SlideShare ist ein Scribd-Unternehmen logo
1 von 15
Kampus West City
Condominium
Presentation Information
Project Details
 Self-contained university town
 Approximately 1.5km to University (UTAR)
 10 minutes’ drive from Gopeng exit from North-
South Express Highway
 Consists of 3 blocks of high-end high rises
condominium
Condominium Details
 Total Land area: 9.21 acres
 Tittle Status : Leasehold(99years), Parcel Strata Title
 Classification : Residential Property
 No. of Blocks : 2 blocks with total 360 units
 Size : Type A – 856sqft and Type B – 713sqft
Condominium Details
 Estimated Completion Date
: Mid of year 2016
 Approval building no.
: Bil (15) dlm MDKpr (OSC) (K) 31/2013/ (04)
 Development Order
: Bil (2) dlm MDKpr (OSC) (K) 21/2013 (01)
 Approving Authority
: Majlis Daerah Kampar
 Advertising License no.
: 1314-1/08-2015/0462 (P)
UTAR & KTAR Information
 The main campus throughout all UTAR
branches.
 Located at Kampar where own around 1300
acres of land.
 Currently with 5 main faculties at UTAR Kampar.
 Up to 3 semesters in a year.
 All graduation ceremony will held at UTAR
Kampar.
Floor Plan Type A
 3 rooms
 2 bathrooms
 1 living room
 2 car parks
 856 sqft
 Price : From RM226,800
Floor Plan Type B
 2 rooms
 2 bathrooms
 1 living room
 1 car park
 713 sqft
 Price : From RM 188,000
Additional Packages (cont)
 Additional Car Park (Add-On)
RM 15,000 per unit (Limited)
*Only 25 extra car park for each block
 Free SPA Legal Fees
 Early Bird Purchase With RM10,000 Discount
(Before 21th Sep 2013)
Project Preview
Specification (Type A)
 Ceiling Lighting Point – 15 Nos
 60” DIA Ceiling Fan Point C/W Fan Hook – 5 Nos
 1x1 3A Switch Socket Outlet – 12 Nos
 1x1 5A Socket Outlet C/W On/Off Switch – 3 Nos
 1x1 5A Socket Outlet C/W 10mA ELCB & On/Off Switch
(For Water Heater Point) – 2 Nos
 Tel Socket Outlet – 1 No
 TV Socket Outlet – 1 No
 Distribution Board – 1 No
Specification (Type B)
 Ceiling Lighting Point – 12 Nos
 60” DIA Ceiling Fan Point C/W Fan Hook – 4 Nos
 1x1 3A Switch Socket Outlet – 10 Nos
 1x1 5A Socket Outlet C/W On/Off Switch – 2 Nos
 1x1 5A Socket Outlet C/W 10mA ELCB & On/Off Switch
(For Water Heater Point) – 2 Nos
 Tel Socket Outlet – 1 No
 TV Socket Outlet – 1 No
 Distribution Board – 1 No
Facilities
 Gated and Guarded Compound
 24 security with CCTV and smart tag access
system
Facilities
 Swimming Pool
 Car Park
Environment
 Shop lot area with large lake side
jogging track
 New General Hospital
 UTAR & KTAR ( Around 20000
Students)
Contact
 Please feel free to contact me for further information or any inquiry
for the property investment :
Contact Person : Dawson Lam
Email : ternwei.lam@gmail.com
Phone Contact : 017-5454061

Weitere ähnliche Inhalte

Ähnlich wie Kampus west city condominium kampar

Bergh 42.585 KW Planset - Final
Bergh 42.585 KW Planset - FinalBergh 42.585 KW Planset - Final
Bergh 42.585 KW Planset - FinalDavid Hults
 
Leisure Center. Part 2
Leisure Center. Part 2Leisure Center. Part 2
Leisure Center. Part 2Tej Raj Upreti
 
Make india = make in india presentation by cs electric (2 files merged)
Make india = make in india presentation by cs electric (2 files merged)Make india = make in india presentation by cs electric (2 files merged)
Make india = make in india presentation by cs electric (2 files merged)Mahesh Chandra Manav
 
