Schedule Development – A Methodical
Approach to Building a Schedule
Chris Carson, PSP, CCM      John Potter, PSP
Director Project Controls   Project Controls Manager
Alpha Corporation           Alpha Corporation
Resources for Scheduling
• PMI – Project Management Institute
   – Practice Standard for Scheduling
   – Practice Standard for WBS & EV
• PMI-CoS – College of Scheduling
  PMI-
   – Scheduling Excellence Initiative (SEI) project writing
     Best Practices and Guidelines – Scheduling/Claims
• AACEi – Association for the Advancement of Cost Engineering
   – Publishing Recommended Practices
• CMAA – Construction Management Association of America
   – Revising Time Management Chapter of the
     Construction Management Standards of Practice
Design or Development?
  Refer to 2008 presentation at PMI-CoS
  national conference
     “Schedule Design; Planning for
     Schedule Development”
  Separate the two processes
      Design first
      Development second
  Need to plan (Schedule Design) to create the schedule
  (Schedule Development)
Schedule Design
 Why design a schedule?
    A schedule meets the criteria for a “project” in itself
    A schedule is a guideline or plan for a project
    A schedule provides a a methodical approach for a project
    Keeps the schedule development on track
    Prevents rework due to late understanding of needs
    Allows buy-in from end users prior to Development
    Makes the schedule development session much more
    meaningful
    Documents the assumptions and intention of the schedule
      For reviewer and approver
      For future reference
      To facilitate changes in schedulers
      Place to capture Lessons Learned
Schedule Design
 Scope of Design vs. Development
   Design – Conceptualizing the schedule
     Planning
     Starting with the end in mind
     Providing concept of final product
     Creating organizational structure to fulfill the concept


   Development - Building the schedule
     Input activities
     Input logic
     Input durations
     Review for design compliance
     Review for CPM methodology best practices
     Quality control
Schedule Design - Background
 Design vs. Development – How do PMI &
 PMBOK handle it?
   PMBOK identifies six Project Time
   Management processes, usually defined
   as part of the project lifecycle, Chapter 6
   of PMBOK 4th Edition.
      Define Activities.
      Sequence Activities
      Estimate Activity Resources
      Estimate Activity Durations
      Develop Schedule
      Control Schedule
Schedule Design - Background
Design vs. Development – How do PMI & PMBOK
handle it?
  These processes are paralleled by a planning effort
  by the PM team, part of PMBOK’s “Develop Project
  Management Plan”, PMBOK Section 4.2 (which sets
  the format and establishes criteria for developing &
  controlling the project schedule).
  These processes are documented in what PMBOK
  calls a Schedule Management Plan contained in the
  project management plan. This SMP selects the
  scheduling methodology and the scheduling tool.
  PMBOK says the majority of effort in the TM
  Knowledge Area will occur in the Control Schedule
  process (Section 6.6)
Schedule Design - Background
The inputs for the Time Management Processes
used to Develop the Schedule are listed as:
      These fall under Schedule Design
       Scope Baseline
       Activity List
       Activity Attributes
       Milestone List
       Project Scope Statement
       Resource Requirements
       Resource Calendars
     These fall under Schedule Development
       Project Schedule Network Diagrams
       Activity Resource Requirements
       Activity Duration Estimates
Schedule Design - Background

Design vs. Development – why emphasize the
distinction?
  Design tends to be ignored in favor of jumping right
  into development.
     Many schedulers elect to begin creating activities
     instead of Designing.
     Work is subsequently repetitive, with lots of
     potential for rework.
     Results tend to be disorganized.
Avoid planning mistakes and problems.
AACEi: TCM Framework:
7.2 Schedule Planning & Development
      •   .1 Schedule Planning & Development
      •   .2 Identify Activities
      •   .3 Develop Activity Logic
      •   .4 Estimate Durations
      •   .5 Establish Schedule Requirements
      •   .6 Allocate Recourses
      •   .7 Optimize Schedule
      •   .8 Establish Schedule Control Plan
      •   .9 Review & Validate Schedule
      •   .10 Document & Communicate Schedule
      •   .11 Submit Schedule Deliverables
      •   .12 Develop & Maintain Methods & Tools
PMBOK 3rd Ed. The diagram
to the right is a Project Time
Management (Schedule)
process flow diagram. This
diagram gives us an idea
about how integral the
schedule is to the
management of the entire
project.

The six sections related to
schedule development are
at the center of the diagram.
Schedule Development – Art or Science?
 Most texts and good practices state “Identify
 Activities” & “Develop Logic” and skip any details
   This is the hardest area for most schedulers
   Good organization of the schedule is vital
   It is not that simple
 Every scheduler starts Schedule Development
 differently
 Using the basis from Schedule Design, the process
 can be defined and structured
Schedule Development - Process
Assemble development team
Design the schedule
    Identify Level of detail required
    Identify output needed – Activity Code & WBS structures
    Identify scope of work - Activities (input from subs/primes)
Develop the schedule
    Calculate Durations (input from subs/primes)
    Assign logic (input from subs/primes)
    Input to computer
    Analyze and adjust
Finalize the schedule
    QC checklists & verification
    Seek final buy-in and approval (includes team)
    Add resources and costs
Schedule Development Team
 Includes stakeholders:
     Scheduler
     Superintendent
     Project Manager
     Major trade contractors
 Needs input from:
     Owner
     Estimating
     Senior management
     A&E, if Design-Build or plans not ready
Schedule Design – Review Specifications
Schedule Design - WBS
 • Develop Work Breakdown Structure.
    • Translate asset scope into component
      deliverables (“decomposition”).
    • Ensure consistency in WBS levels, to facilitate
      comparison.
Schedule Scope & Budget

Prepare a Scope &
Budget for the work
required to prepare
and maintain the
project schedule.
Even if it’s an internal
document it will
come in handy at
some point during
the project.
Schedule Design
• Technical Scheduling Components
   • Design Activity Coding structure
     • Input Driven - Based on need to organize
       schedule
       •   Look at Stages and Areas (as well as Phases)
       •   Stages: Foundations, Structure, Rough-ins
       •   Areas: Determined by expected progress
       •   Phases: Usually are repetitive sequence activities
     • Output Driven - Based on need to report to
       different stakeholders
     • Based on need to filter & isolate
Schedule Design - Use

• Schedule Design Output (Software Driven)
   • Level of Detail
    • Determine approach:
      •   Bottom-up (starting with detailed activities)
      •   Top-down (starting with summary schedule)
      •   Both (prepare Top-down, then Bottom-up)
    • Develop functional Stages, then progress-rate
      Areas
    • Review use of schedule
    • Identify frequency of updates.
    • Establish smallest activity duration range.
Schedule Design – Level of Detail
 One of the most important decisions
   Depends on the nature, size and complexity of the project
   Need enough activities to reflect intricacies and
   interdependencies
   Too few activities will require use of SS and FS lagged
   activities; harder to analyze
   High level of detail will make updates more time consuming
   High level of detail will allow better monitoring & updating
   Need ability to monitor individual trade contractors
   Need enough detail to avoid incomplete activities waiting on
   others to progress
     Example: Office/educational building, corridors will not be
     completed with the offices/classrooms, so if they are covered by
     the same activities, there will be multiple activities progressed to
     85% (room finishes complete, but corridor finishes not started)
Schedule Design

