GOVERNMENT OF ANDHRA PRADESH
ABSTRACT
Clean and Green Energy – Development of Solar Power in Andhra Pradesh
– Andhra Pradesh Solar Power Policy – Order – Issued.
----------------------------------------------------------------------------------------------------------ENERGY (RES-A1) DEPARTMENT
G.O. Ms. No. 39

Dt. 26-09-2012

ORDER:In order to promote generation of power from Solar Power, the State
Government hereby introduce the Andhra Pradesh Solar Policy 2012, as
mentioned below :-

ty

.in

ANDHRA PRADESH SOLAR POWER POLICY -2012

pe
r

PREAMBLE

al

pr
o

Solar power is one of the important renewable energy sources. GoI have
recognized the importance of Solar Energy as one of the future sources of
energy and accordingly National Solar Mission was launched on 14.11.2009,
under the brand name “Solar India” with an objective to maximize generation of
power from solar energy.

st
ri

Andhra Pradesh is one of the suitable locations for installing Solar Power
Projects due to the following favorable factors:
Availability of about 300 sunny days in a year with solar insolation
of 5.5 to 6 KWh/m².

•

Availability of widespread electric grid network, which facilitate
Projects with easy connectivity.
Growing energy demand in the State.

.in

w
w

w

•

du

•

The present situation prevailing in the State with regard to substantial gap
between the demand and supply position of power calls for taking immediate
measures to augment production of energy through non conventional sources on
fast track. Keeping in view the conducive environment present to encourage
solar power and also the fact that the production of solar power is less time
consuming, it has been decided to formulate the following policy to encourage
generation of solar power in the State.
OBJECTIVE :
Main objectives of the Solar power policy are:
1. To encourage, develop and promote solar power generation in the State with
a view to meet the growing demand for power in an environmentally and
economically sustainable manner.
2. To attract investment in the state for the establishment of solar power plants.
3. To promote investments for setting up manufacturing facilities in the State,
which can generate gainful local employment.
Contd. P.2
:: 2 ::
4. To promote the Off-Grid Solar applications to meet the power needs on
Stand-alone basis.
5. To contribute to overall economic development, employment generation and
improvement in public services by provision of electrical energy for various
needs.
6. To encourage Decentralised, Distribution Generation System in the State to
reduce T&D losses.
1. Title
The policy shall be known as the “Andhra Pradesh Solar Power Policy
– 2012 ”
2. Operative Period

.in

The policy shall come into operation with effect from the date of issuance
and shall remain applicable till 2017.

ty

3. Eligible Developers

al

pr
o

pe
r

All registered companies, Central and State power generation/ distribution
companies and public / private sector solar power project developers will be
eligible for setting up of Solar Power Projects, either for the purpose of captive
use and/or for selling of electricity, in accordance with the Electricity Act-2003, as
amended from time to time.

.in

4. Installed capacity

du

st
ri

The entity desiring to set up Solar Power Project, either for sale of power
and/ or for captive use of power within the state, shall submit a proposal to the
Nodal Agency.

w
w

a) Utility Grid Power Projects for Captive use /direct sale to 3rd
Party/States other than A.P. State

w

The State will promote Solar Power Developers to set up Solar Power
Plants for captive use or sale of power to 3rd party/States other than Andhra
Pradesh.
b) Utility Grid Power Projects for sale through RE (Solar) Certificate
Mechanism
The State will promote Solar Power Developers to set up Solar Power
Plants for sale through RE (Solar) Certificate mechanism. The Solar Power
Developers will be required to apply for accreditation to the State Accreditation
Agency and thereafter to Central Agency for registration and issuance of RE
(Solar) certificate under REC mechanism as per order/regulations of appropriate
Commission issued in this regard. SLDC will give clearance for REC applications
within 15 days from the date of application. The Power generated from these
power projects shall be purchased by AP DISCOMs at Pooled Cost of Power
Purchase as determined by A.P.E.R.C. from time to time.
The Solar Power
Developers will sell RE (Solar) Certificates as per the regulations/orders of
A.P.E.R.C.
Contd. P.3
:: 3 ::
5. Open Access for Third Party Sale
If the Open Access is granted to any developer, they shall pay the
applicable Open Access charges and losses as approved by APERC from time
to time for sale to third party outside the State.
6. Wheeling and Transmission Loss
Producer will bear the wheeling and transmission losses as per actual.
7. Banking
Banking of 100% of energy shall be permitted from January to December of that
year. There will be no banking for energy produced being consumed on the same
day. However, banked units can not be consumed/redeemed between February
to June and also during peak hours i.e. 6.30 PM to 10.30 PM. Developer will be
required to pay 2% of the banked energy towards banking charges. The energy
unutilized by December of that year gets lapsed.

