SlideShare a Scribd company logo
1 of 7
David Jonathan Ingram
Personal Information
Address : :20 Winchcombe Road, Carshalton, Surrey. SM5 1RB
Mobile No. : 07966662001
Nationality : British
Date of Birth : 11th March 1970
Place of Birth : Plymouth
Driving License : Full
E-mail Address : daveingram_uk@yahoo.co.uk
Human Factors certified : Jan 2018
Fuel safety phase 1 & 2 certified : Jan 2018
EWIS certified : June 2016
Personal Profile
I am a well organised, committed. Aircraft fitter, with excellent communication and people
oriented skills. I work equally well as part of a team or alone and I am well used to working on
my own initiative. I am also familiar with the requirement of meeting demanding deadlines, able
to recognise and prioritise work, remaining flexible, and identifying changes in priority as they
arise, whilst enjoying the challenge of the work.
Eduction and summary of qualifications & courses
• GKN Filton, Bristol
Composite laying up and awareness practical and theory course,
Module 1A,1B Drawing Module & Aircraft awareness
• Tank Devils: Fuel tank safety and repair course
• School of Technical Training • RAF Hilton UK
City and Guilds Diploma In
General Mechanical Engineering Parts I & 2
General Aeronautical Engineering parts 1 & 2
Basic Sheet metal and Structure course
• College of Further Education Plymouth
BTEC First Cert. Construction
BTEC National Cert. Construction
• Southway Comprehensive Plymouth
O Level and CSE Qualifications
English, Mathematics, General Science,
Art, Technical Drawing, World Studies
Professional Experience
LOT AMS, Poland. Jan 2016-Present day
Boeing 767 Airbus A320, D-Checks
Complete strip/rebuild including structural repairs and mechanical rectification incorporated in the major
inspection, including forming, bending & re-working of components.
Jets Biggin Hill Ltd, Biggin Hill. February 2015-June 2015.
Challenger 604, Falcon 900DX, Citation
Mechanical and Sheet metal inspection, rectification and repairs carried out as required including
manufacturing, forming, stretching and shrinking structural components.
TAG Farnborough Engineering, June 2015-Oct 2015.
Bombardier Challenger 300, 600 & 850. 24 month Inspections.
Sheet metal, Mechanical & Structural strip, inspection, rectification and rebuild to all areas of the aircraft
required to complete the services within the allotted timescale.
Jets Biggin Hill Ltd, Biggin Hill. February 2015-June 2015.
Challenger 604, Falcon 900DX, Citation
Mechanical and Sheet metal inspection, rectification and repairs carried out as required including
manufacturing, forming, stretching and shrinking structural components.
TAG Farnborough Engineering, January 2015-February 2015.
Bombardier Challenger 300, 600 & 850. 24 month Inspections.
Sheet metal, Mechanical & Structural; strip, inspection, rectification and rebuild to all areas of the aircraft
required to complete the services within the allotted timescale.
ATC Lasham, February 2014-December 2014
Airbus A320 D checks & soundproofing modifications
All aspects involved included in the check in order to make the aircraft serviceable. Mainly structural work
required but also mechanical work carried out. Repairs and manufacturing parts using aluminium, stainless
steel & titanium
Augusta Westlands, Yeovil, September 2013-February 2014
Wessex Helicopters
Complete strip/rebuild including in depth structural repairs and mechanical rectification incorporated in the
inspection. Manufacture and fabrication of components, scab and insert repairs Rectification/Replacement of
severely cracked “J” Stringer and surrounding structure.
Rectification/Replacement of severely corroded transportation joint and surrounding structure,including
fabrication of doubler plates and corresponding components.
Lasham, August 2012-September 2013
Boeing 737,727&757 D checks & soundproofing Modifications
All aspects involved included in the check in order to make the aircraft serviceable. Mainly structural work
required but also mechanical work carried out. Repairs and manufacturing parts using aluminium, stainless
steel & titanium.
GKN Western Approach, Bristol November 2011-August 2012
Airbus A350 Rear spar Production
Manufacture and production of composite rear spars for Airbus A350 aircraft. Including laying up, drilling
and fastening composite spars to attached structure.
ATC Lasham, February 2011-November 2011
Boeing 737,727&757 D checks & soundproofing modifications
