Climate adaptation in
the IJsseldelta
Province of Overijssel
The Netherlands
Climate change in the
IJsseldelta
The river IJssel in the Netherlands is a major branch of the river Rhine, the 3rd largest river of Europe.

It discharges its flows to the Lake IJsselmeer, which was a former sea (Zuiderzee) that was closed off

in 1932 by a big dam (Afsluitdijk). The IJsseldelta is a low-lying area that is threatened by floods from

both the river IJssel and from the Lake IJsselmeer (figure 1).




                                  IJsseldelta




Figure 1: IJsseldelta in a transboundary perspective of the river   Figure 2: Extreme high water in the IJsseldelta in 2015 (red graph) and effect of
Rhine in Europe.                                                    the bypass on the water level (blue graph).




Although the delta and its major cities Zwolle and Kampen           up to 40 cm in 2015 (figure 2) and up to 1 m in the long term
are protected from flooding by dikes, the safety standards          (2050-2100). Further knowledge about the effects of climate
can’t be guaranteed in the near future because of the effects       change is generated within the national research programme
of climate change. Predictions of climate models indicate that      ‘Knowledge for Climate’, in which IJsseldelta is participating.
the extreme high water levels of the river IJssel will rise with
Spatial challenges
Several major spatial developments are planned in the IJsseldelta    the IJsseldelta area, with a strong focus on climate adaptation.
in the coming decades. The municipality of Kampen has planned        The challenge was to combine and integrate several spatial
some 4000 houses, a new railway line (the Hanzelijn) is being        developments (housing, infrastructure, leisure, nature,
constructed at the moment and two highways (N50 and N23)             agriculture), together with the construction of a so-called
will be reconstructed in the area. Furthermore, a river bypass is    bypass of the river IJssel (figure 3).
foreseen as one of the international measures to increase safety
against flooding along the river Rhine system. All these separate,
potentially conflicting spatial developments are coordinated in
Project IJsseldelta. In 2005 the Province of Overijssel initiated
the process of drawing a sustainable development plan for




                                                                                                   Figure 3:

                                                                                                   The spatial challenge of Project
                                                                                                   IJsseldelta:

                                                                                                   - to combine and integrate
                                                                                                     developments together with
                                                                                                     the river bypass in the southwest
                                                                                                     (the arrows on the map);
                                                                                                   - to prevent large scale
                                                                                                     developments in the northeast
                                                                                                     of the delta, which will also
                                                                                                     preserve the resilience of this
                                                                                                     area to adapt to climate change
                                                                                                     in the future (the green area on
                                                                                                     the map).


Room for the River
The bypass is one of the international measures along the river      the bypass some 350 hectares will be added to the floodplains
Rhine system to increase safety against flooding. Instead of         of the delta of the river IJssel. This means a break with the
building higher and stronger dikes a new strategy has been           past, because for centuries space has been taken from the
chosen: to add space to the floodplains of the rivers. This          river. For example, in 1850 the floodplains of the big rivers in
strategy - a small revolution and a real ‘paradigm shift’ in water   the Netherlands had about 3 times more space compared with
management - is being adopted within the Dutch programme             the situation at the moment. The effect of the restoration of
‘Room for the River’. Instead of a foe, water is becoming            the floodplains in the IJsseldelta is that the water levels of the
more and more a friend for the planners and water managers           river IJssel will decrease substantially during situations of high
nowadays. Project IJsseldelta is a good exponent of this new         river discharges. This contributes to the safety and resilience
philosophy in water management. With the construction of             of the area.
Sustainable development planning
  Although the Province of Overijssel plays a major role in
  the project as a director of the planning process, it is very
  much dependent upon others. As a matter of fact, the
  plan for the IJsseldelta is made in close cooperation with
  the stakeholders such as the municipalities, neighbour
  provinces, the water boards and many non-governmental
  organizations in the region. The municipality of Kampen,
  water board Groot Salland and the Province of Flevoland
  are the most important partners in the region. But the
  national Government has an decisive position in the
  project too.


