorkshopSeptember 15, 2021 TARC Virtual Workshop
September 15, 2021 TARC Virtual Workshop
 
July 14, 2021 FTAC Virtual Workshop
July 14, 2021 FTAC Virtual WorkshopJuly 14, 2021 FTAC Virtual Workshop
July 14, 2021 FTAC Virtual Workshop
 
Task 3.b: EN TRIPS Priority Corridors - Preliminary Street Redesign Alternat...
Task 3.b:  EN TRIPS Priority Corridors - Preliminary Street Redesign Alternat...Task 3.b:  EN TRIPS Priority Corridors - Preliminary Street Redesign Alternat...
Task 3.b: EN TRIPS Priority Corridors - Preliminary Street Redesign Alternat...
 
Clairemont subcommittee presentation 07.19.17
Clairemont subcommittee presentation  07.19.17Clairemont subcommittee presentation  07.19.17
Clairemont subcommittee presentation 07.19.17
 
City Bayfront Connectivity Nov 08 Presentation
City Bayfront Connectivity Nov 08 PresentationCity Bayfront Connectivity Nov 08 Presentation
City Bayfront Connectivity Nov 08 Presentation
 
Fulton Market Streetscape - July 15th, 2014 Workshop
Fulton Market Streetscape - July 15th, 2014 WorkshopFulton Market Streetscape - July 15th, 2014 Workshop
Fulton Market Streetscape - July 15th, 2014 Workshop
 
Improving Street Design Through 'Link and Place'
Improving Street Design Through 'Link and Place'Improving Street Design Through 'Link and Place'
Improving Street Design Through 'Link and Place'
 
LYNX Blue Line Extension Construction Update
LYNX Blue Line Extension Construction UpdateLYNX Blue Line Extension Construction Update
LYNX Blue Line Extension Construction Update
 
Pacific Beach ad hoc subcommittee presentation 11/3/16
Pacific Beach ad hoc subcommittee presentation 11/3/16Pacific Beach ad hoc subcommittee presentation 11/3/16
Pacific Beach ad hoc subcommittee presentation 11/3/16
 

Andere mochten auch

Presentation Peter A.G. van Bergeijk
Presentation Peter A.G. van BergeijkPresentation Peter A.G. van Bergeijk
Presentation Peter A.G. van Bergeijk
NLandUSA
 
65 years of friendship Canada The Netherlands
65 years of friendship Canada The Netherlands65 years of friendship Canada The Netherlands
65 years of friendship Canada The Netherlands
NLandUSA
 
Factsheet ThinkWind
Factsheet ThinkWindFactsheet ThinkWind
Factsheet ThinkWind
NLandUSA
 

Andere mochten auch (9)

Greening the District
Greening the DistrictGreening the District
Greening the District
 
Opening session Thinkbike
Opening session Thinkbike Opening session Thinkbike
Opening session Thinkbike
 
Presentation Peter A.G. van Bergeijk
Presentation Peter A.G. van BergeijkPresentation Peter A.G. van Bergeijk
Presentation Peter A.G. van Bergeijk
 
65 years of friendship Canada The Netherlands
65 years of friendship Canada The Netherlands65 years of friendship Canada The Netherlands
65 years of friendship Canada The Netherlands
 
Built Environment Solutions that work
Built Environment Solutions that workBuilt Environment Solutions that work
Built Environment Solutions that work
 
De rijksbrede huisstijl bij BZ
De rijksbrede huisstijl bij BZDe rijksbrede huisstijl bij BZ
De rijksbrede huisstijl bij BZ
 
Factsheet ThinkWind
Factsheet ThinkWindFactsheet ThinkWind
Factsheet ThinkWind
 
Urban Wind Energy by Sander Mertens
Urban Wind Energy by Sander MertensUrban Wind Energy by Sander Mertens
Urban Wind Energy by Sander Mertens
 
Room for the River Presentation 2011
Room for the River Presentation 2011Room for the River Presentation 2011
Room for the River Presentation 2011
 