.in

8. Incentive:

pr
o

pe
r

ty

In order to encourage the immediate production of Solar Power to reduce
the present gap in demand and supply position of power and provide industries
with a possibility to utilise the power produced through solar power, following
incentives will be extended to those solar power Developers who commission
their solar plant by June 2014. These incentives will be in force for a period of
seven years from the date of implementation.

st
ri

al

a. Wheeling and Transmission Charges

w
w

.in

du

There will be no wheeling and transmission charges for wheeling of power
generated from the Solar Power Projects , to the desired location/s for captive
use/third party sale within the state through 33 KV system subject to industries
maintaining their demand within its contracted demand. However, wheeling and
transmission charges for wheeling of power generated from the Solar Power
Projects for sale outside the state will be as per APERC regulations

w

b. Cross Subsidy charges
Cross subsidy surcharge shall not be applicable for Open Access obtained for
third party sale within the state subject to the industries maintaining their demand
within its contracted demand with the DISCOMs. It is not applicable for captive
use.
c. Electricity Duty exemption
All Solar Power projects will be exempted from paying Electricity Duty for captive
consumption and third party sale within the state.
d. VAT refund
VAT for all the inputs required for solar power projects will be refunded by the
Commercial Tax Department.
e. Refund of Stamp Duty and Registration charges
Industries Department will provide incentive in terms of refund of Stamp Duty and
Registration charges for land purchased for setting up solar power project.
Contd.P.4.
:: 4 ::
f. REC
All projects developed with the above incentives will also be eligible for REC
benefits. Deemed injection into the grid for in-house captive solar generation
plant (in the same premises) will be considered for issue of REC.
9. Grid Connectivity and Evacuation facility
The power generated from a Solar Power Project shall be injected at an
appropriate voltage to the nearest sub-station of the AP Transco / Distribution
Licensee.

.in

The evacuation line from interconnection point to grid substation shall be
laid by the APTRANSCO or DISCOM at the cost of the project developer.
However, if the project developer wishes to lay evacuation line by themselves,
they can do so by paying the supervision charges to APTRANSCO/DISCOM.
APTRANSCO/DISCOMs will ensure the technical feasibility for evacuation is
granted within 21 days of applying.

pe
r

ty

10. Land

pr
o

It is the responsibility of the Project Developer to acquire the land
required for the project.

al

11. Restriction on use of Fossil Fuels

du

st
ri

No fossil fuel viz., Coal, gas, lignite, naphtha, wood etc., shall be allowed
to be used in a Solar Power Plant.

.in

12. Reactive Power Charges

w

w
w

The drawl of Reactive Power by the solar power plant shall be charged as
decided by the APERC.
13. Nodal Agency
New and Renewable Energy Development Corporation of A.P. Ltd
(NREDCAP) shall be the State Govt. Nodal Agency for clearance, facilitation and
implementation of the proposed Solar Power Policy.
14. Project Monitoring
A “High Level Committee” constituted with the following members will
monitor the progress of implementation of the Solar Power projects cleared
under the proposed policy:
1. Principal Secretary, Energy Department
2. Principal Secretary, Industries and CIP
3. V.C.& Managing Director, NREDCAP (Member-Convener)
4. Chairman and Managing Director, APTRANSCO
5. Commissioner, Commercial Tax.
6. One C&MD of DISCOMs by rotation ( One Year).
7. Representative of Finance Department.
8. Representative of FAPCCI and CII.
9. One representative from Solar Power Developers
Contd. P.5
:: 5 ::
If any difficulty arises in giving effect to this policy, the High Level
Committee is authorized to issue clarification as well as interpretation to such
provisions, as may appear to be necessary for removing the difficultly either on
its own motion or after hearing those parties who have represented.
15. Review
State Govt. will undertake review of this policy after a period of two years.

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF ANDHRA PRADESH)

MRUTUNJAY SAHOO
PRINCIPAL SECRETARY TO GOVERNMENT
To

pr
o

pe
r

ty

.in

The VC & Managing Director, NREDCAP, Hyderabad.
The Chairman & Managing Director, APTRANSCO.
The Managing Director, APGENCO.
The Secretary, APERC.
All CMD of DISCOMs.
All Collectors & District Magistrates.
The Special CS to Government, EFS&T Dept., Govt. of A.P.,
The Principal Secretary to Government, Revenue Dept., Govt. of A.P.

al

Copy to

w

w
w

.in

du

st
ri

The Principal Secretary To Hon’ble C.M.
The P.S. to Hon’ble Minister for Finance, Planning, Small Savings &
State Lotteries.
The P.S. to Hon’ble Minister for Revenue, Relief, Rehabilitation & ULC.
The P.S. to Hon’ble Minister for Major Industries, Sugar, Commerce
& Export Promotion.
The P.S. to Hon’ble Minister for Agriculture & Agriculture Technology
Mission.
The P.S. to Hon’ble Minister for Major and Medium Irrigation, A.P. Water
Resources Development Corpn.
The P.S. to Hon’ble Minister for Housing, Weaker Section Housing
Programme, A.P. Cooperative Housing Societies Federation and AP
Housing Board.
The P.S. to Principal Secretary, Energy.
SF/SC.
// FORWARDED : BY ORDER//
SECTION OFFICER

Weitere ähnliche Inhalte

Was ist angesagt?

Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s Guide
Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s GuideUtility-Scale Solar Photovoltaic Power Plants - A Project Developer’s Guide
Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s GuidePrivate Consultants
 
Captive Power Plants.pdf
Captive Power Plants.pdfCaptive Power Plants.pdf
Captive Power Plants.pdfSourav Bhunia
 
Seminar Presentation on Neclear battery
Seminar Presentation on Neclear batterySeminar Presentation on Neclear battery
Seminar Presentation on Neclear batteryLekhraJ Meena
 
Solar energy presentation(sayef amin 01924122222/01614122222/04475122222)
Solar energy presentation(sayef amin 01924122222/01614122222/04475122222)Solar energy presentation(sayef amin 01924122222/01614122222/04475122222)
Solar energy presentation(sayef amin 01924122222/01614122222/04475122222)Asian Paint Bangladesh Ltd
 
Land acquisition for NH under the NH act, 1956
Land acquisition for NH under the NH act, 1956Land acquisition for NH under the NH act, 1956
Land acquisition for NH under the NH act, 19569437903444
 
