Developing
Solar Power Project

under REC Mechanism
Renewable Energy Sources : Optimization
» In June 2008 Hon’ble Prime Minister of India announced National

Action Plan for Climate Change (NAPCC) to outline its strategy
to meet the challenge of Climate Change. NAPCC envisages several
measures to address global warming. One of the measure is

increasing the share of renewable energy in total electricity
consumption in the country.
» The National Action Plan of Climate Change (NAPCC) has set the
target of 5% renewable energy purchase for FY 2009-10 which

will increase by 1% for next 10 years. The NAPCC further
recommends strong regulatory measures to fulfill these targets.
REC : The Concept
» The concept of Renewable Energy Certificate (REC) assumes

significance to address the mismatch between availability of
RE sources and the requirement of the obligated entities to
meet their renewable purchase obligation.

» Additional revenue from sale of environmental attributes
» REC is treated as equivalent to 1000 Unit (KWh).
» Its validity is 2 years from the date of issuance
» REC mechanism is a market based instrument
REC : The Eligibility
A company generating electricity from renewable energy

sources is eligible
» if it does not have any power purchase agreement at a
preferential tariff

» If it sells the electricity generated either
– To the distribution licensee at the pooled cost of power
purchase
– to an open access consumer at a mutually agreed price,
– or through power exchange at market determined price.
REC : The Eligibility
» A Captive Generating Plant (CGP) based on renewable

energy sources is eligible for self-consumption subject to the
condition that such CGP has not availed or does not propose
to avail any benefit in the form of concessional/promotional

transmission or wheeling charges and/or banking facility
benefit.
REC : The Procedure

ACCREDITATION

REGISTRATION

GENERATION

REC TRADING IN
EXCHANGE

ISSUANCE OF
REC

RE
ACCOUNTING &
VERIFICATION
REC : The Procedure
» Accreditation:

• State Nodal Agency – GEDA grants Accreditation certificate
and intimates the Central Agency, SLDC and the local
DISCOM but not before 6 months prior to the date of

commissioning.
» Registration:
• The Central Agency – NLDC grants Registration certificate
and intimates to the State Nodal Agency, SLDC and the
Power Exchanges but not before 3 months prior to the
proposed date of commissioning.
REC : The Procedure
» Issuance of REC:

• The metering of Renewable Energy injected into the grid is
approved by or recorded through energy accounting by
SLDC.
• Eligible RE Generator to apply to NLDC to issue the RE
certificates as certified by the SLDC.
• Application can be made on a fortnightly basis, i.e., on the
1st day of the month or on 15th day of the month.
• NLDC to issue RECs to Eligible RE Generator within 15 days as
per SLDC and State Agency’s generation report.
• RECs to be sold within 730 days of issuance or else they will
lapse.
REC : The Procedure
» Sale of REC: Only through Power Exchanges (PXs)

• Trading through Closed double-sided auction on the last
Wednesday of every month.
• Call of bids from 13:00 Hrs to 15:00 Hrs on the auction day .
• PXs to intimates details of maximum sale bids placed by
each Eligible RE Generator to NLDC by 15:30 Hrs .
• NLDC to check availability of RECs with the eligible entity by
16:00 Hrs.
• Post-confirmation from NLDC, PXs to determine Market
Clearing Price and Market Clearing Volume and send the
details final cleared trades to NLDC for extinguishing of RECs
sold in the records of NLDC by 17:00 Hrs
REC : Fees & Charges
» Accreditation

Amount Rs

•
•
•
•

5,000
30,000
10,000
15,000

Processing Fees (One Time)
Accreditation Charges (One Time)
Annual Charges
Revalidation Charge at the end of five (5) years

» Registration

Amount Rs

•
•
•
•

1,000
5,000
1,000
5,000

Processing Fees (One Time)
Registration Charges (One Time)
Annual Charges
Revalidation Charge at the end of five (5) years
REC : Fees & Charges
» Issuance of REC

Amount Rs

• Issuance Fees per Certificate
• Exchange Registration Charges (One Time)
• Trading Fees per Certificate

