SlideShare ist ein Scribd-Unternehmen logo
1 von 1
How to deal with engine exhaust emissions when local exhaust ventilation is not an option
Controlling diesel engine exhaust emissions in enclosed spaces such as maintenance workshops is
easily done with local exhaust ventilation (LEV), which can be as simple as fitting pipes to the vehicles’
exhausts while they are being serviced in order to draw the fumes outside. However, there are
situations where this is not an option, for example in a warehouse where there is heavy vehicle
movement inside the building, as vans and lorries come in and out for loading and unloading.
Controlling diesel exhaust emissions is not a one-size-fits-all solution type of problem
The HSE provides information on the health risks of diesel fumes in INDG286 and detailed guidance
on how to control exposure to exhaust emissions in the workplace in HSG187. This is, however, very
prescriptive guidance, and can be difficult or expensive to apply in situations such as the one faced by
the Royal Mail’s Parcelforce in their sorting and distribution centres. These are converted warehouses
that can contain up to 150 vans at any one time – all of them entering and exiting the building at
similar times.
The standard prescriptive solutions focus on the air change rate, which in the case of Parcelforce’s
sorting centres would have meant 6 - 10 air changes per hour. This doesn’t take into account the
variations in the levels of diesel exhaust in the air at different times. There would be peaks at the times
vans drive in or out, but levels would go down whey they were stationary while loading or unloading
the parcels, or when the building was empty between rounds of deliveries and collections.
Considerations when designing an effective ventilation system
When faced with a situation where LEV is not possible, finding an effective and cost efficient solution
may require a little thinking outside the box. The first step is to analyse the layout of the building, its
use, vehicle movements, and the size and type of the vehicles’ engines (which will tell you their
emissions levels).
This type of facility is usually unheated. This is an important consideration, as exhaust fumes are
relatively hot, so will tend to rise, but in an unheated space they will cool as they rise and may not
reach the roof extracts, requiring low and high level extract grilles.
Monitoring the air quality and linking CO detection to the ventilation system can add a further level of
efficiency, matching the extraction rates to the actual levels of emissions in the air at any time.
An effective and cost efficient approach
Going back to our example of Parcelforce’s sorting and distribution centres, the solution we developed
achieves cross flow via natural inlet air and mechanical extract with a combination of axial fans and
natural ventilators. These are triggered by CO detectors when emissions levels reached a
predetermined level. This means that mechanical extraction fans operate only when needed,
significantly cutting operating costs.
In our approach, we thought outside the box and developed a system that doesn’t fit within the
prescriptive solutions in Approved document F. However, its implementation was possible because of
our early involvement, which enabled us to support the M&E consultant from initial design through to
approval with building control. So, if you are in a situation where LEV won’t do and need help with
designing a bespoke solution, it is a good idea to involve the experts from the very early stages of your
project.

© 2013 Colt International Licensing Ltd.

Weitere ähnliche Inhalte

Mehr von Colt UK

CPD Presentation: Smoke curtains and fire curtains
CPD Presentation: Smoke curtains and fire curtainsCPD Presentation: Smoke curtains and fire curtains
CPD Presentation: Smoke curtains and fire curtainsColt UK
 
CPD Presentation: Key considerations when specifying weather louvres
CPD Presentation: Key considerations when specifying weather louvresCPD Presentation: Key considerations when specifying weather louvres
CPD Presentation: Key considerations when specifying weather louvresColt UK
 
People feel better in colt conditions
People feel better in colt conditions People feel better in colt conditions
People feel better in colt conditions Colt UK
 
CPD Presentation: Pressurisation
CPD Presentation: PressurisationCPD Presentation: Pressurisation
CPD Presentation: PressurisationColt UK
 
CPD Presentation: Smoke Ventilation using Shafts
CPD Presentation: Smoke Ventilation using ShaftsCPD Presentation: Smoke Ventilation using Shafts
CPD Presentation: Smoke Ventilation using ShaftsColt UK
 
CPD Presentation: Car Park Ventilation
CPD Presentation: Car Park VentilationCPD Presentation: Car Park Ventilation
CPD Presentation: Car Park VentilationColt UK
 
CPD Presentation: General Principles of Smoke Control
CPD Presentation: General Principles of Smoke ControlCPD Presentation: General Principles of Smoke Control
CPD Presentation: General Principles of Smoke ControlColt UK
 
You want to improve your factory’s productivity: what’s next?
You want to improve your factory’s productivity: what’s next?You want to improve your factory’s productivity: what’s next?
You want to improve your factory’s productivity: what’s next?Colt UK
 