Cross Border Electricity Trade
Cross Border Electricity TradeCross Border Electricity Trade
Cross Border Electricity TradeIPPAI
 
Indian electricity market and power exchanges
Indian electricity market and power exchangesIndian electricity market and power exchanges
Indian electricity market and power exchangesNageswar Rao
 
Potential of Solar energy in India
Potential of Solar energy in IndiaPotential of Solar energy in India
Potential of Solar energy in Indiasandeep nain
 
Competitive Bidding in the Power Sector : Is It Working?
Competitive Bidding in the Power Sector : Is It Working?Competitive Bidding in the Power Sector : Is It Working?
Competitive Bidding in the Power Sector : Is It Working?IPPAI
 
Internship report of NTPC kawas ,summer internship report of ntpc
Internship report of  NTPC kawas ,summer internship report of ntpcInternship report of  NTPC kawas ,summer internship report of ntpc
Internship report of NTPC kawas ,summer internship report of ntpcLalitGoyal27
 
Feasibility of Solar Project with Open Access in Maharashtra
Feasibility of Solar Project with Open Access in Maharashtra Feasibility of Solar Project with Open Access in Maharashtra
Feasibility of Solar Project with Open Access in Maharashtra Gensol Engineering Limited
 
Molten carbonate fuel cell
Molten carbonate fuel cellMolten carbonate fuel cell
Molten carbonate fuel celltanveer aali
 
Future of solar Power Projects in India
Future of solar Power Projects in IndiaFuture of solar Power Projects in India
Future of solar Power Projects in IndiaHarish Sharma
 
Captive power Policy
Captive power PolicyCaptive power Policy
Captive power PolicyPRIYANK JAIN
 
Ultracapacitors for Hybrid and Electric Vehicles - SAE HEV EV Symposium 2013...
Ultracapacitors for Hybrid and Electric Vehicles - SAE HEV  EV Symposium 2013...Ultracapacitors for Hybrid and Electric Vehicles - SAE HEV  EV Symposium 2013...
Ultracapacitors for Hybrid and Electric Vehicles - SAE HEV EV Symposium 2013...Shaw Lynds
 
Solar pv -simulation and designing
Solar pv -simulation and designingSolar pv -simulation and designing
Solar pv -simulation and designingTusharKumarSingh4
 

Was ist angesagt? (20)

Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s Guide
Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s GuideUtility-Scale Solar Photovoltaic Power Plants - A Project Developer’s Guide
Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s Guide
 
Captive Power Plants.pdf
Captive Power Plants.pdfCaptive Power Plants.pdf
Captive Power Plants.pdf
 
Seminar Presentation on Neclear battery
Seminar Presentation on Neclear batterySeminar Presentation on Neclear battery
Seminar Presentation on Neclear battery
 
Solar energy presentation(sayef amin 01924122222/01614122222/04475122222)
Solar energy presentation(sayef amin 01924122222/01614122222/04475122222)Solar energy presentation(sayef amin 01924122222/01614122222/04475122222)
Solar energy presentation(sayef amin 01924122222/01614122222/04475122222)
 
Land acquisition for NH under the NH act, 1956
Land acquisition for NH under the NH act, 1956Land acquisition for NH under the NH act, 1956
Land acquisition for NH under the NH act, 1956
 
Presentation by MNRE on Solar Parks
Presentation by MNRE on Solar ParksPresentation by MNRE on Solar Parks
Presentation by MNRE on Solar Parks
 
Cross Border Electricity Trade
Cross Border Electricity TradeCross Border Electricity Trade
Cross Border Electricity Trade
 
Indian electricity market and power exchanges
Indian electricity market and power exchangesIndian electricity market and power exchanges
Indian electricity market and power exchanges
 
Potential of Solar energy in India
Potential of Solar energy in IndiaPotential of Solar energy in India
Potential of Solar energy in India
 
Kerala Land relinquishment Act - jamesadhikaram land consultancy 9447464502
Kerala Land relinquishment Act -  jamesadhikaram land consultancy 9447464502Kerala Land relinquishment Act -  jamesadhikaram land consultancy 9447464502
Kerala Land relinquishment Act - jamesadhikaram land consultancy 9447464502
 
Competitive Bidding in the Power Sector : Is It Working?
Competitive Bidding in the Power Sector : Is It Working?Competitive Bidding in the Power Sector : Is It Working?
Competitive Bidding in the Power Sector : Is It Working?
 
Internship report of NTPC kawas ,summer internship report of ntpc
Internship report of  NTPC kawas ,summer internship report of ntpcInternship report of  NTPC kawas ,summer internship report of ntpc
Internship report of NTPC kawas ,summer internship report of ntpc
 
Feasibility of Solar Project with Open Access in Maharashtra
Feasibility of Solar Project with Open Access in Maharashtra Feasibility of Solar Project with Open Access in Maharashtra
Feasibility of Solar Project with Open Access in Maharashtra
 
Molten carbonate fuel cell
Molten carbonate fuel cellMolten carbonate fuel cell
Molten carbonate fuel cell
 
Report ntpc
Report ntpcReport ntpc
Report ntpc
 
Future of solar Power Projects in India
Future of solar Power Projects in IndiaFuture of solar Power Projects in India
Future of solar Power Projects in India
 
Captive power Policy
Captive power PolicyCaptive power Policy
Captive power Policy
 
Ultracapacitors for Hybrid and Electric Vehicles - SAE HEV EV Symposium 2013...
Ultracapacitors for Hybrid and Electric Vehicles - SAE HEV  EV Symposium 2013...Ultracapacitors for Hybrid and Electric Vehicles - SAE HEV  EV Symposium 2013...
Ultracapacitors for Hybrid and Electric Vehicles - SAE HEV EV Symposium 2013...
 
