Agile Awareness
Agile Evolution
© 2012 Systems Plus
Why agile? Why do we need another approach (PMBOK Guide) for managing projects?
How do we solve different situations in our everyday life?
© 2012 Systems Plus
Initial Agricultural Revolution Industrial Revolution Information Revolution
Hunter
Gatherer
Wandering
Planting Crops
Herding Animals
Start living in one place
Machines
Factories
Moving to different cities
Led to management (project
Management, WBS)
Information/Collaboration
Focus is not only on manufacturing
Value is on ownership of knowledge
Industrial Worker Knowledge worker
Work is visible Work is invisible
Work is stable Work is changing
Emphasis on running things Emphasis is on changing things
More Structured with fewer decisions Less Structured with more decisions
Focus on right answers Focus on right questions
Define the task Understand the task
Command and Control Give Autonomy
Strict Standards Continuous innovations
Focus on Quantity Focus on quality
Measure performance to strict standards Continuously learn and teach
Minimize cost of worker for each task Treat worker as asset and not as cost
Agile Evolution
 Agile Term came into existence during early 2001 & represents ways of delivering the
product/software in fast, collaborative and iterative fashion.
 Agile Methodologies are contrary to Traditional methodologies (Waterfall etc.)
 Agile term represents huge set of methodologies including RAD, Spiral, XP, SCRUM, FDD,
Lean, OpenUP and Kanban.
 Agile Manifesto Published in Feb 2001 by 17 developers at Snowbird Utah.
© 2012 Systems Plus
Agile Evolution
RUP
(Rational Unified
Process)
SCRUM
Crystal
Clear
XP
(Extreme
Programming)
ASD
(Adaptive
Software
Development)
FDD
(Feature Driven
Development)
DSDM
(Dynamic
Systems
Development
Model)
1994
1995
1996
1996 1995
1995 1995
2001
Agile Project Management Framework
© 2012 Systems Plus
© 2012 Systems Plus
Kent Beck
(Creator XP and TDD Methodologies)
James Grenning
(author of Test-Driven Development for
Embedded C.)
Robert C Martin
("Uncle Bob", is an
American software consultant and author)
Mike Beedle
(founder,CEO of e-Architects Inc., company
that specializes in application development
using distributed objects and Internet
technologies. )
Jim Highsmith
(Author of books on software development
methodologies and creator of Adaptive
Software Development)
Steve Mellor
(developer of the Shlaer-Mellor method
and Executable UML )
Arie Van Bennekum
(Involved in DSDM Consortium)
Andrew Hunt
(Published the book The Pragmatic
Programmer: From Journeyman to Master.)
Ken Schwaber
(Co Creator of Scrum)
Alistair Cockburn
(Creator of Crystal Methodologies)
Ron Jeffries
(Collaborator and founder of XP)
Jeff Sutherland
(Co Creator of Scrum)
Ward Cunningham
(Collaborator of XP and creator of Wiki)
Jon Kern
(with both Jeff De Luca and Peter Coad
and had helped shape the charter on FDD.)
Dave Thomas
(Co Author of the book The Pragmatic
Programmer: From Journeyman to Master.)
Martin Fowler
(as per some people introduced the
term Continuous Integration.)
Brian Marick
( an early proponent of the Context-Driven
school of testing,)
Agile Original Contributors
© 2012 Systems Plus
“We are uncovering better ways of developing software by doing it and helping others
do it. Through this work we have come to value:
The Agile Manifesto
INDIVIDUALS &
INTERACTIONS
over process & tools
WORKING
SOFTWARE
over comprehensive document
CUSTOMER
COLLABORATION
over contract negotiation
RESPONDINGT
OCHANGE
over following a plan
That is, while there is value in the items on the right, we value the items on the left
more.”
Principle Shortened Version
Our highest priority is to satisfy customer through early and continuous delivery of
valuable software.
Satisfy customer with great software or Produce
value early
Welcome changing requirements, even late in development. Agile process harness
change for customer’s competitive advantage
Welcome Change
Deliver working software frequently, from couple of weeks to couple of months, with
preference to the shorter timescale.
Deliver Frequently or iterative delivery
Business people and developers must work together daily throughout the project Work with business or Daily business
collaboration.
Build projects around motivated individuals. Give them environment and support they
need, and trust them to get the job done.
Motivate People or Trust Motivated team
The most efficient and effective method of conveying information to and within a
development team is face-to-face conversation.
Face-to-Face communication
Working software is the primary measure of the progress Measure software done or Working software
Agile process promotes sustainable development. The sponsors, developers, and
users should be able to maintain a constant pace indefinitely.
Maintain sustainable pace
Continuous attention to technical excellence and good design enhances agility. Maintain Design or Technical Excellence
Simplicity- the art of maximizing the amount of work not done- is essential. Keep it simple or K.I.S.S
The best architectures, requirements, and design emerge from self-organizing teams. Team creates architecture or Self Organize
At regular intervals, the team reflects on how to become more effective, then tunes
and adjusts it behaviour accordingly.
Reflect and Adjust
© 2012 Systems Plus
12 Principles Of Agile
© 2012 Systems Plus
Agile and adaptive approaches for linking people, projects and value. DOI focuses on
project management side of agile projects. Agile Manifesto and agile methods offer whole
project guidance.
We are a community of project leaders that are highly successful at delivering results.
To achieve these results:
 We increase return on investment by making continuous flow of value our focus.
 We deliver reliable results by engaging customer in frequent interactions and shared
ownership.
 We expect uncertainty and manage for it through iterations, anticipations and adoptions.
 We unleash creativity and innovation by recognizing that individuals are the ultimate source
of value, and creating an environment where they can make difference.
 We boost performance through group accountability for results and shared responsibility for
team effectiveness.
 We improve effectiveness and reliability through situational specific strategies, processes
and practices.
DOI: Declaration Of Independence
© 2012 Systems Plus
Agile Methodologies
© 2012 Systems Plus
Agile Methodologies
© 2012 Systems Plus
Scrum is not an acronym. First used to describe
hyper-productive development in 1987 by Ikujiro
Nonaka and Hirotaka Takeuchi, Scrum refers to the
mechanism used in rugby for getting an out-of-play
ball back into play.
Scrum generates productivity improvements by
implementing a framework that empowers teams
and thrives on change. A set of rules and
corresponding terminology are used to reinforce
such common sense techniques as small teams,
daily status meetings, not interrupting people
who are working, and a single source of work
prioritization.
SCRUM
Scrum adopts an empirical approach—accepting that the problem
cannot be fully understood or defined, focusing instead on
maximizing the team's ability to deliver quickly and respond to
emerging requirements.
© 2012 Systems Plus
SCRUM
Three pillars that hold up every implementation of empirical process
control:
Visibility: means that those aspects of the process that
affect the outcome must be visible to those controlling the process.
Not only must these aspects be visible, but what is visible must also be
true.
Inspection: The various aspects of the process must be
inspected frequently enough that unacceptable variances in the
process can be detected.
Adaptation: If the inspector determines from the
inspection that one or more aspects of the process are outside
acceptable limits and that the resulting product will be unacceptable,
the inspector must adjust the process or the material being processed
Although the above pillars guides all
aspects of Scrum Projects, there are
also four planned opportunities for
Inspection and Adaption within
Scrum framework:
Sprint Retrospective
Daily Scrum Meeting
Sprint Review Meeting
Sprint Planning Meeting
© 2012 Systems Plus
SCRUM Cont.
The heart of Scrum lies in the iteration (Sprint). The team takes a look at the requirements,
considers the available technology, and evaluates its own skills and capabilities. It then
