SlideShare a Scribd company logo
1 of 7
Download to read offline
Domain Cabinets Direct
888-US-CABINETS
Domain Cabinets Direct 1 | P a g e
Sink Base Vanity
Assembly Instructions for 48” and 60” Frameless Left & Right Drawer Set Sink Base Vanities
BEFORE YOU START
STEP 1: Collect your tools. For this project you will need:
• Phillips head Power Drill
• Nail gun or Staple gun
• Common/Flathead screwdriver
• Rubber mallet
• Wood glue
• Box cutter
STEP 2: Place the box on a sturdy work surface.
STEP 3: Open the box by carefully cutting the tape on the ends of the box. Lift the box from the contents on
one side when cutting along the center seam of tape to avoid damaging the vanity pieces.
STEP 4: Pull back the packaging and carefully lift each piece out of the box, inspecting them for damage. Place
them against a wall.
STEP 5: Remove the box of hardware from the packaging. Separate the types of hardware into small piles and
place them in a plastic box.
PRO TIP: Hardware can get lost, placing it in a box can keep it organized, easy to reach, and prevent small pieces
from getting misplaced.
STEP 6: Locate your model number on the website and click the Packing List link to open a PDF version of the
exploded view Packing List, print. Make sure all parts are accounted for, checking them off the part list.
BEGINNING ASSEMBLY
CABINET BASE
STEP 1: Take both Part A sides and lay them flat on your work surface with the interior side facing upward.
For Left side drawers. For Right side drawers.
STEP 2: Locate the Drawer Slides and remove them from any packaging. Fully extend each slide. The furthest
segment of each slide is the Drawer Box Segment. Pressing the black plastic pin of the Drawer Box
Segment upward, pull it from the remaining segments of the Drawer Slide and place it aside for later.
Left Side
Part A
Right Side
Part A
Pre-drilled holes for
Drawer Glides
Domain Cabinets Direct
888-US-CABINETS
Domain Cabinets Direct 2 | P a g e
STEP 3: Place the flat side of the remaining Drawer Slide on Part A, aligning it with the
pre-drilled holes ensuring that the slide extends to the front of the cabinet. To get
access to the drill holes, you will need to slide the inner track until the holes are
visible. Using the 12mm Slide Screws, gently screw the drawer slides to Part A.
Repeat as needed and on both Part As (Left and Right).
NOTE: For a 2 drawer vanity, you will only install two Drawer Slides on this section of Part A. For a 3 drawer, you
will install three Drawer Slides. Save the remaining slides for Part C.
STEP 4: Locate Part B (Bottom Panel).
STEP 5: With the Drawer Slides attached to both Part As, attach the left
Part A to Part B (Bottom Panel) fitting wood dowels into the dowel
holes. Secure using four 50mm screws and ensure that the grove
at the back of Part A meets the groove on Part B.
NOTE: The grooves must align as they serve as the track to slide in the back panel later in the assembly process.
STEP 6: Once attached to Part B, attach the right side Part A to the Part B and lay the unit on its back.
STEP 7: Locate Part J (Toe Kick) and fit it between the two Part As, aligning the pre-drilled screw holes. Using
four 50mm screws, secure the toe kick to Part A (Left) and Part A (Right).
STEP 8: Set the unit aside.
STEP 9: Locate the two Part Cs (Center Dividers) and place them flat on your work
surface. Note that the finished edge of Part C indicates the front of the
cabinet. For the left side drawer orientation, attach Drawer Slides to the
pre-drilled drawer slide holes on the left side of one of the Part Cs. For the
right side drawer orientation, attach Drawer Slides to the holes on the right
side of the remaining Part C as described in STEP 3.
PRO TIP: Many assemblers use wood glue to secure the dowels and create added strength. Excess wood glue
can be removed with a damp towel. The dowels serve as an assembly aid but aren’t necessarily needed
to construct this part of the cabinet. If you wish to forego the use of dowels for Part C ONLY you may,
the 50mm screws are more than sufficient to construct this part of the cabinet.
Part B
(Bottom
Panel)
Part C
(Center Divider)
Part B
(Bottom Panel)
Left side drawer base
orientation shown.
Back Panel Groove
Pre-drilled
Dowel Holes
Pre-drilled
Screw Holes
Domain Cabinets Direct
888-US-CABINETS
Domain Cabinets Direct 3 | P a g e
STEP 10: With the remaining Drawer Slides attached to Part C, place the wood
dowels in the pre-drilled dowel holes located on the bottom of Part C. Placing the
finished edge of Part C facing frontwards, secure both Part Cs to Part B using wood
dowels and 50mm screws.
STEP 11: Locate the four Part Ds (the Drawer Side Connecting Beams). Part D is
