How to select modulating controls when specifying glass louvred
ventilators
Following our recent article on the “Top three
considerations when specifying glass louvred
ventilators” we have been inundated with
questions about modulating controls. Clearly this
is a topic that resonates with many in the
industry, and in this article we aim to provide
some guidance on how to modulate louvred
window ventilators.
As we wrote in our previous article, when it
comes to controls, the devil is in the detail. Let’s
begin by looking at the different types of
actuators you can choose from:
1. Standard 24v Actuator
This type of actuator is more suited for systems where modulation is not required, as it is very difficult
to provide full modulation with it. Stepped control, opening the blades in 4 stages, is possible via a
local control module. This control module will require the following components:
Transformer to reduce voltage supply from 230v to 24v.
Relay switch to enable power to open/close.
Time delay card to restrict power thus providing stepped control.
VFC link to accept a 0-10v BMS signal.
2. Semi Intelligent 24v Actuator
These actuators can provide full modulation via a local control module. This control module will require
the following components:
Transformer to reduce voltage supply from 230v to 24v.
Relay switch to enable power to open/close.
Servo card to modulate the louvred window blades.
VFC link to accept a 0-10v BMS signal.
The first actuator of each zone must be fitted with a special master actuator, all other actuators then
act as slaves and mimic the master’s position.
3. Fully Intelligent 24v Actuator
These can be linked directly to the BMS without the requirement of a control module, but a local power
unit will be required to:

© 2013 Colt International Licensing Ltd.
Transform voltage supply from 230v to 24v.
Switch between power to open/close.
Key considerations when specifying modulating controls:
All actuators require a 0-10V BMS signal to modulate.
The BMS will only provide a data signal; a power supply will also be required.
The power supply will need to be reduced from 230v to 24v.
A relay switch will be required to change between power open/close.
If the glass louvred vents are being used for smoke control then operation must be through a properly
designed and certified smoke control system. A BMS link can usually be fed through this smoke
control system for operation in day-to-day mode.
Finally, as we said in our previous article, don’t feel shy about getting advice:
Discuss with your supplier how best to control your system in more detail before specifying your glass
louvred ventilators and the modulating controls.
Or you can speak to a Colt specialist : Contact Colt and read about our Coltlite glass louvred ventilator

Graeme Clark is a Senior Consultant for Colt UK and specialises in the design
and product application of energy efficient HVAC and smoke control systems.

Connect on LinkedIn

© 2013 Colt International Licensing Ltd.

Weitere ähnliche Inhalte

Mehr von Colt UK

CPD Presentation: Key considerations when specifying weather louvres
CPD Presentation: Key considerations when specifying weather louvresCPD Presentation: Key considerations when specifying weather louvres
CPD Presentation: Key considerations when specifying weather louvresColt UK
 
People feel better in colt conditions
People feel better in colt conditions People feel better in colt conditions
People feel better in colt conditions Colt UK
 
CPD Presentation: Pressurisation
CPD Presentation: PressurisationCPD Presentation: Pressurisation
CPD Presentation: PressurisationColt UK
 
CPD Presentation: Smoke Ventilation using Shafts
CPD Presentation: Smoke Ventilation using ShaftsCPD Presentation: Smoke Ventilation using Shafts
CPD Presentation: Smoke Ventilation using ShaftsColt UK
 
CPD Presentation: Car Park Ventilation
CPD Presentation: Car Park VentilationCPD Presentation: Car Park Ventilation
CPD Presentation: Car Park VentilationColt UK
 
CPD Presentation: General Principles of Smoke Control
CPD Presentation: General Principles of Smoke ControlCPD Presentation: General Principles of Smoke Control
CPD Presentation: General Principles of Smoke ControlColt UK
 
You want to improve your factory’s productivity: what’s next?
You want to improve your factory’s productivity: what’s next?You want to improve your factory’s productivity: what’s next?
You want to improve your factory’s productivity: what’s next?Colt UK
 
Can your factory be more productive?
Can your factory be more productive?Can your factory be more productive?
Can your factory be more productive?Colt UK
 
Are you sure your natural ventilation system is really energy efficient?
Are you sure your natural ventilation system is really energy efficient?Are you sure your natural ventilation system is really energy efficient?
Are you sure your natural ventilation system is really energy efficient?Colt UK
 
When is a U value real?
When is a U value real?When is a U value real?
When is a U value real?Colt UK
 
