2
Forward Looking Information
This presentation contains certain forward-looking information and statements as defined in applicable securities law (referred to herein as
“forward-looking statements”). Forward-looking statements include, but are not limited to, statements with respect to 2015 guidance for
production, total cash costs, all-in sustaining costs, capital costs, deferred stripping costs, and exploration costs; expected throughput,
mining and recovery rates; expected future production and mining activities; opportunities to optimize the mine operation; timeline for the
life of mine plan update, and exploration program; and opportunities to optimize the mine operation.
Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause actual results, performance
or achievements to be materially different from any of its future results, performance or achievements expressed or implied by forward-
looking statements. These risks, uncertainties and other factors include, but are not limited to, assumptions and parameters underlying the
life of mine update not being realized, a decrease in the future gold price, discrepancies between actual and estimated production, changes
in costs (including labour, supplies, fuel and equipment), changes to tax rates; environmental compliance and changes in environmental
legislation and regulation, exchange rate fluctuations, general economic conditions and other risks involved in the gold exploration and
development industry, as well as those risk factors discussed in the section entitled “Description of Business - Risk Factors” in Detour
Gold’s 2014 AIF and in the continuous disclosure documents filed by Detour Gold on and available on SEDAR at www.sedar.com.
Such forward-looking statements are also based on a number of assumptions which may prove to be incorrect, including, but not limited to,
assumptions about the following: the availability of financing for exploration and development activities; operating and sustaining capital
costs; the Company’s ability to attract and retain skilled staff; sensitivity to metal prices and other sensitivities; the supply and demand for,
and the level and volatility of the price of, gold; the supply and availability of consumables and services; the exchange rates of the Canadian
dollar to the U.S. dollar; energy and fuel costs; the accuracy of reserve and resource estimates and the assumptions on which the reserve
and resource estimates are based; market competition; ongoing relations with employees and impacted communities and general business
and economic conditions. Accordingly, readers should not place undue reliance on forward-looking statements. The forward-looking
statements contained herein are made as of the date hereof, or such other date or dates specified in such statements.
All forward-looking statements in this presentation are necessarily based on opinions and estimates made as of the date such statements
are made and are subject to important risk factors and uncertainties, many of which cannot be controlled or predicted. Detour Gold and the
Qualified Persons who authored the associated Technical Report undertake no obligation to update publicly or otherwise revise any
forward-looking statements contained herein whether as a result of new information or future events or otherwise, except as may be
required by law.
3
Notes to Investors
The scientific and technical content of this presentation was reviewed, verified and approved by Drew Anwyll, P.Eng., Senior Vice President Technical
Services, and exploration results was reviewed, verified and approved by Guy MacGillivray, P.Geo., Exploration Manager , both Qualified Person as
defined by Canadian Securities Administrators National Instrument 43-101 “Standards of Disclosure for Mineral Projects”.
Qualified Persons
Non-IFRS Financial Performance Measures
The Company has included non-IFRS measures in this presentation: total cash costs, all-in sustaining costs, adjusted net loss and adjusted net loss per
share. The Company believes that these measures, in addition to conventional measures prepared in accordance with IFRS, provide investors an improved
ability to evaluate the underlying performance of the Company. The non-IFRS measures are intended to provide additional information and should not be
considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. These measures do not have any standardized
meaning prescribed under IFRS, and therefore may not be comparable to other issuers. Other companies may calculate these measure differently.
Detour Gold reports total cash costs on a sales basis. Total cash costs include production costs such as mining, processing, refining and site
administration, less non-cash share-based compensation and net of silver sales divided by gold ounces sold to arrive at total cash costs per gold ounce
sold. The measure also includes other mine related costs incurred such as mine standby costs and current inventory write downs. Production costs are
exclusive of depreciation and depletion. Production costs include the costs associated with providing the royalty in kind ounces.
Commencing in 2015, the Company adopted all-in sustaining costs on a prospective basis. The Company believes this measure more fully defines the total
costs associated with producing gold. The Company calculates all-in sustaining costs as the sum of total cash costs (as described above), share-based
compensation, corporate general and administrative expense, exploration and evaluation expenses that are sustaining in nature, reclamation cost
accretion, sustaining capital including deferred stripping, and realized gains and losses on hedges due to operating and capital costs, all divided by the gold
ounces sold to arrive at a per ounce figure.
Costs excluded from all-in sustaining costs are non-sustaining capital expenditures and exploration costs that are expected to materially increase
production, financing costs and tax expense. Consequently, this measure is not representative of all of the Company’s cash expenditures. In addition, the
calculation of all-in sustaining costs does not include depreciation and depletion expense as it does not reflect the impact of expenditures incurred in prior
periods.
Adjusted net earnings (loss) and adjusted basic earnings (loss) per share are used by management and investors to measure the underlying operating
performance of the Company. Presenting these measures from period to period helps management and investors evaluate earnings trends more readily in
comparison with results from prior periods. Adjusted net earnings (loss) is defined as net earnings (loss) adjusted to exclude specific items that are
significant, but not reflective of the underlying operations of the Company, including: fair value change of the convertible notes, the impact of foreign
exchange gains and losses, including the foreign exchange on deferred income and mining taxes, non-cash unrealized gains and losses on derivative
instruments, accretion on convertible notes, unwinding of discount on decommissioning and restoration provisions, impairment provisions and reversals
thereof, and other non-recurring items. Adjusted basic net earnings (loss) per share is calculated using the weighted average number of shares outstanding
under the basic method of loss per share as determined under IFRS.
