This is an example of a basic E-house configuration
that can be used for Power and Control requirements in
many industries.
Modular structures, customized enclosures, shelters
and ISO Containers can be outfitted and tested for
worldwide deployment within a factory setting.
Modular Structures produce repeatability which gives
you built in Quality.
Building Size:
Exterior Dimensions
(W x L x H)
Interior Dimensions
(W x L x H)
Floor Area
(ft²)
Approx. Gross
Weight (lbs)
168” x 540” x 144” 157” x 529” x 114” 565 70,000
Structure:
 Manufactured with structural steel members to meet all load requirements.
 The Base is designed to withstand a uniform load 250 PSF over the entire
floor area, with a maximum deflection not exceed L/360.
 The long and short bottom rails of the base are made of WF 14x26 with
2”x2”x1/8” tubing support between the two flanges, 48” apart for additional
support. In addition to that a 1” thick x 2” wide flat bar (with 3 holes 15/16”
diameter) is welded to the long side bottom rails 10’ apart to provide support
points for the lifting lugs. A 1” removable lifting lug with 3 holes of 15/16”
diameter is attached to the flat bar (welded to the base) by 3 bolts 7/8”
diameter x 5” LG, grade L9.
 The cross members, going along the short side, are made of 4”x10”x3/8”
HSST@ 16” apart, at max load area and 24” thereafter. Bracing made of
C8x13.75 @ 48” centers
 The floor is covered by ¼” checker plate to meet the specifications and
provides more stability to the base. Painted grey
 After spraying polyurethane foam on the base for insulation, it will be covered
with 18 gage steel sheets to create an under pan for protection and will be
undercoated for rust prevention.
 Four (4) welded ground pads on all four corners of base.
Lifting Lugs.
Structural Framing:
 All corner posts made of 4”x4”x1/4” HSS
 All intermediate posts made of 4”x4”x1/4” HSS
located 10’ apart.
 The top rails made of tubing 6”x4”x1/4” raised and welded to the top of the
posts, and braced by wall bracing ¼” thick x 6” wide flat bar. This will support
the walls and increase their structural strength.
 The door structure frame is made of 6”x2”x1/8” tubing, connected between
the top rail to the base, and supported by traverse tubing.
 In the middle of the roof, along the long side, a tubing
10”x4”x1/4” raised and welded to the posts for supporting
purling joints
 Studs are fully welded to the posts, made of 14 gage
2”x4”x2” at 16’ apart horizontally that will provide support
for hanging electrical components and equipment.
Roof Structure:
 Roof tapered C channel 2”x10”-6”x2”x1/8 TH. (Purling) welded to the top rails
and middle support tubing 10”x4”x1/4”.
 Above the tapered channel, we install 10 gage steel sheets to support the
roof structure and create a leak resistant structure, stitch weld to the tapered
C channel and fully welded together.
 Roof studs 1”x2”x1” is stitch welded to the steel sheets for installing the
exterior corrugated steel panels.
Insulation:
 The unit will be insulated using Roxul Mineral Wool insulation, which is fire
rated.
 Walls R14
 Roof R23
 Floor R23
Exterior Finish:
 The exterior walls and roof are covered with 11ga galvanized sheet panels
fixed to the studs by # 14 stainless self-drilling screws.
The edges are covered by flashing, and the right and left
walls contain rain gutters with one down spout located at
the front. The exterior is primed with epoxy primer and
painted with urethane paint.
 The exterior is caulked and all the opening are covered
and sealed.
Interior Finish:
 The interior walls and ceiling are covered with
18ga galvanized G 90 steel sheets, fixed to
the studs by 3/16 aluminum rivets. Each
sheet is overlapped and finishing trim is
added. Primed with epoxy primer and painted
with urethane white paint.
 Prior to the painting, the galvanized steel
sheets are light sanded, degreased and cleaned, then sprayed with primer
wash to increase the adhesion of the primer to the metal surfaces, as per
standard method for painting galvanized steel.
 The floor is cleaned, light sanded and painted with urethane floor paint.
Exterior Door Features:
 The door frame structure is made of 6” x 2” x 1/8” steel tubing.
 One (1) Double Door, 72” x 108” and One (1) Man door, 36” x 84”
 Each door is equipped with an aluminum weather canopy fixed with bolts
above each door.
 Included hardware:
 Hold open door closure (allow the door to be kept open).
 Panic bar hardware with cylinder.
 Weather strips for sealing.
 Door sweep to be installed outside of the door
 Door caps
 Spring lock for transportation purpose only. To be removed at
site
 Equipment Doors will be supplied for exterior equipment access.
 Each door will have a gasket seal and three point lock, lockable
 Six (6) 24” access doors
 Seven (7) 36” access doors
 One (1) 48´access door
Painting:
 Base structure is sandblasted before exterior is added
 Exterior colour to be advised (Equipment Grey)
 The interior and exterior will be cleaned and degreases.
 The surfaces will be lightly sanded to enhance the adhesion strength of the
primer
 The surfaces will be coated by edge primer which is important to increase
the contact of the coating to the surfaces
 Prime with epoxy primer
 Paint with urethane paint
 One coat of anti-graffiti paint
 Total coverage 6 mill minimum
Mechanical:
Each building will be provided with two (2) HVAC systems for cooling and heating.
Two (2) 6 ton HVAC industrial units with 10kW of heating each.
 Both units controlled by led-lag controller.
 Intake and return filters c/w with extra set of filters.
Electrical E-house Building:
 (1) 30 circuit 200A 120/240V breaker panel fed from
station switchgear breaker
 (5) 2 lamp 4’ vapour proof fluorescent fixtures
 (2) 3way switches
 (5) duplex receptacles
 (2) emergency exit light fixtures
 (2) 70W HPS outdoor fixtures c/w photocells
 (2) power and control wiring for HVAC
 (1) 15A 125V circuit for PLC panel
 (1) 40A 240V circuit to customer supplied battery charger
 (1) install and strap customer supplied batteries and DC breaker
 (1) install customer supplied DC panel c/w main breaker
 (1) 150A 125V DC wiring from battery to charger
 (1) 150A 123V DC wiring from charger to DC panel
 (1) fire alarm panel c/w 1 smoke, 1 heat detector, 1 bell, 2 alarm, 2
trouble contacts, monitoring by others
 (2) telephone outlets wire back to Communication cabinet
 (1) Exterior Blue beacon as per specifications
 (1) inspection to CSA standards
Accessories:
 Two (2) 20lb ABC fire extinguisher
 Two (2) Basic Eyewash Station
 One (1) Wall mounted hinged table