Junction Nine Residences E-brochure
Junction Nine Residences E-brochureJunction Nine Residences E-brochure
Junction Nine Residences E-brochurePhilip Chua
 
Megger Power And Industrial Test Equipment - Cable Fault Locators, High Volta...
Megger Power And Industrial Test Equipment - Cable Fault Locators, High Volta...Megger Power And Industrial Test Equipment - Cable Fault Locators, High Volta...
Megger Power And Industrial Test Equipment - Cable Fault Locators, High Volta...Thorne & Derrick International
 
Crouzet switches - Railway applications
Crouzet switches - Railway applicationsCrouzet switches - Railway applications
Crouzet switches - Railway applicationsCrouzet
 
C&S Electric Summer Training Report
C&S Electric Summer Training ReportC&S Electric Summer Training Report
C&S Electric Summer Training ReportParas Pratap
 
C&S Electric Summer Training Report
C&S Electric Summer Training ReportC&S Electric Summer Training Report
C&S Electric Summer Training ReportParas Pratap
 
Clover sales project brief gs realty 18072014
Clover sales project brief   gs realty 18072014Clover sales project brief   gs realty 18072014
Clover sales project brief gs realty 18072014Sophy Sulaiman
 
Electromagnetic and-electronic-circuitbreaker-[technolead]
Electromagnetic and-electronic-circuitbreaker-[technolead]Electromagnetic and-electronic-circuitbreaker-[technolead]
Electromagnetic and-electronic-circuitbreaker-[technolead]Neha Bandhu
 
2009-dec02_Fujitsu
2009-dec02_Fujitsu2009-dec02_Fujitsu
2009-dec02_FujitsuAgora Group
 

Ähnlich wie Kampus west city condominium kampar (20)

Amkor Portfolio
Amkor PortfolioAmkor Portfolio
Amkor Portfolio
 
Resume_AbgHaider
Resume_AbgHaiderResume_AbgHaider
Resume_AbgHaider
 
Sol acres
Sol acresSol acres
Sol acres
 
SARAVANAN K
SARAVANAN KSARAVANAN K
SARAVANAN K
 
Bergh 42.585 KW Planset - Final
Bergh 42.585 KW Planset - FinalBergh 42.585 KW Planset - Final
Bergh 42.585 KW Planset - Final
 
Leisure Center. Part 2
Leisure Center. Part 2Leisure Center. Part 2
Leisure Center. Part 2
 
Chan Mye Tun -CV
Chan Mye Tun -CVChan Mye Tun -CV
Chan Mye Tun -CV
 
Make india = make in india presentation by cs electric (2 files merged)
Make india = make in india presentation by cs electric (2 files merged)Make india = make in india presentation by cs electric (2 files merged)
Make india = make in india presentation by cs electric (2 files merged)
 
Junction Nine Residences E-brochure
Junction Nine Residences E-brochureJunction Nine Residences E-brochure
Junction Nine Residences E-brochure
 
Megger Power And Industrial Test Equipment - Cable Fault Locators, High Volta...
Megger Power And Industrial Test Equipment - Cable Fault Locators, High Volta...Megger Power And Industrial Test Equipment - Cable Fault Locators, High Volta...
Megger Power And Industrial Test Equipment - Cable Fault Locators, High Volta...
 
Crouzet switches - Railway applications
Crouzet switches - Railway applicationsCrouzet switches - Railway applications
Crouzet switches - Railway applications
 
GAVIN'S 2016 CV
GAVIN'S 2016 CVGAVIN'S 2016 CV
GAVIN'S 2016 CV
 
Chandru_CV
Chandru_CVChandru_CV
Chandru_CV
 
C&S Electric Summer Training Report
C&S Electric Summer Training ReportC&S Electric Summer Training Report
C&S Electric Summer Training Report
 
C&S Electric Summer Training Report
C&S Electric Summer Training ReportC&S Electric Summer Training Report
C&S Electric Summer Training Report
 