collectively determines how to build the functionality, modifying its approach daily as it
encounters new complexities, difficulties, and surprises. The team figures out what needs to
be done and selects the best way to do it. This creative process is the heart of the Scrum’s
productivity
Dimensions of Software Development
Complexity
P3opl3
R3quir3m3nts
T3chnology
SCRUM Roles:
© 2012 Systems Plus
The Product Owner The Team The Scrum Master
Represents everyone with stake in project
and the final product
Self Managing, self organizing and cross
functional
He is responsible for Scrum Processes
Achieves initial and on going funding Responsible for figuring out how to turn
Product Backlog into an increment of
functionality within an iteration
Teaches Scrum to everyone from
implementation to Delivery
Creates overall requirements(Product
Backlog), ROI objectives and Release plan
Responsible for developing functionality Making sure process fits into organization
culture and delivers expected benefits
Responsible for prioritizing product
backlog
Collectively responsible for each iteration and
whole product
Removes impediments to progress, assists
product owner with managing backlog,
communicating vision, goal and backlog items
to team.
SCRUM Cont.
© 2012 Systems Plus
SCRUM Flow
Sprints:
 A time boxed iteration (2-8 weeks)
 build a potentially shippable product.
 includes a sprint planning meeting, Daily Scrums,
Development work, Sprint Review Meeting, Sprint
Retrospective.
 During sprint no changes are made that effect
sprint goal.
 Scope may be clarified or renegotiated as new
information becomes clear.
 Development team cannot change
© 2012 Systems Plus
SCRUM Activities
Sprint Planning Meeting:
 Is used to define what will define a sprint
and how it will be achieved.
 time boxed for 8 hrs.( 4 hrs. explain, 4 hrs.
plan)
 Product owner explains team product
backlog , ordered by priority
 Team asks questions to clarify user stories so
that they can break it into tasks.
 PO, SM and team is involved.
 Outcome is Sprint Backlog
Daily Scrum:
 Is 15 minutes time boxed daily meeting.
 Meeting happens at same place and same time.
 Each member provides answer to three questions:
 What has been achieved since last meeting?
 What will be done before next meeting?
 What obstacles are in way?
 Daily scrum for pigs (chickens welcome to listen)
 Discussion parked until after scrum
© 2012 Systems Plus
SCRUM Activities Cont.
Sprint Review Meeting:
 Is held at the end of the sprint & last about 1hr per wk of
sprint
 Scrum team demonstrates what is accomplished during
sprint.
 Very informal ; no PowerPoint slides, lectures, diagrams.
 Participant includes PO, SM, Scrum Team, management,
customer
 Project is assessed against the sprint goals defined in sprint
planning meeting
 Ideally team completes each product backlog item brought
into sprint backlog
© 2012 Systems Plus
SCRUM Activities Cont.
Sprint Retrospective Meeting:
 Is usually the last thing of the sprint.
 time boxed for 3-4 hrs.
 Attended by SM and Scrum team and occasionally PO
different formats
 go for lunch
Outside park
 CEO to attend
Product Backlog:
 Prioritized features list, containing short descriptions of all functionality desired in the
product.
 Typically contains features, Bugs, Technical work & Knowledge acquisition.
 It is
 Visible to all
 Single source and copy of truth
 Dynamic
 It helps guide roadmap planning.
© 2012 Systems Plus
SCRUM Artifacts
© 2012 Systems Plus
SCRUM Artifacts
Sprint Backlog:
 Task identified by Scrum Team during Sprint
Planning
 User Stories in Product Backlog are broken into
Tasks.
 Team estimates how many hours each task will
take.
 Burn Down Chart: is a publicly displayed chart
showing remaining work in the sprint backlog.
Updated every day, it gives a simple view of the
sprint progress. It also provides quick
visualizations for reference. Variation of Sprint
burn down is Release burn down chart.
© 2012 Systems Plus
 The main goal of XP is to lower the cost of change in software requirements. With traditional
system development methodologies, like the Waterfall Methodology, the requirements for
the system are determined and often "frozen" at the beginning of the development project.
This means that the cost of changing the requirements at a later stage in the project —
something that is very common in the real-world — can be very high.
 Extreme Programming (or XP) is software development centric agile methodologies. While
scrum focuses on project management level with focus on prioritizing work and getting
feedback, XP focuses on software development good practices.
Extreme Programming (XP) Flow
 Extreme Programming (or XP) is software development centric agile methodologies. While
scrum focuses on project management level with focus on prioritizing work and getting
feedback, XP focuses on software development good practices.
 Core values of XP methodologies are:
Simplicity: focuses on reducing complexity, extra features and waste. “Find the
simplest thing that could work” is the phrase team should keep in mind.
Communication: focuses on making sure each member knows what is expected out of
them and what other members are working on. Daily Stand Up meeting is key component of
communication
Feedback: team should get impression of suitability early. Failing fast can be useful.
Courage: It takes courage to allow our work to be entirely visible to others. In Pair
programming, team members share codes, often makes bold simplifications and changes the
code. Automated build and tests makes sure developers have confidence to make important
changes.
Respect: is essential on XP projects where team work together as a team and
everyone is accountable for success or failure.
© 2012 Systems Plus
Extreme Programming (XP)
© 2012 Systems Plus
Extreme Programming (XP) Flow
© 2012 Systems Plus
XP Practices
 XP Is Based on several simple but powerful core practices.
 XP expects participation from Whole Team, Whole team refers to all contributors to XP
sitting in same physical location as members of same team including Customers.
 XP emphasis on the notion of generalising specialist as opposed to role specialist.
© 2012 Systems Plus
Onsite Customers Product Manager /Owners Domain Experts
Technical Specialists Interaction Designers Programmers
Designer and Architects Testers Coaches- The programmer coach
Project Manager Project Community, stakeholder and
executive sponsor
XP Roles
Planning Games: XP has two primary planning activities or planning games – Release
Planning and Iteration Planning.
 Release Planning is push for new functionality all the way to production. A Project typically
has one or more releases with no more than two releases happening in a year. During
release planning customer outlines the functionality required and developers estimates how
difficult it is to estimate. Based on estimates and priorities customer defines a project plan.
Initial estimates will be bit imprecise, so process is revisited frequently and improved as
estimates and priorities evolves.
 Iterations are small development cycles within a release( as Scrum calls it “Sprint”) ideally of
two weeks. Iteration planning is done at the start of iteration. Customer describes the
functionality required in next two weeks and then developer breaks the functionality into
tasks and estimates the work. Based on these estimates and amount of work achieved in
prior iteration, team commits the amount of work they can do in next iteration.
© 2012 Systems Plus
XP Planning
© 2012 Systems Plus
XP Test Driven Development Cycle
• Red
Write a little test that doesn‘t work (and perhaps doesn‘t even compile at first)
• Green
Make the test work quickly (committing whatever sins necessary)
• Refactor
Eliminate all of the duplication created in merely getting the test to work, improve the
design
© 2012 Systems Plus
Lean Software Development
© 2012 Systems Plus
Lean Software Development
Eliminate Waste: To maximize value we must eliminate waste. In software systems,
waste can be in form of partially done work, unnecessary features etc. Therefore to
increase value we must develop ways to identify and then remove waste.
Empower Team: Rather than taking micromanagement approach we should respect
team’s superior knowledge of the technical steps required for project and let them make
decision to be productive and successful.’
Deliver Fast: Maximize ROI by quickly delivering valuable software.
