“Gas Power Plant”
NTPC DADRI (U.P.)
By - Ayush Srivastava
B.Tech (EN) 4th
year
Topics to be covered:
• Introduction
• Gas turbine
• Generator
• Units Configuration
• Start-up And Applications of Gas Turbines
• combined cycle process
• Waste heat recovery boiler(WHRB)
• Steam turbine
• Advantages & Applications
• NTPC Limited is an Indian PSU Public Sector Undertaking , engaged in the business
of generation of electricity .
• The headquarters of the company is situated at New Delhi. NTPC's core business is
generation and sale of electricity to state-owned power distribution companies and
State Electricity Boards in India.
• The company also undertakes consultancy and turnkey project contracts that
involve engineering, project management, construction management and
operation and management of power plants.
• NTPC is the largest power generation company of India with an electric power
generating capacity of 47228 MW .
• A public sector company, it was incorporated in the year 1975 to accelerate
power development in the country as a wholly owned company of the
Government of India.
• 15 coal based (24,395 MW),
• 7 gas based (3,955 MW)
History
• The company was founded in November 1975 as "National
Thermal Power Corporation Private Limited".
• It started work on its first thermal power project in 1976 at
Shaktinagar (named NationalThermal Power Corporation
Private Limited Singrauli) in Uttar Pradesh.
• In the same year, its name was changed to "NationalThermal
Power Corporation Limited".
• In 1983, NTPC began commercial operations (of selling
power) and earned profits of INR 4.5 crores in FY 1982-83. By
the end of 1985, it had achieved power generation capacity of
2000 MW.
 NTPC Dadri plant and township are property of ntpc ltd. and were built around
1988-1990.
 NTPC Dadri is a unique power plant of NTPC group which has both coal based
thermal plant and gas based thermal plant & it also comprises solar plant as well.
 Toal capacity of coal plant is1820 MW and gas plant is 817 MW .
 Solar plant is of 5 MW
 Total power generated is 2642 MW
NTPC DADRI
“Coal plant”
Stage Unit Number
Installed Capacity
(MW)
Date of
Commissioning
1st 1 210 1991 October
1st 2 210 1992 December
1st 3 210 1993 March
1st 4 210 1994 March
2nd 5 490 2010 January
2nd 6 490 2010 July
Total Six 1820
• The coal for the power plant is sourced from Piparwar Mines, Jharkhand.
• Source of water for the power plant is Upper Ganga Canal.
“Gas plant”
Stage Unit Number
Installed
Capacity (MW)
Date of
Commissioning
GT / ST
1st
1 130.19 1992 March GT
2 130.19 1992 May GT
3 130.19 1992 June GT
4 130.19 1992 November GT
5 154.51 1993 February ST
6 154.51 1993 March ST
Total Six 829.78
 The gas for the power plant is sourced from GAIL HBJ Pipeline, it also
supports HSD as alternate fuel.
 Source of water for the power plant is Upper Ganga Canal.
“Solar Plant”
 Dadri solar plant started functioning from March 2013.
 It’s a 5 mega watt project .
 On an average solar power plant generates 7.26 million
units annually
 It is covering an area of 27 acres .
“ Gas Plant ”
Components of gas plant
• Compressor
• Turbine ( Steam & Gas )
• Combustion chamber
• Alternator
• Preheater
• Heat recovery boiler
Parts of gas turbine
Motion of Compressor and Turbine
Flow of Air
“Gas Turbine”
Gas Turbine is a heat engine
The Process Includes:
Compression :
• Drawing air into the engine, pressurizing it, and then feeding it to
the combustion chamber.
• Compresser consist of 16 stages , with curved blades .
Combustion :
typically made up of a ring of fuel injectors that inject a steady stream of
fuel into combustion chambers where it mixes with the air. The
combustion produces a high temperature, high pressure gas stream that
enters and expands through the turbine section.
Working Principle
“Brayton Cycle”
1-2: Compression
2-3: Combustion
3-4: Expansion through
Turbine and exhaust nozzle
4-1: Heat rejection to
atmosphere
Simplified Prototype of Steam Turbine’s Working.
COURTESY:
Jacking oil is provider at the shaft of the
turbine and alternator to reduce the friction .
Start-up of the GT is driven with the help of
starting equipment which runs the generator
as a motor with speed increasing from 0 to
600rpm. At this speed a pilot flame is
ignited in the combustion chamber, fuel
(gas/naphtha) enters and combustion takes
place.
Start-up of the GT
Start-up of the Gas Turbine
The speed increases further both with the help of generator motoring and the combustion of
fuel up to about 2000 rpm. At this speed starting equipment is switched off and only the
generator is made ready for synchronization with the grid. After synchronizations, the
turbine load increases up to base load with more and more fuel entering the combustion
chamber.
Working of Gas Turbine
Gas turbine basically operates in two types
 Simple cycle operation ( open cycle )
 Combined cycle operation ( closed cycle )
Simple Cycle Operation
A simple cycle operation turbine(SCCT) is a type of gas turbine most
frequently used in the power generation, aviation (jet engine), and oil
and gas industry (electricity generation and mechanical drives).
Combined Cycle Operation
The Combustion Turbine
Natural gas is mixed with air and burned in the combustion chamber to create the high
pressure gasses needed to spin a turbine. This part of the plant is a single cycle, combustion
turbine. These are sometimes called CTs. CTs are normally designed to meet peak loads.
A combined cycle power plant is a dual cycle plant. The "2nd" part of the combined cycle is a
heat recovery unit. It takes advantage of the energy in the exhaust gasses to create steam. The
steam spins a steam turbine to generate additional electricity. The combined cycle plants are
normally designed to meet base and intermediate loads.
The Combined Cycle Plant
Gas
turbine
Steam
turbine
Combined
operation
Heat Recovery Steam Generators
Waste Heat Recovery Boiler(WHRB)
Heat Recovery Steam Generators (HRSG) have found
application in a wide range of industries where the
cogeneration of steam and electricity is required, in order to
obtain an independent power plant and negligible emission
levels.
Heat Recovery Steam Generator
Control Room
SCAD system is used for
controlling as well as monitoring .
Three CPU’s were used in parallel
to send current and recorded data.
Switch Yard
Switch yard consist of huge size transformers and a
number of circuit-breakrs .
It is basically for switching of supply for transmission .
Conclusion
• Gas turbine power plants can be started up and run at
full capacity in only 10 to 20 minutes, making them well
suited as backup plants for utility companies that
require additional electricity immediately.
• Gas turbine systems also require much less water than
steam power plants, and they are easily converted into
combined cycle power plants, which are much more
efficient.
Applications
 Gas turbine power plants are used to supply peak loads in
steam or hydro-plants.
 They are used as standby plants for hydro-electric power
plants.
 Gas turbines are used in jet, aircraft and ships.
ThankYou !