a support bridge between the drawers. Using a small bead of wood glue, place
wood dowels in the dowel holes on the side of each of the Part Ds.
NOTE: When using wood glue to secure dowels for Part D, Part E, Part H, and Part G, remember to also add a
bead of glue to their corresponding holes in Part A and Part B.
Remember – what you do on one side, do on the other.
STEP 12: With the finished edge facing the front of the unit, fit each Part D
between Part A and Part C of each drawer side of the cabinet and
secure with 50mm screws.
STEP 13: Locate Part E (Sink Side Connecting Beam). Using a small bead of
wood glue, place the wood dowels in the dowel holes located at
the ends of both sides of Part E.
STEP 14: On the sink side, fit Part E between Part C and Part A (you may need a
gentle tap of the mallet to fit it snugly) and secure using two 50mm screws just as
you did with Part D on the drawer side.
STEP 15: Locate Part H and place it on the top of the unit with the finished edge
facing the front of the cabinet, securing it using 50mm screws.
PRO TIP: Securing Part H can be a little awkward by yourself. If you’re assembling the cabinet alone, secure Part
H to Part C (the middle screws) first and then secure it on the sides at Part A (both sides).
STEP 16: Locate Part F (Back Panel). IF YOU CHOOSE NOT TO INSTALL PART F, PROCEED TO STEP 18.
NOTE: Many RTA assemblers/installers choose not to use the back panel due to the need to cut the panel to fit
plumbing or plumbing inconsistencies. Omitting the back panel doesn’t compromise the strength of
your cabinet. If you do choose to install the back panel, be sure to measure and cut a generous hole to
accommodate your pipes for the sink base side.
STEP 17: To install the back panel, face the finished side of Part F towards the front of
the cabinet and carefully slide it along the groves at the rear of the unit. Be
sure that the panel sits securely in the groves along the base as well as the
sides.
STEP 18: Locate Part G (Top Back Connecting Beam) and place it at the top of the unit over the back section just
as you did with Part H in STEP 15.
Part D
Part E
Part H
Part A
Part G
Part F
(Back Panel)
Domain Cabinets Direct
888-US-CABINETS
Domain Cabinets Direct 4 | P a g e
NOTE: IF YOU INSTALLED THE BACK PANEL, be sure to fit the groves of Part G over the top edge of Part F.
STEP 19: Using 50mm screws, secure Part G as in STEP 15 for Part H.
STEP 20: Locate the two Part Is (Back Reinforcement Beam). These support
beams secure the cabinet to the wall and (if you install the back panel) also secures
the back panel in place. Fit one Part I along the back of the cabinet at the top with
the angled pre-drilled hole in the center pointed upwards and secure it using one of
the 30mm screws. Use 50mm screws to attach Part I at the sides.
STEP 21: Repeat STEP 20 for the second Part I, securing it at the lower back section of the unit and ensuring the
angled pre-drilled hole points downward.
STEP 22: Locate the Sink Side False Panel (not shown in the exploded view
part list). This panel allows you to connect the false drawer front
to the sink side of the cabinet, above the sink base doors.
Although there are no pre-drilled holes for this section, it can be
easily installed using a staple gun or nail gun. Slide the sink side
false panel into the hole between Part H and Part E so that it is
framed, flush against the front edges of Parts C, E, and H and
attach.
This completes the cabinet base assembly. For door and drawer assembly & instructions, set the cabinet base aside
and please continue.
Part I
(Back Reinforcement Beams)
Sink Side
False Panel
Domain Cabinets Direct
888-US-CABINETS
Domain Cabinets Direct 5 | P a g e
DOOR ATTACHMENT
STEP 1: Locate the cabinet door(s) and door hinges and place them on a sturdy work
surface.
STEP 2: With the door facing down, insert the body of the hinge into the pre-cored holes
on the door and secure using the screws included in the hinge kit.
NOTE: Although the doors come pre-cored, you should use a level to align the hinges and make sure they’re
straight.
STEP 3: Attach the door to the cabinet base in the center sink section
using the screws included in the hinge kit and aligning the
hinges with the pre-drilled holes located each Part C.
STEP 4: After setting the cabinet doors, they can be aligned (top to
bottom, left to right) using the hinge position screws. The
rear hinge position screw aligns top to bottom, the front
position screw aligns the door from side to side.
This concludes the door attachment instructions, for information on drawer assembly please continue.
DRAWER ASSEMBLY
