OM Final Exam Spring 2016
Eastern Gear, Inc.
Eastern gear Inc., in Philadelphia, Pa., is a manufacturer of custom made gears ranging in
weight from a few ounces to over 50 pounds. The gears are made of different metals
depending on the customer’s requirements. Over the past year 40 different types of steel and
brass alloys have been used as raw materials. See Exhibit 1 for details.
Eastern gear sells its products primarily to engineering research and development laboratories
or very small manufacturers. As a result the number of gears in most orders is small; rarely is
exactly the same gear ordered more than once. The distribution of order sizes for March 2012
is shown in Exhibit 2.
Recently the president of Eastern Gear decided to accept a few larger orders for 100 gears or
more. Although lower prices were accepted on these orders, they helped pay the overhead. It
was found that the large orders caused many of the small orders to wait for a long time before
being processed. As a result some deliveries of small orders were late.
Exhibit 1 - Raw Materials
Type of material 2011 usage $(000)
A $ 36
B 10
C 15
D 43
E 110
F 18
G 32
H 75
I 40
J 60
K 30
All others 53
Total
$52
2
Order Entry
When a customer wishes to order a gear, the order is taken by James Lord, sales manager and
marketing vice president. The customer specifies the type of gear desired by submitting a
blue print or sketch. The quantity of gears required and the type of material are also specified
by the customer. On occasion the customers engineer will call up after the order has been
placed and request a change in the design. In these cases, it may be necessary to stop
production and wait for new raw materials or for the design to be clarified. The customers
prints submitted with the order do not always contain the tolerances or finishes required
during machining. As a result the customer is contacted directly when the information is
needed.
After the order is received, one copy is sent to the production supervisor, Joe Irvine, and the
second copy is sent to Sam Smith, the controller. Upon receipt of the customers order, Mr
Smith places a purchase order for the raw materials required. These materials often take from
1 to 2 weeks to arrive, depending on the supplier and the type of material ordered.
OM Final Exam Spring 2016
After receiving the customer order, the supervisor reviews the order and places it on file until
the raw material arrives. The customer order is then routed through the shop along with the
materials. In the past the production process for most gears has taken about 2 weeks after
receipt of raw materials. Recently this production time has increased to 4 weeks.
Joe Irvine expressed concern about the bottlenecks which appear in the production process.
One week the bottleneck may be in one machine centre, and the next week it is in another.
These bottlenecks make it difficult to get the orders out on time.
Exhibit 2 - Sales, March 2012
Order Size Number of Orders
Total $ Value of
Orders
1 80 3,200
2 53 4,250
3 69 8,163
4 32 4,800
5 82 16,392
8 47 15,987
10 64 26,871
15 22 13,172
20 42 31,555
25 27 23,682
30 18 21,600
40 22 32,000
50 10 18,693
100 4 12,500
200 2 14,068
400 1 9,652
700 2 35,600
1000 1 20,000
578 $312,185
Physical Layout and Materials Flow
Eastern Gear utilizes a standard job-shop layout, as shown in Exhibit 3. Each work centre has
a common set of machines or processes. The materials flow from one work centre to another,
depending on the operations needed for a particular order.
A typical order will take the following path. First, the raw material, a gear blank, is sent to the
milling work centre. Here the teeth are cut into the edge of the gear according to the
customers specifications. Next the gear blanks are sent to the drilling works centre, where one
or more holes may be drilled in the gear. The gear is then sent to a grinding centre, where a
finish is put on the gear teeth and the surface of the gear. Next, the gear may be sent to heat
treating if this operation is required by the customer. After the batch of gears is completed,
they are inspected by the next available worker and shipped to the customer.
OM Final Exam Spring 2016
Exhibit 3 – Layout
In Exhibit 3, note how the machines are grouped by similar type on the shop floor. For
example all drills are located together in one work centre, and all milling machines are in
another work centre. While this layout facilitates development of worker skills and training, it
results in a jumbled flow of products through the shop.
There is constant interference of the orders being processed in the shop. The typical order
spends 90 percent of its time waiting in line for a machine to become available. Only 10
percent of the time is actually spent processing the order on a machine. As a result it takes a
relatively long time (4 weeks) for an order to make its way through the shop.
Large and small orders are processed together. No special work flow is utilised for different
order sizes. As a matter of fact large orders are helping to keep the shop at full capacity.
Company Background
Business has been booming at Eastern Gear. For the first two years the company lost money,
but over the last several months a small profit has been made. Sales are up by 100 percent in
