PPP Nodal Officers’ Workshop
        March 23, 2009

          Presentation by


         PPP CELL
      Andhra Pradesh
             Venue:
        The Taj Mahal Hotel
            New Delhi


                               1
CONTENTS

 PPP Policy

 Capacity Improvement

 Development of PPP Guidelines Manual

 Pipeline Development

 Management Systems

 Project Lists

 Case Studies

 Other Initiatives and Ideas


                                         2
PPP POLICY
 Draft PPP Policy is under discussion
    Draft PPP Policy is prepared taking inputs from PPP
     Policy of other states
    Draft PPP Policy is going to be discussed in a PPP Policy
     workshop going to be held in April 2009
    ISB Hyderabad is conducting the workshop with senior
     government officials, Developers and PPP experts
    The final copy of the PPP Policy is expected to be ready by
     May 2009
 Formation of PPP Cell as a Society
    Draft Memorandum of Association (MOA) and draft Rules
     / Bylaws for formation of PPP Cell as a society is
     prepared
    The draft copy is under discussion
                                                                   3
Capacity Improvement

 Workshop with the assistance of Administrative Staff College
  of India (ASCI)
    The workshop was conducted in July 2008 for the PPP Nodal
      Officers of the State Administrative Departments
    The topics broadly covered are Rationale for PPP, Financing
      Techniques, Legal Aspects and Case studies

 Workshop with Transaction Advisors
   IL&FS and SBI Caps made a presentation about the various
    types of PPP projects handled by them
   Case studies were discussed



                                                                   4
Capacity Improvement contd..2
 Workshop with the assistance of Indian School of Business
  (ISB)
    Planning to have a capacity building workshop for the
     Administrative Secretaries in May 2009
 PPP Monthly News
    It capture the Infrastructure Developments in the form a
     Monthly News Letter
    It captures the News Items, Expression of Interests advertised
     for selection of the Consultants and Developers by various
     governments
    The monthly news letter is circulated to the Administrative
     Secretaries, Heads of Departments and the Nodal Officers of
     the various Administrative Departments

                                                                      5
Capacity Improvement contd..3

Assistance of PPP Cell was sought on the following PPP
Projects
 Major Bridge on River Godavari on PPP
 Mass Rapid Transit System (MRTS)
 Krishnapatnam Port
 Nellore – Gooty Road Project
 Public Library at Vizag
 IT based rural initiatives in Kadapa
 Up gradation of Five Roads at Pulivendula
 Setting up of Distilleries at Vishakhapatnam
 Setting up of Working Women's Hostel, Nursing Schools


                                                          6
PPP Guidelines Manual
 PPP Guidelines Manual contains..
      AP Infrastructure Development Enabling Act 2001
      V G F Guidelines
      IIPDF Guidelines
      Guidelines for usage of Transaction Advisors
      PPPs: Creating an enabling environment for state projects
      Model Request for Qualification
      Model Request for Proposal
      Summary of the list of PPP projects undertaken in AP
      The copy of the manual is distributed to the PPP Nodal
       Officers of the State Administrative Departments


                                                                   7
Pipeline Development

 Urban Infrastructure like Foot Over bridge, Pay use Toilets,
  Parks: Its being developed on PPP. DEA has given in principal
  approval for under taking the project under IIPDF Scheme

 Gandhi Hospital: Initial study is conducted to find out what
  areas can be taken up under PPP. KPMG had a initial discussion
  in this regard

 Education Department: Establishment of rural residential
  schools on PPP. Presentations were made to the Prl Secretary in
  this regard by IFC



                                                                    8
Pipeline Development Contd..2

 Commissioner of Sugars: Setting up of Distillery units on PPP
  mode at various places in AP.

 Transportation Department: Setting up of Vehicle Testing
  Centers, Driving Testing Centers and Automated Weighbridges on
  PPP mode

 INCAP: Development of Growth Corridor from Vizag to
  Kakinada. Development of Faster Rail Link between Begumpet
  and Shamshabad Airport




                                                                   9
PPP Website of AP (www.ppp.ap.gov.in)
 Development of PPP Website with the assistance of A P
  Technology Services Ltd (APTS): Comprehensive website has been
  developed to serve as the repository of all the information relating to PPP’s in
  the State for the purpose of information sharing and information dissemination.