4
Unique Investment Opportunity
Mining-friendly Jurisdiction
 Large-scale, long mine life
 Largest gold producing mine not
controlled by a senior producer
 Growing cash flow profile
 Production growth opportunities
 Favourable exposure to
Canadian Dollar
DOMINANT
GOLD PRODUCER
IN CANADA
5
2015 Production Guidance (Koz)
#2 in Production and #1 in Reserves
DGC
Detour Lake
AEM/YRI
Canadian
Malartic
AEM
Meadowbank
G
Red Lake
Canadian Intermediate Gold Producer
400-
425
560
475-
525
400
Gold Reserves (Moz)
DGC
Detour Lake
AEM/YRI
Canadian
Malartic
AEM
Meadowbank
G
Red Lake
2.1
15.0
8.7
1.2
6
2015 Drivers to Success
Execution of Plan
 Gold production increase with higher
mining and milling rates
 Strengthen balance sheet
Added Benefits
 Significant leverage to gold price and
Canadian dollar
 Low power and diesel costs
Near to Long-Term Value Enhancements
 Plant optimization (with limited capital)
 Development of Block A
 Exploration potential
7
2015 Guidance1
TCC2
$780-
$850
AISC/oz sold2
$1,050-$1,150
Capital Expenditures
 Sustaining capital: US$90-100 M
475,000 -
525,000
Gold ounces
ESTIMATED
COSTS
ESTIMATED
PRODUCTION
 Deferred stripping: US$20-25 M
1. Cost assumptions (US$): Gold price of $1,200/oz, diesel fuel price of $0.82 per litre; power cost of $0.04 per kilowatt hour; and
exchange rate of $1.00US:$1.15Cdn.
2. Refer to the section on Non-IFRS Performance Measures on slide 3 of this presentation.
2015
third year
of operation
8
Q2 2015 Highlights – Record Progress
106 125
$1,321
$1,030
$750
$850
$950
$1,050
$1,150
$1,250
$1,350
0
20
40
60
80
100
120
140
H1 2015: Detour Lake Mine
■ AISC (US$/oz sold)1
■ Gold Production (k oz)
Q1 Q2
1. Refer to the section on Non-IFRS Performance Measures on slide 3 of this presentation. Reconciliation and adjustment of this measure
is described in the MD&A for Q2’15.
Higher production, lower costs
 Record milling and mining rates
 Revenues of US$148 million
 Credit facility of C$135 M successfully
amended
 Mine operating profit of US$7.5 M
 Net loss of US$15.4 M / Adjusted net
earnings of US$0.5 M
 Cash position of US$133 M at Q2 end
 Lower Detour 30,000 m drilling
program underway
9
 Continued positive progress on drilling rates, blasted inventory,
and shovel productivity
 Mining rates averaged 280,000 tpd, exceeding budget by 18%
220
280
170
190
210
230
250
270
290
310
Q1A Q2A Q3E Q4EQ1 Q2Mining Rates (k tpd)
Q2 2015 Operating Results – Mine
H1 Achieved H2 Quarterly Targets
250-290
H H
L L
10
Successful re-build of ROM stockpiles
at Q2 end (1.7 Mt @ 0.71 g/t) provides
operational flexibility for H2 2015:
 Focus on delivering higher grade to mill
 Option to accelerate Phase 2 pre-
stripping
 Accelerate east end pit access (former
Campbell pit area)
 Maximize TMA placement efficiency
(using CAT795 trucks)
H2 2015 Mine Plan Focus
Targeting 250,000
to 290,000 tpd for
remainder of 2015
11
 Throughput rate of 57,015 tpd
 At design capacity since March
 Milling rates at 2,712 tpoh with operating time improving to 88%
 Exceeding design of 2,500 tpoh
48
57
55* 55
30
40
50
60
Q1'15 Q2'15 Q3'15 Q4'15
Q2 2015 Operating Results - Mill
2015 Mill Throughput (k tpd)
MT
ore milled
0.82 G/T AU
head grade
%
gold recovery
5.2
91
Q2’15 Performance
Q4EQ3EQ1
60
50
40
30
Q2
*Excludes the processing of fines in Q3
12
H2 2015 Focus – Mill
H2 Focus
 Continue plant optimization efforts
 Increase robustness of 410-
conveyor
 Increase operating time to >90%
 Increase milling rate to 2,800 tpoh
with ‘fines’
 Processing of fines started on July 1
at rate of up to 4,000 tpd
 Targeting average throughput rate of
55,000 tpd for H2 2015
MT
ore milled
0.86 G/T AU
head grade
%
gold recovery
19.7
91.5
2015 Mine Plan Targets
13
$954 $955
$886
$939
$734
Q2'14 Q3'14 Q4'14 Q1'15 Q2'15
Q2 2015 Operating Costs
 Significant cost reduction
per ounce & tonne due to
economies of scale
 Continued reduction of
plant consumables
TCC & AISC1,2 ($/oz sold)
Trending down
Q2’15
$1,321
$1,030
1. Refer to the section on Non-IFRS Performance Measures on slide 3. Reconciliation of these measures is described in the MD&A for the
relevant periods.
2. The calculation for TCC and AISC (non-IFRS measures) and processing unit costs, including prior periods, were adjusted
to allocate the electricity adjustment into the appropriate historical period to which the cost applied.
Refer to slide 24 and MD&A for Q2’15.
Q1’15 Q2’15 2015E
Mining (C$/t mined) $3.16 $2.42 $2.60
Processing2 (C$/t milled) $11.78 $8.81 $9.87
G&A (C$/t milled) $3.89 $2.72 $3.05
 Total Cash Costs1
 Other (Sustaining capital, G&A and exploration)
14
1. Includes US$2.0 M NAC settlement payment.
 Q2 Sustaining Capital
Mine
$30 M
TMA
$34 M
Other
$13 M
Mill
$9 M
Water Management
$10 M
14
Q2 2015 Capital Expenditures
Q1’15 Q2’15 2015E
Sustaining Capital $19.8 M $25.8 M $90-100 M
Capitalized Stripping $10.0 M - $20-25 M
Total (US$) $29.8 M $25.8 M $110-125 M
Breakdown of 2015 Sustaining
Capital (US$)
~90% of costs in Cdn$
Mine $7.5 M
Mill $5.2 M
TMA $6.5 M
Other $6.6 M1
15
Cash position at
June 30,2015:
US$133.2 M
Balance Sheet Improvements
Break even cash flow position at Q2 end
 Expected stronger operational performance
in H2 including further cost reductions
 Additional benefit expected from Canadian
dollar weakness vs U.S. dollar
Credit Facility amendment
Successfully amended terms of credit facility to
reflect “operating” company status:
 Completion Test removed
 More flexible financial covenants
 No amount drawn under revolving credit
facility of C$85 M
16
Benefiting from a Weak Cdn $
$1,000
$1,100
$1,200
$1,300
$1,400
Budget 2015 1-Jan-15 28-Jul-15
$Cdn $US
Gold Performance
YTD
$Cdn: +3%
$US: -7%
$/oz
FX rate 1.15 1.16 1.29
$1,380 $1,372
$1,419
$1,200
$1,182
$1,096
YTD 2015 Gold Price
in US Dollars vs Canadian Dollars
17
Prudent Financial Management
Hedge up to 50% of 2015 Gold Production
Forward sales on 35,000 oz @ US$1,276/oz
Currency Exchange Contracts
Zero-cost collars for US$40 M with a ceiling
of 1.21; Forward contracts for US$40 M at
average 1.26
Hedge ~50% of Next 3 Months’ Diesel Use
Purchasing diesel product (~6 M litres) at
effective hedge price of US$0.46/litre
As at June 30, 2015:
Mark-to-market value of US$3 M
No addition to
hedging programs in
Q2’15
18
 Optimize capital vs mine output (at gold price of US$1,200/oz
long-term)
 Evaluate production ranging from 110 to 140 Mt annually
(equivalent to mining rates of 300,000 to 385,000 tpd)
 Include Block A as a second feed source (at earliest 2018)
 Evaluate the use of Block A pit as waste rock dump and TMA cell
 Evaluate the inclusion of enriched low-grade stockpile (fines) in
mineral reserves (2nd test underway)
LOM Plan Update – EOY Target
Goal: Maximize Returns for Next 5-10 yrs and Optimize NAV
19
Processing of Fines
Segregation of fines:
 Gold concentrates in the finer
material
 Segregation of fines allows for:
›better grade
›faster processing rates
First Test in Fall 2014:
 Positive results from first
200,000 tonnes test
› grade of 0.62 g/t = 41%
higher than avg. grade of SP
› processed at 68,000 tpd
Low-grade stockpile (avg. grade 0.44 g/t)
Natural segregation of fines
from unloading truck
20
Second Test in Q3 2015:
 Started in July 2015
 Process up to 4,000 tpd
 Validate milling rate
improvement:
› Model suggests increase
of 100-125 tpoh
or 2,400-3,000 tpd for
the first 4,000 tpd added
