SlideShare ist ein Scribd-Unternehmen logo
1 von 54
Designing Resilient and Adaptable Marinas in An Age of Potentially More Violent Weather And Uncertain Economic Times Presented by: Dave Wentland, P.E. Coastal and Environmental Engineer DOCKS & MARINAS, INC. De Pere, Wisconsin USA www.docks-marinas.com In Partnership with: STRUCTURMARINE Marinas Tailored to Your Dreams www.structurmarine.com April 7, 2011                            A  Webinar  Presentation
THANK  YOU  FOR  ATTENDING OUR WEBINAR
FOR THE RECORD First and Foremost Docks & Marinas, Inc. prides itself on being a fair and objective coastal engineering company Second We continually search for and are willing to partner with equipment and product manufacturers we believe offer  the finest products and services in our marine industry Third We believe STRUCTURMARINE is such a company and we are proud to represent it Last The observations, opinions and suggestions in this presentation  to possibly reduce future damage to  Santa Cruz and Crescent City, California harbors in the aftermath of the March 11, 2011 tsunami  are solely those of Docks & Marinas, Inc.
INTRODUCTION DOCKS & MARINAS, INC. WHO WE ARE
DAVID WENTLAND, P.E. President Coastal and Environmental Engineer EDUCATION: MS:  Ocean Engineering (Coastal Emphasis) University of Hawaii – 1978 BS:  Civil Engineering (Environmental/Construction Emphasis)  South Dakota School of Mines & Technology - 1973 REGISTRATIONS: Professional Engineer Wisconsin, Registration # E-20150 Michigan, Registration # 40795 OTHER:  Licensed Pilot CREDENTIALS:  Certified Diver www.linkedin.com/in/davewentland
Our Philosophy No One Is An Island ,[object Object]
     Never Be Afraid to Learn
     Do Not Accept the Status Quo – Always Ask Why
     Listen
     Network and Communicate
     Think Outside the BoxPilot Island, Death’s Door Passage between Door County Peninsula and Washington Island Lake Michigan
Thinking Outside the Box: Innovative Products to Help Marinas Become Clean Wisconsin Marina Association WMA & WI Clean Marina Meeting Milwaukee Yacht Club March 10, 2010 This is an example of one of many  presentations we give on docks, marinas, harbors, and coastal  topics. Shown is the Sawyer Park Harbor of Refuge in Door County, Wisconsin designed by Dave Wentland, P.E. Recent Conferences, Presentations and Trade Shows Docks and Marinas Conference in Madison, WI in October 2010Floating Island International (FII) Symposium in Montana in October 2010Marina Recreation Association (MRA) conference in Las Vegas in November 2010International Marina and Boatyard Conference (IMBC) in Ft. Lauderdale in January 2011Wisconsin State Cranberry Growers Association (WSCGA) conference in Stevens Point, WI in January 2011Wisconsin Marina Association (WMA) meeting in Sheboygan, WI in February 2011
ASK  WHY Why Is Sand Pumped On the Accretion Side of the Harbor Breakwater ? Ontonagon, Michigan Lake Superior Photographed by  David Wentland P.E. Docks & Marinas, Inc.
How Do We Deal With These Waterfront Issues?Extreme Low Water LevelsRotting Infrastructure Photographed by  David Wentland P.E. Docks & Marinas, Inc. Kewaunee, Wisconsin Harbor Lake Michigan
How Do We Deal With This Issue? Corrosion has been eating away at steel pilings in Duluth-Superior harbor for over 30 years, consuming an estimated 50,000 plus pounds of steel a year. Once identified in the late 1990s, scientists, engineers and local dock owners (led by the Port Authority) immediately began researching potential causes and ways to either stop it or protect remaining steel structures. “Factors Contributing to Corrosion of Steel Pilings in Duluth-Superior Harbor” (by R. Ray, J. Lee and B. Little), this research demonstrates a specific sequence of biological, chemical and physical events responsible for localized corrosion of carbon steel piling – including the role ice scour plays in accelerating that process.  Duluth-Superior Harbor and Many Other Harbors on Lake Superior With Steel Waterfront Infrastructure are Being Affected
INTRODUCTION STRUCTURMARINE INTRODUCTION STRUCTURMARINE WHO THEY ARE
STRUCTURMARINE Featured on Front Cover Of Marina World March/April 2010
Article in Current Issue Of Marina World March/April 2011 “But marinas can’t be approached like commercial ports – they are more complex, require more disciplines, extra design elements and have a different kind of environmental importance.”
Sturgeon Bay, Wisconsin USA Yacht Made of Welded Aluminum (If Preferred for Ships, Then Why Not for Docks) LEARN FROM OTHERS! ALUMINUM IS USED IN BOAT BUILDING Manitowoc, Wisconsin USA
ALUMINUM IS USED IN AIRCRAFT  WHY ARE AIRPLANES BUILT OF ALUMINUM? Airplanes need to be light and flexible to perform well in flight. Weight Aluminum is a light metal. Flexibility Aluminum is flexible. As an airplane flies, especially pressurized aircraft, the skin must be able to flex both due to the buffeting of the air and due to internal pressure increases and decreases. Bendability Aluminum is easily formed into curved shapes that are more aerodynamically sound. Workability Because it is light, flexible, and easy to bend, aluminum is easy to work. Corrosion Resistant Aluminum is more resistant to corrosion. It reacts more slowly to air,  so it will not rust like steel or other ferrous metals. Cost                Because of the benefits of aluminum, it is the cheapest material available                                       that will serve the engineering requirements.
Why is Aluminum Better ? ----  Facts
Why is Aluminum Better ? ----  Facts Continued
Why is Aluminum Better ? ----  Facts Continued
WAVE REDUCTION SYSTEMS (WRS) STRUCTURMARINE  is at the forefront of WRS development. It offers several types, which have been rigorously tested over the years.  Built to the same standards as its docks, they are built for efficiency – up to 90% wave attenuation – and to last a minimum of 25 years. In addition whenever possible, they are built to be multi-functional, and be revenue generators. It looks for what’s possible and sees what the opportunities are. “Change is an opportunity.  We must embrace the change, work with it and become comfortable with it.  We have to look for what’s possible and see what the opportunities are.” Part of keynote address given by Vince Morvillo Motivational Speaker and Owner Sea Lake Yacht Sales 2011 IMBC BE ADAPTABLE AND MULTI-FUNCTIONAL A Stand-alone Wave Attenuator Was in the Bid Documents Structurmarine Proposed a WRS which included  Additional Dockage to Add Additional Revenue Generation
GOING BEYOND CONVENTIONAL Examples of Innovation
 THINK THROUGH THE DETAILS  Fabrication, Delivery and Installation
 CONSIDER THE OPPORTUNITIES FOR COMPLETE MARINA SOLUTIONS
WHAT IS THE DOCK MANUFACTURER’S STRENGTHS
LOOK FOR CREATIVE THINKING FROM  PROVEN PROJECTS
Designing Resilient and Adaptable Marinas  in An Age of ………………. Potentially More Violent Weather
APRIL 7, 2011 ARTICLE
Designing Resilient and Adaptable Marinas  in An Age of ………………. Uncertain Economic Times