  Major Content Coverage:
   Reference Documents (for Information sharing)
      Important Circulars, Orders, Guide lines, PPP best practices etc.
      Case Studies, MCA’s, DPRs, RFP’s, PPP related EOI’s, Tenders etc.
      Important news, media coverage pertaining to projects
      Details of PPP related important events
      Details of Departmental Nodal Officers, Consulting agencies,
       Developers
   PPP Project details and Up coming Projects
   Message Centre (close user group)
   Glossary, FAQs etc.
      Official launch of this website is expected shortly
                                                                                     10
PPP-MIS Application
 Development of MIS Application with the assistance of Center
  for Good Governance (CGG): A web-enabled integrated system is
  proposed to be developed to facilitate proper record keeping and on line
  monitoring of the overall progress / status of all PPP projects of the state .

   The system is designed to capture the following details:
   Project Details
   General Information pertaining to project including the Project Benefits
   Project Timeline and Bidding Information
   Project costing/share etc. and Details of Funding Agencies and pattern
   Major Milestone during construction and operation period
   Major Risk factors
   Project accomplishment details
   Details of Project related approvals, orders, Relevant documents, Photos etc.
   Details of Issues/problems or suggestions
   Actual execution details pertaining to each stage of Project Planning
                                                                                    11
PPP-MIS Application Contd…

  Current Status

 Comprehensive MIS Design Document completed (Covering all
  the phases of Project Life Cycle)

 Obtained commercial proposal for development and
  implementation of MIS from Center for Good Governance (CGG)

 Administrative approval on the proposal is being sought




                                                                12
PPP Project Lists
     Sector      Number (and Value) of PPP Projects in various stages           Total



              Identified   Detailed   RFP     Bidding    Construction/   Nos.    App.Cost
                           Project                      Implementation           (Rs. Cr.)
                           Report
Road             11           6         1        3             37        58             12624

Railways          -           -         -         -            1          1             12000

Ports             1           -         -         -            3          4             14200

Airports          2           -         -         -            1          3              2978

Tourism           1           1        10        1             35        48              1386

IT                -           -         -         -            4          4                77

Others            -           -         -        1             14        15              2021

Total            15           7        11        5             94        132            43537




                                                                                                13
Major PPP Projects in the State

Major Bridge across River Godavari (Rs 593 crs)

Krishnapatnam Port (Rs 10400 crs)

Mass Rapid Transit System (MRTS) (Rs 12000 crs)

Hyderabad Outer Ring Road (Rs 3000 crs)

Hyderabad International Airport (Rs 1760 crs)

Mind Space Project

Convention Centre & Integrated Township

Hyderabad Integrated Trade and Exposition Center
                                                    14
Major Bridge Across River Godavari
Its near Rajahmundry
Its on BOT with VGF from GOI
In principal approval is given, waiting
 for final approval
Project Cost is Rs 593 crores
It’s a toll bridge
Developer is Ms Gammon India Ltd
Independent Engineer is Ms Scott Wilson
Concession agreement is signed in Oct 2008
Project expected to be completed in 3 years

                                               15
Krishnapatnam Port




                     16
Krishnapatnam Port Contd..

Developer is M/s Krishnapatnam Port Company Limited.
Project cost of Phase – I Rs 1400 crs
Project cost of Phase – II Rs 4000 crs
Estimated cost of Phase – III Rs 5000 crs
Built Operate Share and Transfer basis (BOST)
Contract period is 30 years with further extention of 20 yrs
Lease Rentals is 2% of the fair market value with yrly escalation
Concession fee is 2.6% of the Gross Income for 30 yrs
Government has provided four lane approach road to the Port,
  Power Supply, R&R. The total cost is Rs 159 crs

                                                                     17
Mass Rapid Transit System (MRTS) - Hyderabad




                                           18
Mass Rapid Transit System (MRTS) - Hyderabad
 Length of the corridor is 69 Kms with elevated structure

 Project Cost Rs 12000 crs approx.

 PHPDT is 40000 passengers approx with 3 min headway

 Passengers expected to travel by 2011 is 1.6 mil per day and by
  2021 is 2.3 million per day

 Travel time from Miyapur to LB Nagar is 43 min covering a
  distance of 26 km against Bus Peak hour time of 1 hr 44 min

Concession period is 35 years with a construction period of 5 yrs
                                                                     19
Outer Ring Road - Hyderabad

SPV is incorporated as “Hyderabad Growth Corridor Limited”