  The national ministries involved are the Ministry of                Figure 4: Broad and intense public participation during the phase
                                                                      of the Masterplan. The participation process started with 5
  Housing, Spatial Planning and the Environment, the
                                                                      different, initial scenarios for the future of IJsseldelta. During the
  Ministry of Agriculture, Nature and Food Quality and                process a 6th scenario, developed by the public, was added. This
  the Ministry of Transport, Public Works and Water                   scenario became an essential building block for the Masterplan.

  Management. And last but not least, the public is
  mobilized to participate (figure 4).




The collaborative approach as applied in Project IJsseldelta has proven to be a successful recipe for sustainable development planning.
The Ministry of Housing, Spatial Planning and the Environment awarded Project IJsseldelta as a “best practice”. The project has received
a lot of attention in the media and many members of the national parliament and government have already visited the delta, including
Prime Minister Balkenende. In spring 2006 the Prince of the Netherlands, who has a special interest in water management, came to see
the area (figure 5).




Figure 5: Visit of Prince Willem Alexander to the IJsseldelta.                         Figure 6: Map of the IJsseldelta in 1724,
                                                                                       with the path of the bypass.
The Overijssel approach:
spatial integration and public participation                               In 2007 a gentlemen’s agreement was signed by
In 2006 the Masterplan IJsseldelta came out. Within the                    11 governmental organizations, with the intention to
Masterplan the 6 spatial challenges in the area (housing,                  work together to implement the Masterplan. Another
infrastructure, leisure, nature, agriculture and river bypass)             11 non-governmental organizations supported the plan.
are combined and integrated. One could say, that the result                Recently, the spatial plans of the Provinces of Overijssel and
has become more than the sum of its parts. The Masterplan is               Flevoland have been reviewed. A strategic environmental
broadly supported by the public, because it is based upon a                (impact) assessment (SEA) was part of this review. Within
draft of the bypass (the 6th scenario, see figure 4) that was              this SEA several alternatives for the Masterplan were studied.
made by the public (mostly farmers, assisted by planners and               Also a so-called most environmentally friendly alternative.
professionals). A vital element in the process of gaining public           The decision making process has led to several modifications
support for the plan were the face-to-face meetings with the               of the Masterplan. The current plan resembles in almost every
people at ‘the kitchen table’. Worth mentioning is that the                aspect the most environmentally friendly alternative of the SEA.
bypass follows the alignment of an old sea arm that still can              The figure below gives an impression of the current plan
be seen on an historical map of the IJsseldelta area of 1724               (figure 7).
(figure 6).




     outlet      water reed                 water-oriented houses                  fairway           crossovers           lift-lock    intake
                 & marshes                                                                           with bypass
                         tunnel                                  marshes                        new train                       ecological
                         new railway                                                             station                         corridor




Figure 7: Bird’s eye perspective of the plan IJsseldelta (autumn 2008).
Water as a motor for nature development
A central issue in the plan-making process is how to coop with the dynamics of the water. On the one hand there is the desire to
regulate the water level and fluctuations of the water level in the bypass as much as possible. The reason to do this is the wish to
prevent the effects of water seepage in the vicinity of the bypass. On the other hand there is the desire to utilize the dynamics of
the water as a ‘motor’ for nature development. Frequent inundations - caused by high water in the river as well as by situations of
storm in Lake IJsselmeer - are an important mechanism for the creation of special habitats (e.g. water reed, marshes and flats) that
are characteristic for river deltas. Figure 8 shows how storm situations in Lake IJsselmeer can penetrate in the bypass.




Current level (-70 cm)                               Water level Lake IJsselmeer (-20 cm)                   10 x a year (+ 20 cm)




3 x a year (+ 40 cm)                                 1 x a year (+ 60 cm)                                   1 x in 2 years (+ 80 cm)


Figure 8: Inundations of the bypass caused by storm on Lake IJsselmeer.




