Echelon I Plane Crash   February 18, 2010 Austin, TX City of Austin Fire Department Austin, Texas
[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object]
Just a “normal” day?
9:18 a.m . 1827 Dapplegrey Lane – house fire 09:18  Structure Fire- Residence 1827 Dapplegrey Lane, Austin TX Engine 28 reporting smoke can be seen from station upon departure. 09:24 Engine 28 on scene reporting fire throughout the house with one exposure. A woman reporting her husband was possibly inside, possibly part of a suicide attempt. 09:30 Battalion 3 changes strategy to defensive attack only. 10:21 Fire under control.
Sheryl Stack
Joe Stack
Joseph Stack’s House 1827 Dapplegrey Lane
 
Proximity of Georgetown Airport, Stack House, and Echelon I Building
Georgetown Municipal Airport ,[object Object]
 
 
[object Object]
 
A Picture is Worth a Thousand Words
Echelon I Photos
Echelon I Photos
Echelon I Photos
Echelon I Photos
Echelon I Photos
Echelon I Photos
Echelon I Photos
Echelon I Photos
Echelon I Photos
Echelon I Photos
Echelon I Photos
Echelon I Photos
Echelon I Photos
Echelon I Photos
Echelon I Photos
Echelon I Photos
Echelon I Photos
Echelon I Photos
Echelon I Photos
Echelon I Photos
Echelon I Photos
Echelon I Photos
Echelon I Photos
I-Beam & Bar Joist Deformation
Spray Applied Fireproofing Issues
Spray Applied Fireproofing Issues
Spray Applied Fireproofing Issues
Echelon I Photos
Echelon I Photos
Echelon I Photos
Echelon I Photos
Echelon I Photos
Echelon I Photos
Echelon I Photos
Echelon I Photos
Echelon I Photos
Echelon Building Complex 9420 Research Blvd. Echelon Building Complex Aerial Photo
ALPHA (West Side of Building) Echelon I Aerial Photos
BRAVO (North Side of Building) Echelon I Aerial Photos
Echelon I CHARLIE (East Side of Building) Echelon I Aerial Photos
Charlie Sector
DELTA (South Side of Building) Command Echelon I Aerial Photos
Echelon I Photos
February 18, 2010 START OF THE DAY Austin Fire Department Station Locations
9:00 a.m.  – EMS Traffic Injury Eng 30 dispatched Austin Fire Department Station Locations
9:18 a.m.  – Structure Fire  1827 Dapplegrey Lane Austin Fire Department Station Locations
Austin Fire Department Station Locations 9:20 a.m.  – Engines 8, 25, 28, and 40 dispatched to Dapplegrey Lane fire.
9:22 a.m.  – Fire Alarm   Eng 34 dispatched Austin Fire Department Station Locations
9:31 a.m.  – EMS Chest Pain   Eng 18 dispatched Austin Fire Department Station Locations
[object Object],[object Object],Austin Fire Department Station Locations
9:56 a.m.  – Structure Fire   9420 Research Blvd.  Austin Fire Department Station Locations
9:59 a.m.  – Units dispatched to   9420 Research Blvd. Austin Fire Department Station Locations
Austin Fire Department Station Locations 1st Alarm Structure Fire
Aerial Map of Echelon 1 Command and Staging Order of Arrival
Feb. 18, 2010 Aerial Map of Echelon 1 Response
09:56:22 First Call Received Aerial Map of Echelon 1 Response
First Call Received Engine 604 1 st  Unit Aerial Map of Echelon 1 Response E604 E604
First Call Received Engine 604 Engine 21 2 nd  Unit Aerial Map of Echelon 1 Response E21 E604 E604 E21
28 Year old Iraq Veteran Robin De Haven uses work ladder to rescue 5 IRS employees
3 rd  Unit First Call Received Engine 604 Engine 21 CM901 Aerial Map of Echelon 1 Response E21 E604 E21 E604 CM901
4 th  Unit First Call   Received Engine 604 Engine 21 CM901 Quint 19  Aerial Map of Echelon 1 Response E21 E604 Q19 CM901 E21 E604 Q19
5 th  Unit First Call Received Engine 604 Engine 21 CM901 Quint 19  Engine 33 Aerial Map of Echelon 1 Response E21 E604 Q19 E33 CM901
 
