A study on
Rural Road Development & Maintenance
         Management in Nepal




•   Bhim P. Upadhyaya, DDG, DoLIDAR/MLD
•   Devendra Karki, SE, DoR/MoPPW
•   Mukunda Raj Prakash Ghimire, JS, MoST
•   Prem Kumar Shahi, DIG, APF
•   Rudra P Paudel, JS, MoHA
•   Shreedhar Sapkota, Joint Government Attorney,
    Office of Attorney General
Content of Presentation
1.   Preliminaries & Objectives of the Study
2.   Introduction & Methodology
3.   Organizations Visit and Policy Documents’ Study,
     Status and Review
4.   Field Visits, Data Collection and Analysis
5.   Strategic Issues Identification & Environmental
     Scanning
6.   Strategic Recommendations & Implementation
     Plan: Policy, Organization and Human Resources
7.   Conclusions
8.   Appendices
Preliminaries
Introduction, Methodology &
Objectives of the Study
   Shreedhar Sapkota
Objective of the study

 Study on policy implementation towards
rural road development and maintenance.


            status of the
                          the network
How is this rural road
                           maintained
managed? maintenance
                          & Improved
               system
Study Methodology & process
   Methodology              Process
Primary and Secondary   Review of the Policy
Data Collection         Documents on Rural
Visit to the relevant   Road
Organizations: NPC,
RoD, DoLIDAR, DTOs-
                        Analysis of data, maps,
Ilam, Jhapa, Lalitpur   SWOT analysis etc.
Interaction with the    Strategic Issues
Officials               Identified,
Presentation from       Report Writing
officials
Limitation of the study
 Time and location,
 Limitation on review of different
 infrastructure policies
 Highly focused on Local
 Infrastructure Policy 2061
 not consider other rural roads:
 RoD, irrigation, VDC, others
Organizations Visit and Policy
Documents’ Study, Status and Review




Rudra Prasad
   Poudel
Policy Documents Reviewed
1.    Nepal Road Statistics 2010 (DoR)
2.    Local Infrastructure Development Policy (LIDP)
3.    Strategic Action Plan for Local Infra. Dev.
4.    National Rural Road Maintenance Plan DoLIDAR
5.    Rural Road Maintenance Directive, DoLIDAR
6.    20 Year Agricultural Perspective Plan
7.    Rural Road Vision 2025 India
8.    Pradhan Mantri Gram Sadak Yojana India- A
      Briefing Paper
9.    Rural Road Maintenance ILO report 2007
10.   Yearly District Development Plans of DDCs
Rural Road Development
     Agencies
1.   DoR
2.   DoLIDAR
3.   DDCs(DTOs)
4.   Department of Irrigation for Canal Roads
5.   National Planning Commission
6.   Ministry of Local Development
7.   Bi- & Multinational Donor/Lending Agencies
Stakeholder Organizations
     Visited
1.   National Planning Commission( NPC)
2.   Department of Roads (DoR)
3.   Dept of Local Infrastructure Development
     and Agricultural Roads(DoLIDAR)
4.   District Technical Office, Lalitpur( DTOL)
5.   District Technical Office, Ilam( DTOI)
6.   District Technical Office, Ilam( DTOJ)
u|fdL0f ;8s ljsf; ;DjGwL k|d"v /fli6|o sfo{s|d
                ljsf; ;DjGwL                 sfo{s|
  / ah]6===!
!= ljs]Gb|Lt u|fdL0f k"jf{{wf/ tyf hLljsf]kfh{g
   ljs]Gb|                fwf/
                           wf      hLljsf]kfh{
                                          kfh
  sfo{s|        cj{
  sfo{s|d ? ! cj{ &$ s/f]8 &* nfv
              lg{df{
                 df                    cfof]hgf
@= u|fdL0f k'glg{df{0f tyf k'g{:yfkgf cfof]hgf ? @
   cj{
   cj{ (* s/f]8 (^ nfv
   :yfgLo                  f{wf/ qut sfo{s|
                             wf
#= :yfgLo oftfoft k"jf{wf/ If]qut sfo{s|d ? ! cj{   cj{
   !) s/f]8 !* nfv
                  sfo{s|
$= u|fdL0f kx"r sfo{s|d ? ^# s/f]8 @@ nfv
%= lhNnf ;8s ;xof]u sfo{s|d ?#! s/f]8 @& nfv
                 ;xof sfo{s|
                     xof]
u|fdL0f ;8s ljsf; ;DjGwL k|d"v /fli6|o sfo{s|d
              ljsf; ;DjGwL               sfo{s|
  / ah]6===@
^= u|fdL0f kx"r ;'wff/ tyf ljs]Gb|Ls/0f sfo{s|d ? (! s/f]8 @& nfv .
                  wf/
                  w        ljs]Gb| s/0f sfo{s|
          af] sfo{s|
&= ;8s af]8{ sfo{s|d ? @%s/f]8 !( nfv .
   lhlj;                                 sf]
*= lhlj; cg'bfg k"lhut -? !!# s/f]8 sf] $@ k|z_ ? $& s/f]8 $^
    nfv .
   uflj;                                        cj{
(= uflj; cg'bfg -? ^@^ s/f]8sf] $@ k|z_ ? @ cj{ ^@ s/f]8 (@ nfv
    .
  !) :yfgLo zf;g ;fd'bflos ljsf; sfo{s|d -? #@* s/f]8sf] !% k|z_
       :yfgLo                   ljsf; sfo{s|
                                                      ? $($) nfv .
                  cGtu{
 !! ;8s ljefu cGtu{t ? ? !!% s/f]8 .
                  s"n ah]6 M ? !@ cj{ &)s/f]8 !( nfv .
                                  cj{
                              dd{ ef/
                                    ef
                              dd{t;+ef/ ah]6M $& s/f]8 .
lhNnfut u|fdL0f ;8s ljsf; ;DjGwL sfo{s|d /
                    ljsf; ;DjGwL sfo{s|
ah]6
emfkf lhNnf
  s"n ? !$ s/f]8 ** nfv .
  dd{tdf ? @ s/f]8 .