All aspects involved included in the check in order to make the aircraft serviceable. Mainly structural work
required but also mechanical work carried out. Repairs and manufacturing parts using aluminium, stainless
steel & titanium
Jet Aviation Zurich, November 2010- February 2011.
Beechcraft King Air, 'C' Check.
Mechanical and Sheet metal inspection, rectification and repairs carried out as required including
manufacturing, forming, stretching and shrinking structural components.
Lufthansa Brussels, Brussels Airport August 2010- September 2010.
Airbus 330- 300 'D' check.
Under galley inspections. Removal of all galleys and toilets, inspect and rectify and faults found due to
corrosion. Refit galleys and toilets.
Vulcan to the skies, RAF Lyneham March 2010-August 2010.
Avro Vulcan. Modification Programme.
Introduce the fatigue life modification to the forward spars. Landing light aperture strengthening
modification, removal of stringers, manufacture of new parts to introduce the modification from relevant
drawings. These two modifications have never been complete on any other aircraft, so were completed
without any previous knowledge.
ATC Lasham, January 2010 - March 2010,
Boeing 737, D checks and Winglet modification.
Introduction of winglet modification inline with mod leaflet and drawings. Also structural repairs
incorporated for the completion of the D check.
Air South West September 2009 - January 2010,
Dash 8 Q300
Line support including daily, weekly, night stop & A checks.
On going maintenance and ground support for the upkeep of aircraft for a busy regional airline operator.
Rectification of damage sustained from lightning strikes.
Serco, RNAS Yeovilton November 2007 - September 2009.
Seaking Mk 3,3A,4,5&7. Sheet Metal/Mechanical Supervisor. Modification Programme.
Mechanical & Sheet metal Supervisor to introduce the Hums, Zapper, Siff & Elmer modifications
to all marks of Seaking helicopters in a given timescale. Actively embody, supervise and independently
check all aspects of work carried out.
British International, March 2007 – November 2007.
Sikorsky S61, 9000 hour inspection
Complete strip/rebuild including in depth structural repairs and mechanical rectification incorporated in the
inspection. Manufacture and fabrication of components, scab and insert repairs Rectification/Replacement of
severely cracked “J” Stringer and surrounding structure. Rectification/Replacement of severely corroded
transportation joint and surrounding structure, including fabrication of doubler plates and corresponding
components
DARA Fleetlands, Gosport January 2007 - March 2007.
Seaking Helicopters, Minor & Major (C&D Checks).
Sheet metal, Mechanical & Structural; strip, inspection, rectification and rebuild to all areas of the aircraft
required to complete the services within the allotted timescale.
GKN Westlands, Yeovil October 2006 - January 2007.
Production & forming of aircraft components.
Precision forming and truing of manufactured aircraft components by means of hand forming, stretching and shrinking,
bending and rolling to Airbus/Westlands specifications.
Bristows Norwich International Airport September 2006 - October 2006
Sikorsky 76 Helicopters D check.
Build up of the tail section, including removal/replacement of intermediate gearbox, drive shafts and
surrounding fitments. Run out checks, structural repairs & fabrications to complete the check as required.
FB Heliservices RAF Shawbury Shropshire. August 2006 - September 2006
Bell 412 Helicopters Major inspection
Sheet metal inspection, rectification and repairs carried out as required including manufacturing, forming,
stretching and shrinking structural components.
Tank Devils, Numerous contracts including-Bournemouth/Amsterdam/Switzerland
AOG Fuel tank repairs to various aircraft type ranging from Airbus-Dash 8.Quick response to AOG call out
for all aircraft type on detection of fuel leak, in depth repair to make serviceable ASAP
British International, Plymouth Airport. December 2005 - August 2006
Sikorsky S61 Helicopters. 9000-hour Major inspection.
Complete strip/rebuild including in depth structural repairs and mechanical rectification incorporated in the
inspection. Manufacture and fabrication of components, scab and insert repairs Rectification/Replacement of
severely cracked MGB mount and surrounding structure.
British International/Air South West. August 2005 – December 2005