Optimize the whole: Aim to see the system as more than the sum of its parts. We go
beyond the pieces of project and look how it aligns with organization. As part of
optimizing the whole we also focus on forming better intergroup relations.
Build Quality In: Lean development does not try to “test-in” quality at the end. It builds
quality into the product and continually assures quality throughout the development
process using techniques like refactoring, continuous integrations, and unit testing.
Defer Decisions: Balance early planning with making decisions and committing to
things as late as possible.
Amplify Learning: Concept involves facilitating communication early and often getting
feedback as soon as possible and building on what we learn.
Lean gives us techniques and concepts such as Value stream Mapping, seven forms of
waste, WIP etc.
© 2012 Systems Plus
 Lean software development is a translation of lean manufacturing and lean IT principles and
practices to the software development domain. Adapted from the Toyota Production System, a
pro-lean subculture is emerging from within the Agile community. Lean software development
practices, or what is commonly called "tools" are expressed slight differently from their equivalents
in agile software development, but there are parallels. Examples of such practices include:
 Eliminate Waste
 Provide market and technical leadership - Your company can be successful by producing
innovative and technologically advanced products but you must understand what your
customers value and you know what technology you are using can deliver
 Create nothing but value - You have to be careful with all the processes you follow, i.e., be sure
that all of them are required and they are focused on creating value
 Write less code - The more code you have the more tests you need thus it requires more
work and if you're writing tests for features that are not needed you are simply wasting time
Lean Software Development
© 2012 Systems Plus
 Create Knowledge
 Create design-build teams - Leader of the development team has to listen to his/her
members and ask smart questions encouraging them to look for the answers and to get
back with encountered problems or invented solutions as soon as possible
 Maintain a culture of constant improvement - Create environment in which people will be
constantly improving what they are working on - they should know that they are not and should
not be perfect - they always have a field to improve and they should do it
 Teach problem-solving methods - Development team should behave like small research
institute, they should establish hypotheses and conduct many rapid experiments in order to
verify them
 Build Quality In
 Synchronize - In order to achieve high quality in your software you should start worrying about
it before you write single line of working code - don't wait with synchronization because it will
hurt
 Automate - Automate testing, building, installations, anything that is routine, but do it
smartly, do it in a way people can improve the process and change anything they want
without worrying that after the change is done the software will stop working
 Refactor - Eliminate code duplication to ZERO - every time it shows up refactor the code, the
tests, and the documentation to minimize the complexity.
Lean Software Development
© 2012 Systems Plus
 Defer Commitment
 Schedule irreversible decisions at the last responsible moment - You should know where you
want to go but you don't know the road very well, you will be discovering it day after day - the
most important thing is to keep the right direction
 Break dependencies - Components should be coupled as loosely as possible to enable
implementation in any order
 Maintain options - Develop multiple solutions for all critical decisions and see which one works
best
 Optimize the Whole
 Focus on the entire value stream - Focus on winning the whole race which is the software -
don't optimize local inefficiencies, see the whole and optimize the whole organization
 Deliver a complete product - Teams need to have great leaders as well as great engineers,
sales, marketing specialists, secretaries, etc. - they together can deliver great final products
to their customers
Lean Software Development
© 2012 Systems Plus
 Deliver Fast
 Work in small batches - Reduce projects size, shorten release cycles, stabilize work
environment (listen to what your velocity tells you), repeat what's good and eradicate
practices that creates obstacles
 Limit work to capacity - Limit tasks queue to minimum (one or two iterations ahead is
enough), don't be afraid of removing items from the queue - reject any work until you have
an empty slot in your queue
 Focus on cycle time, not utilization - Put in your queue small tasks that cannot clog the
process for a long time - reduce cycle time and have fewer things to process in your queue
 Respect People
 Train team leaders/supervisors - Give team leaders the training, the guidance and
some free space to implement lean thinking in their environment
 Move responsibility and decision making to the lowest possible level - Let your people
think and decide on their own - they know better how to implement difficult
 algorithms and apply state-of-the-art software frameworks
 Foster pride in workmanship - Encourage passionate involvement of your team
members to what and how they do
Lean Software Development
 Task Kanban Board named after Just-In-Timeproduction method in Toyota Production System
(TPS).
 A Kanban is a ticket describing a task to do. In TPS, it is used to realize Just-In-Time"pull"
production control. In Figure 1, the Kanban Board shows the current status of all the tasks to
be done within this iteration. The tasks are represented by cards (Post-It Notes). Status is
presented by areas on the board separated and named To Do, Doing, and Done. This
Kanban Board helps team understand how they are doing, as well as what to do next. This
helps make the team self-directing.
© 2012 Systems Plus
KANBAN TPS Board
 Limiting the amount of work that is in progress will contribute to faster completion, better
quality, and greater focus on only the highest-priority work. A WIP limit is a policy, an agreed-
upon decision about how the work will be processed. Policies can similarly specify how the
organization handles types of work items.
 A WIP limit defines a stage in the Kanban system. A stage in the Kanban system may span
across several workflow states. A limit on WIP constrains how many work items can be in each
stage of the workflow at a given time. When a work item is pulled to the next stage of the
process, a slot opens and a new work item can be pulled into that stage. A number of workflow
states may be grouped together under a single WIP limit.
 A significant consequence of a WIP limit is that blocked work “holds up the line.” A blocked
work item still counts against the limit, so a situation may arise as more items become blocked, in
which no new work can progress until the block is resolved. This drives collaboration, as the team
(and any affected external stakeholders) are highly motivated to clear the blockage.
© 2012 Systems Plus
KANBAN TPS Board
© 2012 Systems Plus
KANBAN TPS Board
Three Principles of Kanban
1. Start with what you know
2. Agree to pursue incremental, evolutionary change
3. Initially, respect current roles, responsibilities and job titles
Kanban five core practices
1. Visualize
2. Limiting work in progress
3. Manage flow
4. Make management policies
5. Improve collaboratively using “safe to fail” experiments
 In Agile project management, planning is an iterative component of the
project lifecycle.
 In the above figure, see the repeated sets of green shading as planning
occurs throughout the project lifecycle.
Agile Project Management Framework
K & S – Level 1
 ENVISION
Determine the product vision and project scope, the project
community, and how the team will work together
 SPECULATE
Develop a feature-based release, milestone, and iteration plan to
deliver on the vision
 EXPLORE
Deliver tested features in a short timeframe, constantly seeking to
reduce the risk and uncertainty of the project
 ADAPT
Review the delivered results, the current situation, and the team's
performance, and adapt as necessary
 CLOSE
Conclude the project, pass along key learnings, and celebrate