Onfd lhNnf
 ? !# s/f]8 ** nfv .
  dd{tdf ? ! s/f]8 $ nfv .

nlntk'
nlntk'/ lhNnf
  ? !# s/f]8 #^ nfv .
   dd{tdf ? (* nfv .
Field Visits, Data Collection,
Analysis & Findings

         Bhim Upadhyaya
Exponential Budget increase. The 70 % of total budget is for Local
Infrastructure, and 70 % of this for Rural Roads
Local Dev Investment
Year Between             Expenditure Rs Crore
038/39- 039/40                            61
040/41- 044/45                           170
045/46-049/50                            230
050/51- 054/55                          1417
055/56- 059/60                          2116
060/61- 063/64                          3040
064/65-066/67                           7300
067/068 budget*                         4100
                 Total                1, 87,40 17
:yf lj dGqfnosf]
     ;+u7gx?           dGqL               ;ldltx?, s]Gb|
                     dGqfno
 lhlj; &%
                   ljefu-8f]ln8f/_          cfof]hgf
     lhlj;sf]                               sfof{no
      sfof{no       k|fljlws sfof{no &%
 gu/kflnsf                                cfof]hgf sfof{Gjog
                       Ufflj;sf]                OsfO{x?
     gu/kflnsf
     sfof{no %*      sfof{no #(!%                          18
8f]ln8f/sf] ;+u7g ;+/rgf
                                         DoLIDAR STRUCTURE




                             dxflgb]{zs
                                 DIRECTOR GENERAL
                                       Gaz I

               U|ffdL0f s[lif ;8s
                 Rural/Agri Roads Division                        General Admin Section
                            DDG
                                                                K|fzf;g zfvf
                                                                   Senior Admin Officer
                                                                     Section Officer 1
               dxfzfvf                                                Law Officer 1

 U|Rural/AgriSDE 1 Section
   ff s[lif ;8s
              Roads             Suspension Bridge Section           Account Section

 zfvf Engineer 2         emf]n+'u] k"n zfvf
                                         SDE 1
                                       Engineer 4                  n]vf zfvf
                                                                    Account Officer 1



              of]hgf ;dGjo
                Planning,Monotoring & Donor
                    Coordination Division

              dxfzfvf      DDG

                                                                    /fk   k| k|f     M $
Planning & Donor Coordination     Monotoring,Environment &
                                cg'udg jftfj/0f                     /fk   l4 k|f    M *+ !
 of]hgf ;dGjo
            Section             Technology Promotion Section

 zfvf
       SDE 1 Engineer 2
       Agri Economist 1         zfvf SDE 1 Engineer 2,
                                     Social Scientist 1
                                                                    /fk   l4 k|    M !
              Other Infras Development Division                     /fk   t[ k|f   M @&
              cGo k"jf{wf/   DDG
                                                                    /fk   t[ k|     M #
              dxfzfvf                                               s"n             $$
  Rural Drinking water and       Irrigation River control and
Vffg]kfgL ejg
Sanitation & Building Section    l;+rfO{ / cGo
                                     Other Infras Section
                                      SDE 1 Engineer 2,             ;xfos           ## 19
zfvf  SDE 1 Engineer 2
                                zfvf    Agri Engineer 1
Road Accessibility
Accessibility Status 1,2,3,4 hrs
                                   1 hr
                                   2 hr
                                   3 hr
                                   4 hr
Lalitpur Road Access




             Total Rural Road 560 km;
             Popn 3.4 Lakh; 385 Sqkm
Ilam Road Access
Total Rural Road 1270 km;
Popn 3 Lakh; Area 1703 Sqkm
Jhapa Road Access
Total Rural Road 1470 km;
Popn 6.4 Lakh; Area 1606 Sqkm
Roads and Poverty
Strategic Issues Identification
& Environmental Scanning

Mukunda Raj Prakash Ghimire
Environmental Scanning
Strength                   Weakness
•Adequate Laws and         •Contradictory and mutually nullifying policies
Policies                   •Inadequate budget allocation for ever
                           increasing projects
•Budget allocation         • Untargeted development of network funded
increasing exponentially   by local resources
• Multiple technical       •Un-integrated development of road
organizations              •Inadequate capacity of Local body
•Local bodies              •Non-compliance of DTMP
                           •Political highhandedness in selection of road
•Political participation   alignment
•Competent Human           •Understaffing of technical officials
resources                  • Lack of competence building contractors,
•Regular enrichment of     •Donor driven policies
human resources            •Lack of career development opportunity
•Beginning of ICT use      • Lack of ICT manpower for effective e-
•Sector-wide development   government
Approach begun             •Lack of Emphasis in Maintenance of road .
Environmental Scanning
Opportunity             Threat
                        •Insecure feeling in the staff
•Rural Road at the      •Lack of policy in attracting competent
top priorities in the   professional to work at the remote
                        areas
peoples need.           •Environment degradation due to
•Donors’ priorities     haphazard development of rural roads
and attraction in the   •Political interference in budget
                        allocation to the local roads
rural infrastructure    •Lack of emphasis in maintaining rural
sectors                 roads from the local politicians
•Active participation   •Lack of ownership feeling in rural
                        roads
and contribution of     •Quasi contractor-ship in the name of
local community         users committee
                        •Competing multiple organizations
Strategic Issues Identified
1.   How to Optimally Develop Rural Road
     Network?
2.   How to ensure proper rural roads maintenance
     Management ?
3.   How to ensure providing transport service
     Delivery on the Roads?
4.   How to Appropriately re-organize
     Organizational System for effective management
     of Roads?
5.   How to Reinforce the organizations with
     adequate and competent Human Resources?
Rural Road Density
        Area sq   VDC Rural Road    Populatio Rural     Rural     APP
        km        No. + length km   n million Road      Road      target
                  Muni                        density   density   km
                  cipali                      per 1     km per    per
                  ty                          Lakh      100       100 sq
                                                        sqkm      km

Nepal   147,181 3915 40,000(+100    280       34.0      27        11
                     00=50,000      lakh
                     SRN)

