SlideShare a Scribd company logo
1 of 8
 Electrical Engineer
 Bachelor of Science in Electrical Engineer
(UC) Universityof Cebu
SanciangkoStreetCebuCityPhilippines6000
 Dale C. Banquirigo
 Address : 1085 Juana OsmeñaExtensionCebuCity, Philippines6000.
 Mobile No. : +639322077869 or + (032) 505 - 0604
 E-mail address : dalebanquirigo@rocketmail.com
 Degree : Holderfor(BSEE) Bachelorof Science in Electrical Engineer.
5 years of experience asElectrical Engineer.
 Proficient : in usingAutoCAD,MicrosoftOffice,MSWord, M Excel andPowerPoint.
: Can InterpretConstructionPlaninArchitectural,Structural,PlumbingandElectrical.
: Estimate Electrical Design.
: Prepare proposal quotationtoattend invitation contestforBiddingfromthe clients.
: Constantresponsiblethe average MasterScheduleinconstruction toavoidmislaidthe
developmentof works.
: Reviewandscrutinize Electrical computationSchedule of Loadsand Single Riser
Diagram.
: Can InterpretSingle Line Diagramof Electrical Design.
: Determine the average Electrical mountingheightmeasurementsof Powerand
AuxiliaryLayouts.
: Must constantlyresponsible intermsof Time Managementinordertoavoidthe delay
and itsprioritization of Electrical Scope of Works.
: RiskAssessmentsandManagement.
: Process and Performance Improvements.
: Work effectively inateamOriented,Collaborative Environment.
: Researchand Development.
: Extremely checkthe productionof works
: Must have QualityControl andQualityAssurance.
: Manage and DeterminedElectrical DifficultytoTrouble shoots.
: Strong DecisionsMakingandTime ManagementSkills
: Excellentcustomerandcommunicationskills.
Proposed Position:
Name & Contact:
Key Qualifications:
Address : 1085 Juana OsmeñaExtensionCapitol SiteCebuCity,
Philippines 6000.
Telephone Number : +63932-2077-869 or (032) 505 - 0604
Date of Birth : November 02, 1982
Place of Birth : Cebu City
Civil Status : Single
Sex : Male
Nationality : Filipino
Height : 5'8 inch
Weight : 179.2 lbs.
Religion : Roman Catholic
College : University of Cebu (UC)
Bachelor of Science in Electrical Engineer (BSEE)
Sanciangko Street Cebu City, Philippines 6000.
Batch (March 2007 – 2008).
Secondary : (UC) University Of Cebu
Sanciangko Street Cebu City, Philippines 6000.
Batch (March 1999 – 2000).
Primary : Camputhaw Elementary School.
Camputhaw Cebu. Cebu City, Philippines 6000.
Batch (March 1994 – 1995).
Personal Information:
Educational Attainment
In Marco Polo Tower 3 Projects (Real State High Rise Residential Units Building Projects)
(UMSSI) Universal Macro - technology System and Services Inc.
Design Estimate Electrical Mechanical Civil Plumbing EMS Preparer/Auditor Project Management Property Development
November 11, 2014 – April 16, 2015
Duties and Responsibilities:
 Review & Interpret Electrical Layout and its Design.
 Estimates Electrical Materials must to be used.
 Flat the Breakdown of Estimated Materials (BOM) Bill of Materials and (BOQ) Bill of Quantity.
 Attend invitationalbidding fromthevalued clients, In orderto Contest the final Breakdown of estimated
materials and its general quotation price.
 Review Electrical Layout Plan “For Construction”. If the invitational bidding was fortunate awarded in
our prominent company.
 Review and binary check the general quotation price of electrical materials “for Bidding” and “for
Construction” if there is no deficit or any possible additional materials.
 Review and refresh estimated Electrical LayoutPlan “For Construction”If there is significant Information
request must to amend from the Electrical designer.
 Review Electrical LayoutPlan “For Construction”forreferences and guide before to engage in operation
at site.
 Review and scrutinize Electrical computation Schedule of Loads and the Single Riser Diagram “for
construction Blue Print”. If the general computation of electrical loads was in particular.
 Determine and appraise the Project Management Schedule or Master Construction Tracker Schedule
for guide and reference to avoid mislaid the development of works.
 Be liable and mustseriousas (P.I.C) ProjectinCharge to put in orderthe required process for submission
of Weekly, Daily and Monthly report accomplishments.
 Constantly review Electrical Layoutsand theothertradesin construction.If there areno possibleconflicts
in terms in differentindividualscopeof worksand mustcooperateduring operation to avoid inaccuracy.
 Constantly updateinquiresto theElectrical Designer, if there arepossible instruction mustto amend and
inaccuracy.
 Constantly provide Request Approval to the Electrical Designer for Brand materials and specifications
must to utilize, before to proceed.
 Must responsible in advance to consolidate “Electrical As-built Plan” for references and work
development of the accomplishments reports.
 Provide Inspection Work Request for Installations.
 Compose Progress Billing.
