Scaling API-first – The story of a global engineering organization
Philip Atherton NextGen 09
1. Next Gen ‘09 Presenter: Phil Atherton Principal Consultant Date: November 2009
2.
3.
4. Network Elements Council/Partner/Utility Offices 32x100Mbps/16x1Gbps (WDM-PON) 32x70Mbps (GPON) Council Office Electricity Substation Water Treatment Works 20Km (GPON) or 40Km (WDM-PON) Internet Distribution Access Core 1 , 2 , 3 Cabinet or Buried Box Splitter Business Park 1 2 Local Office or Residence ONT ONT <10Km <10Km <10Km) Ethernet = 100Mbps Network Core Backbone (n x 10Gbps) A = <10Km B = <10Km C = <10Km Equipment Equipment Equipment LAN Rooms 1 , 2 , 3 1 ONT 1 , 2 , 3 Cabinet or Buried Box Splitter