De-Haaviland Dash 8 (200&300)
Line support including daily, weekly, night stop & A checks.
On going maintenance and ground support for the upkeep of aircraft for a busy regional airline operator.
Rectification of damage sustained from lightning strikes.
Turkish Airways Istanbul. August 2005 – August 2005
Bae 146
Fwd & Rear Wing spar Replacement.
Removal and replacement of fwd and rear wing spars which where found corroded during scheduled C
check. Then completion of work remaining on the C check
British International Helicopters. November 2004 -August 2005
Sikorsky S61, Helicopters/DaulphanA365.9000 hour major inspection.
All aspects involved included in the check in order to make the aircraft serviceable. Mainly structural work
required but also mechanical work carried out. Repairs and manufacturing parts using aluminium, stainless
steel & titanium
British European Exeter, March 2002 -November 2004
Dash 8 (200-Q 400) B/C/D Checks
Heavy maintenance checks on aircraft including Manufacturer’s modification of
Under wing doubler plate, Nacelle A Frame reinforcement,TRU Pressure Bulkhead, Window cold-
working
KLM Amsterdam, January 2002 -March 2002
Airbus A340 Boeing 747-D Checks
Complete strip/rebuild including structural repairs and mechanical rectification incorporated in the major
inspection, including forming, bending & re-working of components.
Federal Express / Farn Air Transport-Paris France, June 1999 - January 2002
Shorts 360 & Fokker F27 Line maintenance.
Quick and in depth maintenance, A&B checks including troubleshooting and rectifications to enable aircraft
to run on a tight schedule serving cargo to all of Europe
Delta Air Transport – Brussels. February 1999 – June 1999
BAe 146.C/D Checks & 8 Year structure inspections,
In depth maintenance and inspection covering all areas of the aircraft, including fault diagnostics, preventative
maintenance and repairs.
Brymon Airways – Plymouth. December 1998 - February 1999
DASH 8. A/B/E Check
All forms of maintenance involved in the above checks. Rectifications of MEL.'s. Inspection and repair of
lightning strikes. Removal, split and installation of Pratt and Whitney engines.
Jersey European Airways – Exeter. October 1998 - December 1998.
ATP, BAe 146, Fokker F27 & Shots 330 - 360 B/C/D Checks.
General hangar maintenance to complete checks including rectifications arising From checks. Role changes to the
330 - 360 aircraft from passenger to mail carriers.
Maersk Ltd - Birmingham. July 1998 - October 1998
Boeing 737. A/B Checks.
In depth maintenance and rectification including fuel tank inspection to repair leaks, windscreen changes and all
other forms of inspection and repair.
British Aerospace – Abu Dhabi U.A.E. October 1997- July 1998
BAe Hawk Mk 63 - 102
A member of the Contract Working Party (CWP) carrying out structural modification to all over wing fuel panels,
IAW, BAe, Spec. Ris 1192.
Newham Engineering Ltd. April 1996 - October 1997
'Tool Maker'
Responsible for the manufacture of all types of precision components for the engineering industry using
lathe, milling, grinding machines etc.
RAF St. Athan. January 1994 - April 1996
VC 10, K 1,2 and 3: C/D Checks
Complete interior servicing to include flight deck removal, installation passenger compartment trim along
with removal of all fuel cells and associated components. Also retrospect part. Oil completion of the check,
engine runs and pressure tests of the upper fuselage.
RAF Chivenor Search and Rescue & 92 Sqn September 1992 - January 1994
Bae Hawk & Seaking Helicopter, A/B Checks
First and second line servicing, incorporating all systems tests and inspection, in depth fault
diagnosis and rectifications,
structural repairs and modifications
HOBBIES AND PERSONAL INTERESTS
Judo (Gold in the RAF Championship and to National level ). Swimming, football, travelling and music.
REFERENCES
Mr Paul Barlow Mr Ian Jones
Maintenance Manager Aircraft Supervisor
JETS Biggin Hill LTD Jets Biggin Hill LTD
Biggin Hill Airport Biggin Hill Airport
Kent Kent
Tel: 01959 579673 / 07765042480 Tel: 07859 821230
paul.barlow@jets.eu ian.jones@jets.eu
Mr Kevin Stone Mr John Hufton
Vulcan to the sky Trust Vulcan to the sky trust
1&2 Venture court, 1&2 Venture court,
Hinkley, Leicestershire Hinkley, Leicestershire
Tel: 01455 895910 Tel: 01249 890669
kstone@vulcantothesky.org jhufton@vulcantothesky.org
kstone@vulcantothesky.org jhufton@vulcantothesky.org