Weitere ähnliche Inhalte

Was ist angesagt?

6 weeks summer Training report on thermal power plant in DCPP
6 weeks summer Training report on thermal power plant in DCPP6 weeks summer Training report on thermal power plant in DCPP
6 weeks summer Training report on thermal power plant in DCPP
Amit Bansal
 
NTPC Auraiya Industrial Training
NTPC Auraiya Industrial TrainingNTPC Auraiya Industrial Training
NTPC Auraiya Industrial Training
Abhitendra Singh
 
INTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPCINTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPC
ADITYA ARYAN
 
thermal power plant PTTP Parichha
thermal power plant PTTP Parichhathermal power plant PTTP Parichha
thermal power plant PTTP Parichha
Gagandeep Maan
 
CONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANTCONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANT
Subarna Poddar
 

Was ist angesagt? (20)

6 weeks summer Training report on thermal power plant in DCPP
6 weeks summer Training report on thermal power plant in DCPP6 weeks summer Training report on thermal power plant in DCPP
6 weeks summer Training report on thermal power plant in DCPP
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
NTPC Auraiya Industrial Training
NTPC Auraiya Industrial TrainingNTPC Auraiya Industrial Training
NTPC Auraiya Industrial Training
 
INTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPCINTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPC
 
Ntpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyardNtpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyard
 
Report on Boilers at NTPC Ramagunadam
Report on  Boilers at NTPC RamagunadamReport on  Boilers at NTPC Ramagunadam
Report on Boilers at NTPC Ramagunadam
 
NTPC summer training report
NTPC summer training reportNTPC summer training report
NTPC summer training report
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHALVOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
 
Final reprt at ntpc vindhyanagar , singrauli
Final  reprt at ntpc vindhyanagar , singrauliFinal  reprt at ntpc vindhyanagar , singrauli
Final reprt at ntpc vindhyanagar , singrauli
 
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial ReportELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
 
Themal power plant NTPC
Themal power plant NTPCThemal power plant NTPC
Themal power plant NTPC
 
gas power plant ntpc dadri
gas power plant ntpc dadrigas power plant ntpc dadri
gas power plant ntpc dadri
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
thermal power plant PTTP Parichha
thermal power plant PTTP Parichhathermal power plant PTTP Parichha
thermal power plant PTTP Parichha
 