Drawer assembly is simple yet precise. As all of the drawers use dovetail joining, it is important to be very careful
during assembly and not to use unnecessary force as it could cause damage to the joiners.
Each drawer consists of 2 Drawer Sides (Part K), 2 Drawer Aprons (Part L – for soft closing drawers the rear and
back drawer aprons will vary slightly – the rear apron will have a notch at the base of each side whereas the front
apron has a straight base and will contain two pre-drilled holes in order to attach the Door Face), 1 Drawer Bottom
(Part M), and the Drawer Front (not shown in the exploded view of the part list).
STEP 1: Collect your tools. For this project you will need:
• Power Drill with Phillips
screwdriver tip
• Wood glue
• Rubber mallet
• 2 x 4 piece of scrap wood
STEP 2: For each drawer, locate 2 Drawer Sides (Part K), 2 Drawer Aprons (Part L – one notched as well as one
straight bottom with pre-drilled holes), 1 Drawer Bottom (Part M), and the Drawer Front and set them
on a secure work surface bottom groove side facing upward.
STEP 3: Set aside one of the drawer aprons (Part L) and one of the drawer
sides (Part K). Place a small bead of wood glue between the
dovetail joiners on one side of the front drawer apron (Part L).
Cabinet
Door
Hinges
Part L
(Drawer Apron)
Part K
(Drawer Side)
Domain Cabinets Direct
888-US-CABINETS
Domain Cabinets Direct 6 | P a g e
Part L
(Drawer Apron)
Drawer Front
STEP 4: Align the drawer side (Part K) with the glued side of the front drawer apron (Part L), ensuring the groves
at the base of each piece align, and that the dovetail joiners align. Tap gently with the rubber mallet.
PRO TIP: To fit the pieces together and avoid damage to the box and joiners, use the scrap 2 x 4 by placing it over
the dovetail joint. Tap the mallet firmly but carefully. The 2 x 4 distributes the pressure of the mallet
evenly and also keeps the mallet from leaving impressions in the wood.
Remember – Although dovetail makes a very secure joining the dovetail tongues are vulnerable to damage until the
sides are assembled, be careful and try not to force pieces together.
STEP 5: Locate Part M (Drawer Bottom). Slide the drawer bottom into place along the grooves.
STEP 6: Place a small bead of wood glue between the dovetail joiners on
opposite side of the front drawer apron (Part L) already joined to the drawer
side (Part K). Take the other drawer side (Part K) and slide it into place, aligning
it with the glued dovetail joiners and the drawer base. Tap gently with the
rubber mallet as described in STEP 4 and as listed in the above PRO TIP.
STEP 7: Locate Part K (the back Drawer Side). Apply small beads of wood glue on
both dovetail joiner sides. Align the back drawer apron (Part K) to the
drawer sides (Part L) and drawer base, gently tapping it into place with
the mallet. Repeat the instructions listed in the above PRO TIP.
Repeat for all drawers STEP 2 – STEP 7 for all drawers.
STEP 8: Locate the Drawer Box Segment of the drawer glides set aside earlier during the cabinet base assembly.
STEP 9: Placing the assembled drawer box on its side, positioning the drawer
box segment of the drawer glides so that the break end faces the front of the
box and the pinched end faces the rear. Be sure to align the pre-drilled holes on
the drawer sides with holes on the drawer slide. Secure using the 12mm slide
screws. Repeat for each side of each drawer.
STEP 10: Attaching Drawer Fronts:
Use a piece of scribe molding as a
spacer to align the fronts then attach
from the back, inside the drawer, using 30mm screws. Clamps
come in handy to hold the pieces in place during drilling. Repeat
for each drawer and for the sink side false panel. Keep in mind
you won’t necessarily attach the drawer fronts to the drawer
aprons at the pre-drilled holes. Each style is different. As a
rule, ALWAYS attach aprons to the “meat” of the drawer front
to avoid drawer front damage.
NOTE: When attaching handles, be sure not to over-tighten screws as it could damage the front. You may wish
to attach hardware to the “meat” of the drawer front (such as the frame on a shaker-style cabinet).
Part K
(Drawer Side)
Part L
(Drawer Apron)
Drawer Glide
(End)
Part L
(Front Drawer
Apron)
Domain Cabinets Direct
888-US-CABINETS
Domain Cabinets Direct 7 | P a g e
FINISHING UP
Congratulations, you have just assembled your sink base vanity! To finish up, place the adhesive plastic stoppers
at the corners of the drawers and doors to keep them from banging upon closing.
Before assembling, take a moment to re-inspect your work a final time, looking for any screws that could be
tightened or hinges that could be adjusted slightly.