Weitere ähnliche Inhalte

Was ist angesagt?

How to lead successful agile transformation (ceo’s guide)
How to lead successful agile transformation (ceo’s guide)How to lead successful agile transformation (ceo’s guide)
How to lead successful agile transformation (ceo’s guide)Katy Slemon
 
Improvement opportunity in agile methodology and a survey on the adoption rat...
Improvement opportunity in agile methodology and a survey on the adoption rat...Improvement opportunity in agile methodology and a survey on the adoption rat...
Improvement opportunity in agile methodology and a survey on the adoption rat...Alexander Decker
 
What is Agility - Transforming to become an Agile Organization in the Digital...
What is Agility - Transforming to become an Agile Organization in the Digital...What is Agility - Transforming to become an Agile Organization in the Digital...
What is Agility - Transforming to become an Agile Organization in the Digital...Richard Ellis PMP PRM CSM PMI-ACP SSGB
 
Agile and semat v0.91
Agile and semat v0.91Agile and semat v0.91
Agile and semat v0.91Yury Katkov
 
Normalizing agile and lean product development and aim
Normalizing agile and lean product development and aimNormalizing agile and lean product development and aim
Normalizing agile and lean product development and aimRussell Pannone
 
Adaptive software development (asd) a minimalist approach to complex software...
Adaptive software development (asd) a minimalist approach to complex software...Adaptive software development (asd) a minimalist approach to complex software...
Adaptive software development (asd) a minimalist approach to complex software...Katy Slemon
 
Agile Learning - Agile2013
Agile Learning - Agile2013Agile Learning - Agile2013
Agile Learning - Agile2013Don McGreal
 
Lean Change Management (part I) - IAD 2014
Lean Change Management (part I) - IAD 2014Lean Change Management (part I) - IAD 2014
Lean Change Management (part I) - IAD 2014Fabio Armani
 
Agile & User Experience
Agile & User ExperienceAgile & User Experience
Agile & User ExperienceMichelle Adams
 
CMI Presentation on Organisational Change Maturity Model
CMI Presentation on Organisational Change Maturity ModelCMI Presentation on Organisational Change Maturity Model
CMI Presentation on Organisational Change Maturity Modelkyliemalmberg
 
Build it Right: Digital Governance for Product Managers
Build it Right: Digital Governance for Product ManagersBuild it Right: Digital Governance for Product Managers
Build it Right: Digital Governance for Product ManagersLisa Welchman
 
AGILE PM A trade-off between proactivity and reactivity
AGILE PM A trade-off between proactivity and reactivityAGILE PM A trade-off between proactivity and reactivity
AGILE PM A trade-off between proactivity and reactivityEmiliano Soldi
 
Business Agility 2017 (final)
Business Agility 2017 (final)Business Agility 2017 (final)
Business Agility 2017 (final)Fabio Armani
 
Extending Agile to Suite Big Projects
Extending Agile to Suite Big ProjectsExtending Agile to Suite Big Projects
Extending Agile to Suite Big ProjectsAmin Bandeali
 
Agile Configuration Management Environments
Agile Configuration Management EnvironmentsAgile Configuration Management Environments
Agile Configuration Management EnvironmentsBrad Appleton
 
Intro to Agile and Lean Software Development
Intro to Agile and Lean Software DevelopmentIntro to Agile and Lean Software Development
Intro to Agile and Lean Software DevelopmentAleksejs Truhans
 

Was ist angesagt? (20)

How to lead successful agile transformation (ceo’s guide)
How to lead successful agile transformation (ceo’s guide)How to lead successful agile transformation (ceo’s guide)
How to lead successful agile transformation (ceo’s guide)
 
Improvement opportunity in agile methodology and a survey on the adoption rat...
Improvement opportunity in agile methodology and a survey on the adoption rat...Improvement opportunity in agile methodology and a survey on the adoption rat...
Improvement opportunity in agile methodology and a survey on the adoption rat...
 
What is Agility - Transforming to become an Agile Organization in the Digital...
What is Agility - Transforming to become an Agile Organization in the Digital...What is Agility - Transforming to become an Agile Organization in the Digital...
What is Agility - Transforming to become an Agile Organization in the Digital...
 
Agile and semat v0.91
Agile and semat v0.91Agile and semat v0.91
Agile and semat v0.91
 
Normalizing agile and lean product development and aim
Normalizing agile and lean product development and aimNormalizing agile and lean product development and aim
Normalizing agile and lean product development and aim
 
The PM Role in a Lean and Agile World white paper - PMI Global Congress 2014
The PM Role in a Lean and Agile World white paper - PMI Global Congress 2014The PM Role in a Lean and Agile World white paper - PMI Global Congress 2014
The PM Role in a Lean and Agile World white paper - PMI Global Congress 2014
 
Adaptive software development (asd) a minimalist approach to complex software...
Adaptive software development (asd) a minimalist approach to complex software...Adaptive software development (asd) a minimalist approach to complex software...
Adaptive software development (asd) a minimalist approach to complex software...
 
Agile Learning - Agile2013
Agile Learning - Agile2013Agile Learning - Agile2013
Agile Learning - Agile2013
 
Lean Change Management (part I) - IAD 2014
Lean Change Management (part I) - IAD 2014Lean Change Management (part I) - IAD 2014
Lean Change Management (part I) - IAD 2014
 
Agile & User Experience
Agile & User ExperienceAgile & User Experience
Agile & User Experience
 
Agile EcoSystem
Agile EcoSystemAgile EcoSystem
Agile EcoSystem
 
CMI Presentation on Organisational Change Maturity Model
CMI Presentation on Organisational Change Maturity ModelCMI Presentation on Organisational Change Maturity Model
CMI Presentation on Organisational Change Maturity Model
 
Build it Right: Digital Governance for Product Managers
Build it Right: Digital Governance for Product ManagersBuild it Right: Digital Governance for Product Managers
Build it Right: Digital Governance for Product Managers
 
AGILE PM A trade-off between proactivity and reactivity
AGILE PM A trade-off between proactivity and reactivityAGILE PM A trade-off between proactivity and reactivity
AGILE PM A trade-off between proactivity and reactivity
 
Business Agility 2017 (final)
Business Agility 2017 (final)Business Agility 2017 (final)
Business Agility 2017 (final)
 
The PM Role in a Lean and Agile World
The PM Role in a Lean and Agile WorldThe PM Role in a Lean and Agile World
The PM Role in a Lean and Agile World
 
Agile Methodology - The Road to the Philosophy
Agile Methodology - The Road to the PhilosophyAgile Methodology - The Road to the Philosophy
Agile Methodology - The Road to the Philosophy
 
Extending Agile to Suite Big Projects
Extending Agile to Suite Big ProjectsExtending Agile to Suite Big Projects
Extending Agile to Suite Big Projects
 
Agile Configuration Management Environments
Agile Configuration Management EnvironmentsAgile Configuration Management Environments
Agile Configuration Management Environments
 
Intro to Agile and Lean Software Development
Intro to Agile and Lean Software DevelopmentIntro to Agile and Lean Software Development
Intro to Agile and Lean Software Development
 

