Volkswagen Group
Key Figures 2015
Models
approx. 338
Production plants
119 worldwide
Production per day
Ø 38,527 vehicles
6. Seite 6PMF/A | Dr. König | 2016
Factory Planning @ Volkswagen
Design and Construction 4.0
2
5 Outlook & Summary
4
Industry 4.0 @ Volkswagen3
Contents
Volkswagen Group1
7. Seite 7PMF/A | Dr. König | 2016
Factory Planning @ Volkswagen
Working Locations of PMF worldwide
Südamerika
Nordamerika
Afrika
Australie
n
Asien
Europ
a
Projects
Since 2006 > 80 Mio€ construction cost
12 green- and brownfield projects
Since 2006 < 80 Mio€ construction cost
900 mid-size Projects
Ø 90-100 projects/year
infrastructure volume: approx. 5 billion €
coordination building & civil
engineering
HVAC electrical supply PMO
8. Seite 8PMF/A | Dr. König | 2016
Factory Planning @ Volkswagen
Purpose
The departement factory Planning has a central function
since the existing of the volkswagen group
Main specialists are architects, civil and building
engineers, electrical engineers, utility engineers
In times of stagnation: optimizing existing building
structures and standards
In times of expansion: New factorys and buildings
worldwide
Future: energy saving, factory of the future
9. Seite 9PMF/A | Dr. König | 2016
Factory Planning @ Volkswagen
5 main greenfield projects of past 15 years
10. Seite 10PMF/A | Dr. König | 2016
Factory Planning @ Volkswagen
Design and Construction 4.0
2
5 Summary
4
Industry 4.0 @ Volkswagen3
Contents
Volkswagen Group1
11. Seite 11PMF/A | Dr. König | 2016
Big Data
Digitalization
Internet of things
and services
Industry 4.0
Industry 4.0 @ Volkswagen
Understanding of VW Production
12. Seite 12PMF/A | Dr. König | 2016
Big Data
Digitalization
Internet of things
and services
Industry 4.0
Intelligent
Systems
Digital
Factory
Smart
Factory
Cyber-
Physical-
Systems
…
Industry 4.0 @ Volkswagen
Understanding of VW Production
13. Seite 13PMF/A | Dr. König | 2016
Social Media
Industrie 4.0 describes a consistant development of a real time connection between humans, objects
and systems with the utilization of all possibilities from the IT technologies around the whole supply
chain.
intelligent machinesautomatization
Yesterday: Industry1.0 & 2.0
Today: Industry 3.0
Tomorrow: Industry 4.0
mechanization tayloring
Internet of things
Industry 4.0 @ Volkswagen
From Industry 1.0 to Industry 4.0
14. Seite 14PMF/A | Dr. König | 2016
Factory of the future
PQ35
Digitalization 2D 3D
Automated engineering
facilities
MQB
(heute)
Connected
engineering facilities
Connected
Production
Future
Development
Cennected
HMI
Connected
Processes
Ab 20152000 – 20152000
Industry 4.0 @ Volkswagen
Interaction and integration of planning &manufacturing
15. Seite 15PMF/A | Dr. König | 2016
Factory Planning @ Volkswagen
Design and Construction 4.0
2
5 Summary
4
Industry 4.0 @ Volkswagen3
Contents
Volkswagen Group1
16. Seite 16PMF/A | Dr. König | 2016
Design and Construction 4.0
Definition
„Digital Factory is the generic form for a comprehensive network of
digital models, methods and tools – among others the simulation
and 3D-visualization integrated by a consistent Data-management.
The goal of Digital Factory is the integrated planning, evaluation
and continuous improvement of all relevant structures, processes
and resources of the real factory in connection with the product.“
from: VDI Richtlinie 4499 Blatt 1, 2008-02
17. Seite 17PMF/A | Dr. König | 2016
Design and Construction 4.0
Digital Factory @ Volkswagen Project structure
12 Brands/ > 119 Locations
10 Areas/ 3 Divisions (P, H, E)
18 Countrys/ 15 Languages
6 Basic Systems
Over 20.000 permanent system Users
Over 600 active project members
18. Seite 18PMF/A | Dr. König | 2016
Design and Construction 4.0
Digital Factory@ Volkswagen – Factory Planning System
Productive since 1986
In 6 brands and more then 45 locationsn
Approx. 6000 Users and more then 180.000 drawings
HLS is based on software from Bentley Systems Inc.