APRIL 7, 2011 ARTICLE
Santa Cruz and Crescent City, California harbors in the aftermath of the March 11, 2011 tsunami Observations, Opinions  and Suggestions by Docks & Marinas, Inc.
IN THE NEWS
THE LOCATIONS 2011 Google
SANTA CRUZ HARBOR Inlet to East End 2011 Google
SANTA CRUZ HARBOR Inlet to Bridge “Port Director Lisa Ekers revised her estimate to $22.5 million in tsunami-related damage to Santa Cruz Harbor, up from $17 million, the Santa Cruz Sentinel reported. Ekers told the newspaper the final figure cost could be more than $25 million. The figure includes the expected cost of rebuilding damaged docks and other infrastructure but not an additional $4 million in damage to private vessels.”  WIVB.com 3/16/2011 2011 Google
SANTA CRUZ PHOTOS AFTER THE TSUNAMI
SANTA CRUZ PHOTOS AFTER THE TSUNAMI
SANTA CRUZ PHOTOS AFTER THE TSUNAMI
CRESCENT CITY HARBOR 2011 Google
CRESCENT CITY HARBOR  The Marina “Total damage estimate $38.5M  Written by Megan Hansen, The Triplicate March 30, 2011 06:34 pm  Harbor cleanup continues while fed funds sought.  Damage estimates for Crescent City’s harbor exceed $38.5 million and $16 million can be attributed to the recent tsunami, Harbormaster Richard Young said Tuesday.  The harbor previously sustained $22.5 million in damages during a tsunami in 2006 — after which the state declared the harbor an emergency and allocated funds from the California Emergency Management Agency.  2011 Google
CRESCENT CITY PHOTOS AFTER THE TSUNAMI KTLA.com
CRESCENT CITY PHOTOS AFTER THE TSUNAMI KTLA.com
CRESCENT CITY PHOTOS AFTER THE TSUNAMI KTLA.com
OBSERVATIONS Both harbors have been damaged by tsunamis in the past.  Why is this?  Might their locations and physical  layouts be factors?  What changes have been made after previous “events” causing damage? The marina /harbor in Santa Cruz and marina in Crescent City have narrow entrances.  As the “external” ocean level changes rapidly the water in the “box” will try to equalize the difference but is restricted by the size of the entrance.  Current (water velocity) must increase dramatically to compensate.  Q = VA or V = Q/A As long as the only water  route is through the entrance the direction of the current will be relatively consistent.  The rate of change of the “external” water level will affect the velocity of the current.  This may affect whether the flow is more turbulent than laminar  which would affect how the water propagates within the “box”.  Eddies on the lower water side of the entrance will also behave differently.  The floating dock layouts appear to have been determined based on maximizing the # of boat slips, rather than streamlining the structures relative to the currents to reduce lateral loads. Floating docks appear to be heavy structures because of the extensive amount of flotation keeping them floating.  Anchorage is vertical piles.
OPINIONS Each “event” that causes damage needs to be a learning experience, and adjustments made. Natural forces often exceed what we can design and build.  How do we deal with that reality?  Can we design flexible, “resilient” marinas? LOCATION, LOCATION, LOCATION.  Just as in landside real estate, each location is “site specific”.  Some locations are much better than others.  We need to recognize the distinctions from experience and training.  Many of the less challenging locations have been already adapted and altered for our use.  Developing locations today requires far more knowledge than luck. Layouts, structures and anchorage need to be designed and built recognizing past events and our knowledge of potential natural forces.  Risk of damage is inversely related to costs. The more we know about a site the better our design.  Generally quality in, quality out.  Knowledge of soils, land elevations, water depths, water levels, waves, sediment transport, circulation, land drainage, contamination are examples.  Intended short-term and long-term uses, desired useful life, and expected maintenance are crucial. Things change.  Basing future events on past (historical) events is no longer as dependable as we used to believe.  The sizes of, and reasons for, boats will not be the same over time.  The same is true where we keep them.
OPINIONS continued: When you have a “box” with a small entrance, is it possible to install a door at the entrance?  This is done on river locks, to eliminate, or nearly eliminate, the water trying to maintain the same level inside and outside the “box”. Can a larger or additional openings be constructed to increase the area (A).  V =  Q/A.  The larger the area, the less the velocity.  The tradeoff is whether doing so will create an unacceptable wave climate in the marina.  Typically a resident one foot wave is acceptable in a marina.  Sometimes a two foot wave is acceptable.  It depends on the size of boats, flexibility of dockage, and user preferences.  Can the dockage and boats, or at least the boats, be moved out of harms way?  What areas in a marina are protected by solid structures where boats can be sheltered away from dangerous currents?  Are there access areas, like launch ramps or travel lifts, where boats can be removed as soon as an alarm is given? How soon is an alarm given?  I read that there was about a four hour window of time from the time of the earthquake in Japan until the tsunami reached Santa Cruz and Crescent City.  Was there an emergency preparedness plan to reduce potential damage?  Was it implemented?  Given the damage that resulted, can it be improved?
SUGGESTIONS We are observing, researching and learning about our planet as never before.  Combined with our “information highway” we have the greatest amount of knowledge and resources for educated decisions. Do not design marinas based only on the past (hindcasting).  Consider what may be events in the future and plan wisely. Layout marinas and floating structures to minimize vertical and horizontal loads.  Streamline the profiles to reduce horizontal forces.  Fish, boats, birds and airplanes are examples of such designs.  Minimize the weight of floating docks so as little flotation as possible is needed.  Less flotation means less current forces against the docks.  Boats have better profiles than docks.  The goal is not to feel like you are “walking on land”.  Rather to get safely to your boat. Floating concrete docks are heavy and rigid .  They need more flotation and will often break rather than bend.  Build docks of materials that are lighter and able to flex without breaking.  “All wood” docks wear out too fast where bolts are fastened to wood.  Use anchorage that is not rigid but flexible.  When possible use “chain and bottom anchor” or elastic anchorage instead of rigid pilings.  As water level changes, ensure dock connections to anchors do not bind.   Boat lines to dock cleats, docks connections to anchorage, and anchors to the harbor bottom are the points of concentrated loadings.   Use shock absorbing materials and strong connections to transfer those loads through the entire dock system.