More Related Content

What's hot

Michael+Resume+2015_01021
Michael+Resume+2015_01021Michael+Resume+2015_01021
Michael+Resume+2015_01021
Michael DeHart
 
Hazem Ouda CV 03 2014
Hazem Ouda CV 03 2014Hazem Ouda CV 03 2014
Hazem Ouda CV 03 2014
Hazem Ouda
 
B.Hickey Confidential Resume
B.Hickey Confidential ResumeB.Hickey Confidential Resume
B.Hickey Confidential Resume
Blake Hickey
 
updated Cv 04-01-2017 (1)
updated Cv 04-01-2017 (1)updated Cv 04-01-2017 (1)
updated Cv 04-01-2017 (1)
ABDUL QADIR
 
Final Report -Aircraft Design
Final Report -Aircraft DesignFinal Report -Aircraft Design
Final Report -Aircraft Design
Thomas Spisak
 
Storage of helicopter components
Storage of helicopter componentsStorage of helicopter components
Storage of helicopter components
Bai Haqi
 

What's hot (19)

Aw Aerospace Presentation
Aw Aerospace PresentationAw Aerospace Presentation
Aw Aerospace Presentation
 
Aircraft design trends and their impact on air cargo oriented aircrafts
Aircraft design trends and their impact on air cargo oriented aircraftsAircraft design trends and their impact on air cargo oriented aircrafts
Aircraft design trends and their impact on air cargo oriented aircrafts
 
IrvineVMET
IrvineVMETIrvineVMET
IrvineVMET
 
SUDARSONO_Resume
SUDARSONO_ResumeSUDARSONO_Resume
SUDARSONO_Resume
 
Final project report 791417 (1)
Final project report 791417 (1)Final project report 791417 (1)
Final project report 791417 (1)
 
Aircraft Design
Aircraft DesignAircraft Design
Aircraft Design
 
Michael+Resume+2015_01021
Michael+Resume+2015_01021Michael+Resume+2015_01021
Michael+Resume+2015_01021
 
A330 mrtt update 2012
A330 mrtt update 2012A330 mrtt update 2012
A330 mrtt update 2012
 
Hazem Ouda CV 03 2014
Hazem Ouda CV 03 2014Hazem Ouda CV 03 2014
Hazem Ouda CV 03 2014
 
Ahmed.Lepda
Ahmed.LepdaAhmed.Lepda
Ahmed.Lepda
 
Dave Andrews cv
Dave Andrews cvDave Andrews cv
Dave Andrews cv
 
B.Hickey Confidential Resume
B.Hickey Confidential ResumeB.Hickey Confidential Resume
B.Hickey Confidential Resume
 
Ortiz resume
Ortiz resumeOrtiz resume
Ortiz resume
 
updated Cv 04-01-2017 (1)
updated Cv 04-01-2017 (1)updated Cv 04-01-2017 (1)
updated Cv 04-01-2017 (1)
 
Final Report -Aircraft Design
Final Report -Aircraft DesignFinal Report -Aircraft Design
Final Report -Aircraft Design
 
Reduce your maintenance costs with ARTS
Reduce your maintenance costs with ARTSReduce your maintenance costs with ARTS
Reduce your maintenance costs with ARTS
 
Flight_Vehicle_Design
Flight_Vehicle_DesignFlight_Vehicle_Design
Flight_Vehicle_Design
 
anthonyaugustinaitisresumetechnical
anthonyaugustinaitisresumetechnicalanthonyaugustinaitisresumetechnical
anthonyaugustinaitisresumetechnical
 
Storage of helicopter components
Storage of helicopter componentsStorage of helicopter components
Storage of helicopter components
 

Viewers also liked

CV_George Triantaphyllidis 2016 Linked In
CV_George Triantaphyllidis 2016 Linked InCV_George Triantaphyllidis 2016 Linked In
CV_George Triantaphyllidis 2016 Linked In
George Triantaphyllidis
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
Stuart Haig
 
George Nieuwoudt UK CV Updated 290116
George Nieuwoudt UK CV Updated 290116George Nieuwoudt UK CV Updated 290116
George Nieuwoudt UK CV Updated 290116
George Nieuwoudt
 