An interesting frame of reference for Project IJsseldelta is Lake
Peipsi at the border of Estonia and Russia (figure 9). Especially as
an example for nature development and water dynamics. Lake
Peipsi has a lot in common with Lake IJsselmeer, but one of the
main differences is, is that the first is more natural and the latter
more artificial. As ‘twin lakes’ they can learn a lot from each
other and for the Ministry of Transport, Public Works and Water
Management this has been the reason for a joint cooperation
between Dutch, Estonian and Russian specialists.

                                                                            Figure 9: Lake Peipsi as a frame of reference for Project IJsseldelta.
The visibility of frequent inundations and variable water levels
is also of importance for keeping and raising the awareness of
the public for such an elusive matter as climate change. This
issue of awareness raising is addressed in the Dutch knowledge
impuls programme ‘Living with Water’, in which (international)
project consortia collaborate on achieving changes in water
management.
Implementation                                                      Consequences of the advice of the Delta Committee
The review of the - above mentioned - provincial plans is a next    In 2007 the Government of the Netherlands requested an
step towards the implementation of the plan. Financing the          independent Committee of State (the Delta Committee) to
project (which will cost about €325 million in total) is another    give its advice on climate change and flood protection in
important aspect that needs to be arranged in the beginning         the Netherlands for the next century. The Delta Committee
of 2009. Already €30 million has been invested, as a part of        presented her advice in September 2008. The Committee has
these total costs, to finance the necessary adaptations of the      made twelve recommendations in order to increase the level
infrastructure. A new railway is already under construction;        of flood protection and to safeguard the fresh water supply.
                                                                    Two of them are of major importance for the IJsseldelta. The
                                                                    first one underlines the necessity to implement the long term
                                                                    ‘Room for the River’ measures - such as the river bypass - as
                                                                    soon as possible. The second one is to increase the level of
                                                                    the Lake IJsselmeer with a maximum of 1.5 m in the long term.
                                                                    This recommendation will also affect the IJsseldelta and - as
                                                                    a consequence - additional measures might be necessary.
                                                                    Possibly, a combination of a river bypass with the enlargement
                                                                    of the summer bed is already necessary in 2015 or shortly
                                                                    after. The combination of the two measures can even be an
                                                                    advantage, because in that case the sediment of the river IJssel
                                                                    can be used to construct the dikes of the river bypass or the
                                                                    embankment that is needed for housing development.
Figure 10: Impression of housing development on a
(climate proof) dike (source: Municipality of Kampen).
                                                                    One of the most recent ideas is to develop a climate proof dike
the bypass will cross this railway two times. Furthermore, the      - a kind of super dike along the river bypass - that at the same
Province of Overijssel has funded €20 million for anticipatory      time can act as an embankment for housing development.
purchases of land and real estate (on a voluntary basis) in the     Figure 10 gives an impression of how housing development
bypass area.                                                        on a (climate proof) dike might look like.


At this moment the environmental impact assessment (EIA) is
being made for the review of the local land use plan and the
‘dike displacement plan’. One of the challenges for coming
period will be to find ways to prevent, mitigate or compensate         Information
the effects of water seepage. The final step, after the finish of
the formal plan procedures, will be the application for licenses      For further information about
and permits. When everything goes according to plan and               Project IJsseldelta visit our website:
without delay, the construction of the dikes, sluices, bridges,       www.ijsseldelta.info
dams and a storm-surge barrier will start in 2011. This tight
time schedule is a necessity because the bypass needs to be           Or contact:
operational in 2015. In case the river bypass won’t or can’t          Arjan Otten
be implemented in 2015, a cheaper, less complex - but also            Province of Overijssel
less sustainable - short term alternative will be carried out to      PO Box 10078
protect the IJsseldelta against flooding: the enlargement of the      8000 GB Zwolle
summer bed of the river IJssel (over a length of 22 kilometers,       the Netherlands
with an average depth of 1.5 meter).                                  tel. +31 (0)38 499 81 08
                                                                      e-mail: a.otten@overijssel.nl
www.ijsseldelta.info                                   The photo of the Great White Egret is taken in the IJsseldelta (by Ed van Zoonen)




Public partners of project IJsseldelta                                                                                  Main consultants




