CANADA’S NEXT
INTERMEDIATE
GOLD PRODUCER




    National Bank Financial London Gold Conference
    February 13, 2013
1
Forward Looking Information
    This presentation contains certain forward-looking information as defined in applicable securities laws (referred to herein as
    “forward-looking statements”). Specifically, this presentation contains forward-looking statements regarding the reserve and
    resource estimates, ore grade, expected mine life, anticipated gold production, gold recovery, cash operating costs and other
    costs, capital costs, sensitivity to metal prices and other sensitivities, financial analysis of the project, commencement of
    operations, potential expansion opportunities, and plans for organic growth. Forward-looking statements involve known and
    unknown risks, uncertainties and other factors which are beyond Detour Gold’s ability to predict or control and may cause
    Detour Gold’s actual results, performance or achievements to be materially different from any of its future results, performance
    or achievements expressed or implied by forward-looking statements. These risks, uncertainties and other factors include, but
    are not limited to, gold price volatility, changes in debt and equity markets, the uncertainties involved in interpreting geological
    data, increases in costs, environmental compliance and changes in environmental legislation and regulation, interest rate and
    exchange rate fluctuations, general economic conditions and other risks involved in the gold exploration and development
    industry, as well as those risk factors discussed in the section entitled “Description of Business - Risk Factors” in Detour Gold’s
    2011 AIF and in the continuous disclosure documents filed by Detour Gold on and available on SEDAR at www.sedar.com.
    Such forward-looking statements are also based on a number of assumptions which may prove to be incorrect, including, but
    not limited to, assumptions about the following: the supply and demand for gold, and the level and volatility of the price of gold;
    the availability of financing for exploration and development activities; the estimated timeline for the development of the Detour
    Lake gold project; the expected mine life; anticipated gold production; gold recovery; the development schedule; cash
    operating costs and other costs; the financial analysis for the project; capital costs; sensitivity to metal prices and other
    sensitivities; the accuracy of reserve and resource estimates and the assumptions on which the reserve and resource
    estimates are based; the receipt of necessary permits; market competition; ongoing relations with employees and impacted
    communities; and general business and economic conditions. Accordingly, readers should not place undue reliance on
    forward-looking statements. The forward-looking statements contained herein are made as of the date hereof, or such other
    date or dates specified in such statements. Detour Gold undertakes no obligation to update publicly or otherwise revise any
    forward-looking statements contained herein whether as a result of new information or future events or otherwise, except as
    may be required by law. If the Company does update one or more forward-looking statements, no inference should be drawn
    that it will make additional updates with respect to those or other forward-looking statements.




2
NI-43 101 Disclosure
    Information Containing Estimates of Mineral Reserves and Resources
    The mineral reserve and resource estimates reported in this presentation were prepared in accordance with Canadian
    National Instrument 43-101Standards of Disclosure for Mineral Projects (“NI 43-101”), as required by Canadian securities
    regulatory authorities. For United States reporting purposes, the United States Securities and Exchange Commission (“SEC”)
    applies different standards in order to classify mineralization as a reserve. In particular, while the terms “measured,” “indicated”
    and “inferred” mineral resources are required pursuant to NI 43-101, the SEC does not recognize such terms. Canadian
    standards differ significantly from the requirements of the SEC. Investors are cautioned not to assume that any part or all of
    the mineral deposits in these categories constitute or will ever be converted into reserves. In addition, “inferred” mineral
    resources have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal
    feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category.
    Under Canadian securities laws, issuers must not make any disclosure of results of an economic analysis that includes
    inferred mineral resources, except in rare cases.

    On September 4, 2012, Detour Gold announced an updated mine production plan for the Detour Lake project. The NI 43-101
    compliant Technical Report for this update was filed on SEDAR on October 18, 2012. The following QPs participated in this
    update: BBA Inc., under the direction of André Allaire, Eng., Vice-President, Markets – Mining and Metals and Patrice Live,
    Eng., Mining Manager; SGS Canada Inc., under the direction of Michel Dagbert, Eng., Senior Geostatistician and Maxime
    Dupéré, P.Geo., Senior Geologist; and AMEC Environment & Infrastructure, a Division of AMEC Americas Limited, David G.
    Ritchie M.Eng., P.Eng, Senior Associate Geotechnical Engineer.




3
Invest in Detour Gold
    Our Vision




     Focus on a world-class asset – Detour Lake
        Canada’s largest pure gold play with 15.6 M oz in reserves
        Gold processing initiated in January 2013
     One of the best cash flow/share opportunities
     Average annual gold production of 657,000 oz
     Excellent organic growth potential (5 year plan)
     Potential expansion of mill throughput




4
Share Capital
                                                           OPTIONS & FN SHARE
                                                             COMMITMENTS
     ISSUED AND                                                       8.9 M
    OUTSTANDING
                                FULLY DILUTED                     CONVERTIBLE
      117.9M                        139.8 M                         NOTES
                                                                      13.0 M



     Market cap: C$2.6 billion
     Cash position: C$236 million
     Major shareholders:
              Paulson & Co.       15%
              Carmignac Gestion 5%
              Detour Gold Mgmt <2%
              Institutions total >90%
    Note: Cash position at December 31, 2012 and share data at January 18, 2013.


5
Successful Focused Approach
       Record Timing from “Discovery” to Projected Production
                  Detour Lake in 6 years
     2007            2009            2010       2011-12        2013


                                                                   PRODUCTION
                                                                   2013




    ACQUISITION   PRE-FEASIBILITY FEASIBILITY   DEVELOPMENT PRODUCTION
    /DISCOVERY    STUDY           STUDY &
                                  PERMITTING




6
2013 Objectives
    H1 2013
     First gold pour
     Commissioning of second production line
     Securing $90 million credit facility
     20,000 m drilling program targeting high-grade gold mineralization

    H2 2013
     Declaring commercial production
     Gold production target of +350,000 ounces for the year
     Completing pre-feasibility study on Block A
     Advancing evaluation of mine expansion scenarios
     Revising block model for Detour Lake


7
Detour Lake Profile
                                                                                                          September 2012
                                                                        Detour Lake                         Mine Plan(1)

             Open pit                                                   Production Start                    Q1 2013
             @ 0.5 g/t cut-off                20,600E                   OP Reserves (M oz)                    15.6

                                                                        Mill throughput (tpd)                55,000

                                                                        Strip Ratio (waste:ore)                3.7
                                                                        Gold recoveries                       91%
   16,500E
                                                                        Average grade (g/t)                   1.03
                                                                        Estimated mine life (yrs)             21.5
700 m                                          1.0 g/t Au               Avg. Production (oz/yr)              657,000
                                               0.5 - 1.0 g/t Au         Cash operating costs (C$/oz)          $710
                                               <0.5 g/t Au
                                                                        Total cash costs (C$/oz)              $749
                                                                        Initial Capex (C$ B)(2)               1.45


      (1) Gold price assumptions: US$1,600/oz for 2013, US$1,500/oz for 2014, and US$1,400/oz for 2015.
      (2) Revised to approx. C$1.5 B in news release dated November 8, 2012.


