SlideShare ist ein Scribd-Unternehmen logo
1 von 24
CONTENT SUBJECT TO PLANNING CONSENT.
ALL TIMINGS INDICATIVE.




              Melksham Area Board
                   Wednesday 10th October 2012


          Melksham Community Campus –
                 Project Update
CONTENT SUBJECT TO PLANNING CONSENT.
ALL TIMINGS INDICATIVE.




    Background
    • COB update

    • Existing site plan - challenges and opportunities

    • Site plan - preferred layout

    • Adjacencies diagram

    • Draft accommodation schedule
CONTENT SUBJECT TO PLANNING CONSENT.
ALL TIMINGS INDICATIVE.



   Melksham Shadow Community Operations Board
   (COB)
    •   Appointed by Area Board
    •   The team
    •   Our role
    •   New approach

   Community Engagement
   • Consultation (Community Area Partnership and Youth Survey)
   • Fact Finding with community groups
     (Melksham House users and sports clubs, Christie Miller
     Members Forum, Chamber of commerce)
CONTENT SUBJECT TO PLANNING CONSENT.
ALL TIMINGS INDICATIVE.




    Communications
    • Development of website
      Melkshamcampus-scob.org.uk

    • Posters
    • Melksham House User
      Updates
    • Press Releases
    • Updates to Area Board
CONTENT SUBJECT TO PLANNING CONSENT.
ALL TIMINGS INDICATIVE.




    Development of Feasibility Brief
    • The initial proposal

    • Design / Equalities / Travel principles

    • Service specifications

    • Local considerations

    • Discussions with Architect
CONTENT SUBJECT TO PLANNING CONSENT.
ALL TIMINGS INDICATIVE.


 Aerial view

  Nature reserve

                                                      St Michael’s
      Cemetery                                        Church

   Site boundary
                                                      Assembly Hall

    Cricket and                                       Blue Pool
   rugby pitches   CONTENT SUBJECT TO PLANNING
                   CONSENT. ALL TIMINGS INDICATIVE.   Site entrance

  Secondary site                                      Market Place
        access
                                                      Melksham House

  A350 Western                                        Parking
         Way
                                                      Melksham
                                                      Town FC
CONTENT SUBJECT TO PLANNING CONSENT.
ALL TIMINGS INDICATIVE.


 Site analysis
                                       Overview

                                       •Great opportunity

                                       •Excellent site

                                       •Central location

                                       •Level ground

                                       •Total area
                                          5.6 hectares
                                         (13.9 acres)

                                       •Some key
                                          site issues
                                          to consider
CONTENT SUBJECT TO PLANNING CONSENT.
ALL TIMINGS INDICATIVE.


 Site analysis
                                       Listed buildings:

                                       •Melksham
                                         House
                                         (main façade
                                         and entrance
                                         porch)

                                       •Gate piers to
                                         Place Road

                                       •Gate piers to
                                         Market Place
CONTENT SUBJECT TO PLANNING CONSENT.
ALL TIMINGS INDICATIVE.


 Site analysis
                                       Listed buildings


                                       Existing pond

                                       •Valuable asset

                                       •Historic
                                         significance

                                       •Potential
                                         ecological value
CONTENT SUBJECT TO PLANNING CONSENT.
ALL TIMINGS INDICATIVE.


 Site analysis
                                       Listed buildings


                                       Existing pond


                                       Trees and TPO’s

                                       •Around pond

                                       •Along
                                          north boundary

                                       •In front of House
                                          and bowling
                                          green
CONTENT SUBJECT TO PLANNING CONSENT.
ALL TIMINGS INDICATIVE.


 Site analysis
                                       Listed buildings


                                       Existing pond


                                       Trees and TPO’s


                                       Restricted main
                                       entrance

                                       •No vehicle /
                                         pedestrian
                                         separation

                                       •Conflicting
                                         accesses

                                       •Narrow road
CONTENT SUBJECT TO PLANNING CONSENT.
ALL TIMINGS INDICATIVE.