Weitere ähnliche Inhalte

Was ist angesagt?

Troubleshooting of Electrical Switchyard & Substation Equipments
Troubleshooting of Electrical Switchyard & Substation EquipmentsTroubleshooting of Electrical Switchyard & Substation Equipments
Troubleshooting of Electrical Switchyard & Substation EquipmentsMarcep Inc.
 
Substation design guideliness
Substation design guidelinessSubstation design guideliness
Substation design guidelinessmichaeljmack
 
Heat Shrink Cable Joints & Cable Terminations LV HV, 6.6kV 11kV 33kV - SPS Ca...
Heat Shrink Cable Joints & Cable Terminations LV HV, 6.6kV 11kV 33kV - SPS Ca...Heat Shrink Cable Joints & Cable Terminations LV HV, 6.6kV 11kV 33kV - SPS Ca...
Heat Shrink Cable Joints & Cable Terminations LV HV, 6.6kV 11kV 33kV - SPS Ca...Thorne & Derrick International
 
Passive Filter Design using PSpice
Passive Filter Design using PSpicePassive Filter Design using PSpice
Passive Filter Design using PSpiceTsuyoshi Horigome
 
Lv switchgear & lv cable sizing
Lv switchgear & lv cable sizingLv switchgear & lv cable sizing
Lv switchgear & lv cable sizingAsif Eqbal
 
AUTO-RECLOSING & LOCAL SYSTEM RESTORATION
AUTO-RECLOSING & LOCAL SYSTEM RESTORATIONAUTO-RECLOSING & LOCAL SYSTEM RESTORATION
AUTO-RECLOSING & LOCAL SYSTEM RESTORATIONPower System Operation
 