Can your factory be more productive?
Can your factory be more productive?Can your factory be more productive?
Can your factory be more productive?Colt UK
 
Are you sure your natural ventilation system is really energy efficient?
Are you sure your natural ventilation system is really energy efficient?Are you sure your natural ventilation system is really energy efficient?
Are you sure your natural ventilation system is really energy efficient?Colt UK
 
When is a U value real?
When is a U value real?When is a U value real?
When is a U value real?Colt UK
 
Questions and answers from Paul Compton's pressurisation webinar
Questions and answers from Paul Compton's pressurisation webinar Questions and answers from Paul Compton's pressurisation webinar
Questions and answers from Paul Compton's pressurisation webinar Colt UK
 
The Lakanal House inquest and Local Authority tower blocks
The Lakanal House inquest and Local Authority tower blocksThe Lakanal House inquest and Local Authority tower blocks
The Lakanal House inquest and Local Authority tower blocksColt UK
 
Not all “Class A” weather louvres are equal
Not all “Class A” weather louvres are equalNot all “Class A” weather louvres are equal
Not all “Class A” weather louvres are equalColt UK
 
Green micro-algae façade becomes reality in Hamburg
Green micro-algae façade becomes reality in HamburgGreen micro-algae façade becomes reality in Hamburg
Green micro-algae façade becomes reality in HamburgColt UK
 
The CPR and mandatory CE marking: what is changing and what will it mean for you
The CPR and mandatory CE marking: what is changing and what will it mean for youThe CPR and mandatory CE marking: what is changing and what will it mean for you
The CPR and mandatory CE marking: what is changing and what will it mean for youColt UK
 
5 reasons why it’s wrong to use HVAC control systems for smoke ventilation
5 reasons why it’s wrong to use HVAC control systems for smoke ventilation5 reasons why it’s wrong to use HVAC control systems for smoke ventilation
5 reasons why it’s wrong to use HVAC control systems for smoke ventilationColt UK
 
How to boost your ventilation system’s cooling capacity
How to boost your ventilation system’s cooling capacityHow to boost your ventilation system’s cooling capacity
How to boost your ventilation system’s cooling capacityColt UK
 
Adding attenuation to a Natural Ventilation System retrospectively can be an ...
Adding attenuation to a Natural Ventilation System retrospectively can be an ...Adding attenuation to a Natural Ventilation System retrospectively can be an ...
Adding attenuation to a Natural Ventilation System retrospectively can be an ...Colt UK
 
Construction products regulations – are you ready?
Construction products regulations – are you ready?Construction products regulations – are you ready?
Construction products regulations – are you ready?Colt UK
 

Mehr von Colt UK (20)

CPD Presentation: Smoke curtains and fire curtains
CPD Presentation: Smoke curtains and fire curtainsCPD Presentation: Smoke curtains and fire curtains
CPD Presentation: Smoke curtains and fire curtains
 
CPD Presentation: Key considerations when specifying weather louvres
CPD Presentation: Key considerations when specifying weather louvresCPD Presentation: Key considerations when specifying weather louvres
CPD Presentation: Key considerations when specifying weather louvres
 
People feel better in colt conditions
People feel better in colt conditions People feel better in colt conditions
People feel better in colt conditions
 
CPD Presentation: Pressurisation
CPD Presentation: PressurisationCPD Presentation: Pressurisation
CPD Presentation: Pressurisation
 
CPD Presentation: Smoke Ventilation using Shafts
CPD Presentation: Smoke Ventilation using ShaftsCPD Presentation: Smoke Ventilation using Shafts
CPD Presentation: Smoke Ventilation using Shafts
 
CPD Presentation: Car Park Ventilation
CPD Presentation: Car Park VentilationCPD Presentation: Car Park Ventilation
CPD Presentation: Car Park Ventilation
 
CPD Presentation: General Principles of Smoke Control
CPD Presentation: General Principles of Smoke ControlCPD Presentation: General Principles of Smoke Control
CPD Presentation: General Principles of Smoke Control
 
You want to improve your factory’s productivity: what’s next?
You want to improve your factory’s productivity: what’s next?You want to improve your factory’s productivity: what’s next?
You want to improve your factory’s productivity: what’s next?
 
Can your factory be more productive?
Can your factory be more productive?Can your factory be more productive?
Can your factory be more productive?
 
Are you sure your natural ventilation system is really energy efficient?
Are you sure your natural ventilation system is really energy efficient?Are you sure your natural ventilation system is really energy efficient?
Are you sure your natural ventilation system is really energy efficient?
 
When is a U value real?
When is a U value real?When is a U value real?
When is a U value real?
 