Total Length – 158 Kms

Estimated cost – Rs 3000 crs

Part of the project which is of 62.3 km is on PPP Annuity basis

Provides orbital linkage to radial arterial roads

Creates options for development of the further satellite townships

Provides linkage to the proposed MRTS and Bus System


                                                                      20
Rajeev Gandhi International Airport




                                      21
Rajeev Gandhi International Airport Contd…




                                         22
Rajeev Gandhi International Airport Contd…
Total Project Cost is Rs 2478 crs
Project area is about 5495 acres
Project Partners: GMR Group (63%), MAHB (11%), Govt of
 India (13%), Govt of Andhra Pradesh: 13%
BOOT Format – Build Own Operate Transfer
Concession period is 30 yrs
Concession fee is 4% of Gross Revenue Annually
Commenced operation from Mar 2008
42 aircraft parking stands - 12 boarding bridges
Modular Cargo Terminal initial capacity - 100,000 MT/year
146 Check-in counters including 16 self check-in kiosks
Modern Air Traffic Control tower 75m high


                                                             23
Rajeev Gandhi International Airport Contd…


              Phased Development

Airport is to be developed in phases based on the air
 traffic forecast.
     Design Capacity (mppa) Construction-Start/Finish
Phase 1          12          March 2008
Phase 2          20          As per traffic trigger
Phase 3 & 4      40          As per traffic trigger



                                                        24
Mind Space Project
A  Special Project for IT & IT enabled services
Project area 110 acres at Madhapur

APIIC Ltd & K.Raheja Corpn. P Ltd have jointly

  promoted the project
Total investment is around Rs.600 crs with

  employment generation of about 30000 persons
Equity Partners: Govt of AP-11%, Private partner

 89%. The revenue to AP Govt on dividend declared
 on equity
Built up space of 5 million sft completed

Secured approval for IT/ITES SEZ



                                                    25
Convention Centre & Integrated Township
An integrated township, 18 – hole international golf
 course, a convention centre with 6000 seating capacity
 and a business hotel
 APIIC Ltd and EMAAR Properties, Dubai jointly
  promoted the project with 3 SPVs with equity of 26%
  and 74% respectively
Hyderabad International Convention Centre was built
 on an extent of 15 acres.
The Golf Course is developed on an extent of 235 acres.
The assets of Convention Centre and Golf Course will
  revert back to Govt. of A P after 66 years of lease
  without any encumbrances.
Besides equity, APIIC Ltd shall receive 2 and 3% Gross
 Annual Revenue as lease rentals from both assets
                                                           26
Roads and Bridges

 There are 58 Road projects in the state at
  various stages of development apart from
  Outer Ring Road
The total project cost is Rs 12624 crs
The projects are taken under BOT / Annuity
  mode
Out of 58 road projects 18 are under
  implementation stage




                                               27
Tourism Projects
There are 48 tourism projects on PPP
 mode
The total project cost is Rs 1386 crs     Beach Resort at Rishikonda, Vizag
Status of the projects
   Implementation Stage - 21 Projects
   Various stages of bidding Stage - 27
Major Tourism Projects:
   IMAX Theatre at Hyderabad
   Beach Resort at Rishikonda, Vizag
   Snow World at Hyderabad
   Food Courts at Lower Tank Bund,
    Hyderabad


                                                                               28
Other Initiatives and Ideas

 Infrastructure Vision Document 2030: The document brings out
  Infrastructure Requirements, Infrastructure Gaps, Resources
  required and how to take it forward

 Setting up of a State Project Development Fund (PDF): This
  assistance will encourage more and more departments to take up
  Infrastructure Projects on PPP

 Setting up of a State Viability Gap Funding Scheme (VGF):
  This fund will help in attracting developers toward projects which
  are economically viable but not financially

 Empanelling Transaction Advisors for the State who have
  local presence

                                                                       29
30

More Related Content

What's hot

DFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_KoiDFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_KoiShobhit Acharya
 
VaDOT
VaDOTVaDOT
VaDOTcgla
 
MBPJ_GKLKV_Nov2013_SPAD_Part1
MBPJ_GKLKV_Nov2013_SPAD_Part1MBPJ_GKLKV_Nov2013_SPAD_Part1
MBPJ_GKLKV_Nov2013_SPAD_Part1Norma Nun
 
ME Roads & Railway Projects & Consortiums, Feb., 2011 Loay Ghazaleh
ME Roads & Railway Projects & Consortiums, Feb., 2011   Loay GhazalehME Roads & Railway Projects & Consortiums, Feb., 2011   Loay Ghazaleh
ME Roads & Railway Projects & Consortiums, Feb., 2011 Loay GhazalehLoay Ghazaleh MBA, BSc Civil Eng.
 
