SlideShare ist ein Scribd-Unternehmen logo
1 von 17
BEDIFFERENT                                ACE   GERMANY




Copyright © 2012 Aras. All Rights Reserved.                   aras.com
ACE
                                              Germany


 Supplier Management.
 Integration der Lieferanten und Partner

 Jens Rollenmüller
 Aras Partner Manager
 T-Systems




Copyright © 2012 Aras. All Rights Reserved.        aras.com
Agenda / Overview.

 1        OEM & supplier ecosphere

 2        Overview of challenges

 2        IT challenges

 3        Process challenges

 4        IT solutions

 5        Process solutions

 6        Example for an OEM supplier environment bases on Aras Innovator

 7        Discussion & Questions



Copyright © 2012 Aras. All Rights Reserved.   Slide 3                       aras.com
OEM & Supplier Ecosphere.
  OEM Supplier for …

   Moduls                                                                        Production
                                                                                               Retail
    (front of car, gearbox, airplane kitchen)
   Parts                                                    Supplier

    (standard parts)
   Engineering only                                                                                                  Recycling
    (engineering center)
                                                                        Development
   Engineering and production                OEMs                      partner                                  Production planning

    responsible for components
                                                                                                IT
   Complete product
    outsourcing of a complete product
                                                                            OEM                         Prototyping
                                                 Design center




Copyright © 2012 Aras. All Rights Reserved.             Slide 4                                                          aras.com
Challenges.
  Complexity top down view…
   Multi level supplier structure
   M:N relations
             OEM  OEM                                              OEM
             Supplier  supplier
             OEM  supplier
   Multi cultural ecosphere
             Asia (China, India, …)
             America (US, Mexico, Brasil, …)
                                                             Supplier Tier[1]
             Europe (Germany, France, Italy, …)
   Measurements and standards
   Infrastructure
             IT Hardware                                    Supplier Tier[2]

             IT Software (PLM)
             Bandwidth and latency
                                                             Supplier Tier[3 - n]


Copyright © 2012 Aras. All Rights Reserved.        Slide 5             aras.com
Challenges.
                                                             OEM [B]
  Complexity bottom up view…
   Multi level supplier & OEM structure                                          OEM [A]
   M:N relations
             OEM  OEM
             Supplier  supplier
             OEM  supplier                                       Supplier
   Multi cultural ecosphere
             Asia (China, India, …)
             America (US, Mexico, Brasil, …)
             Europe (Germany, France, Italy, …)
   Measurements and standards
   Infrastructure
             IT Hardware                                                              Supplier
             IT Software (PLM)
             Bandwidth and latency

                                                                       Supplier
Copyright © 2012 Aras. All Rights Reserved.        Slide 6                                        aras.com
IT Challenges.
  Options for collaboration Environment…

   Online connection within supplier ecosphere (unfortunately does not work)
             Same PLM platform and identical data model and processes
   Online with different copies of database
             Definite need for a synchronization
             Identical data model is a prerequisite
   Offline
             Data exchange – immense amount of data has to be managed every day
             Synchronization between sites.
             IP Protection is possible (exchange only what OEM, supplier needs)
                                                  Experiences:
                    Depending on your need you normally need all types of collaboration types
                                          (Online, online copy, offline)
                                                                                           D
              Within an environment there is always a need to exchange data with offline capabilities.



Copyright © 2012 Aras. All Rights Reserved.          Slide 7                                             aras.com
IT Challenges.
  Global view…




                                                T




Copyright © 2012 Aras. All Rights Reserved.   Slide 8   aras.com
IT Challenges.
  Germany …




                                                T




Copyright © 2012 Aras. All Rights Reserved.   Slide 9   aras.com
IT Challenges.
  Europe …




                                                T




Copyright © 2012 Aras. All Rights Reserved.   Slide 10   aras.com
IT Challenges.
  North America …




                                                T




Copyright © 2012 Aras. All Rights Reserved.   Slide 11   aras.com
IT Challenges.
  Global view…


                                                                  Online PLM access:
                                                                   Easy to connect.
                                                                                   D
                      Online PLM access:
                                                                      T
                          Works, but
                      dependent on env.
                                              D                                                    Online PLM access:
                                                                                                 Could work, very limited
                                                                                                                     D




