SlideShare a Scribd company logo
1 of 9
Cliona O’Hanrahan
     Introduction and Overview
Overview

My project management background has given me a very good understanding of
technologies and project methodologies which I have used to manage a wide range
of projects. One of my key strengths is the ability to very quickly understand when a
project is in trouble and using a collaborative approach work with the project team
to provide and agree to an overall solution to bring the project back on track

In today’s economy where companies are challenged to ensure that projects are
delivered in line with their agreed strategies and goals, applying the correct project
process will lead to a greater success of delivering the project and meeting the
overall project deliverables. I am experienced enough to understand if they will be
using a less formal approach or a fully integrated project management solution to
manage the project life cycles and know the importance of communication and
teamwork to ensure a successful delivery.

I have been involved in projects within the telecommunications, banking and digital
mobile sectors and have always enjoyed the diversity of the projects that I managed
which have included both local and international teams.

I am both a career women as well as a mom and believe in a good balance that
allows me to enjoy the best of both worlds. I enjoy writing, entertaining, travelling
and spending time with my very energetic teenage son.
Thumbtribe Mobile Solutions            Sector                   Mobile and Web Digital
       2010 – 2011
                                       Project Methodology      Digital, PMBOK, Prince2
                                       SDLC approach            Waterfall, Agile
                                       Budget range             R200K – R2.5M
     Projects Implemented
                                       Technology               HTML, Ajax, CSSE, Java, Netbiscuits, Momac

•    Application Scoring Projects for Absa Business Units
•    Omniture Analytics
•    Recommendation Engine
•    Reporting Administration Consol
•    Campaign and Marketing launches

    What Was Achieved


•    Development of a software development process combining PMBOK, Prince2 and SDLC best practices.
•    Better efficiency in delivering the customer’s product roadmap
•    Ability to deliver multiply projects simultaneously
•    Allowed the business teams to make their financial and revenue targets
•    Allowed the customer to increase their digital footprint within Mobile(WAP) and Web


        Summary

Working together with the Thumbtribe Management Team and the client we developed a software development
process that was aligned to the delivery of digital projects covering both web and mobile. This allowed Thumbtribe
to implement multiple projects that were defined by the client‘s roadmap and to ensure that all of the required
goals for both the client and Thumbtribe were met successfully.

Using this project model the Thumbtribe team have been able to increase their footprint within the banking digital
environment and to ensure that they can commit to all project deliverables requested by their clients both in the
short and long term.
Standard Bank Card Africa            Sector                     Banking – Card Division
       2009 - 2010
                                     Project Methodology        PMBOK, Prince2. Microsoft EPM
                                     SDLC approach              Waterfall, Agile
                                     Budget                     R2.5M
                                     Technology                 Postilion, CR2, TSYS, Connect Direct, Bank
                                                                Infrastructure
   Projects Implemented

Integrated Multilane Solution Host to Host


 What Was Achieved


• The provision of a more effective mechanism for the retailer to manage and reconcile multi terminal POS
  acquiring within the regulatory statutory requirements of the local banking industry.
• Consolidated MIS reporting using Card Africa's technical infrastructure and operating processes.
• Compliance to the Legislative requirement in Namibia initially and other countries in line with the Africa Game
  Plan.
• Card Africa would be able to effectively compete in the retail segments in the various markets in Africa.
• Enhanced Customer Service for their current merchants.


       Summary


This Multilane Solution provided Standard Bank Card Africa the opportunity to successfully integrate a new
concept for a Multilane Lane approach using various external suppliers as well as various internal suppliers to
streamline processes and communication strategies to manage a multi faceted multi matrix environment. The
system developed will allow for the authorisation and processing of debit and credit cards via an integrated
solution hosted by the retailer into the Bank’s point of sale acquiring infrastructure.
Sector                     Telecommunications
              MTN
           2007 – 2009                  Project Methodology        PMBOK, Microsoft EPM
                                        SDLC approach              Waterfall, Agile
                                        Budget range               R300K – R5M
                                        Technology                 GSM; EDGE; Web; WAP; USSD; IVR; SMS;
     Projects Implemented                                          VOD; MMS; GPRS