Clover sales project brief gs realty 18072014
Clover sales project brief   gs realty 18072014Clover sales project brief   gs realty 18072014
Clover sales project brief gs realty 18072014
 
Electromagnetic and-electronic-circuitbreaker-[technolead]
Electromagnetic and-electronic-circuitbreaker-[technolead]Electromagnetic and-electronic-circuitbreaker-[technolead]
Electromagnetic and-electronic-circuitbreaker-[technolead]
 
pradip updated c v
pradip updated c vpradip updated c v
pradip updated c v
 
CV-JKGHOSH_04 Jun 2016
CV-JKGHOSH_04 Jun 2016CV-JKGHOSH_04 Jun 2016
CV-JKGHOSH_04 Jun 2016
 
2009-dec02_Fujitsu
2009-dec02_Fujitsu2009-dec02_Fujitsu
2009-dec02_Fujitsu
 

Kampus west city condominium kampar

  • 2. Project Details  Self-contained university town  Approximately 1.5km to University (UTAR)  10 minutes’ drive from Gopeng exit from North- South Express Highway  Consists of 3 blocks of high-end high rises condominium
  • 3. Condominium Details  Total Land area: 9.21 acres  Tittle Status : Leasehold(99years), Parcel Strata Title  Classification : Residential Property  No. of Blocks : 2 blocks with total 360 units  Size : Type A – 856sqft and Type B – 713sqft
  • 4. Condominium Details  Estimated Completion Date : Mid of year 2016  Approval building no. : Bil (15) dlm MDKpr (OSC) (K) 31/2013/ (04)  Development Order : Bil (2) dlm MDKpr (OSC) (K) 21/2013 (01)  Approving Authority : Majlis Daerah Kampar  Advertising License no. : 1314-1/08-2015/0462 (P)
  • 5. UTAR & KTAR Information  The main campus throughout all UTAR branches.  Located at Kampar where own around 1300 acres of land.  Currently with 5 main faculties at UTAR Kampar.  Up to 3 semesters in a year.  All graduation ceremony will held at UTAR Kampar.
  • 6. Floor Plan Type A  3 rooms  2 bathrooms  1 living room  2 car parks  856 sqft  Price : From RM226,800
  • 7. Floor Plan Type B  2 rooms  2 bathrooms  1 living room  1 car park  713 sqft  Price : From RM 188,000
  • 8. Additional Packages (cont)  Additional Car Park (Add-On) RM 15,000 per unit (Limited) *Only 25 extra car park for each block  Free SPA Legal Fees  Early Bird Purchase With RM10,000 Discount (Before 21th Sep 2013)
  • 10. Specification (Type A)  Ceiling Lighting Point – 15 Nos  60” DIA Ceiling Fan Point C/W Fan Hook – 5 Nos  1x1 3A Switch Socket Outlet – 12 Nos  1x1 5A Socket Outlet C/W On/Off Switch – 3 Nos  1x1 5A Socket Outlet C/W 10mA ELCB & On/Off Switch (For Water Heater Point) – 2 Nos  Tel Socket Outlet – 1 No  TV Socket Outlet – 1 No  Distribution Board – 1 No
  • 11. Specification (Type B)  Ceiling Lighting Point – 12 Nos  60” DIA Ceiling Fan Point C/W Fan Hook – 4 Nos  1x1 3A Switch Socket Outlet – 10 Nos  1x1 5A Socket Outlet C/W On/Off Switch – 2 Nos  1x1 5A Socket Outlet C/W 10mA ELCB & On/Off Switch (For Water Heater Point) – 2 Nos  Tel Socket Outlet – 1 No  TV Socket Outlet – 1 No  Distribution Board – 1 No
  • 12. Facilities  Gated and Guarded Compound  24 security with CCTV and smart tag access system
  • 14. Environment  Shop lot area with large lake side jogging track  New General Hospital  UTAR & KTAR ( Around 20000 Students)
  • 15. Contact  Please feel free to contact me for further information or any inquiry for the property investment : Contact Person : Dawson Lam Email : ternwei.lam@gmail.com Phone Contact : 017-5454061