Questions and answers from Paul Compton's pressurisation webinar
Questions and answers from Paul Compton's pressurisation webinar Questions and answers from Paul Compton's pressurisation webinar
Questions and answers from Paul Compton's pressurisation webinar
 
The Lakanal House inquest and Local Authority tower blocks
The Lakanal House inquest and Local Authority tower blocksThe Lakanal House inquest and Local Authority tower blocks
The Lakanal House inquest and Local Authority tower blocks
 
Not all “Class A” weather louvres are equal
Not all “Class A” weather louvres are equalNot all “Class A” weather louvres are equal
Not all “Class A” weather louvres are equal
 
Green micro-algae façade becomes reality in Hamburg
Green micro-algae façade becomes reality in HamburgGreen micro-algae façade becomes reality in Hamburg
Green micro-algae façade becomes reality in Hamburg
 
The CPR and mandatory CE marking: what is changing and what will it mean for you
The CPR and mandatory CE marking: what is changing and what will it mean for youThe CPR and mandatory CE marking: what is changing and what will it mean for you
The CPR and mandatory CE marking: what is changing and what will it mean for you
 
5 reasons why it’s wrong to use HVAC control systems for smoke ventilation
5 reasons why it’s wrong to use HVAC control systems for smoke ventilation5 reasons why it’s wrong to use HVAC control systems for smoke ventilation
5 reasons why it’s wrong to use HVAC control systems for smoke ventilation
 
How to boost your ventilation system’s cooling capacity
How to boost your ventilation system’s cooling capacityHow to boost your ventilation system’s cooling capacity
How to boost your ventilation system’s cooling capacity
 
Adding attenuation to a Natural Ventilation System retrospectively can be an ...
Adding attenuation to a Natural Ventilation System retrospectively can be an ...Adding attenuation to a Natural Ventilation System retrospectively can be an ...
Adding attenuation to a Natural Ventilation System retrospectively can be an ...
 
Construction products regulations – are you ready?
Construction products regulations – are you ready?Construction products regulations – are you ready?
Construction products regulations – are you ready?
 

Kürzlich hochgeladen

办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一
办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一
办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一diploma 1
 
FiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdfFiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdfShivakumar Viswanathan
 
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree 毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree ttt fff
 
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCRdollysharma2066
 
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书zdzoqco
 
Passbook project document_april_21__.pdf
Passbook project document_april_21__.pdfPassbook project document_april_21__.pdf
Passbook project document_april_21__.pdfvaibhavkanaujia
 
General Knowledge Quiz Game C++ CODE.pptx
General Knowledge Quiz Game C++ CODE.pptxGeneral Knowledge Quiz Game C++ CODE.pptx
General Knowledge Quiz Game C++ CODE.pptxmarckustrevion
 
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一z xss
 
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...Rishabh Aryan
 
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 
cda.pptx critical discourse analysis ppt
cda.pptx critical discourse analysis pptcda.pptx critical discourse analysis ppt
cda.pptx critical discourse analysis pptMaryamAfzal41
 
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degreeyuu sss
 
(办理学位证)约克圣约翰大学毕业证,KCL成绩单原版一比一
(办理学位证)约克圣约翰大学毕业证,KCL成绩单原版一比一(办理学位证)约克圣约翰大学毕业证,KCL成绩单原版一比一
(办理学位证)约克圣约翰大学毕业证,KCL成绩单原版一比一D SSS
 
办理学位证(UCSD证书)美国加利福尼亚大学圣迭戈分校毕业证成绩单原版一比一
办理学位证(UCSD证书)美国加利福尼亚大学圣迭戈分校毕业证成绩单原版一比一办理学位证(UCSD证书)美国加利福尼亚大学圣迭戈分校毕业证成绩单原版一比一
办理学位证(UCSD证书)美国加利福尼亚大学圣迭戈分校毕业证成绩单原版一比一A SSS
 
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,Aginakm1
 
西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造kbdhl05e
 
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...mrchrns005
 
澳洲UQ学位证,昆士兰大学毕业证书1:1制作
澳洲UQ学位证,昆士兰大学毕业证书1:1制作澳洲UQ学位证,昆士兰大学毕业证书1:1制作
澳洲UQ学位证,昆士兰大学毕业证书1:1制作aecnsnzk
 
How to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AIHow to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AIyuj
 

Kürzlich hochgeladen (20)

办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一
办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一
办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一
 
FiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdfFiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdf
 
Call Girls in Pratap Nagar, 9953056974 Escort Service
Call Girls in Pratap Nagar,  9953056974 Escort ServiceCall Girls in Pratap Nagar,  9953056974 Escort Service
Call Girls in Pratap Nagar, 9953056974 Escort Service
 