• Reporting
  •   Define all reports
  •   Provide examples
Schedule Design – Level of Detail
 Steps to determine level of detail
    How will schedule be used?
      Management tool for daily trade monitoring, look-ahead
      schedules generated out of main CPM schedule
        Need weekly data, will update weekly
      Overview for superintendent to correlate his weekly bar
      chart which will be used for look-ahead schedules
        Need monthly data, will update monthly
    Assess minimum duration
      For weekly management, smallest typical duration set at 1
      to 3 days
      For monthly overview management, smallest typical
      duration set at 4 to 10 days
Schedule Design – Level of Detail
 Steps to determine level of detail
    Break down the project into appropriate Stages
      Each Stage may progress somewhat independently from
      other Stages (other than Intra-Stage dependencies)
      Facilities
        Underground utilities may require some initial work and then
        run concurrently
        Foundations will progress alone until sufficiently ahead to
        start structure
        Foundations and structure will progress independently from
        interior work and exterior façade
        Exterior façade, other than dry-in, will proceed concurrently
        with interior rough-ins and finishes, but lagged from structure
        Interior rough-ins will lead interior finishes but can overlap
        Some interior finishes, such as museum millwork, may
        require full unencumbered access
        Site work will proceed separately, but treat as infrastructure
Schedule Design – Level of Detail
 Steps to determine level of detail
    Break down the project into appropriate Stages
      Each Stage may progress somewhat independently from
      other Stages (other than Intra-Stage dependencies)
      Infrastructure & Transportation
        MOT (Maintenance of Traffic) may dictate sequencing
        All work proceeds partly independently from other work
        Earthwork (cut and fill) will progress ahead of but lag utilities
        Wharf work will proceed separately from piling but lagged
        Roadway work will progress at a lag from utilities
        Bridge work will follow abutments but ahead of utilities
Schedule Design – Level of Detail
 Steps to determine level of detail
    Consider how progress will actually happen
      Review & correct the Area sequencing plan
      Identify the Areas in the project and assess the rates of
      production
        Group Areas with similar rates of production
        This will keep updates clean and minimize out of sequence or
        incomplete work - especially true if cost loaded
      Think about what will prevent an Area from completing
        If completion can be held up due to other rooms or systems,
        then separate out those rooms into Areas
      Important: All sections of the project within each Area
      should progress at a similar rate
      Note: The SME (Subject Matter Expert) for each Stage are
      typically different, but are combined in Areas
        They won’t be thinking about rate of progress
Schedule Design – Level of Detail
 Steps to determine level of detail
    Group Areas with similar rates of production
      Keep corridors separate (utilities & traffic will slow
      progress)
      Offices, classrooms similar rate of progress
      Labs, exam rooms, and other specialty rooms will
      progress slower
      Auditoriums, meeting rooms, theaters, sanctuary
      (chancel/nave),
      Kitchens, Bathrooms, Operating Rooms have significant
      utilities
      Mechanical & Electrical Rooms will incur lead time issues
      as well as long installation durations
      Second floor space MEP rough-ins will progress after first
      floor MEP rough-ins
Schedule Development
  Use Sequencing Plan from Design
Schedule Design – Level of Detail
 Steps to determine level of detail
    Group Areas with similar rates of production
      Each major trade in infrastructure work will operate at its
      own rate of production – this is why Linear Scheduling is
      popular for transportation work
      Infrastructure/transportation will have varying rates of
      progress depending on subgrade conditions
      Sports fields will progress independently of parking lots
      Plant work will have individual processes that are
      relatively independent
      Renovation work will bring in entirely new requirements
      for phasing, start with these
      Justice and Courts work will have production rates
      dictated by security installations or product lead times
Schedule Design – Level of Detail
 Steps to determine level of detail
    Watch for switches in Area sequencing
      Structure for high-rise will be built from bottom to top
      Rough-ins will likely follow
      Finishes will likely not follow:
        May run horizontally
        May start at top floor and move down to bottom
      You may need horizontal (or lateral) logic along with
      vertical (or linear) logic
        Rough-in Inspections (linked floor to floor) are predecessor to
        Hang Drywall (linked side to side)
Schedule Design – Level of Detail
 Steps to determine level of detail
    Identify repetitive work opportunities
      A full repetitive type project (high-rise, roadway) needs to
      be treated slightly differently
      Separate out the stages
      Detail a small portion of the repetitive work, summarize
      the major trades and develop the overview schedule from
      those summarized trades (we call it an Outline Schedule)
    Watch for switches in Area sequencing
      Structure for high-rise will be build from bottom to top
      Rough-ins will likely follow
      Finishes will likely not follow:
        May run horizontally
        May start at top floor and move down to bottom
Schedule Development - Process
Develop an Outline Schedule
   High level overview schedule
   Provides guidance in overall systems durations
     Finishes in a medical facility might take 10 weeks
     Foundation for high-rise might take 2 months
   Provides guidance in repetitive areas
     Floor to floor structure cycle time might be 7 days
     Floor to floor finishes cycle time might be 30 days
     Station to Station roadway storm sewer might take 4
     days
   Use this Outline Schedule to identify the
   summary schedule and check for
   reasonableness
   Acts as a guideline during detailed development
Schedule Development - Process
Start the Detailed Schedule Development
   Input activities by Area (detail by trade)
      Foundation area
        Strip
        Structural fill
        Underground utilities
        Layout footings
        Dig footings
        Form/prep footings
        Set rebar in footings
        Inspect rebar
        Pour footings
   Try to keep each the similar granularity within
   each Area (can base on durations)
Schedule Development - Process
Detailed Schedule Development
   Use the Activity Code Structure to keep trades
   separate
     Develop all activities in all areas
     Go through each area trade-by-trade
     Make sure all work scope is covered in each area
   Check overall scope of work by trade
   Go through schedule from beginning
     At each activity, question, “What activity cannot start
     until this activity is completed (or partially complete)?”
     Make missing logic connections
     Ignore dates, just review logic connections &
     sequencing
   Identify hard (physical) logic and soft logic
Schedule Development - Process
Detailed Schedule Development
   Go through the schedule and review all
   durations
   Sort by Activity Description
     Compare similar activity scopes to see if durations are
     same
     Check full coverage
   Summarize to trades, look at count of activities
   in each trade; should be similar & reasonable
   Print Detailed Predecessor Report
   Have report in hand to check relationships
Schedule Development - Process
Detailed Schedule Development
   Start at the end of the schedule
     Work backwards from last activity
     At each activity, ask, “What work has to be done for this
     activity to start?” (what prevents this from starting?)
     Make the missing logic connections
     Use the Pred Report for quick entry of predecessors
   Compare the areas of the detailed schedule to
   the Outline Schedule
     Should be similar
     Review and adjust as necessary
Schedule Development - Owner-Controlled, Design
      Related And Procurement Activities

  Treat Owner activities like any other work activities
      Look in Contract for specification requirements
      Submittal approval times – specification or verify
      Consider re-submittal cycle for difficult or highly detailed
      activities
      Include all Owner scope of work (include permits,
      permanent telephone and other utilities, owner supplied
      equipment, other contracts, Health Department approvals,
      etc.)
  Code Owner activities so they can be filtered and tracked
      Owner and Contractor are both interested parties
  Ensure the successor activities are accurately defined
      Any delays related to these activities should be captured
      accurately for the protection of both the Owner and the
      Contractor
Early Completion Schedules
    Unintentional Early Completion
      Review durations and other components carefully
      Do not leave float in baseline schedule unless
      positive that the job can be completed early
      Constrain Substantial Completion for contractual
      date
      Review durations and logic very carefully
    Intentional Early Completion
      Check specification requirements for early
      completion
      Document that project was bid with general
      conditions to match planned project duration
      Notify Owner that intention is to finish early
      Be aware that Owner may suggest formal change
      order to move the completion date to the scheduled
      completion
      Negotiate the completion date during baseline
      review
Project Team