Ähnlich wie Final recommendations Thinkbike Workshop DC

Designing for Cycling RTPI 15.6.16 Tim Pheby
Designing for Cycling RTPI 15.6.16 Tim PhebyDesigning for Cycling RTPI 15.6.16 Tim Pheby
Designing for Cycling RTPI 15.6.16 Tim Pheby
Tim Pheby
 
Leslie safety tour nov 20 2010
Leslie safety tour nov 20 2010Leslie safety tour nov 20 2010
Leslie safety tour nov 20 2010
bikingtoronto
 
Complete Streets Sussex - Eric Snyder
Complete Streets Sussex - Eric SnyderComplete Streets Sussex - Eric Snyder
Complete Streets Sussex - Eric Snyder
njbikeped
 
Wpc.sw barriers
Wpc.sw barriersWpc.sw barriers
Wpc.sw barriers
WPCwalks
 
Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013
Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013
Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013
Design South East
 

Ähnlich wie Final recommendations Thinkbike Workshop DC (20)

ThinkBike Workshops DC Recommendations
ThinkBike Workshops DC RecommendationsThinkBike Workshops DC Recommendations
ThinkBike Workshops DC Recommendations
 
Designing for Cycling RTPI 15.6.16 Tim Pheby
Designing for Cycling RTPI 15.6.16 Tim PhebyDesigning for Cycling RTPI 15.6.16 Tim Pheby
Designing for Cycling RTPI 15.6.16 Tim Pheby
 
Leslie safety tour nov 20 2010
Leslie safety tour nov 20 2010Leslie safety tour nov 20 2010
Leslie safety tour nov 20 2010
 
ATS-16: Protected Bike Lanes: Lessons Learned in Planning and Implementation,...
ATS-16: Protected Bike Lanes: Lessons Learned in Planning and Implementation,...ATS-16: Protected Bike Lanes: Lessons Learned in Planning and Implementation,...
ATS-16: Protected Bike Lanes: Lessons Learned in Planning and Implementation,...
 
Thinkbikeblue ppt
Thinkbikeblue pptThinkbikeblue ppt
Thinkbikeblue ppt
 
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
 
Complete Streets Sussex - Eric Snyder
Complete Streets Sussex - Eric SnyderComplete Streets Sussex - Eric Snyder
Complete Streets Sussex - Eric Snyder
 
The Minneapolis Bicycle Story David Peterson
The Minneapolis Bicycle Story David PetersonThe Minneapolis Bicycle Story David Peterson
The Minneapolis Bicycle Story David Peterson
 
Wpc.sw barriers
Wpc.sw barriersWpc.sw barriers
Wpc.sw barriers
 
Public Meeting #2 Presentation - November 11, 2014
Public Meeting #2 Presentation - November 11, 2014Public Meeting #2 Presentation - November 11, 2014
Public Meeting #2 Presentation - November 11, 2014
 
World usa pres_2017_en_systematic safety - action plan for boston_pfurth
World usa pres_2017_en_systematic safety - action plan for boston_pfurthWorld usa pres_2017_en_systematic safety - action plan for boston_pfurth
World usa pres_2017_en_systematic safety - action plan for boston_pfurth
 
Oxford City Centre Movement and Public Realm Strategy
Oxford City Centre Movement and Public Realm StrategyOxford City Centre Movement and Public Realm Strategy
Oxford City Centre Movement and Public Realm Strategy
 
Balboa Station Plan Alternatives
Balboa Station Plan AlternativesBalboa Station Plan Alternatives
Balboa Station Plan Alternatives
 
Birmingham Cycle Revolution, Paul Simkins- Cycle City Event
Birmingham Cycle Revolution, Paul Simkins- Cycle City EventBirmingham Cycle Revolution, Paul Simkins- Cycle City Event
Birmingham Cycle Revolution, Paul Simkins- Cycle City Event
 
Sheridan Road City Council Presentation
Sheridan Road City Council PresentationSheridan Road City Council Presentation
Sheridan Road City Council Presentation
 
Brigham City, UT SDAT Presentation
Brigham City, UT SDAT PresentationBrigham City, UT SDAT Presentation
Brigham City, UT SDAT Presentation
 
Beal Parkway Public Meeting (Oct. 14, 2014)
Beal Parkway Public Meeting (Oct. 14, 2014)Beal Parkway Public Meeting (Oct. 14, 2014)
Beal Parkway Public Meeting (Oct. 14, 2014)
 
Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013
Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013
Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013
 
Complete Freeways: Evaluation of Florida's Bicycles on Limited Access Facilit...
Complete Freeways: Evaluation of Florida's Bicycles on Limited Access Facilit...Complete Freeways: Evaluation of Florida's Bicycles on Limited Access Facilit...
Complete Freeways: Evaluation of Florida's Bicycles on Limited Access Facilit...
 