Province of Overijssel           Province of Flevoland                  Municipality of Kampen                          DHV Consultancy and
                                                                                                                        Engineering




Municipality of Dronten          Municipality of Oldebroek              Municipality of Zwolle                          H+N+S Landscape
                                                                                                                        Architects




Waterboard Groot Salland         Waterboard Zuiderzeeland               Staatsbosbeheer




Ministry of Transport, Public    Ministry of Housing, Spatial           Ministry of Agriculture,
Works and Water Management       Planning and the Environment           Nature and Food Quality

More Related Content

Featured

Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTExpeed Software
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsPixeldarts
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthThinkNow
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfmarketingartwork
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsKurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Applitools
 

Featured (20)

Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
 

Paper Climate Adaptation In The IJsseldelta

  • 1. Climate adaptation in the IJsseldelta Province of Overijssel The Netherlands
  • 2. Climate change in the IJsseldelta The river IJssel in the Netherlands is a major branch of the river Rhine, the 3rd largest river of Europe. It discharges its flows to the Lake IJsselmeer, which was a former sea (Zuiderzee) that was closed off in 1932 by a big dam (Afsluitdijk). The IJsseldelta is a low-lying area that is threatened by floods from both the river IJssel and from the Lake IJsselmeer (figure 1). IJsseldelta Figure 1: IJsseldelta in a transboundary perspective of the river Figure 2: Extreme high water in the IJsseldelta in 2015 (red graph) and effect of Rhine in Europe. the bypass on the water level (blue graph). Although the delta and its major cities Zwolle and Kampen up to 40 cm in 2015 (figure 2) and up to 1 m in the long term are protected from flooding by dikes, the safety standards (2050-2100). Further knowledge about the effects of climate can’t be guaranteed in the near future because of the effects change is generated within the national research programme of climate change. Predictions of climate models indicate that ‘Knowledge for Climate’, in which IJsseldelta is participating. the extreme high water levels of the river IJssel will rise with
  • 3. Spatial challenges Several major spatial developments are planned in the IJsseldelta the IJsseldelta area, with a strong focus on climate adaptation. in the coming decades. The municipality of Kampen has planned The challenge was to combine and integrate several spatial some 4000 houses, a new railway line (the Hanzelijn) is being developments (housing, infrastructure, leisure, nature, constructed at the moment and two highways (N50 and N23) agriculture), together with the construction of a so-called will be reconstructed in the area. Furthermore, a river bypass is bypass of the river IJssel (figure 3). foreseen as one of the international measures to increase safety against flooding along the river Rhine system. All these separate, potentially conflicting spatial developments are coordinated in Project IJsseldelta. In 2005 the Province of Overijssel initiated the process of drawing a sustainable development plan for Figure 3: The spatial challenge of Project IJsseldelta: - to combine and integrate developments together with the river bypass in the southwest (the arrows on the map); - to prevent large scale developments in the northeast of the delta, which will also preserve the resilience of this area to adapt to climate change in the future (the green area on the map). Room for the River The bypass is one of the international measures along the river the bypass some 350 hectares will be added to the floodplains Rhine system to increase safety against flooding. Instead of of the delta of the river IJssel. This means a break with the building higher and stronger dikes a new strategy has been past, because for centuries space has been taken from the chosen: to add space to the floodplains of the rivers. This river. For example, in 1850 the floodplains of the big rivers in strategy - a small revolution and a real ‘paradigm shift’ in water the Netherlands had about 3 times more space compared with management - is being adopted within the Dutch programme the situation at the moment. The effect of the restoration of ‘Room for the River’. Instead of a foe, water is becoming the floodplains in the IJsseldelta is that the water levels of the more and more a friend for the planners and water managers river IJssel will decrease substantially during situations of high nowadays. Project IJsseldelta is a good exponent of this new river discharges. This contributes to the safety and resilience philosophy in water management. With the construction of of the area.