Weitere ähnliche Inhalte

Ähnlich wie Designing Resilient and Adaptable Marinas

Artificial Reef 2001 Anglers Club
Artificial Reef 2001 Anglers ClubArtificial Reef 2001 Anglers Club
Artificial Reef 2001 Anglers ClubCindy Sullivan
 
Marine applications
Marine applicationsMarine applications
Marine applicationsRobin Wright
 
Waterfront Master Planning | Urban Waterfronts and Marinas Services | Moffatt...
Waterfront Master Planning | Urban Waterfronts and Marinas Services | Moffatt...Waterfront Master Planning | Urban Waterfronts and Marinas Services | Moffatt...
Waterfront Master Planning | Urban Waterfronts and Marinas Services | Moffatt...KatthyLucas2100
 
Roen Salvage Company In situ Repair of Submerged Steel Sheet Pile Walls
Roen Salvage Company In situ Repair of Submerged Steel Sheet Pile WallsRoen Salvage Company In situ Repair of Submerged Steel Sheet Pile Walls
Roen Salvage Company In situ Repair of Submerged Steel Sheet Pile WallsDocks & Marinas, Inc.
 
Diaz v. Carcamo Legal Analysis Grading GuideMGT434 Version 8.docx
Diaz v. Carcamo Legal Analysis Grading GuideMGT434 Version 8.docxDiaz v. Carcamo Legal Analysis Grading GuideMGT434 Version 8.docx
Diaz v. Carcamo Legal Analysis Grading GuideMGT434 Version 8.docxlynettearnold46882
 
11 9 2010 Am. Trails Symposium Mods For Rec.Boating
11 9 2010 Am. Trails Symposium   Mods For Rec.Boating11 9 2010 Am. Trails Symposium   Mods For Rec.Boating
11 9 2010 Am. Trails Symposium Mods For Rec.Boatingjmpflaum
 
plp-white-paper-series1
plp-white-paper-series1plp-white-paper-series1
plp-white-paper-series1latesch
 
02 Coastal Stabilization And Alternative Solutions
02  Coastal Stabilization And Alternative Solutions02  Coastal Stabilization And Alternative Solutions
02 Coastal Stabilization And Alternative SolutionsKrystian Pilarczyk
 
Risks to biscayne bay ecosystem from sea level rise
Risks to biscayne bay ecosystem from sea level riseRisks to biscayne bay ecosystem from sea level rise
Risks to biscayne bay ecosystem from sea level riseHydrologic Science, llc.
 
Citizens Vision - Cleveland OH Scranton Peninsula River Jewel
Citizens Vision - Cleveland OH Scranton Peninsula River JewelCitizens Vision - Cleveland OH Scranton Peninsula River Jewel
Citizens Vision - Cleveland OH Scranton Peninsula River JewelR Ray Saikus
 
Implications of bridge crossings
Implications of bridge crossings Implications of bridge crossings
Implications of bridge crossings santharooban
 
Can Wea Supply Chain Final June 10, 2010
Can Wea Supply Chain Final June 10, 2010Can Wea Supply Chain Final June 10, 2010
Can Wea Supply Chain Final June 10, 2010mtingle
 
Trinity River Corridor Project
Trinity  River Corridor ProjectTrinity  River Corridor Project
Trinity River Corridor ProjectSean Merrell
 
Jason Abendroth Project experience_10_2015
Jason Abendroth Project experience_10_2015Jason Abendroth Project experience_10_2015
Jason Abendroth Project experience_10_2015Jason Abendroth, PE
 
Introduction CMS (Coastal Modeling System) SMS
Introduction CMS (Coastal Modeling System) SMS Introduction CMS (Coastal Modeling System) SMS
Introduction CMS (Coastal Modeling System) SMS bahar fahmi
 