 Site analysis
                                       Listed buildings


                                       Existing pond


                                       Trees and TPO’s


                                       Restricted main
                                       Entrance


                                       Parkland setting

                                       •Valuable asset

                                       •Retention
                                         important
CONTENT SUBJECT TO PLANNING CONSENT.
ALL TIMINGS INDICATIVE.


 Site analysis
                                       Listed buildings


                                       Existing pond


                                       Trees and TPO’s


                                       Restricted main
                                       Entrance


                                       Parkland setting


                                       Access off A350

                                       •Inadequate
                                          visibility

                                       •Not viable
CONTENT SUBJECT TO PLANNING CONSENT.
ALL TIMINGS INDICATIVE.


 Site analysis
                                       Listed buildings


                                       Existing pond


                                       Trees and TPO’s


                                       Restricted main
                                       Entrance


                                       Parkland setting


                                       Access off A350


                                       Potential cemetery
                                       expansion
CONTENT SUBJECT TO PLANNING CONSENT.
ALL TIMINGS INDICATIVE.


 Site analysis
                                       Site access and
                                       Rights of Way

                                       •Variety of
                                          access points

                                       •Several
                                          permissive
                                          and public rights
                                          of way
CONTENT SUBJECT TO PLANNING CONSENT.
ALL TIMINGS INDICATIVE.


 Site analysis
                                       Site access and
                                       Rights of Way


                                       Ecology

                                       •Link to Cemetery
                                           and Nature
                                           Reserve on north
                                           and west sides

                                       •Trees and stone
                                          walls on north
                                          half of site

                                       •Pond

                                       •Keep western half
                                          ‘dark’
CONTENT SUBJECT TO PLANNING CONSENT.
ALL TIMINGS INDICATIVE.


 Site analysis
                                       Site access and
                                       Rights of Way


                                       Ecology


                                       Archaeology

                                       •Northern side of
                                          site
CONTENT SUBJECT TO PLANNING CONSENT.
ALL TIMINGS INDICATIVE.


 Site analysis
                                       Site access and
                                       Rights of Way


                                       Ecology


                                       Archaeology


                                       Facilities / Activities

                                       •Assembly Hall
                                          adjoining the site

                                       •Blue Pool site

                                       •Rugby and cricket
                                          pitches

                                       •MTFC pitch

                                       •Snooker, skittles,
                                          bowls, tennis and
                                          social clubs
                                          centred on
                                          Melksham House
CONTENT SUBJECT TO PLANNING CONSENT.
ALL TIMINGS INDICATIVE.


 Proposals
                                       •   Key elements of
                                           Melksham House
                                           retained

                                       •   Small scale new build
                                           around Melksham
                                           House

                                       •   New development for
                                           leisure facilities
                                           on MTFC ground

                                       •   Creation of good
                                           quality public space

                                       •   Single point of contact
                                           in central hub building

                                       •   Cricket pitch retained

                                       •   Potential cemetery
                                           expansion

                                       •   Potential additional
                                           car parking

                                       •   Potential reuse of Blue
                                           Pool
CONTENT SUBJECT TO PLANNING CONSENT.
ALL TIMINGS INDICATIVE.


 Proposals
                                       •   Key elements of
                                           Melksham House
                                           retained

                                       •   Small scale new build
                                           around Melksham
                                           House

                                       •   New development for
                                           leisure facilities
                                           on MTFC ground

                                       •   Development
                                           supports existing
                                           rights of way and
                                           routes into the site

                                       •   Creation of good
                                           quality public space

                                       •   Pond retained and
                                           enhanced

                                       •   Parkland approach
                                           retained

                                       •   Single point of contact
                                           in central hub building
CONTENT SUBJECT TO PLANNING CONSENT.
ALL TIMINGS INDICATIVE.