Gensol - EPC Services
Gensol - EPC ServicesGensol - EPC Services
Gensol - EPC Services
 
Solar pv -simulation and designing
Solar pv -simulation and designingSolar pv -simulation and designing
Solar pv -simulation and designing
 

Andere mochten auch

Arunachal Pradesh Industrial Policy 2008
Arunachal Pradesh Industrial Policy 2008Arunachal Pradesh Industrial Policy 2008
Arunachal Pradesh Industrial Policy 2008Bakul Haria
 
Cooking Up Drama - ChefConf 2015
Cooking Up Drama - ChefConf 2015 Cooking Up Drama - ChefConf 2015
Cooking Up Drama - ChefConf 2015 Chef
 
Adoptamos un cacho de río 2007 2008
Adoptamos un cacho de río 2007  2008Adoptamos un cacho de río 2007  2008
Adoptamos un cacho de río 2007 2008radiorasca
 
Konsep pelaporan aplikasi monitoring pemupukan
Konsep pelaporan aplikasi monitoring pemupukanKonsep pelaporan aplikasi monitoring pemupukan
Konsep pelaporan aplikasi monitoring pemupukanaditya wicaksana
 
Promoção especial midia virgem para exames diagnóstico por imagem clínicas e ...
Promoção especial midia virgem para exames diagnóstico por imagem clínicas e ...Promoção especial midia virgem para exames diagnóstico por imagem clínicas e ...
Promoção especial midia virgem para exames diagnóstico por imagem clínicas e ...Jair Szapiro
 
Andhra pradesh electronic hardware policy 2012 2017
Andhra pradesh electronic hardware policy 2012 2017Andhra pradesh electronic hardware policy 2012 2017
Andhra pradesh electronic hardware policy 2012 2017Bakul Haria
 

Andere mochten auch (9)

Arunachal Pradesh Industrial Policy 2008
Arunachal Pradesh Industrial Policy 2008Arunachal Pradesh Industrial Policy 2008
Arunachal Pradesh Industrial Policy 2008
 
Seo2india the social semantic web
Seo2india the social semantic webSeo2india the social semantic web
Seo2india the social semantic web
 
Cooking Up Drama - ChefConf 2015
Cooking Up Drama - ChefConf 2015 Cooking Up Drama - ChefConf 2015
Cooking Up Drama - ChefConf 2015
 
Client handbook
Client handbookClient handbook
Client handbook
 
Promo
PromoPromo
Promo
 
Adoptamos un cacho de río 2007 2008
Adoptamos un cacho de río 2007  2008Adoptamos un cacho de río 2007  2008
Adoptamos un cacho de río 2007 2008
 
Konsep pelaporan aplikasi monitoring pemupukan
Konsep pelaporan aplikasi monitoring pemupukanKonsep pelaporan aplikasi monitoring pemupukan
Konsep pelaporan aplikasi monitoring pemupukan
 
Promoção especial midia virgem para exames diagnóstico por imagem clínicas e ...
Promoção especial midia virgem para exames diagnóstico por imagem clínicas e ...Promoção especial midia virgem para exames diagnóstico por imagem clínicas e ...
Promoção especial midia virgem para exames diagnóstico por imagem clínicas e ...
 
Andhra pradesh electronic hardware policy 2012 2017
Andhra pradesh electronic hardware policy 2012 2017Andhra pradesh electronic hardware policy 2012 2017
Andhra pradesh electronic hardware policy 2012 2017
 

Ähnlich wie Andhra Pradesh solar power policy 2012

Ap solar policy 2012.
Ap solar policy 2012.Ap solar policy 2012.
Ap solar policy 2012.antastoya
 
Andhra pradesh solar policy 2015
Andhra pradesh solar policy 2015Andhra pradesh solar policy 2015
Andhra pradesh solar policy 2015Headway Solar
 
Uttar pradesh solar rooftop policy 2014
Uttar pradesh solar rooftop policy 2014Uttar pradesh solar rooftop policy 2014
Uttar pradesh solar rooftop policy 2014Headway Solar
 
Jharkhand solar power policy 2013
Jharkhand solar power policy 2013Jharkhand solar power policy 2013
Jharkhand solar power policy 2013Headway Solar
 
UP Solar Power Policy 2013
UP Solar Power Policy 2013UP Solar Power Policy 2013
UP Solar Power Policy 2013Headway Solar
 
J&K Solar policy 2010
J&K Solar policy 2010J&K Solar policy 2010
J&K Solar policy 2010Headway Solar
 
Manipur solar policy 2014
Manipur solar policy 2014Manipur solar policy 2014
Manipur solar policy 2014Headway Solar
 
Session 13 national policy & regulatory framework & available incentives
Session 13   national policy & regulatory framework & available incentivesSession 13   national policy & regulatory framework & available incentives
Session 13 national policy & regulatory framework & available incentivesChirag Jain
 
Gujarat Wind Power Policy 2013
Gujarat Wind Power Policy 2013Gujarat Wind Power Policy 2013
Gujarat Wind Power Policy 2013Spark Network
 
Draft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsDraft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsSanman Rajput
 