6 th  Unit First Call Received Engine 604 Engine 21 CM901 Quint 19  Engine 33 Engine 44   Aerial Map of Echelon 1 Response E21 E604 Q19 E44 E33 CM901 E21 E604 Q19
7 th  Unit First Call Received Engine 604 Engine 21 CM901 Quint 19  Engine 33 Engine 44   Engine 16 Aerial Map of Echelon 1 Response E21 E604 Q19 E44 E33 CM901 E21 E604 Q19 E16
8 th  Unit First Call Received Engine 604 Engine 21 CM901 Quint 19  Engine 33 Engine 44  Engine 16 Rescue 14 E21 Aerial Map of Echelon 1 Response CM901 E604 Q19 E44 E33 E16 R14 CM901
First Call Received Engine 604 Engine 21 CM901 Quint 19  Engine 33 Engine 44  Engine 16 Rescue 14 Engine 31 9 th  Unit Aerial Map of Echelon 1 Response E21 R14 E604 Q19 E31 E44 E33 CM901 E16
10 th  Unit First Call Received Engine 604 Engine 21 CM901 Quint 19  Engine 33 Engine 44  Engine 16 Rescue 14 Engine 31 Ladder 31 Aerial Map of Echelon 1 Response E21 R14 E604 Q19 E31 E44 E33 CM901 E16 L31
11 th  Unit First Call Received Engine 604 Engine 21 CM901 Quint 19  Engine 33 Engine 44  Engine 16 Rescue 14 Engine 31 Ladder 31 Engine 38 Aerial Map of Echelon 1 Response E21 R14 E604 Q19 L31 E31 E44 E33 CM901 E16 E38
12 th  Unit First Call Received Engine 604 Engine 21 CM901 Quint 19  Engine 33 Engine 44  Engine 16 Rescue 14 Engine 31 Ladder 31 Engine 38 Engine 02 Aerial Map of Echelon 1 Response E21 R14 E604 Q19 L31 E31 E44 E33 CM901 E02 E16 E38
First Call Received Engine 604 Engine 21 CM901 Quint 19  Engine 33 Engine 44  Engine 16 Rescue 14 Engine 31 Ladder 31 Engine 38 Engine 02 Engine 23 13 th  Unit Aerial Map of Echelon 1 Response E21 R14 E604 Q19 L31 E31 E44 E33 CM901 E02 E23 E16 E38
10:24:07 First Call Received Engine 604 Engine 21 CM901 Quint 19  Engine 33 Engine 44  Engine 16 Rescue 14 Engine 31 Ladder 31 Engine 38 Engine 02 Engine 23 Ladder 18 CM901 Aerial Map of Echelon 1 Response E21 R14 E604 Q19 L31 E31 E44 E33 E02 E23 E16 E38 L18
Initial Site Plan and Google ©  view at CP
February 18, 2010, Austin, TX – clear skies,  light winds, mid 50’s 9420 Research Blvd – Echelon I Building 09:56 Structure Fire – Large explosion, unsure what it is. 10:00 Engine 604 on scene requesting next unit report to parking lot side of building. ESD units at training exercise across the highway. 10:02 Witness reports plane crashed into building. Numerous reports to Dispatch—large explosion, plane crash, huge fireball, smoke and flames visible. 10:04 AFD Quint 19 on scene. 10:07 Unified Command established on west side of building. 10:11 Triage setup on west side of building. 10:11 Staging area for AFD 2 nd  alarm units: parking lot on Jollyville Road side of incident. 10:13  CV1 vehicle dispatched for CP.
Echelon I Photos
Echelon I Operations
9420 Research Blvd – Echelon I Building (timeline cont’d) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],February 18, 2010, Austin, TX – clear skies,  light winds, mid 50’s
Echelon I Photos
Echelon I Photos
9420 Research Blvd – Echelon I Building (timeline cont’d) February 18, 2010, Austin, TX – clear skies,  light winds, mid 50’s 10:47 EOC activated. 10:55 Primary search 2 nd  floor complete. 10:56 No-fly zone requested around incident site. 11:00  Offensive fire operations re-initiated. 11:21  Building power cut. 11:23  Fire knocked down. 13:50 Fire under control. 16:34  Missing employee found in structure.
Echelon I Photos
Echelon I Photo
Echelon I Photos
Echelon I Photos
Initial ICS 202
Initial ICS 203/215
Building the Next IAP
Incident Planning Takes Time and Commitment! 7. GENERAL SAFETY MESSAGE: Maintain personal accountability. Wear PPE appropriate to the situation. Maintain hydration. Report all injuries to Safety. 6. WEATHER FORECAST FOR OPERATIONAL PERIOD: Today: Sunny with highs in lower 60's. South winds at 5mph becoming SE 10-15 in the afternoon. Tonight: Partly cloudy lows in mid 40's, south winds at 5-10 mph 5. GENERAL CONTROL OBJECTIVES FOR THE INCIDENT (INCLUDE ALTERNATIVES) Maintain perimeter Provide for rehab of responders Complete fire suppression Maintain traffic flow Transition to Law Enforcement event Complete ICS organization Maintain communications with key agencies/persons Ensure safety of all Responders 4. OPERATIONAL PERIOD (DATE/TIME) 2/18/2010 event-1900 3. TIME  PREPARED 1400 2. DATE  PREPARED 2/18/2010 1. INCIDENT NAME Echelon Event INCIDENT OBJECTIVES
7. GENERAL SAFETY MESSAGE: Maintain personal accountability. Wear PPE appropriate to the situation. Maintain hydration. Report all injuries to Safety. 6. WEATHER FORECAST FOR OPERATIONAL PERIOD: Today: Sunny with highs in lower 60's. South winds at 5mph becoming SE 10-15 in the afternoon. Tonight: Partly cloudy lows in mid 40's, south winds at 5-10 mph 4. OPERATIONAL PERIOD (DATE/TIME) 2/18/2010 1900- 0700 5. GENERAL CONTROL OBJECTIVES FOR THE INCIDENT (INCLUDE ALTERNATIVES) Maintain perimeter Provide for rehab of responders Continue fire overhaul Provide for evidence preservation Maintain traffic flow Complete transition to Law Enforcement event Maintain communications with key agencies/persons Ensure safety of all Responders 3. TIME  PREPARED 1600 2. DATE  PREPARED 2/18/2010 1. INCIDENT NAME Echelon Event INCIDENT OBJECTIVES Incident Planning Takes Time and Commitment!
City Leaders Convene at the Echelon I Building
Aftermath ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Summary of Incident  and  Significant Findings ,[object Object],[object Object],[object Object],[object Object],[object Object]
 
Notification and Response ,[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],Inter-Agency Cooperation  and  Unified Command
Inter-Agency Cooperation and  Unified Command
EOC Coordination ,[object Object],[object Object],[object Object],[object Object]
CTECC EOC
 
Joint Information Center ,[object Object],[object Object],[object Object],[object Object],[object Object]
City Leaders Convene at the Echelon I Building
Criminal Investigation ,[object Object],[object Object],[object Object]
Lessons Learned and Reinforced ,[object Object],[object Object],[object Object],[object Object],[object Object]
Accountability ,[object Object],[object Object]
Austin Fire Department ESD 2 Pflugerville FD ESD 3  Oak Hill FD ESD 6  Lake Travis Fire Rescue ESD 9 Westlake FD Austin/Travis County EMS Williamson County EMS Participating Fire Departments and EMS Agencies
Austin Police Department Travis County Sheriff Williamson County Sheriff FBI Bureau of Alcohol, Tobacco, Firearms & Explosives TX Dept. of Public Safety Texas Rangers Federal Protective Services  AFD Arson Investigations  Univ. of Texas Police Dept Austin Community College Police Department  St. Edwards University Police Department  Secret Service  Transportation Security Administration  US Treasury  Participating Law Enforcement Agencies
Texas Division of Emergency Management  Texas Commission on Environmental Quality  US Army 6th Civil Support Team  Federal Aviation Administration  National Transportation Safety Board  Other Participating Agencies
Austin Homeland Security Emergency Management  Austin PIO  Austin Fire Department Austin/Travis County EMS Austin Police Department Austin/Travis County Health and Human Services Department Austin Emergency Operations Center Participants Travis County DEM ESD 9
Command/Management ,[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],Command/Management
[object Object],[object Object],[object Object],[object Object],Safety
Communications ,[object Object],[object Object],[object Object],[object Object],[object Object]
Firefighting/Response ,[object Object],[object Object],[object Object],[object Object],[object Object]
Areas for Improvement ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Areas for Improvement ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
IRS Evacuation Procedure ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
IRS Evacuation Procedures ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
IRS Evacuation Procedures ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
IRS Evacuation Procedures ,[object Object],[object Object],http://www.irs.gov/irm/part10/irm_10-002-009.html
February 18, 2010 Echelon Building I Installed Fire Protection and Sprinkler Performance Issues
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],A Retrofit System
Courtesy Structures PE, LLP,  1018 W. 11th ST Austin, Texas
Courtesy Structures PE, LLP,  1018 W. 11th ST Austin, Texas Courtesy Structures PE, LLP,  1018 W. 11th ST Austin, Texas 40x Magnification
Courtesy Structures PE, LLP,  1018 W. 11th ST Austin, Texas
Reference: http://www.engineeringtoolbox.com/melting-temperature-metals-d_860.html Melting Points of Metal Elements Symbol(s) Melting Point  ° C Melting Point  ° F Aluminum Al 660 1218 Brass (85/15) Cu/Zn 900-940 1650-1720
Melting Point ~ 1220 ° F (660 ° C) Aluminum Window Frames
Sprinkler Brass Completely Melted Temperatures > 1720 °F (940°C)
Floor Plan/Impact Data    
Noted Point # 1 Floor Plan: Noted Point #1
HVAC Mixing Box and Piping
HVAC Unit MEP/HVAC Water Lines HVAC Mixing Box and Piping:  MEP System Hanger
HVAC Unit
HVAC Unit and Support Piping
Heating and Cooling Lines Heating and Cooling
Heating and Cooling Piping Heating and Cooling
HVAC Piping HVAC
HVAC Piping HVAC
HVAC Piping HVAC
Noted Point # 2 Floor Plan: Noted Point #2
Sprinkler Piping Piping HVAC Piping
Sprinkler Piping Piping
Noted Point # 2 Floor Plan/Piping: Noted Point #2
Brass Missing (>1720  ° F) Sprinkler Piping Piping
Noted Point # 3 Floor Plan: Noted Point #3 Partially Melted or Destroyed Destroyed/Melted Out Operated & Intact Did Not Operate Unknown – Not Seen or  Not Recognized 
Calculated 2 nd  Floor Sprinkler Flows Partially Melted or Destroyed Destroyed/Melted Out Operated & Intact Did Not Operate Unknown – Not Seen or  Not Recognized 8.2 8.7 8.0 4.3 4.0 4.3 ~11 ~9 ~9.5 12.6 8.5 8.6 10.6 13.3 15.2 14.6
Second Floor Break Area
At least 62 sprinklers operated Noted Point # 4 Floor Plan: Noted Point #4 Partially Melted or Destroyed Destroyed/Melted Out Operated & Intact Did Not Operate Unknown – Not Seen or  Not Recognized 
Interior Photos
Interior Photos
14 sprinklers  operated First Floor Sprinkler Operation
Third Floor Sprinkler Operation Secure  Area Not Accessible 13 sprinklers operated  ( > 80 total)
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Approximate Flows
[object Object],[object Object],[object Object],Special Thanks To
IRS Evacuation Procedures ,[object Object],[object Object],http://www.irs.gov/irm/part10/irm_10-002-009.html
http://www.irs.gov/irm/part10/irm_10-002-009.html  Downloads
Echelon 1000 hours
Echelon 1100 hours