Wapda intership report by Manzar
Wapda intership report by ManzarWapda intership report by Manzar
Wapda intership report by ManzarManzar12
 
Public Private Partnerships (P3) - Kome Ajese AGC 01.2011 Presentation
Public Private Partnerships (P3) - Kome Ajese AGC 01.2011 PresentationPublic Private Partnerships (P3) - Kome Ajese AGC 01.2011 Presentation
Public Private Partnerships (P3) - Kome Ajese AGC 01.2011 PresentationAGC of California
 
List of various_IRCs_&_sps
List of various_IRCs_&_spsList of various_IRCs_&_sps
List of various_IRCs_&_spsPralhad Kore
 
Dfccil(dedicated freight corridor)
Dfccil(dedicated freight corridor)Dfccil(dedicated freight corridor)
Dfccil(dedicated freight corridor)Gurparvesh kaur
 
Jeddah metro full presentation - Briefing Day March, 30th
Jeddah metro full presentation - Briefing Day March, 30th Jeddah metro full presentation - Briefing Day March, 30th
Jeddah metro full presentation - Briefing Day March, 30th Ibrahim Al-Hudhaif
 
Ahmedabad Metro Project
Ahmedabad Metro ProjectAhmedabad Metro Project
Ahmedabad Metro ProjectASHISH SINGH
 
CIMB_Construction&Infrastructure_2016_SPAD
CIMB_Construction&Infrastructure_2016_SPADCIMB_Construction&Infrastructure_2016_SPAD
CIMB_Construction&Infrastructure_2016_SPADNorma Nun
 
Indian port growth story satya pal 04.02.2011
Indian port growth story satya pal 04.02.2011Indian port growth story satya pal 04.02.2011
Indian port growth story satya pal 04.02.2011Sat Ya
 
Traffic report final 20 3-12
Traffic report final 20 3-12Traffic report final 20 3-12
Traffic report final 20 3-12giap0083
 
M9 final report 07.07.12
M9 final report 07.07.12M9 final report 07.07.12
M9 final report 07.07.12giap0083
 

What's hot (17)

DFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_KoiDFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
 
VaDOT
VaDOTVaDOT
VaDOT
 
MBPJ_GKLKV_Nov2013_SPAD_Part1
MBPJ_GKLKV_Nov2013_SPAD_Part1MBPJ_GKLKV_Nov2013_SPAD_Part1
MBPJ_GKLKV_Nov2013_SPAD_Part1
 
ME Roads & Railway Projects & Consortiums, Feb., 2011 Loay Ghazaleh
ME Roads & Railway Projects & Consortiums, Feb., 2011   Loay GhazalehME Roads & Railway Projects & Consortiums, Feb., 2011   Loay Ghazaleh
ME Roads & Railway Projects & Consortiums, Feb., 2011 Loay Ghazaleh
 
Wapda intership report by Manzar
Wapda intership report by ManzarWapda intership report by Manzar
Wapda intership report by Manzar
 
Study of MORT_&_H
Study of MORT_&_HStudy of MORT_&_H
Study of MORT_&_H
 
Public Private Partnerships (P3) - Kome Ajese AGC 01.2011 Presentation
Public Private Partnerships (P3) - Kome Ajese AGC 01.2011 PresentationPublic Private Partnerships (P3) - Kome Ajese AGC 01.2011 Presentation
Public Private Partnerships (P3) - Kome Ajese AGC 01.2011 Presentation
 
List of various_IRCs_&_sps
List of various_IRCs_&_spsList of various_IRCs_&_sps
List of various_IRCs_&_sps
 
Dfccil(dedicated freight corridor)
Dfccil(dedicated freight corridor)Dfccil(dedicated freight corridor)
Dfccil(dedicated freight corridor)
 
Jeddah metro full presentation - Briefing Day March, 30th
Jeddah metro full presentation - Briefing Day March, 30th Jeddah metro full presentation - Briefing Day March, 30th
Jeddah metro full presentation - Briefing Day March, 30th
 
Ahmedabad Metro Project
Ahmedabad Metro ProjectAhmedabad Metro Project
Ahmedabad Metro Project
 
Dfc
DfcDfc
Dfc
 
CIMB_Construction&Infrastructure_2016_SPAD
CIMB_Construction&Infrastructure_2016_SPADCIMB_Construction&Infrastructure_2016_SPAD
CIMB_Construction&Infrastructure_2016_SPAD
 
Indian port growth story satya pal 04.02.2011
Indian port growth story satya pal 04.02.2011Indian port growth story satya pal 04.02.2011
Indian port growth story satya pal 04.02.2011
 
Traffic report final 20 3-12
Traffic report final 20 3-12Traffic report final 20 3-12
Traffic report final 20 3-12
 
M9 final report 07.07.12
M9 final report 07.07.12M9 final report 07.07.12
M9 final report 07.07.12
 