• Who owns the schedule?
   • Project Manager?
   • Superintendent?
   • Scheduler?
   • Project Team?
• It is absolutely imperative that someone on the
  Team has primary responsibility for maintaining
  the schedule in order for it to be successfully
  utilized.
Site Visit &/or Photographs

•   Have you, as the scheduler, ever been to the site?
•   Do you know what it is you’re scheduling?
•   It is always helpful to visit the site if possible. Particulary
    with the project team so they can describe their ideas about
    how they will be constructing the project.
Characteristics Of A Useful
Schedule
•   Schedule must model the project
•   Proper level of detail (limited number of critical activities)
•   Summarize to one page
•   Team buy-in; all stakeholders involved in schedule process
•   Describes superintendent’s plan (not the President’s plan)
•   All activities tied to completion
•   Resource-based durations
•   Meet the specification
•   Include procurement activities (and coordination)
•   Written narrative to identify plan
Schedule Logic - Subcontractors

•   Subcontractors should be an integral part of Baseline
    Schedule development team.
•   Teamwork and commitment
•   Schedule must be understandable to subcontractors
•   Subcontractors must be part of any revision or recovery
    discussion
Typical Areas of Conflict

•   Stakeholders: Who uses the schedule?
•   Level of Detail
•   Reasonableness of Schedule
•   Approval/Non-approval Issue/Approval Standoff
•   Failure to Involve Major Trade Contractors
•   Failure to include Owner requirements (other contracts,
    utilities, commissioning, etc.)
•   Early Completion Schedules
•   Ownership of float, contingency time
Know the…
   • Contract Requirements
   • Scope of the Work
   • Basic CPM logic rules and how they are
     applied in the software
   • Contractor means & methods
   • Limitations & constraints of the Owner,
     Contractor, the Site & the Industry
Questions/Comments




                                                          45




               “PMI” is a registered trade and service mark
                  of the Project Management Institute, Inc.
Contact Information
  Name     John Potter, PSP
   Title   Project Controls Manager
Company    Alpha Construction & Engineering Corporation
  Email    John.potter@alphacorporation.com
  Phone    (O) 757-533-9368    (M) 206-200-6833
  Name     Chris Carson, PSP
   Title   Corporate Director of Project Controls
Company    Alpha Construction & Engineering Corporation
  Email    Chris.Carson@alphacorporation.com
  Phone    (O) 757-533-9368    (M) 757-342-5524
                                                                                             46




                                                  “PMI” is a registered trade and service mark
                                                     of the Project Management Institute, Inc.

Weitere ähnliche Inhalte

Was ist angesagt?

How to prepare recovery or revised schedule rev.2
How to prepare recovery or revised schedule rev.2How to prepare recovery or revised schedule rev.2
How to prepare recovery or revised schedule rev.2Abdelhay Ghanem
 
Project management cpm-pert
Project management   cpm-pertProject management   cpm-pert
Project management cpm-pertAbu Bashar
 
Avoiding unrealistic schedules
Avoiding unrealistic schedulesAvoiding unrealistic schedules
Avoiding unrealistic schedulesHatem Hegazi
 
Understanding p6 dates
Understanding p6 datesUnderstanding p6 dates
Understanding p6 dateskrunalplanning
 
Project planning and Scheduling
Project planning and SchedulingProject planning and Scheduling
Project planning and Schedulingsaurabmi2
 
Construction scheduling & Cost control
Construction scheduling & Cost controlConstruction scheduling & Cost control
Construction scheduling & Cost controlGuhan M
 
PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS Akash Prasanna
 
Controling productivity in construction projects
Controling productivity in construction projectsControling productivity in construction projects
Controling productivity in construction projectsEssam Lotffy, PMP®, CCP®
 
Project Management Fundamental
Project Management FundamentalProject Management Fundamental
Project Management FundamentalAndy Pham, PMP
 

Was ist angesagt? (20)

How to prepare recovery or revised schedule rev.2
How to prepare recovery or revised schedule rev.2How to prepare recovery or revised schedule rev.2
How to prepare recovery or revised schedule rev.2
 
Project management cpm-pert
Project management   cpm-pertProject management   cpm-pert
Project management cpm-pert
 
Schedule Updates
Schedule UpdatesSchedule Updates
Schedule Updates
 
PMP_Project Cost Management
PMP_Project Cost ManagementPMP_Project Cost Management
PMP_Project Cost Management
 
Avoiding unrealistic schedules
Avoiding unrealistic schedulesAvoiding unrealistic schedules
Avoiding unrealistic schedules
 
Extension of time (E.O.T) By Ahmed Ibarhim
Extension of time (E.O.T) By Ahmed IbarhimExtension of time (E.O.T) By Ahmed Ibarhim
Extension of time (E.O.T) By Ahmed Ibarhim
 
Understanding p6 dates
Understanding p6 datesUnderstanding p6 dates
Understanding p6 dates
 
Visualizing Progress.pptx
Visualizing Progress.pptxVisualizing Progress.pptx
Visualizing Progress.pptx
 
Project Management PERT and CPM
Project Management PERT and CPMProject Management PERT and CPM
Project Management PERT and CPM
 
Project planning and Scheduling
Project planning and SchedulingProject planning and Scheduling
Project planning and Scheduling
 
Construction scheduling & Cost control
Construction scheduling & Cost controlConstruction scheduling & Cost control
Construction scheduling & Cost control
 
PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS
 
Pert and cpm
Pert and cpmPert and cpm
Pert and cpm
 
Cost management
Cost managementCost management
Cost management
 
Controling productivity in construction projects
Controling productivity in construction projectsControling productivity in construction projects
Controling productivity in construction projects
 
Eot claims hr__may2012
Eot claims hr__may2012Eot claims hr__may2012
Eot claims hr__may2012
 
Project Management Fundamental
Project Management FundamentalProject Management Fundamental
Project Management Fundamental
 
crashing of project
crashing of project crashing of project
crashing of project
 
Project cost management-slides
Project cost management-slidesProject cost management-slides
Project cost management-slides
 
Project cost management
Project cost managementProject cost management
Project cost management
 

Andere mochten auch

Design Patterns For 70% Of Programmers In The World
Design Patterns For 70% Of Programmers In The WorldDesign Patterns For 70% Of Programmers In The World
Design Patterns For 70% Of Programmers In The WorldSaurabh Moody
 
Oil-Refinery Planning & Scheduling Optimization
Oil-Refinery Planning & Scheduling OptimizationOil-Refinery Planning & Scheduling Optimization
Oil-Refinery Planning & Scheduling OptimizationAlkis Vazacopoulos
 
Fnbe0115 Integrated - awesome
Fnbe0115 Integrated - awesomeFnbe0115 Integrated - awesome
Fnbe0115 Integrated - awesomeMuhammad Nazmi
 
Energy resource management
Energy resource managementEnergy resource management
Energy resource managementRiddhima Kartik
 
Steel building Graded Unit Civil Engineering Project HND Project Glasgow Kel...
Steel building Graded Unit  Civil Engineering Project HND Project Glasgow Kel...Steel building Graded Unit  Civil Engineering Project HND Project Glasgow Kel...
Steel building Graded Unit Civil Engineering Project HND Project Glasgow Kel...Tehmas Saeed
 