Weitere ähnliche Inhalte

Andere mochten auch

Lead Management in SugarCRM Series: Lead Routing with Workflows
Lead Management in SugarCRM Series: Lead Routing with WorkflowsLead Management in SugarCRM Series: Lead Routing with Workflows
Lead Management in SugarCRM Series: Lead Routing with WorkflowsAtcore Systems
 

Andere mochten auch (20)

Can Seng-ooi - Education and social engineering - museums in singapore
Can Seng-ooi - Education and social engineering - museums in singaporeCan Seng-ooi - Education and social engineering - museums in singapore
Can Seng-ooi - Education and social engineering - museums in singapore
 
Susanne Klingenberg, bopladsområdet ved Hoby
Susanne Klingenberg, bopladsområdet ved Hoby Susanne Klingenberg, bopladsområdet ved Hoby
Susanne Klingenberg, bopladsområdet ved Hoby
 
Mette Klingenberg og Lotte Christensen - gården bag palisaden
Mette Klingenberg og Lotte Christensen - gården bag palisadenMette Klingenberg og Lotte Christensen - gården bag palisaden
Mette Klingenberg og Lotte Christensen - gården bag palisaden
 
Bente Grundvad moellemarksgaard
Bente Grundvad moellemarksgaardBente Grundvad moellemarksgaard
Bente Grundvad moellemarksgaard
 
Karen Munk Nielsen og Anneken Appel Laursen - status fra nyere tids netværk
Karen Munk Nielsen og Anneken Appel Laursen - status fra nyere tids netværkKaren Munk Nielsen og Anneken Appel Laursen - status fra nyere tids netværk
Karen Munk Nielsen og Anneken Appel Laursen - status fra nyere tids netværk
 
Birgit Wilster - fra kortlægning til strategi
Birgit Wilster -  fra kortlægning til strategiBirgit Wilster -  fra kortlægning til strategi
Birgit Wilster - fra kortlægning til strategi
 
8 Thomas Guntzelnick Poulsen, Danske mønter
8 Thomas Guntzelnick Poulsen, Danske mønter8 Thomas Guntzelnick Poulsen, Danske mønter
8 Thomas Guntzelnick Poulsen, Danske mønter
 
67 niels ehlerskoch_trap
67 niels ehlerskoch_trap67 niels ehlerskoch_trap
67 niels ehlerskoch_trap
 
94 arne jouttij+ñrvi_at skille sk+ªg fra snot
94 arne jouttij+ñrvi_at skille sk+ªg fra snot94 arne jouttij+ñrvi_at skille sk+ªg fra snot
94 arne jouttij+ñrvi_at skille sk+ªg fra snot
 
Michael Alrøjensen, sct. nicolaj gade
Michael Alrøjensen, sct. nicolaj gadeMichael Alrøjensen, sct. nicolaj gade
Michael Alrøjensen, sct. nicolaj gade
 
Samir rafla principles of cardiology pages 1 61
Samir rafla principles of cardiology pages 1 61 Samir rafla principles of cardiology pages 1 61
Samir rafla principles of cardiology pages 1 61
 
50 Peter Bjerregaard, Videnskabens grænseland
50 Peter Bjerregaard, Videnskabens grænseland50 Peter Bjerregaard, Videnskabens grænseland
50 Peter Bjerregaard, Videnskabens grænseland
 
Catherine Jessen praeboreale dyreofringer
Catherine Jessen praeboreale dyreofringerCatherine Jessen praeboreale dyreofringer
Catherine Jessen praeboreale dyreofringer
 
Birgitte Faurhøj Olsen - orientering om nyfundne kalkmalerier
Birgitte Faurhøj Olsen  - orientering om nyfundne kalkmalerierBirgitte Faurhøj Olsen  - orientering om nyfundne kalkmalerier
Birgitte Faurhøj Olsen - orientering om nyfundne kalkmalerier
 
Poul Krogh Joergensen bronzealderens bulvaegshuse
Poul Krogh Joergensen bronzealderens bulvaegshusePoul Krogh Joergensen bronzealderens bulvaegshuse
Poul Krogh Joergensen bronzealderens bulvaegshuse
 
Lead Management in SugarCRM Series: Lead Routing with Workflows
Lead Management in SugarCRM Series: Lead Routing with WorkflowsLead Management in SugarCRM Series: Lead Routing with Workflows
Lead Management in SugarCRM Series: Lead Routing with Workflows
 
93 cecilie odderskov_ct-scanningers potentialer
93 cecilie odderskov_ct-scanningers potentialer93 cecilie odderskov_ct-scanningers potentialer
93 cecilie odderskov_ct-scanningers potentialer
 
101 camilla julbastholm_nkf 2015
101 camilla julbastholm_nkf 2015101 camilla julbastholm_nkf 2015
101 camilla julbastholm_nkf 2015
 
Vitus Vestergaard, Samarbejder mellem museer og universiteter
Vitus Vestergaard, Samarbejder mellem museer og universiteterVitus Vestergaard, Samarbejder mellem museer og universiteter
Vitus Vestergaard, Samarbejder mellem museer og universiteter
 
59 sikringsstilling nord odm 2016 redigeret
59 sikringsstilling nord odm 2016 redigeret59 sikringsstilling nord odm 2016 redigeret
59 sikringsstilling nord odm 2016 redigeret
 

Mehr von Brandon Williams

Cmwg contract breaches presentation
Cmwg contract breaches presentationCmwg contract breaches presentation
Cmwg contract breaches presentationBrandon Williams
 
Mar 2012 cdphe contractor performance monitoring trng
Mar 2012 cdphe contractor performance monitoring trngMar 2012 cdphe contractor performance monitoring trng
Mar 2012 cdphe contractor performance monitoring trngBrandon Williams
 
Tobacco wb webinar 6.22.12
Tobacco wb webinar 6.22.12Tobacco wb webinar 6.22.12
Tobacco wb webinar 6.22.12Brandon Williams
 
Applicant webinar tobacco cessation initiatives
Applicant webinar tobacco cessation initiativesApplicant webinar tobacco cessation initiatives
Applicant webinar tobacco cessation initiativesBrandon Williams
 
Applicant webinar ccpd final 05-29-12
Applicant webinar ccpd final 05-29-12Applicant webinar ccpd final 05-29-12
Applicant webinar ccpd final 05-29-12Brandon Williams
 