Madhya pradesh solar policy 2012
Madhya pradesh solar policy 2012Madhya pradesh solar policy 2012
Madhya pradesh solar policy 2012Headway Solar
 
Saudi Arabia-Solar power business plans
Saudi Arabia-Solar power business plansSaudi Arabia-Solar power business plans
Saudi Arabia-Solar power business plansSHAIK AMANULLA
 
20 MW Canal Top Solar RfP by PEDA
20 MW Canal Top Solar RfP by PEDA20 MW Canal Top Solar RfP by PEDA
20 MW Canal Top Solar RfP by PEDAHarish Sharma
 
Issuance of Ministry of Energy and Mineral Resources Regulation No. 2 of 2024...
Issuance of Ministry of Energy and Mineral Resources Regulation No. 2 of 2024...Issuance of Ministry of Energy and Mineral Resources Regulation No. 2 of 2024...
Issuance of Ministry of Energy and Mineral Resources Regulation No. 2 of 2024...AHRP Law Firm
 

Ähnlich wie Andhra Pradesh solar power policy 2012 (20)

Ap solar policy 2012.
Ap solar policy 2012.Ap solar policy 2012.
Ap solar policy 2012.
 
Andhra pradesh solar policy 2015
Andhra pradesh solar policy 2015Andhra pradesh solar policy 2015
Andhra pradesh solar policy 2015
 
Uttar pradesh solar rooftop policy 2014
Uttar pradesh solar rooftop policy 2014Uttar pradesh solar rooftop policy 2014
Uttar pradesh solar rooftop policy 2014
 
Solar Presentation
Solar PresentationSolar Presentation
Solar Presentation
 
Jharkhand solar power policy 2013
Jharkhand solar power policy 2013Jharkhand solar power policy 2013
Jharkhand solar power policy 2013
 
UP Solar Power Policy 2013
UP Solar Power Policy 2013UP Solar Power Policy 2013
UP Solar Power Policy 2013
 
J&K Solar policy 2010
J&K Solar policy 2010J&K Solar policy 2010
J&K Solar policy 2010
 
Manipur solar policy 2014
Manipur solar policy 2014Manipur solar policy 2014
Manipur solar policy 2014
 
Solar power - A developer prespective
Solar power - A developer prespectiveSolar power - A developer prespective
Solar power - A developer prespective
 
Session 13 national policy & regulatory framework & available incentives
Session 13   national policy & regulatory framework & available incentivesSession 13   national policy & regulatory framework & available incentives
Session 13 national policy & regulatory framework & available incentives
 
Final faq booklet
Final faq bookletFinal faq booklet
Final faq booklet
 
Gujarat Wind Power Policy 2013
Gujarat Wind Power Policy 2013Gujarat Wind Power Policy 2013
Gujarat Wind Power Policy 2013
 
Draft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsDraft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projects
 
Madhya pradesh solar policy 2012
Madhya pradesh solar policy 2012Madhya pradesh solar policy 2012
Madhya pradesh solar policy 2012
 
Saudi Arabia-Solar power business plans
Saudi Arabia-Solar power business plansSaudi Arabia-Solar power business plans
Saudi Arabia-Solar power business plans
 
20 MW Canal Top Solar RfP by PEDA
20 MW Canal Top Solar RfP by PEDA20 MW Canal Top Solar RfP by PEDA
20 MW Canal Top Solar RfP by PEDA
 
Grid Connected Roof Top Solar Power Generation: A Review
Grid Connected Roof Top Solar Power Generation: A ReviewGrid Connected Roof Top Solar Power Generation: A Review
Grid Connected Roof Top Solar Power Generation: A Review
 
SOLAR MISSION
SOLAR MISSION SOLAR MISSION
SOLAR MISSION
 
Issuance of Ministry of Energy and Mineral Resources Regulation No. 2 of 2024...
Issuance of Ministry of Energy and Mineral Resources Regulation No. 2 of 2024...Issuance of Ministry of Energy and Mineral Resources Regulation No. 2 of 2024...
Issuance of Ministry of Energy and Mineral Resources Regulation No. 2 of 2024...
 
Solar power plant Opportunity and Costing
Solar power plant Opportunity and CostingSolar power plant Opportunity and Costing
Solar power plant Opportunity and Costing
 

Mehr von Bakul Haria

Maharashtra Package Scheme of Incentives for Industries 1993
Maharashtra Package Scheme of Incentives for Industries 1993Maharashtra Package Scheme of Incentives for Industries 1993
Maharashtra Package Scheme of Incentives for Industries 1993Bakul Haria
 
Maharashtra Industrial Policy 2013
Maharashtra Industrial Policy  2013Maharashtra Industrial Policy  2013
Maharashtra Industrial Policy 2013Bakul Haria
 
Maharashtra Industrial Policy 2013
Maharashtra Industrial Policy  2013Maharashtra Industrial Policy  2013
Maharashtra Industrial Policy 2013Bakul Haria
 
Maharashtra Textile Policy
Maharashtra Textile PolicyMaharashtra Textile Policy
Maharashtra Textile PolicyBakul Haria
 
Maharashtra Industrial policy of 2013, Incentives for Investment.
Maharashtra Industrial policy of 2013, Incentives for Investment.Maharashtra Industrial policy of 2013, Incentives for Investment.
Maharashtra Industrial policy of 2013, Incentives for Investment.Bakul Haria
 
Maharashtra Biotechnology policy 2001
Maharashtra Biotechnology policy 2001Maharashtra Biotechnology policy 2001
Maharashtra Biotechnology policy 2001Bakul Haria
 