Intern final report
Intern final reportIntern final report
Intern final report
 

Similar to Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)

hyderabad outer ring road
hyderabad outer ring roadhyderabad outer ring road
hyderabad outer ring roadAkhil Padiga
 
Report No.19 of 2023 – Union Government – Ministry of Road Transport and High...
Report No.19 of 2023 – Union Government – Ministry of Road Transport and High...Report No.19 of 2023 – Union Government – Ministry of Road Transport and High...
Report No.19 of 2023 – Union Government – Ministry of Road Transport and High...Life of A Public Auditor
 
Public Private Partnership
Public Private PartnershipPublic Private Partnership
Public Private PartnershipDeepti Mahajan
 
11. NECS 2016 _Current status and the way ahead for road development in the ...
11.  NECS 2016 _Current status and the way ahead for road development in the ...11.  NECS 2016 _Current status and the way ahead for road development in the ...
11. NECS 2016 _Current status and the way ahead for road development in the ...FICCINorthEast
 
Public Private Partnerships. Infrastructure Projects Plan in Indonesia.
Public Private Partnerships. Infrastructure Projects Plan in Indonesia.Public Private Partnerships. Infrastructure Projects Plan in Indonesia.
Public Private Partnerships. Infrastructure Projects Plan in Indonesia.Oswar Mungkasa
 
Mumbai metro project Phase I
Mumbai metro project Phase IMumbai metro project Phase I
Mumbai metro project Phase IKaran Shah
 
projectfinancingandpublicprivatepartnershipppp-191120191032.pdf
projectfinancingandpublicprivatepartnershipppp-191120191032.pdfprojectfinancingandpublicprivatepartnershipppp-191120191032.pdf
projectfinancingandpublicprivatepartnershipppp-191120191032.pdfSeshukumar53
 
Project financing and public private partnership (ppp)
Project financing and public private partnership (ppp)Project financing and public private partnership (ppp)
Project financing and public private partnership (ppp)M. Asim U Khan
 
Errp ia report dec 2012
Errp ia report dec 2012Errp ia report dec 2012
Errp ia report dec 2012zubeditufail
 
Public private partnership in development of road network
Public private partnership in development of road networkPublic private partnership in development of road network
Public private partnership in development of road networkGokul K Prasad
 
mumbai metro PPP model.pptx
mumbai metro PPP model.pptxmumbai metro PPP model.pptx
mumbai metro PPP model.pptxTwinkleVincent2
 
Expansion of state highway 1
Expansion of state highway 1Expansion of state highway 1
Expansion of state highway 1Sneha Kaira
 
Feasibility study on expansion of state highway
Feasibility study on expansion of state highwayFeasibility study on expansion of state highway
Feasibility study on expansion of state highwaysnehakaira
 
Rebuilding of Railway Infrastructures during the present crisis by Rajesh Prasad
Rebuilding of Railway Infrastructures during the present crisis by Rajesh PrasadRebuilding of Railway Infrastructures during the present crisis by Rajesh Prasad
Rebuilding of Railway Infrastructures during the present crisis by Rajesh PrasadRajesh Prasad
 
Construction Industry Review
Construction Industry Review Construction Industry Review
Construction Industry Review Remona Divekar
 
M9-EIA-Draft Final Report
M9-EIA-Draft Final ReportM9-EIA-Draft Final Report
M9-EIA-Draft Final Reportgiap0083
 

Similar to Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009) (20)

hyderabad outer ring road
hyderabad outer ring roadhyderabad outer ring road
hyderabad outer ring road
 
Report No.19 of 2023 – Union Government – Ministry of Road Transport and High...
Report No.19 of 2023 – Union Government – Ministry of Road Transport and High...Report No.19 of 2023 – Union Government – Ministry of Road Transport and High...
Report No.19 of 2023 – Union Government – Ministry of Road Transport and High...
 
Public Private Partnership
Public Private PartnershipPublic Private Partnership
Public Private Partnership
 
Lect 03 ppp kppip
Lect 03 ppp kppipLect 03 ppp kppip
Lect 03 ppp kppip
 
Hyd metro rail
Hyd metro railHyd metro rail
Hyd metro rail
 
11. NECS 2016 _Current status and the way ahead for road development in the ...
11.  NECS 2016 _Current status and the way ahead for road development in the ...11.  NECS 2016 _Current status and the way ahead for road development in the ...
11. NECS 2016 _Current status and the way ahead for road development in the ...
 
Public Private Partnerships. Infrastructure Projects Plan in Indonesia.
Public Private Partnerships. Infrastructure Projects Plan in Indonesia.Public Private Partnerships. Infrastructure Projects Plan in Indonesia.
Public Private Partnerships. Infrastructure Projects Plan in Indonesia.
 