  8
Updated LOM Gold Production
Gold Production (‘000 oz)                        Grade (g/t Au)

800                                                       1.6
                            Avg. 657,000 oz/yr
700                                                       1.4

600                                                       1.2

500                                                       1.0

400                                                       0.8

300                                                       0.6

200                                                       0.4

100                                                       0.2

     0                                                      0




 9
Updated LOM Operating Costs
                                                             Breakdown of 2013-14 TCC
     Operating Costs (LOM) C$/t milled C$/t mined   C$/oz

     Mining costs             11.65      2.49       388
                                                                    LABOUR
     Processing cost           7.83       --        260              18%       POWER

     G&A                       1.86       --         62
                                                                               12%
                                                                                  DIESEL
     Cash operating costs     21.34       --        710     MAINTENANCE            8%
     Royalty (2%) and other    1.26       --         42       22%               G&A
     Refining                  0.12       --          4
                                                                                       5%
     Silver credit            (0.20)      --         (7)         CONSUMABLES       ROYALTY+
                                                                                      OTHER
     Total cash costs (TCC)   22.52       --        749               29%           (2% NSR)
                                                                                       6%
     A 10% change in:
     Diesel or power costs = $9/oz change in TCC
     Cdn$ FX rate = $63/oz in TCC



10
Financial Analysis
     Base Case Assumptions
      Gold - US$1,200/oz (1)                             Power Cdn $0.065/kwh
      F/X - $Cdn/$US = 1.00                              Diesel US$100/barrel (WTI)

                                                     Base Case (1)
      US$ Billions                      Undiscounted (0%)                 5.0%
      Pre-tax cash flow                            4.3                     1.7
      Net cash flow after tax                      3.0                     1.1
      Pre-tax IRR                                         14.4%

      1. Gold price US$1,600/oz for 2013, US$1,500/oz for 2014, and US$1,400/oz for 2015.


                                                    @ US$1,600/oz                           12-12-23
      US$ Billions                      Undiscounted (0%)                 5.0%
      Pre-tax cash flow                            9.4                     4.4
      Net cash flow after tax                      6.6                     3.0
      Pre-tax IRR                                           24.6%


11
                                                                                                       49
DETOUR LAKE MINE
START UP
12
2013 Forecast
     Guidance
      350,000 oz to 400,000 oz of gold
      Total cash costs between C$800/oz and C$900/oz (on
       commercial production of 200,000 oz to 250,000 oz sold)
      Estimated LOM sustaining capital of C$1.2 B:
         2013 = C$180 M (<$80 M in H1)
         2014 = C$140 M




     NOTE: Commercial production to be declared after 60
     consecutive days of operating at >75% of throughput
     (55,000 tpd x 75% = 41,250 tpd)



13
Mining Production
                                   Status
     2012 Pre-Stripping
                               (Year-end 2012)
     Overburden/Till               15.1 Mt
     Waste                          7.7 Mt
     Low Grade (0.3-0.5 g/t)        1.1 Mt
     Ore                            2.2 Mt
     Total                         26.1 Mt




      2.2 Mt ore inventory on ROMs and short-term stockpiles (reconciled
       average grade of approx. 0.7 g/t) (till dilution on first bench)
      Average mining rates of +115,000 tpd in December 2012
      Mining operation on 24 hrs/day, 365 days/yr



14
Mining Production


                                  NORTH WASTE
       MINERALIZED                   DUMP                           PLANT SITE
          ZONE




                                                                     CAMPBELL
                                                                        PIT



              CURRENT
              PIT SHAPE                         APPROX. PIT SHELL
                                                 AT END OF LOM



      Satellite image dated July 2012

15
Detour Lake Open Pit Mine




                 12-10-22

16
DETOUR LAKE
17
             SITE
Overview Detour Lake Facilities
                 SECONDARY
                 CRUSHERS


                             STOCKPILE
                             RECLAIM

      GEODESIC
      DOME




                             PRIMARY
                             CRUSHER




     12-10-22


18
Processing Plant
        Conventional gravity and CIP plant
        55,000 tpd (=92% availability of 60,000 tpd capacity)
        2 parallel lines (each with 1 secondary cone crusher + 1 SAG & 1 ball mill)
        Estimated gravity recovery: 30-40%
        Estimated overall gold recovery: 91.0%
        Leach time 29 hours; leach feed size 80% passing 95 μm




         12-12-23
19
DGC Workforce: Hiring Local First
  423 employees at year-end*                                            DIVISION OF
   (25% are Aboriginal)                                                    LABOUR
                                                FRONT LINE
  Continuing focus on hiring local and            81%               •   Professional includes:
                                                                         MGMT, Eng., Geo., Supt.
   regional                                                          •   Front Line includes:
                                               PROFESSIONAL
                                                                         Operators, Admin,
                                                          19%            Support




                                                                           WORKFORCE
                                              COCHRANE
                                                                             ORIGIN
                                                AREA         COCHRANE
                                                  26%              25%
                                               NORTHERN                         REST OF
                                                ONTARIO                         ONTARIO
                                                                                      3%
                                                         43%                OTHER
  Work rotation: 1 week in/out                                                 2%
  Modern camp facility with 400
                                          * Excludes Corporate office.
   en-suite rooms

20
PLANNING FOR
21
     ORGANIC GROWTH
          Under-Explored Greenstone Belt
Planning for Organic Growth
     5 Year Plan for Successful Organic Growth

     Large prospective land position of approx. 566 km2
     • Two main gold structures with total strike length of >80km
     • Continue focus on Detour Lake deposit extension (northern
       structure i.e. Block A)
     • Test targets on structure south of Detour Lake

     Future objectives
      Grow reserve base to +20 M oz (@ US$850/oz)
      Increase mill throughput to above 75,000 tpd for gold production
       output of +800,000 oz/yr
      Find high-grade ore near-surface within trucking distance to
       supplement mill

22
Successful Growth of Resources
     Resource Growth Exceeding 750% Since IPO @ $5/oz

      Date     Accumulative   Resources/Reserves (M oz)
               DGC Drilling                                     Inferred   M&I   2P
                                               10M                 20M           30M
     2005-05                     Estimated by Pelangio

     2006-09                       DGC due diligence
     2007-12     50,000m

     2008-06    123,000m

     2009-09    249,000m                 8.8
     2010-06    334,000m      $850/oz        11.4
     2011-01    430,000m      $850/oz                14.9
     2012-01    523,000m      $850/oz                    15.6



23
Priority #1 – Block A Target



      Block A
      Pre-feasibility




      Block A pre-feasibility study by year-end 2013
      Evaluate potential expansion options

     *Not updated with TWD Dec. 30th PR. On Dec. 1, 2011, Detour Gold announced the acquisition of TWD.


24
Priority #2 – South Structure
      Land package = 566 km2




                                           15.6 M oz in Reserves




                                                            20,000 m
                                                            in H1 2013
                                 MMI Survey Coverage
                                 MMI Au Anomaly

                              Existing DDH
                              Gold occurrence (OGS)
                              DDH intersection >1g/2m
                              DDH intersection >1g/10m

     *Note: Excludes drilling around Detour Lake and M zone (Block A).
25
Invest in Detour Gold
     Our Vision




      Focus on a world-class asset – Detour Lake
         Canada’s largest pure gold play with 15.6 M oz in reserves
         Gold processing initiated in January 2013
      One of the best cash flow/share opportunities
      Average annual gold production of 657,000 oz
      Excellent organic growth potential (5 year plan)
      Potential expansion of mill throughput




26
ADDITIONAL
INFORMATION
 27
Detour Lake Reserves & Resources
     As at December 31, 2011

                                Tonnes            Grade         Contained Gold
     @ US$850/oz
                               (millions)          (g/t)           (‘000 oz)
     Reserves (1)
     Proven                       101.6             1.29                4,222
     Probable                     368.4             0.96               11,351
     P&P                          470.0             1.03               15,573
     Resources (2)
     Measured                     124.5             1.36                5,424
     Indicated                    554.3             1.00               17,836
     M&I                          678.8             1.07               23,261
     Inferred                     208.5             0.86                5,785


     1.   After a 95% mining recovery rate; Mining dilution factor of 15.5%.
     2.   Inclusive of mineral reserves.




28
Detour Lake Profile
                                                                                   January 2011   September 2012
      Detour Lake
                                                                                     Update (2)     Mine Plan(3)
                            Gold price (US$/oz) (1)                                    850            1,200
                            Foreign exchange rate (US$/Cdn$)                           1.10            1.00
     Assumptions Fuel price (US$/barrel)                                               80              100
                            Income/mining tax rate (%)                                25/10           25/10
                            Net Smelter Royalty (%)                                     2               2
                            Ore milled (Mt)                                           449.6           470.0
                            Waste mined (Mt) (4)                                      1,654           1,734
     Mine                   Strip ratio (waste:ore)                                    3.9             3.7
     Parameters             Average gold grade (g/t)                                   1.03            1.03
                            Total contained gold (M oz)                                14.9            15.6
                            Estimated gold recovery (%)                                91.0            91.0
                            Total recovered gold (M oz)                                13.5            14.1
                            Mine life (years)                                          21              21.5
                            Average annual gold production (oz)                      657,000         657,000
     1.   US$1,600/oz for 2013, US$1,500/oz for 2014, and US$1,400/oz for 2015.
     2.   Press release Jan. 31, 2011 with Technical Report dated Mar. 15, 2011.
     3.   Press release Sept. 4, 2012 with Technical Report dated Oct. 18, 2012.
     4.   Includes low-grade stockpile.
29
Gold Production/Cost Profile
Gold Production (‘000 oz)                                        Total Cash Costs (C$/oz)

800                                              Avg. C$749/oz                     900

700                                                                                850

600                                                                                800

500                                                                                750

400                                                                                700

300                                                                                650

200                                                                                600

100                                                                                550

     0                                                                             500


         Note: Excludes stripping adjustments.