Questions and answers from Paul Compton's pressurisation webinar
Questions and answers from Paul Compton's pressurisation webinar Questions and answers from Paul Compton's pressurisation webinar
Questions and answers from Paul Compton's pressurisation webinar Colt UK
 
The Lakanal House inquest and Local Authority tower blocks
The Lakanal House inquest and Local Authority tower blocksThe Lakanal House inquest and Local Authority tower blocks
The Lakanal House inquest and Local Authority tower blocksColt UK
 
Not all “Class A” weather louvres are equal
Not all “Class A” weather louvres are equalNot all “Class A” weather louvres are equal
Not all “Class A” weather louvres are equalColt UK
 
Green micro-algae façade becomes reality in Hamburg
Green micro-algae façade becomes reality in HamburgGreen micro-algae façade becomes reality in Hamburg
Green micro-algae façade becomes reality in HamburgColt UK
 
The CPR and mandatory CE marking: what is changing and what will it mean for you
The CPR and mandatory CE marking: what is changing and what will it mean for youThe CPR and mandatory CE marking: what is changing and what will it mean for you
The CPR and mandatory CE marking: what is changing and what will it mean for youColt UK
 
5 reasons why it’s wrong to use HVAC control systems for smoke ventilation
5 reasons why it’s wrong to use HVAC control systems for smoke ventilation5 reasons why it’s wrong to use HVAC control systems for smoke ventilation
5 reasons why it’s wrong to use HVAC control systems for smoke ventilationColt UK
 
How to boost your ventilation system’s cooling capacity
How to boost your ventilation system’s cooling capacityHow to boost your ventilation system’s cooling capacity
How to boost your ventilation system’s cooling capacityColt UK
 
Adding attenuation to a Natural Ventilation System retrospectively can be an ...
Adding attenuation to a Natural Ventilation System retrospectively can be an ...Adding attenuation to a Natural Ventilation System retrospectively can be an ...
Adding attenuation to a Natural Ventilation System retrospectively can be an ...Colt UK
 
Construction products regulations – are you ready?
Construction products regulations – are you ready?Construction products regulations – are you ready?
Construction products regulations – are you ready?Colt UK
 
Are we too afraid of the unknown to design sustainable buildings?
Are we too afraid of the unknown to design sustainable buildings?Are we too afraid of the unknown to design sustainable buildings?
Are we too afraid of the unknown to design sustainable buildings?Colt UK
 

Mehr von Colt UK (20)

CPD Presentation: Key considerations when specifying weather louvres
CPD Presentation: Key considerations when specifying weather louvresCPD Presentation: Key considerations when specifying weather louvres
CPD Presentation: Key considerations when specifying weather louvres
 
People feel better in colt conditions
People feel better in colt conditions People feel better in colt conditions
People feel better in colt conditions
 
CPD Presentation: Pressurisation
CPD Presentation: PressurisationCPD Presentation: Pressurisation
CPD Presentation: Pressurisation
 
CPD Presentation: Smoke Ventilation using Shafts
CPD Presentation: Smoke Ventilation using ShaftsCPD Presentation: Smoke Ventilation using Shafts
CPD Presentation: Smoke Ventilation using Shafts
 
CPD Presentation: Car Park Ventilation
CPD Presentation: Car Park VentilationCPD Presentation: Car Park Ventilation
CPD Presentation: Car Park Ventilation
 
CPD Presentation: General Principles of Smoke Control
CPD Presentation: General Principles of Smoke ControlCPD Presentation: General Principles of Smoke Control
CPD Presentation: General Principles of Smoke Control
 
You want to improve your factory’s productivity: what’s next?
You want to improve your factory’s productivity: what’s next?You want to improve your factory’s productivity: what’s next?
You want to improve your factory’s productivity: what’s next?
 
Can your factory be more productive?
Can your factory be more productive?Can your factory be more productive?
Can your factory be more productive?
 
Are you sure your natural ventilation system is really energy efficient?
Are you sure your natural ventilation system is really energy efficient?Are you sure your natural ventilation system is really energy efficient?
Are you sure your natural ventilation system is really energy efficient?
 
When is a U value real?
When is a U value real?When is a U value real?
When is a U value real?
 