RV 2014: Can We Get There from Here? First and Last Miles by Dan Gallagher
RV 2014: Can We Get There from Here? First and Last Miles by Dan GallagherRV 2014: Can We Get There from Here? First and Last Miles by Dan Gallagher
RV 2014: Can We Get There from Here? First and Last Miles by Dan Gallagher
 

Mehr von NLandUSA

The dashboard
The dashboardThe dashboard
The dashboard
NLandUSA
 
Final report ThinkBike Toronto 2010
Final report ThinkBike Toronto 2010Final report ThinkBike Toronto 2010
Final report ThinkBike Toronto 2010
NLandUSA
 
Final report ThinkBike Chicago 2010
Final report ThinkBike Chicago 2010Final report ThinkBike Chicago 2010
Final report ThinkBike Chicago 2010
NLandUSA
 
FLOW - Far and Large Offshore Wind (Summary)
FLOW - Far and Large Offshore Wind (Summary)FLOW - Far and Large Offshore Wind (Summary)
FLOW - Far and Large Offshore Wind (Summary)
NLandUSA
 
Embassy of the_netherlands.thank_you-1-2_pg_vert-nov_10
Embassy of the_netherlands.thank_you-1-2_pg_vert-nov_10Embassy of the_netherlands.thank_you-1-2_pg_vert-nov_10
Embassy of the_netherlands.thank_you-1-2_pg_vert-nov_10
NLandUSA
 
Embassy of the_netherlands.thank_you-1-2_pg_vert-nov_10
Embassy of the_netherlands.thank_you-1-2_pg_vert-nov_10Embassy of the_netherlands.thank_you-1-2_pg_vert-nov_10
Embassy of the_netherlands.thank_you-1-2_pg_vert-nov_10
NLandUSA
 

Mehr von NLandUSA (13)

The dashboard
The dashboardThe dashboard
The dashboard
 
Research on Wind Power in the Built Environment by Case van Dam
Research on Wind Power in the Built Environment by Case van DamResearch on Wind Power in the Built Environment by Case van Dam
Research on Wind Power in the Built Environment by Case van Dam
 
Urban Turbine by Paul Vosbeek
Urban Turbine by Paul VosbeekUrban Turbine by Paul Vosbeek
Urban Turbine by Paul Vosbeek
 
Final report ThinkBike Toronto 2010
Final report ThinkBike Toronto 2010Final report ThinkBike Toronto 2010
Final report ThinkBike Toronto 2010
 
Final report ThinkBike Chicago 2010
Final report ThinkBike Chicago 2010Final report ThinkBike Chicago 2010
Final report ThinkBike Chicago 2010
 
FLOW - Far and Large Offshore Wind (Summary)
FLOW - Far and Large Offshore Wind (Summary)FLOW - Far and Large Offshore Wind (Summary)
FLOW - Far and Large Offshore Wind (Summary)
 
Final report ThinkBike Washington DC 2010
Final report ThinkBike Washington DC 2010Final report ThinkBike Washington DC 2010
Final report ThinkBike Washington DC 2010
 
Embassy of the_netherlands.thank_you-1-2_pg_vert-nov_10
Embassy of the_netherlands.thank_you-1-2_pg_vert-nov_10Embassy of the_netherlands.thank_you-1-2_pg_vert-nov_10
Embassy of the_netherlands.thank_you-1-2_pg_vert-nov_10
 
Embassy of the_netherlands.thank_you-1-2_pg_vert-nov_10
Embassy of the_netherlands.thank_you-1-2_pg_vert-nov_10Embassy of the_netherlands.thank_you-1-2_pg_vert-nov_10
Embassy of the_netherlands.thank_you-1-2_pg_vert-nov_10
 