CRUDE-OIL BLEND SCHEDULING OPTIMIZATION OF AN INDUSTRIAL-SIZED REFINERY: A DI...
CRUDE-OIL BLEND SCHEDULING OPTIMIZATION OF AN INDUSTRIAL-SIZED REFINERY: A DI...CRUDE-OIL BLEND SCHEDULING OPTIMIZATION OF AN INDUSTRIAL-SIZED REFINERY: A DI...
CRUDE-OIL BLEND SCHEDULING OPTIMIZATION OF AN INDUSTRIAL-SIZED REFINERY: A DI...Brenno Menezes
 
Enercept Power Point[1]
Enercept Power Point[1]Enercept Power Point[1]
Enercept Power Point[1]cezitelli
 
Architectural Professional Practice - Construction Documents
Architectural Professional Practice - Construction DocumentsArchitectural Professional Practice - Construction Documents
Architectural Professional Practice - Construction DocumentsGalala University
 
Schedule Design PMI
Schedule Design PMISchedule Design PMI
Schedule Design PMIChris Carson
 
Distillation Blending and Cutpoint Temperature Optimization (DBCTO) in Schedu...
Distillation Blending and Cutpoint Temperature Optimization (DBCTO) in Schedu...Distillation Blending and Cutpoint Temperature Optimization (DBCTO) in Schedu...
Distillation Blending and Cutpoint Temperature Optimization (DBCTO) in Schedu...Brenno Menezes
 
Crude-Oil Scheduling Technology: moving from simulation to optimization
Crude-Oil Scheduling Technology: moving from simulation to optimizationCrude-Oil Scheduling Technology: moving from simulation to optimization
Crude-Oil Scheduling Technology: moving from simulation to optimizationBrenno Menezes
 
Crude-Oil Blend Scheduling Optimization: An Application with Multi-Million D...
Crude-Oil Blend Scheduling Optimization:  An Application with Multi-Million D...Crude-Oil Blend Scheduling Optimization:  An Application with Multi-Million D...
Crude-Oil Blend Scheduling Optimization: An Application with Multi-Million D...Alkis Vazacopoulos
 
Distillation Blending and Cutpoint Temperature Optimization in Scheduling Ope...
Distillation Blending and Cutpoint Temperature Optimization in Scheduling Ope...Distillation Blending and Cutpoint Temperature Optimization in Scheduling Ope...
Distillation Blending and Cutpoint Temperature Optimization in Scheduling Ope...Brenno Menezes
 
Strategic brand management
Strategic brand managementStrategic brand management
Strategic brand managementRiddhima Kartik
 
Design and analasys of a g+3 residential building using staad
Design and analasys of a g+3 residential building using staadDesign and analasys of a g+3 residential building using staad
Design and analasys of a g+3 residential building using staadgopichand's
 
Profit Impact of Market Strategies (PIMS)
Profit Impact of Market Strategies (PIMS)Profit Impact of Market Strategies (PIMS)
Profit Impact of Market Strategies (PIMS)Nurul Aqilah
 
DESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRO
DESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRODESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRO
DESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PROAli Meer
 
Multistorey building
Multistorey buildingMultistorey building
Multistorey buildingRahul
 

Andere mochten auch (20)

Design Patterns For 70% Of Programmers In The World
Design Patterns For 70% Of Programmers In The WorldDesign Patterns For 70% Of Programmers In The World
Design Patterns For 70% Of Programmers In The World
 
Oil-Refinery Planning & Scheduling Optimization
Oil-Refinery Planning & Scheduling OptimizationOil-Refinery Planning & Scheduling Optimization
Oil-Refinery Planning & Scheduling Optimization
 
Fnbe0115 Integrated - awesome
Fnbe0115 Integrated - awesomeFnbe0115 Integrated - awesome
Fnbe0115 Integrated - awesome
 
Energy resource management
Energy resource managementEnergy resource management
Energy resource management
 
Steel building Graded Unit Civil Engineering Project HND Project Glasgow Kel...
Steel building Graded Unit  Civil Engineering Project HND Project Glasgow Kel...Steel building Graded Unit  Civil Engineering Project HND Project Glasgow Kel...
Steel building Graded Unit Civil Engineering Project HND Project Glasgow Kel...
 
CRUDE-OIL BLEND SCHEDULING OPTIMIZATION OF AN INDUSTRIAL-SIZED REFINERY: A DI...
CRUDE-OIL BLEND SCHEDULING OPTIMIZATION OF AN INDUSTRIAL-SIZED REFINERY: A DI...CRUDE-OIL BLEND SCHEDULING OPTIMIZATION OF AN INDUSTRIAL-SIZED REFINERY: A DI...
CRUDE-OIL BLEND SCHEDULING OPTIMIZATION OF AN INDUSTRIAL-SIZED REFINERY: A DI...
 
Enercept Power Point[1]
Enercept Power Point[1]Enercept Power Point[1]
Enercept Power Point[1]
 
Architectural Professional Practice - Construction Documents
Architectural Professional Practice - Construction DocumentsArchitectural Professional Practice - Construction Documents
Architectural Professional Practice - Construction Documents
 
Schedule Design PMI
Schedule Design PMISchedule Design PMI
Schedule Design PMI
 
Distillation Blending and Cutpoint Temperature Optimization (DBCTO) in Schedu...
Distillation Blending and Cutpoint Temperature Optimization (DBCTO) in Schedu...Distillation Blending and Cutpoint Temperature Optimization (DBCTO) in Schedu...
Distillation Blending and Cutpoint Temperature Optimization (DBCTO) in Schedu...
 
Crude-Oil Scheduling Technology: moving from simulation to optimization
Crude-Oil Scheduling Technology: moving from simulation to optimizationCrude-Oil Scheduling Technology: moving from simulation to optimization
Crude-Oil Scheduling Technology: moving from simulation to optimization
 
5case
5case5case
5case
 
Crude-Oil Blend Scheduling Optimization: An Application with Multi-Million D...
Crude-Oil Blend Scheduling Optimization:  An Application with Multi-Million D...Crude-Oil Blend Scheduling Optimization:  An Application with Multi-Million D...
Crude-Oil Blend Scheduling Optimization: An Application with Multi-Million D...
 
Distillation Blending and Cutpoint Temperature Optimization in Scheduling Ope...
Distillation Blending and Cutpoint Temperature Optimization in Scheduling Ope...Distillation Blending and Cutpoint Temperature Optimization in Scheduling Ope...
Distillation Blending and Cutpoint Temperature Optimization in Scheduling Ope...
 