Ntpc KAHALGAON REPORT FILE
Ntpc KAHALGAON REPORT FILENtpc KAHALGAON REPORT FILE
Ntpc KAHALGAON REPORT FILE
 
CONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANTCONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANT
 
turbine governing oil system
turbine governing oil systemturbine governing oil system
turbine governing oil system
 
Thermal power station
Thermal power stationThermal power station
Thermal power station
 

Andere mochten auch

Andere mochten auch (20)

Ramgarh Gas Power Plant, Jaisalmer
Ramgarh Gas Power Plant, JaisalmerRamgarh Gas Power Plant, Jaisalmer
Ramgarh Gas Power Plant, Jaisalmer
 
Gas power plant
Gas power plantGas power plant
Gas power plant
 
Gas turbines working ppt
Gas turbines working pptGas turbines working ppt
Gas turbines working ppt
 
Gas Turbine Power Plant
Gas Turbine Power PlantGas Turbine Power Plant
Gas Turbine Power Plant
 
Steam power plant
Steam power plantSteam power plant
Steam power plant
 
Power plant, Power Station and types of power plant
Power plant, Power Station and types of power plantPower plant, Power Station and types of power plant
Power plant, Power Station and types of power plant
 
Power Plants in India - Plant Details - For Sealing Compounds for Power Stati...
Power Plants in India - Plant Details - For Sealing Compounds for Power Stati...Power Plants in India - Plant Details - For Sealing Compounds for Power Stati...
Power Plants in India - Plant Details - For Sealing Compounds for Power Stati...
 
Gas and diesel Plant
Gas and diesel PlantGas and diesel Plant
Gas and diesel Plant
 
Wind project cost & financing
Wind project cost & financingWind project cost & financing
Wind project cost & financing
 
Captive gen
Captive genCaptive gen
Captive gen
 
Group captive mechanism
Group captive mechanismGroup captive mechanism
Group captive mechanism
 
Gas Power Plants
Gas Power PlantsGas Power Plants
Gas Power Plants
 
NPP, Nuclear Power Plant,
NPP, Nuclear Power Plant, NPP, Nuclear Power Plant,
NPP, Nuclear Power Plant,
 
Captive Power Plants India - For Sealing Compounds for Power Stations Call +9...
Captive Power Plants India - For Sealing Compounds for Power Stations Call +9...Captive Power Plants India - For Sealing Compounds for Power Stations Call +9...
Captive Power Plants India - For Sealing Compounds for Power Stations Call +9...
 
IPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationIPGCL/PPCL Training presentation
IPGCL/PPCL Training presentation
 
Gas turbine Power-plant, NTPC Anta, Rajasthan
Gas turbine Power-plant, NTPC Anta, RajasthanGas turbine Power-plant, NTPC Anta, Rajasthan
Gas turbine Power-plant, NTPC Anta, Rajasthan
 
Hydal power plant
Hydal power plantHydal power plant
Hydal power plant
 
A presentation on steam power plant1
A presentation on steam power plant1A presentation on steam power plant1
A presentation on steam power plant1
 
Thermal Power Plant
Thermal  Power  PlantThermal  Power  Plant
Thermal Power Plant
 
Combined operation of power plants
Combined operation of power plantsCombined operation of power plants
Combined operation of power plants
 

Ähnlich wie NTPC Dadri Gas plant

Thermal power plant from A.I.C.E Jaipur
Thermal power plant from A.I.C.E JaipurThermal power plant from A.I.C.E Jaipur
Thermal power plant from A.I.C.E Jaipur
Chandra veer singh
 
Inplant training report
Inplant training reportInplant training report
Inplant training report
applesam8
 

Ähnlich wie NTPC Dadri Gas plant (20)

Ntpc dadri
Ntpc dadriNtpc dadri
Ntpc dadri
 
Ntpc report harsh
Ntpc report  harshNtpc report  harsh
Ntpc report harsh
 
Anil thermal power plant
Anil thermal power plantAnil thermal power plant
Anil thermal power plant
 
IPGCL/PPCL( INDRAPRASTHA POWER GENERATION CO. LTD. & PRAGATI POWER GENERATION)
IPGCL/PPCL( INDRAPRASTHA POWER GENERATION CO. LTD. & PRAGATI POWER GENERATION)IPGCL/PPCL( INDRAPRASTHA POWER GENERATION CO. LTD. & PRAGATI POWER GENERATION)
IPGCL/PPCL( INDRAPRASTHA POWER GENERATION CO. LTD. & PRAGATI POWER GENERATION)
 