 Organized Forms and Submittals.
 Monitor and Supervised Man power Loadings.
Work Experiences:
Electrical Engineer (P.I.C) Project in Charge
 Organized Man Power loading’s for its Individual Designated Task.
 Organized and conduct Tool Box meeting of the various Laymen’s in order to check.
 Ask for Submittal Reports from foreman and Lead man in order to check the Actual Accomplishments.
 Attend and cooperatethecoordinateweekly meeting in jobsitefor thepossible Updatesand Adjustment
in Site Constructions.
 Attend PTG/Video Connection meeting from the (FLI) Federal Land Inc.
 Conduct Orientation and Dry Run to implement the process of outward appearance.
 OrganizeLine Tradesof Route,to appropriatethe manual labor of Different Scope of Works in Electrical.
QA/QC Electrical Engineer
Quality Assurance/Quality Control Electrical Engineer.
(In Real Estate High Rise Commercial Building and Horizontal Projects in InnoLand Kontractors Inc.)
(I.K.I) INNOBUILD KONTRACTORS INCORPORATED.
August 15, 2013 – September 15, 2014
Duties and Responsibilities:
 Review Electrical design specifications & Technical Drawings
 Review the As-Built Plan and its specifications of Electrical General Notes.
 Review Electrical Systems Legends and Auxiliary from As-Built Plan.
 Review all the Electrical Details and its Components from As-Built Plan.
 Scrutinize and verify the exact location of Lightings, Power, Structured Cabling, Emergency & Exit Light,
White Noise, CCTV, Wire Way, FDAS Layout & Etc. from As-Built Plan before Implementation in
Construction.
 Verify & Scrutinize the Schedule of Loads and Single Line Diagram from As-built Plan.
 Review specifications and the Required Material to be implement during the construction specially the
standard size of Wires & Cables, Brand Material & the Color Coding.
 Always Refer to the Key Plan, Lay out Plan & Blow up Plan from As-built Plan to ensure & for reference
during construction.
 Conduct Orientation & Dry Run to implement the process of outward appearance.
 Organizewell and the Line Trades of Route,to appropriatethemanuallaborof Different Scope of Works
of Electrical.
 Conduct proper Inspection to generate Routine and to expedite the Installations.
 Review the Schedule to determine the progress of works and its percentage accomplishments.
 Composedocumentation reportof Quality Assurance& Quality Control for the consummate of Electrical
Works and for References.
 Review the Schedule of Loads if the ensues was implemented correctly.
 Review the (QA) Quality Assurance of Electrical Specifications for Major Materials to be executed.
QA/QC Electrical Engineer
 Attend coordination meeting in site construction along with other Trades to aware and update if there’s
no amendment.
 Conduct Inspection and Set-Outs to ensure installation of Electrical roughing-ins.
 Conduct (IPI) initial Phase Inspection Checklist & Report.
 Preparations of Electrical procedures for Installations Test & Commissioning.
 Manage and organize well the Turn-Over Checklist.
 Prepare Turnover Checklist in Lightings, Power, Fdas & Auxiliary in As Built Plan.
 Prepare and review redundantly the Single Line Diagram & its Schedule of Loads.
 Prepare Insulation Test Result.
 Prepare Functionality Testing Report (Electrical, Fdas and Auxiliary)
SalesEngineerin (RCGC) ManufacturerPlantfor WiresandCablesfromLow,Medium, HighVoltage, (OHL) Over
Head lines, Telephone Cables and Fiber Optics.
(RCGC) Riyadh Cables Group of Companies
2ndIndustrial Street Jaded Sania Riyadh City, Kingdom Of Saudi Arabia (K.S.A).
December 23, 2010 – December 23, 2012.
Duties and Responsibilities:
 Immediate Response of the Clients for their queries.
 Entertain customers/clients to discuss the various products of company.
 Negotiate and execute the projects of end users.
 Verify the Metal Exchange or (LME) London Metal Exchange before to generate quotations from the
Clients.
 Discuss and finalize quotations, specifications and Terms of Conditions to the clients.
 Provide Manufacturer Responsibility Statement.
 Organized and Arranged Schedule of (ITP) Inspection Test Plan.
 Provide Compliance Statement Manufacturer of the End Users for their Projects.
 Provide Sales Order Follow Up.
 Prepare and Arrange the Delivery Schedule for Shipment of their Ordered Materials.
 Scrutinize Daily E-mail Enquiries of the Clients.
 Make Immediate Response of the Clients for their Enquiries.
 If the conversation of both Parties will meet then I will allocate their Demands.
 Entertaining customers/clients to discuss the various products of company.
 Negotiating and execute the projects of end users.
 Familiarize the different size of Wire and Cables.
 Familiarize the Voltage rate of wires and cables especially High Voltage.
 Familiarize the Different kinds of Materials to be Used and Sheathed of Wires and Cables.