the last quarter. See Exhibit 4 for more details.
Although sales are rapidly increasing, a recent market survey has indicated that sales can be
expanded even more in the next few years. According to the market survey, sales will be $5
million in calendar year 1988 if the current delivery lead time of 5 to 6 weeks is maintained.
If total delivery lead time can be reduced to the former 3 to 4 weeks, sales could be expanded
to $5.5 million instead of $5million.
Because of increased delivery lead times, the company has recently added an expediter, Matt
Williams. Each morning Matt reviews the work in progress in the shop and selects those
orders which appear to be behind schedule. Each order which is behind receives a red tag,
indicating that it should be treated on a rush basis. At the present time about 20 percent of the
orders have rush tags on them. Mr. Williams also spends his time looking for past-due raw
materials and lost orders as well as explaining late orders to customers.
OM Final Exam Spring 2016
Exhibit 4 - Financial Data
2009 2010 2011 First Quarter, 2012
Sales 560*
1,500 3,100
1,06
3
Manufacturing Costs
Materials 63 273 522 214
Labour 136 587 1,063 327
Overhead 70 216 412 140
Depreciation 172 398 422 150
Total Manufacturing Costs 441 1,474 2419 831
Sales Expenses 70 130 263 80
G & A Expenses 75 110 297 93
Total Costs 586 1,714 2,979
1,00
4
Profit Before tax (26) (214) 121 59
*
All figures in thousands of dollars
The organization chart for the company is shown in Exhibit 5. Roger Rhodes is the president
and founder of Eastern Gear. Mr Rhodes handles contacts with some of the large customers,
arranges the financing needed by the company and sits in on the weekly production meeting.
During these meetings, scheduling problems, employee problems, and other production
problems are discussed.
The company engineer is Sam Bartholomew. His responsibilities include design of the
company’s products, procurement and maintenance of equipment, and overseeing of the
supervisor, Joe Irvine. Mr Bartholomew who attends the weekly production meetings, and he
spends about ten hours a week on the factory floor talking with individual workers.
The company is currently experiencing about a six percent return rate on completed orders
due to poor quality. In 75 percent of the cases the returned orders have failed to under go one
or more operations or the operations have been improperly done. For example in one returned
order, all the gears were missing a hole.
Occasionally, the company will receive rush orders from its customers. In this case the order
is referred directly to Roger Rhodes for approval. If the order is accepted, the raw materials
are rush-ordered and received the next day. After receipt of the raw materials, the order is
rushed through production in 4 days. This is accomplished by Fred Dirkson, a trusted
employee, who hand-carries the rush orders through all operations. About 10 percent of the
orders are handled on a rush basis.
The work force consists of 50 employees who are highly skilled or semiskilled. The milling
machine operators, for example, are highly skilled and require at least 2 years of vocational-
technical training plus several months of on-the-job training. Within the last quarter, 10 new
employees have been added to the work force. The employees are not unionized and good
labour relations exist. The work force is managed using a family-type approach.
OM Final Exam Spring 2016
OM Final Exam Spring 2016
Exhibit - 5
Organization chart
QUESTIONS
1. Evaluate Eastern Gear with operations strategic objectives and how would you like to make
recommendations for any changes in the firm’s operations strategy?
2. Based on the diagnoses of Eastern Gear’s operations, what decisions should Mr Rhodes make
to solve his problems in terms of (1) process and (2) quality?
3. Based on the diagnoses of Eastern Gear’s operations, what decisions should Mr Rhodes make
to solve his problems in terms of (3) capacity and (4) inventory?
Instructions:
1. No more than 500 words are allowed in each answer.
2. Use Times New Roman, 12-point, single-spaced with margins of 2.54 cm.
3. Citations: Refer to textbook page(s) and line(s), or PowerPoint slide(s)
4. In case you wish to support your arguments with information outside our textbook or
PowerPoint, follow the APA style and make References.
President
Roger Rhodes
Sales Manager
James Lord
Engineer
Sam Bartholomew
Expeditor
Matt Williams
Controller
Sam Smith
Foreman
Joe Irvine
OM Final Exam Spring 2016
1. Evaluate Eastern Gear with operations strategic objectives and how would you like to
make recommendations for any changes in the firm’s operations strategy?
OM Final Exam Spring 2016
2. Based on the diagnoses of Eastern Gear’s operations, what decisions should Mr
Rhodes make to solve his problems in terms of (1) process and (2) quality?
OM Final Exam Spring 2016
3. Based on the diagnoses of Eastern Gear’s operations, what decisions should Mr
Rhodes make to solve his problems in terms of (3) capacity and (4) inventory?
OM Final Exam Spring 2016
3. Based on the diagnoses of Eastern Gear’s operations, what decisions should Mr
Rhodes make to solve his problems in terms of (3) capacity and (4) inventory?