More Related Content

What's hot

Settanni Donato Final 11.12.15
Settanni Donato Final 11.12.15Settanni Donato Final 11.12.15
Settanni Donato Final 11.12.15
John Zierke
 
Solar cooker installation
Solar cooker installationSolar cooker installation
Solar cooker installation
Prabhat Kumar
 
Faimon Initial Packet 2.22.16
Faimon Initial Packet 2.22.16Faimon Initial Packet 2.22.16
Faimon Initial Packet 2.22.16
John Zierke
 
NT NEW SHOP CONCEPT Design
NT NEW SHOP CONCEPT DesignNT NEW SHOP CONCEPT Design
NT NEW SHOP CONCEPT Design
Domingo Valdez
 

What's hot (18)

4. How to build shed roof rafters
4. How to build shed roof rafters4. How to build shed roof rafters
4. How to build shed roof rafters
 
5. How to build shed walls
5. How to build shed walls5. How to build shed walls
5. How to build shed walls
 
7. How to build shed roof
7. How to build shed roof7. How to build shed roof
7. How to build shed roof
 
3. How to install floor sheeting
3. How to install floor sheeting3. How to install floor sheeting
3. How to install floor sheeting
 
2. How to build a shed floor?
2. How to build a shed floor?2. How to build a shed floor?
2. How to build a shed floor?
 
thi cong vach ngan ve sinh compact
thi cong vach ngan ve sinh compactthi cong vach ngan ve sinh compact
thi cong vach ngan ve sinh compact
 
gaveteiro
gaveteirogaveteiro
gaveteiro
 
plano gabinete servidores
plano gabinete servidoresplano gabinete servidores
plano gabinete servidores
 
Adega modular
Adega modularAdega modular
Adega modular
 
Settanni Donato Final 11.12.15
Settanni Donato Final 11.12.15Settanni Donato Final 11.12.15
Settanni Donato Final 11.12.15
 
Design Portfolio
Design PortfolioDesign Portfolio
Design Portfolio
 
Solar cooker installation
Solar cooker installationSolar cooker installation
Solar cooker installation
 
Faimon Initial Packet 2.22.16
Faimon Initial Packet 2.22.16Faimon Initial Packet 2.22.16
Faimon Initial Packet 2.22.16
 
Work holding on drill press
Work holding on drill pressWork holding on drill press
Work holding on drill press
 
Coffee table 11
Coffee table 11Coffee table 11
Coffee table 11
 
NT NEW SHOP CONCEPT Design
NT NEW SHOP CONCEPT DesignNT NEW SHOP CONCEPT Design
NT NEW SHOP CONCEPT Design
 
Sample Product Reseach
Sample Product ReseachSample Product Reseach
Sample Product Reseach
 
12x12 shed plan step by step
12x12 shed plan step by step12x12 shed plan step by step
12x12 shed plan step by step
 

Viewers also liked

Lesson 207 19 oct13-1500-ay
Lesson 207 19 oct13-1500-ayLesson 207 19 oct13-1500-ay
Lesson 207 19 oct13-1500-ay
Codecademy Ren
 
Lesson 206 11 oct13-1500-ay
Lesson 206 11 oct13-1500-ayLesson 206 11 oct13-1500-ay
Lesson 206 11 oct13-1500-ay
Codecademy Ren
 
Music downlonds
Music downlondsMusic downlonds
Music downlonds
rogerhills
 
Music dowloding
Music dowlodingMusic dowloding
Music dowloding
rogerhills
 
Muziek downlauden
Muziek downlaudenMuziek downlauden
Muziek downlauden
rogerhills
 
Lesson 112 24 aug13-2300-ay
Lesson 112 24 aug13-2300-ayLesson 112 24 aug13-2300-ay
Lesson 112 24 aug13-2300-ay
Codecademy Ren
 
Music upload share
Music upload shareMusic upload share
Music upload share
rogerhills
 
Lesson 108 23 aug13-1430-ay
Lesson 108 23 aug13-1430-ayLesson 108 23 aug13-1430-ay
Lesson 108 23 aug13-1430-ay
Codecademy Ren
 
A2 12-penyusunan tujuan insruksional
A2 12-penyusunan tujuan insruksionalA2 12-penyusunan tujuan insruksional
A2 12-penyusunan tujuan insruksional
WaQhyoe Arryee
 
Music diwnloads
Music diwnloadsMusic diwnloads
Music diwnloads
rogerhills
 
Music downliads
Music downliadsMusic downliads
Music downliads
rogerhills
 
Lesson 111 24 aug13-1430-ay
Lesson 111 24 aug13-1430-ayLesson 111 24 aug13-1430-ay
Lesson 111 24 aug13-1430-ay
Codecademy Ren
 
Music creators
Music creatorsMusic creators
Music creators
rogerhills
 

Viewers also liked (20)

Lesson 207 19 oct13-1500-ay
Lesson 207 19 oct13-1500-ayLesson 207 19 oct13-1500-ay
Lesson 207 19 oct13-1500-ay
 
Frameless wall easy reach
Frameless wall easy reachFrameless wall easy reach
Frameless wall easy reach
 
SafeCare: An Evidence-based Widely Disseminated Parent Trianing Program to Pr...
SafeCare: An Evidence-based Widely Disseminated Parent Trianing Program to Pr...SafeCare: An Evidence-based Widely Disseminated Parent Trianing Program to Pr...
SafeCare: An Evidence-based Widely Disseminated Parent Trianing Program to Pr...
 