  • 4. Sustainable development planning Although the Province of Overijssel plays a major role in the project as a director of the planning process, it is very much dependent upon others. As a matter of fact, the plan for the IJsseldelta is made in close cooperation with the stakeholders such as the municipalities, neighbour provinces, the water boards and many non-governmental organizations in the region. The municipality of Kampen, water board Groot Salland and the Province of Flevoland are the most important partners in the region. But the national Government has an decisive position in the project too. The national ministries involved are the Ministry of Figure 4: Broad and intense public participation during the phase of the Masterplan. The participation process started with 5 Housing, Spatial Planning and the Environment, the different, initial scenarios for the future of IJsseldelta. During the Ministry of Agriculture, Nature and Food Quality and process a 6th scenario, developed by the public, was added. This the Ministry of Transport, Public Works and Water scenario became an essential building block for the Masterplan. Management. And last but not least, the public is mobilized to participate (figure 4). The collaborative approach as applied in Project IJsseldelta has proven to be a successful recipe for sustainable development planning. The Ministry of Housing, Spatial Planning and the Environment awarded Project IJsseldelta as a “best practice”. The project has received a lot of attention in the media and many members of the national parliament and government have already visited the delta, including Prime Minister Balkenende. In spring 2006 the Prince of the Netherlands, who has a special interest in water management, came to see the area (figure 5). Figure 5: Visit of Prince Willem Alexander to the IJsseldelta. Figure 6: Map of the IJsseldelta in 1724, with the path of the bypass.
  • 5. The Overijssel approach: spatial integration and public participation In 2007 a gentlemen’s agreement was signed by In 2006 the Masterplan IJsseldelta came out. Within the 11 governmental organizations, with the intention to Masterplan the 6 spatial challenges in the area (housing, work together to implement the Masterplan. Another infrastructure, leisure, nature, agriculture and river bypass) 11 non-governmental organizations supported the plan. are combined and integrated. One could say, that the result Recently, the spatial plans of the Provinces of Overijssel and has become more than the sum of its parts. The Masterplan is Flevoland have been reviewed. A strategic environmental broadly supported by the public, because it is based upon a (impact) assessment (SEA) was part of this review. Within draft of the bypass (the 6th scenario, see figure 4) that was this SEA several alternatives for the Masterplan were studied. made by the public (mostly farmers, assisted by planners and Also a so-called most environmentally friendly alternative. professionals). A vital element in the process of gaining public The decision making process has led to several modifications support for the plan were the face-to-face meetings with the of the Masterplan. The current plan resembles in almost every people at ‘the kitchen table’. Worth mentioning is that the aspect the most environmentally friendly alternative of the SEA. bypass follows the alignment of an old sea arm that still can The figure below gives an impression of the current plan be seen on an historical map of the IJsseldelta area of 1724 (figure 7). (figure 6). outlet water reed water-oriented houses fairway crossovers lift-lock intake & marshes with bypass tunnel marshes new train ecological new railway station corridor Figure 7: Bird’s eye perspective of the plan IJsseldelta (autumn 2008).
  • 6. Water as a motor for nature development A central issue in the plan-making process is how to coop with the dynamics of the water. On the one hand there is the desire to regulate the water level and fluctuations of the water level in the bypass as much as possible. The reason to do this is the wish to prevent the effects of water seepage in the vicinity of the bypass. On the other hand there is the desire to utilize the dynamics of the water as a ‘motor’ for nature development. Frequent inundations - caused by high water in the river as well as by situations of storm in Lake IJsselmeer - are an important mechanism for the creation of special habitats (e.g. water reed, marshes and flats) that are characteristic for river deltas. Figure 8 shows how storm situations in Lake IJsselmeer can penetrate in the bypass. Current level (-70 cm) Water level Lake IJsselmeer (-20 cm) 10 x a year (+ 20 cm) 3 x a year (+ 40 cm) 1 x a year (+ 60 cm) 1 x in 2 years (+ 80 cm) Figure 8: Inundations of the bypass caused by storm on Lake IJsselmeer. An interesting frame of reference for Project IJsseldelta is Lake Peipsi at the