10
20,000
20

» Issuance of REC: To apply to the Central Agency for
Certificates

within

Six

months

after

corresponding

generation from eligible renewable energy projects provided
that the online application for issuance of certificates may
be made on 10th /20th or last day of the month.
Regulatory Commission : Role
» The Electricity Act, 2003 entrusts on the appropriate
commission the responsibility of promotion of co-generation

and generation based on renewable energy sources.
“86. (1) The State Commission shall discharge the following
functions, namely: » (a) …….
» (e) promote cogeneration and generation of electricity from
renewable sources of energy by providing suitable measures
for connectivity with the grid and sale of electricity to any
person, and also specify, for purchase of electricity from
such sources, a percentage of the total consumption of
electricity in the area of a distribution licensee;
» (f) ………”
REC : Forbearance and Floor Price
» Under section 66 and 178 of the Electricity Act, 2003 the
CERC has notified the Terms and Conditions for recognition
and issuance of Renewable Energy Certificate (REC) for
Renewable Energy Generation Regulations, 2010
Period :
1st June 2010 – 31st March 2012
Forbearance Price
Floor Price
1st 2012 – 31st March 2017
Forbearance Price
Floor Price

Non Solar REC
Rs/MWh
3900
1500

Solar REC
Rs/MWh
17000
12000

3300
1500

13400
9300
REC Response in India:
May 2012 – October 2013:
Evaluating Expected Revenue Realization
Assumptions:
» Project Cost
: Rs 7.00 Crs/ MW
» Generation in First Year
: 16.00 MUs
» Deration in generation every year
: 1%
» Tax Benefit (Accelerated Depreciation) : 1.85 Crs/ MW
» Floor Price of REC Up to March 2017
: Rs 9.30/ Kwh
» Floor Price of REC Up to March 2022
: Rs 4.65/ Kwh
» Realization from Electricity Sale: (Yearly Escalation – 5%)
• For Captive Consumer
: Rs 6.00/ Kwh
• For Third Party Sale
: Rs 4.00/ Kwh
• APPC (DISCOM)
: Rs 3.00/ Kwh
Evaluating Expected Revenue Realization
Year wise Net Cash Flow in Rs Crs
Year
REC Period
Captive
Third Party
1
2014 - 15
1.38
1.04
2
2015 - 16
1.41
1.06
3
2016 - 17
1.45
1.09
4
2017 - 18
0.77
0.39
5
2018 - 19
0.82
0.42
6
2019 - 20
0.87
0.46
7
2020- 21
0.92
0.49
8
2021- 22
0.97
0.53
9
10
11
Pay back Period
4th Year
8th Year

APPC
0.87
0.89
0.91
0.20
0.23
0.25
0.28
0.31
0.34
0.37
0.40
11th Year
Global Annual Installation:
Germany is the Market Leader
Solar Market India:
Levellised Cost Comparison:
Utility Scale PV & Conventional Power at Grid Parity
Thank You

? Query : mail to – parmarbr@yahoo.co.in or call 9909904332

Weitere ähnliche Inhalte

Was ist angesagt?

Draft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsDraft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projects
Sanman Rajput
 
Umpp(ultra mega power plant and international bidding )
Umpp(ultra mega power plant and international bidding )Umpp(ultra mega power plant and international bidding )
Umpp(ultra mega power plant and international bidding )
Gurparvesh kaur
 

Was ist angesagt? (20)

Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019
 
Will Renewable Energy Certificates(RECs) drive the growth of Solar in India?
Will Renewable Energy Certificates(RECs) drive the growth of Solar in India?Will Renewable Energy Certificates(RECs) drive the growth of Solar in India?
Will Renewable Energy Certificates(RECs) drive the growth of Solar in India?
 
Making tariff rationalization for domestic consumers a winning proposition fo...
Making tariff rationalization for domestic consumers a winning proposition fo...Making tariff rationalization for domestic consumers a winning proposition fo...
Making tariff rationalization for domestic consumers a winning proposition fo...
 
Session 2 Dr Ziad Jibril Sabra, Jordan
Session 2 Dr Ziad Jibril Sabra, JordanSession 2 Dr Ziad Jibril Sabra, Jordan
Session 2 Dr Ziad Jibril Sabra, Jordan
 
Day-3, Mr. Vimal Kirti Singh, IAS
Day-3, Mr. Vimal Kirti Singh, IASDay-3, Mr. Vimal Kirti Singh, IAS
Day-3, Mr. Vimal Kirti Singh, IAS
 
Presentation by MNRE on Solar Parks
Presentation by MNRE on Solar ParksPresentation by MNRE on Solar Parks
Presentation by MNRE on Solar Parks
 
States Policies and SERCs Regulatory/ Tariff Order for rooftop solar power pr...
States Policies and SERCs Regulatory/ Tariff Order for rooftop solar power pr...States Policies and SERCs Regulatory/ Tariff Order for rooftop solar power pr...
States Policies and SERCs Regulatory/ Tariff Order for rooftop solar power pr...
 