If results are successful:
 Incorporate into LOM plan
› Potential for +20,000 oz/yr at very low cost
Processing of Fines
X No
fines
 With
fines Projected model
Plant
throughput
55,000 54,000
Loss of 1,000 tpd
of capacity
Added
throughput
0 4,000 Gain of 4,000 tpd
Total 55,000 58,000 Net gain of 3,000 tpd
21
 Drilling program started at end of June
 7,200 metres in 20 holes completed as of July 28
 All holes have intersected the targeted mineralized zones
 Majority of holes encountered visible gold
 Further targets identified from Magnetic & IP surveys east of
Lower Detour trend
 Budget increased to approximately US$8 million
Exploration – Lower Detour
30,000 m drilling program underway
22
PRODUCTION GROWTH /
DECLINING UNIT COSTS
REALIZE VALUE-ENHANCING
OPPORTUNITIES
MATERIAL INPUTS TRENDING
FAVOURABLY
GROWING CASH FLOW
A GREAT TIME TO BE A
GOLD PRODUCER!
23
ADDITIONAL
information
 2015 Safety Performance
 Q2 2015 Operational & Financial
Summary
 Detour Gold Reserves &
Resources
 Detour Lake & Block A
 Lower Detour Exploration
 Shareholder Information
 Analyst Coverage
 Management & Directors
 Contact Information
24
3.9
2.5
2.8
0
0.5
1
1.5
2
2.5
3
3.5
4
2014 ON
Average2
Zero Harm is Our Goal
Total Recordable Injury
Frequency Rate1
2015 Safety Performance
H1 20152014
H1 2015
 TRIFR at 2.8 with
Q2 higher than Q1
2015 Initiatives
 Safety Leadership
for Safe Production
 Life Saving Rules
1. Total recordable injury frequency rates = number of recorded injuries per 200,000 hours worked.
2. 2014 Ontario Mining Industry average (source: Workplace Safety North, WSIB).
25
Q2 2015 Operational Statistics
Q2’14 Q3’14 Q4’14 Q1’15 Q2’15
Ore mined (Mt) 2.89 4.20 4.30 3.82 6.37
Waste mined (Mt) 16.11 14.71 15.39 15.97 19.08
Total mined (Mt) 19.00 18.91 19.69 19.79 25.45
Strip ratio (waste:ore) 5.6 3.5 3.6 4.2 3.0
Mining rate (tpd) 209,000 206,000 214,000 220,000 280,000
Ore milled (Mt) 4.42 4.53 4.71 4.30 5.19
Mill grade (g/t Au) 0.91 0.88 0.85 0.84 0.82
Recovery (%) 91 90 91 91 91
Mill throughput (tpd) 48,569 49,186 51,142 47,797 57,015
Mill operating time (%) 83 81 83 78 88
Ounces produced (oz) 117,366 115,344 116,770 105,572 125,348
Ounces sold (oz) 107,206 106,334 124,913 104,497 123,296
26
Q2 2015 Financial Summary
Key Financial Statistics
(US$ M, unless noted)
Q2’15
Metal sales $147.5
Production costs ($100.2)
Depreciation & depletion ($39.8)
Earnings from mine operations $7.5
Net loss/adjusted net earnings1 ($15.4) / 0.5
Net loss/adjusted basic earnings
per share1 ($0.09) / $0.00
Cash & short-term investments $133.2
1. Refer to the section on Non-IFRS Financial Performance Measures on slide 3 of this presentation.
Note: The Company has been notified by the Independent Electricity System Operator (“IESO”) of an adjustment to its electricity rebate
for the period between January 2013 and April 2015, which has resulted in an additional electricity cost of US$12.5 million (refer to Note 6i
in second quarter 2015 financial statements). The balance is payable in 20 equal monthly instalments. As per its contract with IESO, the
Company pays a maximum of C$0.05/kWh until December 2019. The Company has filed for a three-year extension of the contact.
Refer to the MD&A for Q2’15.
27
Effective December 31, 2014 Tonnes (Mt) Grade (g/t Au) Contained Gold (koz)
Reserves
(1,2,3,4,5)
Detour Lake Mine Proven 94.2 1.25 3,795
Probable 364.6 0.95 11,146
P&P 458.8 1.01 14,941
Stockpiles 0.7 0.74 16
Total P&P 459.4 1.01 14,957
Resources
(1,3,4,5)
Detour Lake Mine Measured (M) 16.4 1.37 725
Indicated (I) 65.9 1.01 2,150
M+I 82.4 1.09 2,874
Block A Measured (M) 1.5 1.21 57
Indicated (I) 52.5 1.15 1,934
M+I 53.9 1.15 1,991
Total M+I 136.3 1.11 4,866
Detour Lake Mine Inferred 19.1 0.75 463
Block A Inferred 2.5 1.23 99
Total Inferred 21.6 0.81 562
Detour Gold: Reserves & Resources
1. Mineral reserves calculated using a gold price of US$1,000/oz; mineral resources calculated using US$1,200/oz. Foreign exchange
rate of C$1.03 to US$1.00 (refer to the “Detour Lake Mine NI 43-101 Technical Report dated February 4, 2014).
2. Mineral reserves estimated using a 4% dilution at 0.20 g/t Au and 5% ore loss.
3. Based on an elevated cut-off grade of 0.5 g/t Au for Detour Lake and cut-off grade of 0.6 g/t Au for Block A.
4. Mineral resources are exclusive of mineral reserves. Mineral resources that are not mineral reserves do not have demonstrated
economic viability. Mineral reserves and resources are compliant with CIM definitions.
5. Totals may not add due to rounding.
28
Detour Lake & Block A
US$1,000/oz
US$1,200/oz
15.5 Moz
@ 1.02 g/t Au
P+P
2.0 Moz
@ 1.15 g/t Au
M+I
~5.5 km
Current
North
Pit
Note: Mineral reserves and resources as of December 31, 2013. Refer to February 2014 Technical Report.
29
Lower Detour
Area
630 km2
Exploration Focus: Lower Detour
Block A
Resource
Detour Lake
OP Mine
30
Lower Detour – Phase 1 Drilling Program
31
Lower Detour Phase 1 Drilling Program
32
Lower Detour Phase 1 Drilling Program
33
1. Conversion price for the Notes is US$38.50.
2. Cash and short-term investments at June 30, 2015.
Shareholder Information
Paulson & Co.
>80% INSTITUTIONS TOTAL9.2 M Share options
13.0 M Convertible notes 1
192.8 M FULLY DILUTED
170.7 M Issued & outstanding
Share Structure (03/31/2014) Top Shareholders
13%
C$1.9
6
BILLION
market capUS$133.2
3
MILLION
cash position2
Share Structure (June 30, 2015) Top Shareholders
34
Initiating
Research
Firm Analyst Target Price at
July 29, 2015
07.06.11 Haywood Kerry Smith $18.50
07.07.09 Paradigm Don Blyth/Don MacLean $18.50
07.08.07 Raymond James Phil Russo $15.00
07.11.26 National Bank Steve Parsons $16.50
07.12.20 Macquarie Mike Siperco $17.00
08.01.14 Canaccord Rahul Paul $18.50
08.07.14 TD Dan Earle $18.50
08.09.04 RBC Dan Rollins $19.00
08.11.06 BMO NB Brian Quast $16.00
09.06.17 Laurentian Killian Charles $16.40
10.05.19 CIBC World Markets Cosmos Chiu $16.50
10.07.22 Credit Suisse Anita Soni $17.50
13.04.16 Scotiabank Trevor Turnbull $19.00
13.08.14 Desjardins Michael Parkin $17.50
13.11.12 Beacon Securities Michael Curran $15.75
13.12.09 GMP Securities Ian Parkinson $10.20
14.02.06 Cormark Securities Richard Gray/Tyron Breytenbach $20.00
14.04.22 Goldman Sachs Andrew Quail $17.00
14.06.17 Dundee Capital Markets Joseph Fazzini $17.00
14.09.03 Morgan Stanley Brad Humphrey $16.50
Average target C$17.04
Analyst Coverage (20)
35
 Paul Martin
President and CEO
 Pierre Beaudoin
COO
 James Mavor
CFO
 Drew Anwyll
Sr VP Technical Services
 Julie Galloway
Sr VP General Counsel &
Corporate Secretary
 Derek Teevan
Sr VP Corporate &
Aboriginal Affairs
 Jean-Francois Metail
VP Mineral Resource
Management
 Rachel Pineault
VP HR & Aboriginal Affairs
 Jim Robertson
VP Environment &
Sustainability
 Charles Hennessey
Mine General Manager
 Andrew Croal
Director Technical Services
 Laurie Gaborit
Director Investor Relations
 Alberto Heredia
Controller
 Bill Snelling
Director Corporate Systems & Controls
 Lisa Colnett
 Robert E. Doyle
 André Falzon
 Alex G. Morrison
 Jonathan Rubenstein
 Graham Wozniak
 Ingrid Hibbard
 Michael Kenyon
 Paul Martin
Management & Directors
Management
Directors
36
Laurie Gaborit
Director Investor Relations
Email: lgaborit@detourgold.com
Phone: 416.304.0581
Paul Martin
President and Chief Executive Officer
Email: pmartin@detourgold.com
Phone: 416.304.0800
www.detourgold.com
Contact Information