2 nuevo codigo nacional de electricidad suministro 2011
2 nuevo codigo nacional de electricidad  suministro 20112 nuevo codigo nacional de electricidad  suministro 2011
2 nuevo codigo nacional de electricidad suministro 2011punomario
 
11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV...
11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV...11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV...
11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV...Thorne & Derrick International
 
IEC 61439 - the new standard for low voltage components
IEC 61439 - the new standard for low voltage componentsIEC 61439 - the new standard for low voltage components
IEC 61439 - the new standard for low voltage componentsCotmac Electronics Pvt. Ltd.
 
ABB Medium Voltage MV Indoor and Outdoor Current Transformers - ABB CT's Cur...
ABB Medium Voltage MV Indoor and Outdoor Current Transformers -  ABB CT's Cur...ABB Medium Voltage MV Indoor and Outdoor Current Transformers -  ABB CT's Cur...
ABB Medium Voltage MV Indoor and Outdoor Current Transformers - ABB CT's Cur...Thorne & Derrick International
 
Pile cap design structural guide
Pile cap design   structural guidePile cap design   structural guide
Pile cap design structural guideAlberto Rosado
 
Benefits of using iec 61439 standard in electrical busbar systems
Benefits of using iec 61439 standard in electrical busbar systemsBenefits of using iec 61439 standard in electrical busbar systems
Benefits of using iec 61439 standard in electrical busbar systemsMessung Electrical Engineering
 
Training report-in-a-132-k-v-substation
Training report-in-a-132-k-v-substationTraining report-in-a-132-k-v-substation
Training report-in-a-132-k-v-substationankesh kumar
 

Was ist angesagt? (20)

Troubleshooting of Electrical Switchyard & Substation Equipments
Troubleshooting of Electrical Switchyard & Substation EquipmentsTroubleshooting of Electrical Switchyard & Substation Equipments
Troubleshooting of Electrical Switchyard & Substation Equipments
 
Introduction to mv switchgear
Introduction to mv switchgearIntroduction to mv switchgear
Introduction to mv switchgear
 
MV Switchgear from IEEE
MV Switchgear from IEEEMV Switchgear from IEEE
MV Switchgear from IEEE
 
Tes p-122.04-r0
Tes p-122.04-r0Tes p-122.04-r0
Tes p-122.04-r0
 
Substation design guideliness
Substation design guidelinessSubstation design guideliness
Substation design guideliness
 
Heat Shrink Cable Joints & Cable Terminations LV HV, 6.6kV 11kV 33kV - SPS Ca...
Heat Shrink Cable Joints & Cable Terminations LV HV, 6.6kV 11kV 33kV - SPS Ca...Heat Shrink Cable Joints & Cable Terminations LV HV, 6.6kV 11kV 33kV - SPS Ca...
Heat Shrink Cable Joints & Cable Terminations LV HV, 6.6kV 11kV 33kV - SPS Ca...
 
Passive Filter Design using PSpice
Passive Filter Design using PSpicePassive Filter Design using PSpice
Passive Filter Design using PSpice
 
Lv switchgear & lv cable sizing
Lv switchgear & lv cable sizingLv switchgear & lv cable sizing
Lv switchgear & lv cable sizing
 
how to read single line diagram
how to read single line diagramhow to read single line diagram
how to read single line diagram
 
AUTO-RECLOSING & LOCAL SYSTEM RESTORATION
AUTO-RECLOSING & LOCAL SYSTEM RESTORATIONAUTO-RECLOSING & LOCAL SYSTEM RESTORATION
AUTO-RECLOSING & LOCAL SYSTEM RESTORATION
 
2 nuevo codigo nacional de electricidad suministro 2011
2 nuevo codigo nacional de electricidad  suministro 20112 nuevo codigo nacional de electricidad  suministro 2011
2 nuevo codigo nacional de electricidad suministro 2011
 
11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV...
11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV...11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV...
11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV...
 