Strategic brand management
Strategic brand managementStrategic brand management
Strategic brand management
 
Design and analasys of a g+2 residential building
Design and analasys of a g+2 residential building Design and analasys of a g+2 residential building
Design and analasys of a g+2 residential building
 
Design and analasys of a g+3 residential building using staad
Design and analasys of a g+3 residential building using staadDesign and analasys of a g+3 residential building using staad
Design and analasys of a g+3 residential building using staad
 
Profit Impact of Market Strategies (PIMS)
Profit Impact of Market Strategies (PIMS)Profit Impact of Market Strategies (PIMS)
Profit Impact of Market Strategies (PIMS)
 
DESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRO
DESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRODESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRO
DESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRO
 
Multistorey building
Multistorey buildingMultistorey building
Multistorey building
 

Ähnlich wie Schedule Development

Managingtripleconstraint aam
Managingtripleconstraint aamManagingtripleconstraint aam
Managingtripleconstraint aamAldo Arecco
 
The Effective Management of Time
The Effective Management of TimeThe Effective Management of Time
The Effective Management of TimeInSync Conference
 
Gonzales.matthew
Gonzales.matthewGonzales.matthew
Gonzales.matthewNASAPMC
 
PMP Exam Prep - Time Management
PMP Exam Prep - Time ManagementPMP Exam Prep - Time Management
PMP Exam Prep - Time Managementtkrikau
 
The project plan
The project planThe project plan
The project planVatsalaPG
 
Project Management Toolkit - Presentation
Project Management Toolkit - PresentationProject Management Toolkit - Presentation
Project Management Toolkit - PresentationHassan Rizwan
 
Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01samansari22
 
Information Technology Project Management
Information Technology Project ManagementInformation Technology Project Management
Information Technology Project ManagementGoutama Bachtiar
 
Northern Finishing School: IT Project Managment
Northern Finishing School: IT Project ManagmentNorthern Finishing School: IT Project Managment
Northern Finishing School: IT Project ManagmentSiwawong Wuttipongprasert
 
Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800PRIYANSHU KUMAR
 
projectmanagement-141108102434-conversion-gate01-converted.pptx
projectmanagement-141108102434-conversion-gate01-converted.pptxprojectmanagement-141108102434-conversion-gate01-converted.pptx
projectmanagement-141108102434-conversion-gate01-converted.pptxChandrasen Sharma
 
ASAP-01 Implementaion.pptx
ASAP-01 Implementaion.pptxASAP-01 Implementaion.pptx
ASAP-01 Implementaion.pptxAshraf206702
 
Primavera6.0
Primavera6.0Primavera6.0
Primavera6.0niict
 
Primavara
PrimavaraPrimavara
Primavaradanabl
 

Ähnlich wie Schedule Development (20)

Project scheduling
Project schedulingProject scheduling
Project scheduling
 
Managingtripleconstraint aam
Managingtripleconstraint aamManagingtripleconstraint aam
Managingtripleconstraint aam
 
The Effective Management of Time
The Effective Management of TimeThe Effective Management of Time
The Effective Management of Time
 
Gonzales.matthew
Gonzales.matthewGonzales.matthew
Gonzales.matthew
 
PMP Exam Prep - Time Management
PMP Exam Prep - Time ManagementPMP Exam Prep - Time Management
PMP Exam Prep - Time Management
 
The project plan
The project planThe project plan
The project plan
 
WBS PROJECT
WBS PROJECTWBS PROJECT
WBS PROJECT
 
Project Management Toolkit - Presentation
Project Management Toolkit - PresentationProject Management Toolkit - Presentation
Project Management Toolkit - Presentation
 
Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01
 
Information Technology Project Management
Information Technology Project ManagementInformation Technology Project Management
Information Technology Project Management
 
Northern Finishing School: IT Project Managment
Northern Finishing School: IT Project ManagmentNorthern Finishing School: IT Project Managment
Northern Finishing School: IT Project Managment
 
Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800
 
MIS Project management
MIS Project managementMIS Project management
MIS Project management
 
6396901
63969016396901
6396901
 
CAPM M Charles Week3 Chapter5-6
CAPM M Charles Week3 Chapter5-6CAPM M Charles Week3 Chapter5-6
CAPM M Charles Week3 Chapter5-6
 
projectmanagement-141108102434-conversion-gate01-converted.pptx
projectmanagement-141108102434-conversion-gate01-converted.pptxprojectmanagement-141108102434-conversion-gate01-converted.pptx
projectmanagement-141108102434-conversion-gate01-converted.pptx
 
ASAP-01 Implementaion.pptx
ASAP-01 Implementaion.pptxASAP-01 Implementaion.pptx
ASAP-01 Implementaion.pptx
 
Session 8 4th edition PMP
Session 8 4th edition PMPSession 8 4th edition PMP
Session 8 4th edition PMP
 
Primavera6.0
Primavera6.0Primavera6.0
Primavera6.0
 
Primavara
PrimavaraPrimavara
Primavara
 

Mehr von Chris Carson

Favorite Delay Analysis Methodologies Town Hall SEI
Favorite Delay Analysis Methodologies Town Hall SEIFavorite Delay Analysis Methodologies Town Hall SEI
Favorite Delay Analysis Methodologies Town Hall SEIChris Carson
 
Dealing With A Schedule That Cannot Be Approved - AACE 2012 Meeting
Dealing With A Schedule That Cannot Be Approved - AACE 2012 MeetingDealing With A Schedule That Cannot Be Approved - AACE 2012 Meeting
Dealing With A Schedule That Cannot Be Approved - AACE 2012 MeetingChris Carson
 
Use Of Schedule Logs 2012 Pmi Scop Conference
Use Of Schedule Logs   2012 Pmi Scop ConferenceUse Of Schedule Logs   2012 Pmi Scop Conference
Use Of Schedule Logs 2012 Pmi Scop ConferenceChris Carson
 
Pmicos 2011 Review And Analysis Of Mitigation Schedules
Pmicos 2011 Review And Analysis Of Mitigation SchedulesPmicos 2011 Review And Analysis Of Mitigation Schedules
Pmicos 2011 Review And Analysis Of Mitigation SchedulesChris Carson
 
Mitigation And Performance Recovery Using Earned Value
Mitigation And Performance Recovery Using Earned ValueMitigation And Performance Recovery Using Earned Value
Mitigation And Performance Recovery Using Earned ValueChris Carson
 
Roadmap To World Class Project Controls Pp
Roadmap To World Class Project Controls PpRoadmap To World Class Project Controls Pp
Roadmap To World Class Project Controls PpChris Carson
 
Types Of Industry Scheduling
Types Of Industry SchedulingTypes Of Industry Scheduling
Types Of Industry SchedulingChris Carson
 
Use Of A Claims Triage Workshop To Choose An Analysis Method
Use Of A Claims Triage Workshop To Choose An Analysis MethodUse Of A Claims Triage Workshop To Choose An Analysis Method
Use Of A Claims Triage Workshop To Choose An Analysis MethodChris Carson
 
Early Completion Schedules
Early Completion SchedulesEarly Completion Schedules
Early Completion SchedulesChris Carson
 
Can A Subcontractor Have CP Delay When The Gc Does Not
Can A Subcontractor Have CP Delay When The Gc Does NotCan A Subcontractor Have CP Delay When The Gc Does Not
Can A Subcontractor Have CP Delay When The Gc Does NotChris Carson
 
Schedule-Centric View Of Contract Admin
Schedule-Centric View Of Contract AdminSchedule-Centric View Of Contract Admin
Schedule-Centric View Of Contract AdminChris Carson
 
Design & Development Of A Schedule Management Plan Presentation
Design & Development Of A Schedule Management Plan PresentationDesign & Development Of A Schedule Management Plan Presentation
Design & Development Of A Schedule Management Plan PresentationChris Carson
 
Presentation Classification Of Schedule Types
Presentation Classification Of Schedule TypesPresentation Classification Of Schedule Types
Presentation Classification Of Schedule TypesChris Carson
 
Using Symptoms To Develop Appropriate Claims Avoidance Documentation Wpl We...
Using Symptoms To Develop Appropriate Claims Avoidance Documentation   Wpl We...Using Symptoms To Develop Appropriate Claims Avoidance Documentation   Wpl We...
Using Symptoms To Develop Appropriate Claims Avoidance Documentation Wpl We...Chris Carson
 