Weitere ähnliche Inhalte

Was ist angesagt?

Dgc 15 12_1-2 - scotia mining conference 1-1
Dgc 15 12_1-2 - scotia mining conference 1-1Dgc 15 12_1-2 - scotia mining conference 1-1
Dgc 15 12_1-2 - scotia mining conference 1-1DetourGold
 
Dgc 15 06_16-17 - rbc conference
Dgc 15 06_16-17 - rbc conferenceDgc 15 06_16-17 - rbc conference
Dgc 15 06_16-17 - rbc conferenceDetourGold
 
Dgc 15 09_20-23 - dgf 1x1 presentation
Dgc 15 09_20-23 - dgf 1x1 presentationDgc 15 09_20-23 - dgf 1x1 presentation
Dgc 15 09_20-23 - dgf 1x1 presentationDetourGold
 
Dgc 15 06_04 - detour lake mine tour
Dgc 15 06_04 - detour lake mine tourDgc 15 06_04 - detour lake mine tour
Dgc 15 06_04 - detour lake mine tourDetourGold
 
Dgc 15 11_17 - rj texas gold investor forum
Dgc 15 11_17 - rj texas gold investor forumDgc 15 11_17 - rj texas gold investor forum
Dgc 15 11_17 - rj texas gold investor forumDetourGold
 
Dgc 16 11_02 - corporate presentation
Dgc 16 11_02 - corporate presentationDgc 16 11_02 - corporate presentation
Dgc 16 11_02 - corporate presentationDetourGold
 
Dgc 15 05_12-14 - bo_aml conference
Dgc 15 05_12-14 - bo_aml conferenceDgc 15 05_12-14 - bo_aml conference
Dgc 15 05_12-14 - bo_aml conferenceDetourGold
 
Dgc 16 01_20 - cibc whistler conference
Dgc 16 01_20 - cibc whistler conferenceDgc 16 01_20 - cibc whistler conference
Dgc 16 01_20 - cibc whistler conferenceDetourGold
 
Q3 2013 Financial Results
Q3 2013 Financial ResultsQ3 2013 Financial Results
Q3 2013 Financial ResultsAuRico Gold
 
Dgc 15 01_20 - corporate presentation
Dgc 15 01_20 - corporate presentationDgc 15 01_20 - corporate presentation
Dgc 15 01_20 - corporate presentationDetourGold
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate PresentationDetourGold
 
Dgc 15 02_22-25-bmo-conference
Dgc 15 02_22-25-bmo-conferenceDgc 15 02_22-25-bmo-conference
Dgc 15 02_22-25-bmo-conferenceDetourGold
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate PresentationDetourGold
 
BMO Capital Markets Global Metals & Mining Conference
BMO Capital Markets Global Metals & Mining ConferenceBMO Capital Markets Global Metals & Mining Conference
BMO Capital Markets Global Metals & Mining Conferenceyamanagold2015
 

Was ist angesagt? (17)

Dgc 15 12_1-2 - scotia mining conference 1-1
Dgc 15 12_1-2 - scotia mining conference 1-1Dgc 15 12_1-2 - scotia mining conference 1-1
Dgc 15 12_1-2 - scotia mining conference 1-1
 
Dgc 15 06_16-17 - rbc conference
Dgc 15 06_16-17 - rbc conferenceDgc 15 06_16-17 - rbc conference
Dgc 15 06_16-17 - rbc conference
 
Dgc 15 09_20-23 - dgf 1x1 presentation
Dgc 15 09_20-23 - dgf 1x1 presentationDgc 15 09_20-23 - dgf 1x1 presentation
Dgc 15 09_20-23 - dgf 1x1 presentation
 
Dgc 15 06_04 - detour lake mine tour
Dgc 15 06_04 - detour lake mine tourDgc 15 06_04 - detour lake mine tour
Dgc 15 06_04 - detour lake mine tour
 
Dgc 15 11_17 - rj texas gold investor forum
Dgc 15 11_17 - rj texas gold investor forumDgc 15 11_17 - rj texas gold investor forum
Dgc 15 11_17 - rj texas gold investor forum
 
Dgc 16 11_02 - corporate presentation
Dgc 16 11_02 - corporate presentationDgc 16 11_02 - corporate presentation
Dgc 16 11_02 - corporate presentation
 
2015 Q3 Financial Results Final
2015 Q3 Financial Results Final2015 Q3 Financial Results Final
2015 Q3 Financial Results Final
 
Dgc 15 05_12-14 - bo_aml conference
Dgc 15 05_12-14 - bo_aml conferenceDgc 15 05_12-14 - bo_aml conference
Dgc 15 05_12-14 - bo_aml conference
 
Dgc 16 01_20 - cibc whistler conference
Dgc 16 01_20 - cibc whistler conferenceDgc 16 01_20 - cibc whistler conference
Dgc 16 01_20 - cibc whistler conference
 
Q3 2013 Financial Results
Q3 2013 Financial ResultsQ3 2013 Financial Results
Q3 2013 Financial Results
 
2016 q1 financial results final
2016 q1 financial results final2016 q1 financial results final
2016 q1 financial results final
 
2016 zurich london april
2016 zurich london april2016 zurich london april
2016 zurich london april
 
Dgc 15 01_20 - corporate presentation
Dgc 15 01_20 - corporate presentationDgc 15 01_20 - corporate presentation
Dgc 15 01_20 - corporate presentation
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Dgc 15 02_22-25-bmo-conference
Dgc 15 02_22-25-bmo-conferenceDgc 15 02_22-25-bmo-conference
Dgc 15 02_22-25-bmo-conference
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
BMO Capital Markets Global Metals & Mining Conference
BMO Capital Markets Global Metals & Mining ConferenceBMO Capital Markets Global Metals & Mining Conference
BMO Capital Markets Global Metals & Mining Conference
 

Andere mochten auch

Reservation xii
Reservation xiiReservation xii
Reservation xiimiarno
 
Dgc 14 06_17-18 - rbc conference
Dgc 14 06_17-18 - rbc conferenceDgc 14 06_17-18 - rbc conference
Dgc 14 06_17-18 - rbc conferenceDetourGold
 
Detour Gold Corporate Presentation
Detour Gold Corporate PresentationDetour Gold Corporate Presentation
Detour Gold Corporate PresentationDetourGold
 
Dgc 14 12_02-03 - scotia conference
Dgc 14 12_02-03 - scotia conferenceDgc 14 12_02-03 - scotia conference
Dgc 14 12_02-03 - scotia conferenceDetourGold
 
Corporate Presentation June 18-22, 2012
Corporate Presentation June 18-22, 2012Corporate Presentation June 18-22, 2012
Corporate Presentation June 18-22, 2012DetourGold
 
Dgc 14 05_07-08 - corporate presentation
Dgc 14 05_07-08 - corporate presentationDgc 14 05_07-08 - corporate presentation
Dgc 14 05_07-08 - corporate presentationDetourGold
 
Canaccord Global Resource Conference Corporate Presentation
Canaccord Global Resource Conference Corporate PresentationCanaccord Global Resource Conference Corporate Presentation
Canaccord Global Resource Conference Corporate PresentationDetourGold
 
Dgc 14 05_01 _ q12014
Dgc 14 05_01 _ q12014Dgc 14 05_01 _ q12014
Dgc 14 05_01 _ q12014DetourGold
 

Andere mochten auch (8)

Reservation xii
Reservation xiiReservation xii
Reservation xii
 
Dgc 14 06_17-18 - rbc conference
Dgc 14 06_17-18 - rbc conferenceDgc 14 06_17-18 - rbc conference
Dgc 14 06_17-18 - rbc conference
 
Detour Gold Corporate Presentation
Detour Gold Corporate PresentationDetour Gold Corporate Presentation
Detour Gold Corporate Presentation
 
Dgc 14 12_02-03 - scotia conference
Dgc 14 12_02-03 - scotia conferenceDgc 14 12_02-03 - scotia conference
Dgc 14 12_02-03 - scotia conference
 
Corporate Presentation June 18-22, 2012
Corporate Presentation June 18-22, 2012Corporate Presentation June 18-22, 2012
Corporate Presentation June 18-22, 2012
 
Dgc 14 05_07-08 - corporate presentation
Dgc 14 05_07-08 - corporate presentationDgc 14 05_07-08 - corporate presentation
Dgc 14 05_07-08 - corporate presentation
 
Canaccord Global Resource Conference Corporate Presentation
Canaccord Global Resource Conference Corporate PresentationCanaccord Global Resource Conference Corporate Presentation
Canaccord Global Resource Conference Corporate Presentation
 
Dgc 14 05_01 _ q12014
Dgc 14 05_01 _ q12014Dgc 14 05_01 _ q12014
Dgc 14 05_01 _ q12014
 

Ähnlich wie Dgc 15 07_30 - corporate presentation

Presentation dgc 15-04_29 _ q1 2015 webcast
Presentation   dgc 15-04_29 _ q1 2015 webcastPresentation   dgc 15-04_29 _ q1 2015 webcast
Presentation dgc 15-04_29 _ q1 2015 webcastDetourGold
 
2015 Annual General Meeting Presentation
2015 Annual General Meeting Presentation2015 Annual General Meeting Presentation
2015 Annual General Meeting PresentationDetourGold
 
Dgc 16 05_10-12 - BAML conference
Dgc 16 05_10-12 - BAML conferenceDgc 16 05_10-12 - BAML conference
Dgc 16 05_10-12 - BAML conferenceDetourGold
 
Dgc 16 06_14-15 - rbc conference
Dgc 16 06_14-15 - rbc conferenceDgc 16 06_14-15 - rbc conference
Dgc 16 06_14-15 - rbc conferenceDetourGold
 