30
Simple Process Plant @ 92% Availability

                       Stockpile
Gyratory               12 h live capacity
crusher:
60” x 113”
90,000 tpd

                    Secondary crushers:
                    2 X XL-1100                                           Ball mills:
                                                   SAG mills:             2 X 26’ x 40’6’’, 15MW
                    67,000 tpd
                                                   2 X 36’ x 20’, 15MW    55,000 tpd
                                Pebble crushers:
                                                   55,000 tpd
                                2 X XL-1100
                                                                                          To
                                73,000 tpd                                                leaching
                                                                                          circuit
                                                                                          To
                                                                                          gravity
                                                                                          circuit

                                                             Circ. load
                                                                             Circ. load   From
                                                             28 %
  Leach circuit:                                                             250 %        gravity
                                                                                          circuit

  55,000 tpd + 15% contingency in piping capacity

  31
Block Model – Gold Distribution
                                        Approx. 3 M oz between 0.3-0.5 g/t Au
                  1,600
                                                  Stockpile over LOM                                                     OK (oz Au)
                                                  0.3-0.5 g/t material                                                   ID3 (oz Au)
                  1,400

                  1,200
 Ounces (000’s)




                  1,000

                   800

                   600

                   400

                   200

                     0    0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 3.0

                                                                           Cut-off BINs
32
Blast Movement Monitoring
      Minimizes dilution by 5% and ore loss
       by up to 10% for a total of 15%
      On a recent 400,000 t blast using 4
       balls costing $1,200:
         150,000 t ore at 0.9 g/t = 4,340 oz
         Potential benefit up to 579 oz or +13%




33
Grade Control: First 2 Benches
             DDH Block model 40x40m drill spacing   RC Grade Control 20X10m & 10X10m drill
     Bench                                          spacing
     6264m




             DDH Block model 40x40m drill spacing   RC Grade Control 20x10m & 10X10 m drill
     Bench                                          spacing
     6252m




34
Management & Directors
     Management
      Gerald Panneton               Pat Donovan                  Andrew Croal
         Founder, President & CEO     VP Corporate Development       Director Technical Services
         Director                    James Mavor                  Laurie Gaborit
      Michael Kenyon                  VP Finance                    Director Investor Relations
         Executive Chairman          Rachel Pineault              Jean-Francois Metail
      Paul Martin                     VP HR & Northern Affairs      Director Reserves and Resources
         CFO                         James Robertson              Greg Miazga
      Pierre Beaudoin                VP Environment &               Director Construction & Engineering
         Sr VP Capital Projects       Sustainability
                                                                   Bill Snelling
      Julie Galloway                Eric Josipovic                 Director Corporate Systems & Controls
         Sr VP General Counsel &      Controller
                                                                   Christian Brousseau
         Corporate Secretary         Drew Anwyll                    Project Manager
      Derek Teevan                   Director of Operations
         Sr VP External &                                          Patrik Gillerstedt
         Aboriginal Affairs                                          Mine Manager

     Directors
        Peter Crossgrove            Michael Kenyon               Jonathan Rubenstein
        Louis Dionne                Alex G. Morrison             Graham Wozniak
        Robert E. Doyle             Gerald Panneton
        Ingrid Hibbard
35
Contact Information

     Gerald Panneton
     President & CEO
     Email: gpanneton@detourgold.com
     Phone: 416.304.0800

     Laurie Gaborit
     Director Investor Relations
     Email: lgaborit@detourgold.com
     Phone: 416.304.0800


     www.detourgold.com




36

Weitere ähnliche Inhalte

Was ist angesagt?

Canaccord Global Resource Conference Corporate Presentation
Canaccord Global Resource Conference Corporate PresentationCanaccord Global Resource Conference Corporate Presentation
Canaccord Global Resource Conference Corporate PresentationDetourGold
 
PDAC 2013 Corporate Presentation Forum for Investors
PDAC 2013 Corporate Presentation Forum for InvestorsPDAC 2013 Corporate Presentation Forum for Investors
PDAC 2013 Corporate Presentation Forum for InvestorsAuRico Gold
 
Avion Presentation Aug 2010
Avion Presentation Aug 2010Avion Presentation Aug 2010
Avion Presentation Aug 2010Avion Gold Corp
 
Claude Resources Inc. 2011 Annual Report
Claude Resources Inc. 2011 Annual ReportClaude Resources Inc. 2011 Annual Report
Claude Resources Inc. 2011 Annual ReportClaude Resources Inc.
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate PresentationDetourGold
 
Claude Resources Inc. April 2015 Corporate Presentation
Claude Resources Inc. April 2015 Corporate Presentation Claude Resources Inc. April 2015 Corporate Presentation
Claude Resources Inc. April 2015 Corporate Presentation Claude Resources Inc.
 
Managing Directors Presentation 2012 AGM
Managing Directors Presentation 2012 AGMManaging Directors Presentation 2012 AGM
Managing Directors Presentation 2012 AGMMinotaur Exploration
 
Q1 2012 Conference Call and Webcast Presentation
Q1 2012 Conference Call and Webcast PresentationQ1 2012 Conference Call and Webcast Presentation
Q1 2012 Conference Call and Webcast PresentationClaude Resources Inc.
 
2010 June Presentation
2010 June Presentation2010 June Presentation
2010 June PresentationGoldCorpInc
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate PresentationDetourGold
 
Q2 2012 Conference Call and Webcast Presentation
Q2 2012 Conference Call and Webcast PresentationQ2 2012 Conference Call and Webcast Presentation
Q2 2012 Conference Call and Webcast PresentationClaude Resources Inc.
 
Cambridge House Vancouver Resource Investment Conference
Cambridge House Vancouver Resource Investment ConferenceCambridge House Vancouver Resource Investment Conference
Cambridge House Vancouver Resource Investment ConferenceVMS Ventures
 
Dgc 13 04_16-18_european gold forum
Dgc 13 04_16-18_european gold forumDgc 13 04_16-18_european gold forum
Dgc 13 04_16-18_european gold forumDetourGold
 
Alexis marketing presentation March 2012
Alexis marketing presentation March 2012Alexis marketing presentation March 2012
Alexis marketing presentation March 2012QMX Gold Corporation
 
newmont mining Diggers_RClark
newmont mining Diggers_RClarknewmont mining Diggers_RClark
newmont mining Diggers_RClarkfinance37
 
Vms nan combo for astrologers fund feb 2013
Vms nan combo for astrologers fund feb 2013Vms nan combo for astrologers fund feb 2013
Vms nan combo for astrologers fund feb 2013VMS Ventures
 
Rainy River Resources Ltd. Corporate Presentation - February 2012
Rainy River Resources Ltd. Corporate Presentation - February 2012Rainy River Resources Ltd. Corporate Presentation - February 2012
Rainy River Resources Ltd. Corporate Presentation - February 2012RainyRiver
 