Madhya Pradesh Investment policy 2012
Madhya Pradesh Investment policy 2012Madhya Pradesh Investment policy 2012
Madhya Pradesh Investment policy 2012Bakul Haria
 
Madhya pradesh industrial promotion policy 2010
Madhya pradesh industrial promotion  policy 2010Madhya pradesh industrial promotion  policy 2010
Madhya pradesh industrial promotion policy 2010Bakul Haria
 
Kerala industrial & commercial policy 2011
Kerala industrial & commercial policy 2011Kerala industrial & commercial policy 2011
Kerala industrial & commercial policy 2011Bakul Haria
 
Karnataka industrial policy 2009 14
Karnataka industrial policy 2009 14Karnataka industrial policy 2009 14
Karnataka industrial policy 2009 14Bakul Haria
 
Jharkhand Policy 2013
Jharkhand Policy 2013Jharkhand Policy 2013
Jharkhand Policy 2013Bakul Haria
 
Jammu kashmir industrial policy 2004
Jammu kashmir industrial policy 2004Jammu kashmir industrial policy 2004
Jammu kashmir industrial policy 2004Bakul Haria
 
Himachal Pradesh Industrial policy 2013
Himachal Pradesh Industrial policy 2013Himachal Pradesh Industrial policy 2013
Himachal Pradesh Industrial policy 2013Bakul Haria
 
Haryana Industry Policy-2009-2011
Haryana Industry Policy-2009-2011Haryana Industry Policy-2009-2011
Haryana Industry Policy-2009-2011Bakul Haria
 
Gujarat Industrial Policy-2009-at-a-glance
Gujarat Industrial Policy-2009-at-a-glanceGujarat Industrial Policy-2009-at-a-glance
Gujarat Industrial Policy-2009-at-a-glanceBakul Haria
 
Gujarat Industrial policy 2009
Gujarat Industrial policy 2009Gujarat Industrial policy 2009
Gujarat Industrial policy 2009Bakul Haria
 
Gujarat Agro Industrial Policy 2000
Gujarat Agro Industrial Policy 2000Gujarat Agro Industrial Policy 2000
Gujarat Agro Industrial Policy 2000Bakul Haria
 
Goa Ind policy 2003-14
Goa Ind policy 2003-14Goa Ind policy 2003-14
Goa Ind policy 2003-14Bakul Haria
 
Delhi Industrial Policy 2010 2021
Delhi Industrial Policy  2010 2021Delhi Industrial Policy  2010 2021
Delhi Industrial Policy 2010 2021Bakul Haria
 
Chhattisgarh Investment policy 2012 17
Chhattisgarh Investment policy 2012 17Chhattisgarh Investment policy 2012 17
Chhattisgarh Investment policy 2012 17Bakul Haria
 

Mehr von Bakul Haria (20)

Maharashtra Package Scheme of Incentives for Industries 1993
Maharashtra Package Scheme of Incentives for Industries 1993Maharashtra Package Scheme of Incentives for Industries 1993
Maharashtra Package Scheme of Incentives for Industries 1993
 
Maharashtra Industrial Policy 2013
Maharashtra Industrial Policy  2013Maharashtra Industrial Policy  2013
Maharashtra Industrial Policy 2013
 
Maharashtra Industrial Policy 2013
Maharashtra Industrial Policy  2013Maharashtra Industrial Policy  2013
Maharashtra Industrial Policy 2013
 
Maharashtra Textile Policy
Maharashtra Textile PolicyMaharashtra Textile Policy
Maharashtra Textile Policy
 
Maharashtra Industrial policy of 2013, Incentives for Investment.
Maharashtra Industrial policy of 2013, Incentives for Investment.Maharashtra Industrial policy of 2013, Incentives for Investment.
Maharashtra Industrial policy of 2013, Incentives for Investment.
 
Maharashtra Biotechnology policy 2001
Maharashtra Biotechnology policy 2001Maharashtra Biotechnology policy 2001
Maharashtra Biotechnology policy 2001
 
Madhya Pradesh Investment policy 2012
Madhya Pradesh Investment policy 2012Madhya Pradesh Investment policy 2012
Madhya Pradesh Investment policy 2012
 
Madhya pradesh industrial promotion policy 2010
Madhya pradesh industrial promotion  policy 2010Madhya pradesh industrial promotion  policy 2010
Madhya pradesh industrial promotion policy 2010
 
Kerala industrial & commercial policy 2011
Kerala industrial & commercial policy 2011Kerala industrial & commercial policy 2011
Kerala industrial & commercial policy 2011
 
Karnataka industrial policy 2009 14
Karnataka industrial policy 2009 14Karnataka industrial policy 2009 14
Karnataka industrial policy 2009 14
 
Jharkhand Policy 2013
Jharkhand Policy 2013Jharkhand Policy 2013
Jharkhand Policy 2013
 
Jammu kashmir industrial policy 2004
Jammu kashmir industrial policy 2004Jammu kashmir industrial policy 2004
Jammu kashmir industrial policy 2004
 
Himachal Pradesh Industrial policy 2013
Himachal Pradesh Industrial policy 2013Himachal Pradesh Industrial policy 2013
Himachal Pradesh Industrial policy 2013
 
Haryana Industry Policy-2009-2011
Haryana Industry Policy-2009-2011Haryana Industry Policy-2009-2011
Haryana Industry Policy-2009-2011
 
Gujarat Industrial Policy-2009-at-a-glance
Gujarat Industrial Policy-2009-at-a-glanceGujarat Industrial Policy-2009-at-a-glance
Gujarat Industrial Policy-2009-at-a-glance
 