Mumbai metro project Phase I
Mumbai metro project Phase IMumbai metro project Phase I
Mumbai metro project Phase I
 
PURA STATUS
PURA STATUSPURA STATUS
PURA STATUS
 
projectfinancingandpublicprivatepartnershipppp-191120191032.pdf
projectfinancingandpublicprivatepartnershipppp-191120191032.pdfprojectfinancingandpublicprivatepartnershipppp-191120191032.pdf
projectfinancingandpublicprivatepartnershipppp-191120191032.pdf
 
Project financing and public private partnership (ppp)
Project financing and public private partnership (ppp)Project financing and public private partnership (ppp)
Project financing and public private partnership (ppp)
 
Errp ia report dec 2012
Errp ia report dec 2012Errp ia report dec 2012
Errp ia report dec 2012
 
Public private partnership in development of road network
Public private partnership in development of road networkPublic private partnership in development of road network
Public private partnership in development of road network
 
mumbai metro PPP model.pptx
mumbai metro PPP model.pptxmumbai metro PPP model.pptx
mumbai metro PPP model.pptx
 
William paterson governance in dgh june 14 2011
William paterson governance in dgh june 14 2011William paterson governance in dgh june 14 2011
William paterson governance in dgh june 14 2011
 
Expansion of state highway 1
Expansion of state highway 1Expansion of state highway 1
Expansion of state highway 1
 
Feasibility study on expansion of state highway
Feasibility study on expansion of state highwayFeasibility study on expansion of state highway
Feasibility study on expansion of state highway
 
Rebuilding of Railway Infrastructures during the present crisis by Rajesh Prasad
Rebuilding of Railway Infrastructures during the present crisis by Rajesh PrasadRebuilding of Railway Infrastructures during the present crisis by Rajesh Prasad
Rebuilding of Railway Infrastructures during the present crisis by Rajesh Prasad
 
Construction Industry Review
Construction Industry Review Construction Industry Review
Construction Industry Review
 
M9-EIA-Draft Final Report
M9-EIA-Draft Final ReportM9-EIA-Draft Final Report
M9-EIA-Draft Final Report
 

Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)