Social Media: SlideShare
Social Media: SlideShareSocial Media: SlideShare
Social Media: SlideShare
 
Overview of all the NY400 events
Overview of all the NY400 eventsOverview of all the NY400 events
Overview of all the NY400 events
 
The Sustainability Dashboard: A tale of two cities
The Sustainability Dashboard: A tale of two citiesThe Sustainability Dashboard: A tale of two cities
The Sustainability Dashboard: A tale of two cities
 
Neighborhood Sustainability Indicators Pilot Project
Neighborhood Sustainability Indicators Pilot ProjectNeighborhood Sustainability Indicators Pilot Project
Neighborhood Sustainability Indicators Pilot Project
 

Kürzlich hochgeladen

THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
Faga1939
 

Kürzlich hochgeladen (20)

Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover BackVerified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
 
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
 
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
 
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
 
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
 
declarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdfdeclarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdf
 
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
 
05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf
 
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
 
02052024_First India Newspaper Jaipur.pdf
02052024_First India Newspaper Jaipur.pdf02052024_First India Newspaper Jaipur.pdf
02052024_First India Newspaper Jaipur.pdf
 
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdhEmbed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
 
06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf
 
Group_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the tradeGroup_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the trade
 
Julius Randle's Injury Status: Surgery Not Off the Table
Julius Randle's Injury Status: Surgery Not Off the TableJulius Randle's Injury Status: Surgery Not Off the Table
Julius Randle's Injury Status: Surgery Not Off the Table
 
China's soft power in 21st century .pptx
China's soft power in 21st century   .pptxChina's soft power in 21st century   .pptx
China's soft power in 21st century .pptx
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
 