Lalitpur 385      41+1 560          3.4 lakh 113.2      145.5     23
Ilam    1703      48+1 1270         3 lakh    423.3     74.5      11
Jhapa   1606      47+3 1490         6.9       216.0     92.8      23
                                    lakh
Road Network Development
     Indicators
1.   Road per 100 sq.km Land Area (APP)
       Terai 23 from 13km; Hill 11 from 6km; Mountain 4 from 1km)
2.   Road Indicator- Road per 10 Lakh population(
     Accessibility quality)
        Higher the Road density, higher the affluence
3.   Road Head Access by walking time( LID Policy)
       2 hr for Terai; 4 hrs for Hill & Mountain
4. Road Access to Cluster of human settlement( India’s
   policy)
      Paved Road for population threshold- all weather
   for all    settlement cluster >500 population
5. Economy: Road cost per capita ( World Banks feasibility
   for rural road in Nepal, RAIDP)
     < $100 per capita cost is feasible for IRR.
Strategic Recommendations &
Implementation Plan

       Devendra Karki
Strategic How to address?                                                      Responsi Time
Issues                                                                         bility   Frame
          •Review of LID Policy                                                GoN, MLD,    3 months
                                                                               DoLIDAR
1. Optimization of rural road
                                •Formulation of separate Rural Road            MLD,         1 year
                                                                               DoLIDAR
                                Policy on sector-wide approach
                                •New DTMP focusing cluster                     DDCs, DTOs   6 months

                                approach >1500 -1000-500
                                population criteria and all weather
                                access
                                •New Dedicated Rural Road Office in all        MLD,DDC      6 months
                                districts
                                • Separate Road building and Maintenance       MLD,DDC      6 months
   network




                                Sections under the new office
                                •Separate Bridge Directorate under DoLIDAR     GoN, MLD     6 months

                                •Adequate permanent technical officials        MLD, MoGA    1 year
                                staffing @ 1 Er, 2 sub-Er per 4 crore budget
                                work load in all districts
Strategic                       How to address?                              Respon Time
Issues                                                                       sibility Frame
                                •Review of LID Policy                        GoN, MLD,   3 months
   Rural Road Maintenance for                                                DoLIDAR
                                •Formulation of separate Rural Road          MLD,        1 year
                                                                             DoLIDAR
2. Maintenance Strategy for

                                Policy with emphasis on maintenance
   better service Delivery
                                •Maintenance Plan in the New DTMP focusing   DDCs,       6 months
                                cluster approach >1500-1000-500 population   DTOs
                                criteria and all weather access
                                •Maintenance section under New               MLD,DDC     6 months
                                Dedicated Rural Road Office
                                •Handing over provision of built road        DDCs        Within 3 mths of
                                                                                         setting up of
                                from building section to maintenance
                                                                                         new road offices
                                section regular basis
                                •Separate Rural Road Budget line in Red      MLD, MoF    From the next
                                                                                         fiscal year
                                Book of MoF under MLD
                                •Adequate separate staffing for regular      MLD,        1 year
                                                                             MoGA
                                maintenance management @ 1 Er ,2
                                SubEr for 100 km of rural roads
Fikkal Shriantu Rural Road, Ilam
    Domukha Road, Jhapa
Satashi Bridge Pier Failure across Dudhe –
     Birpur-Bagahachaudhari , Jhapa
Surunga - Saranamati –
Tagandubba-Digalbank,
        Jhapa
Conclusion & Appendices

     Prem Kumar Shahi
Conclusions
 1.   Total length of rural roads density exceeds minimum
      requirement to provide access to rural Nepal wherever the
      network exist.
 2.   Development of Road network is imbalanced between
      districts, regions, ecological zones
 3.   More than 40,000 km of rural road network are constructed
      which itself is a huge asset and investment
 4.   But effectiveness of rural road services due to disrepair
      deterioration, need protection & maintenance
 5.   Huge fund required for maintenance and up-keeping of the
      constructed roads and ensuring adequate fund is the main
      challenge.
 6.   Development of new road network at the cost of
      maintenance get priority over maintenance of rural roads.
7. Rural road development has also negative impact on
    environment through landslide, erosion, pollution etc which
    need attention.
8. Adequate number of qualified, experienced technical human
    resources is the basis of quality works which is lacking
9. Without quality works no roads can provide reliable,
    sustainable and enduring services.
10. Opening of new roads is given highest priorities but provided
    public transport services is not sufficient.
11. How to provide public transport services is the challenge.
12. Providing 2/4 hrs accessibility can not address the rural
    access services, For there must be a regular public transport
    facilities.
13. Providing all weather roads to the cluster of human
    settlement should be made the prime policy in Nepal.
    Settlement with more than 1500 -1000-500 population
    should be covered in the first phase and rest in the second
    phase.
14. Dedicated Rural road professional /government offices should
    be set up immediately to develop and manage rural road
    with enforcement rights.
15. Workload versus man power availability norms should be
    established with adequate monitoring and supervision logistic
    facilities.
16. One Engineer +Two Sub-Engineers should be made
    responsible for workload of maximum Rs 4 Crore/100 kms
17. All the district should reformulate District Transport Master
    Plans in accordance with the recommendation.
18. The master plan must have the information of all the
    settlement clusters. Those links which connect having more
    than 1500-1000-500 populations will be put in the top
    priority list.
19. Nepal Government should reformulate Rural Road
    Development Policy addressing the recommendation herein
20 year Agricultural Perspective Plan and Rural Road Density

                                      Terai :13 to 23
                                      km/100 sqkm

                                      Hill: 6 to 11
                                      km/100 sqkm

                                      Mountain: 1 to
                                      4km/100 sqkm

                                      Nepal: 6 to
                                      11km/100
                                      sqkm
                                      2054 to 2074
Agricultural Perspective Plan and Rural Road Length




  Terai 3,400km, Hill 1950km, Mountain 850km.
  Total 6,200km
SEDP Training Snaps
s'g} k|Zg<
s'g} lh1f;f<



hanks
               50

More Related Content

What's hot

Public Private Partnerships
Public Private PartnershipsPublic Private Partnerships
Public Private Partnerships
jamesrobinsonjnr
 
Structure & Infrastructure Planning
Structure & Infrastructure PlanningStructure & Infrastructure Planning
Structure & Infrastructure Planning
Ir. Abdul Aziz Abas
 