Sale’s Engineer
 Price Canvassing of Currency for the Metals to be used, (LME) or London Metal Exchange,
 Provide quotations of clients.
 Walk-in to their offices for the Demonstration Report of their Requested products.
 Discuss our Terms and Conditions.
 Organized and Arranged Schedule of (ITP) Inspection Test Plan. (If the End Users will request).
 Provide Compliance Statement Manufacturer of the End Users for their Projects.
 Provide Technical Data Specifications for their Ordered Materials.
 Provide Manufacturer Responsibility Statement.
 Provide Sales Order Follow Up.
 Review and Discuss the Payment Terms if L/C at Sight or Cash.
 Prepare and Arrange the Delivery Schedule for Shipment of their Ordered Materials.
Maintenance Engineer in Vertical and Horizontal Commercial Building Department Stores
Gaisano Capital South, Tai-Pan Development, INC.
Colon Corner Leon Kilat Streets, Cebu City Philippines 6000. Tel. Nos. 254-8888 to 95
December 06, 2008 – October 10, 2010
Duties and Responsibilities:
 Regularly Conduct Preventive Maintenance Schedule.
 Replace Damage Capacitors Bank, single Pole and 3 poles Breakers with 220 Volts – 440 Volts.
 Stabilize and Monitor the Power Factor Reading of Capacitors Bank.
 Trouble Shoots and Diagnose HVAC Units 80-100 Tons Compressors.
 Trouble shoots and determined the Connections of Converted Transformers, from 220V-440V Step up
And 440V-220V Step Down.
 Trouble shoots and installs Various Electrical connections for the AC and DC Motors.
 Conduct General Preventive Maintenance Schedule of Generator Sets, Oil type and Dry Type
Transformers.
 Conduct and Monitor the Over-All Total Current Loads from (MDP) Main Distributions Panel.
 ConductResponsibleRoutineof Engineering Works Regularly ConductPreventiveMaintenanceSchedule.
 Conduct Preventive Maintenance Schedule for Cooling Towers 300 tons.
 Trouble shoots and installs Wiring Connections of AC/DC Motors.
 Trouble Shoot various Phasing connections of Faulty Wirings.
 Trouble Shoot and replaced Smoldering Breakers from single Pole to 3 poles.
 Replaced Damage various types of CAPACITORS BANK.
 Stabilize and Monitor the Power Factor Reading of Capacitors Bank.
 Trouble Shoots and Diagnose HVAC Units 80-100 Tons Compressors.
 Trouble shoots defective 750 – 1000 KVA Generator Set Connections.
Maintenance Engineer
 Trouble Shoot Smoldering Three Phase Mounted Transformer with a Rating of 300KVA capacity.
 Trouble Shoot Damage Dry Type Transformers.
 Trouble Shoot and Determined the Over All Total Current Loads from Transformers.
 Conduct General Preventive Maintenance Schedule of Generator Sets.
 Conduct General Preventive Maintenance schedule Oil type and Dry Type Transformers.
 Conduct and Monitor the Over-All Total Current Loads from (MDP) Main Distributions Panel.
 ConductPreventiveMaintenanceScheduleof VariousTypesof (ACU’s) AirConditioning Unitsand (AHU’s)
Air Handling Units.
Maintenance Engineer in (UC) University of Cebu
UC Main Campus Sanciangko Street Cebu City, Philippines 6000)
November 2007 - February 2008.
Duties and Responsibilities:
 Regularly Conduct Preventive Maintenance Schedule.
 Troubles Shoot Faulty Wirings.
 Trouble Shoot various Phasing connections of Faulty Wirings.
 Trouble Shoot and replaced Smoldering Breakers from single Pole to 3 poles w/ 220 Volts – 440 Volts.
 Replaced Damage single Pole and 3 poles Breakers with 220 Volts – 440 Volts.
 Install various Building wirings.
 Troubleshoot and Install AC/DC Motors.
 Trouble Shoots Generators from 750KVA – 1000KVA.
 Trouble shoots ACU’s window and split type.
 Replaced Various Busted Lights.
 Diagnose Air Conditioning Unit Split and Window Type from 1 tons – 3 tons.
 Monitor the Main total current loads.
 Conduct Responsible Routine of Engineering Works.
Reasons for Leaving:
Successfully Completed the360 Hours,On the Job Training (OJT).
Maintenance Engineer (OJT)
1085 Juana Osmeña Extension
Capitol Site, Cebu City 6000 Philippines.
TO THE MANAGER :
Dear Sir / Madam :
I am DALE C. BANQUIRIGO, a product of UNIVERSITY OF CEBU with a degree of BACHELOR OF
SCIENCE IN ELECTRICAL ENGINEERING. I have heard that your company is currently hiring and
accepting applicants. If I will be given a chance to work in your prestigious company, I am willing to
offer my very best in the job. I'm hardworking, flexible, and honest person. I'm willing to work any job
as to be assigned in me within my capacity. Herewith my complete RESUME for further references
about my personal data.
I could appreciate very much if I will be given an opportunity to come to your office for an
interview. I am available any time in your most convenient part. You can reach me at my Mobile and
Landline number +63-932-2077-869 or + (032) 505 -0604.
Respectfully Yours,
Dale C. Banquirigo