Applicant webinar tobacco community initiatives
Applicant webinar tobacco community initiativesApplicant webinar tobacco community initiatives
Applicant webinar tobacco community initiativesBrandon Williams
 
Cdphe cd presentation for ccpd 10 14 11a
Cdphe cd presentation for ccpd 10 14 11aCdphe cd presentation for ccpd 10 14 11a
Cdphe cd presentation for ccpd 10 14 11aBrandon Williams
 
Jillians slides for 12 9 11 ccpd final
Jillians slides for 12 9 11 ccpd finalJillians slides for 12 9 11 ccpd final
Jillians slides for 12 9 11 ccpd finalBrandon Williams
 
Ccpd stakeholder input process 01 13-12
Ccpd stakeholder input process 01 13-12Ccpd stakeholder input process 01 13-12
Ccpd stakeholder input process 01 13-12Brandon Williams
 
Ttfcci mid program presentation to trc 121411.cb
Ttfcci mid program presentation to trc 121411.cbTtfcci mid program presentation to trc 121411.cb
Ttfcci mid program presentation to trc 121411.cbBrandon Williams
 
Ttfcci mid program presentation to trc 121411.cb
Ttfcci mid program presentation to trc 121411.cbTtfcci mid program presentation to trc 121411.cb
Ttfcci mid program presentation to trc 121411.cbBrandon Williams
 
Colorado lgbt data scan final 10 14-11
Colorado lgbt data scan final 10 14-11Colorado lgbt data scan final 10 14-11
Colorado lgbt data scan final 10 14-11Brandon Williams
 
PSD Obesity Presentation 2011
PSD Obesity Presentation 2011PSD Obesity Presentation 2011
PSD Obesity Presentation 2011Brandon Williams
 
Epe literature review training november 28 2011 (1)
Epe literature review training november 28 2011 (1)Epe literature review training november 28 2011 (1)
Epe literature review training november 28 2011 (1)Brandon Williams
 
LGBT HOPP Strategic Plan Slides
LGBT HOPP Strategic Plan SlidesLGBT HOPP Strategic Plan Slides
LGBT HOPP Strategic Plan SlidesBrandon Williams
 

Mehr von Brandon Williams (20)

Cmwg contract breaches presentation
Cmwg contract breaches presentationCmwg contract breaches presentation
Cmwg contract breaches presentation
 
Mar 2012 cdphe contractor performance monitoring trng
Mar 2012 cdphe contractor performance monitoring trngMar 2012 cdphe contractor performance monitoring trng
Mar 2012 cdphe contractor performance monitoring trng
 
Tobacco wb webinar 6.22.12
Tobacco wb webinar 6.22.12Tobacco wb webinar 6.22.12
Tobacco wb webinar 6.22.12
 
Cmpu orientation webinar
Cmpu orientation webinarCmpu orientation webinar
Cmpu orientation webinar
 
Applicant webinar tobacco cessation initiatives
Applicant webinar tobacco cessation initiativesApplicant webinar tobacco cessation initiatives
Applicant webinar tobacco cessation initiatives
 
Applicant webinar ccpd final 05-29-12
Applicant webinar ccpd final 05-29-12Applicant webinar ccpd final 05-29-12
Applicant webinar ccpd final 05-29-12
 
Applicant webinar tobacco community initiatives
Applicant webinar tobacco community initiativesApplicant webinar tobacco community initiatives
Applicant webinar tobacco community initiatives
 
MCH Data to Action
MCH Data to ActionMCH Data to Action
MCH Data to Action
 
Tobacco wb webinar 5 1-12
Tobacco wb webinar 5 1-12Tobacco wb webinar 5 1-12
Tobacco wb webinar 5 1-12
 
Cdphe cd presentation for ccpd 10 14 11a
Cdphe cd presentation for ccpd 10 14 11aCdphe cd presentation for ccpd 10 14 11a
Cdphe cd presentation for ccpd 10 14 11a
 
Jillians slides for 12 9 11 ccpd final
Jillians slides for 12 9 11 ccpd finalJillians slides for 12 9 11 ccpd final
Jillians slides for 12 9 11 ccpd final
 
Ccpd stakeholder input process 01 13-12
Ccpd stakeholder input process 01 13-12Ccpd stakeholder input process 01 13-12
Ccpd stakeholder input process 01 13-12
 
Ttfcci mid program presentation to trc 121411.cb
Ttfcci mid program presentation to trc 121411.cbTtfcci mid program presentation to trc 121411.cb
Ttfcci mid program presentation to trc 121411.cb
 
Federal tobacco control
Federal tobacco controlFederal tobacco control
Federal tobacco control
 
Ttfcci mid program presentation to trc 121411.cb
Ttfcci mid program presentation to trc 121411.cbTtfcci mid program presentation to trc 121411.cb
Ttfcci mid program presentation to trc 121411.cb
 
Colorado lgbt data scan final 10 14-11
Colorado lgbt data scan final 10 14-11Colorado lgbt data scan final 10 14-11
Colorado lgbt data scan final 10 14-11
 
PSD Obesity Presentation 2011
PSD Obesity Presentation 2011PSD Obesity Presentation 2011
PSD Obesity Presentation 2011
 
Epe literature review training november 28 2011 (1)
Epe literature review training november 28 2011 (1)Epe literature review training november 28 2011 (1)
Epe literature review training november 28 2011 (1)
 
Colorado leadership v4
Colorado leadership v4Colorado leadership v4
Colorado leadership v4
 
LGBT HOPP Strategic Plan Slides
LGBT HOPP Strategic Plan SlidesLGBT HOPP Strategic Plan Slides
LGBT HOPP Strategic Plan Slides
 