Urban Risk Assessment-URA
Urban Risk Assessment-URAUrban Risk Assessment-URA
Urban Risk Assessment-URA
Arvind Kumar
 
Rural Roads as Infrastructure for Economic Development
Rural Roads as Infrastructure for Economic DevelopmentRural Roads as Infrastructure for Economic Development
Rural Roads as Infrastructure for Economic Development
Iram Aziz
 

What's hot (20)

Public procurement act_2063
Public procurement act_2063Public procurement act_2063
Public procurement act_2063
 
Public Private Partnerships
Public Private PartnershipsPublic Private Partnerships
Public Private Partnerships
 
Structure & Infrastructure Planning
Structure & Infrastructure PlanningStructure & Infrastructure Planning
Structure & Infrastructure Planning
 
HYDROPOWER DEVELOPMENT IN NEPAL
HYDROPOWER DEVELOPMENT IN NEPALHYDROPOWER DEVELOPMENT IN NEPAL
HYDROPOWER DEVELOPMENT IN NEPAL
 
Urban Risk Assessment-URA
Urban Risk Assessment-URAUrban Risk Assessment-URA
Urban Risk Assessment-URA
 
Urban planning and development rajendrapsharma
Urban planning and development rajendrapsharmaUrban planning and development rajendrapsharma
Urban planning and development rajendrapsharma
 
Dukungan Program Kotaku (Kota Tanpa Kumuh) Terhadap Pencapaian Tujuan SDGs
Dukungan Program Kotaku (Kota Tanpa Kumuh) Terhadap Pencapaian Tujuan SDGsDukungan Program Kotaku (Kota Tanpa Kumuh) Terhadap Pencapaian Tujuan SDGs
Dukungan Program Kotaku (Kota Tanpa Kumuh) Terhadap Pencapaian Tujuan SDGs
 
Cost of 1 km Urban and Rural road in Pakistan
Cost of 1 km Urban and Rural road in Pakistan  Cost of 1 km Urban and Rural road in Pakistan
Cost of 1 km Urban and Rural road in Pakistan
 
Curves
CurvesCurves
Curves
 
Rural Roads as Infrastructure for Economic Development
Rural Roads as Infrastructure for Economic DevelopmentRural Roads as Infrastructure for Economic Development
Rural Roads as Infrastructure for Economic Development
 
Improving Indian Urban Finances
Improving Indian Urban FinancesImproving Indian Urban Finances
Improving Indian Urban Finances
 
Urban planning and development:in the context of nepal [compatibility mode]
Urban planning and development:in the context of nepal  [compatibility mode]Urban planning and development:in the context of nepal  [compatibility mode]
Urban planning and development:in the context of nepal [compatibility mode]
 
PERDA RTRW Kab Pasuruan Periode 2009-2029 12 Juli 2010
PERDA RTRW Kab Pasuruan Periode 2009-2029 12 Juli 2010PERDA RTRW Kab Pasuruan Periode 2009-2029 12 Juli 2010
PERDA RTRW Kab Pasuruan Periode 2009-2029 12 Juli 2010
 
District planning in India
District planning in IndiaDistrict planning in India
District planning in India
 
Government of India Ministry of Road Transport & Highways
Government of India Ministry of Road Transport & HighwaysGovernment of India Ministry of Road Transport & Highways
Government of India Ministry of Road Transport & Highways
 
Penyusunan dan Evaluasi RPJMD, Renstra SKPD, RKPD, dan Renja SKPD
Penyusunan dan Evaluasi RPJMD, Renstra SKPD, RKPD, dan Renja SKPDPenyusunan dan Evaluasi RPJMD, Renstra SKPD, RKPD, dan Renja SKPD
Penyusunan dan Evaluasi RPJMD, Renstra SKPD, RKPD, dan Renja SKPD
 
STANDAR TEKNIS SPM PUPR Berdasarkan Peraturan Menteri Pekerjaan Umum dan Peru...
STANDAR TEKNIS SPM PUPR Berdasarkan Peraturan Menteri Pekerjaan Umum dan Peru...STANDAR TEKNIS SPM PUPR Berdasarkan Peraturan Menteri Pekerjaan Umum dan Peru...
STANDAR TEKNIS SPM PUPR Berdasarkan Peraturan Menteri Pekerjaan Umum dan Peru...
 
Peran dan Partisipasi Masyarakat di Bidang Sanitasi Permukiman
Peran dan Partisipasi Masyarakat di Bidang Sanitasi PermukimanPeran dan Partisipasi Masyarakat di Bidang Sanitasi Permukiman
Peran dan Partisipasi Masyarakat di Bidang Sanitasi Permukiman
 
Tacheometric surveying
Tacheometric surveying Tacheometric surveying
Tacheometric surveying
 
Penyusunan RENJA
Penyusunan RENJAPenyusunan RENJA
Penyusunan RENJA
 

Similar to A study on rural road development and maintenance management in nepal nasc-sedp field study group presen

Nepal infrastructure journal of ser de-n 2013
Nepal infrastructure journal of ser de-n 2013Nepal infrastructure journal of ser de-n 2013
Nepal infrastructure journal of ser de-n 2013
Bhim Upadhyaya
 
Organization dev for rural dev presentation to drilp engineers training- nas...
Organization dev for rural dev  presentation to drilp engineers training- nas...Organization dev for rural dev  presentation to drilp engineers training- nas...
Organization dev for rural dev presentation to drilp engineers training- nas...
Bhim Upadhyaya
 
Vdc secretary training
Vdc secretary trainingVdc secretary training
Vdc secretary training
DIPECHO Nepal
 
Small scale mitigation report
Small scale mitigation reportSmall scale mitigation report
Small scale mitigation report
DIPECHO Nepal
 
District flood preparedness guidelines 2 48
District flood preparedness guidelines 2 48District flood preparedness guidelines 2 48
District flood preparedness guidelines 2 48
DIPECHO Nepal
 
Disability oreantation to plan team 2015
Disability oreantation to plan team 2015Disability oreantation to plan team 2015
Disability oreantation to plan team 2015
Uttam Siwakoti
 

Similar to A study on rural road development and maintenance management in nepal nasc-sedp field study group presen (20)

Nepal infrastructure journal of ser de-n 2013
Nepal infrastructure journal of ser de-n 2013Nepal infrastructure journal of ser de-n 2013
Nepal infrastructure journal of ser de-n 2013
 
Organization dev for rural dev presentation to drilp engineers training- nas...
Organization dev for rural dev  presentation to drilp engineers training- nas...Organization dev for rural dev  presentation to drilp engineers training- nas...
Organization dev for rural dev presentation to drilp engineers training- nas...
 