Breakwaters & Training Walls | The good, the bad and the ugly
Breakwaters & Training Walls | The good, the bad and the uglyBreakwaters & Training Walls | The good, the bad and the ugly
Breakwaters & Training Walls | The good, the bad and the uglyAdvisian
 

Ähnlich wie Designing Resilient and Adaptable Marinas (20)

Artificial Reef 2001 Anglers Club
Artificial Reef 2001 Anglers ClubArtificial Reef 2001 Anglers Club
Artificial Reef 2001 Anglers Club
 
Marine applications
Marine applicationsMarine applications
Marine applications
 
Waterfront Master Planning | Urban Waterfronts and Marinas Services | Moffatt...
Waterfront Master Planning | Urban Waterfronts and Marinas Services | Moffatt...Waterfront Master Planning | Urban Waterfronts and Marinas Services | Moffatt...
Waterfront Master Planning | Urban Waterfronts and Marinas Services | Moffatt...
 
Roen Salvage Company In situ Repair of Submerged Steel Sheet Pile Walls
Roen Salvage Company In situ Repair of Submerged Steel Sheet Pile WallsRoen Salvage Company In situ Repair of Submerged Steel Sheet Pile Walls
Roen Salvage Company In situ Repair of Submerged Steel Sheet Pile Walls
 
Diaz v. Carcamo Legal Analysis Grading GuideMGT434 Version 8.docx
Diaz v. Carcamo Legal Analysis Grading GuideMGT434 Version 8.docxDiaz v. Carcamo Legal Analysis Grading GuideMGT434 Version 8.docx
Diaz v. Carcamo Legal Analysis Grading GuideMGT434 Version 8.docx
 
Sustinable Mainatenace of Navigation Channel
Sustinable Mainatenace of Navigation ChannelSustinable Mainatenace of Navigation Channel
Sustinable Mainatenace of Navigation Channel
 
11 9 2010 Am. Trails Symposium Mods For Rec.Boating
11 9 2010 Am. Trails Symposium   Mods For Rec.Boating11 9 2010 Am. Trails Symposium   Mods For Rec.Boating
11 9 2010 Am. Trails Symposium Mods For Rec.Boating
 
plp-white-paper-series1
plp-white-paper-series1plp-white-paper-series1
plp-white-paper-series1
 
02 Coastal Stabilization And Alternative Solutions
02  Coastal Stabilization And Alternative Solutions02  Coastal Stabilization And Alternative Solutions
02 Coastal Stabilization And Alternative Solutions
 
QB Poster4
QB Poster4QB Poster4
QB Poster4
 
Risks to biscayne bay ecosystem from sea level rise
Risks to biscayne bay ecosystem from sea level riseRisks to biscayne bay ecosystem from sea level rise
Risks to biscayne bay ecosystem from sea level rise
 
Citizens Vision - Cleveland OH Scranton Peninsula River Jewel
Citizens Vision - Cleveland OH Scranton Peninsula River JewelCitizens Vision - Cleveland OH Scranton Peninsula River Jewel
Citizens Vision - Cleveland OH Scranton Peninsula River Jewel
 
Implications of bridge crossings
Implications of bridge crossings Implications of bridge crossings
Implications of bridge crossings
 
Engineering Ethics
 Engineering Ethics Engineering Ethics
Engineering Ethics
 
Can Wea Supply Chain Final June 10, 2010
Can Wea Supply Chain Final June 10, 2010Can Wea Supply Chain Final June 10, 2010
Can Wea Supply Chain Final June 10, 2010
 
Coasts
CoastsCoasts
Coasts
 
Trinity River Corridor Project
Trinity  River Corridor ProjectTrinity  River Corridor Project
Trinity River Corridor Project
 
Jason Abendroth Project experience_10_2015
Jason Abendroth Project experience_10_2015Jason Abendroth Project experience_10_2015
Jason Abendroth Project experience_10_2015
 
Introduction CMS (Coastal Modeling System) SMS
Introduction CMS (Coastal Modeling System) SMS Introduction CMS (Coastal Modeling System) SMS
Introduction CMS (Coastal Modeling System) SMS
 
Breakwaters & Training Walls | The good, the bad and the ugly
Breakwaters & Training Walls | The good, the bad and the uglyBreakwaters & Training Walls | The good, the bad and the ugly
Breakwaters & Training Walls | The good, the bad and the ugly
 

Mehr von Docks & Marinas, Inc.

Impacts of the Sister Bay Waterfront Developments on Waves and Sediment Trans...
Impacts of the Sister Bay Waterfront Developments on Waves and Sediment Trans...Impacts of the Sister Bay Waterfront Developments on Waves and Sediment Trans...
Impacts of the Sister Bay Waterfront Developments on Waves and Sediment Trans...Docks & Marinas, Inc.
 
Field Observations and Technical Analysis of Wave Set-Up on Ala Moana Reef, O...
Field Observations and Technical Analysis of Wave Set-Up on Ala Moana Reef, O...Field Observations and Technical Analysis of Wave Set-Up on Ala Moana Reef, O...
Field Observations and Technical Analysis of Wave Set-Up on Ala Moana Reef, O...Docks & Marinas, Inc.
 
ACEC 2007 Engineering Excellence Awards_Olde Stone Quarry Harbor of Refuge
ACEC 2007 Engineering Excellence Awards_Olde Stone Quarry Harbor of RefugeACEC 2007 Engineering Excellence Awards_Olde Stone Quarry Harbor of Refuge
ACEC 2007 Engineering Excellence Awards_Olde Stone Quarry Harbor of RefugeDocks & Marinas, Inc.
 