Echelon Plane Crash

  • 1. Echelon I Plane Crash February 18, 2010 Austin, TX City of Austin Fire Department Austin, Texas
  • 2.
  • 3.
  • 5. 9:18 a.m . 1827 Dapplegrey Lane – house fire 09:18 Structure Fire- Residence 1827 Dapplegrey Lane, Austin TX Engine 28 reporting smoke can be seen from station upon departure. 09:24 Engine 28 on scene reporting fire throughout the house with one exposure. A woman reporting her husband was possibly inside, possibly part of a suicide attempt. 09:30 Battalion 3 changes strategy to defensive attack only. 10:21 Fire under control.
  • 8. Joseph Stack’s House 1827 Dapplegrey Lane
  • 9.  
  • 10. Proximity of Georgetown Airport, Stack House, and Echelon I Building
  • 11.
  • 12.  
  • 13.  
  • 14.
  • 15.  
  • 16. A Picture is Worth a Thousand Words
  • 40. I-Beam & Bar Joist Deformation
  • 53. Echelon Building Complex 9420 Research Blvd. Echelon Building Complex Aerial Photo
  • 54. ALPHA (West Side of Building) Echelon I Aerial Photos
  • 55. BRAVO (North Side of Building) Echelon I Aerial Photos
  • 56. Echelon I CHARLIE (East Side of Building) Echelon I Aerial Photos
  • 58. DELTA (South Side of Building) Command Echelon I Aerial Photos
  • 60. February 18, 2010 START OF THE DAY Austin Fire Department Station Locations
  • 61. 9:00 a.m. – EMS Traffic Injury Eng 30 dispatched Austin Fire Department Station Locations
  • 62. 9:18 a.m. – Structure Fire 1827 Dapplegrey Lane Austin Fire Department Station Locations
  • 63. Austin Fire Department Station Locations 9:20 a.m. – Engines 8, 25, 28, and 40 dispatched to Dapplegrey Lane fire.
  • 64. 9:22 a.m. – Fire Alarm Eng 34 dispatched Austin Fire Department Station Locations
  • 65. 9:31 a.m. – EMS Chest Pain Eng 18 dispatched Austin Fire Department Station Locations
  • 66.
  • 67. 9:56 a.m. – Structure Fire 9420 Research Blvd. Austin Fire Department Station Locations
  • 68. 9:59 a.m. – Units dispatched to 9420 Research Blvd. Austin Fire Department Station Locations
  • 69. Austin Fire Department Station Locations 1st Alarm Structure Fire
  • 70. Aerial Map of Echelon 1 Command and Staging Order of Arrival
  • 71. Feb. 18, 2010 Aerial Map of Echelon 1 Response
  • 72. 09:56:22 First Call Received Aerial Map of Echelon 1 Response
  • 73. First Call Received Engine 604 1 st Unit Aerial Map of Echelon 1 Response E604 E604
  • 74. First Call Received Engine 604 Engine 21 2 nd Unit Aerial Map of Echelon 1 Response E21 E604 E604 E21
  • 75. 28 Year old Iraq Veteran Robin De Haven uses work ladder to rescue 5 IRS employees
  • 76. 3 rd Unit First Call Received Engine 604 Engine 21 CM901 Aerial Map of Echelon 1 Response E21 E604 E21 E604 CM901
  • 77. 4 th Unit First Call Received Engine 604 Engine 21 CM901 Quint 19 Aerial Map of Echelon 1 Response E21 E604 Q19 CM901 E21 E604 Q19
  • 78. 5 th Unit First Call Received Engine 604 Engine 21 CM901 Quint 19 Engine 33 Aerial Map of Echelon 1 Response E21 E604 Q19 E33 CM901
  • 79.  
  • 80. 6 th Unit First Call Received Engine 604 Engine 21 CM901 Quint 19 Engine 33 Engine 44 Aerial Map of Echelon 1 Response E21 E604 Q19 E44 E33 CM901 E21 E604 Q19
  • 81. 7 th Unit First Call Received Engine 604 Engine 21 CM901 Quint 19 Engine 33 Engine 44 Engine 16 Aerial Map of Echelon 1 Response E21 E604 Q19 E44 E33 CM901 E21 E604 Q19 E16
  • 82. 8 th Unit First Call Received Engine 604 Engine 21 CM901 Quint 19 Engine 33 Engine 44 Engine 16 Rescue 14 E21 Aerial Map of Echelon 1 Response CM901 E604 Q19 E44 E33 E16 R14 CM901
  • 83. First Call Received Engine 604 Engine 21 CM901 Quint 19 Engine 33 Engine 44 Engine 16 Rescue 14 Engine 31 9 th Unit Aerial Map of Echelon 1 Response E21 R14 E604 Q19 E31 E44 E33 CM901 E16
  • 84. 10 th Unit First Call Received Engine 604 Engine 21 CM901 Quint 19 Engine 33 Engine 44 Engine 16 Rescue 14 Engine 31 Ladder 31 Aerial Map of Echelon 1 Response E21 R14 E604 Q19 E31 E44 E33 CM901 E16 L31
  • 85. 11 th Unit First Call Received Engine 604 Engine 21 CM901 Quint 19 Engine 33 Engine 44 Engine 16 Rescue 14 Engine 31 Ladder 31 Engine 38 Aerial Map of Echelon 1 Response E21 R14 E604 Q19 L31 E31 E44 E33 CM901 E16 E38
  • 86. 12 th Unit First Call Received Engine 604 Engine 21 CM901 Quint 19 Engine 33 Engine 44 Engine 16 Rescue 14 Engine 31 Ladder 31 Engine 38 Engine 02 Aerial Map of Echelon 1 Response E21 R14 E604 Q19 L31 E31 E44 E33 CM901 E02 E16 E38
  • 87. First Call Received Engine 604 Engine 21 CM901 Quint 19 Engine 33 Engine 44 Engine 16 Rescue 14 Engine 31 Ladder 31 Engine 38 Engine 02 Engine 23 13 th Unit Aerial Map of Echelon 1 Response E21 R14 E604 Q19 L31 E31 E44 E33 CM901 E02 E23 E16 E38
  • 88. 10:24:07 First Call Received Engine 604 Engine 21 CM901 Quint 19 Engine 33 Engine 44 Engine 16 Rescue 14 Engine 31 Ladder 31 Engine 38 Engine 02 Engine 23 Ladder 18 CM901 Aerial Map of Echelon 1 Response E21 R14 E604 Q19 L31 E31 E44 E33 E02 E23 E16 E38 L18
  • 89. Initial Site Plan and Google © view at CP
  • 90. February 18, 2010, Austin, TX – clear skies, light winds, mid 50’s 9420 Research Blvd – Echelon I Building 09:56 Structure Fire – Large explosion, unsure what it is. 10:00 Engine 604 on scene requesting next unit report to parking lot side of building. ESD units at training exercise across the highway. 10:02 Witness reports plane crashed into building. Numerous reports to Dispatch—large explosion, plane crash, huge fireball, smoke and flames visible. 10:04 AFD Quint 19 on scene. 10:07 Unified Command established on west side of building. 10:11 Triage setup on west side of building. 10:11 Staging area for AFD 2 nd alarm units: parking lot on Jollyville Road side of incident. 10:13 CV1 vehicle dispatched for CP.
  • 93.