Radio Profile Big FM 101.2 Pokhara
Radio Profile Big FM 101.2 PokharaRadio Profile Big FM 101.2 Pokhara
Radio Profile Big FM 101.2 Pokhara
 
Cc words
Cc wordsCc words
Cc words
 
A Study On Distribution and Sales.
A Study On  Distribution and Sales.A Study On  Distribution and Sales.
A Study On Distribution and Sales.
 
Vdc secretary training
Vdc secretary trainingVdc secretary training
Vdc secretary training
 
Off-season vegetable production Technology
Off-season vegetable production TechnologyOff-season vegetable production Technology
Off-season vegetable production Technology
 
Small scale mitigation report
Small scale mitigation reportSmall scale mitigation report
Small scale mitigation report
 
Drr toolkit nepali
Drr toolkit nepaliDrr toolkit nepali
Drr toolkit nepali
 
Moha
MohaMoha
Moha
 
First paper unit 5
First paper unit 5First paper unit 5
First paper unit 5
 
NFDN program review 2012
NFDN program review 2012NFDN program review 2012
NFDN program review 2012
 
First paper unit 6 various aspects
First paper unit 6 various aspectsFirst paper unit 6 various aspects
First paper unit 6 various aspects
 
NTA UGC NET JRF - 34 nepali-new updated syllabus
NTA UGC NET JRF - 34 nepali-new updated syllabusNTA UGC NET JRF - 34 nepali-new updated syllabus
NTA UGC NET JRF - 34 nepali-new updated syllabus
 
1 disaster in nepal a concern june2k10
1 disaster in nepal a concern june2k101 disaster in nepal a concern june2k10
1 disaster in nepal a concern june2k10
 
District flood preparedness guidelines 2 48
District flood preparedness guidelines 2 48District flood preparedness guidelines 2 48
District flood preparedness guidelines 2 48
 
6 disaster management act
6 disaster management act6 disaster management act
6 disaster management act
 
HRDC Banke: Khajura Rural Municipality Orientation December 20, 2018
HRDC Banke:  Khajura Rural Municipality Orientation December 20,  2018HRDC Banke:  Khajura Rural Municipality Orientation December 20,  2018
HRDC Banke: Khajura Rural Municipality Orientation December 20, 2018
 
Aksharica - 075 (अक्षरिका - ०७५)
Aksharica - 075 (अक्षरिका - ०७५)Aksharica - 075 (अक्षरिका - ०७५)
Aksharica - 075 (अक्षरिका - ०७५)
 
Disability oreantation to plan team 2015
Disability oreantation to plan team 2015Disability oreantation to plan team 2015
Disability oreantation to plan team 2015
 

More from Bhim Upadhyaya

More from Bhim Upadhyaya (20)

Role of engineers in infrastructure development for the prosperity of nepal ...
Role of engineers  in infrastructure development for the prosperity of nepal ...Role of engineers  in infrastructure development for the prosperity of nepal ...
Role of engineers in infrastructure development for the prosperity of nepal ...
 
India's vision and roadmap for development of sanskrit report
India's vision and roadmap for development of sanskrit reportIndia's vision and roadmap for development of sanskrit report
India's vision and roadmap for development of sanskrit report
 
Nepal faecal sludge management and regulatory framework 2074
Nepal faecal sludge management and regulatory framework 2074Nepal faecal sludge management and regulatory framework 2074
Nepal faecal sludge management and regulatory framework 2074
 
Nepal- Total sanitation guidelines 2073 ministry of water supply and sanitat...
Nepal- Total  sanitation guidelines 2073 ministry of water supply and sanitat...Nepal- Total  sanitation guidelines 2073 ministry of water supply and sanitat...
Nepal- Total sanitation guidelines 2073 ministry of water supply and sanitat...
 
जलस्रोत विकास परिषद्को कार्यविधि तथा गठनविधि 054.08.19
जलस्रोत विकास परिषद्को कार्यविधि तथा गठनविधि 054.08.19जलस्रोत विकास परिषद्को कार्यविधि तथा गठनविधि 054.08.19
जलस्रोत विकास परिषद्को कार्यविधि तथा गठनविधि 054.08.19
 
जल तथा उर्जा आयोग गठनको गठन आदेश राजपत्र 049.3.15
जल तथा उर्जा आयोग गठनको गठन आदेश राजपत्र 049.3.15जल तथा उर्जा आयोग गठनको गठन आदेश राजपत्र 049.3.15
जल तथा उर्जा आयोग गठनको गठन आदेश राजपत्र 049.3.15
 
Water resources of nepal- in the context of climate change 2011 by wecs
Water resources of nepal- in the context of climate change 2011 by wecsWater resources of nepal- in the context of climate change 2011 by wecs
Water resources of nepal- in the context of climate change 2011 by wecs
 
Energy demand projection 2030 a study done by nepal investment board
Energy demand projection 2030  a study done by nepal investment boardEnergy demand projection 2030  a study done by nepal investment board
Energy demand projection 2030 a study done by nepal investment board
 
Nepal Energy strategy 2013 by wecs
Nepal Energy strategy 2013 by wecsNepal Energy strategy 2013 by wecs
Nepal Energy strategy 2013 by wecs
 
National Water Plan Nepal 2005 by WECS
National Water Plan Nepal 2005 by WECSNational Water Plan Nepal 2005 by WECS
National Water Plan Nepal 2005 by WECS
 
Water Resources Strategy Nepal 2002 by WECs
Water Resources Strategy Nepal 2002 by WECsWater Resources Strategy Nepal 2002 by WECs
Water Resources Strategy Nepal 2002 by WECs
 