Lesson 206 11 oct13-1500-ay
Lesson 206 11 oct13-1500-ayLesson 206 11 oct13-1500-ay
Lesson 206 11 oct13-1500-ay
 
Partner Violence and Children...How Should We Respond?-- Angie Boy, DrPh
Partner Violence and Children...How Should We Respond?-- Angie Boy, DrPhPartner Violence and Children...How Should We Respond?-- Angie Boy, DrPh
Partner Violence and Children...How Should We Respond?-- Angie Boy, DrPh
 
Kepala sekolah
Kepala sekolahKepala sekolah
Kepala sekolah
 
Parts list & assembly instructions frameless wall easy reach
Parts list & assembly instructions frameless wall easy reachParts list & assembly instructions frameless wall easy reach
Parts list & assembly instructions frameless wall easy reach
 
Music downlonds
Music downlondsMusic downlonds
Music downlonds
 
Guru
GuruGuru
Guru
 
Music dowloding
Music dowlodingMusic dowloding
Music dowloding
 
Muziek downlauden
Muziek downlaudenMuziek downlauden
Muziek downlauden
 
Lesson 112 24 aug13-2300-ay
Lesson 112 24 aug13-2300-ayLesson 112 24 aug13-2300-ay
Lesson 112 24 aug13-2300-ay
 
Music upload share
Music upload shareMusic upload share
Music upload share
 
Lesson 108 23 aug13-1430-ay
Lesson 108 23 aug13-1430-ayLesson 108 23 aug13-1430-ay
Lesson 108 23 aug13-1430-ay
 
A2 12-penyusunan tujuan insruksional
A2 12-penyusunan tujuan insruksionalA2 12-penyusunan tujuan insruksional
A2 12-penyusunan tujuan insruksional
 
Music diwnloads
Music diwnloadsMusic diwnloads
Music diwnloads
 
Music downliads
Music downliadsMusic downliads
Music downliads
 
Peneliti pendidikan
Peneliti pendidikanPeneliti pendidikan
Peneliti pendidikan
 
Lesson 111 24 aug13-1430-ay
Lesson 111 24 aug13-1430-ayLesson 111 24 aug13-1430-ay
Lesson 111 24 aug13-1430-ay
 
Music creators
Music creatorsMusic creators
Music creators
 

Similar to How to assemble a sink base vanity

Effective heat installation guid
Effective heat installation guidEffective heat installation guid
Effective heat installation guid
Don Pell
 

Similar to How to assemble a sink base vanity (20)

How To Assemble A Base Trash Can
How To Assemble A Base Trash CanHow To Assemble A Base Trash Can
How To Assemble A Base Trash Can
 
iMovR Cadence Express Standing Desk Converter Installation Manual
iMovR Cadence Express Standing Desk Converter Installation ManualiMovR Cadence Express Standing Desk Converter Installation Manual
iMovR Cadence Express Standing Desk Converter Installation Manual
 
ThermoDesk ELITE Adjustable-Height Desk System - Installation and User Manual
ThermoDesk ELITE Adjustable-Height Desk System - Installation and User ManualThermoDesk ELITE Adjustable-Height Desk System - Installation and User Manual
ThermoDesk ELITE Adjustable-Height Desk System - Installation and User Manual
 
Ug lunette
Ug lunette Ug lunette
Ug lunette
 
Ug lunette projection screen
Ug lunette projection screenUg lunette projection screen
Ug lunette projection screen
 
Ug lunette
Ug lunette Ug lunette
Ug lunette
 
Ug lunette rev101012
Ug lunette rev101012Ug lunette rev101012
Ug lunette rev101012
 
iMovr Omega Olympus Manual 12 24-15
iMovr Omega Olympus Manual 12 24-15iMovr Omega Olympus Manual 12 24-15
iMovr Omega Olympus Manual 12 24-15
 
iMovR Vigor: 3 Leg Kit Installation Manual
iMovR Vigor: 3 Leg Kit Installation ManualiMovR Vigor: 3 Leg Kit Installation Manual
iMovR Vigor: 3 Leg Kit Installation Manual
 
Installation Manual: Height Adjustable Table - Three Leg Kit
Installation Manual: Height Adjustable Table - Three Leg KitInstallation Manual: Height Adjustable Table - Three Leg Kit
Installation Manual: Height Adjustable Table - Three Leg Kit
 
Ms200 Install Asphalt
Ms200 Install AsphaltMs200 Install Asphalt
Ms200 Install Asphalt
 
iMovR Cadence Standing Desk Converter Installation Manual
iMovR Cadence Standing Desk Converter Installation ManualiMovR Cadence Standing Desk Converter Installation Manual
iMovR Cadence Standing Desk Converter Installation Manual
 
Mobile Wire Shelving Installation Instructions
Mobile Wire Shelving Installation InstructionsMobile Wire Shelving Installation Instructions
Mobile Wire Shelving Installation Instructions
 
F5 assembly instructions
F5 assembly instructionsF5 assembly instructions
F5 assembly instructions
 