Ähnlich wie Agile~overview

Is There Room For Project Managers In An Agile Like Environment Such As Scrum1
Is There Room For Project Managers In An Agile Like Environment Such As Scrum1Is There Room For Project Managers In An Agile Like Environment Such As Scrum1
Is There Room For Project Managers In An Agile Like Environment Such As Scrum1alexnasiri
 
PhuNguyeAgileStudyReport201506
PhuNguyeAgileStudyReport201506PhuNguyeAgileStudyReport201506
PhuNguyeAgileStudyReport201506Phu Rich Nguyen
 
Scrum 18 months later
Scrum 18 months laterScrum 18 months later
Scrum 18 months laterCraig Brown
 
Strengths And Weaknesses Of Software Development
Strengths And Weaknesses Of Software DevelopmentStrengths And Weaknesses Of Software Development
Strengths And Weaknesses Of Software DevelopmentBrianna Johnson
 
Scaling agile. Agile across the enterprise
Scaling agile. Agile across the enterpriseScaling agile. Agile across the enterprise
Scaling agile. Agile across the enterpriseDarren Wilmshurst
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)IJERD Editor
 
SE18_Lec 05_Agile Software Development
SE18_Lec 05_Agile Software DevelopmentSE18_Lec 05_Agile Software Development
SE18_Lec 05_Agile Software DevelopmentAmr E. Mohamed
 
Why Agile? Why Now? IPMA Forum 2009
Why Agile? Why Now?   IPMA Forum 2009Why Agile? Why Now?   IPMA Forum 2009
Why Agile? Why Now? IPMA Forum 2009skipangel
 
The_Role_of_the_Product_Owner_in_Scrum-comparison_.pdf
The_Role_of_the_Product_Owner_in_Scrum-comparison_.pdfThe_Role_of_the_Product_Owner_in_Scrum-comparison_.pdf
The_Role_of_the_Product_Owner_in_Scrum-comparison_.pdfRafaelSalamanca11
 
Implementation Of Incremental Development Process
Implementation Of Incremental Development ProcessImplementation Of Incremental Development Process
Implementation Of Incremental Development ProcessSherry Bailey
 
Susan Clarke - The practicalities of adopting scaled agile methodologies
Susan Clarke - The practicalities of adopting scaled agile methodologiesSusan Clarke - The practicalities of adopting scaled agile methodologies
Susan Clarke - The practicalities of adopting scaled agile methodologiesAssociation for Project Management
 
Agile software development
Agile software developmentAgile software development
Agile software developmentpradeeppatelpmp
 
SE_Lec 04_Agile Software Development
SE_Lec 04_Agile Software DevelopmentSE_Lec 04_Agile Software Development
SE_Lec 04_Agile Software DevelopmentAmr E. Mohamed
 

Ähnlich wie Agile~overview (20)

A littlebook about agile
A littlebook about agileA littlebook about agile
A littlebook about agile
 
Is There Room For Project Managers In An Agile Like Environment Such As Scrum1
Is There Room For Project Managers In An Agile Like Environment Such As Scrum1Is There Room For Project Managers In An Agile Like Environment Such As Scrum1
Is There Room For Project Managers In An Agile Like Environment Such As Scrum1
 
PhuNguyeAgileStudyReport201506
PhuNguyeAgileStudyReport201506PhuNguyeAgileStudyReport201506
PhuNguyeAgileStudyReport201506
 
Scrum 18 months later
Scrum 18 months laterScrum 18 months later
Scrum 18 months later
 
Scrum
Scrum Scrum
Scrum
 
Strengths And Weaknesses Of Software Development
Strengths And Weaknesses Of Software DevelopmentStrengths And Weaknesses Of Software Development
Strengths And Weaknesses Of Software Development
 
Chapter 5
Chapter 5Chapter 5
Chapter 5
 
Scaling agile. Agile across the enterprise
Scaling agile. Agile across the enterpriseScaling agile. Agile across the enterprise
Scaling agile. Agile across the enterprise
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)
 
SE18_Lec 05_Agile Software Development
SE18_Lec 05_Agile Software DevelopmentSE18_Lec 05_Agile Software Development
SE18_Lec 05_Agile Software Development
 
Why Agile? Why Now? IPMA Forum 2009
Why Agile? Why Now?   IPMA Forum 2009Why Agile? Why Now?   IPMA Forum 2009
Why Agile? Why Now? IPMA Forum 2009
 
The_Role_of_the_Product_Owner_in_Scrum-comparison_.pdf
The_Role_of_the_Product_Owner_in_Scrum-comparison_.pdfThe_Role_of_the_Product_Owner_in_Scrum-comparison_.pdf
The_Role_of_the_Product_Owner_in_Scrum-comparison_.pdf
 
Agile frameworks
Agile frameworksAgile frameworks
Agile frameworks
 
Implementation Of Incremental Development Process
Implementation Of Incremental Development ProcessImplementation Of Incremental Development Process
Implementation Of Incremental Development Process
 
Introduction to agile
Introduction to agileIntroduction to agile
Introduction to agile
 
Agile Organizations
Agile OrganizationsAgile Organizations
Agile Organizations
 
Unit2
Unit2Unit2
Unit2
 
Susan Clarke - The practicalities of adopting scaled agile methodologies
Susan Clarke - The practicalities of adopting scaled agile methodologiesSusan Clarke - The practicalities of adopting scaled agile methodologies
Susan Clarke - The practicalities of adopting scaled agile methodologies
 
Agile software development
Agile software developmentAgile software development
Agile software development
 
SE_Lec 04_Agile Software Development
SE_Lec 04_Agile Software DevelopmentSE_Lec 04_Agile Software Development
SE_Lec 04_Agile Software Development
 

Kürzlich hochgeladen

Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilV3cube
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...apidays
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobeapidays
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 

Kürzlich hochgeladen (20)

+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of Brazil
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 