IEC 61439 - the new standard for low voltage components
IEC 61439 - the new standard for low voltage componentsIEC 61439 - the new standard for low voltage components
IEC 61439 - the new standard for low voltage components
 
ABB Medium Voltage MV Indoor and Outdoor Current Transformers - ABB CT's Cur...
ABB Medium Voltage MV Indoor and Outdoor Current Transformers -  ABB CT's Cur...ABB Medium Voltage MV Indoor and Outdoor Current Transformers -  ABB CT's Cur...
ABB Medium Voltage MV Indoor and Outdoor Current Transformers - ABB CT's Cur...
 
Pile cap design structural guide
Pile cap design   structural guidePile cap design   structural guide
Pile cap design structural guide
 
Benefits of using iec 61439 standard in electrical busbar systems
Benefits of using iec 61439 standard in electrical busbar systemsBenefits of using iec 61439 standard in electrical busbar systems
Benefits of using iec 61439 standard in electrical busbar systems
 
Training report-in-a-132-k-v-substation
Training report-in-a-132-k-v-substationTraining report-in-a-132-k-v-substation
Training report-in-a-132-k-v-substation
 
ABB Price List MCB DB
ABB Price List MCB DBABB Price List MCB DB
ABB Price List MCB DB
 
220kv substation
220kv substation220kv substation
220kv substation
 
Tes p-122.07-r0
Tes p-122.07-r0Tes p-122.07-r0
Tes p-122.07-r0
 

Andere mochten auch

Resurse educaționale deschise - repere practice
Resurse educaționale deschise - repere practiceResurse educaționale deschise - repere practice
Resurse educaționale deschise - repere practiceNicolaie Constantinescu
 
Los ilicitos tributarios actividad 3 andrea
Los ilicitos tributarios actividad 3 andreaLos ilicitos tributarios actividad 3 andrea
Los ilicitos tributarios actividad 3 andreaAndreamarissad
 
Алексей Альшевский - "Дар Святого Духа" | 22.05.2016
Алексей Альшевский - "Дар Святого Духа" | 22.05.2016Алексей Альшевский - "Дар Святого Духа" | 22.05.2016
Алексей Альшевский - "Дар Святого Духа" | 22.05.2016bcpulse
 
Алексей Альшевский - "Дух Святой в истории" | 05.06.2016
Алексей Альшевский - "Дух Святой в истории" | 05.06.2016Алексей Альшевский - "Дух Святой в истории" | 05.06.2016
Алексей Альшевский - "Дух Святой в истории" | 05.06.2016bcpulse
 
Orquídeas - Aprendizagem
Orquídeas - AprendizagemOrquídeas - Aprendizagem
Orquídeas - AprendizagemClaudia Costa
 
Portfólio Eduardo Monteiro
Portfólio Eduardo MonteiroPortfólio Eduardo Monteiro
Portfólio Eduardo MonteiroEduardo Monteiro
 
Konsep TermodinamikaTugas 3
Konsep TermodinamikaTugas 3Konsep TermodinamikaTugas 3
Konsep TermodinamikaTugas 3mokhalfanz
 
Mba capstone presentation
Mba capstone presentationMba capstone presentation
Mba capstone presentationMinh Nguyen
 
Dasar-Dasar Ilmu KImia
Dasar-Dasar Ilmu KImiaDasar-Dasar Ilmu KImia
Dasar-Dasar Ilmu KImiamokhalfanz
 
Cv october-2011 sabry-
Cv  october-2011   sabry-Cv  october-2011   sabry-
Cv october-2011 sabry-Sabry Elnaggar
 
Towards a Platform for Global Health
Towards a Platform for Global HealthTowards a Platform for Global Health
Towards a Platform for Global HealthPhilip Bourne
 
The FAIRDOM Commons for Systems Biology
The FAIRDOM Commons for Systems BiologyThe FAIRDOM Commons for Systems Biology
The FAIRDOM Commons for Systems BiologyFAIRDOM
 
Reproducibility of model-based results: standards, infrastructure, and recogn...
Reproducibility of model-based results: standards, infrastructure, and recogn...Reproducibility of model-based results: standards, infrastructure, and recogn...
Reproducibility of model-based results: standards, infrastructure, and recogn...FAIRDOM
 