Mitigation Of Risks In Using Parallel Schedules
Mitigation Of Risks In Using Parallel SchedulesMitigation Of Risks In Using Parallel Schedules
Mitigation Of Risks In Using Parallel SchedulesChris Carson
 
How To Structure A Successful Mediation
How To Structure A Successful MediationHow To Structure A Successful Mediation
How To Structure A Successful MediationChris Carson
 
2010 AACEi Great Debate - Approval of Schedule Revisions
2010 AACEi Great Debate - Approval of Schedule Revisions2010 AACEi Great Debate - Approval of Schedule Revisions
2010 AACEi Great Debate - Approval of Schedule RevisionsChris Carson
 
Planning A Complex Project
Planning A Complex ProjectPlanning A Complex Project
Planning A Complex ProjectChris Carson
 
Schedule Recovery Using Earned Value
Schedule Recovery Using Earned ValueSchedule Recovery Using Earned Value
Schedule Recovery Using Earned ValueChris Carson
 

Mehr von Chris Carson (20)

Favorite Delay Analysis Methodologies Town Hall SEI
Favorite Delay Analysis Methodologies Town Hall SEIFavorite Delay Analysis Methodologies Town Hall SEI
Favorite Delay Analysis Methodologies Town Hall SEI
 
Dealing With A Schedule That Cannot Be Approved - AACE 2012 Meeting
Dealing With A Schedule That Cannot Be Approved - AACE 2012 MeetingDealing With A Schedule That Cannot Be Approved - AACE 2012 Meeting
Dealing With A Schedule That Cannot Be Approved - AACE 2012 Meeting
 
Use Of Schedule Logs 2012 Pmi Scop Conference
Use Of Schedule Logs   2012 Pmi Scop ConferenceUse Of Schedule Logs   2012 Pmi Scop Conference
Use Of Schedule Logs 2012 Pmi Scop Conference
 
Pmicos 2011 Review And Analysis Of Mitigation Schedules
Pmicos 2011 Review And Analysis Of Mitigation SchedulesPmicos 2011 Review And Analysis Of Mitigation Schedules
Pmicos 2011 Review And Analysis Of Mitigation Schedules
 
Mitigation And Performance Recovery Using Earned Value
Mitigation And Performance Recovery Using Earned ValueMitigation And Performance Recovery Using Earned Value
Mitigation And Performance Recovery Using Earned Value
 
Roadmap To World Class Project Controls Pp
Roadmap To World Class Project Controls PpRoadmap To World Class Project Controls Pp
Roadmap To World Class Project Controls Pp
 
Types Of Industry Scheduling
Types Of Industry SchedulingTypes Of Industry Scheduling
Types Of Industry Scheduling
 
Use Of A Claims Triage Workshop To Choose An Analysis Method
Use Of A Claims Triage Workshop To Choose An Analysis MethodUse Of A Claims Triage Workshop To Choose An Analysis Method
Use Of A Claims Triage Workshop To Choose An Analysis Method
 
Early Completion Schedules
Early Completion SchedulesEarly Completion Schedules
Early Completion Schedules
 
Can A Subcontractor Have CP Delay When The Gc Does Not
Can A Subcontractor Have CP Delay When The Gc Does NotCan A Subcontractor Have CP Delay When The Gc Does Not
Can A Subcontractor Have CP Delay When The Gc Does Not
 
Schedule-Centric View Of Contract Admin
Schedule-Centric View Of Contract AdminSchedule-Centric View Of Contract Admin
Schedule-Centric View Of Contract Admin
 
Design & Development Of A Schedule Management Plan Presentation
Design & Development Of A Schedule Management Plan PresentationDesign & Development Of A Schedule Management Plan Presentation
Design & Development Of A Schedule Management Plan Presentation
 
Presentation Classification Of Schedule Types
Presentation Classification Of Schedule TypesPresentation Classification Of Schedule Types
Presentation Classification Of Schedule Types
 
Claims Triage
Claims TriageClaims Triage
Claims Triage
 
Using Symptoms To Develop Appropriate Claims Avoidance Documentation Wpl We...
Using Symptoms To Develop Appropriate Claims Avoidance Documentation   Wpl We...Using Symptoms To Develop Appropriate Claims Avoidance Documentation   Wpl We...
Using Symptoms To Develop Appropriate Claims Avoidance Documentation Wpl We...
 
Mitigation Of Risks In Using Parallel Schedules
Mitigation Of Risks In Using Parallel SchedulesMitigation Of Risks In Using Parallel Schedules
Mitigation Of Risks In Using Parallel Schedules
 
How To Structure A Successful Mediation
How To Structure A Successful MediationHow To Structure A Successful Mediation
How To Structure A Successful Mediation
 
2010 AACEi Great Debate - Approval of Schedule Revisions
2010 AACEi Great Debate - Approval of Schedule Revisions2010 AACEi Great Debate - Approval of Schedule Revisions
2010 AACEi Great Debate - Approval of Schedule Revisions
 
Planning A Complex Project
Planning A Complex ProjectPlanning A Complex Project
Planning A Complex Project
 
Schedule Recovery Using Earned Value
Schedule Recovery Using Earned ValueSchedule Recovery Using Earned Value
Schedule Recovery Using Earned Value
 

Kürzlich hochgeladen

20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdfChris Skinner
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfJamesConcepcion7
 
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdfChris Skinner
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...ssuserf63bd7
 
Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...
Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...
Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...Associazione Digital Days
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsIndiaMART InterMESH Limited
 
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...SOFTTECHHUB
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsKnowledgeSeed
 
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryEffective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryWhittensFineJewelry1
 
NAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataNAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdftrending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdfMintel Group
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifeBhavana Pujan Kendra
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreNZSG
 
digital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingdigital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingrajputmeenakshi733
 

Kürzlich hochgeladen (20)

20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdf
 
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
 
Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...
Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...
Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan Dynamics
 
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applications
 
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryEffective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
 
WAM Corporate Presentation April 12 2024.pdf
WAM Corporate Presentation April 12 2024.pdfWAM Corporate Presentation April 12 2024.pdf
WAM Corporate Presentation April 12 2024.pdf
 
NAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataNAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors Data
 
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdftrending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in Life
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource Centre
 
digital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingdigital marketing , introduction of digital marketing
digital marketing , introduction of digital marketing
 