•    New product/platform Development – in-house
•    New product/platform Development – outside vendor (RFP) – platform implementation
•    Functional Component development
•    Regulatory projects
•    Interface design projects
•    Campaign support


    What Was Achieved

•    Delivery and implementation of the approved roadmaps
•    Management of the deliverables required by 3rd party suppliers
•    Resource allocation to ensure the required skills within the project life cycle were available
•    Stakeholder and management buy-in across all business units
•    Development of a program management process to manage multiple projects and resources
•    Allowing MTNLoaded to meet both their revenue and score card targets


          Summary


Working together The MTN Loaded Team and the Marketing Product Managers we ensured that quality and
innovative products and content were produced and deployed into a very challenging and dynamic
marketplace. This allowed the MTNLoaded team to be ahead of mobile technology environment and to meet
the requirements of their vast and varied customer base.
Motorola                  Sector                   Telecommunications
           2000- 2006
                                      Project Methodology      PMBOK, Microsoft EPM, Clarity/Niku
                                      SDLC approach            Motorola Best Practice
                                      Budget range             $500 - $3M
                                      Technology               GSM; 2G/3G; GPRS; VSWR; SQL; HTML;
     Projects Implemented                                      Adobe


•   GSM Site Rollouts
•   TL9000 quality process and procedures rollout throughout Motorola EMEA
•   Reworks and upgrades
•   Development of a PMO Integrated Website


    What was achieved

•    Ability to meet the customer’s performance targets and avoid penalties
•    Project Management was aligned globally to meet the TL 9000 requirements
•    Vodacom network was maintained in line with their business requirements and strategies
•    All projects were managed using a using the agreed project management standards
•    Control and management of the EMEA region using a central PMO structure


        Summary

Motorola SA had a wide and varied client base across the EMEA region and using agreed processes and
standards we managed to deploy all projects to meet strategic targets and quality goals. The project office
had to ensure that we could effectively support the account managers once the contracts and scope of works
had been approved. Success of delivery was measured by avoidance of penalties and the ability to work with
a wide section of internal and external resources across the EMEA region. We managed to deploy new
technology and maintain current technology for the networks to ensure that their quality targets were
achieved
Liberty Life                Sector                    Financial - Insurance
           1988 - 1995
                                       Project Methodology       PMBOK, Microsoft EPM,
                                       Budget                    Controlled by business units



     Projects Implemented


•   Phase 1 Training        Level 1 Consultants
•   Phase 2 Training        Level 2 Consultants
•   Phase 3 Training        Level 3 Consultants
•   Medical Lifestyle       Product Launch



    What Was Achieved


•   Training was provided for all level of consultants from entry level to writing of their ILPA exams
•   Setup of a training design division
•   Agencies met their sales targets allowing Liberty Life to become the leader in the market place .
•   Integrated training web site rolled out
•   Medical lifestyle launched in South Africa a unique and dynamic solution to an ever-changing insurance
    environment to meet clients medical requirements.

        Summary

Liberty Life Launched the Medical Lifestyle product which revolutionised the way their customers were able
to manage their medical and health requirements. The Training and Development Department introduced a
web interactive training programme allowing consultants to keep on track with latest industry developments
and ensure that all current product information was on hand 24 hours a day. It also assisted the
consultants to prepare for the ILPA exams.
Recommendations
           Cliona has strong leadership abilities, excellent vision and would be an outstanding
           asset to any company
           Linda Ritchie Senior Training and Development Manager


           Cliona has the right skills, organisational ability as well as the capacity to maintain a
           good relationship with both the internal teams as well as the customer. She always
           ensured that she maintained the right vision for the company, as well as providing new
           concepts and operational processes to allow the division to operate effectively.
           Graham Cusack Territorial Business Unit Manager – Southern Africa