Was ist angesagt? (20)

Canaccord Global Resource Conference Corporate Presentation
Canaccord Global Resource Conference Corporate PresentationCanaccord Global Resource Conference Corporate Presentation
Canaccord Global Resource Conference Corporate Presentation
 
PDAC 2013 Corporate Presentation Forum for Investors
PDAC 2013 Corporate Presentation Forum for InvestorsPDAC 2013 Corporate Presentation Forum for Investors
PDAC 2013 Corporate Presentation Forum for Investors
 
Torex jan2013presentation
Torex jan2013presentationTorex jan2013presentation
Torex jan2013presentation
 
Avion Presentation Aug 2010
Avion Presentation Aug 2010Avion Presentation Aug 2010
Avion Presentation Aug 2010
 
Claude Resources Inc. 2011 Annual Report
Claude Resources Inc. 2011 Annual ReportClaude Resources Inc. 2011 Annual Report
Claude Resources Inc. 2011 Annual Report
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Claude Resources Inc. April 2015 Corporate Presentation
Claude Resources Inc. April 2015 Corporate Presentation Claude Resources Inc. April 2015 Corporate Presentation
Claude Resources Inc. April 2015 Corporate Presentation
 
Managing Directors Presentation 2012 AGM
Managing Directors Presentation 2012 AGMManaging Directors Presentation 2012 AGM
Managing Directors Presentation 2012 AGM
 
Q1 2012 Conference Call and Webcast Presentation
Q1 2012 Conference Call and Webcast PresentationQ1 2012 Conference Call and Webcast Presentation
Q1 2012 Conference Call and Webcast Presentation
 
Alexis Corporate Presentation
Alexis Corporate PresentationAlexis Corporate Presentation
Alexis Corporate Presentation
 
2010 June Presentation
2010 June Presentation2010 June Presentation
2010 June Presentation
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Q2 2012 Conference Call and Webcast Presentation
Q2 2012 Conference Call and Webcast PresentationQ2 2012 Conference Call and Webcast Presentation
Q2 2012 Conference Call and Webcast Presentation
 
Cambridge House Vancouver Resource Investment Conference
Cambridge House Vancouver Resource Investment ConferenceCambridge House Vancouver Resource Investment Conference
Cambridge House Vancouver Resource Investment Conference
 
Dgc 13 04_16-18_european gold forum
Dgc 13 04_16-18_european gold forumDgc 13 04_16-18_european gold forum
Dgc 13 04_16-18_european gold forum
 
Alexis marketing presentation March 2012
Alexis marketing presentation March 2012Alexis marketing presentation March 2012
Alexis marketing presentation March 2012
 
newmont mining Diggers_RClark
newmont mining Diggers_RClarknewmont mining Diggers_RClark
newmont mining Diggers_RClark
 
Vms nan combo for astrologers fund feb 2013
Vms nan combo for astrologers fund feb 2013Vms nan combo for astrologers fund feb 2013
Vms nan combo for astrologers fund feb 2013
 
Barclays Presentation
Barclays PresentationBarclays Presentation
Barclays Presentation
 
Rainy River Resources Ltd. Corporate Presentation - February 2012
Rainy River Resources Ltd. Corporate Presentation - February 2012Rainy River Resources Ltd. Corporate Presentation - February 2012
Rainy River Resources Ltd. Corporate Presentation - February 2012
 

Ähnlich wie National Bank Financial London Gold Conference Corporate Presentation

20110711 minera agm
20110711 minera agm20110711 minera agm
20110711 minera agmMineraandres
 
BoAML Canada Mining Conference, Toronto
BoAML Canada Mining Conference, TorontoBoAML Canada Mining Conference, Toronto
BoAML Canada Mining Conference, TorontoDetourGold
 
Dgc 13 09_12-13_bo_aml conference
Dgc 13 09_12-13_bo_aml conferenceDgc 13 09_12-13_bo_aml conference
Dgc 13 09_12-13_bo_aml conferenceDetourGold
 
2014 prospectors and developers association of canada conference, toronto
2014 prospectors and developers association of canada conference, toronto2014 prospectors and developers association of canada conference, toronto
2014 prospectors and developers association of canada conference, torontoCompany Spotlight
 
2014 prospectors and developers association of canada conference, toronto
2014 prospectors and developers association of canada conference, toronto2014 prospectors and developers association of canada conference, toronto
2014 prospectors and developers association of canada conference, torontoCompany Spotlight
 
RBC Global Mining and Materials Conference
RBC Global Mining and Materials ConferenceRBC Global Mining and Materials Conference
RBC Global Mining and Materials ConferenceDetourGold
 
Dgc Denver Gold Forum
Dgc Denver Gold ForumDgc Denver Gold Forum
Dgc Denver Gold ForumDetourGold
 
Denver Gold corporate presentation
Denver Gold corporate presentationDenver Gold corporate presentation
Denver Gold corporate presentationDetourGold
 
Gold Investment Symposium 2012 - Company Presentation - Kula Gold Limited
Gold Investment Symposium 2012 - Company Presentation - Kula Gold LimitedGold Investment Symposium 2012 - Company Presentation - Kula Gold Limited
Gold Investment Symposium 2012 - Company Presentation - Kula Gold LimitedSymposium
 
Investor Presentation May 2013
Investor Presentation May 2013Investor Presentation May 2013
Investor Presentation May 2013Company Spotlight
 
Investor Presentation May 2013
Investor Presentation May 2013Investor Presentation May 2013
Investor Presentation May 2013Company Spotlight
 
Dgc 13 05_14-16_bo_aml conference
Dgc 13 05_14-16_bo_aml conferenceDgc 13 05_14-16_bo_aml conference
Dgc 13 05_14-16_bo_aml conferenceDetourGold
 
Third Quater 10 November 2011 Conferance Call
Third Quater 10 November 2011 Conferance CallThird Quater 10 November 2011 Conferance Call
Third Quater 10 November 2011 Conferance CallLake Shore Gold
 
Third quater conferance call
Third quater conferance callThird quater conferance call
Third quater conferance callLake Shore Gold
 
Q2 2012 results presentation conf call
Q2 2012 results presentation conf callQ2 2012 results presentation conf call
Q2 2012 results presentation conf callAgnico Eagle Mines
 
Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014
Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014
Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014Symposium
 

Ähnlich wie National Bank Financial London Gold Conference Corporate Presentation (20)

20110711 minera agm
20110711 minera agm20110711 minera agm
20110711 minera agm
 
BoAML Canada Mining Conference, Toronto
BoAML Canada Mining Conference, TorontoBoAML Canada Mining Conference, Toronto
BoAML Canada Mining Conference, Toronto
 
Dgc 13 09_12-13_bo_aml conference
Dgc 13 09_12-13_bo_aml conferenceDgc 13 09_12-13_bo_aml conference
Dgc 13 09_12-13_bo_aml conference
 
2014 prospectors and developers association of canada conference, toronto
2014 prospectors and developers association of canada conference, toronto2014 prospectors and developers association of canada conference, toronto
2014 prospectors and developers association of canada conference, toronto
 
2014 prospectors and developers association of canada conference, toronto
2014 prospectors and developers association of canada conference, toronto2014 prospectors and developers association of canada conference, toronto
2014 prospectors and developers association of canada conference, toronto
 
RBC Global Mining and Materials Conference
RBC Global Mining and Materials ConferenceRBC Global Mining and Materials Conference
RBC Global Mining and Materials Conference
 
Second Quarter 2012
Second Quarter 2012Second Quarter 2012
Second Quarter 2012
 
Dgc Denver Gold Forum
Dgc Denver Gold ForumDgc Denver Gold Forum
Dgc Denver Gold Forum
 
Denver Gold corporate presentation
Denver Gold corporate presentationDenver Gold corporate presentation
Denver Gold corporate presentation
 