  • 96. 9420 Research Blvd – Echelon I Building (timeline cont’d) February 18, 2010, Austin, TX – clear skies, light winds, mid 50’s 10:47 EOC activated. 10:55 Primary search 2 nd floor complete. 10:56 No-fly zone requested around incident site. 11:00 Offensive fire operations re-initiated. 11:21 Building power cut. 11:23 Fire knocked down. 13:50 Fire under control. 16:34 Missing employee found in structure.
  • 104. Incident Planning Takes Time and Commitment! 7. GENERAL SAFETY MESSAGE: Maintain personal accountability. Wear PPE appropriate to the situation. Maintain hydration. Report all injuries to Safety. 6. WEATHER FORECAST FOR OPERATIONAL PERIOD: Today: Sunny with highs in lower 60's. South winds at 5mph becoming SE 10-15 in the afternoon. Tonight: Partly cloudy lows in mid 40's, south winds at 5-10 mph 5. GENERAL CONTROL OBJECTIVES FOR THE INCIDENT (INCLUDE ALTERNATIVES) Maintain perimeter Provide for rehab of responders Complete fire suppression Maintain traffic flow Transition to Law Enforcement event Complete ICS organization Maintain communications with key agencies/persons Ensure safety of all Responders 4. OPERATIONAL PERIOD (DATE/TIME) 2/18/2010 event-1900 3. TIME PREPARED 1400 2. DATE PREPARED 2/18/2010 1. INCIDENT NAME Echelon Event INCIDENT OBJECTIVES
  • 105. 7. GENERAL SAFETY MESSAGE: Maintain personal accountability. Wear PPE appropriate to the situation. Maintain hydration. Report all injuries to Safety. 6. WEATHER FORECAST FOR OPERATIONAL PERIOD: Today: Sunny with highs in lower 60's. South winds at 5mph becoming SE 10-15 in the afternoon. Tonight: Partly cloudy lows in mid 40's, south winds at 5-10 mph 4. OPERATIONAL PERIOD (DATE/TIME) 2/18/2010 1900- 0700 5. GENERAL CONTROL OBJECTIVES FOR THE INCIDENT (INCLUDE ALTERNATIVES) Maintain perimeter Provide for rehab of responders Continue fire overhaul Provide for evidence preservation Maintain traffic flow Complete transition to Law Enforcement event Maintain communications with key agencies/persons Ensure safety of all Responders 3. TIME PREPARED 1600 2. DATE PREPARED 2/18/2010 1. INCIDENT NAME Echelon Event INCIDENT OBJECTIVES Incident Planning Takes Time and Commitment!
  • 106. City Leaders Convene at the Echelon I Building
  • 107.
  • 108.
  • 109.  
  • 110.
  • 111.
  • 112. Inter-Agency Cooperation and Unified Command
  • 113.
  • 115.  
  • 116.
  • 117. City Leaders Convene at the Echelon I Building
  • 118.
  • 119.
  • 120.
  • 121. Austin Fire Department ESD 2 Pflugerville FD ESD 3 Oak Hill FD ESD 6 Lake Travis Fire Rescue ESD 9 Westlake FD Austin/Travis County EMS Williamson County EMS Participating Fire Departments and EMS Agencies
  • 122. Austin Police Department Travis County Sheriff Williamson County Sheriff FBI Bureau of Alcohol, Tobacco, Firearms & Explosives TX Dept. of Public Safety Texas Rangers Federal Protective Services AFD Arson Investigations Univ. of Texas Police Dept Austin Community College Police Department St. Edwards University Police Department Secret Service Transportation Security Administration US Treasury Participating Law Enforcement Agencies
  • 123. Texas Division of Emergency Management Texas Commission on Environmental Quality US Army 6th Civil Support Team Federal Aviation Administration National Transportation Safety Board Other Participating Agencies
  • 124. Austin Homeland Security Emergency Management Austin PIO Austin Fire Department Austin/Travis County EMS Austin Police Department Austin/Travis County Health and Human Services Department Austin Emergency Operations Center Participants Travis County DEM ESD 9
  • 125.
  • 126.
  • 127.
  • 128.
  • 129.
  • 130.
  • 131.
  • 132.
  • 133.
  • 134.
  • 135.
  • 136. February 18, 2010 Echelon Building I Installed Fire Protection and Sprinkler Performance Issues
  • 137.
  • 138. Courtesy Structures PE, LLP, 1018 W. 11th ST Austin, Texas
  • 139. Courtesy Structures PE, LLP, 1018 W. 11th ST Austin, Texas Courtesy Structures PE, LLP, 1018 W. 11th ST Austin, Texas 40x Magnification
  • 140. Courtesy Structures PE, LLP, 1018 W. 11th ST Austin, Texas
  • 141. Reference: http://www.engineeringtoolbox.com/melting-temperature-metals-d_860.html Melting Points of Metal Elements Symbol(s) Melting Point ° C Melting Point ° F Aluminum Al 660 1218 Brass (85/15) Cu/Zn 900-940 1650-1720
  • 142. Melting Point ~ 1220 ° F (660 ° C) Aluminum Window Frames
  • 143. Sprinkler Brass Completely Melted Temperatures > 1720 °F (940°C)
  • 144. Floor Plan/Impact Data    
  • 145. Noted Point # 1 Floor Plan: Noted Point #1
  • 146. HVAC Mixing Box and Piping
  • 147. HVAC Unit MEP/HVAC Water Lines HVAC Mixing Box and Piping: MEP System Hanger
  • 149. HVAC Unit and Support Piping
  • 150. Heating and Cooling Lines Heating and Cooling
  • 151. Heating and Cooling Piping Heating and Cooling
  • 155. Noted Point # 2 Floor Plan: Noted Point #2
  • 156. Sprinkler Piping Piping HVAC Piping
  • 158. Noted Point # 2 Floor Plan/Piping: Noted Point #2
  • 159. Brass Missing (>1720 ° F) Sprinkler Piping Piping
  • 160. Noted Point # 3 Floor Plan: Noted Point #3 Partially Melted or Destroyed Destroyed/Melted Out Operated & Intact Did Not Operate Unknown – Not Seen or Not Recognized 
  • 161. Calculated 2 nd Floor Sprinkler Flows Partially Melted or Destroyed Destroyed/Melted Out Operated & Intact Did Not Operate Unknown – Not Seen or Not Recognized 8.2 8.7 8.0 4.3 4.0 4.3 ~11 ~9 ~9.5 12.6 8.5 8.6 10.6 13.3 15.2 14.6
  • 163. At least 62 sprinklers operated Noted Point # 4 Floor Plan: Noted Point #4 Partially Melted or Destroyed Destroyed/Melted Out Operated & Intact Did Not Operate Unknown – Not Seen or Not Recognized 
  • 166. 14 sprinklers operated First Floor Sprinkler Operation
  • 167. Third Floor Sprinkler Operation Secure Area Not Accessible 13 sprinklers operated ( > 80 total)
  • 168.
  • 169.
  • 170.