Draft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsDraft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projects
 
Renewable Energy Certificate (REC) Mechanism
Renewable Energy Certificate (REC) MechanismRenewable Energy Certificate (REC) Mechanism
Renewable Energy Certificate (REC) Mechanism
 
Feasibility Study of Low Carbon Energy Investments in Jordan. By Bashar Zagha
Feasibility Study of Low Carbon Energy Investments in Jordan. By Bashar ZaghaFeasibility Study of Low Carbon Energy Investments in Jordan. By Bashar Zagha
Feasibility Study of Low Carbon Energy Investments in Jordan. By Bashar Zagha
 
Discussion paper 16.11.2015
Discussion paper 16.11.2015Discussion paper 16.11.2015
Discussion paper 16.11.2015
 
Umpp(ultra mega power plant and international bidding )
Umpp(ultra mega power plant and international bidding )Umpp(ultra mega power plant and international bidding )
Umpp(ultra mega power plant and international bidding )
 
Egypt energy
Egypt energyEgypt energy
Egypt energy
 
Nl energy sep 26 - oct 2, 2015
Nl energy sep 26 - oct 2, 2015Nl energy sep 26 - oct 2, 2015
Nl energy sep 26 - oct 2, 2015
 
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
 
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderTender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
 
Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)
 
Day-3, Mr. Alok Roy
Day-3, Mr. Alok RoyDay-3, Mr. Alok Roy
Day-3, Mr. Alok Roy
 
Power of sun and solar energy (india power)
Power of sun and solar energy (india power)Power of sun and solar energy (india power)
Power of sun and solar energy (india power)
 
Small Wind Turbine Market In India1
Small Wind Turbine Market In India1Small Wind Turbine Market In India1
Small Wind Turbine Market In India1
 

Ähnlich wie Solar power projects under rec mechanism in india

REC a market ready for take-off
REC   a market ready for take-offREC   a market ready for take-off
REC a market ready for take-off
Anuj Kaushik
 
Esci rec presentation 13 feb 2013
Esci rec presentation   13 feb 2013Esci rec presentation   13 feb 2013
Esci rec presentation 13 feb 2013
Sandeep Melana
 
Pat rules and obligations of d cs under pat scheme
Pat rules and obligations of d cs under pat schemePat rules and obligations of d cs under pat scheme
Pat rules and obligations of d cs under pat scheme
shambhupoddar1
 
A Presentation on the Regulatory Regime for Renewable Energy Projects in Andh...
A Presentation on the Regulatory Regime for Renewable Energy Projects in Andh...A Presentation on the Regulatory Regime for Renewable Energy Projects in Andh...
A Presentation on the Regulatory Regime for Renewable Energy Projects in Andh...
electricitygovernance
 

Ähnlich wie Solar power projects under rec mechanism in india (20)

Renewable Energy Certificate
Renewable Energy CertificateRenewable Energy Certificate
Renewable Energy Certificate
 
REC a market ready for take-off
REC   a market ready for take-offREC   a market ready for take-off
REC a market ready for take-off
 
REC status
REC statusREC status
REC status
 
Esci rec presentation 13 feb 2013
Esci rec presentation   13 feb 2013Esci rec presentation   13 feb 2013
Esci rec presentation 13 feb 2013
 
RECs – a market ready for take off
RECs – a market ready for take offRECs – a market ready for take off
RECs – a market ready for take off
 
Renewable Energy - Recent Initiatives
Renewable Energy - Recent InitiativesRenewable Energy - Recent Initiatives
Renewable Energy - Recent Initiatives
 
RENEWABLE POLICY
RENEWABLE POLICYRENEWABLE POLICY
RENEWABLE POLICY
 
Pat rules and obligations of d cs under pat scheme
Pat rules and obligations of d cs under pat schemePat rules and obligations of d cs under pat scheme
Pat rules and obligations of d cs under pat scheme
 
Day-4, Mr. MG Raout
Day-4, Mr. MG RaoutDay-4, Mr. MG Raout
Day-4, Mr. MG Raout
 
Small Power Generation Plant
Small Power Generation PlantSmall Power Generation Plant
Small Power Generation Plant
 
Tapping potential of waste heat to power and energy conservation
Tapping potential of waste heat to power and energy conservationTapping potential of waste heat to power and energy conservation
Tapping potential of waste heat to power and energy conservation
 
A Presentation on the Regulatory Regime for Renewable Energy Projects in Andh...
A Presentation on the Regulatory Regime for Renewable Energy Projects in Andh...A Presentation on the Regulatory Regime for Renewable Energy Projects in Andh...
A Presentation on the Regulatory Regime for Renewable Energy Projects in Andh...
 