Gold Investment Symposium 2012 - Company Presentation - Kula Gold Limited
Gold Investment Symposium 2012 - Company Presentation - Kula Gold LimitedGold Investment Symposium 2012 - Company Presentation - Kula Gold Limited
Gold Investment Symposium 2012 - Company Presentation - Kula Gold Limited
 
Investor Presentation May 2013
Investor Presentation May 2013Investor Presentation May 2013
Investor Presentation May 2013
 
Investor Presentation May 2013
Investor Presentation May 2013Investor Presentation May 2013
Investor Presentation May 2013
 
Dgc 13 05_14-16_bo_aml conference
Dgc 13 05_14-16_bo_aml conferenceDgc 13 05_14-16_bo_aml conference
Dgc 13 05_14-16_bo_aml conference
 
Fourth Quarter 2011
Fourth Quarter 2011Fourth Quarter 2011
Fourth Quarter 2011
 
Q4 2012 and full year results
Q4 2012 and full year resultsQ4 2012 and full year results
Q4 2012 and full year results
 
Third Quater 10 November 2011 Conferance Call
Third Quater 10 November 2011 Conferance CallThird Quater 10 November 2011 Conferance Call
Third Quater 10 November 2011 Conferance Call
 
Third quater conferance call
Third quater conferance callThird quater conferance call
Third quater conferance call
 
Q3 2012 results
Q3 2012 resultsQ3 2012 results
Q3 2012 results
 
Q2 2012 results presentation conf call
Q2 2012 results presentation conf callQ2 2012 results presentation conf call
Q2 2012 results presentation conf call
 
Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014
Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014
Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014
 

Mehr von DetourGold

Dgc 17 04_4-6_dgf zurich corporate 1x1 presentation
Dgc 17 04_4-6_dgf zurich corporate 1x1 presentationDgc 17 04_4-6_dgf zurich corporate 1x1 presentation
Dgc 17 04_4-6_dgf zurich corporate 1x1 presentationDetourGold
 
Dgc 17 03_24_corporate presentation
Dgc 17 03_24_corporate presentationDgc 17 03_24_corporate presentation
Dgc 17 03_24_corporate presentationDetourGold
 
Dgc 17 02_27 - bmo presentation_final
Dgc 17 02_27 - bmo presentation_finalDgc 17 02_27 - bmo presentation_final
Dgc 17 02_27 - bmo presentation_finalDetourGold
 
Presentation dgc 17-01_31 _ q4 ops 2017 guidance webcast
Presentation   dgc 17-01_31 _ q4 ops 2017 guidance webcastPresentation   dgc 17-01_31 _ q4 ops 2017 guidance webcast
Presentation dgc 17-01_31 _ q4 ops 2017 guidance webcastDetourGold
 
Dgc 16 11_8-9 - corporate presentation
Dgc 16 11_8-9 - corporate presentationDgc 16 11_8-9 - corporate presentation
Dgc 16 11_8-9 - corporate presentationDetourGold
 
Dgc 16 11_02 - corporate presentation
Dgc 16 11_02 - corporate presentationDgc 16 11_02 - corporate presentation
Dgc 16 11_02 - corporate presentationDetourGold
 
Dgc 16 09_18-21 - dgf conference_1x1
Dgc 16 09_18-21 - dgf conference_1x1Dgc 16 09_18-21 - dgf conference_1x1
Dgc 16 09_18-21 - dgf conference_1x1DetourGold
 
Dgc 16 09_08 - baml conference
Dgc 16 09_08 - baml conferenceDgc 16 09_08 - baml conference
Dgc 16 09_08 - baml conferenceDetourGold
 
Dgc 16 08_30-31 - corporate presentation
Dgc 16 08_30-31 - corporate presentationDgc 16 08_30-31 - corporate presentation
Dgc 16 08_30-31 - corporate presentationDetourGold
 
Dgc 16 06_14-15 - rbc conference
Dgc 16 06_14-15 - rbc conferenceDgc 16 06_14-15 - rbc conference
Dgc 16 06_14-15 - rbc conferenceDetourGold
 
Dgc 16 05_10-12 - BAML conference
Dgc 16 05_10-12 - BAML conferenceDgc 16 05_10-12 - BAML conference
Dgc 16 05_10-12 - BAML conferenceDetourGold
 
BMO Global Metals & Mining Conference - Hollywood, FL
BMO Global Metals & Mining Conference - Hollywood, FLBMO Global Metals & Mining Conference - Hollywood, FL
BMO Global Metals & Mining Conference - Hollywood, FLDetourGold
 
Dgc 16 02_09-10 - corporate presentation
Dgc 16 02_09-10 - corporate presentationDgc 16 02_09-10 - corporate presentation
Dgc 16 02_09-10 - corporate presentationDetourGold
 
Dgc 16 01_26 - td conference
Dgc 16 01_26 - td conferenceDgc 16 01_26 - td conference
Dgc 16 01_26 - td conferenceDetourGold
 
Dgc 16 01_20 - cibc whistler conference
Dgc 16 01_20 - cibc whistler conferenceDgc 16 01_20 - cibc whistler conference
Dgc 16 01_20 - cibc whistler conferenceDetourGold
 
Dgc 15 12_1-2 - scotia mining conference 1-1
Dgc 15 12_1-2 - scotia mining conference 1-1Dgc 15 12_1-2 - scotia mining conference 1-1
Dgc 15 12_1-2 - scotia mining conference 1-1DetourGold
 
Dgc 15 11_17 - rj texas gold investor forum
Dgc 15 11_17 - rj texas gold investor forumDgc 15 11_17 - rj texas gold investor forum
Dgc 15 11_17 - rj texas gold investor forumDetourGold
 
Dgc 15 11_10 - nbf-tsx canadian miners conference
Dgc 15 11_10 - nbf-tsx canadian miners conferenceDgc 15 11_10 - nbf-tsx canadian miners conference
Dgc 15 11_10 - nbf-tsx canadian miners conferenceDetourGold
 
Dgc 15 10_29 - corporate presentation
Dgc 15 10_29 - corporate presentationDgc 15 10_29 - corporate presentation
Dgc 15 10_29 - corporate presentationDetourGold
 
Dgc 15 09_20-23 - dgf 1x1 presentation
Dgc 15 09_20-23 - dgf 1x1 presentationDgc 15 09_20-23 - dgf 1x1 presentation
Dgc 15 09_20-23 - dgf 1x1 presentationDetourGold
 

Mehr von DetourGold (20)

Dgc 17 04_4-6_dgf zurich corporate 1x1 presentation
Dgc 17 04_4-6_dgf zurich corporate 1x1 presentationDgc 17 04_4-6_dgf zurich corporate 1x1 presentation
Dgc 17 04_4-6_dgf zurich corporate 1x1 presentation
 
Dgc 17 03_24_corporate presentation
Dgc 17 03_24_corporate presentationDgc 17 03_24_corporate presentation
Dgc 17 03_24_corporate presentation
 
Dgc 17 02_27 - bmo presentation_final
Dgc 17 02_27 - bmo presentation_finalDgc 17 02_27 - bmo presentation_final
Dgc 17 02_27 - bmo presentation_final
 
Presentation dgc 17-01_31 _ q4 ops 2017 guidance webcast
Presentation   dgc 17-01_31 _ q4 ops 2017 guidance webcastPresentation   dgc 17-01_31 _ q4 ops 2017 guidance webcast
Presentation dgc 17-01_31 _ q4 ops 2017 guidance webcast
 
Dgc 16 11_8-9 - corporate presentation
Dgc 16 11_8-9 - corporate presentationDgc 16 11_8-9 - corporate presentation
Dgc 16 11_8-9 - corporate presentation
 
Dgc 16 11_02 - corporate presentation
Dgc 16 11_02 - corporate presentationDgc 16 11_02 - corporate presentation
Dgc 16 11_02 - corporate presentation
 
Dgc 16 09_18-21 - dgf conference_1x1
Dgc 16 09_18-21 - dgf conference_1x1Dgc 16 09_18-21 - dgf conference_1x1
Dgc 16 09_18-21 - dgf conference_1x1
 