Schedule Development

  • 1.
  • 2. Schedule Development – A Methodical Approach to Building a Schedule Chris Carson, PSP, CCM John Potter, PSP Director Project Controls Project Controls Manager Alpha Corporation Alpha Corporation
  • 3. Resources for Scheduling • PMI – Project Management Institute – Practice Standard for Scheduling – Practice Standard for WBS & EV • PMI-CoS – College of Scheduling PMI- – Scheduling Excellence Initiative (SEI) project writing Best Practices and Guidelines – Scheduling/Claims • AACEi – Association for the Advancement of Cost Engineering – Publishing Recommended Practices • CMAA – Construction Management Association of America – Revising Time Management Chapter of the Construction Management Standards of Practice
  • 4. Design or Development? Refer to 2008 presentation at PMI-CoS national conference “Schedule Design; Planning for Schedule Development” Separate the two processes Design first Development second Need to plan (Schedule Design) to create the schedule (Schedule Development)
  • 5. Schedule Design Why design a schedule? A schedule meets the criteria for a “project” in itself A schedule is a guideline or plan for a project A schedule provides a a methodical approach for a project Keeps the schedule development on track Prevents rework due to late understanding of needs Allows buy-in from end users prior to Development Makes the schedule development session much more meaningful Documents the assumptions and intention of the schedule For reviewer and approver For future reference To facilitate changes in schedulers Place to capture Lessons Learned
  • 6. Schedule Design Scope of Design vs. Development Design – Conceptualizing the schedule Planning Starting with the end in mind Providing concept of final product Creating organizational structure to fulfill the concept Development - Building the schedule Input activities Input logic Input durations Review for design compliance Review for CPM methodology best practices Quality control
  • 7. Schedule Design - Background Design vs. Development – How do PMI & PMBOK handle it? PMBOK identifies six Project Time Management processes, usually defined as part of the project lifecycle, Chapter 6 of PMBOK 4th Edition. Define Activities. Sequence Activities Estimate Activity Resources Estimate Activity Durations Develop Schedule Control Schedule
  • 8. Schedule Design - Background Design vs. Development – How do PMI & PMBOK handle it? These processes are paralleled by a planning effort by the PM team, part of PMBOK’s “Develop Project Management Plan”, PMBOK Section 4.2 (which sets the format and establishes criteria for developing & controlling the project schedule). These processes are documented in what PMBOK calls a Schedule Management Plan contained in the project management plan. This SMP selects the scheduling methodology and the scheduling tool. PMBOK says the majority of effort in the TM Knowledge Area will occur in the Control Schedule process (Section 6.6)
  • 9. Schedule Design - Background The inputs for the Time Management Processes used to Develop the Schedule are listed as: These fall under Schedule Design Scope Baseline Activity List Activity Attributes Milestone List Project Scope Statement Resource Requirements Resource Calendars These fall under Schedule Development Project Schedule Network Diagrams Activity Resource Requirements Activity Duration Estimates
  • 10. Schedule Design - Background Design vs. Development – why emphasize the distinction? Design tends to be ignored in favor of jumping right into development. Many schedulers elect to begin creating activities instead of Designing. Work is subsequently repetitive, with lots of potential for rework. Results tend to be disorganized. Avoid planning mistakes and problems.
  • 11. AACEi: TCM Framework: 7.2 Schedule Planning & Development • .1 Schedule Planning & Development • .2 Identify Activities • .3 Develop Activity Logic • .4 Estimate Durations • .5 Establish Schedule Requirements • .6 Allocate Recourses • .7 Optimize Schedule • .8 Establish Schedule Control Plan • .9 Review & Validate Schedule • .10 Document & Communicate Schedule • .11 Submit Schedule Deliverables • .12 Develop & Maintain Methods & Tools
  • 12. PMBOK 3rd Ed. The diagram to the right is a Project Time Management (Schedule) process flow diagram. This diagram gives us an idea about how integral the schedule is to the management of the entire project. The six sections related to schedule development are at the center of the diagram.
  • 13. Schedule Development – Art or Science? Most texts and good practices state “Identify Activities” & “Develop Logic” and skip any details This is the hardest area for most schedulers Good organization of the schedule is vital It is not that simple Every scheduler starts Schedule Development differently Using the basis from Schedule Design, the process can be defined and structured
  • 14. Schedule Development - Process Assemble development team Design the schedule Identify Level of detail required Identify output needed – Activity Code & WBS structures Identify scope of work - Activities (input from subs/primes) Develop the schedule Calculate Durations (input from subs/primes) Assign logic (input from subs/primes) Input to computer Analyze and adjust Finalize the schedule QC checklists & verification Seek final buy-in and approval (includes team) Add resources and costs
  • 15. Schedule Development Team Includes stakeholders: Scheduler Superintendent Project Manager Major trade contractors Needs input from: Owner Estimating Senior management A&E, if Design-Build or plans not ready
  • 16. Schedule Design – Review Specifications
  • 17. Schedule Design - WBS • Develop Work Breakdown Structure. • Translate asset scope into component deliverables (“decomposition”). • Ensure consistency in WBS levels, to facilitate comparison.
  • 18. Schedule Scope & Budget Prepare a Scope & Budget for the work required to prepare and maintain the project schedule. Even if it’s an internal document it will come in handy at some point during the project.
  • 19. Schedule Design • Technical Scheduling Components • Design Activity Coding structure • Input Driven - Based on need to organize schedule • Look at Stages and Areas (as well as Phases) • Stages: Foundations, Structure, Rough-ins • Areas: Determined by expected progress • Phases: Usually are repetitive sequence activities • Output Driven - Based on need to report to different stakeholders • Based on need to filter & isolate
  • 20. Schedule Design - Use • Schedule Design Output (Software Driven) • Level of Detail • Determine approach: • Bottom-up (starting with detailed activities) • Top-down (starting with summary schedule) • Both (prepare Top-down, then Bottom-up) • Develop functional Stages, then progress-rate Areas • Review use of schedule • Identify frequency of updates. • Establish smallest activity duration range.
  • 21. Schedule Design – Level of Detail One of the most important decisions Depends on the nature, size and complexity of the project Need enough activities to reflect intricacies and interdependencies Too few activities will require use of SS and FS lagged activities; harder to analyze High level of detail will make updates more time consuming High level of detail will allow better monitoring & updating Need ability to monitor individual trade contractors Need enough detail to avoid incomplete activities waiting on others to progress Example: Office/educational building, corridors will not be completed with the offices/classrooms, so if they are covered by the same activities, there will be multiple activities progressed to 85% (room finishes complete, but corridor finishes not started)
  • 22. Schedule Design • Reporting • Define all reports • Provide examples
  • 23. Schedule Design – Level of Detail Steps to determine level of detail How will schedule be used? Management tool for daily trade monitoring, look-ahead schedules generated out of main CPM schedule Need weekly data, will update weekly Overview for superintendent to correlate his weekly bar chart which will be used for look-ahead schedules Need monthly data, will update monthly Assess minimum duration For weekly management, smallest typical duration set at 1 to 3 days For monthly overview management, smallest typical duration set at 4 to 10 days
  • 24. Schedule Design – Level of Detail Steps to determine level of detail Break down the project into appropriate Stages Each Stage may progress somewhat independently from other Stages (other than Intra-Stage dependencies) Facilities Underground utilities may require some initial work and then run concurrently Foundations will progress alone until sufficiently ahead to start structure Foundations and structure will progress independently from interior work and exterior façade Exterior façade, other than dry-in, will proceed concurrently with interior rough-ins and finishes, but lagged from structure Interior rough-ins will lead interior finishes but can overlap Some interior finishes, such as museum millwork, may require full unencumbered access Site work will proceed separately, but treat as infrastructure
  • 25. Schedule Design – Level of Detail Steps to determine level of detail Break down the project into appropriate Stages Each Stage may progress somewhat independently from other Stages (other than Intra-Stage dependencies) Infrastructure & Transportation MOT (Maintenance of Traffic) may dictate sequencing All work proceeds partly independently from other work Earthwork (cut and fill) will progress ahead of but lag utilities Wharf work will proceed separately from piling but lagged Roadway work will progress at a lag from utilities Bridge work will follow abutments but ahead of utilities