                                                                 Experiences:
                                                            Green: connect online
                                                  Yellow and Red: Better use own installation.                   D



Copyright © 2012 Aras. All Rights Reserved.                        Slide 12                                                 aras.com
Process challenges.
    Typical scenario…                                                 3
                                                                          Each OEM delivers different data
                                                                                exchange package



                                         OEM
1
               PLM Backbone from different
                   IT service providers,
                and with different versions


                                                                                           2
                                                                                               Own PLM strategy with flexible toolset with
                                                                                                       best value for supplier
 General conditions:                           4
  Large amount of data.                            Content of data
  Content dependent on project phase.             exchange package                            Supplier
  Content has to be checked (quality).               is defined.




Copyright © 2012 Aras. All Rights Reserved.         Slide 13                                                                   aras.com
Process challenges.
                                              A1             A1                   A1
                                                   B1   E1           B2      E1         B2     E1

                                                        F1                   F2                F2

                                                   C1   G1           C1      G1         C1     G1
  OEM
                                                   D1   G1           D1      G1         D2     G1

                                                        H1                   H1                H2


                                                                                          Additional complexities:
                                                                                           Configuration management
                                                                                   A1       (aerospace).
                                                                                           Different responsibilities at OEM
                                                   B1   E1           B2      E1         D2 (engine, body).
                                                                                                G1
                                                                                           2D/3D documents.
 Supplier                                               F1                   F2                 H2
                                                                                           IP Protection.




Copyright © 2012 Aras. All Rights Reserved.                       Slide 14                                              aras.com
Conclusion.
  IT Challenges
   Worldwide challenges (build your own ecosphere).
   Handle with different OEMs and toolsets.
   Changes within IT Toolset of OEM.
  Process Challenges
   Multi OEM handling.
   Different content of data exchange packages.
   Documentation of data exchange (what is new, changes within toolset, …)
  Supplier needs a simple and flexible solution to fulfill the requirements of all OEM’s and
  be able to keep own processes.




Copyright © 2012 Aras. All Rights Reserved.   Slide 15                                  aras.com
Example environment.
  T-Systems “Aerospace Supplier Package ” powered by Aras Innovator


                                              Four Software Components within one package.
                                               Basic Aras Innovator.
                                               Engineering configuration management.
                                               Data exchange toolset.
                                               CAD Integration.
                                              Every component is pre-customized and optimized
                                              for aerospace suppliers.




Copyright © 2012 Aras. All Rights Reserved.            Slide 16                                 aras.com
ACE Germany




 Questions                                    ?
 Jens Rollenmüller
 Aras Partner Manager
 T-Systems
 jens.rollenmueller@t-systems.com



Copyright © 2012 Aras. All Rights Reserved.               aras.com

Weitere ähnliche Inhalte

Was ist angesagt?

Organizing Design-Driven Development Using Rational Requirements Composer
Organizing Design-Driven Development Using Rational Requirements ComposerOrganizing Design-Driven Development Using Rational Requirements Composer
Organizing Design-Driven Development Using Rational Requirements Composer
Kurt Solarte
 
Enterprise modernization: improving the economics of mainframe and multi-plat...
Enterprise modernization: improving the economics of mainframe and multi-plat...Enterprise modernization: improving the economics of mainframe and multi-plat...
Enterprise modernization: improving the economics of mainframe and multi-plat...
IBM Rational software
 
Warsaw Seminar Diem Ho 2
Warsaw Seminar Diem Ho 2Warsaw Seminar Diem Ho 2
Warsaw Seminar Diem Ho 2
Youth Agora
 

Was ist angesagt? (20)

IPM_E_8.2.2012
IPM_E_8.2.2012IPM_E_8.2.2012
IPM_E_8.2.2012
 
IPM_E_17.3.12
IPM_E_17.3.12IPM_E_17.3.12
IPM_E_17.3.12
 
IPM_E_19.3.12
IPM_E_19.3.12IPM_E_19.3.12
IPM_E_19.3.12
 
SolidWorks: Overview, 2012
SolidWorks: Overview, 2012SolidWorks: Overview, 2012
SolidWorks: Overview, 2012
 