REC status
REC statusREC status
REC status
 
Promotion of Clean Energy, Energy Efficiency and DSM by Maharasthra Electrici...
Promotion of Clean Energy, Energy Efficiency and DSM by Maharasthra Electrici...Promotion of Clean Energy, Energy Efficiency and DSM by Maharasthra Electrici...
Promotion of Clean Energy, Energy Efficiency and DSM by Maharasthra Electrici...
 
Experience of GCCIA in developing GCC Regional Electricity Market
Experience of GCCIA in developing GCC Regional Electricity MarketExperience of GCCIA in developing GCC Regional Electricity Market
Experience of GCCIA in developing GCC Regional Electricity Market
 
Open access ppt
Open access pptOpen access ppt
Open access ppt
 
Introduction to the Renewable Energy Certificate (REC) Mechanism
Introduction to the Renewable Energy Certificate (REC) MechanismIntroduction to the Renewable Energy Certificate (REC) Mechanism
Introduction to the Renewable Energy Certificate (REC) Mechanism
 
Availing the Net metering facility: impact of BOI's reforms
Availing the Net metering facility: impact of BOI's reformsAvailing the Net metering facility: impact of BOI's reforms
Availing the Net metering facility: impact of BOI's reforms
 
Scope of solar generation in West Bengal (an Indian State)
Scope of solar generation in West Bengal (an Indian State)Scope of solar generation in West Bengal (an Indian State)
Scope of solar generation in West Bengal (an Indian State)
 
Rsm GC Advisory Renewable Purchase Obligation (RPO) & Renewable Energy Certif...
Rsm GC Advisory Renewable Purchase Obligation (RPO) & Renewable Energy Certif...Rsm GC Advisory Renewable Purchase Obligation (RPO) & Renewable Energy Certif...
Rsm GC Advisory Renewable Purchase Obligation (RPO) & Renewable Energy Certif...
 

Kürzlich hochgeladen

Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
WSO2
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Victor Rentea
 

Kürzlich hochgeladen (20)

Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptx
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 