More Related Content

What's hot

Senior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDINSenior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDINHossam Fattah
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultantdilish pareed
 
Jaime_Navarro_Resume
Jaime_Navarro_ResumeJaime_Navarro_Resume
Jaime_Navarro_ResumeJaime Navarro
 
CV of Electrical Engineer - Projects with 7+ years experience in Project mana...
CV of Electrical Engineer - Projects with 7+ years experience in Project mana...CV of Electrical Engineer - Projects with 7+ years experience in Project mana...
CV of Electrical Engineer - Projects with 7+ years experience in Project mana...sudhakar k
 
Mohd ghazi credentials
Mohd ghazi credentialsMohd ghazi credentials
Mohd ghazi credentialsMohd Ghazi
 
Dale Crowe Resume 2016
Dale Crowe Resume 2016Dale Crowe Resume 2016
Dale Crowe Resume 2016Dale Crowe
 
Arun das latest resume
Arun das latest resume Arun das latest resume
Arun das latest resume Arun Das
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpSubhash +966535838322
 
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATRommel Siasat
 
Simon Britton CV linkedin
Simon Britton CV linkedinSimon Britton CV linkedin
Simon Britton CV linkedinSimon Britton
 

What's hot (15)

Senior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDINSenior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
 
Jaime_Navarro_Resume
Jaime_Navarro_ResumeJaime_Navarro_Resume
Jaime_Navarro_Resume
 
CV of Electrical Engineer - Projects with 7+ years experience in Project mana...
CV of Electrical Engineer - Projects with 7+ years experience in Project mana...CV of Electrical Engineer - Projects with 7+ years experience in Project mana...
CV of Electrical Engineer - Projects with 7+ years experience in Project mana...
 
Mohd ghazi credentials
Mohd ghazi credentialsMohd ghazi credentials
Mohd ghazi credentials
 
CV
CVCV
CV
 
Dale Crowe Resume 2016
Dale Crowe Resume 2016Dale Crowe Resume 2016
Dale Crowe Resume 2016
 
Arun das latest resume
Arun das latest resume Arun das latest resume
Arun das latest resume
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CV
 
tufail CV dxb
tufail CV dxbtufail CV dxb
tufail CV dxb
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years Exp
 
THOWFIC AHAMED CV
THOWFIC AHAMED CVTHOWFIC AHAMED CV
THOWFIC AHAMED CV
 
HASSAN CV
HASSAN CVHASSAN CV
HASSAN CV
 
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
 
Simon Britton CV linkedin
Simon Britton CV linkedinSimon Britton CV linkedin
Simon Britton CV linkedin
 

Viewers also liked

Viewers also liked (12)

DaleBanquirigo.UpdatedCV.061516
DaleBanquirigo.UpdatedCV.061516DaleBanquirigo.UpdatedCV.061516
DaleBanquirigo.UpdatedCV.061516
 