Frameless base cabinet 1 door 1 drawer
Frameless base cabinet 1 door 1 drawerFrameless base cabinet 1 door 1 drawer
Frameless base cabinet 1 door 1 drawer
 
Cadence plus installation manual
Cadence plus installation manualCadence plus installation manual
Cadence plus installation manual
 
Effective heat installation guid
Effective heat installation guidEffective heat installation guid
Effective heat installation guid
 
F-F-Fiddle Assembly Instructions
F-F-Fiddle Assembly InstructionsF-F-Fiddle Assembly Instructions
F-F-Fiddle Assembly Instructions
 
Omega Denali Adjustable-Height Desk Manual
Omega Denali Adjustable-Height Desk ManualOmega Denali Adjustable-Height Desk Manual
Omega Denali Adjustable-Height Desk Manual
 
Xtend Dual Screen Crossbar Monitor Arm Assembly Instructions
Xtend Dual Screen Crossbar Monitor Arm Assembly InstructionsXtend Dual Screen Crossbar Monitor Arm Assembly Instructions
Xtend Dual Screen Crossbar Monitor Arm Assembly Instructions
 

Recently uploaded

Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
amitlee9823
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
lizamodels9
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
lizamodels9
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
Renandantas16
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
amitlee9823
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
dlhescort
 

Recently uploaded (20)

Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 

How to assemble a sink base vanity

  • 1. Domain Cabinets Direct 888-US-CABINETS Domain Cabinets Direct 1 | P a g e Sink Base Vanity Assembly Instructions for 48” and 60” Frameless Left & Right Drawer Set Sink Base Vanities BEFORE YOU START STEP 1: Collect your tools. For this project you will need: • Phillips head Power Drill • Nail gun or Staple gun • Common/Flathead screwdriver • Rubber mallet • Wood glue • Box cutter STEP 2: Place the box on a sturdy work surface. STEP 3: Open the box by carefully cutting the tape on the ends of the box. Lift the box from the contents on one side when cutting along the center seam of tape to avoid damaging the vanity pieces. STEP 4: Pull back the packaging and carefully lift each piece out of the box, inspecting them for damage. Place them against a wall. STEP 5: Remove the box of hardware from the packaging. Separate the types of hardware into small piles and place them in a plastic box. PRO TIP: Hardware can get lost, placing it in a box can keep it organized, easy to reach, and prevent small pieces from getting misplaced. STEP 6: Locate your model number on the website and click the Packing List link to open a PDF version of the exploded view Packing List, print. Make sure all parts are accounted for, checking them off the part list. BEGINNING ASSEMBLY CABINET BASE STEP 1: Take both Part A sides and lay them flat on your work surface with the interior side facing upward. For Left side drawers. For Right side drawers. STEP 2: Locate the Drawer Slides and remove them from any packaging. Fully extend each slide. The furthest segment of each slide is the Drawer Box Segment. Pressing the black plastic pin of the Drawer Box Segment upward, pull it from the remaining segments of the Drawer Slide and place it aside for later. Left Side Part A Right Side Part A Pre-drilled holes for Drawer Glides
  • 2. Domain Cabinets Direct 888-US-CABINETS Domain Cabinets Direct 2 | P a g e STEP 3: Place the flat side of the remaining Drawer Slide on Part A, aligning it with the pre-drilled holes ensuring that the slide extends to the front of the cabinet. To get access to the drill holes, you will need to slide the inner track until the holes are visible. Using the 12mm Slide Screws, gently screw the drawer slides to Part A. Repeat as needed and on both Part As (Left and Right). NOTE: For a 2 drawer vanity, you will only install two Drawer Slides on this section of Part A. For a 3 drawer, you will install three Drawer Slides. Save the remaining slides for Part C. STEP 4: Locate Part B (Bottom Panel). STEP 5: With the Drawer Slides attached to both Part As, attach the left Part A to Part B (Bottom Panel) fitting wood dowels into the dowel holes. Secure using four 50mm screws and ensure that the grove at the back of Part A meets the groove on Part B. NOTE: The grooves must align as they serve as the track to slide in the back panel later in the assembly process. STEP 6: Once attached to Part B, attach the right side Part A to the Part B and lay the unit on its back. STEP 7: Locate Part J (Toe Kick) and fit it between the two Part As, aligning the pre-drilled screw holes. Using four 50mm screws, secure the toe kick to Part A (Left) and Part A (Right). STEP 8: Set the unit aside. STEP 9: Locate the two Part Cs (Center Dividers) and place them flat on your work surface. Note that the finished edge of Part C indicates the front of the cabinet. For the left side drawer orientation, attach Drawer Slides to the pre-drilled drawer slide holes on the left side of one of the Part Cs. For the right side drawer orientation, attach Drawer Slides to the holes on the right side of the remaining Part C as described in STEP 3. PRO TIP: Many assemblers use wood glue to secure the dowels and create added strength. Excess wood glue can be removed with a damp towel. The dowels serve as an assembly aid but aren’t necessarily needed to construct this part of the cabinet. If you wish to forego the use of dowels for Part C ONLY you may, the 50mm screws are more than sufficient to construct this part of the cabinet. Part B (Bottom Panel) Part C (Center Divider) Part B (Bottom Panel) Left side drawer base orientation shown. Back Panel Groove Pre-drilled Dowel Holes Pre-drilled Screw Holes
  • 3. Domain Cabinets Direct 888-US-CABINETS Domain Cabinets Direct 3 | P a g e STEP 10: With the remaining Drawer Slides attached to Part C, place the wood dowels in the pre-drilled dowel holes located on the bottom of Part C. Placing the finished edge of Part C facing frontwards, secure both Part Cs to Part B using wood dowels and 50mm screws. STEP 11: Locate the four Part Ds (the Drawer Side Connecting Beams). Part D is a support bridge between the drawers. Using a small bead of wood glue, place wood dowels in the dowel holes on the side of each of the Part Ds. NOTE: When using wood glue to secure dowels for Part D, Part E, Part H, and Part G, remember to also add a bead of glue to their corresponding holes in Part A and Part B. Remember – what you do on one side, do on the other. STEP 12: With the finished edge facing the front of the unit, fit each Part D between Part A and Part C of each drawer side of the cabinet and secure with 50mm screws. STEP 13: Locate Part E (Sink Side Connecting Beam). Using a small bead of wood glue, place the wood dowels in the dowel holes located at the ends of both sides of Part E. STEP 14: On the sink side, fit Part E between Part C and Part A (you may need a gentle tap of the mallet to fit it snugly) and secure using two 50mm screws just as you did with Part D on the drawer side. STEP 15: Locate Part H and place it on the top of the unit with the finished edge facing the front of the cabinet, securing it using 50mm screws. PRO TIP: Securing Part H can be a little awkward by yourself. If you’re assembling the cabinet alone, secure Part H to Part C (the middle screws) first and then secure it on the sides at Part A (both sides). STEP 16: Locate Part F (Back Panel). IF YOU CHOOSE NOT TO INSTALL PART F, PROCEED TO STEP 18. NOTE: Many RTA assemblers/installers choose not to use the back panel due to the need to cut the panel to fit plumbing or plumbing inconsistencies. Omitting the back panel doesn’t compromise the strength of your cabinet. If you do choose to install the back panel, be sure to measure and cut a generous hole to accommodate your pipes for the sink base side. STEP 17: To install the back panel, face the finished side of Part F towards the front of the cabinet and carefully slide it along the groves at the rear of the unit. Be sure that the panel sits securely in the groves along the base as well as the sides. STEP 18: Locate Part G (Top Back Connecting Beam) and place it at the top of the unit over the back section just as you did with Part H in STEP 15. Part D Part E Part H Part A Part G Part F (Back Panel)