Agile~overview

  • 1. © 2012 Systems Plus Agile Awareness
  • 2. Agile Evolution © 2012 Systems Plus
  • 3. Why agile? Why do we need another approach (PMBOK Guide) for managing projects? How do we solve different situations in our everyday life? © 2012 Systems Plus Initial Agricultural Revolution Industrial Revolution Information Revolution Hunter Gatherer Wandering Planting Crops Herding Animals Start living in one place Machines Factories Moving to different cities Led to management (project Management, WBS) Information/Collaboration Focus is not only on manufacturing Value is on ownership of knowledge Industrial Worker Knowledge worker Work is visible Work is invisible Work is stable Work is changing Emphasis on running things Emphasis is on changing things More Structured with fewer decisions Less Structured with more decisions Focus on right answers Focus on right questions Define the task Understand the task Command and Control Give Autonomy Strict Standards Continuous innovations Focus on Quantity Focus on quality Measure performance to strict standards Continuously learn and teach Minimize cost of worker for each task Treat worker as asset and not as cost Agile Evolution
  • 4.  Agile Term came into existence during early 2001 & represents ways of delivering the product/software in fast, collaborative and iterative fashion.  Agile Methodologies are contrary to Traditional methodologies (Waterfall etc.)  Agile term represents huge set of methodologies including RAD, Spiral, XP, SCRUM, FDD, Lean, OpenUP and Kanban.  Agile Manifesto Published in Feb 2001 by 17 developers at Snowbird Utah. © 2012 Systems Plus Agile Evolution RUP (Rational Unified Process) SCRUM Crystal Clear XP (Extreme Programming) ASD (Adaptive Software Development) FDD (Feature Driven Development) DSDM (Dynamic Systems Development Model) 1994 1995 1996 1996 1995 1995 1995 2001
  • 5. Agile Project Management Framework © 2012 Systems Plus
  • 6. © 2012 Systems Plus Kent Beck (Creator XP and TDD Methodologies) James Grenning (author of Test-Driven Development for Embedded C.) Robert C Martin ("Uncle Bob", is an American software consultant and author) Mike Beedle (founder,CEO of e-Architects Inc., company that specializes in application development using distributed objects and Internet technologies. ) Jim Highsmith (Author of books on software development methodologies and creator of Adaptive Software Development) Steve Mellor (developer of the Shlaer-Mellor method and Executable UML ) Arie Van Bennekum (Involved in DSDM Consortium) Andrew Hunt (Published the book The Pragmatic Programmer: From Journeyman to Master.) Ken Schwaber (Co Creator of Scrum) Alistair Cockburn (Creator of Crystal Methodologies) Ron Jeffries (Collaborator and founder of XP) Jeff Sutherland (Co Creator of Scrum) Ward Cunningham (Collaborator of XP and creator of Wiki) Jon Kern (with both Jeff De Luca and Peter Coad and had helped shape the charter on FDD.) Dave Thomas (Co Author of the book The Pragmatic Programmer: From Journeyman to Master.) Martin Fowler (as per some people introduced the term Continuous Integration.) Brian Marick ( an early proponent of the Context-Driven school of testing,) Agile Original Contributors
  • 7. © 2012 Systems Plus “We are uncovering better ways of developing software by doing it and helping others do it. Through this work we have come to value: The Agile Manifesto INDIVIDUALS & INTERACTIONS over process & tools WORKING SOFTWARE over comprehensive document CUSTOMER COLLABORATION over contract negotiation RESPONDINGT OCHANGE over following a plan That is, while there is value in the items on the right, we value the items on the left more.”
  • 8. Principle Shortened Version Our highest priority is to satisfy customer through early and continuous delivery of valuable software. Satisfy customer with great software or Produce value early Welcome changing requirements, even late in development. Agile process harness change for customer’s competitive advantage Welcome Change Deliver working software frequently, from couple of weeks to couple of months, with preference to the shorter timescale. Deliver Frequently or iterative delivery Business people and developers must work together daily throughout the project Work with business or Daily business collaboration. Build projects around motivated individuals. Give them environment and support they need, and trust them to get the job done. Motivate People or Trust Motivated team The most efficient and effective method of conveying information to and within a development team is face-to-face conversation. Face-to-Face communication Working software is the primary measure of the progress Measure software done or Working software Agile process promotes sustainable development. The sponsors, developers, and users should be able to maintain a constant pace indefinitely. Maintain sustainable pace Continuous attention to technical excellence and good design enhances agility. Maintain Design or Technical Excellence Simplicity- the art of maximizing the amount of work not done- is essential. Keep it simple or K.I.S.S The best architectures, requirements, and design emerge from self-organizing teams. Team creates architecture or Self Organize At regular intervals, the team reflects on how to become more effective, then tunes and adjusts it behaviour accordingly. Reflect and Adjust © 2012 Systems Plus 12 Principles Of Agile
  • 9. © 2012 Systems Plus Agile and adaptive approaches for linking people, projects and value. DOI focuses on project management side of agile projects. Agile Manifesto and agile methods offer whole project guidance. We are a community of project leaders that are highly successful at delivering results. To achieve these results:  We increase return on investment by making continuous flow of value our focus.  We deliver reliable results by engaging customer in frequent interactions and shared ownership.  We expect uncertainty and manage for it through iterations, anticipations and adoptions.  We unleash creativity and innovation by recognizing that individuals are the ultimate source of value, and creating an environment where they can make difference.  We boost performance through group accountability for results and shared responsibility for team effectiveness.  We improve effectiveness and reliability through situational specific strategies, processes and practices. DOI: Declaration Of Independence
  • 10. © 2012 Systems Plus Agile Methodologies
  • 11. © 2012 Systems Plus Agile Methodologies
  • 12. © 2012 Systems Plus Scrum is not an acronym. First used to describe hyper-productive development in 1987 by Ikujiro Nonaka and Hirotaka Takeuchi, Scrum refers to the mechanism used in rugby for getting an out-of-play ball back into play. Scrum generates productivity improvements by implementing a framework that empowers teams and thrives on change. A set of rules and corresponding terminology are used to reinforce such common sense techniques as small teams, daily status meetings, not interrupting people who are working, and a single source of work prioritization. SCRUM
  • 13. Scrum adopts an empirical approach—accepting that the problem cannot be fully understood or defined, focusing instead on maximizing the team's ability to deliver quickly and respond to emerging requirements. © 2012 Systems Plus SCRUM Three pillars that hold up every implementation of empirical process control: Visibility: means that those aspects of the process that affect the outcome must be visible to those controlling the process. Not only must these aspects be visible, but what is visible must also be true. Inspection: The various aspects of the process must be inspected frequently enough that unacceptable variances in the process can be detected. Adaptation: If the inspector determines from the inspection that one or more aspects of the process are outside acceptable limits and that the resulting product will be unacceptable, the inspector must adjust the process or the material being processed Although the above pillars guides all aspects of Scrum Projects, there are also four planned opportunities for Inspection and Adaption within Scrum framework: Sprint Retrospective Daily Scrum Meeting Sprint Review Meeting Sprint Planning Meeting
  • 14. © 2012 Systems Plus SCRUM Cont. The heart of Scrum lies in the iteration (Sprint). The team takes a look at the requirements, considers the available technology, and evaluates its own skills and capabilities. It then collectively determines how to build the functionality, modifying its approach daily as it encounters new complexities, difficulties, and surprises. The team figures out what needs to be done and selects the best way to do it. This creative process is the heart of the Scrum’s productivity Dimensions of Software Development Complexity P3opl3 R3quir3m3nts T3chnology
  • 15. SCRUM Roles: © 2012 Systems Plus The Product Owner The Team The Scrum Master Represents everyone with stake in project and the final product Self Managing, self organizing and cross functional He is responsible for Scrum Processes Achieves initial and on going funding Responsible for figuring out how to turn Product Backlog into an increment of functionality within an iteration Teaches Scrum to everyone from implementation to Delivery Creates overall requirements(Product Backlog), ROI objectives and Release plan Responsible for developing functionality Making sure process fits into organization culture and delivers expected benefits Responsible for prioritizing product backlog Collectively responsible for each iteration and whole product Removes impediments to progress, assists product owner with managing backlog, communicating vision, goal and backlog items to team. SCRUM Cont.
  • 16. © 2012 Systems Plus SCRUM Flow
  • 17. Sprints:  A time boxed iteration (2-8 weeks)  build a potentially shippable product.  includes a sprint planning meeting, Daily Scrums, Development work, Sprint Review Meeting, Sprint Retrospective.  During sprint no changes are made that effect sprint goal.  Scope may be clarified or renegotiated as new information becomes clear.  Development team cannot change © 2012 Systems Plus SCRUM Activities Sprint Planning Meeting:  Is used to define what will define a sprint and how it will be achieved.  time boxed for 8 hrs.( 4 hrs. explain, 4 hrs. plan)  Product owner explains team product backlog , ordered by priority  Team asks questions to clarify user stories so that they can break it into tasks.  PO, SM and team is involved.  Outcome is Sprint Backlog
  • 18. Daily Scrum:  Is 15 minutes time boxed daily meeting.  Meeting happens at same place and same time.  Each member provides answer to three questions:  What has been achieved since last meeting?  What will be done before next meeting?  What obstacles are in way?  Daily scrum for pigs (chickens welcome to listen)  Discussion parked until after scrum © 2012 Systems Plus SCRUM Activities Cont. Sprint Review Meeting:  Is held at the end of the sprint & last about 1hr per wk of sprint  Scrum team demonstrates what is accomplished during sprint.  Very informal ; no PowerPoint slides, lectures, diagrams.  Participant includes PO, SM, Scrum Team, management, customer  Project is assessed against the sprint goals defined in sprint planning meeting  Ideally team completes each product backlog item brought into sprint backlog
  • 19. © 2012 Systems Plus SCRUM Activities Cont. Sprint Retrospective Meeting:  Is usually the last thing of the sprint.  time boxed for 3-4 hrs.  Attended by SM and Scrum team and occasionally PO different formats  go for lunch Outside park  CEO to attend
  • 20. Product Backlog:  Prioritized features list, containing short descriptions of all functionality desired in the product.  Typically contains features, Bugs, Technical work & Knowledge acquisition.  It is  Visible to all  Single source and copy of truth  Dynamic  It helps guide roadmap planning. © 2012 Systems Plus SCRUM Artifacts
  • 21. © 2012 Systems Plus SCRUM Artifacts Sprint Backlog:  Task identified by Scrum Team during Sprint Planning  User Stories in Product Backlog are broken into Tasks.  Team estimates how many hours each task will take.  Burn Down Chart: is a publicly displayed chart showing remaining work in the sprint backlog. Updated every day, it gives a simple view of the sprint progress. It also provides quick visualizations for reference. Variation of Sprint burn down is Release burn down chart.