            Cliona is an energetic and forward looking individual. Cliona does not only look at the
            task at hand, but also considers aspects that could have an impact in the future. In the
            Credit Card Africa space Cliona has been a real asset bringing with her a wealth of
            experience in the virtual commerce space. She has a broad communications network
            and are able to obtain information instantly. She is particularly detailed and has the
            ability to provide informative and quality progress reports
            Reinhardt Greyvensteyn Portfolio Manager, Standard Bank


            Cliona was hired to implement a Project Management process at Thumbtribe and to also
            manage our Absa projects. She has vast experience and knowledge on the subject and
            brought a tremendous amount of structure to our approach. Her diligence and leadership
            in maintaining accurate project records is an absolute pleasure as we always knew,
            where we were and that all angles were covered. Cliona is unwavering in her pursuit of
            any outstanding project deliverables or requirements. Once on the case you can rest
            assured that it will get done. I am sure Cliona will enjoy much success in her future
            endeavours. We at Thumbtribe thank her for her contribution and wish her all the best
            Stephen O’Donoghue New Business Director
Conclusion
   There are many challenges that are faced by the business world today on
   how to manage your business goals and strategies in a market that is both
   dynamic and moves very quickly. Within both the technology and business
   sectors change is constant and the question that one asks is how do you
   manage this effectively.

   The principles of project management and the approved processes has stood
   the test of time and allowed business objectives, strategies and visions to be
   delivered efficiently and effectively.  The one constant is that project
   management will allow you to meet these challenges and deliver a quality
   product or service each and every time.

   I know that both my skills and experience will be an advantage to deliver any
   project requirement and look forward to the opportunity this presents.

   Thank you for taking the time to read my presentation.


Coming together is a beginning. Keeping together is progress. Working together is
success.
- Henry Ford (1863-1947) (American industrialist and pioneer of the assembly-line production method).

More Related Content

What's hot (11)

Tarek Shazly_CV
Tarek Shazly_CVTarek Shazly_CV
Tarek Shazly_CV
 
31225 huwae cert
31225 huwae cert31225 huwae cert
31225 huwae cert
 
Sharath Logandha
Sharath LogandhaSharath Logandha
Sharath Logandha
 
Sharath Logandha
Sharath LogandhaSharath Logandha
Sharath Logandha
 
Ranjana biswas resume
Ranjana biswas resumeRanjana biswas resume
Ranjana biswas resume
 
4G Business Case Model
4G Business Case Model 4G Business Case Model
4G Business Case Model
 
Resume_RamVerma
Resume_RamVermaResume_RamVerma
Resume_RamVerma
 
MobileComm Training Services
MobileComm Training ServicesMobileComm Training Services
MobileComm Training Services
 
IQBG Cobol Prospectus
IQBG Cobol ProspectusIQBG Cobol Prospectus
IQBG Cobol Prospectus
 
Varun - Enterprise Solution Architect
Varun - Enterprise Solution ArchitectVarun - Enterprise Solution Architect
Varun - Enterprise Solution Architect
 
Network Process Outsourcing Services
Network Process Outsourcing ServicesNetwork Process Outsourcing Services
Network Process Outsourcing Services
 

Viewers also liked

Viewers also liked (6)

Pm audit and assessment approach final
Pm audit and assessment approach   finalPm audit and assessment approach   final
Pm audit and assessment approach final
 
PMO View Dashboard Brochure_2 Page.compressed
PMO View Dashboard Brochure_2 Page.compressedPMO View Dashboard Brochure_2 Page.compressed
PMO View Dashboard Brochure_2 Page.compressed
 
Lets get digital
Lets get digitalLets get digital
Lets get digital
 
A project quick start guide
A project quick start guideA project quick start guide
A project quick start guide
 
Jeanie Liu Portfolio
Jeanie Liu PortfolioJeanie Liu Portfolio
Jeanie Liu Portfolio
 
The digital project manager
The digital project managerThe digital project manager
The digital project manager
 

Similar to Manage Projects and Deliver Digital Solutions

Adrian lancaster cv 2013 v1.1
Adrian lancaster cv 2013 v1.1Adrian lancaster cv 2013 v1.1
Adrian lancaster cv 2013 v1.1lancasad
 