Planning, Design, Construction, Repair and Renovation of Docks and Marinas
Planning, Design, Construction, Repair and Renovation of Docks and MarinasPlanning, Design, Construction, Repair and Renovation of Docks and Marinas
Planning, Design, Construction, Repair and Renovation of Docks and MarinasDocks & Marinas, Inc.
 
A Designer's Introduction to the Development, Design and Application of Vinyl...
A Designer's Introduction to the Development, Design and Application of Vinyl...A Designer's Introduction to the Development, Design and Application of Vinyl...
A Designer's Introduction to the Development, Design and Application of Vinyl...Docks & Marinas, Inc.
 

Mehr von Docks & Marinas, Inc. (6)

Impacts of the Sister Bay Waterfront Developments on Waves and Sediment Trans...
Impacts of the Sister Bay Waterfront Developments on Waves and Sediment Trans...Impacts of the Sister Bay Waterfront Developments on Waves and Sediment Trans...
Impacts of the Sister Bay Waterfront Developments on Waves and Sediment Trans...
 
Field Observations and Technical Analysis of Wave Set-Up on Ala Moana Reef, O...
Field Observations and Technical Analysis of Wave Set-Up on Ala Moana Reef, O...Field Observations and Technical Analysis of Wave Set-Up on Ala Moana Reef, O...
Field Observations and Technical Analysis of Wave Set-Up on Ala Moana Reef, O...
 
ACEC 2007 Engineering Excellence Awards_Olde Stone Quarry Harbor of Refuge
ACEC 2007 Engineering Excellence Awards_Olde Stone Quarry Harbor of RefugeACEC 2007 Engineering Excellence Awards_Olde Stone Quarry Harbor of Refuge
ACEC 2007 Engineering Excellence Awards_Olde Stone Quarry Harbor of Refuge
 
Planning, Design, Construction, Repair and Renovation of Docks and Marinas
Planning, Design, Construction, Repair and Renovation of Docks and MarinasPlanning, Design, Construction, Repair and Renovation of Docks and Marinas
Planning, Design, Construction, Repair and Renovation of Docks and Marinas
 
A Designer's Introduction to the Development, Design and Application of Vinyl...
A Designer's Introduction to the Development, Design and Application of Vinyl...A Designer's Introduction to the Development, Design and Application of Vinyl...
A Designer's Introduction to the Development, Design and Application of Vinyl...
 
BioDocks Presentation 2010-10-20
BioDocks Presentation 2010-10-20BioDocks Presentation 2010-10-20
BioDocks Presentation 2010-10-20
 

Kürzlich hochgeladen

group_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfgroup_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfneelspinoy
 
办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一
办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一
办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一diploma 1
 
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 
Apresentação Clamo Cristo -letra música Matheus Rizzo
Apresentação Clamo Cristo -letra música Matheus RizzoApresentação Clamo Cristo -letra música Matheus Rizzo
Apresentação Clamo Cristo -letra música Matheus RizzoCarolTelles6
 
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...Rishabh Aryan
 
FiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdfFiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdfShivakumar Viswanathan
 
西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造kbdhl05e
 
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...mrchrns005
 
Design principles on typography in design
Design principles on typography in designDesign principles on typography in design
Design principles on typography in designnooreen17
 
Iconic Global Solution - web design, Digital Marketing services
Iconic Global Solution - web design, Digital Marketing servicesIconic Global Solution - web design, Digital Marketing services
Iconic Global Solution - web design, Digital Marketing servicesIconic global solution
 
Create Web Pages by programming of your chice.pdf
Create Web Pages by programming of your chice.pdfCreate Web Pages by programming of your chice.pdf
Create Web Pages by programming of your chice.pdfworkingdev2003
 
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 
Unveiling the Future: Columbus, Ohio Condominiums Through the Lens of 3D Arch...
Unveiling the Future: Columbus, Ohio Condominiums Through the Lens of 3D Arch...Unveiling the Future: Columbus, Ohio Condominiums Through the Lens of 3D Arch...
Unveiling the Future: Columbus, Ohio Condominiums Through the Lens of 3D Arch...Yantram Animation Studio Corporation
 
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一Fi L
 
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书zdzoqco
 
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,Aginakm1
 
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degreeyuu sss
 
办理澳大利亚国立大学毕业证ANU毕业证留信学历认证
办理澳大利亚国立大学毕业证ANU毕业证留信学历认证办理澳大利亚国立大学毕业证ANU毕业证留信学历认证
办理澳大利亚国立大学毕业证ANU毕业证留信学历认证jdkhjh
 
韩国SKKU学位证,成均馆大学毕业证书1:1制作
韩国SKKU学位证,成均馆大学毕业证书1:1制作韩国SKKU学位证,成均馆大学毕业证书1:1制作
韩国SKKU学位证,成均馆大学毕业证书1:1制作7tz4rjpd
 

Kürzlich hochgeladen (20)

group_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfgroup_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdf
 
Call Girls in Pratap Nagar, 9953056974 Escort Service
Call Girls in Pratap Nagar,  9953056974 Escort ServiceCall Girls in Pratap Nagar,  9953056974 Escort Service
Call Girls in Pratap Nagar, 9953056974 Escort Service
 
办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一
办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一
办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一
 
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
 
Apresentação Clamo Cristo -letra música Matheus Rizzo
Apresentação Clamo Cristo -letra música Matheus RizzoApresentação Clamo Cristo -letra música Matheus Rizzo
Apresentação Clamo Cristo -letra música Matheus Rizzo
 
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
 
FiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdfFiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdf
 
西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造
 
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...
 