  • 22. © 2012 Systems Plus  The main goal of XP is to lower the cost of change in software requirements. With traditional system development methodologies, like the Waterfall Methodology, the requirements for the system are determined and often "frozen" at the beginning of the development project. This means that the cost of changing the requirements at a later stage in the project — something that is very common in the real-world — can be very high.  Extreme Programming (or XP) is software development centric agile methodologies. While scrum focuses on project management level with focus on prioritizing work and getting feedback, XP focuses on software development good practices. Extreme Programming (XP) Flow
  • 23.  Extreme Programming (or XP) is software development centric agile methodologies. While scrum focuses on project management level with focus on prioritizing work and getting feedback, XP focuses on software development good practices.  Core values of XP methodologies are: Simplicity: focuses on reducing complexity, extra features and waste. “Find the simplest thing that could work” is the phrase team should keep in mind. Communication: focuses on making sure each member knows what is expected out of them and what other members are working on. Daily Stand Up meeting is key component of communication Feedback: team should get impression of suitability early. Failing fast can be useful. Courage: It takes courage to allow our work to be entirely visible to others. In Pair programming, team members share codes, often makes bold simplifications and changes the code. Automated build and tests makes sure developers have confidence to make important changes. Respect: is essential on XP projects where team work together as a team and everyone is accountable for success or failure. © 2012 Systems Plus Extreme Programming (XP)
  • 24. © 2012 Systems Plus Extreme Programming (XP) Flow
  • 25. © 2012 Systems Plus XP Practices  XP Is Based on several simple but powerful core practices.
  • 26.  XP expects participation from Whole Team, Whole team refers to all contributors to XP sitting in same physical location as members of same team including Customers.  XP emphasis on the notion of generalising specialist as opposed to role specialist. © 2012 Systems Plus Onsite Customers Product Manager /Owners Domain Experts Technical Specialists Interaction Designers Programmers Designer and Architects Testers Coaches- The programmer coach Project Manager Project Community, stakeholder and executive sponsor XP Roles
  • 27. Planning Games: XP has two primary planning activities or planning games – Release Planning and Iteration Planning.  Release Planning is push for new functionality all the way to production. A Project typically has one or more releases with no more than two releases happening in a year. During release planning customer outlines the functionality required and developers estimates how difficult it is to estimate. Based on estimates and priorities customer defines a project plan. Initial estimates will be bit imprecise, so process is revisited frequently and improved as estimates and priorities evolves.  Iterations are small development cycles within a release( as Scrum calls it “Sprint”) ideally of two weeks. Iteration planning is done at the start of iteration. Customer describes the functionality required in next two weeks and then developer breaks the functionality into tasks and estimates the work. Based on these estimates and amount of work achieved in prior iteration, team commits the amount of work they can do in next iteration. © 2012 Systems Plus XP Planning
  • 28. © 2012 Systems Plus XP Test Driven Development Cycle • Red Write a little test that doesn‘t work (and perhaps doesn‘t even compile at first) • Green Make the test work quickly (committing whatever sins necessary) • Refactor Eliminate all of the duplication created in merely getting the test to work, improve the design
  • 29. © 2012 Systems Plus Lean Software Development
  • 30. © 2012 Systems Plus Lean Software Development Eliminate Waste: To maximize value we must eliminate waste. In software systems, waste can be in form of partially done work, unnecessary features etc. Therefore to increase value we must develop ways to identify and then remove waste. Empower Team: Rather than taking micromanagement approach we should respect team’s superior knowledge of the technical steps required for project and let them make decision to be productive and successful.’ Deliver Fast: Maximize ROI by quickly delivering valuable software. Optimize the whole: Aim to see the system as more than the sum of its parts. We go beyond the pieces of project and look how it aligns with organization. As part of optimizing the whole we also focus on forming better intergroup relations. Build Quality In: Lean development does not try to “test-in” quality at the end. It builds quality into the product and continually assures quality throughout the development process using techniques like refactoring, continuous integrations, and unit testing. Defer Decisions: Balance early planning with making decisions and committing to things as late as possible. Amplify Learning: Concept involves facilitating communication early and often getting feedback as soon as possible and building on what we learn. Lean gives us techniques and concepts such as Value stream Mapping, seven forms of waste, WIP etc.
  • 31. © 2012 Systems Plus  Lean software development is a translation of lean manufacturing and lean IT principles and practices to the software development domain. Adapted from the Toyota Production System, a pro-lean subculture is emerging from within the Agile community. Lean software development practices, or what is commonly called "tools" are expressed slight differently from their equivalents in agile software development, but there are parallels. Examples of such practices include:  Eliminate Waste  Provide market and technical leadership - Your company can be successful by producing innovative and technologically advanced products but you must understand what your customers value and you know what technology you are using can deliver  Create nothing but value - You have to be careful with all the processes you follow, i.e., be sure that all of them are required and they are focused on creating value  Write less code - The more code you have the more tests you need thus it requires more work and if you're writing tests for features that are not needed you are simply wasting time Lean Software Development
  • 32. © 2012 Systems Plus  Create Knowledge  Create design-build teams - Leader of the development team has to listen to his/her members and ask smart questions encouraging them to look for the answers and to get back with encountered problems or invented solutions as soon as possible  Maintain a culture of constant improvement - Create environment in which people will be constantly improving what they are working on - they should know that they are not and should not be perfect - they always have a field to improve and they should do it  Teach problem-solving methods - Development team should behave like small research institute, they should establish hypotheses and conduct many rapid experiments in order to verify them  Build Quality In  Synchronize - In order to achieve high quality in your software you should start worrying about it before you write single line of working code - don't wait with synchronization because it will hurt  Automate - Automate testing, building, installations, anything that is routine, but do it smartly, do it in a way people can improve the process and change anything they want without worrying that after the change is done the software will stop working  Refactor - Eliminate code duplication to ZERO - every time it shows up refactor the code, the tests, and the documentation to minimize the complexity. Lean Software Development
  • 33. © 2012 Systems Plus  Defer Commitment  Schedule irreversible decisions at the last responsible moment - You should know where you want to go but you don't know the road very well, you will be discovering it day after day - the most important thing is to keep the right direction  Break dependencies - Components should be coupled as loosely as possible to enable implementation in any order  Maintain options - Develop multiple solutions for all critical decisions and see which one works best  Optimize the Whole  Focus on the entire value stream - Focus on winning the whole race which is the software - don't optimize local inefficiencies, see the whole and optimize the whole organization  Deliver a complete product - Teams need to have great leaders as well as great engineers, sales, marketing specialists, secretaries, etc. - they together can deliver great final products to their customers Lean Software Development
  • 34. © 2012 Systems Plus  Deliver Fast  Work in small batches - Reduce projects size, shorten release cycles, stabilize work environment (listen to what your velocity tells you), repeat what's good and eradicate practices that creates obstacles  Limit work to capacity - Limit tasks queue to minimum (one or two iterations ahead is enough), don't be afraid of removing items from the queue - reject any work until you have an empty slot in your queue  Focus on cycle time, not utilization - Put in your queue small tasks that cannot clog the process for a long time - reduce cycle time and have fewer things to process in your queue  Respect People  Train team leaders/supervisors - Give team leaders the training, the guidance and some free space to implement lean thinking in their environment  Move responsibility and decision making to the lowest possible level - Let your people think and decide on their own - they know better how to implement difficult  algorithms and apply state-of-the-art software frameworks  Foster pride in workmanship - Encourage passionate involvement of your team members to what and how they do Lean Software Development
  • 35.  Task Kanban Board named after Just-In-Timeproduction method in Toyota Production System (TPS).  A Kanban is a ticket describing a task to do. In TPS, it is used to realize Just-In-Time"pull" production control. In Figure 1, the Kanban Board shows the current status of all the tasks to be done within this iteration. The tasks are represented by cards (Post-It Notes). Status is presented by areas on the board separated and named To Do, Doing, and Done. This Kanban Board helps team understand how they are doing, as well as what to do next. This helps make the team self-directing. © 2012 Systems Plus KANBAN TPS Board
  • 36.  Limiting the amount of work that is in progress will contribute to faster completion, better quality, and greater focus on only the highest-priority work. A WIP limit is a policy, an agreed- upon decision about how the work will be processed. Policies can similarly specify how the organization handles types of work items.  A WIP limit defines a stage in the Kanban system. A stage in the Kanban system may span across several workflow states. A limit on WIP constrains how many work items can be in each stage of the workflow at a given time. When a work item is pulled to the next stage of the process, a slot opens and a new work item can be pulled into that stage. A number of workflow states may be grouped together under a single WIP limit.  A significant consequence of a WIP limit is that blocked work “holds up the line.” A blocked work item still counts against the limit, so a situation may arise as more items become blocked, in which no new work can progress until the block is resolved. This drives collaboration, as the team (and any affected external stakeholders) are highly motivated to clear the blockage. © 2012 Systems Plus KANBAN TPS Board
  • 37. © 2012 Systems Plus KANBAN TPS Board Three Principles of Kanban 1. Start with what you know 2. Agree to pursue incremental, evolutionary change 3. Initially, respect current roles, responsibilities and job titles Kanban five core practices 1. Visualize 2. Limiting work in progress 3. Manage flow 4. Make management policies 5. Improve collaboratively using “safe to fail” experiments
  • 38.  In Agile project management, planning is an iterative component of the project lifecycle.  In the above figure, see the repeated sets of green shading as planning occurs throughout the project lifecycle. Agile Project Management Framework
  • 39. K & S – Level 1
  • 40.  ENVISION Determine the product vision and project scope, the project community, and how the team will work together  SPECULATE Develop a feature-based release, milestone, and iteration plan to deliver on the vision  EXPLORE Deliver tested features in a short timeframe, constantly seeking to reduce the risk and uncertainty of the project  ADAPT Review the delivered results, the current situation, and the team's performance, and adapt as necessary  CLOSE Conclude the project, pass along key learnings, and celebrate