Mohamed R. Mahran Resume
Mohamed R. Mahran ResumeMohamed R. Mahran Resume
Mohamed R. Mahran ResumeMohamed Mahran
 
Mohamed R. Mahran Resume
Mohamed R. Mahran ResumeMohamed R. Mahran Resume
Mohamed R. Mahran ResumeMohamed Mahran
 
Martin Lavelle CV 2016 v1.1
Martin Lavelle CV 2016 v1.1Martin Lavelle CV 2016 v1.1
Martin Lavelle CV 2016 v1.1Martin Lavelle
 
Nitin Gupta_2016_resume
Nitin Gupta_2016_resumeNitin Gupta_2016_resume
Nitin Gupta_2016_resumeNitin Gupta
 
paul_jubb cv 16May15
paul_jubb cv  16May15paul_jubb cv  16May15
paul_jubb cv 16May15Paul Jubb
 
Digital Transformation Map
Digital Transformation MapDigital Transformation Map
Digital Transformation Maposcarallejandro
 
Resume_OmPrakash_12yrs
Resume_OmPrakash_12yrs Resume_OmPrakash_12yrs
Resume_OmPrakash_12yrs OM GUPTA
 
Bohill Consulting Project Management And Solutions Consultancy
Bohill Consulting   Project Management And Solutions ConsultancyBohill Consulting   Project Management And Solutions Consultancy
Bohill Consulting Project Management And Solutions Consultancygabrielleburns
 
CV_PGM_G.Moat_20151130a
CV_PGM_G.Moat_20151130aCV_PGM_G.Moat_20151130a
CV_PGM_G.Moat_20151130aGraham Moat
 
Utilities App Development - Mobiloitte
Utilities App Development - MobiloitteUtilities App Development - Mobiloitte
Utilities App Development - MobiloitteMobiloitte
 

Similar to Manage Projects and Deliver Digital Solutions (20)

Adrian lancaster cv 2013 v1.1
Adrian lancaster cv 2013 v1.1Adrian lancaster cv 2013 v1.1
Adrian lancaster cv 2013 v1.1
 
Mohamed R. Mahran Resume
Mohamed R. Mahran ResumeMohamed R. Mahran Resume
Mohamed R. Mahran Resume
 
Mohamed R. Mahran Resume
Mohamed R. Mahran ResumeMohamed R. Mahran Resume
Mohamed R. Mahran Resume
 
Martin Lavelle CV 2016 v1.1
Martin Lavelle CV 2016 v1.1Martin Lavelle CV 2016 v1.1
Martin Lavelle CV 2016 v1.1
 
Nitin Gupta_2016_resume
Nitin Gupta_2016_resumeNitin Gupta_2016_resume
Nitin Gupta_2016_resume
 
Mahendra Gopu
Mahendra GopuMahendra Gopu
Mahendra Gopu
 
paul_jubb cv 16May15
paul_jubb cv  16May15paul_jubb cv  16May15
paul_jubb cv 16May15
 
Zeeshan_Jafri_T
Zeeshan_Jafri_TZeeshan_Jafri_T
Zeeshan_Jafri_T
 
CV of Presantha Pillay
CV of Presantha PillayCV of Presantha Pillay
CV of Presantha Pillay
 
Digital Transformation Map
Digital Transformation MapDigital Transformation Map
Digital Transformation Map
 
Tk amk new
Tk amk newTk amk new
Tk amk new
 
Tk amk new
Tk amk newTk amk new
Tk amk new
 
Ankit Agarwal - PM
Ankit Agarwal - PMAnkit Agarwal - PM
Ankit Agarwal - PM
 
Resume_OmPrakash_12yrs
Resume_OmPrakash_12yrs Resume_OmPrakash_12yrs
Resume_OmPrakash_12yrs
 
MKMitra CV Apr16
MKMitra CV Apr16MKMitra CV Apr16
MKMitra CV Apr16
 
PeterGuirgis_SM_resume
PeterGuirgis_SM_resumePeterGuirgis_SM_resume
PeterGuirgis_SM_resume
 
Vivek Srivastava-2015
Vivek Srivastava-2015Vivek Srivastava-2015
Vivek Srivastava-2015
 