Nepal - energy sector synopsis report 2010- wecs
Nepal - energy sector synopsis report 2010- wecsNepal - energy sector synopsis report 2010- wecs
Nepal - energy sector synopsis report 2010- wecs
 
Nepal final report on energy sectors vision 2050 ad
Nepal  final report on energy sectors vision 2050 adNepal  final report on energy sectors vision 2050 ad
Nepal final report on energy sectors vision 2050 ad
 
Andhra pradesh(india) sunrise vision 2029 draft by chandrababu naidu
Andhra pradesh(india) sunrise vision 2029 draft by chandrababu naiduAndhra pradesh(india) sunrise vision 2029 draft by chandrababu naidu
Andhra pradesh(india) sunrise vision 2029 draft by chandrababu naidu
 
Facebook sambad with naya patrika daily push 9th 2071
Facebook sambad with naya patrika daily push 9th 2071Facebook sambad with naya patrika daily push 9th 2071
Facebook sambad with naya patrika daily push 9th 2071
 
Ma pradhanmantri bhayeko bhaye as pub nayapatrika म प्रम भएको भए
Ma pradhanmantri bhayeko bhaye as pub nayapatrika म प्रम भएको भएMa pradhanmantri bhayeko bhaye as pub nayapatrika म प्रम भएको भए
Ma pradhanmantri bhayeko bhaye as pub nayapatrika म प्रम भएको भए
 
Gurustrotam in sanskrit and hindi
Gurustrotam in sanskrit and hindiGurustrotam in sanskrit and hindi
Gurustrotam in sanskrit and hindi
 
Engineering council uk guidance on security for engineers &amp; technicians
Engineering council uk guidance on security for engineers &amp; techniciansEngineering council uk guidance on security for engineers &amp; technicians
Engineering council uk guidance on security for engineers &amp; technicians
 
Sankskrit and science by dr raja ramanna
Sankskrit and  science by dr raja ramannaSankskrit and  science by dr raja ramanna
Sankskrit and science by dr raja ramanna
 
Ayurveda swadeshi chikitsa- part 1 by rajiv dixit
Ayurveda swadeshi chikitsa- part 1 by rajiv dixitAyurveda swadeshi chikitsa- part 1 by rajiv dixit
Ayurveda swadeshi chikitsa- part 1 by rajiv dixit
 

Recently uploaded

Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
KarakKing
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 

Recently uploaded (20)

How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 

A study on rural road development and maintenance management in nepal nasc-sedp field study group presen