EV3#5: Exercicios com o sensor cor
EV3#5: Exercicios com o sensor corEV3#5: Exercicios com o sensor cor
EV3#5: Exercicios com o sensor corAna Carneirinho
 

Andere mochten auch (20)

Resurse educaționale deschise - repere practice
Resurse educaționale deschise - repere practiceResurse educaționale deschise - repere practice
Resurse educaționale deschise - repere practice
 
Los ilicitos tributarios actividad 3 andrea
Los ilicitos tributarios actividad 3 andreaLos ilicitos tributarios actividad 3 andrea
Los ilicitos tributarios actividad 3 andrea
 
Алексей Альшевский - "Дар Святого Духа" | 22.05.2016
Алексей Альшевский - "Дар Святого Духа" | 22.05.2016Алексей Альшевский - "Дар Святого Духа" | 22.05.2016
Алексей Альшевский - "Дар Святого Духа" | 22.05.2016
 
Manoranjan Bal Resume
Manoranjan Bal ResumeManoranjan Bal Resume
Manoranjan Bal Resume
 
DORMAAccessSolutions10-15r1-16_lo
DORMAAccessSolutions10-15r1-16_loDORMAAccessSolutions10-15r1-16_lo
DORMAAccessSolutions10-15r1-16_lo
 
Алексей Альшевский - "Дух Святой в истории" | 05.06.2016
Алексей Альшевский - "Дух Святой в истории" | 05.06.2016Алексей Альшевский - "Дух Святой в истории" | 05.06.2016
Алексей Альшевский - "Дух Святой в истории" | 05.06.2016
 
Orquídeas - Aprendizagem
Orquídeas - AprendizagemOrquídeas - Aprendizagem
Orquídeas - Aprendizagem
 
Cv Essec Cyrl
Cv Essec CyrlCv Essec Cyrl
Cv Essec Cyrl
 
Portfólio Eduardo Monteiro
Portfólio Eduardo MonteiroPortfólio Eduardo Monteiro
Portfólio Eduardo Monteiro
 
Konsep TermodinamikaTugas 3
Konsep TermodinamikaTugas 3Konsep TermodinamikaTugas 3
Konsep TermodinamikaTugas 3
 
Mba capstone presentation
Mba capstone presentationMba capstone presentation
Mba capstone presentation
 
Dasar-Dasar Ilmu KImia
Dasar-Dasar Ilmu KImiaDasar-Dasar Ilmu KImia
Dasar-Dasar Ilmu KImia
 
Cv october-2011 sabry-
Cv  october-2011   sabry-Cv  october-2011   sabry-
Cv october-2011 sabry-
 
Towards a Platform for Global Health
Towards a Platform for Global HealthTowards a Platform for Global Health
Towards a Platform for Global Health
 
The FAIRDOM Commons for Systems Biology
The FAIRDOM Commons for Systems BiologyThe FAIRDOM Commons for Systems Biology
The FAIRDOM Commons for Systems Biology
 
Reproducibility of model-based results: standards, infrastructure, and recogn...
Reproducibility of model-based results: standards, infrastructure, and recogn...Reproducibility of model-based results: standards, infrastructure, and recogn...
Reproducibility of model-based results: standards, infrastructure, and recogn...
 
FAIR data overview
FAIR data overviewFAIR data overview
FAIR data overview
 
Centrais de alarme
Centrais de alarmeCentrais de alarme
Centrais de alarme
 
EV3#5: Exercicios com o sensor cor
EV3#5: Exercicios com o sensor corEV3#5: Exercicios com o sensor cor
EV3#5: Exercicios com o sensor cor
 
An overview of the MyHeart Counts app
An overview of the MyHeart Counts appAn overview of the MyHeart Counts app
An overview of the MyHeart Counts app
 

Ähnlich wie Ehouse Specification Sample

Trailers dry freight_strick101
Trailers dry freight_strick101Trailers dry freight_strick101
Trailers dry freight_strick101Anjer Inc
 