Hinweis der Redaktion

  1. Agilityisthe ability todelivercustomervalue while dealingwithinherent project unpredictabilityanddynamismbyrecognizing andadaptingto change
  2. We see value in customizing our approach to different situations. We do not resolve all issues exactly the same way; instead we adjust our approach to be effective for unique solution. Same applies to project management. Some projects, especially knowledge worker projects occurring in fast moving or time constrained environments, call for agile approach.
  3. The Shlaer–Mellor method, also known as Object Oriented Systems Analysis (OOSA) or Object Oriented Analysis (OOA) is an object-oriented software development methodology introduced by Sally Shlaer and Stephen Mellor in 1988. The goal of the method is to make the documented analysis so precise that it is possible to implement the analysis model directly by translation rather than by elaboration.
  4. Individuals and interactions over processes and tools Projects are undertaken by People and not tools. Problems gets solved by People and not process.Project is accepted by people, definition of “done” is defined by people, scope is debated by people.Process and tools are important aspects but we need to value more on individual and interactions.Working software over comprehensive documentation It speaks of need to deliver. Ideal goal is valuable, high quality software.Documentation which does not add to the value of goal is valuelessCustomer collaboration over contract negotiation It reminds us to be flexible & accommodating, rather than fixed & uncooperative.It is same difference of being right and doing the right things.Work with customer continuously , towards the shared definition of “Done”Responding to change overfollowing a plan Plan is required, but instead of trying to bring project back in line with original plan, we work towards responding to change.High Rate of changes are common in software and competitive business.
  5. What is incremental and iterative?
  6. Empirical by dictionary means: Based on, concerned with or verifiable by observation or experience rather than theory or pure logic.
  7. Sprint Goal (, one- or two-sentence, description of what the team plans to achieve ) e.g.Implement basic shopping cart functionality including add, remove, and update quantities.The checkout process—pay for an order, pick shipping, order gift wrapping, etc.