Bohill Consulting Project Management And Solutions Consultancy
Bohill Consulting   Project Management And Solutions ConsultancyBohill Consulting   Project Management And Solutions Consultancy
Bohill Consulting Project Management And Solutions Consultancy
 
CV_PGM_G.Moat_20151130a
CV_PGM_G.Moat_20151130aCV_PGM_G.Moat_20151130a
CV_PGM_G.Moat_20151130a
 
Utilities App Development - Mobiloitte
Utilities App Development - MobiloitteUtilities App Development - Mobiloitte
Utilities App Development - Mobiloitte
 

More from Project Management Solutions

A guide for the rolling out of a software delivery project
A guide for the rolling out of a software delivery projectA guide for the rolling out of a software delivery project
A guide for the rolling out of a software delivery projectProject Management Solutions
 
Is your project not going well this will help you get it back on track
Is your project not going well this will help you get it back on trackIs your project not going well this will help you get it back on track
Is your project not going well this will help you get it back on trackProject Management Solutions
 

More from Project Management Solutions (17)

The role of the project manager
The role of the project managerThe role of the project manager
The role of the project manager
 
Setting up a project framework phase 1 june 20162
Setting up a project framework phase 1 june 20162Setting up a project framework phase 1 june 20162
Setting up a project framework phase 1 june 20162
 
Taking a web site from concept to launch
Taking a web site from concept to launchTaking a web site from concept to launch
Taking a web site from concept to launch
 
Managing multiple projects
Managing multiple projectsManaging multiple projects
Managing multiple projects
 
Turning your project around
Turning your project aroundTurning your project around
Turning your project around
 
A guide for the rolling out of a software delivery project
A guide for the rolling out of a software delivery projectA guide for the rolling out of a software delivery project
A guide for the rolling out of a software delivery project
 
The agile pmo v2
The agile pmo v2The agile pmo v2
The agile pmo v2
 
Business and project changing the paradigm
Business and project changing the paradigmBusiness and project changing the paradigm
Business and project changing the paradigm
 
Project health check updated and improved
Project health check updated and improvedProject health check updated and improved
Project health check updated and improved
 
Why not - Words to make you think
Why not - Words to make you thinkWhy not - Words to make you think
Why not - Words to make you think
 
Project management today a step ahead
Project management today   a step aheadProject management today   a step ahead
Project management today a step ahead
 
Managing your suppliers makes perfect sense
Managing your suppliers makes perfect senseManaging your suppliers makes perfect sense
Managing your suppliers makes perfect sense
 
Ready get set go your project is approved
Ready get set go your project is approvedReady get set go your project is approved
Ready get set go your project is approved
 
Getting Ready for UAT
Getting Ready for UATGetting Ready for UAT
Getting Ready for UAT
 
Is your project not going well this will help you get it back on track
Is your project not going well this will help you get it back on trackIs your project not going well this will help you get it back on track
Is your project not going well this will help you get it back on track
 
Pm audit and assessment approach final
Pm audit and assessment approach   finalPm audit and assessment approach   final
Pm audit and assessment approach final
 
Strategy planning for small digital companies
Strategy planning for small digital companiesStrategy planning for small digital companies
Strategy planning for small digital companies
 