Euro Style Design Ltd Arxx P Panel Dura Viessmann Commercialresidential
Euro Style Design Ltd Arxx P Panel Dura Viessmann CommercialresidentialEuro Style Design Ltd Arxx P Panel Dura Viessmann Commercialresidential
Euro Style Design Ltd Arxx P Panel Dura Viessmann CommercialresidentialRoland Laufer
 
AmeriKooler Architectural Specifications
AmeriKooler Architectural SpecificationsAmeriKooler Architectural Specifications
AmeriKooler Architectural SpecificationsAmeriKooler
 
K House Manufacturer - EPACK Prefab
K House Manufacturer - EPACK PrefabK House Manufacturer - EPACK Prefab
K House Manufacturer - EPACK PrefabEPACK Prefab
 
K House Manufacturer - Epack Prefab.pptx
K House Manufacturer - Epack Prefab.pptxK House Manufacturer - Epack Prefab.pptx
K House Manufacturer - Epack Prefab.pptxEPACK Prefab
 
Procamp tech spec msb 21
Procamp tech spec msb 21Procamp tech spec msb 21
Procamp tech spec msb 21biznetswe
 
PEB - Standard Product Specifications
PEB - Standard Product SpecificationsPEB - Standard Product Specifications
PEB - Standard Product SpecificationsAjay Kathuria
 
Eric Buck resume 2017
Eric Buck resume 2017Eric Buck resume 2017
Eric Buck resume 2017Eric Buck
 
Mill 14-1-15 - Sheet - A118 - 3D SECTIONS
Mill 14-1-15 - Sheet - A118 - 3D SECTIONSMill 14-1-15 - Sheet - A118 - 3D SECTIONS
Mill 14-1-15 - Sheet - A118 - 3D SECTIONSSin Byrne
 
Visual Dictionary Revised 2
Visual Dictionary Revised 2Visual Dictionary Revised 2
Visual Dictionary Revised 2siding
 
Lv panel specification
Lv panel specificationLv panel specification
Lv panel specificationSajeewa Lakmal
 
Der bindley 200 dpi_03-01-10
Der bindley 200 dpi_03-01-10Der bindley 200 dpi_03-01-10
Der bindley 200 dpi_03-01-10SmarterHomeGuide
 
Visual Dictionary-Blocking
Visual Dictionary-BlockingVisual Dictionary-Blocking
Visual Dictionary-BlockingBlocking
 

Ähnlich wie Ehouse Specification Sample (20)

Skid unit -presentation of bunk housing, oil field, gas field, man camps
Skid unit -presentation of bunk housing, oil field, gas field, man campsSkid unit -presentation of bunk housing, oil field, gas field, man camps
Skid unit -presentation of bunk housing, oil field, gas field, man camps
 
Trailers dry freight_strick101
Trailers dry freight_strick101Trailers dry freight_strick101
Trailers dry freight_strick101
 
Design Guide2016-2
Design Guide2016-2Design Guide2016-2
Design Guide2016-2
 
Euro Style Design Ltd Arxx P Panel Dura Viessmann Commercialresidential
Euro Style Design Ltd Arxx P Panel Dura Viessmann CommercialresidentialEuro Style Design Ltd Arxx P Panel Dura Viessmann Commercialresidential
Euro Style Design Ltd Arxx P Panel Dura Viessmann Commercialresidential
 
AmeriKooler Architectural Specifications
AmeriKooler Architectural SpecificationsAmeriKooler Architectural Specifications
AmeriKooler Architectural Specifications
 
K House Manufacturer - EPACK Prefab
K House Manufacturer - EPACK PrefabK House Manufacturer - EPACK Prefab
K House Manufacturer - EPACK Prefab
 
K House Manufacturer - Epack Prefab.pptx
K House Manufacturer - Epack Prefab.pptxK House Manufacturer - Epack Prefab.pptx
K House Manufacturer - Epack Prefab.pptx
 
Procamp tech spec msb 21
Procamp tech spec msb 21Procamp tech spec msb 21
Procamp tech spec msb 21
 