Dgc 16 09_08 - baml conference
Dgc 16 09_08 - baml conferenceDgc 16 09_08 - baml conference
Dgc 16 09_08 - baml conference
 
Dgc 16 08_30-31 - corporate presentation
Dgc 16 08_30-31 - corporate presentationDgc 16 08_30-31 - corporate presentation
Dgc 16 08_30-31 - corporate presentation
 
Dgc 16 06_14-15 - rbc conference
Dgc 16 06_14-15 - rbc conferenceDgc 16 06_14-15 - rbc conference
Dgc 16 06_14-15 - rbc conference
 
Dgc 16 05_10-12 - BAML conference
Dgc 16 05_10-12 - BAML conferenceDgc 16 05_10-12 - BAML conference
Dgc 16 05_10-12 - BAML conference
 
BMO Global Metals & Mining Conference - Hollywood, FL
BMO Global Metals & Mining Conference - Hollywood, FLBMO Global Metals & Mining Conference - Hollywood, FL
BMO Global Metals & Mining Conference - Hollywood, FL
 
Dgc 16 02_09-10 - corporate presentation
Dgc 16 02_09-10 - corporate presentationDgc 16 02_09-10 - corporate presentation
Dgc 16 02_09-10 - corporate presentation
 
Dgc 16 01_26 - td conference
Dgc 16 01_26 - td conferenceDgc 16 01_26 - td conference
Dgc 16 01_26 - td conference
 
Dgc 16 01_20 - cibc whistler conference
Dgc 16 01_20 - cibc whistler conferenceDgc 16 01_20 - cibc whistler conference
Dgc 16 01_20 - cibc whistler conference
 
Dgc 15 12_1-2 - scotia mining conference 1-1
Dgc 15 12_1-2 - scotia mining conference 1-1Dgc 15 12_1-2 - scotia mining conference 1-1
Dgc 15 12_1-2 - scotia mining conference 1-1
 
Dgc 15 11_17 - rj texas gold investor forum
Dgc 15 11_17 - rj texas gold investor forumDgc 15 11_17 - rj texas gold investor forum
Dgc 15 11_17 - rj texas gold investor forum
 
Dgc 15 11_10 - nbf-tsx canadian miners conference
Dgc 15 11_10 - nbf-tsx canadian miners conferenceDgc 15 11_10 - nbf-tsx canadian miners conference
Dgc 15 11_10 - nbf-tsx canadian miners conference
 
Dgc 15 10_29 - corporate presentation
Dgc 15 10_29 - corporate presentationDgc 15 10_29 - corporate presentation
Dgc 15 10_29 - corporate presentation
 
Dgc 15 09_20-23 - dgf 1x1 presentation
Dgc 15 09_20-23 - dgf 1x1 presentationDgc 15 09_20-23 - dgf 1x1 presentation
Dgc 15 09_20-23 - dgf 1x1 presentation
 

Kürzlich hochgeladen

Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our EscortsCall Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escortsindian call girls near you
 
Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024TeckResourcesLtd
 
B2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxcccccccccccccccB2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxcccccccccccccccMollyBrown86
 
Q3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call PresentationQ3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call PresentationSysco_Investors
 
Malad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls ServiceMalad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls ServicePooja Nehwal
 
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual serviceanilsa9823
 
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service 🧦
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service  🧦CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service  🧦
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service 🧦anilsa9823
 
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In AmritsarCall Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsaronly4webmaster01
 
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort ServiceBDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort ServiceDelhi Call girls
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Banjara Hills high-profile Ca...
VIP 7001035870 Find & Meet Hyderabad Call Girls Banjara Hills high-profile Ca...VIP 7001035870 Find & Meet Hyderabad Call Girls Banjara Hills high-profile Ca...
VIP 7001035870 Find & Meet Hyderabad Call Girls Banjara Hills high-profile Ca...aditipandeya
 
Corporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdfCorporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdfProbe Gold
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girladitipandeya
 

Kürzlich hochgeladen (20)

Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our EscortsCall Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
 
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
 
Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024
 
B2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxcccccccccccccccB2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxccccccccccccccc
 
Call Girls 🫤 Nehru Place ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ENJOY
Call Girls 🫤 Nehru Place ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ENJOYCall Girls 🫤 Nehru Place ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ENJOY
Call Girls 🫤 Nehru Place ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ENJOY
 
Q3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call PresentationQ3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call Presentation
 
Malad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls ServiceMalad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls Service
 
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
 
Call Girls In South Delhi 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In South Delhi 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICECall Girls In South Delhi 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In South Delhi 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
 
@9999965857 🫦 Sexy Desi Call Girls Vaishali 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Vaishali 💓 High Profile Escorts Delhi 🫶@9999965857 🫦 Sexy Desi Call Girls Vaishali 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Vaishali 💓 High Profile Escorts Delhi 🫶
 
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service 🧦
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service  🧦CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service  🧦
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service 🧦
 
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In AmritsarCall Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
 
(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida 👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida  👉 Delhi 👈 : 9999 Cash Payment...(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida  👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida 👉 Delhi 👈 : 9999 Cash Payment...
 
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
 
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort ServiceBDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Banjara Hills high-profile Ca...
VIP 7001035870 Find & Meet Hyderabad Call Girls Banjara Hills high-profile Ca...VIP 7001035870 Find & Meet Hyderabad Call Girls Banjara Hills high-profile Ca...
VIP 7001035870 Find & Meet Hyderabad Call Girls Banjara Hills high-profile Ca...
 
Vip Call Girls Hauz Khas ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls Hauz Khas ➡️ Delhi ➡️ 9999965857 No Advance 24HRS LiveVip Call Girls Hauz Khas ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls Hauz Khas ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
 
Corporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdfCorporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdf
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
 