More Related Content

Recently uploaded

Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
amitlee9823
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
lizamodels9
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
lizamodels9
 

Recently uploaded (20)

Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 

Featured

Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
Kurio // The Social Media Age(ncy)
 

Featured (20)

AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work
 
ChatGPT webinar slides
ChatGPT webinar slidesChatGPT webinar slides
ChatGPT webinar slides
 
More than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike RoutesMore than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike Routes
 

Manufacturer Assignment Help|Cheap Industry Assignment Help

  • 1. OM Final Exam Spring 2016 Eastern Gear, Inc. Eastern gear Inc., in Philadelphia, Pa., is a manufacturer of custom made gears ranging in weight from a few ounces to over 50 pounds. The gears are made of different metals depending on the customer’s requirements. Over the past year 40 different types of steel and brass alloys have been used as raw materials. See Exhibit 1 for details. Eastern gear sells its products primarily to engineering research and development laboratories or very small manufacturers. As a result the number of gears in most orders is small; rarely is exactly the same gear ordered more than once. The distribution of order sizes for March 2012 is shown in Exhibit 2. Recently the president of Eastern Gear decided to accept a few larger orders for 100 gears or more. Although lower prices were accepted on these orders, they helped pay the overhead. It was found that the large orders caused many of the small orders to wait for a long time before being processed. As a result some deliveries of small orders were late. Exhibit 1 - Raw Materials Type of material 2011 usage $(000) A $ 36 B 10 C 15 D 43 E 110 F 18 G 32 H 75 I 40 J 60 K 30 All others 53 Total $52 2 Order Entry When a customer wishes to order a gear, the order is taken by James Lord, sales manager and marketing vice president. The customer specifies the type of gear desired by submitting a blue print or sketch. The quantity of gears required and the type of material are also specified by the customer. On occasion the customers engineer will call up after the order has been placed and request a change in the design. In these cases, it may be necessary to stop production and wait for new raw materials or for the design to be clarified. The customers prints submitted with the order do not always contain the tolerances or finishes required during machining. As a result the customer is contacted directly when the information is needed. After the order is received, one copy is sent to the production supervisor, Joe Irvine, and the second copy is sent to Sam Smith, the controller. Upon receipt of the customers order, Mr Smith places a purchase order for the raw materials required. These materials often take from 1 to 2 weeks to arrive, depending on the supplier and the type of material ordered.
  • 2. OM Final Exam Spring 2016 After receiving the customer order, the supervisor reviews the order and places it on file until the raw material arrives. The customer order is then routed through the shop along with the materials. In the past the production process for most gears has taken about 2 weeks after receipt of raw materials. Recently this production time has increased to 4 weeks. Joe Irvine expressed concern about the bottlenecks which appear in the production process. One week the bottleneck may be in one machine centre, and the next week it is in another. These bottlenecks make it difficult to get the orders out on time. Exhibit 2 - Sales, March 2012 Order Size Number of Orders Total $ Value of Orders 1 80 3,200 2 53 4,250 3 69 8,163 4 32 4,800 5 82 16,392 8 47 15,987 10 64 26,871 15 22 13,172 20 42 31,555 25 27 23,682 30 18 21,600 40 22 32,000 50 10 18,693 100 4 12,500 200 2 14,068 400 1 9,652 700 2 35,600 1000 1 20,000 578 $312,185 Physical Layout and Materials Flow Eastern Gear utilizes a standard job-shop layout, as shown in Exhibit 3. Each work centre has a common set of machines or processes. The materials flow from one work centre to another, depending on the operations needed for a particular order. A typical order will take the following path. First, the raw material, a gear blank, is sent to the milling work centre. Here the teeth are cut into the edge of the gear according to the customers specifications. Next the gear blanks are sent to the drilling works centre, where one or more holes may be drilled in the gear. The gear is then sent to a grinding centre, where a finish is put on the gear teeth and the surface of the gear. Next, the gear may be sent to heat treating if this operation is required by the customer. After the batch of gears is completed, they are inspected by the next available worker and shipped to the customer.