  • 26. Schedule Design – Level of Detail Steps to determine level of detail Consider how progress will actually happen Review & correct the Area sequencing plan Identify the Areas in the project and assess the rates of production Group Areas with similar rates of production This will keep updates clean and minimize out of sequence or incomplete work - especially true if cost loaded Think about what will prevent an Area from completing If completion can be held up due to other rooms or systems, then separate out those rooms into Areas Important: All sections of the project within each Area should progress at a similar rate Note: The SME (Subject Matter Expert) for each Stage are typically different, but are combined in Areas They won’t be thinking about rate of progress
  • 27. Schedule Design – Level of Detail Steps to determine level of detail Group Areas with similar rates of production Keep corridors separate (utilities & traffic will slow progress) Offices, classrooms similar rate of progress Labs, exam rooms, and other specialty rooms will progress slower Auditoriums, meeting rooms, theaters, sanctuary (chancel/nave), Kitchens, Bathrooms, Operating Rooms have significant utilities Mechanical & Electrical Rooms will incur lead time issues as well as long installation durations Second floor space MEP rough-ins will progress after first floor MEP rough-ins
  • 28. Schedule Development Use Sequencing Plan from Design
  • 29. Schedule Design – Level of Detail Steps to determine level of detail Group Areas with similar rates of production Each major trade in infrastructure work will operate at its own rate of production – this is why Linear Scheduling is popular for transportation work Infrastructure/transportation will have varying rates of progress depending on subgrade conditions Sports fields will progress independently of parking lots Plant work will have individual processes that are relatively independent Renovation work will bring in entirely new requirements for phasing, start with these Justice and Courts work will have production rates dictated by security installations or product lead times
  • 30. Schedule Design – Level of Detail Steps to determine level of detail Watch for switches in Area sequencing Structure for high-rise will be built from bottom to top Rough-ins will likely follow Finishes will likely not follow: May run horizontally May start at top floor and move down to bottom You may need horizontal (or lateral) logic along with vertical (or linear) logic Rough-in Inspections (linked floor to floor) are predecessor to Hang Drywall (linked side to side)
  • 31. Schedule Design – Level of Detail Steps to determine level of detail Identify repetitive work opportunities A full repetitive type project (high-rise, roadway) needs to be treated slightly differently Separate out the stages Detail a small portion of the repetitive work, summarize the major trades and develop the overview schedule from those summarized trades (we call it an Outline Schedule) Watch for switches in Area sequencing Structure for high-rise will be build from bottom to top Rough-ins will likely follow Finishes will likely not follow: May run horizontally May start at top floor and move down to bottom
  • 32. Schedule Development - Process Develop an Outline Schedule High level overview schedule Provides guidance in overall systems durations Finishes in a medical facility might take 10 weeks Foundation for high-rise might take 2 months Provides guidance in repetitive areas Floor to floor structure cycle time might be 7 days Floor to floor finishes cycle time might be 30 days Station to Station roadway storm sewer might take 4 days Use this Outline Schedule to identify the summary schedule and check for reasonableness Acts as a guideline during detailed development
  • 33. Schedule Development - Process Start the Detailed Schedule Development Input activities by Area (detail by trade) Foundation area Strip Structural fill Underground utilities Layout footings Dig footings Form/prep footings Set rebar in footings Inspect rebar Pour footings Try to keep each the similar granularity within each Area (can base on durations)
  • 34. Schedule Development - Process Detailed Schedule Development Use the Activity Code Structure to keep trades separate Develop all activities in all areas Go through each area trade-by-trade Make sure all work scope is covered in each area Check overall scope of work by trade Go through schedule from beginning At each activity, question, “What activity cannot start until this activity is completed (or partially complete)?” Make missing logic connections Ignore dates, just review logic connections & sequencing Identify hard (physical) logic and soft logic
  • 35. Schedule Development - Process Detailed Schedule Development Go through the schedule and review all durations Sort by Activity Description Compare similar activity scopes to see if durations are same Check full coverage Summarize to trades, look at count of activities in each trade; should be similar & reasonable Print Detailed Predecessor Report Have report in hand to check relationships
  • 36. Schedule Development - Process Detailed Schedule Development Start at the end of the schedule Work backwards from last activity At each activity, ask, “What work has to be done for this activity to start?” (what prevents this from starting?) Make the missing logic connections Use the Pred Report for quick entry of predecessors Compare the areas of the detailed schedule to the Outline Schedule Should be similar Review and adjust as necessary
  • 37. Schedule Development - Owner-Controlled, Design Related And Procurement Activities Treat Owner activities like any other work activities Look in Contract for specification requirements Submittal approval times – specification or verify Consider re-submittal cycle for difficult or highly detailed activities Include all Owner scope of work (include permits, permanent telephone and other utilities, owner supplied equipment, other contracts, Health Department approvals, etc.) Code Owner activities so they can be filtered and tracked Owner and Contractor are both interested parties Ensure the successor activities are accurately defined Any delays related to these activities should be captured accurately for the protection of both the Owner and the Contractor
  • 38. Early Completion Schedules Unintentional Early Completion Review durations and other components carefully Do not leave float in baseline schedule unless positive that the job can be completed early Constrain Substantial Completion for contractual date Review durations and logic very carefully Intentional Early Completion Check specification requirements for early completion Document that project was bid with general conditions to match planned project duration Notify Owner that intention is to finish early Be aware that Owner may suggest formal change order to move the completion date to the scheduled completion Negotiate the completion date during baseline review
  • 39. Project Team • Who owns the schedule? • Project Manager? • Superintendent? • Scheduler? • Project Team? • It is absolutely imperative that someone on the Team has primary responsibility for maintaining the schedule in order for it to be successfully utilized.
  • 40. Site Visit &/or Photographs • Have you, as the scheduler, ever been to the site? • Do you know what it is you’re scheduling? • It is always helpful to visit the site if possible. Particulary with the project team so they can describe their ideas about how they will be constructing the project.
  • 41. Characteristics Of A Useful Schedule • Schedule must model the project • Proper level of detail (limited number of critical activities) • Summarize to one page • Team buy-in; all stakeholders involved in schedule process • Describes superintendent’s plan (not the President’s plan) • All activities tied to completion • Resource-based durations • Meet the specification • Include procurement activities (and coordination) • Written narrative to identify plan
  • 42. Schedule Logic - Subcontractors • Subcontractors should be an integral part of Baseline Schedule development team. • Teamwork and commitment • Schedule must be understandable to subcontractors • Subcontractors must be part of any revision or recovery discussion
  • 43. Typical Areas of Conflict • Stakeholders: Who uses the schedule? • Level of Detail • Reasonableness of Schedule • Approval/Non-approval Issue/Approval Standoff • Failure to Involve Major Trade Contractors • Failure to include Owner requirements (other contracts, utilities, commissioning, etc.) • Early Completion Schedules • Ownership of float, contingency time
  • 44. Know the… • Contract Requirements • Scope of the Work • Basic CPM logic rules and how they are applied in the software • Contractor means & methods • Limitations & constraints of the Owner, Contractor, the Site & the Industry
  • 45. Questions/Comments 45 “PMI” is a registered trade and service mark of the Project Management Institute, Inc.
  • 46. Contact Information Name John Potter, PSP Title Project Controls Manager Company Alpha Construction & Engineering Corporation Email John.potter@alphacorporation.com Phone (O) 757-533-9368 (M) 206-200-6833 Name Chris Carson, PSP Title Corporate Director of Project Controls Company Alpha Construction & Engineering Corporation Email Chris.Carson@alphacorporation.com Phone (O) 757-533-9368 (M) 757-342-5524 46 “PMI” is a registered trade and service mark of the Project Management Institute, Inc.