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 

National Bank Financial London Gold Conference Corporate Presentation

  • 1. CANADA’S NEXT INTERMEDIATE GOLD PRODUCER National Bank Financial London Gold Conference February 13, 2013 1
  • 2. Forward Looking Information This presentation contains certain forward-looking information as defined in applicable securities laws (referred to herein as “forward-looking statements”). Specifically, this presentation contains forward-looking statements regarding the reserve and resource estimates, ore grade, expected mine life, anticipated gold production, gold recovery, cash operating costs and other costs, capital costs, sensitivity to metal prices and other sensitivities, financial analysis of the project, commencement of operations, potential expansion opportunities, and plans for organic growth. Forward-looking statements involve known and unknown risks, uncertainties and other factors which are beyond Detour Gold’s ability to predict or control and may cause Detour Gold’s actual results, performance or achievements to be materially different from any of its future results, performance or achievements expressed or implied by forward-looking statements. These risks, uncertainties and other factors include, but are not limited to, gold price volatility, changes in debt and equity markets, the uncertainties involved in interpreting geological data, increases in costs, environmental compliance and changes in environmental legislation and regulation, interest rate and exchange rate fluctuations, general economic conditions and other risks involved in the gold exploration and development industry, as well as those risk factors discussed in the section entitled “Description of Business - Risk Factors” in Detour Gold’s 2011 AIF and in the continuous disclosure documents filed by Detour Gold on and available on SEDAR at www.sedar.com. Such forward-looking statements are also based on a number of assumptions which may prove to be incorrect, including, but not limited to, assumptions about the following: the supply and demand for gold, and the level and volatility of the price of gold; the availability of financing for exploration and development activities; the estimated timeline for the development of the Detour Lake gold project; the expected mine life; anticipated gold production; gold recovery; the development schedule; cash operating costs and other costs; the financial analysis for the project; capital costs; sensitivity to metal prices and other sensitivities; the accuracy of reserve and resource estimates and the assumptions on which the reserve and resource estimates are based; the receipt of necessary permits; market competition; ongoing relations with employees and impacted communities; and general business and economic conditions. Accordingly, readers should not place undue reliance on forward-looking statements. The forward-looking statements contained herein are made as of the date hereof, or such other date or dates specified in such statements. Detour Gold undertakes no obligation to update publicly or otherwise revise any forward-looking statements contained herein whether as a result of new information or future events or otherwise, except as may be required by law. If the Company does update one or more forward-looking statements, no inference should be drawn that it will make additional updates with respect to those or other forward-looking statements. 2
  • 3. NI-43 101 Disclosure Information Containing Estimates of Mineral Reserves and Resources The mineral reserve and resource estimates reported in this presentation were prepared in accordance with Canadian National Instrument 43-101Standards of Disclosure for Mineral Projects (“NI 43-101”), as required by Canadian securities regulatory authorities. For United States reporting purposes, the United States Securities and Exchange Commission (“SEC”) applies different standards in order to classify mineralization as a reserve. In particular, while the terms “measured,” “indicated” and “inferred” mineral resources are required pursuant to NI 43-101, the SEC does not recognize such terms. Canadian standards differ significantly from the requirements of the SEC. Investors are cautioned not to assume that any part or all of the mineral deposits in these categories constitute or will ever be converted into reserves. In addition, “inferred” mineral resources have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian securities laws, issuers must not make any disclosure of results of an economic analysis that includes inferred mineral resources, except in rare cases. On September 4, 2012, Detour Gold announced an updated mine production plan for the Detour Lake project. The NI 43-101 compliant Technical Report for this update was filed on SEDAR on October 18, 2012. The following QPs participated in this update: BBA Inc., under the direction of André Allaire, Eng., Vice-President, Markets – Mining and Metals and Patrice Live, Eng., Mining Manager; SGS Canada Inc., under the direction of Michel Dagbert, Eng., Senior Geostatistician and Maxime Dupéré, P.Geo., Senior Geologist; and AMEC Environment & Infrastructure, a Division of AMEC Americas Limited, David G. Ritchie M.Eng., P.Eng, Senior Associate Geotechnical Engineer. 3
  • 4. Invest in Detour Gold Our Vision  Focus on a world-class asset – Detour Lake  Canada’s largest pure gold play with 15.6 M oz in reserves  Gold processing initiated in January 2013  One of the best cash flow/share opportunities  Average annual gold production of 657,000 oz  Excellent organic growth potential (5 year plan)  Potential expansion of mill throughput 4
  • 5. Share Capital OPTIONS & FN SHARE COMMITMENTS ISSUED AND 8.9 M OUTSTANDING FULLY DILUTED CONVERTIBLE 117.9M 139.8 M NOTES 13.0 M  Market cap: C$2.6 billion  Cash position: C$236 million  Major shareholders:  Paulson & Co. 15%  Carmignac Gestion 5%  Detour Gold Mgmt <2%  Institutions total >90% Note: Cash position at December 31, 2012 and share data at January 18, 2013. 5
  • 6. Successful Focused Approach Record Timing from “Discovery” to Projected Production Detour Lake in 6 years 2007 2009 2010 2011-12 2013 PRODUCTION 2013 ACQUISITION PRE-FEASIBILITY FEASIBILITY DEVELOPMENT PRODUCTION /DISCOVERY STUDY STUDY & PERMITTING 6
  • 7. 2013 Objectives H1 2013  First gold pour  Commissioning of second production line  Securing $90 million credit facility  20,000 m drilling program targeting high-grade gold mineralization H2 2013  Declaring commercial production  Gold production target of +350,000 ounces for the year  Completing pre-feasibility study on Block A  Advancing evaluation of mine expansion scenarios  Revising block model for Detour Lake 7
  • 8. Detour Lake Profile September 2012 Detour Lake Mine Plan(1) Open pit Production Start Q1 2013 @ 0.5 g/t cut-off 20,600E OP Reserves (M oz) 15.6 Mill throughput (tpd) 55,000 Strip Ratio (waste:ore) 3.7 Gold recoveries 91% 16,500E Average grade (g/t) 1.03 Estimated mine life (yrs) 21.5 700 m 1.0 g/t Au Avg. Production (oz/yr) 657,000 0.5 - 1.0 g/t Au Cash operating costs (C$/oz) $710 <0.5 g/t Au Total cash costs (C$/oz) $749 Initial Capex (C$ B)(2) 1.45 (1) Gold price assumptions: US$1,600/oz for 2013, US$1,500/oz for 2014, and US$1,400/oz for 2015. (2) Revised to approx. C$1.5 B in news release dated November 8, 2012. 8
  • 9. Updated LOM Gold Production Gold Production (‘000 oz) Grade (g/t Au) 800 1.6 Avg. 657,000 oz/yr 700 1.4 600 1.2 500 1.0 400 0.8 300 0.6 200 0.4 100 0.2 0 0 9
  • 10. Updated LOM Operating Costs Breakdown of 2013-14 TCC Operating Costs (LOM) C$/t milled C$/t mined C$/oz Mining costs 11.65 2.49 388 LABOUR Processing cost 7.83 -- 260 18% POWER G&A 1.86 -- 62 12% DIESEL Cash operating costs 21.34 -- 710 MAINTENANCE 8% Royalty (2%) and other 1.26 -- 42 22% G&A Refining 0.12 -- 4 5% Silver credit (0.20) -- (7) CONSUMABLES ROYALTY+ OTHER Total cash costs (TCC) 22.52 -- 749 29% (2% NSR) 6% A 10% change in: Diesel or power costs = $9/oz change in TCC Cdn$ FX rate = $63/oz in TCC 10