Manage Projects and Deliver Digital Solutions

  • 1. Cliona O’Hanrahan Introduction and Overview
  • 2. Overview My project management background has given me a very good understanding of technologies and project methodologies which I have used to manage a wide range of projects. One of my key strengths is the ability to very quickly understand when a project is in trouble and using a collaborative approach work with the project team to provide and agree to an overall solution to bring the project back on track In today’s economy where companies are challenged to ensure that projects are delivered in line with their agreed strategies and goals, applying the correct project process will lead to a greater success of delivering the project and meeting the overall project deliverables. I am experienced enough to understand if they will be using a less formal approach or a fully integrated project management solution to manage the project life cycles and know the importance of communication and teamwork to ensure a successful delivery. I have been involved in projects within the telecommunications, banking and digital mobile sectors and have always enjoyed the diversity of the projects that I managed which have included both local and international teams. I am both a career women as well as a mom and believe in a good balance that allows me to enjoy the best of both worlds. I enjoy writing, entertaining, travelling and spending time with my very energetic teenage son.
  • 3. Thumbtribe Mobile Solutions Sector Mobile and Web Digital 2010 – 2011 Project Methodology Digital, PMBOK, Prince2 SDLC approach Waterfall, Agile Budget range R200K – R2.5M Projects Implemented Technology HTML, Ajax, CSSE, Java, Netbiscuits, Momac • Application Scoring Projects for Absa Business Units • Omniture Analytics • Recommendation Engine • Reporting Administration Consol • Campaign and Marketing launches What Was Achieved • Development of a software development process combining PMBOK, Prince2 and SDLC best practices. • Better efficiency in delivering the customer’s product roadmap • Ability to deliver multiply projects simultaneously • Allowed the business teams to make their financial and revenue targets • Allowed the customer to increase their digital footprint within Mobile(WAP) and Web Summary Working together with the Thumbtribe Management Team and the client we developed a software development process that was aligned to the delivery of digital projects covering both web and mobile. This allowed Thumbtribe to implement multiple projects that were defined by the client‘s roadmap and to ensure that all of the required goals for both the client and Thumbtribe were met successfully. Using this project model the Thumbtribe team have been able to increase their footprint within the banking digital environment and to ensure that they can commit to all project deliverables requested by their clients both in the short and long term.
  • 4. Standard Bank Card Africa Sector Banking – Card Division 2009 - 2010 Project Methodology PMBOK, Prince2. Microsoft EPM SDLC approach Waterfall, Agile Budget R2.5M Technology Postilion, CR2, TSYS, Connect Direct, Bank Infrastructure Projects Implemented Integrated Multilane Solution Host to Host What Was Achieved • The provision of a more effective mechanism for the retailer to manage and reconcile multi terminal POS acquiring within the regulatory statutory requirements of the local banking industry. • Consolidated MIS reporting using Card Africa's technical infrastructure and operating processes. • Compliance to the Legislative requirement in Namibia initially and other countries in line with the Africa Game Plan. • Card Africa would be able to effectively compete in the retail segments in the various markets in Africa. • Enhanced Customer Service for their current merchants. Summary This Multilane Solution provided Standard Bank Card Africa the opportunity to successfully integrate a new concept for a Multilane Lane approach using various external suppliers as well as various internal suppliers to streamline processes and communication strategies to manage a multi faceted multi matrix environment. The system developed will allow for the authorisation and processing of debit and credit cards via an integrated solution hosted by the retailer into the Bank’s point of sale acquiring infrastructure.
  • 5. Sector Telecommunications MTN 2007 – 2009 Project Methodology PMBOK, Microsoft EPM SDLC approach Waterfall, Agile Budget range R300K – R5M Technology GSM; EDGE; Web; WAP; USSD; IVR; SMS; Projects Implemented VOD; MMS; GPRS • New product/platform Development – in-house • New product/platform Development – outside vendor (RFP) – platform implementation • Functional Component development • Regulatory projects • Interface design projects • Campaign support What Was Achieved • Delivery and implementation of the approved roadmaps • Management of the deliverables required by 3rd party suppliers • Resource allocation to ensure the required skills within the project life cycle were available • Stakeholder and management buy-in across all business units • Development of a program management process to manage multiple projects and resources • Allowing MTNLoaded to meet both their revenue and score card targets Summary Working together The MTN Loaded Team and the Marketing Product Managers we ensured that quality and innovative products and content were produced and deployed into a very challenging and dynamic marketplace. This allowed the MTNLoaded team to be ahead of mobile technology environment and to meet the requirements of their vast and varied customer base.