 Adjacencies schematic




                                                                                  Supplementary new
                                                                                  build / extension to
                                                                                  Melksham House
                                                                                  (appropriate in scale)



                                                                                          Library
                                                                                          Service
                                                                                          accommodation,
                                                                                          Multi-purpose
                                                                                          spaces, etc.



                                                                                    Retained heritage
                                                                                    elements of Melksham
                                                                                    House (ground and
                                                                                    first floors)

        Primary leisure elements   Single point of contact   Wiltshire Council service provision
                                          and core                  and core specification
CONTENT SUBJECT TO PLANNING CONSENT.
ALL TIMINGS INDICATIVE.

 Draft Accommodation Schedule
CONTENT SUBJECT TO PLANNING CONSENT.
ALL TIMINGS INDICATIVE.




    Next Steps
    •   Detailed design: October 2012 – March 2013

    •   Planning: Aiming for Spring 2013

    •   Assuming Area Board approval liaise with Melksham Town Council
        to ensure that the existing Assembly Hall is considered within
        scope for the project and that associated activities are protected.
Questions?

Weitere ähnliche Inhalte

Empfohlen

Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTExpeed Software
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsPixeldarts
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthThinkNow
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfmarketingartwork
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsKurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Applitools
 

Empfohlen (20)

Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
 

Melksham area board 10 oct 2012

  • 1. CONTENT SUBJECT TO PLANNING CONSENT. ALL TIMINGS INDICATIVE. Melksham Area Board Wednesday 10th October 2012 Melksham Community Campus – Project Update
  • 2. CONTENT SUBJECT TO PLANNING CONSENT. ALL TIMINGS INDICATIVE. Background • COB update • Existing site plan - challenges and opportunities • Site plan - preferred layout • Adjacencies diagram • Draft accommodation schedule
  • 3. CONTENT SUBJECT TO PLANNING CONSENT. ALL TIMINGS INDICATIVE. Melksham Shadow Community Operations Board (COB) • Appointed by Area Board • The team • Our role • New approach Community Engagement • Consultation (Community Area Partnership and Youth Survey) • Fact Finding with community groups (Melksham House users and sports clubs, Christie Miller Members Forum, Chamber of commerce)
  • 4. CONTENT SUBJECT TO PLANNING CONSENT. ALL TIMINGS INDICATIVE. Communications • Development of website Melkshamcampus-scob.org.uk • Posters • Melksham House User Updates • Press Releases • Updates to Area Board
  • 5. CONTENT SUBJECT TO PLANNING CONSENT. ALL TIMINGS INDICATIVE. Development of Feasibility Brief • The initial proposal • Design / Equalities / Travel principles • Service specifications • Local considerations • Discussions with Architect
  • 6. CONTENT SUBJECT TO PLANNING CONSENT. ALL TIMINGS INDICATIVE. Aerial view Nature reserve St Michael’s Cemetery Church Site boundary Assembly Hall Cricket and Blue Pool rugby pitches CONTENT SUBJECT TO PLANNING CONSENT. ALL TIMINGS INDICATIVE. Site entrance Secondary site Market Place access Melksham House A350 Western Parking Way Melksham Town FC