DaleBanquirigo.UpdatedCV.061516
DaleBanquirigo.UpdatedCV.061516DaleBanquirigo.UpdatedCV.061516
DaleBanquirigo.UpdatedCV.061516
 
DaleBanquirigo.UpdatedCV.061516
DaleBanquirigo.UpdatedCV.061516DaleBanquirigo.UpdatedCV.061516
DaleBanquirigo.UpdatedCV.061516
 
Resume' Virgilio Beeyong Sison
Resume' Virgilio Beeyong SisonResume' Virgilio Beeyong Sison
Resume' Virgilio Beeyong Sison
 
MVG NEW CV
MVG NEW CVMVG NEW CV
MVG NEW CV
 
Zandrix Reyes CV
Zandrix Reyes CVZandrix Reyes CV
Zandrix Reyes CV
 
Ppt jadi
Ppt jadiPpt jadi
Ppt jadi
 
CV AGAPITO
CV AGAPITOCV AGAPITO
CV AGAPITO
 
Wallace corp 230214
Wallace corp 230214Wallace corp 230214
Wallace corp 230214
 
The UX mindset
The UX mindsetThe UX mindset
The UX mindset
 
Menulis pengumuman
Menulis pengumuman Menulis pengumuman
Menulis pengumuman
 
Presentation Scientix
Presentation Scientix Presentation Scientix
Presentation Scientix
 

Similar to DaleBanquirigo.UpdatedCV.061516

Similar to DaleBanquirigo.UpdatedCV.061516 (20)

ilyas_MEP new
ilyas_MEP newilyas_MEP new
ilyas_MEP new
 
Hassan mohamed resume 2016 aug (1)
Hassan mohamed resume 2016 aug (1)Hassan mohamed resume 2016 aug (1)
Hassan mohamed resume 2016 aug (1)
 
F. CV
F. CVF. CV
F. CV
 
Resume
ResumeResume
Resume
 
nestor
nestornestor
nestor
 
Dubai cv
Dubai cvDubai cv
Dubai cv
 
NARESH 3+
NARESH 3+NARESH 3+
NARESH 3+
 
CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer)
 
nabi
nabinabi
nabi
 
Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Electrical Cv2
Naveed Electrical Cv2
 
CV Electrical Engineer - Emad Ahmed Mohamed Sabek
CV Electrical Engineer - Emad  Ahmed Mohamed SabekCV Electrical Engineer - Emad  Ahmed Mohamed Sabek
CV Electrical Engineer - Emad Ahmed Mohamed Sabek
 
Engr iqbal resume ,
Engr  iqbal  resume ,Engr  iqbal  resume ,
Engr iqbal resume ,
 
Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016
 
Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016
 
Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016
 
1. Usman Ali CV Project Engineer Electrical.pdf
1. Usman Ali CV Project Engineer Electrical.pdf1. Usman Ali CV Project Engineer Electrical.pdf
1. Usman Ali CV Project Engineer Electrical.pdf
 
Jitendra_B_Chaudhari BE (MEP)
Jitendra_B_Chaudhari BE (MEP)Jitendra_B_Chaudhari BE (MEP)
Jitendra_B_Chaudhari BE (MEP)
 
mubashir Electrical engineer
mubashir Electrical engineermubashir Electrical engineer
mubashir Electrical engineer
 