Dgc 16 11_8-9 - corporate presentation
Dgc 16 11_8-9 - corporate presentationDgc 16 11_8-9 - corporate presentation
Dgc 16 11_8-9 - corporate presentationDetourGold
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate PresentationDetourGold
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate PresentationDetourGold
 
Dgc 16 08_30-31 - corporate presentation
Dgc 16 08_30-31 - corporate presentationDgc 16 08_30-31 - corporate presentation
Dgc 16 08_30-31 - corporate presentationDetourGold
 
Dgc 16 09_08 - baml conference
Dgc 16 09_08 - baml conferenceDgc 16 09_08 - baml conference
Dgc 16 09_08 - baml conferenceDetourGold
 
Presentation dgc 17-01_31 _ q4 ops 2017 guidance webcast
Presentation   dgc 17-01_31 _ q4 ops 2017 guidance webcastPresentation   dgc 17-01_31 _ q4 ops 2017 guidance webcast
Presentation dgc 17-01_31 _ q4 ops 2017 guidance webcastDetourGold
 
Dgc 15 03_02 - pdac corporate presentation
Dgc 15 03_02 - pdac corporate presentationDgc 15 03_02 - pdac corporate presentation
Dgc 15 03_02 - pdac corporate presentationDetourGold
 
Dgc 15 03_02-pdac-corporate-presentation_v001_c1cd6h
Dgc 15 03_02-pdac-corporate-presentation_v001_c1cd6hDgc 15 03_02-pdac-corporate-presentation_v001_c1cd6h
Dgc 15 03_02-pdac-corporate-presentation_v001_c1cd6hDetourGold
 
Dgc 15 03_11 - corporate presentation
Dgc 15 03_11 - corporate presentationDgc 15 03_11 - corporate presentation
Dgc 15 03_11 - corporate presentationDetourGold
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate PresentationDetourGold
 
Dgc 17 03_24_corporate presentation
Dgc 17 03_24_corporate presentationDgc 17 03_24_corporate presentation
Dgc 17 03_24_corporate presentationDetourGold
 
Dgc 16 02_09-10 - corporate presentation
Dgc 16 02_09-10 - corporate presentationDgc 16 02_09-10 - corporate presentation
Dgc 16 02_09-10 - corporate presentationDetourGold
 
Dgc 16 01_26 - td conference
Dgc 16 01_26 - td conferenceDgc 16 01_26 - td conference
Dgc 16 01_26 - td conferenceDetourGold
 

Ähnlich wie Dgc 15 07_30 - corporate presentation (17)

Presentation dgc 15-04_29 _ q1 2015 webcast
Presentation   dgc 15-04_29 _ q1 2015 webcastPresentation   dgc 15-04_29 _ q1 2015 webcast
Presentation dgc 15-04_29 _ q1 2015 webcast
 
2015 Annual General Meeting Presentation
2015 Annual General Meeting Presentation2015 Annual General Meeting Presentation
2015 Annual General Meeting Presentation
 
Dgc 16 05_10-12 - BAML conference
Dgc 16 05_10-12 - BAML conferenceDgc 16 05_10-12 - BAML conference
Dgc 16 05_10-12 - BAML conference
 
Dgc 16 06_14-15 - rbc conference
Dgc 16 06_14-15 - rbc conferenceDgc 16 06_14-15 - rbc conference
Dgc 16 06_14-15 - rbc conference
 
Dgc 16 11_8-9 - corporate presentation
Dgc 16 11_8-9 - corporate presentationDgc 16 11_8-9 - corporate presentation
Dgc 16 11_8-9 - corporate presentation
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Dgc 16 08_30-31 - corporate presentation
Dgc 16 08_30-31 - corporate presentationDgc 16 08_30-31 - corporate presentation
Dgc 16 08_30-31 - corporate presentation
 
Dgc 16 09_08 - baml conference
Dgc 16 09_08 - baml conferenceDgc 16 09_08 - baml conference
Dgc 16 09_08 - baml conference
 
Presentation dgc 17-01_31 _ q4 ops 2017 guidance webcast
Presentation   dgc 17-01_31 _ q4 ops 2017 guidance webcastPresentation   dgc 17-01_31 _ q4 ops 2017 guidance webcast
Presentation dgc 17-01_31 _ q4 ops 2017 guidance webcast
 
Dgc 15 03_02 - pdac corporate presentation
Dgc 15 03_02 - pdac corporate presentationDgc 15 03_02 - pdac corporate presentation
Dgc 15 03_02 - pdac corporate presentation
 
Dgc 15 03_02-pdac-corporate-presentation_v001_c1cd6h
Dgc 15 03_02-pdac-corporate-presentation_v001_c1cd6hDgc 15 03_02-pdac-corporate-presentation_v001_c1cd6h
Dgc 15 03_02-pdac-corporate-presentation_v001_c1cd6h
 
Dgc 15 03_11 - corporate presentation
Dgc 15 03_11 - corporate presentationDgc 15 03_11 - corporate presentation
Dgc 15 03_11 - corporate presentation
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Dgc 17 03_24_corporate presentation
Dgc 17 03_24_corporate presentationDgc 17 03_24_corporate presentation
Dgc 17 03_24_corporate presentation
 
Dgc 16 02_09-10 - corporate presentation
Dgc 16 02_09-10 - corporate presentationDgc 16 02_09-10 - corporate presentation
Dgc 16 02_09-10 - corporate presentation
 
Dgc 16 01_26 - td conference
Dgc 16 01_26 - td conferenceDgc 16 01_26 - td conference
Dgc 16 01_26 - td conference
 

Kürzlich hochgeladen

VIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our Escorts
VIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our EscortsVIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our Escorts
VIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our Escortssonatiwari757
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girladitipandeya
 
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...mriyagarg453
 
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts PodanurTop Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanurdharasingh5698
 
SME IPO and sme ipo listing consultants .pptx
SME IPO and sme ipo listing consultants .pptxSME IPO and sme ipo listing consultants .pptx
SME IPO and sme ipo listing consultants .pptxindia IPO
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024CollectiveMining1
 
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our EscortsCall Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escortsindian call girls near you
 
Enjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort ServiceDelhi Call girls
 
Pakistani Call girls in Ajman +971563133746 Ajman Call girls
Pakistani Call girls in Ajman +971563133746 Ajman Call girlsPakistani Call girls in Ajman +971563133746 Ajman Call girls
Pakistani Call girls in Ajman +971563133746 Ajman Call girlsgwenoracqe6
 
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort ServiceBDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort ServiceDelhi Call girls
 
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service AvailableCall Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service AvailableSheetaleventcompany
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024CollectiveMining1
 

Kürzlich hochgeladen (20)

VIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our Escorts
VIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our EscortsVIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our Escorts
VIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our Escorts
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
 
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
 
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
@9999965857 🫦 Sexy Desi Call Girls Vaishali 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Vaishali 💓 High Profile Escorts Delhi 🫶@9999965857 🫦 Sexy Desi Call Girls Vaishali 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Vaishali 💓 High Profile Escorts Delhi 🫶
 
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts PodanurTop Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
 
Call Girls 🫤 Hauz Khas ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ENJOY
Call Girls 🫤 Hauz Khas ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ENJOYCall Girls 🫤 Hauz Khas ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ENJOY
Call Girls 🫤 Hauz Khas ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ENJOY
 
SME IPO and sme ipo listing consultants .pptx
SME IPO and sme ipo listing consultants .pptxSME IPO and sme ipo listing consultants .pptx
SME IPO and sme ipo listing consultants .pptx
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
 
Russian Call Girls Rohini Sector 3 💓 Delhi 9999965857 @Sabina Modi VVIP MODEL...
Russian Call Girls Rohini Sector 3 💓 Delhi 9999965857 @Sabina Modi VVIP MODEL...Russian Call Girls Rohini Sector 3 💓 Delhi 9999965857 @Sabina Modi VVIP MODEL...
Russian Call Girls Rohini Sector 3 💓 Delhi 9999965857 @Sabina Modi VVIP MODEL...
 