  • 4. Domain Cabinets Direct 888-US-CABINETS Domain Cabinets Direct 4 | P a g e NOTE: IF YOU INSTALLED THE BACK PANEL, be sure to fit the groves of Part G over the top edge of Part F. STEP 19: Using 50mm screws, secure Part G as in STEP 15 for Part H. STEP 20: Locate the two Part Is (Back Reinforcement Beam). These support beams secure the cabinet to the wall and (if you install the back panel) also secures the back panel in place. Fit one Part I along the back of the cabinet at the top with the angled pre-drilled hole in the center pointed upwards and secure it using one of the 30mm screws. Use 50mm screws to attach Part I at the sides. STEP 21: Repeat STEP 20 for the second Part I, securing it at the lower back section of the unit and ensuring the angled pre-drilled hole points downward. STEP 22: Locate the Sink Side False Panel (not shown in the exploded view part list). This panel allows you to connect the false drawer front to the sink side of the cabinet, above the sink base doors. Although there are no pre-drilled holes for this section, it can be easily installed using a staple gun or nail gun. Slide the sink side false panel into the hole between Part H and Part E so that it is framed, flush against the front edges of Parts C, E, and H and attach. This completes the cabinet base assembly. For door and drawer assembly & instructions, set the cabinet base aside and please continue. Part I (Back Reinforcement Beams) Sink Side False Panel
  • 5. Domain Cabinets Direct 888-US-CABINETS Domain Cabinets Direct 5 | P a g e DOOR ATTACHMENT STEP 1: Locate the cabinet door(s) and door hinges and place them on a sturdy work surface. STEP 2: With the door facing down, insert the body of the hinge into the pre-cored holes on the door and secure using the screws included in the hinge kit. NOTE: Although the doors come pre-cored, you should use a level to align the hinges and make sure they’re straight. STEP 3: Attach the door to the cabinet base in the center sink section using the screws included in the hinge kit and aligning the hinges with the pre-drilled holes located each Part C. STEP 4: After setting the cabinet doors, they can be aligned (top to bottom, left to right) using the hinge position screws. The rear hinge position screw aligns top to bottom, the front position screw aligns the door from side to side. This concludes the door attachment instructions, for information on drawer assembly please continue. DRAWER ASSEMBLY Drawer assembly is simple yet precise. As all of the drawers use dovetail joining, it is important to be very careful during assembly and not to use unnecessary force as it could cause damage to the joiners. Each drawer consists of 2 Drawer Sides (Part K), 2 Drawer Aprons (Part L – for soft closing drawers the rear and back drawer aprons will vary slightly – the rear apron will have a notch at the base of each side whereas the front apron has a straight base and will contain two pre-drilled holes in order to attach the Door Face), 1 Drawer Bottom (Part M), and the Drawer Front (not shown in the exploded view of the part list). STEP 1: Collect your tools. For this project you will need: • Power Drill with Phillips screwdriver tip • Wood glue • Rubber mallet • 2 x 4 piece of scrap wood STEP 2: For each drawer, locate 2 Drawer Sides (Part K), 2 Drawer Aprons (Part L – one notched as well as one straight bottom with pre-drilled holes), 1 Drawer Bottom (Part M), and the Drawer Front and set them on a secure work surface bottom groove side facing upward. STEP 3: Set aside one of the drawer aprons (Part L) and one of the drawer sides (Part K). Place a small bead of wood glue between the dovetail joiners on one side of the front drawer apron (Part L). Cabinet Door Hinges Part L (Drawer Apron) Part K (Drawer Side)
  • 6. Domain Cabinets Direct 888-US-CABINETS Domain Cabinets Direct 6 | P a g e Part L (Drawer Apron) Drawer Front STEP 4: Align the drawer side (Part K) with the glued side of the front drawer apron (Part L), ensuring the groves at the base of each piece align, and that the dovetail joiners align. Tap gently with the rubber mallet. PRO TIP: To fit the pieces together and avoid damage to the box and joiners, use the scrap 2 x 4 by placing it over the dovetail joint. Tap the mallet firmly but carefully. The 2 x 4 distributes the pressure of the mallet evenly and also keeps the mallet from leaving impressions in the wood. Remember – Although dovetail makes a very secure joining the dovetail tongues are vulnerable to damage until the sides are assembled, be careful and try not to force pieces together. STEP 5: Locate Part M (Drawer Bottom). Slide the drawer bottom into place along the grooves. STEP 6: Place a small bead of wood glue between the dovetail joiners on opposite side of the front drawer apron (Part L) already joined to the drawer side (Part K). Take the other drawer side (Part K) and slide it into place, aligning it with the glued dovetail joiners and the drawer base. Tap gently with the rubber mallet as described in STEP 4 and as listed in the above PRO TIP. STEP 7: Locate Part K (the back Drawer Side). Apply small beads of wood glue on both dovetail joiner sides. Align the back drawer apron (Part K) to the drawer sides (Part L) and drawer base, gently tapping it into place with the mallet. Repeat the instructions listed in the above PRO TIP. Repeat for all drawers STEP 2 – STEP 7 for all drawers. STEP 8: Locate the Drawer Box Segment of the drawer glides set aside earlier during the cabinet base assembly. STEP 9: Placing the assembled drawer box on its side, positioning the drawer box segment of the drawer glides so that the break end faces the front of the box and the pinched end faces the rear. Be sure to align the pre-drilled holes on the drawer sides with holes on the drawer slide. Secure using the 12mm slide screws. Repeat for each side of each drawer. STEP 10: Attaching Drawer Fronts: Use a piece of scribe molding as a spacer to align the fronts then attach from the back, inside the drawer, using 30mm screws. Clamps come in handy to hold the pieces in place during drilling. Repeat for each drawer and for the sink side false panel. Keep in mind you won’t necessarily attach the drawer fronts to the drawer aprons at the pre-drilled holes. Each style is different. As a rule, ALWAYS attach aprons to the “meat” of the drawer front to avoid drawer front damage. NOTE: When attaching handles, be sure not to over-tighten screws as it could damage the front. You may wish to attach hardware to the “meat” of the drawer front (such as the frame on a shaker-style cabinet). Part K (Drawer Side) Part L (Drawer Apron) Drawer Glide (End) Part L (Front Drawer Apron)
  • 7. Domain Cabinets Direct 888-US-CABINETS Domain Cabinets Direct 7 | P a g e FINISHING UP Congratulations, you have just assembled your sink base vanity! To finish up, place the adhesive plastic stoppers at the corners of the drawers and doors to keep them from banging upon closing. Before assembling, take a moment to re-inspect your work a final time, looking for any screws that could be tightened or hinges that could be adjusted slightly.