Solar power projects under rec mechanism in india

  • 2. Renewable Energy Sources : Optimization » In June 2008 Hon’ble Prime Minister of India announced National Action Plan for Climate Change (NAPCC) to outline its strategy to meet the challenge of Climate Change. NAPCC envisages several measures to address global warming. One of the measure is increasing the share of renewable energy in total electricity consumption in the country. » The National Action Plan of Climate Change (NAPCC) has set the target of 5% renewable energy purchase for FY 2009-10 which will increase by 1% for next 10 years. The NAPCC further recommends strong regulatory measures to fulfill these targets.
  • 3. REC : The Concept » The concept of Renewable Energy Certificate (REC) assumes significance to address the mismatch between availability of RE sources and the requirement of the obligated entities to meet their renewable purchase obligation. » Additional revenue from sale of environmental attributes » REC is treated as equivalent to 1000 Unit (KWh). » Its validity is 2 years from the date of issuance » REC mechanism is a market based instrument
  • 4. REC : The Eligibility A company generating electricity from renewable energy sources is eligible » if it does not have any power purchase agreement at a preferential tariff » If it sells the electricity generated either – To the distribution licensee at the pooled cost of power purchase – to an open access consumer at a mutually agreed price, – or through power exchange at market determined price.
  • 5. REC : The Eligibility » A Captive Generating Plant (CGP) based on renewable energy sources is eligible for self-consumption subject to the condition that such CGP has not availed or does not propose to avail any benefit in the form of concessional/promotional transmission or wheeling charges and/or banking facility benefit.
  • 6. REC : The Procedure ACCREDITATION REGISTRATION GENERATION REC TRADING IN EXCHANGE ISSUANCE OF REC RE ACCOUNTING & VERIFICATION
  • 7. REC : The Procedure » Accreditation: • State Nodal Agency – GEDA grants Accreditation certificate and intimates the Central Agency, SLDC and the local DISCOM but not before 6 months prior to the date of commissioning. » Registration: • The Central Agency – NLDC grants Registration certificate and intimates to the State Nodal Agency, SLDC and the Power Exchanges but not before 3 months prior to the proposed date of commissioning.
  • 8. REC : The Procedure » Issuance of REC: • The metering of Renewable Energy injected into the grid is approved by or recorded through energy accounting by SLDC. • Eligible RE Generator to apply to NLDC to issue the RE certificates as certified by the SLDC. • Application can be made on a fortnightly basis, i.e., on the 1st day of the month or on 15th day of the month. • NLDC to issue RECs to Eligible RE Generator within 15 days as per SLDC and State Agency’s generation report. • RECs to be sold within 730 days of issuance or else they will lapse.
  • 9. REC : The Procedure » Sale of REC: Only through Power Exchanges (PXs) • Trading through Closed double-sided auction on the last Wednesday of every month. • Call of bids from 13:00 Hrs to 15:00 Hrs on the auction day . • PXs to intimates details of maximum sale bids placed by each Eligible RE Generator to NLDC by 15:30 Hrs . • NLDC to check availability of RECs with the eligible entity by 16:00 Hrs. • Post-confirmation from NLDC, PXs to determine Market Clearing Price and Market Clearing Volume and send the details final cleared trades to NLDC for extinguishing of RECs sold in the records of NLDC by 17:00 Hrs
  • 10. REC : Fees & Charges » Accreditation Amount Rs • • • • 5,000 30,000 10,000 15,000 Processing Fees (One Time) Accreditation Charges (One Time) Annual Charges Revalidation Charge at the end of five (5) years » Registration Amount Rs • • • • 1,000 5,000 1,000 5,000 Processing Fees (One Time) Registration Charges (One Time) Annual Charges Revalidation Charge at the end of five (5) years
  • 11. REC : Fees & Charges » Issuance of REC Amount Rs • Issuance Fees per Certificate • Exchange Registration Charges (One Time) • Trading Fees per Certificate 10 20,000 20 » Issuance of REC: To apply to the Central Agency for Certificates within Six months after corresponding generation from eligible renewable energy projects provided that the online application for issuance of certificates may be made on 10th /20th or last day of the month.
  • 12. Regulatory Commission : Role » The Electricity Act, 2003 entrusts on the appropriate commission the responsibility of promotion of co-generation and generation based on renewable energy sources. “86. (1) The State Commission shall discharge the following functions, namely: » (a) ……. » (e) promote cogeneration and generation of electricity from renewable sources of energy by providing suitable measures for connectivity with the grid and sale of electricity to any person, and also specify, for purchase of electricity from such sources, a percentage of the total consumption of electricity in the area of a distribution licensee; » (f) ………”
  • 13. REC : Forbearance and Floor Price » Under section 66 and 178 of the Electricity Act, 2003 the CERC has notified the Terms and Conditions for recognition and issuance of Renewable Energy Certificate (REC) for Renewable Energy Generation Regulations, 2010 Period : 1st June 2010 – 31st March 2012 Forbearance Price Floor Price 1st 2012 – 31st March 2017 Forbearance Price Floor Price Non Solar REC Rs/MWh 3900 1500 Solar REC Rs/MWh 17000 12000 3300 1500 13400 9300
  • 14. REC Response in India: May 2012 – October 2013:
  • 15. Evaluating Expected Revenue Realization Assumptions: » Project Cost : Rs 7.00 Crs/ MW » Generation in First Year : 16.00 MUs » Deration in generation every year : 1% » Tax Benefit (Accelerated Depreciation) : 1.85 Crs/ MW » Floor Price of REC Up to March 2017 : Rs 9.30/ Kwh » Floor Price of REC Up to March 2022 : Rs 4.65/ Kwh » Realization from Electricity Sale: (Yearly Escalation – 5%) • For Captive Consumer : Rs 6.00/ Kwh • For Third Party Sale : Rs 4.00/ Kwh • APPC (DISCOM) : Rs 3.00/ Kwh
  • 16. Evaluating Expected Revenue Realization Year wise Net Cash Flow in Rs Crs Year REC Period Captive Third Party 1 2014 - 15 1.38 1.04 2 2015 - 16 1.41 1.06 3 2016 - 17 1.45 1.09 4 2017 - 18 0.77 0.39 5 2018 - 19 0.82 0.42 6 2019 - 20 0.87 0.46 7 2020- 21 0.92 0.49 8 2021- 22 0.97 0.53 9 10 11 Pay back Period 4th Year 8th Year APPC 0.87 0.89 0.91 0.20 0.23 0.25 0.28 0.31 0.34 0.37 0.40 11th Year
  • 17. Global Annual Installation: Germany is the Market Leader
  • 19. Levellised Cost Comparison: Utility Scale PV & Conventional Power at Grid Parity
  • 20. Thank You ? Query : mail to – parmarbr@yahoo.co.in or call 9909904332