Making Scrum Stick Inside Heavy Regulated Industries (2012)
Making Scrum Stick Inside Heavy Regulated Industries (2012) Making Scrum Stick Inside Heavy Regulated Industries (2012)
Making Scrum Stick Inside Heavy Regulated Industries (2012)
 
IPM_E_17.3.12
IPM_E_17.3.12IPM_E_17.3.12
IPM_E_17.3.12
 
IEM_E_13.2.12
IEM_E_13.2.12IEM_E_13.2.12
IEM_E_13.2.12
 
HSM_E_17.3.12
HSM_E_17.3.12HSM_E_17.3.12
HSM_E_17.3.12
 
HintTech WCM and DAM integration
HintTech WCM and DAM integrationHintTech WCM and DAM integration
HintTech WCM and DAM integration
 
Social Business Practices shared by IBM Vice President Sandy Carter
Social Business Practices shared by IBM Vice President Sandy CarterSocial Business Practices shared by IBM Vice President Sandy Carter
Social Business Practices shared by IBM Vice President Sandy Carter
 
IPM_E_7.4.12
IPM_E_7.4.12IPM_E_7.4.12
IPM_E_7.4.12
 
IPM_E_23.4.12
IPM_E_23.4.12IPM_E_23.4.12
IPM_E_23.4.12
 
IPM_E_17.3.12
IPM_E_17.3.12IPM_E_17.3.12
IPM_E_17.3.12
 
Future of BuildingCycle organisation English
Future of BuildingCycle organisation EnglishFuture of BuildingCycle organisation English
Future of BuildingCycle organisation English
 
Organizing Design-Driven Development Using Rational Requirements Composer
Organizing Design-Driven Development Using Rational Requirements ComposerOrganizing Design-Driven Development Using Rational Requirements Composer
Organizing Design-Driven Development Using Rational Requirements Composer
 
Enterprise modernization: improving the economics of mainframe and multi-plat...
Enterprise modernization: improving the economics of mainframe and multi-plat...Enterprise modernization: improving the economics of mainframe and multi-plat...
Enterprise modernization: improving the economics of mainframe and multi-plat...
 
Warsaw Seminar Diem Ho 2
Warsaw Seminar Diem Ho 2Warsaw Seminar Diem Ho 2
Warsaw Seminar Diem Ho 2
 
Edc Engineering Solutions Profile
Edc Engineering Solutions ProfileEdc Engineering Solutions Profile
Edc Engineering Solutions Profile
 
IRM_E_12.03.12
IRM_E_12.03.12IRM_E_12.03.12
IRM_E_12.03.12
 
CMS_01.03.12
CMS_01.03.12CMS_01.03.12
CMS_01.03.12
 

Ähnlich wie Aras and T-Systems: Supplier Management

Aras PLM Software Update
Aras PLM Software UpdateAras PLM Software Update
Aras PLM Software Update
Aras
 
Packaged Integration Connectors
Packaged Integration ConnectorsPackaged Integration Connectors
Packaged Integration Connectors
Aras
 
What's New in Aras Innovator PLM Software
What's New in Aras Innovator PLM SoftwareWhat's New in Aras Innovator PLM Software
What's New in Aras Innovator PLM Software
Aras
 
Apptio up cloud conference 2012 [final].pptx
Apptio up cloud conference 2012 [final].pptxApptio up cloud conference 2012 [final].pptx
Apptio up cloud conference 2012 [final].pptx
Khazret Sapenov
 
Lotus domino consolidation to linux on system z
Lotus domino consolidation to linux on system zLotus domino consolidation to linux on system z
Lotus domino consolidation to linux on system z
systemz
 
Aras ACE Conference 2013 PLM Keynote by Peter Schroer
Aras ACE Conference 2013 PLM Keynote by Peter SchroerAras ACE Conference 2013 PLM Keynote by Peter Schroer
Aras ACE Conference 2013 PLM Keynote by Peter Schroer
Aras
 

Ähnlich wie Aras and T-Systems: Supplier Management (20)

Ceedo Sales training
Ceedo Sales trainingCeedo Sales training
Ceedo Sales training
 
Build Smarter User Interfaces for Legacy Applications with IBM Rational Host ...
Build Smarter User Interfaces for Legacy Applications with IBM Rational Host ...Build Smarter User Interfaces for Legacy Applications with IBM Rational Host ...
Build Smarter User Interfaces for Legacy Applications with IBM Rational Host ...
 