Scarlett Scott Resume 2016
Scarlett Scott Resume 2016Scarlett Scott Resume 2016
Scarlett Scott Resume 2016
Scarlett Scott
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
Eva Kibue
 

Viewers also liked (14)

24th Sunday C
24th Sunday C24th Sunday C
24th Sunday C
 
CV Kent Gabrielsson_eng
CV Kent Gabrielsson_engCV Kent Gabrielsson_eng
CV Kent Gabrielsson_eng
 
Cv final uk
Cv final ukCv final uk
Cv final uk
 
CV_George Triantaphyllidis 2016 Linked In
CV_George Triantaphyllidis 2016 Linked InCV_George Triantaphyllidis 2016 Linked In
CV_George Triantaphyllidis 2016 Linked In
 
KCC_Final.pdf
KCC_Final.pdfKCC_Final.pdf
KCC_Final.pdf
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Passports @ the library
Passports @ the libraryPassports @ the library
Passports @ the library
 
EU: Steel Springs And Leaves For Springs - Market Report. Analysis And Foreca...
EU: Steel Springs And Leaves For Springs - Market Report. Analysis And Foreca...EU: Steel Springs And Leaves For Springs - Market Report. Analysis And Foreca...
EU: Steel Springs And Leaves For Springs - Market Report. Analysis And Foreca...
 
George Nieuwoudt UK CV Updated 290116
George Nieuwoudt UK CV Updated 290116George Nieuwoudt UK CV Updated 290116
George Nieuwoudt UK CV Updated 290116
 
lasantha Resume
lasantha Resumelasantha Resume
lasantha Resume
 
Scarlett Scott Resume 2016
Scarlett Scott Resume 2016Scarlett Scott Resume 2016
Scarlett Scott Resume 2016
 
DVF
DVFDVF
DVF
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Magdy El Damarawys Cv .Pdf
Magdy El Damarawys Cv .PdfMagdy El Damarawys Cv .Pdf
Magdy El Damarawys Cv .Pdf
 

Similar to David Ingram c.v Mar 2016 (20)

Craig Nicholls CV 1
Craig Nicholls CV 1Craig Nicholls CV 1
Craig Nicholls CV 1
 
Updated CV Curtis Tomlinson 02 04 2014 copy
Updated CV Curtis Tomlinson 02 04 2014 copyUpdated CV Curtis Tomlinson 02 04 2014 copy
Updated CV Curtis Tomlinson 02 04 2014 copy
 
CV
CVCV
CV
 
paul_buckland_cv 18 aug15
paul_buckland_cv 18 aug15paul_buckland_cv 18 aug15
paul_buckland_cv 18 aug15
 
cephas_nzvaura_cv
cephas_nzvaura_cvcephas_nzvaura_cv
cephas_nzvaura_cv
 
Stuart edwards cv
Stuart edwards cvStuart edwards cv
Stuart edwards cv
 
Aircraft Resume New-1
Aircraft Resume New-1Aircraft Resume New-1
Aircraft Resume New-1
 
CV 2016
CV 2016CV 2016
CV 2016
 
John ETT
John ETTJohn ETT
John ETT
 
Paul Moore- Engineering1.2016
Paul Moore- Engineering1.2016Paul Moore- Engineering1.2016
Paul Moore- Engineering1.2016
 
Beagley, t aviation business cv
Beagley, t aviation business cvBeagley, t aviation business cv
Beagley, t aviation business cv
 
Derrick J Smith
Derrick J SmithDerrick J Smith
Derrick J Smith
 
RMJCV2017
RMJCV2017RMJCV2017
RMJCV2017
 
Jonathan Rose CV
Jonathan Rose CV Jonathan Rose CV
Jonathan Rose CV
 
R&d precision exports pvt ltd-Export Processing Zones Pakistan
R&d precision exports pvt ltd-Export Processing Zones PakistanR&d precision exports pvt ltd-Export Processing Zones Pakistan
R&d precision exports pvt ltd-Export Processing Zones Pakistan
 
Project Mechanical Engineer C.V
Project Mechanical Engineer C.VProject Mechanical Engineer C.V
Project Mechanical Engineer C.V
 
Project mechanical engineer c.v
Project mechanical engineer c.vProject mechanical engineer c.v
Project mechanical engineer c.v
 