  • 6. Motorola Sector Telecommunications 2000- 2006 Project Methodology PMBOK, Microsoft EPM, Clarity/Niku SDLC approach Motorola Best Practice Budget range $500 - $3M Technology GSM; 2G/3G; GPRS; VSWR; SQL; HTML; Projects Implemented Adobe • GSM Site Rollouts • TL9000 quality process and procedures rollout throughout Motorola EMEA • Reworks and upgrades • Development of a PMO Integrated Website What was achieved • Ability to meet the customer’s performance targets and avoid penalties • Project Management was aligned globally to meet the TL 9000 requirements • Vodacom network was maintained in line with their business requirements and strategies • All projects were managed using a using the agreed project management standards • Control and management of the EMEA region using a central PMO structure Summary Motorola SA had a wide and varied client base across the EMEA region and using agreed processes and standards we managed to deploy all projects to meet strategic targets and quality goals. The project office had to ensure that we could effectively support the account managers once the contracts and scope of works had been approved. Success of delivery was measured by avoidance of penalties and the ability to work with a wide section of internal and external resources across the EMEA region. We managed to deploy new technology and maintain current technology for the networks to ensure that their quality targets were achieved
  • 7. Liberty Life Sector Financial - Insurance 1988 - 1995 Project Methodology PMBOK, Microsoft EPM, Budget Controlled by business units Projects Implemented • Phase 1 Training Level 1 Consultants • Phase 2 Training Level 2 Consultants • Phase 3 Training Level 3 Consultants • Medical Lifestyle Product Launch What Was Achieved • Training was provided for all level of consultants from entry level to writing of their ILPA exams • Setup of a training design division • Agencies met their sales targets allowing Liberty Life to become the leader in the market place . • Integrated training web site rolled out • Medical lifestyle launched in South Africa a unique and dynamic solution to an ever-changing insurance environment to meet clients medical requirements. Summary Liberty Life Launched the Medical Lifestyle product which revolutionised the way their customers were able to manage their medical and health requirements. The Training and Development Department introduced a web interactive training programme allowing consultants to keep on track with latest industry developments and ensure that all current product information was on hand 24 hours a day. It also assisted the consultants to prepare for the ILPA exams.
  • 8. Recommendations Cliona has strong leadership abilities, excellent vision and would be an outstanding asset to any company Linda Ritchie Senior Training and Development Manager Cliona has the right skills, organisational ability as well as the capacity to maintain a good relationship with both the internal teams as well as the customer. She always ensured that she maintained the right vision for the company, as well as providing new concepts and operational processes to allow the division to operate effectively. Graham Cusack Territorial Business Unit Manager – Southern Africa Cliona is an energetic and forward looking individual. Cliona does not only look at the task at hand, but also considers aspects that could have an impact in the future. In the Credit Card Africa space Cliona has been a real asset bringing with her a wealth of experience in the virtual commerce space. She has a broad communications network and are able to obtain information instantly. She is particularly detailed and has the ability to provide informative and quality progress reports Reinhardt Greyvensteyn Portfolio Manager, Standard Bank Cliona was hired to implement a Project Management process at Thumbtribe and to also manage our Absa projects. She has vast experience and knowledge on the subject and brought a tremendous amount of structure to our approach. Her diligence and leadership in maintaining accurate project records is an absolute pleasure as we always knew, where we were and that all angles were covered. Cliona is unwavering in her pursuit of any outstanding project deliverables or requirements. Once on the case you can rest assured that it will get done. I am sure Cliona will enjoy much success in her future endeavours. We at Thumbtribe thank her for her contribution and wish her all the best Stephen O’Donoghue New Business Director
  • 9. Conclusion There are many challenges that are faced by the business world today on how to manage your business goals and strategies in a market that is both dynamic and moves very quickly. Within both the technology and business sectors change is constant and the question that one asks is how do you manage this effectively. The principles of project management and the approved processes has stood the test of time and allowed business objectives, strategies and visions to be delivered efficiently and effectively. The one constant is that project management will allow you to meet these challenges and deliver a quality product or service each and every time. I know that both my skills and experience will be an advantage to deliver any project requirement and look forward to the opportunity this presents. Thank you for taking the time to read my presentation. Coming together is a beginning. Keeping together is progress. Working together is success. - Henry Ford (1863-1947) (American industrialist and pioneer of the assembly-line production method).