Aras PLM Software Update
Aras PLM Software UpdateAras PLM Software Update
Aras PLM Software Update
 
Oop2012 keynote Design Driven Development
Oop2012 keynote Design Driven DevelopmentOop2012 keynote Design Driven Development
Oop2012 keynote Design Driven Development
 
Packaged Integration Connectors
Packaged Integration ConnectorsPackaged Integration Connectors
Packaged Integration Connectors
 
Cast Iron Overview Webinar 6.13
Cast Iron Overview Webinar 6.13Cast Iron Overview Webinar 6.13
Cast Iron Overview Webinar 6.13
 
Cast Iron Overview Webinar 6.13.12 Final(Jb)
Cast Iron Overview Webinar 6.13.12 Final(Jb)Cast Iron Overview Webinar 6.13.12 Final(Jb)
Cast Iron Overview Webinar 6.13.12 Final(Jb)
 
What's New in Aras Innovator PLM Software
What's New in Aras Innovator PLM SoftwareWhat's New in Aras Innovator PLM Software
What's New in Aras Innovator PLM Software
 
Dom introduction-website-v1.0
Dom introduction-website-v1.0Dom introduction-website-v1.0
Dom introduction-website-v1.0
 
Apptio up cloud conference 2012 [final].pptx
Apptio up cloud conference 2012 [final].pptxApptio up cloud conference 2012 [final].pptx
Apptio up cloud conference 2012 [final].pptx
 
Intro To Starling Framework for ActionScript 3.0
Intro To Starling Framework for ActionScript 3.0Intro To Starling Framework for ActionScript 3.0
Intro To Starling Framework for ActionScript 3.0
 
Lotus domino consolidation to linux on system z
Lotus domino consolidation to linux on system zLotus domino consolidation to linux on system z
Lotus domino consolidation to linux on system z
 
05 architectural design
05 architectural design05 architectural design
05 architectural design
 
Aras ACE Conference 2013 PLM Keynote by Peter Schroer
Aras ACE Conference 2013 PLM Keynote by Peter SchroerAras ACE Conference 2013 PLM Keynote by Peter Schroer
Aras ACE Conference 2013 PLM Keynote by Peter Schroer
 
OSS Business models
OSS Business modelsOSS Business models
OSS Business models
 
Discovering Computers: Chapter 15
Discovering Computers: Chapter 15Discovering Computers: Chapter 15
Discovering Computers: Chapter 15
 
Sunrise Presentation, Company Overview 2012
Sunrise Presentation, Company Overview 2012Sunrise Presentation, Company Overview 2012
Sunrise Presentation, Company Overview 2012
 
Sunrise presentation
Sunrise presentationSunrise presentation
Sunrise presentation
 
Ibm at sae2012 highlights
Ibm at sae2012 highlightsIbm at sae2012 highlights
Ibm at sae2012 highlights
 
News to Development Environments and for RDz for z/VSE
News to Development Environments and for RDz for z/VSENews to Development Environments and for RDz for z/VSE
News to Development Environments and for RDz for z/VSE
 

Mehr von Aras

Mehr von Aras (20)

Implementing PLM in the Fast-Paced, Innovation Driven Prepared Foods Industry
Implementing PLM in the Fast-Paced, Innovation Driven Prepared Foods IndustryImplementing PLM in the Fast-Paced, Innovation Driven Prepared Foods Industry
Implementing PLM in the Fast-Paced, Innovation Driven Prepared Foods Industry
 
Strategic BOM Management
Strategic BOM ManagementStrategic BOM Management
Strategic BOM Management
 
Client Technology Directions
Client Technology DirectionsClient Technology Directions
Client Technology Directions
 
Aras Vision and Roadmap 2016
Aras Vision and Roadmap 2016Aras Vision and Roadmap 2016
Aras Vision and Roadmap 2016
 