  • 1. PPP Nodal Officers’ Workshop March 23, 2009 Presentation by PPP CELL Andhra Pradesh Venue: The Taj Mahal Hotel New Delhi 1
  • 2. CONTENTS  PPP Policy  Capacity Improvement  Development of PPP Guidelines Manual  Pipeline Development  Management Systems  Project Lists  Case Studies  Other Initiatives and Ideas 2
  • 3. PPP POLICY  Draft PPP Policy is under discussion  Draft PPP Policy is prepared taking inputs from PPP Policy of other states  Draft PPP Policy is going to be discussed in a PPP Policy workshop going to be held in April 2009  ISB Hyderabad is conducting the workshop with senior government officials, Developers and PPP experts  The final copy of the PPP Policy is expected to be ready by May 2009  Formation of PPP Cell as a Society  Draft Memorandum of Association (MOA) and draft Rules / Bylaws for formation of PPP Cell as a society is prepared  The draft copy is under discussion 3
  • 4. Capacity Improvement  Workshop with the assistance of Administrative Staff College of India (ASCI)  The workshop was conducted in July 2008 for the PPP Nodal Officers of the State Administrative Departments  The topics broadly covered are Rationale for PPP, Financing Techniques, Legal Aspects and Case studies  Workshop with Transaction Advisors  IL&FS and SBI Caps made a presentation about the various types of PPP projects handled by them  Case studies were discussed 4
  • 5. Capacity Improvement contd..2  Workshop with the assistance of Indian School of Business (ISB)  Planning to have a capacity building workshop for the Administrative Secretaries in May 2009  PPP Monthly News  It capture the Infrastructure Developments in the form a Monthly News Letter  It captures the News Items, Expression of Interests advertised for selection of the Consultants and Developers by various governments  The monthly news letter is circulated to the Administrative Secretaries, Heads of Departments and the Nodal Officers of the various Administrative Departments 5
  • 6. Capacity Improvement contd..3 Assistance of PPP Cell was sought on the following PPP Projects  Major Bridge on River Godavari on PPP  Mass Rapid Transit System (MRTS)  Krishnapatnam Port  Nellore – Gooty Road Project  Public Library at Vizag  IT based rural initiatives in Kadapa  Up gradation of Five Roads at Pulivendula  Setting up of Distilleries at Vishakhapatnam  Setting up of Working Women's Hostel, Nursing Schools 6
  • 7. PPP Guidelines Manual  PPP Guidelines Manual contains..  AP Infrastructure Development Enabling Act 2001  V G F Guidelines  IIPDF Guidelines  Guidelines for usage of Transaction Advisors  PPPs: Creating an enabling environment for state projects  Model Request for Qualification  Model Request for Proposal  Summary of the list of PPP projects undertaken in AP  The copy of the manual is distributed to the PPP Nodal Officers of the State Administrative Departments 7
  • 8. Pipeline Development  Urban Infrastructure like Foot Over bridge, Pay use Toilets, Parks: Its being developed on PPP. DEA has given in principal approval for under taking the project under IIPDF Scheme  Gandhi Hospital: Initial study is conducted to find out what areas can be taken up under PPP. KPMG had a initial discussion in this regard  Education Department: Establishment of rural residential schools on PPP. Presentations were made to the Prl Secretary in this regard by IFC 8
  • 9. Pipeline Development Contd..2  Commissioner of Sugars: Setting up of Distillery units on PPP mode at various places in AP.  Transportation Department: Setting up of Vehicle Testing Centers, Driving Testing Centers and Automated Weighbridges on PPP mode  INCAP: Development of Growth Corridor from Vizag to Kakinada. Development of Faster Rail Link between Begumpet and Shamshabad Airport 9
  • 10. PPP Website of AP (www.ppp.ap.gov.in)  Development of PPP Website with the assistance of A P Technology Services Ltd (APTS): Comprehensive website has been developed to serve as the repository of all the information relating to PPP’s in the State for the purpose of information sharing and information dissemination. Major Content Coverage: Reference Documents (for Information sharing) Important Circulars, Orders, Guide lines, PPP best practices etc. Case Studies, MCA’s, DPRs, RFP’s, PPP related EOI’s, Tenders etc. Important news, media coverage pertaining to projects Details of PPP related important events Details of Departmental Nodal Officers, Consulting agencies, Developers PPP Project details and Up coming Projects Message Centre (close user group) Glossary, FAQs etc. Official launch of this website is expected shortly 10
  • 11. PPP-MIS Application  Development of MIS Application with the assistance of Center for Good Governance (CGG): A web-enabled integrated system is proposed to be developed to facilitate proper record keeping and on line monitoring of the overall progress / status of all PPP projects of the state . The system is designed to capture the following details: Project Details General Information pertaining to project including the Project Benefits Project Timeline and Bidding Information Project costing/share etc. and Details of Funding Agencies and pattern Major Milestone during construction and operation period Major Risk factors Project accomplishment details Details of Project related approvals, orders, Relevant documents, Photos etc. Details of Issues/problems or suggestions Actual execution details pertaining to each stage of Project Planning 11
  • 12. PPP-MIS Application Contd… Current Status  Comprehensive MIS Design Document completed (Covering all the phases of Project Life Cycle)  Obtained commercial proposal for development and implementation of MIS from Center for Good Governance (CGG)  Administrative approval on the proposal is being sought 12