Design principles on typography in design
Design principles on typography in designDesign principles on typography in design
Design principles on typography in design
 
Iconic Global Solution - web design, Digital Marketing services
Iconic Global Solution - web design, Digital Marketing servicesIconic Global Solution - web design, Digital Marketing services
Iconic Global Solution - web design, Digital Marketing services
 
Create Web Pages by programming of your chice.pdf
Create Web Pages by programming of your chice.pdfCreate Web Pages by programming of your chice.pdf
Create Web Pages by programming of your chice.pdf
 
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
 
Unveiling the Future: Columbus, Ohio Condominiums Through the Lens of 3D Arch...
Unveiling the Future: Columbus, Ohio Condominiums Through the Lens of 3D Arch...Unveiling the Future: Columbus, Ohio Condominiums Through the Lens of 3D Arch...
Unveiling the Future: Columbus, Ohio Condominiums Through the Lens of 3D Arch...
 
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
 
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
 
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
 
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
办理澳大利亚国立大学毕业证ANU毕业证留信学历认证
办理澳大利亚国立大学毕业证ANU毕业证留信学历认证办理澳大利亚国立大学毕业证ANU毕业证留信学历认证
办理澳大利亚国立大学毕业证ANU毕业证留信学历认证
 
韩国SKKU学位证,成均馆大学毕业证书1:1制作
韩国SKKU学位证,成均馆大学毕业证书1:1制作韩国SKKU学位证,成均馆大学毕业证书1:1制作
韩国SKKU学位证,成均馆大学毕业证书1:1制作
 