border of Estonia and Russia (figure 9). Especially as an example for nature development and water dynamics. Lake Peipsi has a lot in common with Lake IJsselmeer, but one of the main differences is, is that the first is more natural and the latter more artificial. As ‘twin lakes’ they can learn a lot from each other and for the Ministry of Transport, Public Works and Water Management this has been the reason for a joint cooperation between Dutch, Estonian and Russian specialists. Figure 9: Lake Peipsi as a frame of reference for Project IJsseldelta. The visibility of frequent inundations and variable water levels is also of importance for keeping and raising the awareness of the public for such an elusive matter as climate change. This issue of awareness raising is addressed in the Dutch knowledge impuls programme ‘Living with Water’, in which (international) project consortia collaborate on achieving changes in water management.
  • 7. Implementation Consequences of the advice of the Delta Committee The review of the - above mentioned - provincial plans is a next In 2007 the Government of the Netherlands requested an step towards the implementation of the plan. Financing the independent Committee of State (the Delta Committee) to project (which will cost about €325 million in total) is another give its advice on climate change and flood protection in important aspect that needs to be arranged in the beginning the Netherlands for the next century. The Delta Committee of 2009. Already €30 million has been invested, as a part of presented her advice in September 2008. The Committee has these total costs, to finance the necessary adaptations of the made twelve recommendations in order to increase the level infrastructure. A new railway is already under construction; of flood protection and to safeguard the fresh water supply. Two of them are of major importance for the IJsseldelta. The first one underlines the necessity to implement the long term ‘Room for the River’ measures - such as the river bypass - as soon as possible. The second one is to increase the level of the Lake IJsselmeer with a maximum of 1.5 m in the long term. This recommendation will also affect the IJsseldelta and - as a consequence - additional measures might be necessary. Possibly, a combination of a river bypass with the enlargement of the summer bed is already necessary in 2015 or shortly after. The combination of the two measures can even be an advantage, because in that case the sediment of the river IJssel can be used to construct the dikes of the river bypass or the embankment that is needed for housing development. Figure 10: Impression of housing development on a (climate proof) dike (source: Municipality of Kampen). One of the most recent ideas is to develop a climate proof dike the bypass will cross this railway two times. Furthermore, the - a kind of super dike along the river bypass - that at the same Province of Overijssel has funded €20 million for anticipatory time can act as an embankment for housing development. purchases of land and real estate (on a voluntary basis) in the Figure 10 gives an impression of how housing development bypass area. on a (climate proof) dike might look like. At this moment the environmental impact assessment (EIA) is being made for the review of the local land use plan and the ‘dike displacement plan’. One of the challenges for coming period will be to find ways to prevent, mitigate or compensate Information the effects of water seepage. The final step, after the finish of the formal plan procedures, will be the application for licenses For further information about and permits. When everything goes according to plan and Project IJsseldelta visit our website: without delay, the construction of the dikes, sluices, bridges, www.ijsseldelta.info dams and a storm-surge barrier will start in 2011. This tight time schedule is a necessity because the bypass needs to be Or contact: operational in 2015. In case the river bypass won’t or can’t Arjan Otten be implemented in 2015, a cheaper, less complex - but also Province of Overijssel less sustainable - short term alternative will be carried out to PO Box 10078 protect the IJsseldelta against flooding: the enlargement of the 8000 GB Zwolle summer bed of the river IJssel (over a length of 22 kilometers, the Netherlands with an average depth of 1.5 meter). tel. +31 (0)38 499 81 08 e-mail: a.otten@overijssel.nl
  • 8. www.ijsseldelta.info The photo of the Great White Egret is taken in the IJsseldelta (by Ed van Zoonen) Public partners of project IJsseldelta Main consultants Province of Overijssel Province of Flevoland Municipality of Kampen DHV Consultancy and Engineering Municipality of Dronten Municipality of Oldebroek Municipality of Zwolle H+N+S Landscape Architects Waterboard Groot Salland Waterboard Zuiderzeeland Staatsbosbeheer Ministry of Transport, Public Ministry of Housing, Spatial Ministry of Agriculture, Works and Water Management Planning and the Environment Nature and Food Quality