  • 13. PPP Project Lists Sector Number (and Value) of PPP Projects in various stages Total Identified Detailed RFP Bidding Construction/ Nos. App.Cost Project Implementation (Rs. Cr.) Report Road 11 6 1 3 37 58 12624 Railways - - - - 1 1 12000 Ports 1 - - - 3 4 14200 Airports 2 - - - 1 3 2978 Tourism 1 1 10 1 35 48 1386 IT - - - - 4 4 77 Others - - - 1 14 15 2021 Total 15 7 11 5 94 132 43537 13
  • 14. Major PPP Projects in the State Major Bridge across River Godavari (Rs 593 crs) Krishnapatnam Port (Rs 10400 crs) Mass Rapid Transit System (MRTS) (Rs 12000 crs) Hyderabad Outer Ring Road (Rs 3000 crs) Hyderabad International Airport (Rs 1760 crs) Mind Space Project Convention Centre & Integrated Township Hyderabad Integrated Trade and Exposition Center 14
  • 15. Major Bridge Across River Godavari Its near Rajahmundry Its on BOT with VGF from GOI In principal approval is given, waiting for final approval Project Cost is Rs 593 crores It’s a toll bridge Developer is Ms Gammon India Ltd Independent Engineer is Ms Scott Wilson Concession agreement is signed in Oct 2008 Project expected to be completed in 3 years 15
  • 17. Krishnapatnam Port Contd.. Developer is M/s Krishnapatnam Port Company Limited. Project cost of Phase – I Rs 1400 crs Project cost of Phase – II Rs 4000 crs Estimated cost of Phase – III Rs 5000 crs Built Operate Share and Transfer basis (BOST) Contract period is 30 years with further extention of 20 yrs Lease Rentals is 2% of the fair market value with yrly escalation Concession fee is 2.6% of the Gross Income for 30 yrs Government has provided four lane approach road to the Port, Power Supply, R&R. The total cost is Rs 159 crs 17
  • 18. Mass Rapid Transit System (MRTS) - Hyderabad 18
  • 19. Mass Rapid Transit System (MRTS) - Hyderabad  Length of the corridor is 69 Kms with elevated structure  Project Cost Rs 12000 crs approx.  PHPDT is 40000 passengers approx with 3 min headway  Passengers expected to travel by 2011 is 1.6 mil per day and by 2021 is 2.3 million per day  Travel time from Miyapur to LB Nagar is 43 min covering a distance of 26 km against Bus Peak hour time of 1 hr 44 min Concession period is 35 years with a construction period of 5 yrs 19
  • 20. Outer Ring Road - Hyderabad SPV is incorporated as “Hyderabad Growth Corridor Limited” Total Length – 158 Kms Estimated cost – Rs 3000 crs Part of the project which is of 62.3 km is on PPP Annuity basis Provides orbital linkage to radial arterial roads Creates options for development of the further satellite townships Provides linkage to the proposed MRTS and Bus System 20
  • 22. Rajeev Gandhi International Airport Contd… 22
  • 23. Rajeev Gandhi International Airport Contd… Total Project Cost is Rs 2478 crs Project area is about 5495 acres Project Partners: GMR Group (63%), MAHB (11%), Govt of India (13%), Govt of Andhra Pradesh: 13% BOOT Format – Build Own Operate Transfer Concession period is 30 yrs Concession fee is 4% of Gross Revenue Annually Commenced operation from Mar 2008 42 aircraft parking stands - 12 boarding bridges Modular Cargo Terminal initial capacity - 100,000 MT/year 146 Check-in counters including 16 self check-in kiosks Modern Air Traffic Control tower 75m high 23
  • 24. Rajeev Gandhi International Airport Contd… Phased Development Airport is to be developed in phases based on the air traffic forecast. Design Capacity (mppa) Construction-Start/Finish Phase 1 12 March 2008 Phase 2 20 As per traffic trigger Phase 3 & 4 40 As per traffic trigger 24
  • 25. Mind Space Project A Special Project for IT & IT enabled services Project area 110 acres at Madhapur APIIC Ltd & K.Raheja Corpn. P Ltd have jointly promoted the project Total investment is around Rs.600 crs with employment generation of about 30000 persons Equity Partners: Govt of AP-11%, Private partner 89%. The revenue to AP Govt on dividend declared on equity Built up space of 5 million sft completed Secured approval for IT/ITES SEZ 25
  • 26. Convention Centre & Integrated Township An integrated township, 18 – hole international golf course, a convention centre with 6000 seating capacity and a business hotel  APIIC Ltd and EMAAR Properties, Dubai jointly promoted the project with 3 SPVs with equity of 26% and 74% respectively Hyderabad International Convention Centre was built on an extent of 15 acres. The Golf Course is developed on an extent of 235 acres. The assets of Convention Centre and Golf Course will revert back to Govt. of A P after 66 years of lease without any encumbrances. Besides equity, APIIC Ltd shall receive 2 and 3% Gross Annual Revenue as lease rentals from both assets 26
  • 27. Roads and Bridges  There are 58 Road projects in the state at various stages of development apart from Outer Ring Road The total project cost is Rs 12624 crs The projects are taken under BOT / Annuity mode Out of 58 road projects 18 are under implementation stage 27
  • 28. Tourism Projects There are 48 tourism projects on PPP mode The total project cost is Rs 1386 crs Beach Resort at Rishikonda, Vizag Status of the projects Implementation Stage - 21 Projects Various stages of bidding Stage - 27 Major Tourism Projects: IMAX Theatre at Hyderabad Beach Resort at Rishikonda, Vizag Snow World at Hyderabad Food Courts at Lower Tank Bund, Hyderabad 28
  • 29. Other Initiatives and Ideas  Infrastructure Vision Document 2030: The document brings out Infrastructure Requirements, Infrastructure Gaps, Resources required and how to take it forward  Setting up of a State Project Development Fund (PDF): This assistance will encourage more and more departments to take up Infrastructure Projects on PPP  Setting up of a State Viability Gap Funding Scheme (VGF): This fund will help in attracting developers toward projects which are economically viable but not financially  Empanelling Transaction Advisors for the State who have local presence 29
  • 30. 30