ilyas-MEP CV
ilyas-MEP CVilyas-MEP CV
ilyas-MEP CV
 
Navaneeth New CV
Navaneeth New CVNavaneeth New CV
Navaneeth New CV
 

DaleBanquirigo.UpdatedCV.061516

  • 1.  Electrical Engineer  Bachelor of Science in Electrical Engineer (UC) Universityof Cebu SanciangkoStreetCebuCityPhilippines6000  Dale C. Banquirigo  Address : 1085 Juana OsmeñaExtensionCebuCity, Philippines6000.  Mobile No. : +639322077869 or + (032) 505 - 0604  E-mail address : dalebanquirigo@rocketmail.com  Degree : Holderfor(BSEE) Bachelorof Science in Electrical Engineer. 5 years of experience asElectrical Engineer.  Proficient : in usingAutoCAD,MicrosoftOffice,MSWord, M Excel andPowerPoint. : Can InterpretConstructionPlaninArchitectural,Structural,PlumbingandElectrical. : Estimate Electrical Design. : Prepare proposal quotationtoattend invitation contestforBiddingfromthe clients. : Constantresponsiblethe average MasterScheduleinconstruction toavoidmislaidthe developmentof works. : Reviewandscrutinize Electrical computationSchedule of Loadsand Single Riser Diagram. : Can InterpretSingle Line Diagramof Electrical Design. : Determine the average Electrical mountingheightmeasurementsof Powerand AuxiliaryLayouts. : Must constantlyresponsible intermsof Time Managementinordertoavoidthe delay and itsprioritization of Electrical Scope of Works. : RiskAssessmentsandManagement. : Process and Performance Improvements. : Work effectively inateamOriented,Collaborative Environment. : Researchand Development. : Extremely checkthe productionof works : Must have QualityControl andQualityAssurance. : Manage and DeterminedElectrical DifficultytoTrouble shoots. : Strong DecisionsMakingandTime ManagementSkills : Excellentcustomerandcommunicationskills. Proposed Position: Name & Contact: Key Qualifications:
  • 2. Address : 1085 Juana OsmeñaExtensionCapitol SiteCebuCity, Philippines 6000. Telephone Number : +63932-2077-869 or (032) 505 - 0604 Date of Birth : November 02, 1982 Place of Birth : Cebu City Civil Status : Single Sex : Male Nationality : Filipino Height : 5'8 inch Weight : 179.2 lbs. Religion : Roman Catholic College : University of Cebu (UC) Bachelor of Science in Electrical Engineer (BSEE) Sanciangko Street Cebu City, Philippines 6000. Batch (March 2007 – 2008). Secondary : (UC) University Of Cebu Sanciangko Street Cebu City, Philippines 6000. Batch (March 1999 – 2000). Primary : Camputhaw Elementary School. Camputhaw Cebu. Cebu City, Philippines 6000. Batch (March 1994 – 1995). Personal Information: Educational Attainment
  • 3. In Marco Polo Tower 3 Projects (Real State High Rise Residential Units Building Projects) (UMSSI) Universal Macro - technology System and Services Inc. Design Estimate Electrical Mechanical Civil Plumbing EMS Preparer/Auditor Project Management Property Development November 11, 2014 – April 16, 2015 Duties and Responsibilities:  Review & Interpret Electrical Layout and its Design.  Estimates Electrical Materials must to be used.  Flat the Breakdown of Estimated Materials (BOM) Bill of Materials and (BOQ) Bill of Quantity.  Attend invitationalbidding fromthevalued clients, In orderto Contest the final Breakdown of estimated materials and its general quotation price.  Review Electrical Layout Plan “For Construction”. If the invitational bidding was fortunate awarded in our prominent company.  Review and binary check the general quotation price of electrical materials “for Bidding” and “for Construction” if there is no deficit or any possible additional materials.  Review and refresh estimated Electrical LayoutPlan “For Construction”If there is significant Information request must to amend from the Electrical designer.  Review Electrical LayoutPlan “For Construction”forreferences and guide before to engage in operation at site.  Review and scrutinize Electrical computation Schedule of Loads and the Single Riser Diagram “for construction Blue Print”. If the general computation of electrical loads was in particular.  Determine and appraise the Project Management Schedule or Master Construction Tracker Schedule for guide and reference to avoid mislaid the development of works.  Be liable and mustseriousas (P.I.C) ProjectinCharge to put in orderthe required process for submission of Weekly, Daily and Monthly report accomplishments.  Constantly review Electrical Layoutsand theothertradesin construction.If there areno possibleconflicts in terms in differentindividualscopeof worksand mustcooperateduring operation to avoid inaccuracy.  Constantly updateinquiresto theElectrical Designer, if there arepossible instruction mustto amend and inaccuracy.  Constantly provide Request Approval to the Electrical Designer for Brand materials and specifications must to utilize, before to proceed.  Must responsible in advance to consolidate “Electrical As-built Plan” for references and work development of the accomplishments reports.  Provide Inspection Work Request for Installations.  Compose Progress Billing.  Organized Forms and Submittals.  Monitor and Supervised Man power Loadings. Work Experiences: Electrical Engineer (P.I.C) Project in Charge