19. Seite 19PMF/A | Dr. König | 2016
Design and Construction 4.0
Digital Factory @ Volkswagen –HLS system family
File Server
Applications based on MicroStation
CAD-System MicroStation
Factory-DMU
Addon for Viewing und Reporting based Facilitiy
Planning
Modules
20. Seite 20PMF/A | Dr. König | 2016
Design and Construction 4.0
Factory DMU Definition and Benefits
Creation of a digital overall factory model with the following characteristics:
Comprehensive, static representation of the factory
Based on current digital production equipment and factory layout data
Consideration of the complete planning process
2D 3D
Detailed description
Benefits:
Early elimination of collisions
Reduction of the change costs during the realization
Improvement and insurance of the planning quality
Creation of maturity level reports
21. Seite 21PMF/A | Dr. König | 2016
Design and Construction 4.0
System landscape for the factory DMU
3D-total model in Interviews3D
Import/
Conversion
Example: Factory DMU to the hall 4a Bratislava
Advantage of the factory DMU versus the single source systems:
Visualization of all operating equipments and factory arrays in real time on standard CAD
Hardware (Notebook, PC)
Source systems
HLS
Press shop, log., constr.,
electrical engineering, TBE
HLS Venturis
Paint shop, materials
handling technology
Connect
Assembly
Process Designer
Body shop
22. Seite 22PMF/A | Dr. König | 2016
Assembly
Press Shop
Paint Shop
Body Shop
Design and Construction 4.0
Factory-DMU – Project San Jose Chiapa (Mexico)
23. Seite 23PMF/A | Dr. König | 2016
Design and Construction 4.0
Factory-DMU - Project San Jose Chiapa (Mexico)
24. Seite 24PMF/A | Dr. König | 2016
Design and Construction 4.0
Factory-DMU – Example Clash Detection
25. Seite 25PMF/A | Dr. König | 2016
Design and Construction 4.0
Factory-DMU - Process
nach S. Kerber
Factory-DMU
Process
26. Seite 26PMF/A | Dr. König | 2016
Design and Construction 4.0
Factory-DMU - usage of a collaboration platform
- Connected working
- Digitalized processes
- Consolidated information
- Documentation
i
nach S. Kerber
27. Seite 27PMF/A | Dr. König | 2016
Design and Construction 4.0
Collaboration Platform
Examples:
digital plan approval
Change Management
a
b
nach S. Kerber
a
b
28. Seite 28PMF/A | Dr. König | 2016
nach S. Kerber
Design and Construction 4.0
Collaboration Plattform – Design Check Up
Advantages of digital Design Management:
Compliant, accelarated, documentated design check up
Savings in reproduction costs
Connection between construction site and planning
29. Seite 29PMF/A | Dr. König | 2016
nach S. Kerber
Design and Construction 4.0
Collaboration Plattform – Change Management
Advantages of a digital Change Management:
Compliant, accelarated and documentated Process
„actual overview is created by itself“
Usage of digital information (Monitoring, Reportiong exchange to
other systems)
30. Seite 30PMF/A | Dr. König | 2016
Factory Planning @ Volkswagen
Design and Construction 4.0
2
5 Outlook & Summary
4
Industry 4.0 @ Volkswagen3
Contents
Volkswagen Group1
31. Seite 31PMF/A | Dr. König | 2016
Outlook - Digital variance analysis
Usage of tablets with HLS mobile app
nach S. Kerber
32. Seite 32PMF/A | Dr. König | 2016
Outlook - digital variance analysis
Usage of tablets with HLS mobile app
SOLLIST
i
nach S. Kerber
33. Seite 33PMF/A | Dr. König | 2016
Outlook – digital variance analysis
collaboration platform integrated
nach S. Kerber
34. Seite 34PMF/A | Dr. König | 2016
Summary
Factory planning is responsible for new construction projects
world and group-wide
Within the project digital factory, VW deals with design and
construction 4.0
Factory- DMU is a method for the coordination of drawings and
clash detection in projects
Use cases show that a cloud based collaboration Tool is
necessary for handling of complexity within projects
Development and improvement is a continuous need while
dealing with various projectst