Integrating Essential Components of Digital Twin for Energy Industry
KwikGate Capability Statement
1. KWIKGATE PTY LTD
ENGINEERING DESIGN & EQUIPMENT SUPPLY
ENGINEERING CONSULTANCY
KWIKGATE PTY LTD
UNIT 1, 106 MURRIVERIE RD, NORTH BONDI, NSW
AUSTRALIA
ABN 72 050 816 227
TELEPHONE: +61 421 050 858
EMAIL: KwikGate@gmail.com
CAPABILITY
STATEMENT
1990-2015
2. KwikGate Pty Limited – Capability Statement
This document is subject to Copyright and is Confidential. It must not be disclosed to others, reproduced or stored in a
retrieval system or transmitted in any form or by any means without the written consent of KwikGate Pty Limited.
PAGE 2 OF 6
CONTENTS
1 GENERAL ENGINEERING SERVICES................................................................................. 3
1.1 Project Engineering ....................................................................................................................................3
1.2 Instrument & Control Basic Design ............................................................................................................3
1.3 Hazard and Operability Study ....................................................................................................................3
1.4 Instrument & Control Detail Design...........................................................................................................4
2 SPECIALISED ENGENEERING............................................................................................ 5
2.1 Engineering Procedures and Standards......................................................................................................5
2.2 Safety Engineering......................................................................................................................................5
2.3 Industrial Gases Applications......................................................................................................................5
2.4 Flow-Meter Design & Supply .....................................................................................................................5
2.5 Custody Transfer Meters / Performance, Material Balance Meters.............................................................6
2.6 Burner Management System .....................................................................................................................6
2.7 Thermowell Stress Calculations & Design.................................................................................................6
2.8 Measurement & Control Troubleshooting ..................................................................................................6
3. KwikGate Pty Limited – Capability Statement
This document is subject to Copyright and is Confidential. It must not be disclosed to others, reproduced or stored in a
retrieval system or transmitted in any form or by any means without the written consent of KwikGate Pty Limited.
PAGE 3 OF 6
1 GENERAL ENGINEERING SERVICES
1.1 Project Engineering
Project Planning
Project Scope of Work definition
Project Performance definition
Project Estimating
Tender preparation
Equipment data sheet preparation
Equipment specifications
Equipment enquires
Technical bid evaluations
Commercial bid evaluations
Purchase requisitions
Vendor correspondence
Vendor equipment expediting
Vendor equipment inspections
Vendor progress reports
Vendor document review /
approval
Monthly project progress reports
Monthly cost monitoring and control
Contract and sub-contract
administration
Claims preparation and management
Construction specification
preparation
Construction enquires
Prepare organizational charts
Procedure preparation
Review As-Built documentation
Collate project data books
Conduct Project E&I design reviews
Plant upgrade studies
Coordination with overseas suppliers
Assist with obtaining Statutory
Authority approvals
1.2 Instrument & Control Basic Design
Control Concept / Philosophy
Basic List of Measurement Points
Basic Instrument Data Sheets
Standard Instrument Process
Connection
Project Standard Instrument
Requirements
Cause & Effect Matrices
Control Block Diagram
Instrument/Control Input to Basic
PFD’s and P&ID’s
HAZOP
1.3 Hazard and Operability Study
HAZOP / What-If Analysis
Procedure and documents
preparation
HAZOP organization
HAZOP chairing
HAZOP Job sheet expediting
HAZOP Review report
4. KwikGate Pty Limited – Capability Statement
This document is subject to Copyright and is Confidential. It must not be disclosed to others, reproduced or stored in a
retrieval system or transmitted in any form or by any means without the written consent of KwikGate Pty Limited.
PAGE 4 OF 6
1.4 Instrument & Control Detail Design
Scope of Works
Equipment specifications
Equipment Data Sheets
Equipment Calculations
Equipment Vendor QA & Document Requirements
Equipment Vendor Inspections
Instrument Loop Diagrams
Instrument Hook-up Diagrams
Functional Logic Diagrams
Functional Description
Safeguarding Narrative
PFD’s and P&ID’s
Cable Schedules
Termination Schedules
Equipment Mounting Details
Installation Schedules
Hazardous Area Dossier
Operating Manuals
Training Manuals
Performance Testing Criteria and Measurement
5. KwikGate Pty Limited – Capability Statement
This document is subject to Copyright and is Confidential. It must not be disclosed to others, reproduced or stored in a
retrieval system or transmitted in any form or by any means without the written consent of KwikGate Pty Limited.
PAGE 5 OF 6
2 SPECIALISED ENGENEERING
2.1 Engineering Procedures and Standards
Development of Standard
Engineering Procedures
Development of Standard
Engineering Work Instructions
Development of Standard
Engineering Specifications
Development of Standard Engineering
Forms
Development of Standard Engineering
Data Sheets
Development of Standard Engineering
Drawings
2.2 Safety Engineering
HSE Legislation and Risk
Assessment
Safety Audits and Inspections
Flammable Atmosphere Design &
Inspections
HAZOP Facilitation
Oxygen Hazard Flammability
Risk Assessment (OHFRA)
Relief Valve Sizing
2.3 Industrial Gases Applications
Hydrogen and Oxygen Expertise
Artificial Atmospheres
Oxygen Enrichment and
Dissolution
Fuel / Oxygen Gas Burners
Generator Cooling
N2 & CO2 Inertisation
N2 & CO2 Blanketing
Gas and Liquid Hydrocarbon Line
Clearance
LNG Storage Tank Oxygen &
Moisture Removal & Cool-Down
2.4 Flow-Meter Design & Supply
Flow-Metering Orifice Plates
Restriction Orifice Plates
Small Bore Orifice Plates
Plate Thickness Calculation
Plate Noise Calculation
Multi-Hole Restriction Plates
6. KwikGate Pty Limited – Capability Statement
This document is subject to Copyright and is Confidential. It must not be disclosed to others, reproduced or stored in a
retrieval system or transmitted in any form or by any means without the written consent of KwikGate Pty Limited.
PAGE 6 OF 6
2.5 Custody Transfer Meters / Performance, Material Balance Meters
Custody Transfer Meter Design
Custody Transfer Meter
Verification
Custody Transfer Meter
Measurement Uncertainty
Prediction
Invoice / Performance / Material
Balance Meters Design and Supply
Development of Plant / Equipment
Performance Test Procedures
2.6 Burner Management System
BMS Design
BMS Review
Valve Train Design & Supply
2.7 Thermowell Stress Calculations & Design
2.8 Measurement & Control Troubleshooting