A Longstaff CV eng
A Longstaff CV engA Longstaff CV eng
A Longstaff CV eng
 
Philip krueger aviation skills resume 081517
Philip krueger aviation  skills resume 081517Philip krueger aviation  skills resume 081517
Philip krueger aviation skills resume 081517
 
Curriculum Vitae - Stephen Wilson
Curriculum Vitae - Stephen WilsonCurriculum Vitae - Stephen Wilson
Curriculum Vitae - Stephen Wilson
 

David Ingram c.v Mar 2016

  • 1. David Jonathan Ingram Personal Information Address : :20 Winchcombe Road, Carshalton, Surrey. SM5 1RB Mobile No. : 07966662001 Nationality : British Date of Birth : 11th March 1970 Place of Birth : Plymouth Driving License : Full E-mail Address : daveingram_uk@yahoo.co.uk Human Factors certified : Jan 2018 Fuel safety phase 1 & 2 certified : Jan 2018 EWIS certified : June 2016 Personal Profile I am a well organised, committed. Aircraft fitter, with excellent communication and people oriented skills. I work equally well as part of a team or alone and I am well used to working on my own initiative. I am also familiar with the requirement of meeting demanding deadlines, able to recognise and prioritise work, remaining flexible, and identifying changes in priority as they arise, whilst enjoying the challenge of the work. Eduction and summary of qualifications & courses • GKN Filton, Bristol Composite laying up and awareness practical and theory course, Module 1A,1B Drawing Module & Aircraft awareness • Tank Devils: Fuel tank safety and repair course • School of Technical Training • RAF Hilton UK City and Guilds Diploma In General Mechanical Engineering Parts I & 2 General Aeronautical Engineering parts 1 & 2 Basic Sheet metal and Structure course • College of Further Education Plymouth BTEC First Cert. Construction BTEC National Cert. Construction • Southway Comprehensive Plymouth O Level and CSE Qualifications English, Mathematics, General Science, Art, Technical Drawing, World Studies Professional Experience LOT AMS, Poland. Jan 2016-Present day Boeing 767 Airbus A320, D-Checks Complete strip/rebuild including structural repairs and mechanical rectification incorporated in the major inspection, including forming, bending & re-working of components.
  • 2. Jets Biggin Hill Ltd, Biggin Hill. February 2015-June 2015. Challenger 604, Falcon 900DX, Citation Mechanical and Sheet metal inspection, rectification and repairs carried out as required including manufacturing, forming, stretching and shrinking structural components. TAG Farnborough Engineering, June 2015-Oct 2015. Bombardier Challenger 300, 600 & 850. 24 month Inspections. Sheet metal, Mechanical & Structural strip, inspection, rectification and rebuild to all areas of the aircraft required to complete the services within the allotted timescale. Jets Biggin Hill Ltd, Biggin Hill. February 2015-June 2015. Challenger 604, Falcon 900DX, Citation Mechanical and Sheet metal inspection, rectification and repairs carried out as required including manufacturing, forming, stretching and shrinking structural components. TAG Farnborough Engineering, January 2015-February 2015. Bombardier Challenger 300, 600 & 850. 24 month Inspections. Sheet metal, Mechanical & Structural; strip, inspection, rectification and rebuild to all areas of the aircraft required to complete the services within the allotted timescale. ATC Lasham, February 2014-December 2014 Airbus A320 D checks & soundproofing modifications All aspects involved included in the check in order to make the aircraft serviceable. Mainly structural work required but also mechanical work carried out. Repairs and manufacturing parts using aluminium, stainless steel & titanium Augusta Westlands, Yeovil, September 2013-February 2014 Wessex Helicopters Complete strip/rebuild including in depth structural repairs and mechanical rectification incorporated in the inspection. Manufacture and fabrication of components, scab and insert repairs Rectification/Replacement of severely cracked “J” Stringer and surrounding structure. Rectification/Replacement of severely corroded transportation joint and surrounding structure,including fabrication of doubler plates and corresponding components. Lasham, August 2012-September 2013 Boeing 737,727&757 D checks & soundproofing Modifications All aspects involved included in the check in order to make the aircraft serviceable. Mainly structural work required but also mechanical work carried out. Repairs and manufacturing parts using aluminium, stainless steel & titanium. GKN Western Approach, Bristol November 2011-August 2012 Airbus A350 Rear spar Production Manufacture and production of composite rear spars for Airbus A350 aircraft. Including laying up, drilling and fastening composite spars to attached structure. ATC Lasham, February 2011-November 2011 Boeing 737,727&757 D checks & soundproofing modifications All aspects involved included in the check in order to make the aircraft serviceable. Mainly structural work required but also mechanical work carried out. Repairs and manufacturing parts using aluminium, stainless steel & titanium Jet Aviation Zurich, November 2010- February 2011. Beechcraft King Air, 'C' Check.