Ntpc kahalgaon training report
Ntpc kahalgaon training reportNtpc kahalgaon training report
Ntpc kahalgaon training report
 
Indraprastha power
Indraprastha powerIndraprastha power
Indraprastha power
 
ntpc dadri
ntpc dadri ntpc dadri
ntpc dadri
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
report on VTPS
report on VTPSreport on VTPS
report on VTPS
 
Kstps ppt
Kstps pptKstps ppt
Kstps ppt
 
Thermal power plant from A.I.C.E Jaipur
Thermal power plant from A.I.C.E JaipurThermal power plant from A.I.C.E Jaipur
Thermal power plant from A.I.C.E Jaipur
 
Summer training at NTPC Badarpur ppt
Summer training at NTPC Badarpur ppt Summer training at NTPC Badarpur ppt
Summer training at NTPC Badarpur ppt
 
NTPC DADRI THERMAL PLANT PPT
NTPC DADRI THERMAL PLANT PPTNTPC DADRI THERMAL PLANT PPT
NTPC DADRI THERMAL PLANT PPT
 
Presentation on Kota super Thermal Power Station
Presentation on Kota super Thermal Power StationPresentation on Kota super Thermal Power Station
Presentation on Kota super Thermal Power Station
 
Inplant training report
Inplant training reportInplant training report
Inplant training report
 
ntpc unchahar
ntpc unchaharntpc unchahar
ntpc unchahar
 
Thermal Power Plant training Report
Thermal Power Plant training ReportThermal Power Plant training Report
Thermal Power Plant training Report
 
Summer internship report
Summer internship reportSummer internship report
Summer internship report
 
Ntpc dadri
Ntpc dadriNtpc dadri
Ntpc dadri
 
internship report of Kepco
internship report of Kepcointernship report of Kepco
internship report of Kepco
 

Kürzlich hochgeladen

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 

Kürzlich hochgeladen (20)

KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 

NTPC Dadri Gas plant

  • 1. “Gas Power Plant” NTPC DADRI (U.P.) By - Ayush Srivastava B.Tech (EN) 4th year
  • 2. Topics to be covered: • Introduction • Gas turbine • Generator • Units Configuration • Start-up And Applications of Gas Turbines • combined cycle process • Waste heat recovery boiler(WHRB) • Steam turbine • Advantages & Applications
  • 3. • NTPC Limited is an Indian PSU Public Sector Undertaking , engaged in the business of generation of electricity . • The headquarters of the company is situated at New Delhi. NTPC's core business is generation and sale of electricity to state-owned power distribution companies and State Electricity Boards in India. • The company also undertakes consultancy and turnkey project contracts that involve engineering, project management, construction management and operation and management of power plants.
  • 4. • NTPC is the largest power generation company of India with an electric power generating capacity of 47228 MW . • A public sector company, it was incorporated in the year 1975 to accelerate power development in the country as a wholly owned company of the Government of India. • 15 coal based (24,395 MW), • 7 gas based (3,955 MW)
  • 5. History • The company was founded in November 1975 as "National Thermal Power Corporation Private Limited". • It started work on its first thermal power project in 1976 at Shaktinagar (named NationalThermal Power Corporation Private Limited Singrauli) in Uttar Pradesh. • In the same year, its name was changed to "NationalThermal Power Corporation Limited". • In 1983, NTPC began commercial operations (of selling power) and earned profits of INR 4.5 crores in FY 1982-83. By the end of 1985, it had achieved power generation capacity of 2000 MW.
  • 6.  NTPC Dadri plant and township are property of ntpc ltd. and were built around 1988-1990.  NTPC Dadri is a unique power plant of NTPC group which has both coal based thermal plant and gas based thermal plant & it also comprises solar plant as well.  Toal capacity of coal plant is1820 MW and gas plant is 817 MW .  Solar plant is of 5 MW  Total power generated is 2642 MW NTPC DADRI
  • 7. “Coal plant” Stage Unit Number Installed Capacity (MW) Date of Commissioning 1st 1 210 1991 October 1st 2 210 1992 December 1st 3 210 1993 March 1st 4 210 1994 March 2nd 5 490 2010 January 2nd 6 490 2010 July Total Six 1820 • The coal for the power plant is sourced from Piparwar Mines, Jharkhand. • Source of water for the power plant is Upper Ganga Canal.
  • 8. “Gas plant” Stage Unit Number Installed Capacity (MW) Date of Commissioning GT / ST 1st 1 130.19 1992 March GT 2 130.19 1992 May GT 3 130.19 1992 June GT 4 130.19 1992 November GT 5 154.51 1993 February ST 6 154.51 1993 March ST Total Six 829.78  The gas for the power plant is sourced from GAIL HBJ Pipeline, it also supports HSD as alternate fuel.  Source of water for the power plant is Upper Ganga Canal.
  • 9. “Solar Plant”  Dadri solar plant started functioning from March 2013.  It’s a 5 mega watt project .  On an average solar power plant generates 7.26 million units annually  It is covering an area of 27 acres .
  • 11. Components of gas plant • Compressor • Turbine ( Steam & Gas ) • Combustion chamber • Alternator • Preheater • Heat recovery boiler
  • 12. Parts of gas turbine
  • 13. Motion of Compressor and Turbine
  • 15. “Gas Turbine” Gas Turbine is a heat engine The Process Includes: Compression : • Drawing air into the engine, pressurizing it, and then feeding it to the combustion chamber. • Compresser consist of 16 stages , with curved blades . Combustion : typically made up of a ring of fuel injectors that inject a steady stream of fuel into combustion chambers where it mixes with the air. The combustion produces a high temperature, high pressure gas stream that enters and expands through the turbine section.
  • 16. Working Principle “Brayton Cycle” 1-2: Compression 2-3: Combustion 3-4: Expansion through Turbine and exhaust nozzle 4-1: Heat rejection to atmosphere
  • 17. Simplified Prototype of Steam Turbine’s Working. COURTESY:
  • 18. Jacking oil is provider at the shaft of the turbine and alternator to reduce the friction . Start-up of the GT is driven with the help of starting equipment which runs the generator as a motor with speed increasing from 0 to 600rpm. At this speed a pilot flame is ignited in the combustion chamber, fuel (gas/naphtha) enters and combustion takes place. Start-up of the GT
  • 19. Start-up of the Gas Turbine The speed increases further both with the help of generator motoring and the combustion of fuel up to about 2000 rpm. At this speed starting equipment is switched off and only the generator is made ready for synchronization with the grid. After synchronizations, the turbine load increases up to base load with more and more fuel entering the combustion chamber.
  • 20. Working of Gas Turbine Gas turbine basically operates in two types  Simple cycle operation ( open cycle )  Combined cycle operation ( closed cycle )
  • 21. Simple Cycle Operation A simple cycle operation turbine(SCCT) is a type of gas turbine most frequently used in the power generation, aviation (jet engine), and oil and gas industry (electricity generation and mechanical drives).
  • 22.
  • 23.
  • 24. Combined Cycle Operation The Combustion Turbine Natural gas is mixed with air and burned in the combustion chamber to create the high pressure gasses needed to spin a turbine. This part of the plant is a single cycle, combustion turbine. These are sometimes called CTs. CTs are normally designed to meet peak loads. A combined cycle power plant is a dual cycle plant. The "2nd" part of the combined cycle is a heat recovery unit. It takes advantage of the energy in the exhaust gasses to create steam. The steam spins a steam turbine to generate additional electricity. The combined cycle plants are normally designed to meet base and intermediate loads. The Combined Cycle Plant Gas turbine Steam turbine Combined operation
  • 25. Heat Recovery Steam Generators
  • 26. Waste Heat Recovery Boiler(WHRB) Heat Recovery Steam Generators (HRSG) have found application in a wide range of industries where the cogeneration of steam and electricity is required, in order to obtain an independent power plant and negligible emission levels.
  • 27. Heat Recovery Steam Generator
  • 28. Control Room SCAD system is used for controlling as well as monitoring . Three CPU’s were used in parallel to send current and recorded data.
  • 29. Switch Yard Switch yard consist of huge size transformers and a number of circuit-breakrs . It is basically for switching of supply for transmission .
  • 30. Conclusion • Gas turbine power plants can be started up and run at full capacity in only 10 to 20 minutes, making them well suited as backup plants for utility companies that require additional electricity immediately. • Gas turbine systems also require much less water than steam power plants, and they are easily converted into combined cycle power plants, which are much more efficient.
  • 31. Applications  Gas turbine power plants are used to supply peak loads in steam or hydro-plants.  They are used as standby plants for hydro-electric power plants.  Gas turbines are used in jet, aircraft and ships.