  • 3. OM Final Exam Spring 2016 Exhibit 3 – Layout In Exhibit 3, note how the machines are grouped by similar type on the shop floor. For example all drills are located together in one work centre, and all milling machines are in another work centre. While this layout facilitates development of worker skills and training, it results in a jumbled flow of products through the shop. There is constant interference of the orders being processed in the shop. The typical order spends 90 percent of its time waiting in line for a machine to become available. Only 10 percent of the time is actually spent processing the order on a machine. As a result it takes a relatively long time (4 weeks) for an order to make its way through the shop. Large and small orders are processed together. No special work flow is utilised for different order sizes. As a matter of fact large orders are helping to keep the shop at full capacity. Company Background Business has been booming at Eastern Gear. For the first two years the company lost money, but over the last several months a small profit has been made. Sales are up by 100 percent in the last quarter. See Exhibit 4 for more details. Although sales are rapidly increasing, a recent market survey has indicated that sales can be expanded even more in the next few years. According to the market survey, sales will be $5 million in calendar year 1988 if the current delivery lead time of 5 to 6 weeks is maintained. If total delivery lead time can be reduced to the former 3 to 4 weeks, sales could be expanded to $5.5 million instead of $5million. Because of increased delivery lead times, the company has recently added an expediter, Matt Williams. Each morning Matt reviews the work in progress in the shop and selects those orders which appear to be behind schedule. Each order which is behind receives a red tag, indicating that it should be treated on a rush basis. At the present time about 20 percent of the orders have rush tags on them. Mr. Williams also spends his time looking for past-due raw materials and lost orders as well as explaining late orders to customers.
  • 4. OM Final Exam Spring 2016 Exhibit 4 - Financial Data 2009 2010 2011 First Quarter, 2012 Sales 560* 1,500 3,100 1,06 3 Manufacturing Costs Materials 63 273 522 214 Labour 136 587 1,063 327 Overhead 70 216 412 140 Depreciation 172 398 422 150 Total Manufacturing Costs 441 1,474 2419 831 Sales Expenses 70 130 263 80 G & A Expenses 75 110 297 93 Total Costs 586 1,714 2,979 1,00 4 Profit Before tax (26) (214) 121 59 * All figures in thousands of dollars The organization chart for the company is shown in Exhibit 5. Roger Rhodes is the president and founder of Eastern Gear. Mr Rhodes handles contacts with some of the large customers, arranges the financing needed by the company and sits in on the weekly production meeting. During these meetings, scheduling problems, employee problems, and other production problems are discussed. The company engineer is Sam Bartholomew. His responsibilities include design of the company’s products, procurement and maintenance of equipment, and overseeing of the supervisor, Joe Irvine. Mr Bartholomew who attends the weekly production meetings, and he spends about ten hours a week on the factory floor talking with individual workers. The company is currently experiencing about a six percent return rate on completed orders due to poor quality. In 75 percent of the cases the returned orders have failed to under go one or more operations or the operations have been improperly done. For example in one returned order, all the gears were missing a hole. Occasionally, the company will receive rush orders from its customers. In this case the order is referred directly to Roger Rhodes for approval. If the order is accepted, the raw materials are rush-ordered and received the next day. After receipt of the raw materials, the order is rushed through production in 4 days. This is accomplished by Fred Dirkson, a trusted employee, who hand-carries the rush orders through all operations. About 10 percent of the orders are handled on a rush basis. The work force consists of 50 employees who are highly skilled or semiskilled. The milling machine operators, for example, are highly skilled and require at least 2 years of vocational- technical training plus several months of on-the-job training. Within the last quarter, 10 new employees have been added to the work force. The employees are not unionized and good labour relations exist. The work force is managed using a family-type approach.
  • 5. OM Final Exam Spring 2016
  • 6. OM Final Exam Spring 2016 Exhibit - 5 Organization chart QUESTIONS 1. Evaluate Eastern Gear with operations strategic objectives and how would you like to make recommendations for any changes in the firm’s operations strategy? 2. Based on the diagnoses of Eastern Gear’s operations, what decisions should Mr Rhodes make to solve his problems in terms of (1) process and (2) quality? 3. Based on the diagnoses of Eastern Gear’s operations, what decisions should Mr Rhodes make to solve his problems in terms of (3) capacity and (4) inventory? Instructions: 1. No more than 500 words are allowed in each answer. 2. Use Times New Roman, 12-point, single-spaced with margins of 2.54 cm. 3. Citations: Refer to textbook page(s) and line(s), or PowerPoint slide(s) 4. In case you wish to support your arguments with information outside our textbook or PowerPoint, follow the APA style and make References. President Roger Rhodes Sales Manager James Lord Engineer Sam Bartholomew Expeditor Matt Williams Controller Sam Smith Foreman Joe Irvine
  • 7. OM Final Exam Spring 2016 1. Evaluate Eastern Gear with operations strategic objectives and how would you like to make recommendations for any changes in the firm’s operations strategy?
  • 8. OM Final Exam Spring 2016 2. Based on the diagnoses of Eastern Gear’s operations, what decisions should Mr Rhodes make to solve his problems in terms of (1) process and (2) quality?
  • 9. OM Final Exam Spring 2016 3. Based on the diagnoses of Eastern Gear’s operations, what decisions should Mr Rhodes make to solve his problems in terms of (3) capacity and (4) inventory?
  • 10. OM Final Exam Spring 2016 3. Based on the diagnoses of Eastern Gear’s operations, what decisions should Mr Rhodes make to solve his problems in terms of (3) capacity and (4) inventory?