Designing Resilient and Adaptable Marinas

  • 1. Designing Resilient and Adaptable Marinas in An Age of Potentially More Violent Weather And Uncertain Economic Times Presented by: Dave Wentland, P.E. Coastal and Environmental Engineer DOCKS & MARINAS, INC. De Pere, Wisconsin USA www.docks-marinas.com In Partnership with: STRUCTURMARINE Marinas Tailored to Your Dreams www.structurmarine.com April 7, 2011 A Webinar Presentation
  • 2. THANK YOU FOR ATTENDING OUR WEBINAR
  • 3. FOR THE RECORD First and Foremost Docks & Marinas, Inc. prides itself on being a fair and objective coastal engineering company Second We continually search for and are willing to partner with equipment and product manufacturers we believe offer the finest products and services in our marine industry Third We believe STRUCTURMARINE is such a company and we are proud to represent it Last The observations, opinions and suggestions in this presentation to possibly reduce future damage to Santa Cruz and Crescent City, California harbors in the aftermath of the March 11, 2011 tsunami are solely those of Docks & Marinas, Inc.
  • 4. INTRODUCTION DOCKS & MARINAS, INC. WHO WE ARE
  • 5.
  • 6.
  • 7. DAVID WENTLAND, P.E. President Coastal and Environmental Engineer EDUCATION: MS: Ocean Engineering (Coastal Emphasis) University of Hawaii – 1978 BS: Civil Engineering (Environmental/Construction Emphasis) South Dakota School of Mines & Technology - 1973 REGISTRATIONS: Professional Engineer Wisconsin, Registration # E-20150 Michigan, Registration # 40795 OTHER: Licensed Pilot CREDENTIALS: Certified Diver www.linkedin.com/in/davewentland
  • 8.
  • 9. Never Be Afraid to Learn
  • 10. Do Not Accept the Status Quo – Always Ask Why
  • 11. Listen
  • 12. Network and Communicate
  • 13. Think Outside the BoxPilot Island, Death’s Door Passage between Door County Peninsula and Washington Island Lake Michigan
  • 14. Thinking Outside the Box: Innovative Products to Help Marinas Become Clean Wisconsin Marina Association WMA & WI Clean Marina Meeting Milwaukee Yacht Club March 10, 2010 This is an example of one of many presentations we give on docks, marinas, harbors, and coastal topics. Shown is the Sawyer Park Harbor of Refuge in Door County, Wisconsin designed by Dave Wentland, P.E. Recent Conferences, Presentations and Trade Shows Docks and Marinas Conference in Madison, WI in October 2010Floating Island International (FII) Symposium in Montana in October 2010Marina Recreation Association (MRA) conference in Las Vegas in November 2010International Marina and Boatyard Conference (IMBC) in Ft. Lauderdale in January 2011Wisconsin State Cranberry Growers Association (WSCGA) conference in Stevens Point, WI in January 2011Wisconsin Marina Association (WMA) meeting in Sheboygan, WI in February 2011
  • 15. ASK WHY Why Is Sand Pumped On the Accretion Side of the Harbor Breakwater ? Ontonagon, Michigan Lake Superior Photographed by David Wentland P.E. Docks & Marinas, Inc.
  • 16. How Do We Deal With These Waterfront Issues?Extreme Low Water LevelsRotting Infrastructure Photographed by David Wentland P.E. Docks & Marinas, Inc. Kewaunee, Wisconsin Harbor Lake Michigan
  • 17. How Do We Deal With This Issue? Corrosion has been eating away at steel pilings in Duluth-Superior harbor for over 30 years, consuming an estimated 50,000 plus pounds of steel a year. Once identified in the late 1990s, scientists, engineers and local dock owners (led by the Port Authority) immediately began researching potential causes and ways to either stop it or protect remaining steel structures. “Factors Contributing to Corrosion of Steel Pilings in Duluth-Superior Harbor” (by R. Ray, J. Lee and B. Little), this research demonstrates a specific sequence of biological, chemical and physical events responsible for localized corrosion of carbon steel piling – including the role ice scour plays in accelerating that process. Duluth-Superior Harbor and Many Other Harbors on Lake Superior With Steel Waterfront Infrastructure are Being Affected
  • 18. INTRODUCTION STRUCTURMARINE INTRODUCTION STRUCTURMARINE WHO THEY ARE
  • 19.
  • 20.
  • 21. STRUCTURMARINE Featured on Front Cover Of Marina World March/April 2010
  • 22. Article in Current Issue Of Marina World March/April 2011 “But marinas can’t be approached like commercial ports – they are more complex, require more disciplines, extra design elements and have a different kind of environmental importance.”
  • 23. Sturgeon Bay, Wisconsin USA Yacht Made of Welded Aluminum (If Preferred for Ships, Then Why Not for Docks) LEARN FROM OTHERS! ALUMINUM IS USED IN BOAT BUILDING Manitowoc, Wisconsin USA
  • 24. ALUMINUM IS USED IN AIRCRAFT WHY ARE AIRPLANES BUILT OF ALUMINUM? Airplanes need to be light and flexible to perform well in flight. Weight Aluminum is a light metal. Flexibility Aluminum is flexible. As an airplane flies, especially pressurized aircraft, the skin must be able to flex both due to the buffeting of the air and due to internal pressure increases and decreases. Bendability Aluminum is easily formed into curved shapes that are more aerodynamically sound. Workability Because it is light, flexible, and easy to bend, aluminum is easy to work. Corrosion Resistant Aluminum is more resistant to corrosion. It reacts more slowly to air, so it will not rust like steel or other ferrous metals. Cost Because of the benefits of aluminum, it is the cheapest material available that will serve the engineering requirements.
  • 25. Why is Aluminum Better ? ---- Facts
  • 26. Why is Aluminum Better ? ---- Facts Continued
  • 27. Why is Aluminum Better ? ---- Facts Continued
  • 28. WAVE REDUCTION SYSTEMS (WRS) STRUCTURMARINE is at the forefront of WRS development. It offers several types, which have been rigorously tested over the years. Built to the same standards as its docks, they are built for efficiency – up to 90% wave attenuation – and to last a minimum of 25 years. In addition whenever possible, they are built to be multi-functional, and be revenue generators. It looks for what’s possible and sees what the opportunities are. “Change is an opportunity. We must embrace the change, work with it and become comfortable with it. We have to look for what’s possible and see what the opportunities are.” Part of keynote address given by Vince Morvillo Motivational Speaker and Owner Sea Lake Yacht Sales 2011 IMBC BE ADAPTABLE AND MULTI-FUNCTIONAL A Stand-alone Wave Attenuator Was in the Bid Documents Structurmarine Proposed a WRS which included Additional Dockage to Add Additional Revenue Generation
  • 29. GOING BEYOND CONVENTIONAL Examples of Innovation
  • 30. THINK THROUGH THE DETAILS Fabrication, Delivery and Installation
  • 31. CONSIDER THE OPPORTUNITIES FOR COMPLETE MARINA SOLUTIONS
  • 32. WHAT IS THE DOCK MANUFACTURER’S STRENGTHS
  • 33. LOOK FOR CREATIVE THINKING FROM PROVEN PROJECTS
  • 34. Designing Resilient and Adaptable Marinas in An Age of ………………. Potentially More Violent Weather
  • 35. APRIL 7, 2011 ARTICLE
  • 36. Designing Resilient and Adaptable Marinas in An Age of ………………. Uncertain Economic Times
  • 37. APRIL 7, 2011 ARTICLE
  • 38. Santa Cruz and Crescent City, California harbors in the aftermath of the March 11, 2011 tsunami Observations, Opinions and Suggestions by Docks & Marinas, Inc.
  • 41. SANTA CRUZ HARBOR Inlet to East End 2011 Google
  • 42. SANTA CRUZ HARBOR Inlet to Bridge “Port Director Lisa Ekers revised her estimate to $22.5 million in tsunami-related damage to Santa Cruz Harbor, up from $17 million, the Santa Cruz Sentinel reported. Ekers told the newspaper the final figure cost could be more than $25 million. The figure includes the expected cost of rebuilding damaged docks and other infrastructure but not an additional $4 million in damage to private vessels.” WIVB.com 3/16/2011 2011 Google
  • 43. SANTA CRUZ PHOTOS AFTER THE TSUNAMI
  • 44. SANTA CRUZ PHOTOS AFTER THE TSUNAMI
  • 45. SANTA CRUZ PHOTOS AFTER THE TSUNAMI
  • 46. CRESCENT CITY HARBOR 2011 Google