PEB - Standard Product Specifications
PEB - Standard Product SpecificationsPEB - Standard Product Specifications
PEB - Standard Product Specifications
 
Eric Buck resume 2017
Eric Buck resume 2017Eric Buck resume 2017
Eric Buck resume 2017
 
U.S. Bellows Expansion Joints In-Depth Webinar
U.S. Bellows Expansion Joints In-Depth WebinarU.S. Bellows Expansion Joints In-Depth Webinar
U.S. Bellows Expansion Joints In-Depth Webinar
 
Mill 14-1-15 - Sheet - A118 - 3D SECTIONS
Mill 14-1-15 - Sheet - A118 - 3D SECTIONSMill 14-1-15 - Sheet - A118 - 3D SECTIONS
Mill 14-1-15 - Sheet - A118 - 3D SECTIONS
 
Visual Dictionary Revised 2
Visual Dictionary Revised 2Visual Dictionary Revised 2
Visual Dictionary Revised 2
 
Aac
AacAac
Aac
 
Sectional Door System
Sectional Door SystemSectional Door System
Sectional Door System
 
Lv panel specification
Lv panel specificationLv panel specification
Lv panel specification
 
Der bindley 200 dpi_03-01-10
Der bindley 200 dpi_03-01-10Der bindley 200 dpi_03-01-10
Der bindley 200 dpi_03-01-10
 
Visual Dictionary-Blocking
Visual Dictionary-BlockingVisual Dictionary-Blocking
Visual Dictionary-Blocking
 
Visual Dictionary
Visual DictionaryVisual Dictionary
Visual Dictionary
 
Visual Dictionary
Visual DictionaryVisual Dictionary
Visual Dictionary
 

Kürzlich hochgeladen

(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 

Kürzlich hochgeladen (20)