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
 
Kishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdf
 
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
 

Final recommendations Thinkbike Workshop DC

  • 2. Program Welcome by Pex Langenberg, Transport Counselor, Dutch Embassy Remarks from Congressmen Earl Blumentauer, Tom Petry Remarks from Gabe Klein, DDOT Summary of the teams by Team Orange Team Blue General remarks Q&A Closing words by Pex Langenberg and Jim Sebastian, DDOT
  • 4. U.S. vs. Netherlands American trip patterns are not dramatically longer than the Dutch Most trips are less than 4 miles long 20 minutes by bike! But bike use in the U.S. is much less 0% 18% 35% 53% 70% Netherlands U.S. 56% 70% Trips Less Than 4 miles/7.5 km 0% 8% 15% 23% 30% Netherlands U.S. 1% 26% Bicycle Mode Share WHY? Sources: Cycling in the Netherlands, Fiets Beraad, Mobility Study 2007. U.S. National Household Travel Survey, 2009, and FHWA Office of Policy
  • 5. Policy Differences between DC and Netherlands – Cost of getting a drivers license – Price of gasoline – Price/availability of parking – Excise taxes on automobile purchases – Lack of buses to school
  • 6. Goals/recommendations for the workshop Apply Dutch principles of bicycle facility design to Downtown Washington, DC Design high quality bikeway for the downtown – Continuous – Signature “marquee” facility – Bi-directional Bikeway as a transportation connection Focus on bikeway design for L and M Streets NW, between Metropolitan Branch Trail and Georgetown Extend livability principles beyond bikeways linking neighborhoods, retail, and economic development
  • 7. Project: Creating the Crosstown Bikeway as a Regional Transportation Connection L and M Streets From Met Branch trail to Georgetown
  • 8. Workshop process Presentations by Dutch experts Surveyed L & M Streets Reviewed maps Brainstormed Created design treatments
  • 9. Integrated Downtown Network Design focuses on L & M Street Key piece to create an integrated network: – North-Souths – Diagonals (e.g., Mass. Ave., Connecticut Ave.) L & M should be part of an overall bikeway network throughout city L&M can be pilot projects – Create a larger network, – Set robust design precedents
  • 10. Rock Creek Park Trail to Northwest Met Branch Trail to Silver Spring Mount Vernon Trail Capital Crescent and C&O Trails Custis Trail Key Connections to Regional Trail Network
  • 11.
  • 12.
  • 13.
  • 14. Diagonal intersection crossing (L Street @ Mass. Ave.)
  • 15. L Street cross section
  • 17. L Street/15th Street – Cycle Track to Cycle Track
  • 19. Treat M Street as sub-sections of like blocks “Woone rf” Living Zone Golden Triangle Thoma s Circle West End AAD T: 16-22 K 10-13 K 8-10K
  • 20. Cross section – Thomas Circle to Connecticut Ave.
  • 21. Cross section – Connecticut Ave. to 23rd Street
  • 22. Dealing with conflicts – parking garages
  • 23. Issues/Areas of concern Snow clearance/maintenance of way Turning movements Coordinating freight/delivery to manage traffic/bike conflicts Accommodating parking garage entrances Signalization/timing to manage oncoming traffic for contraflows
  • 24. Qualities of the facility (meta-lessons) Bi-directional – Dutch wisdom: “bikes flow like water” – Even in a one way facility, bicyclists will go in both directions in a separated facility Located on side where outer bikes travel with direction of auto traffic Be consistent with, and improve 15th St. cycletrack Montreal cycle track with different treatment
  • 25. Materials and treatments Use materials and colors to differentiate bike space
  • 26. Extend Dutch home zone concepts to Downtown Emphasize 25 mph speed limit Enhance public space/quality of life at key intersections with the Avenues Create a neighborhood zone along M Street between New Hampshire Avenue and Georgetown
  • 27. Extend the amount and quality of the public space such as at M Street and Connecticut Ave.
  • 28. Implementation – Begin Small Short term Paint Plastic bollards Lane markings Long term Hard core physical treatments Medians Curb and sidewalk changes
  • 30.
  • 31.
  • 32. M Street Existing Conditions
  • 33. M Street Recommendations •One-way cycle track on both sides of the street •Cycle tracks buffered by a landscape strip with street trees •Bicycle signals at intersections with high right turn volumes •Unique right-turn configuration •Streetcar and stations on a median alignment
  • 34. M Street Cross Section
  • 35. Amsterdam – Bike Lane Crossing
  • 37. 37
  • 38.
  • 39.
  • 40. I Street Recommendations •Bicycle boulevard principles •Possibly limit through-volumes by restricting traffic every 2-3 blocks •Traffic calming measures, for example pedestrian refuge islands •Green wave configuration •Option for bicycle tunnel configuration on I Street and South Capitol Street •Colored bicycle lanes
  • 41. I Street Cross Section A
  • 42. I Street Existing Conditions
  • 43. I Street SW Intersection Revision
  • 44. I Street Cross Section B
  • 45. I Street SE Missing Connection
  • 47. I Street & South Capitol Street