  • 7. CONTENT SUBJECT TO PLANNING CONSENT. ALL TIMINGS INDICATIVE. Site analysis Overview •Great opportunity •Excellent site •Central location •Level ground •Total area 5.6 hectares (13.9 acres) •Some key site issues to consider
  • 8. CONTENT SUBJECT TO PLANNING CONSENT. ALL TIMINGS INDICATIVE. Site analysis Listed buildings: •Melksham House (main façade and entrance porch) •Gate piers to Place Road •Gate piers to Market Place
  • 9. CONTENT SUBJECT TO PLANNING CONSENT. ALL TIMINGS INDICATIVE. Site analysis Listed buildings Existing pond •Valuable asset •Historic significance •Potential ecological value
  • 10. CONTENT SUBJECT TO PLANNING CONSENT. ALL TIMINGS INDICATIVE. Site analysis Listed buildings Existing pond Trees and TPO’s •Around pond •Along north boundary •In front of House and bowling green
  • 11. CONTENT SUBJECT TO PLANNING CONSENT. ALL TIMINGS INDICATIVE. Site analysis Listed buildings Existing pond Trees and TPO’s Restricted main entrance •No vehicle / pedestrian separation •Conflicting accesses •Narrow road
  • 12. CONTENT SUBJECT TO PLANNING CONSENT. ALL TIMINGS INDICATIVE. Site analysis Listed buildings Existing pond Trees and TPO’s Restricted main Entrance Parkland setting •Valuable asset •Retention important
  • 13. CONTENT SUBJECT TO PLANNING CONSENT. ALL TIMINGS INDICATIVE. Site analysis Listed buildings Existing pond Trees and TPO’s Restricted main Entrance Parkland setting Access off A350 •Inadequate visibility •Not viable
  • 14. CONTENT SUBJECT TO PLANNING CONSENT. ALL TIMINGS INDICATIVE. Site analysis Listed buildings Existing pond Trees and TPO’s Restricted main Entrance Parkland setting Access off A350 Potential cemetery expansion
  • 15. CONTENT SUBJECT TO PLANNING CONSENT. ALL TIMINGS INDICATIVE. Site analysis Site access and Rights of Way •Variety of access points •Several permissive and public rights of way
  • 16. CONTENT SUBJECT TO PLANNING CONSENT. ALL TIMINGS INDICATIVE. Site analysis Site access and Rights of Way Ecology •Link to Cemetery and Nature Reserve on north and west sides •Trees and stone walls on north half of site •Pond •Keep western half ‘dark’
  • 17. CONTENT SUBJECT TO PLANNING CONSENT. ALL TIMINGS INDICATIVE. Site analysis Site access and Rights of Way Ecology Archaeology •Northern side of site
  • 18. CONTENT SUBJECT TO PLANNING CONSENT. ALL TIMINGS INDICATIVE. Site analysis Site access and Rights of Way Ecology Archaeology Facilities / Activities •Assembly Hall adjoining the site •Blue Pool site •Rugby and cricket pitches •MTFC pitch •Snooker, skittles, bowls, tennis and social clubs centred on Melksham House
  • 19. CONTENT SUBJECT TO PLANNING CONSENT. ALL TIMINGS INDICATIVE. Proposals • Key elements of Melksham House retained • Small scale new build around Melksham House • New development for leisure facilities on MTFC ground • Creation of good quality public space • Single point of contact in central hub building • Cricket pitch retained • Potential cemetery expansion • Potential additional car parking • Potential reuse of Blue Pool
  • 20. CONTENT SUBJECT TO PLANNING CONSENT. ALL TIMINGS INDICATIVE. Proposals • Key elements of Melksham House retained • Small scale new build around Melksham House • New development for leisure facilities on MTFC ground • Development supports existing rights of way and routes into the site • Creation of good quality public space • Pond retained and enhanced • Parkland approach retained • Single point of contact in central hub building
  • 21. CONTENT SUBJECT TO PLANNING CONSENT. ALL TIMINGS INDICATIVE. Adjacencies schematic Supplementary new build / extension to Melksham House (appropriate in scale) Library Service accommodation, Multi-purpose spaces, etc. Retained heritage elements of Melksham House (ground and first floors) Primary leisure elements Single point of contact Wiltshire Council service provision and core and core specification
  • 22. CONTENT SUBJECT TO PLANNING CONSENT. ALL TIMINGS INDICATIVE. Draft Accommodation Schedule
  • 23. CONTENT SUBJECT TO PLANNING CONSENT. ALL TIMINGS INDICATIVE. Next Steps • Detailed design: October 2012 – March 2013 • Planning: Aiming for Spring 2013 • Assuming Area Board approval liaise with Melksham Town Council to ensure that the existing Assembly Hall is considered within scope for the project and that associated activities are protected.