Aras Community Update 2016
Aras Community Update 2016Aras Community Update 2016
Aras Community Update 2016
 
MBSE and the Business of Engineering
MBSE and the Business of EngineeringMBSE and the Business of Engineering
MBSE and the Business of Engineering
 
Beyond ECAD Connectors
Beyond ECAD ConnectorsBeyond ECAD Connectors
Beyond ECAD Connectors
 
The PLM Journey of Justifying Change with Strategic Vision
The PLM Journey of Justifying Change with Strategic VisionThe PLM Journey of Justifying Change with Strategic Vision
The PLM Journey of Justifying Change with Strategic Vision
 
The Impact of IoT on Product Design
The Impact of IoT on Product DesignThe Impact of IoT on Product Design
The Impact of IoT on Product Design
 
Enterprise Agile Deployment
Enterprise Agile DeploymentEnterprise Agile Deployment
Enterprise Agile Deployment
 
Taking Manufacturing Process Planning to the Next Level
Taking Manufacturing Process Planning to the Next LevelTaking Manufacturing Process Planning to the Next Level
Taking Manufacturing Process Planning to the Next Level
 
Quality Systems
Quality SystemsQuality Systems
Quality Systems
 
Variant Management
Variant ManagementVariant Management
Variant Management
 
The Power of Self Service Reporting
The Power of Self Service ReportingThe Power of Self Service Reporting
The Power of Self Service Reporting
 
Making users More Productive with Enterprise Search
Making users More Productive with Enterprise SearchMaking users More Productive with Enterprise Search
Making users More Productive with Enterprise Search
 
Understanding the New Content Modeling Framework
Understanding the New Content Modeling FrameworkUnderstanding the New Content Modeling Framework
Understanding the New Content Modeling Framework
 
Technical Documentation for Technical Publications
Technical Documentation for Technical PublicationsTechnical Documentation for Technical Publications
Technical Documentation for Technical Publications
 
Supplier Exchange Portal
Supplier Exchange PortalSupplier Exchange Portal
Supplier Exchange Portal
 
Quality Planning for Product Risk Management
Quality Planning for Product Risk ManagementQuality Planning for Product Risk Management
Quality Planning for Product Risk Management
 
How to Configure Tech Docs
How to Configure Tech DocsHow to Configure Tech Docs
How to Configure Tech Docs
 

Kürzlich hochgeladen

Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
vu2urc
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
Earley Information Science
 

Kürzlich hochgeladen (20)

Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 

Aras and T-Systems: Supplier Management

  • 1. BEDIFFERENT ACE GERMANY Copyright © 2012 Aras. All Rights Reserved. aras.com
  • 2. ACE Germany Supplier Management. Integration der Lieferanten und Partner Jens Rollenmüller Aras Partner Manager T-Systems Copyright © 2012 Aras. All Rights Reserved. aras.com
  • 3. Agenda / Overview. 1 OEM & supplier ecosphere 2 Overview of challenges 2 IT challenges 3 Process challenges 4 IT solutions 5 Process solutions 6 Example for an OEM supplier environment bases on Aras Innovator 7 Discussion & Questions Copyright © 2012 Aras. All Rights Reserved. Slide 3 aras.com
  • 4. OEM & Supplier Ecosphere. OEM Supplier for …  Moduls Production Retail (front of car, gearbox, airplane kitchen)  Parts Supplier (standard parts)  Engineering only Recycling (engineering center) Development  Engineering and production OEMs partner Production planning responsible for components IT  Complete product outsourcing of a complete product OEM Prototyping Design center Copyright © 2012 Aras. All Rights Reserved. Slide 4 aras.com
  • 5. Challenges. Complexity top down view…  Multi level supplier structure  M:N relations  OEM  OEM OEM  Supplier  supplier  OEM  supplier  Multi cultural ecosphere  Asia (China, India, …)  America (US, Mexico, Brasil, …) Supplier Tier[1]  Europe (Germany, France, Italy, …)  Measurements and standards  Infrastructure  IT Hardware Supplier Tier[2]  IT Software (PLM)  Bandwidth and latency Supplier Tier[3 - n] Copyright © 2012 Aras. All Rights Reserved. Slide 5 aras.com
  • 6. Challenges. OEM [B] Complexity bottom up view…  Multi level supplier & OEM structure OEM [A]  M:N relations  OEM  OEM  Supplier  supplier  OEM  supplier Supplier  Multi cultural ecosphere  Asia (China, India, …)  America (US, Mexico, Brasil, …)  Europe (Germany, France, Italy, …)  Measurements and standards  Infrastructure  IT Hardware Supplier  IT Software (PLM)  Bandwidth and latency Supplier Copyright © 2012 Aras. All Rights Reserved. Slide 6 aras.com
  • 7. IT Challenges. Options for collaboration Environment…  Online connection within supplier ecosphere (unfortunately does not work)  Same PLM platform and identical data model and processes  Online with different copies of database  Definite need for a synchronization  Identical data model is a prerequisite  Offline  Data exchange – immense amount of data has to be managed every day  Synchronization between sites.  IP Protection is possible (exchange only what OEM, supplier needs) Experiences: Depending on your need you normally need all types of collaboration types (Online, online copy, offline) D Within an environment there is always a need to exchange data with offline capabilities. Copyright © 2012 Aras. All Rights Reserved. Slide 7 aras.com
  • 8. IT Challenges. Global view… T Copyright © 2012 Aras. All Rights Reserved. Slide 8 aras.com
  • 9. IT Challenges. Germany … T Copyright © 2012 Aras. All Rights Reserved. Slide 9 aras.com
  • 10. IT Challenges. Europe … T Copyright © 2012 Aras. All Rights Reserved. Slide 10 aras.com
  • 11. IT Challenges. North America … T Copyright © 2012 Aras. All Rights Reserved. Slide 11 aras.com
  • 12. IT Challenges. Global view… Online PLM access: Easy to connect. D Online PLM access: T Works, but dependent on env. D Online PLM access: Could work, very limited D Experiences: Green: connect online Yellow and Red: Better use own installation. D Copyright © 2012 Aras. All Rights Reserved. Slide 12 aras.com
  • 13. Process challenges. Typical scenario… 3 Each OEM delivers different data exchange package OEM 1 PLM Backbone from different IT service providers, and with different versions 2 Own PLM strategy with flexible toolset with best value for supplier General conditions: 4  Large amount of data. Content of data  Content dependent on project phase. exchange package Supplier  Content has to be checked (quality). is defined. Copyright © 2012 Aras. All Rights Reserved. Slide 13 aras.com
  • 14. Process challenges. A1 A1 A1 B1 E1 B2 E1 B2 E1 F1 F2 F2 C1 G1 C1 G1 C1 G1 OEM D1 G1 D1 G1 D2 G1 H1 H1 H2 Additional complexities:  Configuration management A1 (aerospace).  Different responsibilities at OEM B1 E1 B2 E1 D2 (engine, body). G1  2D/3D documents. Supplier F1 F2 H2  IP Protection. Copyright © 2012 Aras. All Rights Reserved. Slide 14 aras.com
  • 15. Conclusion. IT Challenges  Worldwide challenges (build your own ecosphere).  Handle with different OEMs and toolsets.  Changes within IT Toolset of OEM. Process Challenges  Multi OEM handling.  Different content of data exchange packages.  Documentation of data exchange (what is new, changes within toolset, …) Supplier needs a simple and flexible solution to fulfill the requirements of all OEM’s and be able to keep own processes. Copyright © 2012 Aras. All Rights Reserved. Slide 15 aras.com
  • 16. Example environment. T-Systems “Aerospace Supplier Package ” powered by Aras Innovator Four Software Components within one package.  Basic Aras Innovator.  Engineering configuration management.  Data exchange toolset.  CAD Integration. Every component is pre-customized and optimized for aerospace suppliers. Copyright © 2012 Aras. All Rights Reserved. Slide 16 aras.com
  • 17. ACE Germany Questions ? Jens Rollenmüller Aras Partner Manager T-Systems jens.rollenmueller@t-systems.com Copyright © 2012 Aras. All Rights Reserved. aras.com