(INDIRA) Call Girl Kashmir Call Now 8617697112 Kashmir Escorts 24x7
(INDIRA) Call Girl Kashmir Call Now 8617697112 Kashmir Escorts 24x7(INDIRA) Call Girl Kashmir Call Now 8617697112 Kashmir Escorts 24x7
(INDIRA) Call Girl Kashmir Call Now 8617697112 Kashmir Escorts 24x7
 
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our EscortsCall Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
 
Enjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort Service
 
Pakistani Call girls in Ajman +971563133746 Ajman Call girls
Pakistani Call girls in Ajman +971563133746 Ajman Call girlsPakistani Call girls in Ajman +971563133746 Ajman Call girls
Pakistani Call girls in Ajman +971563133746 Ajman Call girls
 
@9999965857 🫦 Sexy Desi Call Girls Janakpuri 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Janakpuri 💓 High Profile Escorts Delhi 🫶@9999965857 🫦 Sexy Desi Call Girls Janakpuri 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Janakpuri 💓 High Profile Escorts Delhi 🫶
 
(‿ˠ‿) Independent Call Girls Laxmi Nagar 👉 9999965857 👈 Delhi : 9999 Cash Pa...
(‿ˠ‿) Independent Call Girls Laxmi Nagar 👉 9999965857 👈 Delhi  : 9999 Cash Pa...(‿ˠ‿) Independent Call Girls Laxmi Nagar 👉 9999965857 👈 Delhi  : 9999 Cash Pa...
(‿ˠ‿) Independent Call Girls Laxmi Nagar 👉 9999965857 👈 Delhi : 9999 Cash Pa...
 
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort ServiceBDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
 
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service AvailableCall Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
 
Sensual Moments: +91 9999965857 Independent Call Girls Noida Delhi {{ Monika}...
Sensual Moments: +91 9999965857 Independent Call Girls Noida Delhi {{ Monika}...Sensual Moments: +91 9999965857 Independent Call Girls Noida Delhi {{ Monika}...
Sensual Moments: +91 9999965857 Independent Call Girls Noida Delhi {{ Monika}...
 