Hinweis der Redaktion

  1. It started out as a beautiful day, the kind of day that I wish I was out playing golf rather than working. The Austin Fire Department was having a meeting for all the chief officers just south of downtown Austin. We have these periodic work sessions to discuss new programs or do some group problem solving.
  2. We would soon find out that it was going to be anything but a normal day.
  3. Incident # 10013603 At 9:18 am a light box was dispatched to 1827 Dapplegrey. A light box alarm is two engines, an aerial and a command unit. It is roughly half of what we normally dispatch to a structure fire. The reason it started as a light box alarm was because the time delay for dispatching a full box alarm was unacceptable. We found that when we first dispatched a light box we got units out the door an average of 40 seconds faster. So as soon as the light box was dispatched it was upgraded to a full box alarm. As the first unit left the station they saw the column of smoke. The first unit on the scene was Engine 28, reporting fire throughout the entire structure. There was glass found in the back yard well away from house indicating a possible explosion. Within a few minutes of arrival, an Austin Police officer reported there was a woman by the name of Sheryl Stack on scene stating she was the homeowner and that she believed her husband was inside the structure, possibly attempting to commit suicide. She asked that we check the garage to see if her husbands truck was there. The house was almost fully involved, we were in a defensive mode, and we were hoping there was no truck in the garage. The garage was checked and there was no truck. The wife immediately stated that her husband has a plane and that we need to check to see if it is still in the hangar at Georgetown municipal airport. Things are beginning to get a little strange.
  4. Sheryl Stack actually arrived on scene before the first fire unit arrived. She called 911 to report the fire a few minutes after the first 911 call. Investigators looked hard at her to make sure she was not involved with the arson. To this day it is not believed she was involved. Mrs. Stack told the dispatcher her husband had gone crazy the night before and that she and her daughter had left the house to stay in a nearby hotel. The Stacks were having marital problems and had already privately decided to get a divorce. The argument was so bad Sheryl Stack did not feel it was safe for her and her daughter to stay in the house.
  5. Joseph Andrew Stack III was a software engineer. He started two software companies in California that ultimately failed. According to his 3200 word manifesto, a 1986 tax law made it difficult for people in his profession to work independently rather than for a corporation. He moved to Texas around 2003 and started up another software company. He played bass guitar for a local band called the Billy Eli Band. Joe Stack had at least two tax issues that did not go his way. According to Stack’s Father-in-Law, Jack Cook, Stack had a hang-up with the IRS that strained his marriage. Joe Stack’s friends and neighbors have reportedly told media outlets that they never saw any kind of deep seated anger in Joe Stack. In the first hour or so after the Stack home was burning, Sheryl Stack stated to law enforcement that Joe Stack internalized everything. When they had arguments he would just shut down and stop communicating. All indications are he was a ticking time bomb.
  6. This aerial view of the Stack home shows the close proximity to exposures.
  7. This photo shows what it looked like as Austin Firefighters first arrived on scene at the Stack house. One of the first actions taken by fire crews was to protect the exposure on the “B” side of the structure. Dapplegrey Command called for an investigator early into the incident because they were suspicious about how the fire progressed so rapidly prior to their arrival.
  8. Georgetown airport is approximately 20 miles north of the Dapplegrey house. Law enforcement went to check to see if the plane was still at the airport.
  9. Georgetown Municipal Airport is a general aviation airport. It primarily serves the owners of private aircraft. The airport has seen an increase of activity since Austin closed its old airport in 2000. However, it is still fairly quiet during the week and there are two self serve fueling stations available 24-7.
  10. Joe Stack owned a Piper Cherokee PA-28-236 Dakota. It is a four-seater aircraft that carries a maximum of 72 gallons of fuel.
  11. This is an animation of Joe Stack’s Flight path. It is a little slow so I’ll just talk over it a bit until we get to the last 30 seconds or so. The day of the incident it is believed that Stack rigged his house to burn, wrote his manifesto, drove to the Georgetown airport. Loaded a 55 gallon drum into his aircraft and filled the drum with as much fuel as he could. The FBI has not yet released any information regarding Stack using his credit card to purchase aviation fuel at the self serve pump in Georgetown. The FBI did tell us that Stack purchased two 55 gallon drums a few months before the incident. One of those drums was found next to his truck at the airport. It was made to look like a bomb, however it was just a fake. He also left a note addressed to the IRS in his vehicle. The information in that note has yet to be released. Joe Stack took off in his Piper Cherokee Dakota at approximately 940 am. If you’ll remember from an earlier slide, the first 911 calls reporting the fire on Dapplagrey were at approximately 9:15 am. It is highly unlikely that Joe Stack set the fire at his home, drove to Georgetown airport, and then took off in his aircraft. The time to drive to Georgetown airport from his house on Dapplegreay is almost 30 minutes. By looking at the flight path, Joe Stack flies directly over his neighborhood before taking a hard right bank straight at the Echelon Building. It was reported a few days after the incident that they believe they found the remnants of the second 55 gallon drum in the Echelon fire debris.
  12. It just so happened that one of our smaller local fire departments was training across the highway from where the aircraft flew into the Echelon Building. Next is a little montage of media reports about the incident.
  13. Upper and lower flanges are consistently under protected or unprotected while the web appears to have been consistently coated. Some areas look like there is physical damage to the coating but the obvious damage seems to be related to the protection of the web and does not appear to be related to the flange conditions.
  14. Engine 604 is a unit from a neighboring jurisdiction in the same county. On arrival, engine 604 saw there were employees attempting to evacuate the structure so they focused their initial efforts on rescue.
  15. Engine 21 arrived a minute or so after Engine 604, only because they were dispatched on a medical call – a report of a burn injury. We’ll talk a little more about that later. Engine 21 worked with Engine 604 to evacuate people from the 2 nd floor, and then began a search of the second floor. They were unable to complete that search before being order out of the building due to changing from an offensive attack to a defensive attack.
  16. As Engine 604 and 21 began rescue efforts, a 28 year old employee of a glass company was driving by. He saw the folks near a broken window on the second floor and stopped to help. He assisted five people to safely evacuate the building.
  17. Command 901 arrived and assumed Command of the incident.
  18. Quint 19 took up position on the “Charlie” side of the building and was first given instructions to search the 3 rd and 4 th floors. Just after entering the building Q19 received the order to exit the building for a change in tactics. Quint 19 then set up for defensive aerial operations. After achieving partial knockdown, defensive tactics were halted and offensive operations began again. Quint 19 assisted with extinguishing the fire on the second floor.
  19. Engine 33 supplied the Fire Department Connection for the sprinkler system.
  20. Engine 44 laid a supply line to Engine 33 as engine 33 supplemented the sprinkler system. Engine 44 also used its deck gun during defensive operations to knock down exterior fire from the “Alpha” side of the building.
  21. Engine 16 assisted Engines 44 and 33, by going to the hydrant Engine 44 first connected to and maximized the hydrant by accessing all three hydrant outlets.
  22. Rescue 14, a two person unit, was assigned as water supply due to the difficulties Engines 33 and 44 were having with low water pressure.
  23. Engine 31 responded on 2 nd Alarm. Engine 31 laid a line to support Ladder 31’s defensive aerial operations.
  24. Ladder 31 took position on the “David” side of the building and used its aerial nozzle to knock down a great deal of fire on that side of the building. After the fire was extinguished, Ladder 31 used its aerial to look for a missing person on the second floor. After the fire was knocked down, all engines were order to stop flowing water to give the building time to drain. There was concern about the stability of the building.
  25. Engine 38 was assigned as the Rapid Intervention Crew, what we call the RIC Team. Their job was to stand by and be prepared to assist or rescue any fire fighter that got into any kind of trouble. Another way to put it is to rescue the rescuers.
  26. Engine 2 positioned at a hydrant, maximized it, and supplied Quint 19 for aerial operations.
  27. Engine 23 supplied water Ladder 18. Engine 23 also assisted with primary and secondary searches after the fire was extinguished. Engine 23 located the missing victim.
  28. Ladder 18 positioned on the “Alpha” side of the building for defensive aerial operations.
  29. This was the initial Command Post
  30. Status and Benchmark clipboard used by Westlake Fire Department.
  31. The City of Austin has a Command vehicle that was utilized for this event. The following pictures show the results of the work conducted by unified command. The Initial objectives included maintaining the perimeter, Rehab, extinguish the fire, maintain the traffic flow, and be aware this is a criminal investigation so we have to protect the scene as much as we possibly can.
  32. Resources were tracked, radio channels were designated, and the players in the Command and general staff were identified.
  33. The next action plan was built for the next operational period.
  34. The incident was documented on scene with the use of laptops in the mobile command vehicle.
  35. City Leaders walk to the media briefing. Next is a few observations of the incident from AFD Chief of Staff Harry Evans.