  • 47. CRESCENT CITY HARBOR The Marina “Total damage estimate $38.5M Written by Megan Hansen, The Triplicate March 30, 2011 06:34 pm Harbor cleanup continues while fed funds sought. Damage estimates for Crescent City’s harbor exceed $38.5 million and $16 million can be attributed to the recent tsunami, Harbormaster Richard Young said Tuesday. The harbor previously sustained $22.5 million in damages during a tsunami in 2006 — after which the state declared the harbor an emergency and allocated funds from the California Emergency Management Agency. 2011 Google
  • 48. CRESCENT CITY PHOTOS AFTER THE TSUNAMI KTLA.com
  • 49. CRESCENT CITY PHOTOS AFTER THE TSUNAMI KTLA.com
  • 50. CRESCENT CITY PHOTOS AFTER THE TSUNAMI KTLA.com
  • 51. OBSERVATIONS Both harbors have been damaged by tsunamis in the past. Why is this? Might their locations and physical layouts be factors? What changes have been made after previous “events” causing damage? The marina /harbor in Santa Cruz and marina in Crescent City have narrow entrances. As the “external” ocean level changes rapidly the water in the “box” will try to equalize the difference but is restricted by the size of the entrance. Current (water velocity) must increase dramatically to compensate. Q = VA or V = Q/A As long as the only water route is through the entrance the direction of the current will be relatively consistent. The rate of change of the “external” water level will affect the velocity of the current. This may affect whether the flow is more turbulent than laminar which would affect how the water propagates within the “box”. Eddies on the lower water side of the entrance will also behave differently. The floating dock layouts appear to have been determined based on maximizing the # of boat slips, rather than streamlining the structures relative to the currents to reduce lateral loads. Floating docks appear to be heavy structures because of the extensive amount of flotation keeping them floating. Anchorage is vertical piles.
  • 52. OPINIONS Each “event” that causes damage needs to be a learning experience, and adjustments made. Natural forces often exceed what we can design and build. How do we deal with that reality? Can we design flexible, “resilient” marinas? LOCATION, LOCATION, LOCATION. Just as in landside real estate, each location is “site specific”. Some locations are much better than others. We need to recognize the distinctions from experience and training. Many of the less challenging locations have been already adapted and altered for our use. Developing locations today requires far more knowledge than luck. Layouts, structures and anchorage need to be designed and built recognizing past events and our knowledge of potential natural forces. Risk of damage is inversely related to costs. The more we know about a site the better our design. Generally quality in, quality out. Knowledge of soils, land elevations, water depths, water levels, waves, sediment transport, circulation, land drainage, contamination are examples. Intended short-term and long-term uses, desired useful life, and expected maintenance are crucial. Things change. Basing future events on past (historical) events is no longer as dependable as we used to believe. The sizes of, and reasons for, boats will not be the same over time. The same is true where we keep them.
  • 53. OPINIONS continued: When you have a “box” with a small entrance, is it possible to install a door at the entrance? This is done on river locks, to eliminate, or nearly eliminate, the water trying to maintain the same level inside and outside the “box”. Can a larger or additional openings be constructed to increase the area (A). V = Q/A. The larger the area, the less the velocity. The tradeoff is whether doing so will create an unacceptable wave climate in the marina. Typically a resident one foot wave is acceptable in a marina. Sometimes a two foot wave is acceptable. It depends on the size of boats, flexibility of dockage, and user preferences. Can the dockage and boats, or at least the boats, be moved out of harms way? What areas in a marina are protected by solid structures where boats can be sheltered away from dangerous currents? Are there access areas, like launch ramps or travel lifts, where boats can be removed as soon as an alarm is given? How soon is an alarm given? I read that there was about a four hour window of time from the time of the earthquake in Japan until the tsunami reached Santa Cruz and Crescent City. Was there an emergency preparedness plan to reduce potential damage? Was it implemented? Given the damage that resulted, can it be improved?
  • 54. SUGGESTIONS We are observing, researching and learning about our planet as never before. Combined with our “information highway” we have the greatest amount of knowledge and resources for educated decisions. Do not design marinas based only on the past (hindcasting). Consider what may be events in the future and plan wisely. Layout marinas and floating structures to minimize vertical and horizontal loads. Streamline the profiles to reduce horizontal forces. Fish, boats, birds and airplanes are examples of such designs. Minimize the weight of floating docks so as little flotation as possible is needed. Less flotation means less current forces against the docks. Boats have better profiles than docks. The goal is not to feel like you are “walking on land”. Rather to get safely to your boat. Floating concrete docks are heavy and rigid . They need more flotation and will often break rather than bend. Build docks of materials that are lighter and able to flex without breaking. “All wood” docks wear out too fast where bolts are fastened to wood. Use anchorage that is not rigid but flexible. When possible use “chain and bottom anchor” or elastic anchorage instead of rigid pilings. As water level changes, ensure dock connections to anchors do not bind. Boat lines to dock cleats, docks connections to anchorage, and anchors to the harbor bottom are the points of concentrated loadings. Use shock absorbing materials and strong connections to transfer those loads through the entire dock system.
  • 55. THE FUNDAMENTALS OF FLOATING DOCK DESIGN NEWTON’S LAWS OF MOTION FLOATING STRUCTURES HAVE SIX DEGREES OF FREEDOM MOTIONS
  • 56. NEWTON’S FIRST LAW OF MOTION AN OBJECT AT REST WILL REMAIN AT REST … AN OBJECT IN MOTION CONTINUES IN MOTION WITH THE SAME SPEED AND IN THE SAME DIRECTION UNLESS ACTED UPON BY AN UNBALANCED FORCE NEWTON’S LAWS OF MOTION IMPORTANT PRINCIPLES WHEN DESIGNING FLOATING STRUCTURES NEWTON’S SECOND LAW OF MOTION ACCELERATION IS PRODUCED WHEN A FORCE ACTS AS A MASS NEWTON’S THIRD LAW OF MOTION FOR EVERY ACTION THERE IS AN EQUAL AND OPPOSITE REACTION
  • 57. FLOATING STRUCTURES UNANCHORED HAVE SIX DEGREES OF FREEDOM MOTIONS IMPORTANT PRINCIPLES WHEN DESIGNING FLOATING STRUCTURES
  • 58.
  • 59. Easy to connect and disconnect
  • 60. Interchangeable sections
  • 61. MultifunctionalTapered finger docks for reduced lateral forces, more strength, and more boat capacity Structural frame Make the dock only as stable as acceptable but no more than that. A heavier than necessary dock needs more flotation in the water. More material also costs more money. . The more openings in the water, the better the water circulation in a marina which means better water quality, and less accumulation of debris Minimum amount of flotation in the water Flexjoint connector blocks (shock absorbers)
  • 62.
  • 63. INTENDED PURPOSE
  • 64. RISK (WHAT’S THE CHANCE IT COULD BE DAMAGED)
  • 65.
  • 66. What’s the risk if it is damaged? If the investment of time and cost is modest, so will be the repairs.
  • 67. It appears to be built of readily available materials at reasonable or no costTHERE MAY BE AN IMPORTANT LESSON HERE. Learn to notice what works. Include that knowledge , along with your training, to design resilient and adaptable marinas. Island of Roatan in Honduras Photographed by David Wentland P.E. Docks & Marinas, Inc.