Questions and answers from Paul Compton's pressurisation webinar
Questions and answers from Paul Compton's pressurisation webinar Questions and answers from Paul Compton's pressurisation webinar
Questions and answers from Paul Compton's pressurisation webinar
 
The Lakanal House inquest and Local Authority tower blocks
The Lakanal House inquest and Local Authority tower blocksThe Lakanal House inquest and Local Authority tower blocks
The Lakanal House inquest and Local Authority tower blocks
 
Not all “Class A” weather louvres are equal
Not all “Class A” weather louvres are equalNot all “Class A” weather louvres are equal
Not all “Class A” weather louvres are equal
 
Green micro-algae façade becomes reality in Hamburg
Green micro-algae façade becomes reality in HamburgGreen micro-algae façade becomes reality in Hamburg
Green micro-algae façade becomes reality in Hamburg
 
The CPR and mandatory CE marking: what is changing and what will it mean for you
The CPR and mandatory CE marking: what is changing and what will it mean for youThe CPR and mandatory CE marking: what is changing and what will it mean for you
The CPR and mandatory CE marking: what is changing and what will it mean for you
 
5 reasons why it’s wrong to use HVAC control systems for smoke ventilation
5 reasons why it’s wrong to use HVAC control systems for smoke ventilation5 reasons why it’s wrong to use HVAC control systems for smoke ventilation
5 reasons why it’s wrong to use HVAC control systems for smoke ventilation
 
How to boost your ventilation system’s cooling capacity
How to boost your ventilation system’s cooling capacityHow to boost your ventilation system’s cooling capacity
How to boost your ventilation system’s cooling capacity
 
Adding attenuation to a Natural Ventilation System retrospectively can be an ...
Adding attenuation to a Natural Ventilation System retrospectively can be an ...Adding attenuation to a Natural Ventilation System retrospectively can be an ...
Adding attenuation to a Natural Ventilation System retrospectively can be an ...
 
Construction products regulations – are you ready?
Construction products regulations – are you ready?Construction products regulations – are you ready?
Construction products regulations – are you ready?
 
Are we too afraid of the unknown to design sustainable buildings?
Are we too afraid of the unknown to design sustainable buildings?Are we too afraid of the unknown to design sustainable buildings?
Are we too afraid of the unknown to design sustainable buildings?
 

How to select modulating controls when specifying glass louvred ventilators

  • 1. How to select modulating controls when specifying glass louvred ventilators Following our recent article on the “Top three considerations when specifying glass louvred ventilators” we have been inundated with questions about modulating controls. Clearly this is a topic that resonates with many in the industry, and in this article we aim to provide some guidance on how to modulate louvred window ventilators. As we wrote in our previous article, when it comes to controls, the devil is in the detail. Let’s begin by looking at the different types of actuators you can choose from: 1. Standard 24v Actuator This type of actuator is more suited for systems where modulation is not required, as it is very difficult to provide full modulation with it. Stepped control, opening the blades in 4 stages, is possible via a local control module. This control module will require the following components: Transformer to reduce voltage supply from 230v to 24v. Relay switch to enable power to open/close. Time delay card to restrict power thus providing stepped control. VFC link to accept a 0-10v BMS signal. 2. Semi Intelligent 24v Actuator These actuators can provide full modulation via a local control module. This control module will require the following components: Transformer to reduce voltage supply from 230v to 24v. Relay switch to enable power to open/close. Servo card to modulate the louvred window blades. VFC link to accept a 0-10v BMS signal. The first actuator of each zone must be fitted with a special master actuator, all other actuators then act as slaves and mimic the master’s position. 3. Fully Intelligent 24v Actuator These can be linked directly to the BMS without the requirement of a control module, but a local power unit will be required to: © 2013 Colt International Licensing Ltd.
  • 2. Transform voltage supply from 230v to 24v. Switch between power to open/close. Key considerations when specifying modulating controls: All actuators require a 0-10V BMS signal to modulate. The BMS will only provide a data signal; a power supply will also be required. The power supply will need to be reduced from 230v to 24v. A relay switch will be required to change between power open/close. If the glass louvred vents are being used for smoke control then operation must be through a properly designed and certified smoke control system. A BMS link can usually be fed through this smoke control system for operation in day-to-day mode. Finally, as we said in our previous article, don’t feel shy about getting advice: Discuss with your supplier how best to control your system in more detail before specifying your glass louvred ventilators and the modulating controls. Or you can speak to a Colt specialist : Contact Colt and read about our Coltlite glass louvred ventilator Graeme Clark is a Senior Consultant for Colt UK and specialises in the design and product application of energy efficient HVAC and smoke control systems. Connect on LinkedIn © 2013 Colt International Licensing Ltd.