  36. Notification and response were exceptional given the fact we had firefighters from an adjoining jurisdiction training across the highway from the incident. We have been training with our adjoining jurisdictions for years, plus we have automatic aid agreements, which has created familiarity. Everyone flowed into the command and response structure with few issues which I will detail in the lessons learned area. The EOC was staffed and functioning quickly. That is another area we are comfortable. The EOC is activated almost monthly due to large incidents or weather related events. All agencies are familiar with the surroundings and the processes of the EOC. Thanks to Law Enforcement connecting the dots we knew we would be inundated with media and we prepared accordingly. We established a Policy group and took over a classroom in another Echelon building. We literally crafted the first, very simple media release approximately and hour and a half after the aircraft struck the building. Since we knew we had an intentional act early on, we had to pressure the FBI to join us at the Command Post. The ranking agents on scene were still a little overwhelmed trying to get organized and account for their people since they were in the building next door to Echelon 1. There were over a dozen law enforcement agencies on site, or officed in the area, but we knew the FBI would be the lead on the criminal investigation because of a MOU between the NTSB and the FBI stating the FBI would lead the investigation into intentional aviation events. Next is an interview with Austin Battalion Chief Warren Weidler discussing his initial concerns.
  37. As I stated earlier, we had fast notification and response. One of the pleasantly surprising events about this tragedy was the evacuation plan that had been practice and well executed by the IRS. There were approximately 190 IRS employees officed in Echelon 1. They evacuated, reported to their meeting sites, and completed their accountability in about ten minutes. Before we had our first alarm companies on scene and committed, we knew the first head count had one person missing. The IRS worked hard on their occupant evacuation plan and practiced it often enough to be very proficient. Several law enforcement agencies were used to assist with traffic. We were located next to a major north-south thoroughfare and we needed to keep traffic moving as best possible. Another fortunate aspect to assist our organization and response was the fact that the FBI and the Joint Terrorism Task Force had their offices in the building next to Echelon 1.
  38. There were several factors as to why we had unified command up and running almost immediately, one – we had another jurisdiction that was first to respond to the event, two – the FBI was literally on site, and three – we are very comfortable operating in unified command in Austin with the weather events and so forth. Partly because it was a major event, it seemed all of the senior staff for most of the responding organizations were on scene and participating. The mobile command post is highly visible and helps incoming senior staff to find their check in point. Having the policy group on site assisted with fast decision making and helped the PIOs with their media briefings.
  39. This little meeting happened within 20 minutes of the start of the incident. Here we are organizing into the Policy group, intel group, and command and general staff.
  40. Activation of the EOC was essential. We now had three sites involved with this incident – The Dapplegrey fire, the Echelon fire, and now Joe Stack’s vehicle at the Georgetown Airport which initially appeared to have an IED. It was much easier to order resources from the EOC rather than through fire dospatch.
  41. Electronic documentation used at the Emergency Operations Center.
  42. Because we had information that this was an intentional event, it allowed us to coordinate the Public Information and craft the message. We felt like we had a little advantage because normally the media digs up some information before we us, but in this instance we were a little ahead of the media. It felt like we being proactive rather than reactive.
  43. We had time to meet with the policy group and craft the message. The Policy group, who delivered some of the briefings, were literally on top of the information and that allowed us to better manage the event.
  44. After consulting with most of the federal agencies on scene, we decided to have APD continue as the lead agency within unified comand. Even though the AFD had more personnel involved initially, we knew this was a criminal investigation and we needed to coordinate our efforts with law enforcement as much as possible. The FBI relied on Austin Police to handle many aspects of the investigation until they could assemble enough personnel to work the scene. From my vantage point is was a very collaborative process.
  45. We struggled with accountability, especially with Law Enforcement. When major event occur on the fire ground we take a par (personnel accountability Report) of all our personnel. Changing tactic from offensive to defensive is a major event. We took a par after the first change in tactics and it was difficult to get an accurate par. At that point there was no handle on law enforcement and we had no clue who was there and what they were doing.
  46. Law Enforcement needs to work on accountability. Another issue was the folks on scene from the nearby jurisdiction that responded from their training across the street. Some had unit designations with both personnel and their vehicle, and some were calling themselves by a unit designation but they had no vehicle. That was a challenge for Operations to overcome when they were moving people in and out of rehab and also trying to move assets.
  47. 7 different fire/EMS departments working the incident.
  48. 15 different law enforcement agencies.
  49. Six other agencies either involved or affected by the event.
  50. 8 different agencies or city departments working in the EOC.
  51. We have an expectation that the home lead agency take command of incidents in its jurisdiction. The first five or six AFD units that arrived on scene did not assume command or unified command. The Fire Chief of the Westlake Fire Department was in Command for about the first 15 minutes before and AFD Battalion Chief assumed fire command in a unified command structure. The first in units were have a great deal of difficulty getting any talk time on the fire ground channel. Some were self assigning while others were positioning where they though appropriate and the officer was going to the command post for a face to face. Sectors were not initially set up which added to the confusion of arriving units. With over 24 years of experience Incident Management we feel we still have more training to accomplish, especially for our chief officers in dealing with large incidents. There were a couple of instances where the EOC was not utilized to access resources, which ultimately slowed down the process.
  52. With an influx of so many agencies we have to be able to respond quickly with identifying who needs to be on site and who we need to hald at bay. Without vests it was impossible to tell who belonged and whether they were involved with the incident or not. Law Enforcement needs more training and experience in incident management. Even though we seemed to be well organized at the top end of the management structure, we were not communicating well enough. We need to force ourselves into planning and briefing meetings to foster communication.
  53. We were cognizant to the fact we had an intentional event, and we were actually trying to address secondary hazards, but we did not set up a group to deal with that until hours into the incident. We did not request for our engineers until into the incident. Law Enforcement was in charge of perimeter control. We clearly need to work on it. We continue to struggle with accountability.
  54. We discovered that the first AFD resource sent to this incident was Engine 21 on a medical – burn injury. Apparently, an IRS employee called in the event on 911 and was directed to EMS for the burn injury. We estimate there was about a 40 second delay in sending the resources needed to handle this incident. When we traced back the history of why the call was handled this way, the 911 center claims that EMS unilaterally made the change without consultation or input from other agencies. EMS denies it went down this way. We are still looking for answers. Even though we had three fire ground channels. Only one was used primarily. We have to practice separating groups for communications. We found that the phone system at the EOC was a little complicated, and we need more instructions and training in their use. We found that we were relying on cell phones too much, and need to have standard numbers to the command post.
  55. Supporting the sprinkler system was critical. It saved the building. We are not confident in the use of private (on ground fire hydrants). We had major water pressure problems early on. We need to look hard at our requirements, training, testing, and maintenance of private hydrants. We are finding that when we work closely with neighboring jurisdictions we do not always speak the same language. (bundle, high-rise pack) Again, we need to add CBRNE concerns to our checklists for certain incidents. We had a little freelancing on the fireground when officers could not give or receive orders.
  56. Discussed Discussed Discussed The Intel group morphed into the Policy group and we lost some communication there. Engine 2 – How did they get assigned? They heard the call and decided it was too cool to miss, so they drove to the northern end of their territory so that locution would pick them for the call. Discussed
  57. The first arriving Engine (21) has to move a cruiser and a motorcycle to get access. The cops parked and locked most of their vehicles and then walked closer to the incident to get a look. Discussed We did not call for the coroner until we found the body 6 hours later, We should have notified them sooner. Handling traffic around the incident was taxing on law enforcement. They needed help, probably from the EOC. We need to discuss this type of situation with our neighboring jurisdictions. Especially personnel without apparatus. Very confusing. Discussed
  58. Excellent evacuation procedures. 112 personnel evacuated and accounted for in less than 10 minutes. Why? Because they have a plan that is practiced with clear responsibilities for managers.
  59. Review procedures Teach evacuation routes Assign roles (special needs) Update information Set Meeting place Update changes
  60. Practice. Practice. Practice.
  61. Here is the website for what we consider to be a best practice in evacuation procedures.
  62. These are representative flows with the maximum number of sprinklers open. Early in the fire progression individual sprinklers likely were flowing at greater rates and would explain the retention of the end sprinklers on branches 28 and 29 (4.3 and 4.0 gpm respectively) above. Flow was interrupted at least once and Engine 33 was at times unable to maintain pressure on the riser. This could explain the loss of end sprinklers on branches 22 and 23 (9.0 and 9.5 gpm respectively) above. Flows could have been smaller by about 1 gpm depending on the actual pressure and flow provided by Engines 16, 44, and 33.