Gujarat Industrial policy 2009
Gujarat Industrial policy 2009Gujarat Industrial policy 2009
Gujarat Industrial policy 2009
 
Gujarat Agro Industrial Policy 2000
Gujarat Agro Industrial Policy 2000Gujarat Agro Industrial Policy 2000
Gujarat Agro Industrial Policy 2000
 
Goa Ind policy 2003-14
Goa Ind policy 2003-14Goa Ind policy 2003-14
Goa Ind policy 2003-14
 
Delhi Industrial Policy 2010 2021
Delhi Industrial Policy  2010 2021Delhi Industrial Policy  2010 2021
Delhi Industrial Policy 2010 2021
 
Chhattisgarh Investment policy 2012 17
Chhattisgarh Investment policy 2012 17Chhattisgarh Investment policy 2012 17
Chhattisgarh Investment policy 2012 17
 

Kürzlich hochgeladen

[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfhans926745
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024The Digital Insurer
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUK Journal
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
Evaluating the top large language models.pdf
Evaluating the top large language models.pdfEvaluating the top large language models.pdf
Evaluating the top large language models.pdfChristopherTHyatt
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 

Kürzlich hochgeladen (20)

[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdf
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Evaluating the top large language models.pdf
Evaluating the top large language models.pdfEvaluating the top large language models.pdf
Evaluating the top large language models.pdf
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 