  • 3. Mechanical and Sheet metal inspection, rectification and repairs carried out as required including manufacturing, forming, stretching and shrinking structural components. Lufthansa Brussels, Brussels Airport August 2010- September 2010. Airbus 330- 300 'D' check. Under galley inspections. Removal of all galleys and toilets, inspect and rectify and faults found due to corrosion. Refit galleys and toilets. Vulcan to the skies, RAF Lyneham March 2010-August 2010. Avro Vulcan. Modification Programme. Introduce the fatigue life modification to the forward spars. Landing light aperture strengthening modification, removal of stringers, manufacture of new parts to introduce the modification from relevant drawings. These two modifications have never been complete on any other aircraft, so were completed without any previous knowledge. ATC Lasham, January 2010 - March 2010, Boeing 737, D checks and Winglet modification. Introduction of winglet modification inline with mod leaflet and drawings. Also structural repairs incorporated for the completion of the D check. Air South West September 2009 - January 2010, Dash 8 Q300 Line support including daily, weekly, night stop & A checks. On going maintenance and ground support for the upkeep of aircraft for a busy regional airline operator. Rectification of damage sustained from lightning strikes. Serco, RNAS Yeovilton November 2007 - September 2009. Seaking Mk 3,3A,4,5&7. Sheet Metal/Mechanical Supervisor. Modification Programme. Mechanical & Sheet metal Supervisor to introduce the Hums, Zapper, Siff & Elmer modifications to all marks of Seaking helicopters in a given timescale. Actively embody, supervise and independently check all aspects of work carried out. British International, March 2007 – November 2007. Sikorsky S61, 9000 hour inspection Complete strip/rebuild including in depth structural repairs and mechanical rectification incorporated in the inspection. Manufacture and fabrication of components, scab and insert repairs Rectification/Replacement of severely cracked “J” Stringer and surrounding structure. Rectification/Replacement of severely corroded transportation joint and surrounding structure, including fabrication of doubler plates and corresponding components DARA Fleetlands, Gosport January 2007 - March 2007. Seaking Helicopters, Minor & Major (C&D Checks). Sheet metal, Mechanical & Structural; strip, inspection, rectification and rebuild to all areas of the aircraft required to complete the services within the allotted timescale. GKN Westlands, Yeovil October 2006 - January 2007. Production & forming of aircraft components. Precision forming and truing of manufactured aircraft components by means of hand forming, stretching and shrinking, bending and rolling to Airbus/Westlands specifications. Bristows Norwich International Airport September 2006 - October 2006 Sikorsky 76 Helicopters D check. Build up of the tail section, including removal/replacement of intermediate gearbox, drive shafts and surrounding fitments. Run out checks, structural repairs & fabrications to complete the check as required.
  • 4. FB Heliservices RAF Shawbury Shropshire. August 2006 - September 2006 Bell 412 Helicopters Major inspection Sheet metal inspection, rectification and repairs carried out as required including manufacturing, forming, stretching and shrinking structural components. Tank Devils, Numerous contracts including-Bournemouth/Amsterdam/Switzerland AOG Fuel tank repairs to various aircraft type ranging from Airbus-Dash 8.Quick response to AOG call out for all aircraft type on detection of fuel leak, in depth repair to make serviceable ASAP British International, Plymouth Airport. December 2005 - August 2006 Sikorsky S61 Helicopters. 