  • 48. I Street & South Capitol Street
  • 49. I Street & South Capitol Street
  • 50. 4th  Street  Bicycle Lanes  –  North  South  Route   to  Mall  /  Pennsylvania  Ave
  • 51. 2  Way  Cycle  Track Anacos@a  River   Trail Fort  McNair 4th  St.  Bike  Lanes Maintain  On-­‐street  Parking P  St  at  4th  St  SW  –  Bike  Lanes  to  Mall,   Cycle  Path  &  River  Trail  Access Cyclists  Stop   Here
  • 53.  P Street SW – 2 Way Cycle Track with Buffer
  • 55.
  • 56. P Street SW (Bus Route west of Half St)
  • 57.  P Street SW - 2 Way Cycle Path with Buffer (vs lanes)
  • 58. P St at South Capital, River Trail on 2nd St Potomac Ave & Douglas Bridge Access
  • 59. Anacostia River Trail To Capital Bike Share / Stadium Existing Potomac Ave Bike Lanes P Street Cycle Track P St at South Capital, Potomac Ave & Douglas Bridge Access Signage for SW Waterfront / National Mall and Waterfront Metro Signage Douglas Bridge / Riverwalk Trail / Eastern Market / Navy Yard Metro / S Capitol Trail Bicycles Yield to Pedestrians Signage & Advance SignalizationBicycles / Pedestrian Advance Signal Intervals
  • 60.
  • 61. SW and Stadium Area Improvements 4th Street bike lanes north of P Street to Mall/ Pennsylvania Ave. P Street bicycle track (River Trail to South Capital) South Capital bicycle track (Potomac Ave to P St) Potomac Ave/Frederick Douglas Bridge/River Trail access, signage connects to existing bike lanes and new bicycle tracks Cycle Track as Anacostia River Trail on 2nd St Lead Bicycle / Pedestrian Signal Interval across Potomac Ave & P Street at South Capitol Major Bicycle/Pedestrian Crossroads
  • 63. The  Dutch  taught  us:  Think  BIG  for  Cycling • Biking  helps  the  environment,  reduces  stress,  traffic,  and  gives  you  joy • Bike  infrastructure  and  smart  street  design  encourages  bicycling,  and  reduces   conflict  with  automobiles • Bicycle  infrastructure  doesn’t  have  to  be  expensive  –  a  can  of  paint  goes  a   long  way • Bikes  flow  like  water  –  and  we  should  design  for  it • Think  about  a  whole  bicycle  network,  not  just  two  routes  (M  and  L,  NW)     • Some  routes  must  be  fabulous  and  have  priority  (green  waves) • Other  routes  can  be  bike-­‐safe  but  don’t  require  big  changes • Balancing  legal  liability  between  motorists  and  bicyclists  encourages  safety   and  efficiency 63
  • 64. M and L Streets (NW) recommendations 64 •M  and  L  Streets  can  become  a  key  cross-­‐town  bike  connec@on   between  exis@ng  trails  and  paths •Two  direc@ons  cycle  path  over  the  whole  route   •In  the  CBD,  on-­‐street  parking  can  be  rearranged  to  protect   cycling •In  neighborhoods,  fewer  lanes  are  needed  for  automobile  traffic •Right  turn  bike  boxes  at  the  intersec@ons •Innova@ve  feature  2-­‐stage  le[  turn  box •Colored  pavement  for  cycle  path  at  the  intersec@ons •Special    signal  phasing  for  cyclist
  • 65. I Street recommendations 1.Bicycle boulevard principles 2.Possibly limit through-volumes by restricting traffic every 2-3 blocks 3.Traffic calming measures, for example pedestrian refuge islands 4.Green wave configuration 5.Option for bicycle tunnel configuration on I Street and South Capitol Street 6.Colored bicycle lanes
  • 66. M Street recommendations 1.One-way cycle track on both sides of the street 2.Cycle tracks buffered by a landscape strip with street trees 3.Bicycle signals at intersections with high right turn volumes 4. Unique right-turn configuration 5.Streetcar and stations on a median alignment
  • 67. Southwest and Stadium Area Improvements •4th Street bike lanes north of P Street to Mall/Pennsylvania Ave. •P Street bicycle track (River Trail to South Capital) •South Capital bicycle track (Potomac Ave to P St) •Potomac Ave/Frederick Douglas Bridge/River Trail access, signage connects to existing bike lanes and new bicycle tracks •Cycle Track as Anacostia River Trail on 2nd St •Lead Bicycle / Pedestrian Signal Interval across Potomac Ave & P Street at South Capitol •Major Bicycle/Pedestrian Crossroads
  • 68. Outreach Ideas 1.Target people who do not bike yet 2.“Try a bike” class (WABA, bike shops, DDOT) 3.Work with churches, health centers, youth centers, doctors, nurses
  • 69. Outreach Ideas 1.Provide free trial on Capital Bikeshare or discount annual membership 2.Hold classes and do outreach at Universities, community colleges 3.Target areas around new bikeways 4.Bike education at schools 5.Banners
  • 70. Education Ideas More/Better Driver training (In the Netherlands, 18 years old, 40 classes, 5 questions on bicycling on exam) Colored bike lanes Radio ads, internet videos Reduce speeding (enforcement, traffic calming)
  • 71. Enforcement 1.Lights (for bicyclists) 2.Citations to cars (speeding) 3.More police on bikes 4.Waive ticket fee for bicyclists who if they agree to take a class 5.Points on your drivers license for bicycle violations
  • 72. Other Policies 1.More/better wayfinding signs 2.Make driving/parking more expensive •In NL, gas is $9/gallon •In NL, parking is $20/day 3.More surveys/counting of bicyclists