  • 4.  Organized Man Power loading’s for its Individual Designated Task.  Organized and conduct Tool Box meeting of the various Laymen’s in order to check.  Ask for Submittal Reports from foreman and Lead man in order to check the Actual Accomplishments.  Attend and cooperatethecoordinateweekly meeting in jobsitefor thepossible Updatesand Adjustment in Site Constructions.  Attend PTG/Video Connection meeting from the (FLI) Federal Land Inc.  Conduct Orientation and Dry Run to implement the process of outward appearance.  OrganizeLine Tradesof Route,to appropriatethe manual labor of Different Scope of Works in Electrical. QA/QC Electrical Engineer Quality Assurance/Quality Control Electrical Engineer. (In Real Estate High Rise Commercial Building and Horizontal Projects in InnoLand Kontractors Inc.) (I.K.I) INNOBUILD KONTRACTORS INCORPORATED. August 15, 2013 – September 15, 2014 Duties and Responsibilities:  Review Electrical design specifications & Technical Drawings  Review the As-Built Plan and its specifications of Electrical General Notes.  Review Electrical Systems Legends and Auxiliary from As-Built Plan.  Review all the Electrical Details and its Components from As-Built Plan.  Scrutinize and verify the exact location of Lightings, Power, Structured Cabling, Emergency & Exit Light, White Noise, CCTV, Wire Way, FDAS Layout & Etc. from As-Built Plan before Implementation in Construction.  Verify & Scrutinize the Schedule of Loads and Single Line Diagram from As-built Plan.  Review specifications and the Required Material to be implement during the construction specially the standard size of Wires & Cables, Brand Material & the Color Coding.  Always Refer to the Key Plan, Lay out Plan & Blow up Plan from As-built Plan to ensure & for reference during construction.  Conduct Orientation & Dry Run to implement the process of outward appearance.  Organizewell and the Line Trades of Route,to appropriatethemanuallaborof Different Scope of Works of Electrical.  Conduct proper Inspection to generate Routine and to expedite the Installations.  Review the Schedule to determine the progress of works and its percentage accomplishments.  Composedocumentation reportof Quality Assurance& Quality Control for the consummate of Electrical Works and for References.  Review the Schedule of Loads if the ensues was implemented correctly.  Review the (QA) Quality Assurance of Electrical Specifications for Major Materials to be executed. QA/QC Electrical Engineer
  • 5.  Attend coordination meeting in site construction along with other Trades to aware and update if there’s no amendment.  Conduct Inspection and Set-Outs to ensure installation of Electrical roughing-ins.  Conduct (IPI) initial Phase Inspection Checklist & Report.  Preparations of Electrical procedures for Installations Test & Commissioning.  Manage and organize well the Turn-Over Checklist.  Prepare Turnover Checklist in Lightings, Power, Fdas & Auxiliary in As Built Plan.  Prepare and review redundantly the Single Line Diagram & its Schedule of Loads.  Prepare Insulation Test Result.  Prepare Functionality Testing Report (Electrical, Fdas and Auxiliary) SalesEngineerin (RCGC) ManufacturerPlantfor WiresandCablesfromLow,Medium, HighVoltage, (OHL) Over Head lines, Telephone Cables and Fiber Optics. (RCGC) Riyadh Cables Group of Companies 2ndIndustrial Street Jaded Sania Riyadh City, Kingdom Of Saudi Arabia (K.S.A). December 23, 2010 – December 23, 2012. Duties and Responsibilities:  Immediate Response of the Clients for their queries.  Entertain customers/clients to discuss the various products of company.  Negotiate and execute the projects of end users.  Verify the Metal Exchange or (LME) London Metal Exchange before to generate quotations from the Clients.  Discuss and finalize quotations, specifications and Terms of Conditions to the clients.  Provide Manufacturer Responsibility Statement.  Organized and Arranged Schedule of (ITP) Inspection Test Plan.  Provide Compliance Statement Manufacturer of the End Users for their Projects.  Provide Sales Order Follow Up.  Prepare and Arrange the Delivery Schedule for Shipment of their Ordered Materials.  Scrutinize Daily E-mail Enquiries of the Clients.  Make Immediate Response of the Clients for their Enquiries.  If the conversation of both Parties will meet then I will allocate their Demands.  Entertaining customers/clients to discuss the various products of company.  Negotiating and execute the projects of end users.  Familiarize the different size of Wire and Cables.  Familiarize the Voltage rate of wires and cables especially High Voltage.  Familiarize the Different kinds of Materials to be Used and Sheathed of Wires and Cables. Sale’s Engineer