(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 

Ehouse Specification Sample

  • 1. This is an example of a basic E-house configuration that can be used for Power and Control requirements in many industries. Modular structures, customized enclosures, shelters and ISO Containers can be outfitted and tested for worldwide deployment within a factory setting. Modular Structures produce repeatability which gives you built in Quality.
  • 2. Building Size: Exterior Dimensions (W x L x H) Interior Dimensions (W x L x H) Floor Area (ft²) Approx. Gross Weight (lbs) 168” x 540” x 144” 157” x 529” x 114” 565 70,000 Structure:  Manufactured with structural steel members to meet all load requirements.  The Base is designed to withstand a uniform load 250 PSF over the entire floor area, with a maximum deflection not exceed L/360.  The long and short bottom rails of the base are made of WF 14x26 with 2”x2”x1/8” tubing support between the two flanges, 48” apart for additional support. In addition to that a 1” thick x 2” wide flat bar (with 3 holes 15/16” diameter) is welded to the long side bottom rails 10’ apart to provide support points for the lifting lugs. A 1” removable lifting lug with 3 holes of 15/16” diameter is attached to the flat bar (welded to the base) by 3 bolts 7/8” diameter x 5” LG, grade L9.  The cross members, going along the short side, are made of 4”x10”x3/8” HSST@ 16” apart, at max load area and 24” thereafter. Bracing made of C8x13.75 @ 48” centers  The floor is covered by ¼” checker plate to meet the specifications and provides more stability to the base. Painted grey  After spraying polyurethane foam on the base for insulation, it will be covered with 18 gage steel sheets to create an under pan for protection and will be undercoated for rust prevention.  Four (4) welded ground pads on all four corners of base. Lifting Lugs. Structural Framing:  All corner posts made of 4”x4”x1/4” HSS  All intermediate posts made of 4”x4”x1/4” HSS located 10’ apart.
  • 3.  The top rails made of tubing 6”x4”x1/4” raised and welded to the top of the posts, and braced by wall bracing ¼” thick x 6” wide flat bar. This will support the walls and increase their structural strength.  The door structure frame is made of 6”x2”x1/8” tubing, connected between the top rail to the base, and supported by traverse tubing.  In the middle of the roof, along the long side, a tubing 10”x4”x1/4” raised and welded to the posts for supporting purling joints  Studs are fully welded to the posts, made of 14 gage 2”x4”x2” at 16’ apart horizontally that will provide support for hanging electrical components and equipment. Roof Structure:  Roof tapered C channel 2”x10”-6”x2”x1/8 TH. (Purling) welded to the top rails and middle support tubing 10”x4”x1/4”.  Above the tapered channel, we install 10 gage steel sheets to support the roof structure and create a leak resistant structure, stitch weld to the tapered C channel and fully welded together.  Roof studs 1”x2”x1” is stitch welded to the steel sheets for installing the exterior corrugated steel panels. Insulation:  The unit will be insulated using Roxul Mineral Wool insulation, which is fire rated.  Walls R14  Roof R23  Floor R23
  • 4. Exterior Finish:  The exterior walls and roof are covered with 11ga galvanized sheet panels fixed to the studs by # 14 stainless self-drilling screws. The edges are covered by flashing, and the right and left walls contain rain gutters with one down spout located at the front. The exterior is primed with epoxy primer and painted with urethane paint.  The exterior is caulked and all the opening are covered and sealed. Interior Finish:  The interior walls and ceiling are covered with 18ga galvanized G 90 steel sheets, fixed to the studs by 3/16 aluminum rivets. Each sheet is overlapped and finishing trim is added. Primed with epoxy primer and painted with urethane white paint.  Prior to the painting, the galvanized steel sheets are light sanded, degreased and cleaned, then sprayed with primer wash to increase the adhesion of the primer to the metal surfaces, as per standard method for painting galvanized steel.  The floor is cleaned, light sanded and painted with urethane floor paint. Exterior Door Features:  The door frame structure is made of 6” x 2” x 1/8” steel tubing.  One (1) Double Door, 72” x 108” and One (1) Man door, 36” x 84”  Each door is equipped with an aluminum weather canopy fixed with bolts above each door.  Included hardware:  Hold open door closure (allow the door to be kept open).  Panic bar hardware with cylinder.  Weather strips for sealing.  Door sweep to be installed outside of the door  Door caps  Spring lock for transportation purpose only. To be removed at site
  • 5.  Equipment Doors will be supplied for exterior equipment access.  Each door will have a gasket seal and three point lock, lockable  Six (6) 24” access doors  Seven (7) 36” access doors  One (1) 48´access door Painting:  Base structure is sandblasted before exterior is added  Exterior colour to be advised (Equipment Grey)  The interior and exterior will be cleaned and degreases.  The surfaces will be lightly sanded to enhance the adhesion strength of the primer  The surfaces will be coated by edge primer which is important to increase the contact of the coating to the surfaces  Prime with epoxy primer  Paint with urethane paint  One coat of anti-graffiti paint  Total coverage 6 mill minimum Mechanical: Each building will be provided with two (2) HVAC systems for cooling and heating. Two (2) 6 ton HVAC industrial units with 10kW of heating each.  Both units controlled by led-lag controller.  Intake and return filters c/w with extra set of filters. Electrical E-house Building:  (1) 30 circuit 200A 120/240V breaker panel fed from station switchgear breaker  (5) 2 lamp 4’ vapour proof fluorescent fixtures  (2) 3way switches  (5) duplex receptacles  (2) emergency exit light fixtures  (2) 70W HPS outdoor fixtures c/w photocells  (2) power and control wiring for HVAC  (1) 15A 125V circuit for PLC panel  (1) 40A 240V circuit to customer supplied battery charger  (1) install and strap customer supplied batteries and DC breaker  (1) install customer supplied DC panel c/w main breaker  (1) 150A 125V DC wiring from battery to charger  (1) 150A 123V DC wiring from charger to DC panel
  • 6.  (1) fire alarm panel c/w 1 smoke, 1 heat detector, 1 bell, 2 alarm, 2 trouble contacts, monitoring by others  (2) telephone outlets wire back to Communication cabinet  (1) Exterior Blue beacon as per specifications  (1) inspection to CSA standards Accessories:  Two (2) 20lb ABC fire extinguisher  Two (2) Basic Eyewash Station  One (1) Wall mounted hinged table