  • 2. A study on Rural Road Development & Maintenance Management in Nepal • Bhim P. Upadhyaya, DDG, DoLIDAR/MLD • Devendra Karki, SE, DoR/MoPPW • Mukunda Raj Prakash Ghimire, JS, MoST • Prem Kumar Shahi, DIG, APF • Rudra P Paudel, JS, MoHA • Shreedhar Sapkota, Joint Government Attorney, Office of Attorney General
  • 3. Content of Presentation 1. Preliminaries & Objectives of the Study 2. Introduction & Methodology 3. Organizations Visit and Policy Documents’ Study, Status and Review 4. Field Visits, Data Collection and Analysis 5. Strategic Issues Identification & Environmental Scanning 6. Strategic Recommendations & Implementation Plan: Policy, Organization and Human Resources 7. Conclusions 8. Appendices
  • 5. Objective of the study Study on policy implementation towards rural road development and maintenance. status of the the network How is this rural road maintained managed? maintenance & Improved system
  • 6. Study Methodology & process Methodology Process Primary and Secondary Review of the Policy Data Collection Documents on Rural Visit to the relevant Road Organizations: NPC, RoD, DoLIDAR, DTOs- Analysis of data, maps, Ilam, Jhapa, Lalitpur SWOT analysis etc. Interaction with the Strategic Issues Officials Identified, Presentation from Report Writing officials
  • 7. Limitation of the study Time and location, Limitation on review of different infrastructure policies Highly focused on Local Infrastructure Policy 2061 not consider other rural roads: RoD, irrigation, VDC, others
  • 8. Organizations Visit and Policy Documents’ Study, Status and Review Rudra Prasad Poudel
  • 9. Policy Documents Reviewed 1. Nepal Road Statistics 2010 (DoR) 2. Local Infrastructure Development Policy (LIDP) 3. Strategic Action Plan for Local Infra. Dev. 4. National Rural Road Maintenance Plan DoLIDAR 5. Rural Road Maintenance Directive, DoLIDAR 6. 20 Year Agricultural Perspective Plan 7. Rural Road Vision 2025 India 8. Pradhan Mantri Gram Sadak Yojana India- A Briefing Paper 9. Rural Road Maintenance ILO report 2007 10. Yearly District Development Plans of DDCs
  • 10. Rural Road Development Agencies 1. DoR 2. DoLIDAR 3. DDCs(DTOs) 4. Department of Irrigation for Canal Roads 5. National Planning Commission 6. Ministry of Local Development 7. Bi- & Multinational Donor/Lending Agencies
  • 11. Stakeholder Organizations Visited 1. National Planning Commission( NPC) 2. Department of Roads (DoR) 3. Dept of Local Infrastructure Development and Agricultural Roads(DoLIDAR) 4. District Technical Office, Lalitpur( DTOL) 5. District Technical Office, Ilam( DTOI) 6. District Technical Office, Ilam( DTOJ)
  • 12. u|fdL0f ;8s ljsf; ;DjGwL k|d"v /fli6|o sfo{s|d ljsf; ;DjGwL sfo{s| / ah]6===! != ljs]Gb|Lt u|fdL0f k"jf{{wf/ tyf hLljsf]kfh{g ljs]Gb| fwf/ wf hLljsf]kfh{ kfh sfo{s| cj{ sfo{s|d ? ! cj{ &$ s/f]8 &* nfv lg{df{ df cfof]hgf @= u|fdL0f k'glg{df{0f tyf k'g{:yfkgf cfof]hgf ? @ cj{ cj{ (* s/f]8 (^ nfv :yfgLo f{wf/ qut sfo{s| wf #= :yfgLo oftfoft k"jf{wf/ If]qut sfo{s|d ? ! cj{ cj{ !) s/f]8 !* nfv sfo{s| $= u|fdL0f kx"r sfo{s|d ? ^# s/f]8 @@ nfv %= lhNnf ;8s ;xof]u sfo{s|d ?#! s/f]8 @& nfv ;xof sfo{s| xof]
  • 13. u|fdL0f ;8s ljsf; ;DjGwL k|d"v /fli6|o sfo{s|d ljsf; ;DjGwL sfo{s| / ah]6===@ ^= u|fdL0f kx"r ;'wff/ tyf ljs]Gb|Ls/0f sfo{s|d ? (! s/f]8 @& nfv . wf/ w ljs]Gb| s/0f sfo{s| af] sfo{s| &= ;8s af]8{ sfo{s|d ? @%s/f]8 !( nfv . lhlj; sf] *= lhlj; cg'bfg k"lhut -? !!# s/f]8 sf] $@ k|z_ ? $& s/f]8 $^ nfv . uflj; cj{ (= uflj; cg'bfg -? ^@^ s/f]8sf] $@ k|z_ ? @ cj{ ^@ s/f]8 (@ nfv . !) :yfgLo zf;g ;fd'bflos ljsf; sfo{s|d -? #@* s/f]8sf] !% k|z_ :yfgLo ljsf; sfo{s| ? $($) nfv . cGtu{ !! ;8s ljefu cGtu{t ? ? !!% s/f]8 . s"n ah]6 M ? !@ cj{ &)s/f]8 !( nfv . cj{ dd{ ef/ ef dd{t;+ef/ ah]6M $& s/f]8 .
  • 14. lhNnfut u|fdL0f ;8s ljsf; ;DjGwL sfo{s|d / ljsf; ;DjGwL sfo{s| ah]6 emfkf lhNnf s"n ? !$ s/f]8 ** nfv . dd{tdf ? @ s/f]8 . Onfd lhNnf ? !# s/f]8 ** nfv . dd{tdf ? ! s/f]8 $ nfv . nlntk' nlntk'/ lhNnf ? !# s/f]8 #^ nfv . dd{tdf ? (* nfv .
  • 15. Field Visits, Data Collection, Analysis & Findings Bhim Upadhyaya
  • 16. Exponential Budget increase. The 70 % of total budget is for Local Infrastructure, and 70 % of this for Rural Roads
  • 17. Local Dev Investment Year Between Expenditure Rs Crore 038/39- 039/40 61 040/41- 044/45 170 045/46-049/50 230 050/51- 054/55 1417 055/56- 059/60 2116 060/61- 063/64 3040 064/65-066/67 7300 067/068 budget* 4100 Total 1, 87,40 17
  • 18. :yf lj dGqfnosf] ;+u7gx? dGqL ;ldltx?, s]Gb| dGqfno lhlj; &% ljefu-8f]ln8f/_ cfof]hgf lhlj;sf] sfof{no sfof{no k|fljlws sfof{no &% gu/kflnsf cfof]hgf sfof{Gjog Ufflj;sf] OsfO{x? gu/kflnsf sfof{no %* sfof{no #(!% 18
  • 19. 8f]ln8f/sf] ;+u7g ;+/rgf DoLIDAR STRUCTURE dxflgb]{zs DIRECTOR GENERAL Gaz I U|ffdL0f s[lif ;8s Rural/Agri Roads Division General Admin Section DDG K|fzf;g zfvf Senior Admin Officer Section Officer 1 dxfzfvf Law Officer 1 U|Rural/AgriSDE 1 Section ff s[lif ;8s Roads Suspension Bridge Section Account Section zfvf Engineer 2 emf]n+'u] k"n zfvf SDE 1 Engineer 4 n]vf zfvf Account Officer 1 of]hgf ;dGjo Planning,Monotoring & Donor Coordination Division dxfzfvf DDG /fk k| k|f M $ Planning & Donor Coordination Monotoring,Environment & cg'udg jftfj/0f /fk l4 k|f M *+ ! of]hgf ;dGjo Section Technology Promotion Section zfvf SDE 1 Engineer 2 Agri Economist 1 zfvf SDE 1 Engineer 2, Social Scientist 1 /fk l4 k| M ! Other Infras Development Division /fk t[ k|f M @& cGo k"jf{wf/ DDG /fk t[ k| M # dxfzfvf s"n $$ Rural Drinking water and Irrigation River control and Vffg]kfgL ejg Sanitation & Building Section l;+rfO{ / cGo Other Infras Section SDE 1 Engineer 2, ;xfos ## 19 zfvf SDE 1 Engineer 2 zfvf Agri Engineer 1
  • 20.
  • 21.
  • 23. Accessibility Status 1,2,3,4 hrs 1 hr 2 hr 3 hr 4 hr
  • 24. Lalitpur Road Access Total Rural Road 560 km; Popn 3.4 Lakh; 385 Sqkm
  • 25. Ilam Road Access Total Rural Road 1270 km; Popn 3 Lakh; Area 1703 Sqkm
  • 26. Jhapa Road Access Total Rural Road 1470 km; Popn 6.4 Lakh; Area 1606 Sqkm
  • 28. Strategic Issues Identification & Environmental Scanning Mukunda Raj Prakash Ghimire
  • 29. Environmental Scanning Strength Weakness •Adequate Laws and •Contradictory and mutually nullifying policies Policies •Inadequate budget allocation for ever increasing projects •Budget allocation • Untargeted development of network funded increasing exponentially by local resources • Multiple technical •Un-integrated development of road organizations •Inadequate capacity of Local body •Local bodies •Non-compliance of DTMP •Political highhandedness in selection of road •Political participation alignment •Competent Human •Understaffing of technical officials resources • Lack of competence building contractors, •Regular enrichment of •Donor driven policies human resources •Lack of career development opportunity •Beginning of ICT use • Lack of ICT manpower for effective e- •Sector-wide development government Approach begun •Lack of Emphasis in Maintenance of road .