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree 毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
 
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
 
Passbook project document_april_21__.pdf
Passbook project document_april_21__.pdfPassbook project document_april_21__.pdf
Passbook project document_april_21__.pdf
 
General Knowledge Quiz Game C++ CODE.pptx
General Knowledge Quiz Game C++ CODE.pptxGeneral Knowledge Quiz Game C++ CODE.pptx
General Knowledge Quiz Game C++ CODE.pptx
 
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
 
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
 
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
 
cda.pptx critical discourse analysis ppt
cda.pptx critical discourse analysis pptcda.pptx critical discourse analysis ppt
cda.pptx critical discourse analysis ppt
 
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
 
(办理学位证)约克圣约翰大学毕业证,KCL成绩单原版一比一
(办理学位证)约克圣约翰大学毕业证,KCL成绩单原版一比一(办理学位证)约克圣约翰大学毕业证,KCL成绩单原版一比一
(办理学位证)约克圣约翰大学毕业证,KCL成绩单原版一比一
 
办理学位证(UCSD证书)美国加利福尼亚大学圣迭戈分校毕业证成绩单原版一比一
办理学位证(UCSD证书)美国加利福尼亚大学圣迭戈分校毕业证成绩单原版一比一办理学位证(UCSD证书)美国加利福尼亚大学圣迭戈分校毕业证成绩单原版一比一
办理学位证(UCSD证书)美国加利福尼亚大学圣迭戈分校毕业证成绩单原版一比一
 
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
 
西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造
 
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...
 
澳洲UQ学位证,昆士兰大学毕业证书1:1制作
澳洲UQ学位证,昆士兰大学毕业证书1:1制作澳洲UQ学位证,昆士兰大学毕业证书1:1制作
澳洲UQ学位证,昆士兰大学毕业证书1:1制作
 
How to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AIHow to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AI
 

How to deal with engine exhaust emissions when local exhaust ventilation is not an option

  • 1. How to deal with engine exhaust emissions when local exhaust ventilation is not an option Controlling diesel engine exhaust emissions in enclosed spaces such as maintenance workshops is easily done with local exhaust ventilation (LEV), which can be as simple as fitting pipes to the vehicles’ exhausts while they are being serviced in order to draw the fumes outside. However, there are situations where this is not an option, for example in a warehouse where there is heavy vehicle movement inside the building, as vans and lorries come in and out for loading and unloading. Controlling diesel exhaust emissions is not a one-size-fits-all solution type of problem The HSE provides information on the health risks of diesel fumes in INDG286 and detailed guidance on how to control exposure to exhaust emissions in the workplace in HSG187. This is, however, very prescriptive guidance, and can be difficult or expensive to apply in situations such as the one faced by the Royal Mail’s Parcelforce in their sorting and distribution centres. These are converted warehouses that can contain up to 150 vans at any one time – all of them entering and exiting the building at similar times. The standard prescriptive solutions focus on the air change rate, which in the case of Parcelforce’s sorting centres would have meant 6 - 10 air changes per hour. This doesn’t take into account the variations in the levels of diesel exhaust in the air at different times. There would be peaks at the times vans drive in or out, but levels would go down whey they were stationary while loading or unloading the parcels, or when the building was empty between rounds of deliveries and collections. Considerations when designing an effective ventilation system When faced with a situation where LEV is not possible, finding an effective and cost efficient solution may require a little thinking outside the box. The first step is to analyse the layout of the building, its use, vehicle movements, and the size and type of the vehicles’ engines (which will tell you their emissions levels). This type of facility is usually unheated. This is an important consideration, as exhaust fumes are relatively hot, so will tend to rise, but in an unheated space they will cool as they rise and may not reach the roof extracts, requiring low and high level extract grilles. Monitoring the air quality and linking CO detection to the ventilation system can add a further level of efficiency, matching the extraction rates to the actual levels of emissions in the air at any time. An effective and cost efficient approach Going back to our example of Parcelforce’s sorting and distribution centres, the solution we developed achieves cross flow via natural inlet air and mechanical extract with a combination of axial fans and natural ventilators. These are triggered by CO detectors when emissions levels reached a predetermined level. This means that mechanical extraction fans operate only when needed, significantly cutting operating costs. In our approach, we thought outside the box and developed a system that doesn’t fit within the prescriptive solutions in Approved document F. However, its implementation was possible because of our early involvement, which enabled us to support the M&E consultant from initial design through to approval with building control. So, if you are in a situation where LEV won’t do and need help with designing a bespoke solution, it is a good idea to involve the experts from the very early stages of your project. © 2013 Colt International Licensing Ltd.