  • 6.  Price Canvassing of Currency for the Metals to be used, (LME) or London Metal Exchange,  Provide quotations of clients.  Walk-in to their offices for the Demonstration Report of their Requested products.  Discuss our Terms and Conditions.  Organized and Arranged Schedule of (ITP) Inspection Test Plan. (If the End Users will request).  Provide Compliance Statement Manufacturer of the End Users for their Projects.  Provide Technical Data Specifications for their Ordered Materials.  Provide Manufacturer Responsibility Statement.  Provide Sales Order Follow Up.  Review and Discuss the Payment Terms if L/C at Sight or Cash.  Prepare and Arrange the Delivery Schedule for Shipment of their Ordered Materials. Maintenance Engineer in Vertical and Horizontal Commercial Building Department Stores Gaisano Capital South, Tai-Pan Development, INC. Colon Corner Leon Kilat Streets, Cebu City Philippines 6000. Tel. Nos. 254-8888 to 95 December 06, 2008 – October 10, 2010 Duties and Responsibilities:  Regularly Conduct Preventive Maintenance Schedule.  Replace Damage Capacitors Bank, single Pole and 3 poles Breakers with 220 Volts – 440 Volts.  Stabilize and Monitor the Power Factor Reading of Capacitors Bank.  Trouble Shoots and Diagnose HVAC Units 80-100 Tons Compressors.  Trouble shoots and determined the Connections of Converted Transformers, from 220V-440V Step up And 440V-220V Step Down.  Trouble shoots and installs Various Electrical connections for the AC and DC Motors.  Conduct General Preventive Maintenance Schedule of Generator Sets, Oil type and Dry Type Transformers.  Conduct and Monitor the Over-All Total Current Loads from (MDP) Main Distributions Panel.  ConductResponsibleRoutineof Engineering Works Regularly ConductPreventiveMaintenanceSchedule.  Conduct Preventive Maintenance Schedule for Cooling Towers 300 tons.  Trouble shoots and installs Wiring Connections of AC/DC Motors.  Trouble Shoot various Phasing connections of Faulty Wirings.  Trouble Shoot and replaced Smoldering Breakers from single Pole to 3 poles.  Replaced Damage various types of CAPACITORS BANK.  Stabilize and Monitor the Power Factor Reading of Capacitors Bank.  Trouble Shoots and Diagnose HVAC Units 80-100 Tons Compressors.  Trouble shoots defective 750 – 1000 KVA Generator Set Connections. Maintenance Engineer
  • 7.  Trouble Shoot Smoldering Three Phase Mounted Transformer with a Rating of 300KVA capacity.  Trouble Shoot Damage Dry Type Transformers.  Trouble Shoot and Determined the Over All Total Current Loads from Transformers.  Conduct General Preventive Maintenance Schedule of Generator Sets.  Conduct General Preventive Maintenance schedule Oil type and Dry Type Transformers.  Conduct and Monitor the Over-All Total Current Loads from (MDP) Main Distributions Panel.  ConductPreventiveMaintenanceScheduleof VariousTypesof (ACU’s) AirConditioning Unitsand (AHU’s) Air Handling Units. Maintenance Engineer in (UC) University of Cebu UC Main Campus Sanciangko Street Cebu City, Philippines 6000) November 2007 - February 2008. Duties and Responsibilities:  Regularly Conduct Preventive Maintenance Schedule.  Troubles Shoot Faulty Wirings.  Trouble Shoot various Phasing connections of Faulty Wirings.  Trouble Shoot and replaced Smoldering Breakers from single Pole to 3 poles w/ 220 Volts – 440 Volts.  Replaced Damage single Pole and 3 poles Breakers with 220 Volts – 440 Volts.  Install various Building wirings.  Troubleshoot and Install AC/DC Motors.  Trouble Shoots Generators from 750KVA – 1000KVA.  Trouble shoots ACU’s window and split type.  Replaced Various Busted Lights.  Diagnose Air Conditioning Unit Split and Window Type from 1 tons – 3 tons.  Monitor the Main total current loads.  Conduct Responsible Routine of Engineering Works. Reasons for Leaving: Successfully Completed the360 Hours,On the Job Training (OJT). Maintenance Engineer (OJT)
  • 8. 1085 Juana Osmeña Extension Capitol Site, Cebu City 6000 Philippines. TO THE MANAGER : Dear Sir / Madam : I am DALE C. BANQUIRIGO, a product of UNIVERSITY OF CEBU with a degree of BACHELOR OF SCIENCE IN ELECTRICAL ENGINEERING. I have heard that your company is currently hiring and accepting applicants. If I will be given a chance to work in your prestigious company, I am willing to offer my very best in the job. I'm hardworking, flexible, and honest person. I'm willing to work any job as to be assigned in me within my capacity. Herewith my complete RESUME for further references about my personal data. I could appreciate very much if I will be given an opportunity to come to your office for an interview. I am available any time in your most convenient part. You can reach me at my Mobile and Landline number +63-932-2077-869 or + (032) 505 -0604. Respectfully Yours, Dale C. Banquirigo