7. Chris Raftery: Projects and Successes Chris Raftery: Projects and Successes Millennium Tower, Seattle Fujitsu Semiconductor Plant, Gresham, OR IDX Tower, Seattle Fred Hutchinson Cancer Research Center Cedars-Sinai Los Angeles Ste Michelle Winery, Woodinville, WA Bellevue Technology Tower, Bellevue Wells Fargo Center, Seattle
8. Chris Raftery: Projects and Successes Millennium Tower, Seattle Paul Allen’s EMP, Seattle Fred Hutchinson Cancer Research Center Four Seasons Hotel & Condominiums Seattle Wells Fargo Center, Seattle Bellevue City Hall, Bellevue 2 nd & Seneca Building, Seattle 1111 Third Ave Bldg Intros
9.
10.
11.
12.
13. 13 Intros Dave Chambers: Projects and Successes St. Joseph Medical Center, Tacoma, WA Sutter Medical Center, Sacramento, CA Fairview Hospital, Cleveland Clinic Health System White Memorial Medical Center, East Los Angeles, CA
14.
15.
16.
17.
18.
19.
20.
21.
22. A Revolution in Architecture Digital Design & Mfgr’g CATIA made these projects possible for Frank Gehry; nothing like them had ever been built before. Bilbao, Spain EMP: Seattle, Washington Dusseldorf, Germany
23. Paul Allen’s Experience Music Project First, Design and Engineer Design & Model Engineer Envision
27. A System of Integrated Building Elements The Facility
28. For Example, in Your Neighborhood … The Facility
29.
30.
31. OR imaging clinic ER admitting Click and follow the green dot (a patient) as s/he interacts with administrators (yellow) and clinicians (blue). Patient Flow for Pre-Admission Testing in a Superior Conventional Facility room type capacity operating rooms 2 diagnostic modalities 4 exam/observ (incl. emergency/OR/clinic) 15 beds 24 total area (sf) 59,276 services metrics admission 1step lab/ECG/PFT/x-ray 12 steps consult 2 steps total steps 15 steps patient movement 680 feet total patient time 200 mins
32. OR Clinic/ER/Dx 30 BED Acuity Adaptable Unit – single bed rms(shown) Or 42 BED Inpatient Unit Incl. 6 single bed rms and 12 three bed rms Half the size Patient Flow for Pre-Admission Testing in a CareCyte Facility room type capacity operating rooms 3 diagnostic modalities (not including portable modalities) 2 exam/observ (incl. emergency/OR/clinic) 15 beds 30 total area (sf) 28,750 services metrics admission 1step lab/ECG/PFT/x-ray 3 steps consult 2 steps total steps 6 steps patient movement 170 feet total patient time 80 mins 3 ORs & 6 more beds Much more efficient: 75% less patient travel; 60% less time! Click and follow the green dot (a patient) as s/he interacts with administrators (yellow) and clinicians (blue).
33. Dave Chambers’ Prototype Hospital Initiative - Resetting Expectations for Traditional Hospital Construction Efficiency & Costs Based on the outcomes of this effort, Sutter Health is now building five facilities implementing the same principles. Goal – Metric Current Baseline Prototype Hospital Team Expectations Staffing Efficiency - Total FTEs 442 253.2 - Adjusted Patient Discharges (APDs) 7135 8742.3 - FTEs per APD (CMI modified) 0.054 0.029 Area (Efficiency of Program) - Area (BGSF) 114.660 100.611 - Area per Bed 1,911 1,677 - Area per APD 16.07 10.44 Construction Cost - Construction Cost per SF $650.00 $370.00 - Construction Cost per Bed $1.242M $0.62M Other Measures - Time to Build (Design, Permitting, Construction) 72 months plus Less than 48 months - Energy Use Measures include Electrical and Natural Gas 25% decrease 46% fewer FTEs required 35% less space required 44-50% less const. cost