  • 30. Environmental Scanning Opportunity Threat •Insecure feeling in the staff •Rural Road at the •Lack of policy in attracting competent top priorities in the professional to work at the remote areas peoples need. •Environment degradation due to •Donors’ priorities haphazard development of rural roads and attraction in the •Political interference in budget allocation to the local roads rural infrastructure •Lack of emphasis in maintaining rural sectors roads from the local politicians •Active participation •Lack of ownership feeling in rural roads and contribution of •Quasi contractor-ship in the name of local community users committee •Competing multiple organizations
  • 31. Strategic Issues Identified 1. How to Optimally Develop Rural Road Network? 2. How to ensure proper rural roads maintenance Management ? 3. How to ensure providing transport service Delivery on the Roads? 4. How to Appropriately re-organize Organizational System for effective management of Roads? 5. How to Reinforce the organizations with adequate and competent Human Resources?
  • 32. Rural Road Density Area sq VDC Rural Road Populatio Rural Rural APP km No. + length km n million Road Road target Muni density density km cipali per 1 km per per ty Lakh 100 100 sq sqkm km Nepal 147,181 3915 40,000(+100 280 34.0 27 11 00=50,000 lakh SRN) Lalitpur 385 41+1 560 3.4 lakh 113.2 145.5 23 Ilam 1703 48+1 1270 3 lakh 423.3 74.5 11 Jhapa 1606 47+3 1490 6.9 216.0 92.8 23 lakh
  • 33. Road Network Development Indicators 1. Road per 100 sq.km Land Area (APP) Terai 23 from 13km; Hill 11 from 6km; Mountain 4 from 1km) 2. Road Indicator- Road per 10 Lakh population( Accessibility quality) Higher the Road density, higher the affluence 3. Road Head Access by walking time( LID Policy) 2 hr for Terai; 4 hrs for Hill & Mountain 4. Road Access to Cluster of human settlement( India’s policy) Paved Road for population threshold- all weather for all settlement cluster >500 population 5. Economy: Road cost per capita ( World Banks feasibility for rural road in Nepal, RAIDP) < $100 per capita cost is feasible for IRR.
  • 35. Strategic How to address? Responsi Time Issues bility Frame •Review of LID Policy GoN, MLD, 3 months DoLIDAR 1. Optimization of rural road •Formulation of separate Rural Road MLD, 1 year DoLIDAR Policy on sector-wide approach •New DTMP focusing cluster DDCs, DTOs 6 months approach >1500 -1000-500 population criteria and all weather access •New Dedicated Rural Road Office in all MLD,DDC 6 months districts • Separate Road building and Maintenance MLD,DDC 6 months network Sections under the new office •Separate Bridge Directorate under DoLIDAR GoN, MLD 6 months •Adequate permanent technical officials MLD, MoGA 1 year staffing @ 1 Er, 2 sub-Er per 4 crore budget work load in all districts
  • 36. Strategic How to address? Respon Time Issues sibility Frame •Review of LID Policy GoN, MLD, 3 months Rural Road Maintenance for DoLIDAR •Formulation of separate Rural Road MLD, 1 year DoLIDAR 2. Maintenance Strategy for Policy with emphasis on maintenance better service Delivery •Maintenance Plan in the New DTMP focusing DDCs, 6 months cluster approach >1500-1000-500 population DTOs criteria and all weather access •Maintenance section under New MLD,DDC 6 months Dedicated Rural Road Office •Handing over provision of built road DDCs Within 3 mths of setting up of from building section to maintenance new road offices section regular basis •Separate Rural Road Budget line in Red MLD, MoF From the next fiscal year Book of MoF under MLD •Adequate separate staffing for regular MLD, 1 year MoGA maintenance management @ 1 Er ,2 SubEr for 100 km of rural roads
  • 37. Fikkal Shriantu Rural Road, Ilam Domukha Road, Jhapa
  • 38. Satashi Bridge Pier Failure across Dudhe – Birpur-Bagahachaudhari , Jhapa
  • 39. Surunga - Saranamati – Tagandubba-Digalbank, Jhapa
  • 40. Conclusion & Appendices Prem Kumar Shahi
  • 41. Conclusions 1. Total length of rural roads density exceeds minimum requirement to provide access to rural Nepal wherever the network exist. 2. Development of Road network is imbalanced between districts, regions, ecological zones 3. More than 40,000 km of rural road network are constructed which itself is a huge asset and investment 4. But effectiveness of rural road services due to disrepair deterioration, need protection & maintenance 5. Huge fund required for maintenance and up-keeping of the constructed roads and ensuring adequate fund is the main challenge. 6. Development of new road network at the cost of maintenance get priority over maintenance of rural roads.
  • 42. 7. Rural road development has also negative impact on environment through landslide, erosion, pollution etc which need attention. 8. Adequate number of qualified, experienced technical human resources is the basis of quality works which is lacking 9. Without quality works no roads can provide reliable, sustainable and enduring services. 10. Opening of new roads is given highest priorities but provided public transport services is not sufficient. 11. How to provide public transport services is the challenge. 12. Providing 2/4 hrs accessibility can not address the rural access services, For there must be a regular public transport facilities. 13. Providing all weather roads to the cluster of human settlement should be made the prime policy in Nepal. Settlement with more than 1500 -1000-500 population should be covered in the first phase and rest in the second phase.
  • 43. 14. Dedicated Rural road professional /government offices should be set up immediately to develop and manage rural road with enforcement rights. 15. Workload versus man power availability norms should be established with adequate monitoring and supervision logistic facilities. 16. One Engineer +Two Sub-Engineers should be made responsible for workload of maximum Rs 4 Crore/100 kms 17. All the district should reformulate District Transport Master Plans in accordance with the recommendation. 18. The master plan must have the information of all the settlement clusters. Those links which connect having more than 1500-1000-500 populations will be put in the top priority list. 19. Nepal Government should reformulate Rural Road Development Policy addressing the recommendation herein
  • 44. 20 year Agricultural Perspective Plan and Rural Road Density Terai :13 to 23 km/100 sqkm Hill: 6 to 11 km/100 sqkm Mountain: 1 to 4km/100 sqkm Nepal: 6 to 11km/100 sqkm 2054 to 2074
  • 45. Agricultural Perspective Plan and Rural Road Length Terai 3,400km, Hill 1950km, Mountain 850km. Total 6,200km
  • 46.
  • 47.
  • 48.