Dgc 15 07_30 - corporate presentation

  • 2. 2 Forward Looking Information This presentation contains certain forward-looking information and statements as defined in applicable securities law (referred to herein as “forward-looking statements”). Forward-looking statements include, but are not limited to, statements with respect to 2015 guidance for production, total cash costs, all-in sustaining costs, capital costs, deferred stripping costs, and exploration costs; expected throughput, mining and recovery rates; expected future production and mining activities; opportunities to optimize the mine operation; timeline for the life of mine plan update, and exploration program; and opportunities to optimize the mine operation. Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause actual results, performance or achievements to be materially different from any of its future results, performance or achievements expressed or implied by forward- looking statements. These risks, uncertainties and other factors include, but are not limited to, assumptions and parameters underlying the life of mine update not being realized, a decrease in the future gold price, discrepancies between actual and estimated production, changes in costs (including labour, supplies, fuel and equipment), changes to tax rates; environmental compliance and changes in environmental legislation and regulation, exchange rate fluctuations, general economic conditions and other risks involved in the gold exploration and development industry, as well as those risk factors discussed in the section entitled “Description of Business - Risk Factors” in Detour Gold’s 2014 AIF and in the continuous disclosure documents filed by Detour Gold on and available on SEDAR at www.sedar.com. Such forward-looking statements are also based on a number of assumptions which may prove to be incorrect, including, but not limited to, assumptions about the following: the availability of financing for exploration and development activities; operating and sustaining capital costs; the Company’s ability to attract and retain skilled staff; sensitivity to metal prices and other sensitivities; the supply and demand for, and the level and volatility of the price of, gold; the supply and availability of consumables and services; the exchange rates of the Canadian dollar to the U.S. dollar; energy and fuel costs; the accuracy of reserve and resource estimates and the assumptions on which the reserve and resource estimates are based; market competition; ongoing relations with employees and impacted communities and general business and economic conditions. Accordingly, readers should not place undue reliance on forward-looking statements. The forward-looking statements contained herein are made as of the date hereof, or such other date or dates specified in such statements. All forward-looking statements in this presentation are necessarily based on opinions and estimates made as of the date such statements are made and are subject to important risk factors and uncertainties, many of which cannot be controlled or predicted. Detour Gold and the Qualified Persons who authored the associated Technical Report undertake no obligation to update publicly or otherwise revise any forward-looking statements contained herein whether as a result of new information or future events or otherwise, except as may be required by law.
  • 3. 3 Notes to Investors The scientific and technical content of this presentation was reviewed, verified and approved by Drew Anwyll, P.Eng., Senior Vice President Technical Services, and exploration results was reviewed, verified and approved by Guy MacGillivray, P.Geo., Exploration Manager , both Qualified Person as defined by Canadian Securities Administrators National Instrument 43-101 “Standards of Disclosure for Mineral Projects”. Qualified Persons Non-IFRS Financial Performance Measures The Company has included non-IFRS measures in this presentation: total cash costs, all-in sustaining costs, adjusted net loss and adjusted net loss per share. The Company believes that these measures, in addition to conventional measures prepared in accordance with IFRS, provide investors an improved ability to evaluate the underlying performance of the Company. The non-IFRS measures are intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. These measures do not have any standardized meaning prescribed under IFRS, and therefore may not be comparable to other issuers. Other companies may calculate these measure differently. Detour Gold reports total cash costs on a sales basis. Total cash costs include production costs such as mining, processing, refining and site administration, less non-cash share-based compensation and net of silver sales divided by gold ounces sold to arrive at total cash costs per gold ounce sold. The measure also includes other mine related costs incurred such as mine standby costs and current inventory write downs. Production costs are exclusive of depreciation and depletion. Production costs include the costs associated with providing the royalty in kind ounces. Commencing in 2015, the Company adopted all-in sustaining costs on a prospective basis. The Company believes this measure more fully defines the total costs associated with producing gold. The Company calculates all-in sustaining costs as the sum of total cash costs (as described above), share-based compensation, corporate general and administrative expense, exploration and evaluation expenses that are sustaining in nature, reclamation cost accretion, sustaining capital including deferred stripping, and realized gains and losses on hedges due to operating and capital costs, all divided by the gold ounces sold to arrive at a per ounce figure. Costs excluded from all-in sustaining costs are non-sustaining capital expenditures and exploration costs that are expected to materially increase production, financing costs and tax expense. Consequently, this measure is not representative of all of the Company’s cash expenditures. In addition, the calculation of all-in sustaining costs does not include depreciation and depletion expense as it does not reflect the impact of expenditures incurred in prior periods. Adjusted net earnings (loss) and adjusted basic earnings (loss) per share are used by management and investors to measure the underlying operating performance of the Company. Presenting these measures from period to period helps management and investors evaluate earnings trends more readily in comparison with results from prior periods. Adjusted net earnings (loss) is defined as net earnings (loss) adjusted to exclude specific items that are significant, but not reflective of the underlying operations of the Company, including: fair value change of the convertible notes, the impact of foreign exchange gains and losses, including the foreign exchange on deferred income and mining taxes, non-cash unrealized gains and losses on derivative instruments, accretion on convertible notes, unwinding of discount on decommissioning and restoration provisions, impairment provisions and reversals thereof, and other non-recurring items. Adjusted basic net earnings (loss) per share is calculated using the weighted average number of shares outstanding under the basic method of loss per share as determined under IFRS.
  • 4. 4 Unique Investment Opportunity Mining-friendly Jurisdiction  Large-scale, long mine life  Largest gold producing mine not controlled by a senior producer  Growing cash flow profile  Production growth opportunities  Favourable exposure to Canadian Dollar DOMINANT GOLD PRODUCER IN CANADA
  • 5. 5 2015 Production Guidance (Koz) #2 in Production and #1 in Reserves DGC Detour Lake AEM/YRI Canadian Malartic AEM Meadowbank G Red Lake Canadian Intermediate Gold Producer 400- 425 560 475- 525 400 Gold Reserves (Moz) DGC Detour Lake AEM/YRI Canadian Malartic AEM Meadowbank G Red Lake 2.1 15.0 8.7 1.2
  • 6. 6 2015 Drivers to Success Execution of Plan  Gold production increase with higher mining and milling rates  Strengthen balance sheet Added Benefits  Significant leverage to gold price and Canadian dollar  Low power and diesel costs Near to Long-Term Value Enhancements  Plant optimization (with limited capital)  Development of Block A  Exploration potential
  • 7. 7 2015 Guidance1 TCC2 $780- $850 AISC/oz sold2 $1,050-$1,150 Capital Expenditures  Sustaining capital: US$90-100 M 475,000 - 525,000 Gold ounces ESTIMATED COSTS ESTIMATED PRODUCTION  Deferred stripping: US$20-25 M 1. Cost assumptions (US$): Gold price of $1,200/oz, diesel fuel price of $0.82 per litre; power cost of $0.04 per kilowatt hour; and exchange rate of $1.00US:$1.15Cdn. 2. Refer to the section on Non-IFRS Performance Measures on slide 3 of this presentation. 2015 third year of operation
  • 8. 8 Q2 2015 Highlights – Record Progress 106 125 $1,321 $1,030 $750 $850 $950 $1,050 $1,150 $1,250 $1,350 0 20 40 60 80 100 120 140 H1 2015: Detour Lake Mine ■ AISC (US$/oz sold)1 ■ Gold Production (k oz) Q1 Q2 1. Refer to the section on Non-IFRS Performance Measures on slide 3 of this presentation. Reconciliation and adjustment of this measure is described in the MD&A for Q2’15. Higher production, lower costs  Record milling and mining rates  Revenues of US$148 million  Credit facility of C$135 M successfully amended  Mine operating profit of US$7.5 M  Net loss of US$15.4 M / Adjusted net earnings of US$0.5 M  Cash position of US$133 M at Q2 end  Lower Detour 30,000 m drilling program underway
  • 9. 9  Continued positive progress on drilling rates, blasted inventory, and shovel productivity  Mining rates averaged 280,000 tpd, exceeding budget by 18% 220 280 170 190 210 230 250 270 290 310 Q1A Q2A Q3E Q4EQ1 Q2Mining Rates (k tpd) Q2 2015 Operating Results – Mine H1 Achieved H2 Quarterly Targets 250-290 H H L L
  • 10. 10 Successful re-build of ROM stockpiles at Q2 end (1.7 Mt @ 0.71 g/t) provides operational flexibility for H2 2015:  Focus on delivering higher grade to mill  Option to accelerate Phase 2 pre- stripping  Accelerate east end pit access (former Campbell pit area)  Maximize TMA placement efficiency (using CAT795 trucks) H2 2015 Mine Plan Focus Targeting 250,000 to 290,000 tpd for remainder of 2015
  • 11. 11  Throughput rate of 57,015 tpd  At design capacity since March  Milling rates at 2,712 tpoh with operating time improving to 88%  Exceeding design of 2,500 tpoh 48 57 55* 55 30 40 50 60 Q1'15 Q2'15 Q3'15 Q4'15 Q2 2015 Operating Results - Mill 2015 Mill Throughput (k tpd) MT ore milled 0.82 G/T AU head grade % gold recovery 5.2 91 Q2’15 Performance Q4EQ3EQ1 60 50 40 30 Q2 *Excludes the processing of fines in Q3
  • 12. 12 H2 2015 Focus – Mill H2 Focus  Continue plant optimization efforts  Increase robustness of 410- conveyor  Increase operating time to >90%  Increase milling rate to 2,800 tpoh with ‘fines’  Processing of fines started on July 1 at rate of up to 4,000 tpd  Targeting average throughput rate of 55,000 tpd for H2 2015 MT ore milled 0.86 G/T AU head grade % gold recovery 19.7 91.5 2015 Mine Plan Targets