Andhra Pradesh solar power policy 2012

  • 1. GOVERNMENT OF ANDHRA PRADESH ABSTRACT Clean and Green Energy – Development of Solar Power in Andhra Pradesh – Andhra Pradesh Solar Power Policy – Order – Issued. ----------------------------------------------------------------------------------------------------------ENERGY (RES-A1) DEPARTMENT G.O. Ms. No. 39 Dt. 26-09-2012 ORDER:In order to promote generation of power from Solar Power, the State Government hereby introduce the Andhra Pradesh Solar Policy 2012, as mentioned below :- ty .in ANDHRA PRADESH SOLAR POWER POLICY -2012 pe r PREAMBLE al pr o Solar power is one of the important renewable energy sources. GoI have recognized the importance of Solar Energy as one of the future sources of energy and accordingly National Solar Mission was launched on 14.11.2009, under the brand name “Solar India” with an objective to maximize generation of power from solar energy. st ri Andhra Pradesh is one of the suitable locations for installing Solar Power Projects due to the following favorable factors: Availability of about 300 sunny days in a year with solar insolation of 5.5 to 6 KWh/m². • Availability of widespread electric grid network, which facilitate Projects with easy connectivity. Growing energy demand in the State. .in w w w • du • The present situation prevailing in the State with regard to substantial gap between the demand and supply position of power calls for taking immediate measures to augment production of energy through non conventional sources on fast track. Keeping in view the conducive environment present to encourage solar power and also the fact that the production of solar power is less time consuming, it has been decided to formulate the following policy to encourage generation of solar power in the State. OBJECTIVE : Main objectives of the Solar power policy are: 1. To encourage, develop and promote solar power generation in the State with a view to meet the growing demand for power in an environmentally and economically sustainable manner. 2. To attract investment in the state for the establishment of solar power plants. 3. To promote investments for setting up manufacturing facilities in the State, which can generate gainful local employment. Contd. P.2
  • 2. :: 2 :: 4. To promote the Off-Grid Solar applications to meet the power needs on Stand-alone basis. 5. To contribute to overall economic development, employment generation and improvement in public services by provision of electrical energy for various needs. 6. To encourage Decentralised, Distribution Generation System in the State to reduce T&D losses. 1. Title The policy shall be known as the “Andhra Pradesh Solar Power Policy – 2012 ” 2. Operative Period .in The policy shall come into operation with effect from the date of issuance and shall remain applicable till 2017. ty 3. Eligible Developers al pr o pe r All registered companies, Central and State power generation/ distribution companies and public / private sector solar power project developers will be eligible for setting up of Solar Power Projects, either for the purpose of captive use and/or for selling of electricity, in accordance with the Electricity Act-2003, as amended from time to time. .in 4. Installed capacity du st ri The entity desiring to set up Solar Power Project, either for sale of power and/ or for captive use of power within the state, shall submit a proposal to the Nodal Agency. w w a) Utility Grid Power Projects for Captive use /direct sale to 3rd Party/States other than A.P. State w The State will promote Solar Power Developers to set up Solar Power Plants for captive use or sale of power to 3rd party/States other than Andhra Pradesh. b) Utility Grid Power Projects for sale through RE (Solar) Certificate Mechanism The State will promote Solar Power Developers to set up Solar Power Plants for sale through RE (Solar) Certificate mechanism. The Solar Power Developers will be required to apply for accreditation to the State Accreditation Agency and thereafter to Central Agency for registration and issuance of RE (Solar) certificate under REC mechanism as per order/regulations of appropriate Commission issued in this regard. SLDC will give clearance for REC applications within 15 days from the date of application. The Power generated from these power projects shall be purchased by AP DISCOMs at Pooled Cost of Power Purchase as determined by A.P.E.R.C. from time to time. The Solar Power Developers will sell RE (Solar) Certificates as per the regulations/orders of A.P.E.R.C. Contd. P.3
  • 3. :: 3 :: 5. Open Access for Third Party Sale If the Open Access is granted to any developer, they shall pay the applicable Open Access charges and losses as approved by APERC from time to time for sale to third party outside the State. 6. Wheeling and Transmission Loss Producer will bear the wheeling and transmission losses as per actual. 7. Banking Banking of 100% of energy shall be permitted from January to December of that year. There will be no banking for energy produced being consumed on the same day. However, banked units can not be consumed/redeemed between February to June and also during peak hours i.e. 6.30 PM to 10.30 PM. Developer will be required to pay 2% of the banked energy towards banking charges. The energy unutilized by December of that year gets lapsed. .in 8. Incentive: pr o pe r ty In order to encourage the immediate production of Solar Power to reduce the present gap in demand and supply position of power and provide industries with a possibility to utilise the power produced through solar power, following incentives will be extended to those solar power Developers who commission their solar plant by June 2014. These incentives will be in force for a period of seven years from the date of implementation. st ri al a. Wheeling and Transmission Charges w w .in du There will be no wheeling and transmission charges for wheeling of power generated from the Solar Power Projects , to the desired location/s for captive use/third party sale within the state through 33 KV system subject to industries maintaining their demand within its contracted demand. However, wheeling and transmission charges for wheeling of power generated from the Solar Power Projects for sale outside the state will be as per APERC regulations w b. Cross Subsidy charges Cross subsidy surcharge shall not be applicable for Open Access obtained for third party sale within the state subject to the industries maintaining their demand within its contracted demand with the DISCOMs. It is not applicable for captive use. c. Electricity Duty exemption All Solar Power projects will be exempted from paying Electricity Duty for captive consumption and third party sale within the state. d. VAT refund VAT for all the inputs required for solar power projects will be refunded by the Commercial Tax Department. e. Refund of Stamp Duty and Registration charges Industries Department will provide incentive in terms of refund of Stamp Duty and Registration charges for land purchased for setting up solar power project. Contd.P.4.
  • 4. :: 4 :: f. REC All projects developed with the above incentives will also be eligible for REC benefits. Deemed injection into the grid for in-house captive solar generation plant (in the same premises) will be considered for issue of REC. 9. Grid Connectivity and Evacuation facility The power generated from a Solar Power Project shall be injected at an appropriate voltage to the nearest sub-station of the AP Transco / Distribution Licensee. .in The evacuation line from interconnection point to grid substation shall be laid by the APTRANSCO or DISCOM at the cost of the project developer. However, if the project developer wishes to lay evacuation line by themselves, they can do so by paying the supervision charges to APTRANSCO/DISCOM. APTRANSCO/DISCOMs will ensure the technical feasibility for evacuation is granted within 21 days of applying. pe r ty 10. Land pr o It is the responsibility of the Project Developer to acquire the land required for the project. al 11. Restriction on use of Fossil Fuels du st ri No fossil fuel viz., Coal, gas, lignite, naphtha, wood etc., shall be allowed to be used in a Solar Power Plant. .in 12. Reactive Power Charges w w w The drawl of Reactive Power by the solar power plant shall be charged as decided by the APERC. 13. Nodal Agency New and Renewable Energy Development Corporation of A.P. Ltd (NREDCAP) shall be the State Govt. Nodal Agency for clearance, facilitation and implementation of the proposed Solar Power Policy. 14. Project Monitoring A “High Level Committee” constituted with the following members will monitor the progress of implementation of the Solar Power projects cleared under the proposed policy: 1. Principal Secretary, Energy Department 2. Principal Secretary, Industries and CIP 3. V.C.& Managing Director, NREDCAP (Member-Convener) 4. Chairman and Managing Director, APTRANSCO 5. Commissioner, Commercial Tax. 6. One C&MD of DISCOMs by rotation ( One Year). 7. Representative of Finance Department. 8. Representative of FAPCCI and CII. 9. One representative from Solar Power Developers Contd. P.5
  • 5. :: 5 :: If any difficulty arises in giving effect to this policy, the High Level Committee is authorized to issue clarification as well as interpretation to such provisions, as may appear to be necessary for removing the difficultly either on its own motion or after hearing those parties who have represented. 15. Review State Govt. will undertake review of this policy after a period of two years. (BY ORDER AND IN THE NAME OF THE GOVERNOR OF ANDHRA PRADESH) MRUTUNJAY SAHOO PRINCIPAL SECRETARY TO GOVERNMENT To pr o pe r ty .in The VC & Managing Director, NREDCAP, Hyderabad. The Chairman & Managing Director, APTRANSCO. The Managing Director, APGENCO. The Secretary, APERC. All CMD of DISCOMs. All Collectors & District Magistrates. The Special CS to Government, EFS&T Dept., Govt. of A.P., The Principal Secretary to Government, Revenue Dept., Govt. of A.P. al Copy to w w w .in du st ri The Principal Secretary To Hon’ble C.M. The P.S. to Hon’ble Minister for Finance, Planning, Small Savings & State Lotteries. The P.S. to Hon’ble Minister for Revenue, Relief, Rehabilitation & ULC. The P.S. to Hon’ble Minister for Major Industries, Sugar, Commerce & Export Promotion. The P.S. to Hon’ble Minister for Agriculture & Agriculture Technology Mission. The P.S. to Hon’ble Minister for Major and Medium Irrigation, A.P. Water Resources Development Corpn. The P.S. to Hon’ble Minister for Housing, Weaker Section Housing Programme, A.P. Cooperative Housing Societies Federation and AP Housing Board. The P.S. to Principal Secretary, Energy. SF/SC. // FORWARDED : BY ORDER// SECTION OFFICER