  • 11. Financial Analysis Base Case Assumptions  Gold - US$1,200/oz (1)  Power Cdn $0.065/kwh  F/X - $Cdn/$US = 1.00  Diesel US$100/barrel (WTI) Base Case (1) US$ Billions Undiscounted (0%) 5.0% Pre-tax cash flow 4.3 1.7 Net cash flow after tax 3.0 1.1 Pre-tax IRR 14.4% 1. Gold price US$1,600/oz for 2013, US$1,500/oz for 2014, and US$1,400/oz for 2015. @ US$1,600/oz 12-12-23 US$ Billions Undiscounted (0%) 5.0% Pre-tax cash flow 9.4 4.4 Net cash flow after tax 6.6 3.0 Pre-tax IRR 24.6% 11 49
  • 13. 2013 Forecast Guidance  350,000 oz to 400,000 oz of gold  Total cash costs between C$800/oz and C$900/oz (on commercial production of 200,000 oz to 250,000 oz sold)  Estimated LOM sustaining capital of C$1.2 B:  2013 = C$180 M (<$80 M in H1)  2014 = C$140 M NOTE: Commercial production to be declared after 60 consecutive days of operating at >75% of throughput (55,000 tpd x 75% = 41,250 tpd) 13
  • 14. Mining Production Status 2012 Pre-Stripping (Year-end 2012) Overburden/Till 15.1 Mt Waste 7.7 Mt Low Grade (0.3-0.5 g/t) 1.1 Mt Ore 2.2 Mt Total 26.1 Mt  2.2 Mt ore inventory on ROMs and short-term stockpiles (reconciled average grade of approx. 0.7 g/t) (till dilution on first bench)  Average mining rates of +115,000 tpd in December 2012  Mining operation on 24 hrs/day, 365 days/yr 14
  • 15. Mining Production NORTH WASTE MINERALIZED DUMP PLANT SITE ZONE CAMPBELL PIT CURRENT PIT SHAPE APPROX. PIT SHELL AT END OF LOM Satellite image dated July 2012 15
  • 16. Detour Lake Open Pit Mine 12-10-22 16
  • 18. Overview Detour Lake Facilities SECONDARY CRUSHERS STOCKPILE RECLAIM GEODESIC DOME PRIMARY CRUSHER 12-10-22 18
  • 19. Processing Plant  Conventional gravity and CIP plant  55,000 tpd (=92% availability of 60,000 tpd capacity)  2 parallel lines (each with 1 secondary cone crusher + 1 SAG & 1 ball mill)  Estimated gravity recovery: 30-40%  Estimated overall gold recovery: 91.0%  Leach time 29 hours; leach feed size 80% passing 95 μm 12-12-23 19
  • 20. DGC Workforce: Hiring Local First  423 employees at year-end* DIVISION OF (25% are Aboriginal) LABOUR FRONT LINE  Continuing focus on hiring local and 81% • Professional includes: MGMT, Eng., Geo., Supt. regional • Front Line includes: PROFESSIONAL Operators, Admin, 19% Support WORKFORCE COCHRANE ORIGIN AREA COCHRANE 26% 25% NORTHERN REST OF ONTARIO ONTARIO 3% 43% OTHER  Work rotation: 1 week in/out 2%  Modern camp facility with 400 * Excludes Corporate office. en-suite rooms 20
  • 21. PLANNING FOR 21 ORGANIC GROWTH Under-Explored Greenstone Belt
  • 22. Planning for Organic Growth 5 Year Plan for Successful Organic Growth Large prospective land position of approx. 566 km2 • Two main gold structures with total strike length of >80km • Continue focus on Detour Lake deposit extension (northern structure i.e. Block A) • Test targets on structure south of Detour Lake Future objectives  Grow reserve base to +20 M oz (@ US$850/oz)  Increase mill throughput to above 75,000 tpd for gold production output of +800,000 oz/yr  Find high-grade ore near-surface within trucking distance to supplement mill 22
  • 23. Successful Growth of Resources Resource Growth Exceeding 750% Since IPO @ $5/oz Date Accumulative Resources/Reserves (M oz) DGC Drilling Inferred M&I 2P 10M 20M 30M 2005-05 Estimated by Pelangio 2006-09 DGC due diligence 2007-12 50,000m 2008-06 123,000m 2009-09 249,000m 8.8 2010-06 334,000m $850/oz 11.4 2011-01 430,000m $850/oz 14.9 2012-01 523,000m $850/oz 15.6 23
  • 24. Priority #1 – Block A Target Block A Pre-feasibility  Block A pre-feasibility study by year-end 2013  Evaluate potential expansion options *Not updated with TWD Dec. 30th PR. On Dec. 1, 2011, Detour Gold announced the acquisition of TWD. 24
  • 25. Priority #2 – South Structure Land package = 566 km2 15.6 M oz in Reserves 20,000 m in H1 2013 MMI Survey Coverage MMI Au Anomaly Existing DDH Gold occurrence (OGS) DDH intersection >1g/2m DDH intersection >1g/10m *Note: Excludes drilling around Detour Lake and M zone (Block A). 25
  • 26. Invest in Detour Gold Our Vision  Focus on a world-class asset – Detour Lake  Canada’s largest pure gold play with 15.6 M oz in reserves  Gold processing initiated in January 2013  One of the best cash flow/share opportunities  Average annual gold production of 657,000 oz  Excellent organic growth potential (5 year plan)  Potential expansion of mill throughput 26
  • 28. Detour Lake Reserves & Resources As at December 31, 2011 Tonnes Grade Contained Gold @ US$850/oz (millions) (g/t) (‘000 oz) Reserves (1) Proven 101.6 1.29 4,222 Probable 368.4 0.96 11,351 P&P 470.0 1.03 15,573 Resources (2) Measured 124.5 1.36 5,424 Indicated 554.3 1.00 17,836 M&I 678.8 1.07 23,261 Inferred 208.5 0.86 5,785 1. After a 95% mining recovery rate; Mining dilution factor of 15.5%. 2. Inclusive of mineral reserves. 28
  • 29. Detour Lake Profile January 2011 September 2012 Detour Lake Update (2) Mine Plan(3) Gold price (US$/oz) (1) 850 1,200 Foreign exchange rate (US$/Cdn$) 1.10 1.00 Assumptions Fuel price (US$/barrel) 80 100 Income/mining tax rate (%) 25/10 25/10 Net Smelter Royalty (%) 2 2 Ore milled (Mt) 449.6 470.0 Waste mined (Mt) (4) 1,654 1,734 Mine Strip ratio (waste:ore) 3.9 3.7 Parameters Average gold grade (g/t) 1.03 1.03 Total contained gold (M oz) 14.9 15.6 Estimated gold recovery (%) 91.0 91.0 Total recovered gold (M oz) 13.5 14.1 Mine life (years) 21 21.5 Average annual gold production (oz) 657,000 657,000 1. US$1,600/oz for 2013, US$1,500/oz for 2014, and US$1,400/oz for 2015. 2. Press release Jan. 31, 2011 with Technical Report dated Mar. 15, 2011. 3. Press release Sept. 4, 2012 with Technical Report dated Oct. 18, 2012. 4. Includes low-grade stockpile. 29
  • 30. Gold Production/Cost Profile Gold Production (‘000 oz) Total Cash Costs (C$/oz) 800 Avg. C$749/oz 900 700 850 600 800 500 750 400 700 300 650 200 600 100 550 0 500 Note: Excludes stripping adjustments. 30
  • 31. Simple Process Plant @ 92% Availability Stockpile Gyratory 12 h live capacity crusher: 60” x 113” 90,000 tpd Secondary crushers: 2 X XL-1100 Ball mills: SAG mills: 2 X 26’ x 40’6’’, 15MW 67,000 tpd 2 X 36’ x 20’, 15MW 55,000 tpd Pebble crushers: 55,000 tpd 2 X XL-1100 To 73,000 tpd leaching circuit To gravity circuit Circ. load Circ. load From 28 % Leach circuit: 250 % gravity circuit  55,000 tpd + 15% contingency in piping capacity 31
  • 32. Block Model – Gold Distribution Approx. 3 M oz between 0.3-0.5 g/t Au 1,600 Stockpile over LOM OK (oz Au) 0.3-0.5 g/t material ID3 (oz Au) 1,400 1,200 Ounces (000’s) 1,000 800 600 400 200 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 3.0 Cut-off BINs 32
  • 33. Blast Movement Monitoring  Minimizes dilution by 5% and ore loss by up to 10% for a total of 15%  On a recent 400,000 t blast using 4 balls costing $1,200:  150,000 t ore at 0.9 g/t = 4,340 oz  Potential benefit up to 579 oz or +13% 33
  • 34. Grade Control: First 2 Benches DDH Block model 40x40m drill spacing RC Grade Control 20X10m & 10X10m drill Bench spacing 6264m DDH Block model 40x40m drill spacing RC Grade Control 20x10m & 10X10 m drill Bench spacing 6252m 34
  • 35. Management & Directors Management  Gerald Panneton  Pat Donovan  Andrew Croal Founder, President & CEO VP Corporate Development Director Technical Services Director  James Mavor  Laurie Gaborit  Michael Kenyon VP Finance Director Investor Relations Executive Chairman  Rachel Pineault  Jean-Francois Metail  Paul Martin VP HR & Northern Affairs Director Reserves and Resources CFO  James Robertson  Greg Miazga  Pierre Beaudoin VP Environment & Director Construction & Engineering Sr VP Capital Projects Sustainability  Bill Snelling  Julie Galloway  Eric Josipovic Director Corporate Systems & Controls Sr VP General Counsel & Controller  Christian Brousseau Corporate Secretary  Drew Anwyll Project Manager  Derek Teevan Director of Operations Sr VP External &  Patrik Gillerstedt Aboriginal Affairs Mine Manager Directors  Peter Crossgrove  Michael Kenyon  Jonathan Rubenstein  Louis Dionne  Alex G. Morrison  Graham Wozniak  Robert E. Doyle  Gerald Panneton  Ingrid Hibbard 35
  • 36. Contact Information Gerald Panneton President & CEO Email: gpanneton@detourgold.com Phone: 416.304.0800 Laurie Gaborit Director Investor Relations Email: lgaborit@detourgold.com Phone: 416.304.0800 www.detourgold.com 36