  • 13. 13 $954 $955 $886 $939 $734 Q2'14 Q3'14 Q4'14 Q1'15 Q2'15 Q2 2015 Operating Costs  Significant cost reduction per ounce & tonne due to economies of scale  Continued reduction of plant consumables TCC & AISC1,2 ($/oz sold) Trending down Q2’15 $1,321 $1,030 1. Refer to the section on Non-IFRS Performance Measures on slide 3. Reconciliation of these measures is described in the MD&A for the relevant periods. 2. The calculation for TCC and AISC (non-IFRS measures) and processing unit costs, including prior periods, were adjusted to allocate the electricity adjustment into the appropriate historical period to which the cost applied. Refer to slide 24 and MD&A for Q2’15. Q1’15 Q2’15 2015E Mining (C$/t mined) $3.16 $2.42 $2.60 Processing2 (C$/t milled) $11.78 $8.81 $9.87 G&A (C$/t milled) $3.89 $2.72 $3.05  Total Cash Costs1  Other (Sustaining capital, G&A and exploration)
  • 14. 14 1. Includes US$2.0 M NAC settlement payment.  Q2 Sustaining Capital Mine $30 M TMA $34 M Other $13 M Mill $9 M Water Management $10 M 14 Q2 2015 Capital Expenditures Q1’15 Q2’15 2015E Sustaining Capital $19.8 M $25.8 M $90-100 M Capitalized Stripping $10.0 M - $20-25 M Total (US$) $29.8 M $25.8 M $110-125 M Breakdown of 2015 Sustaining Capital (US$) ~90% of costs in Cdn$ Mine $7.5 M Mill $5.2 M TMA $6.5 M Other $6.6 M1
  • 15. 15 Cash position at June 30,2015: US$133.2 M Balance Sheet Improvements Break even cash flow position at Q2 end  Expected stronger operational performance in H2 including further cost reductions  Additional benefit expected from Canadian dollar weakness vs U.S. dollar Credit Facility amendment Successfully amended terms of credit facility to reflect “operating” company status:  Completion Test removed  More flexible financial covenants  No amount drawn under revolving credit facility of C$85 M
  • 16. 16 Benefiting from a Weak Cdn $ $1,000 $1,100 $1,200 $1,300 $1,400 Budget 2015 1-Jan-15 28-Jul-15 $Cdn $US Gold Performance YTD $Cdn: +3% $US: -7% $/oz FX rate 1.15 1.16 1.29 $1,380 $1,372 $1,419 $1,200 $1,182 $1,096 YTD 2015 Gold Price in US Dollars vs Canadian Dollars
  • 17. 17 Prudent Financial Management Hedge up to 50% of 2015 Gold Production Forward sales on 35,000 oz @ US$1,276/oz Currency Exchange Contracts Zero-cost collars for US$40 M with a ceiling of 1.21; Forward contracts for US$40 M at average 1.26 Hedge ~50% of Next 3 Months’ Diesel Use Purchasing diesel product (~6 M litres) at effective hedge price of US$0.46/litre As at June 30, 2015: Mark-to-market value of US$3 M No addition to hedging programs in Q2’15
  • 18. 18  Optimize capital vs mine output (at gold price of US$1,200/oz long-term)  Evaluate production ranging from 110 to 140 Mt annually (equivalent to mining rates of 300,000 to 385,000 tpd)  Include Block A as a second feed source (at earliest 2018)  Evaluate the use of Block A pit as waste rock dump and TMA cell  Evaluate the inclusion of enriched low-grade stockpile (fines) in mineral reserves (2nd test underway) LOM Plan Update – EOY Target Goal: Maximize Returns for Next 5-10 yrs and Optimize NAV
  • 19. 19 Processing of Fines Segregation of fines:  Gold concentrates in the finer material  Segregation of fines allows for: ›better grade ›faster processing rates First Test in Fall 2014:  Positive results from first 200,000 tonnes test › grade of 0.62 g/t = 41% higher than avg. grade of SP › processed at 68,000 tpd Low-grade stockpile (avg. grade 0.44 g/t) Natural segregation of fines from unloading truck
  • 20. 20 Second Test in Q3 2015:  Started in July 2015  Process up to 4,000 tpd  Validate milling rate improvement: › Model suggests increase of 100-125 tpoh or 2,400-3,000 tpd for the first 4,000 tpd added If results are successful:  Incorporate into LOM plan › Potential for +20,000 oz/yr at very low cost Processing of Fines X No fines  With fines Projected model Plant throughput 55,000 54,000 Loss of 1,000 tpd of capacity Added throughput 0 4,000 Gain of 4,000 tpd Total 55,000 58,000 Net gain of 3,000 tpd
  • 21. 21  Drilling program started at end of June  7,200 metres in 20 holes completed as of July 28  All holes have intersected the targeted mineralized zones  Majority of holes encountered visible gold  Further targets identified from Magnetic & IP surveys east of Lower Detour trend  Budget increased to approximately US$8 million Exploration – Lower Detour 30,000 m drilling program underway
  • 22. 22 PRODUCTION GROWTH / DECLINING UNIT COSTS REALIZE VALUE-ENHANCING OPPORTUNITIES MATERIAL INPUTS TRENDING FAVOURABLY GROWING CASH FLOW A GREAT TIME TO BE A GOLD PRODUCER!
  • 23. 23 ADDITIONAL information  2015 Safety Performance  Q2 2015 Operational & Financial Summary  Detour Gold Reserves & Resources  Detour Lake & Block A  Lower Detour Exploration  Shareholder Information  Analyst Coverage  Management & Directors  Contact Information
  • 24. 24 3.9 2.5 2.8 0 0.5 1 1.5 2 2.5 3 3.5 4 2014 ON Average2 Zero Harm is Our Goal Total Recordable Injury Frequency Rate1 2015 Safety Performance H1 20152014 H1 2015  TRIFR at 2.8 with Q2 higher than Q1 2015 Initiatives  Safety Leadership for Safe Production  Life Saving Rules 1. Total recordable injury frequency rates = number of recorded injuries per 200,000 hours worked. 2. 2014 Ontario Mining Industry average (source: Workplace Safety North, WSIB).
  • 25. 25 Q2 2015 Operational Statistics Q2’14 Q3’14 Q4’14 Q1’15 Q2’15 Ore mined (Mt) 2.89 4.20 4.30 3.82 6.37 Waste mined (Mt) 16.11 14.71 15.39 15.97 19.08 Total mined (Mt) 19.00 18.91 19.69 19.79 25.45 Strip ratio (waste:ore) 5.6 3.5 3.6 4.2 3.0 Mining rate (tpd) 209,000 206,000 214,000 220,000 280,000 Ore milled (Mt) 4.42 4.53 4.71 4.30 5.19 Mill grade (g/t Au) 0.91 0.88 0.85 0.84 0.82 Recovery (%) 91 90 91 91 91 Mill throughput (tpd) 48,569 49,186 51,142 47,797 57,015 Mill operating time (%) 83 81 83 78 88 Ounces produced (oz) 117,366 115,344 116,770 105,572 125,348 Ounces sold (oz) 107,206 106,334 124,913 104,497 123,296
  • 26. 26 Q2 2015 Financial Summary Key Financial Statistics (US$ M, unless noted) Q2’15 Metal sales $147.5 Production costs ($100.2) Depreciation & depletion ($39.8) Earnings from mine operations $7.5 Net loss/adjusted net earnings1 ($15.4) / 0.5 Net loss/adjusted basic earnings per share1 ($0.09) / $0.00 Cash & short-term investments $133.2 1. Refer to the section on Non-IFRS Financial Performance Measures on slide 3 of this presentation. Note: The Company has been notified by the Independent Electricity System Operator (“IESO”) of an adjustment to its electricity rebate for the period between January 2013 and April 2015, which has resulted in an additional electricity cost of US$12.5 million (refer to Note 6i in second quarter 2015 financial statements). The balance is payable in 20 equal monthly instalments. As per its contract with IESO, the Company pays a maximum of C$0.05/kWh until December 2019. The Company has filed for a three-year extension of the contact. Refer to the MD&A for Q2’15.
  • 27. 27 Effective December 31, 2014 Tonnes (Mt) Grade (g/t Au) Contained Gold (koz) Reserves (1,2,3,4,5) Detour Lake Mine Proven 94.2 1.25 3,795 Probable 364.6 0.95 11,146 P&P 458.8 1.01 14,941 Stockpiles 0.7 0.74 16 Total P&P 459.4 1.01 14,957 Resources (1,3,4,5) Detour Lake Mine Measured (M) 16.4 1.37 725 Indicated (I) 65.9 1.01 2,150 M+I 82.4 1.09 2,874 Block A Measured (M) 1.5 1.21 57 Indicated (I) 52.5 1.15 1,934 M+I 53.9 1.15 1,991 Total M+I 136.3 1.11 4,866 Detour Lake Mine Inferred 19.1 0.75 463 Block A Inferred 2.5 1.23 99 Total Inferred 21.6 0.81 562 Detour Gold: Reserves & Resources 1. Mineral reserves calculated using a gold price of US$1,000/oz; mineral resources calculated using US$1,200/oz. Foreign exchange rate of C$1.03 to US$1.00 (refer to the “Detour Lake Mine NI 43-101 Technical Report dated February 4, 2014). 2. Mineral reserves estimated using a 4% dilution at 0.20 g/t Au and 5% ore loss. 3. Based on an elevated cut-off grade of 0.5 g/t Au for Detour Lake and cut-off grade of 0.6 g/t Au for Block A. 4. Mineral resources are exclusive of mineral reserves. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral reserves and resources are compliant with CIM definitions. 5. Totals may not add due to rounding.
  • 28. 28 Detour Lake & Block A US$1,000/oz US$1,200/oz 15.5 Moz @ 1.02 g/t Au P+P 2.0 Moz @ 1.15 g/t Au M+I ~5.5 km Current North Pit Note: Mineral reserves and resources as of December 31, 2013. Refer to February 2014 Technical Report.
  • 29. 29 Lower Detour Area 630 km2 Exploration Focus: Lower Detour Block A Resource Detour Lake OP Mine
  • 30. 30 Lower Detour – Phase 1 Drilling Program
  • 31. 31 Lower Detour Phase 1 Drilling Program
  • 32. 32 Lower Detour Phase 1 Drilling Program
  • 33. 33 1. Conversion price for the Notes is US$38.50. 2. Cash and short-term investments at June 30, 2015. Shareholder Information Paulson & Co. >80% INSTITUTIONS TOTAL9.2 M Share options 13.0 M Convertible notes 1 192.8 M FULLY DILUTED 170.7 M Issued & outstanding Share Structure (03/31/2014) Top Shareholders 13% C$1.9 6 BILLION market capUS$133.2 3 MILLION cash position2 Share Structure (June 30, 2015) Top Shareholders
  • 34. 34 Initiating Research Firm Analyst Target Price at July 29, 2015 07.06.11 Haywood Kerry Smith $18.50 07.07.09 Paradigm Don Blyth/Don MacLean $18.50 07.08.07 Raymond James Phil Russo $15.00 07.11.26 National Bank Steve Parsons $16.50 07.12.20 Macquarie Mike Siperco $17.00 08.01.14 Canaccord Rahul Paul $18.50 08.07.14 TD Dan Earle $18.50 08.09.04 RBC Dan Rollins $19.00 08.11.06 BMO NB Brian Quast $16.00 09.06.17 Laurentian Killian Charles $16.40 10.05.19 CIBC World Markets Cosmos Chiu $16.50 10.07.22 Credit Suisse Anita Soni $17.50 13.04.16 Scotiabank Trevor Turnbull $19.00 13.08.14 Desjardins Michael Parkin $17.50 13.11.12 Beacon Securities Michael Curran $15.75 13.12.09 GMP Securities Ian Parkinson $10.20 14.02.06 Cormark Securities Richard Gray/Tyron Breytenbach $20.00 14.04.22 Goldman Sachs Andrew Quail $17.00 14.06.17 Dundee Capital Markets Joseph Fazzini $17.00 14.09.03 Morgan Stanley Brad Humphrey $16.50 Average target C$17.04 Analyst Coverage (20)
  • 35. 35  Paul Martin President and CEO  Pierre Beaudoin COO  James Mavor CFO  Drew Anwyll Sr VP Technical Services  Julie Galloway Sr VP General Counsel & Corporate Secretary  Derek Teevan Sr VP Corporate & Aboriginal Affairs  Jean-Francois Metail VP Mineral Resource Management  Rachel Pineault VP HR & Aboriginal Affairs  Jim Robertson VP Environment & Sustainability  Charles Hennessey Mine General Manager  Andrew Croal Director Technical Services  Laurie Gaborit Director Investor Relations  Alberto Heredia Controller  Bill Snelling Director Corporate Systems & Controls  Lisa Colnett  Robert E. Doyle  André Falzon  Alex G. Morrison  Jonathan Rubenstein  Graham Wozniak  Ingrid Hibbard  Michael Kenyon  Paul Martin Management & Directors Management Directors
  • 36. 36 Laurie Gaborit Director Investor Relations Email: lgaborit@detourgold.com Phone: 416.304.0581 Paul Martin President and Chief Executive Officer Email: pmartin@detourgold.com Phone: 416.304.0800 www.detourgold.com Contact Information