9000-hour Major inspection. Complete strip/rebuild including in depth structural repairs and mechanical rectification incorporated in the inspection. Manufacture and fabrication of components, scab and insert repairs Rectification/Replacement of severely cracked MGB mount and surrounding structure. British International/Air South West. August 2005 – December 2005 De-Haaviland Dash 8 (200&300) Line support including daily, weekly, night stop & A checks. On going maintenance and ground support for the upkeep of aircraft for a busy regional airline operator. Rectification of damage sustained from lightning strikes. Turkish Airways Istanbul. August 2005 – August 2005 Bae 146 Fwd & Rear Wing spar Replacement. Removal and replacement of fwd and rear wing spars which where found corroded during scheduled C check. Then completion of work remaining on the C check British International Helicopters. November 2004 -August 2005 Sikorsky S61, Helicopters/DaulphanA365.9000 hour major inspection. All aspects involved included in the check in order to make the aircraft serviceable. Mainly structural work required but also mechanical work carried out. Repairs and manufacturing parts using aluminium, stainless steel & titanium British European Exeter, March 2002 -November 2004 Dash 8 (200-Q 400) B/C/D Checks Heavy maintenance checks on aircraft including Manufacturer’s modification of Under wing doubler plate, Nacelle A Frame reinforcement,TRU Pressure Bulkhead, Window cold- working KLM Amsterdam, January 2002 -March 2002 Airbus A340 Boeing 747-D Checks Complete strip/rebuild including structural repairs and mechanical rectification incorporated in the major inspection, including forming, bending & re-working of components. Federal Express / Farn Air Transport-Paris France, June 1999 - January 2002 Shorts 360 & Fokker F27 Line maintenance. Quick and in depth maintenance, A&B checks including troubleshooting and rectifications to enable aircraft to run on a tight schedule serving cargo to all of Europe Delta Air Transport – Brussels. February 1999 – June 1999 BAe 146.C/D Checks & 8 Year structure inspections, In depth maintenance and inspection covering all areas of the aircraft, including fault diagnostics, preventative maintenance and repairs.
  • 5. Brymon Airways – Plymouth. December 1998 - February 1999 DASH 8. A/B/E Check All forms of maintenance involved in the above checks. Rectifications of MEL.'s. Inspection and repair of lightning strikes. Removal, split and installation of Pratt and Whitney engines. Jersey European Airways – Exeter. October 1998 - December 1998. ATP, BAe 146, Fokker F27 & Shots 330 - 360 B/C/D Checks. General hangar maintenance to complete checks including rectifications arising From checks. Role changes to the 330 - 360 aircraft from passenger to mail carriers. Maersk Ltd - Birmingham. July 1998 - October 1998 Boeing 737. A/B Checks. In depth maintenance and rectification including fuel tank inspection to repair leaks, windscreen changes and all other forms of inspection and repair. British Aerospace – Abu Dhabi U.A.E. October 1997- July 1998 BAe Hawk Mk 63 - 102 A member of the Contract Working Party (CWP) carrying out structural modification to all over wing fuel panels, IAW, BAe, Spec. Ris 1192. Newham Engineering Ltd. April 1996 - October 1997 'Tool Maker' Responsible for the manufacture of all types of precision components for the engineering industry using lathe, milling, grinding machines etc. RAF St. Athan. January 1994 - April 1996 VC 10, K 1,2 and 3: C/D Checks Complete interior servicing to include flight deck removal, installation passenger compartment trim along with removal of all fuel cells and associated components. Also retrospect part. Oil completion of the check, engine runs and pressure tests of the upper fuselage. RAF Chivenor Search and Rescue & 92 Sqn September 1992 - January 1994 Bae Hawk & Seaking Helicopter, A/B Checks First and second line servicing, incorporating all systems tests and inspection, in depth fault diagnosis and rectifications, structural repairs and modifications HOBBIES AND PERSONAL INTERESTS Judo (Gold in the RAF Championship and to National level ). Swimming, football, travelling and music. REFERENCES Mr Paul Barlow Mr Ian Jones Maintenance Manager Aircraft Supervisor JETS Biggin Hill LTD Jets Biggin Hill LTD Biggin Hill Airport Biggin Hill Airport Kent Kent Tel: 01959 579673 / 07765042480 Tel: 07859 821230 paul.barlow@jets.eu ian.jones@jets.eu Mr Kevin Stone Mr John Hufton Vulcan to the sky Trust Vulcan to the sky trust 1&2 Venture court, 1&2 Venture court, Hinkley, Leicestershire Hinkley, Leicestershire Tel: 01455 895910 Tel: 01249 890669