SlideShare a Scribd company logo
1 of 4
Download to read offline
The Authority on Drug Development & Manufacturing
PharmTech.com
2012Supplement to the February 2012 Issue of
Preferred
Providers
Findingthe
RightPartner
s2 Pharmaceutical Technology  Preferred Providers 2012 PharmTech.com
Project Management
P
roject management underpins successful relation-
ships between contract technology and service pro-
viders and their sponsor companies. As pharmaceuti-
cal companies increase their level of outsourcing, it
becomes increasingly important for contract technology and
service providers to provide not only the technical capabili-
ties needed to execute a given project, but the management
skills to deliver a project on time, to specifications, and with
the necessary communication to prevent or mitigate project
delays. To illustrate the importance of project management in
outsourcing, several industry members provided case studies
on how to coordinate, organize, and implement a successful
project.
Blow/fill/seal manufacturing
Norman Weichbrodt, strategic account manager at Catalent
Pharma Solutions
Catalent Pharma Solutions is a provider of drug and biologic
development services, delivery technologies, and supply so-
lutions. Effective project management is the cornerstone of
being a complete provider of services ranging from devel-
opment of new products to technical transfer of existing
products. Building the proper project team and employing
the correct methodology for handling a complex project is
the foundation on which success is achieved.
In July 2010, Catalent was approached by a major pharma-
ceutical customer to transfer an ophthalmic product approved
for sale in Europe to Catalent’s blow/fill/seal (BFS) manufac-
turing site in Woodstock, Illinois. The successful technical
transfer of the manufacturing process for this product would
potentially lead, following FDA approval of the product al-
ready made in the European facility, to approval of the drug
for manufacture and sale in the United States.
Project scope. The actual scope of this project was much
larger for the Woodstock facility than a simple technical
transfer. The project required the following:
•	A complete renovation of a formulation and filling suite,
including a new separate air-handling system
Case Studies in Pharmaceutical
Project Management
A Technical Forum
Moderated by Patricia Van Arnum
Effective project management is an invaluable
competency in a successful outsourcing
relationship.
GregorSchuster/GettyImages
•	Designing, building, and qualifying an automated for-
mulation skid
•	Upgrading an existing BFS filling machine to match the
capacity requirements for the product
•	Designing, building, and qualifying new vial molding
and filling systems to duplicate the existing European
design
•	Qualifying the room, formulation skid, BFS machine,
and secondary packaging to produce stability and
process-validation batches to support the customer’s
submission and approval timeline
•	Developing and approving the required documentation
for supply-chain, manufacturing, and quality assurance
functions to meet the production timeline
•	Analytical-method transfer for chemistry and microbial
testing
•	Complete process-validation protocols, test plans, and
final reports to meet the submission timeline.
Cross-functional teams. To manage a project of this scope,
the Catalent New Product Development (NPD) group
and the site-management team agreed to form a group of
cross-functional resources. The team members served as
the primary representative of their functional area for the
project and were assigned for the duration of the project.
The project team consisted of a project manager from NPD,
an engineering project manager, a development scientist,
an operations specialist, a validation specialist, a quality-
assurance product specialist, a technical writer, and various
contract resources as required. A strategic account man-
ager had overall responsibility for the project team. The
establishment and use of an expanded core project team of
cross-functional resources was a new approach for Catal-
ent’s Woodstock facility, but the scope and timeline for this
project and the Catalent goal of meeting customer needs
required an innovative solution.
The project was divided into six major activities: the
room, the formulation skid, the BFS machine, method
transfer, secondary packaging, and documentation. The
NPD project manager was the owner of the overall project
timeline. Each major activity was included in a Microsoft
project schedule and maintained by the project manager.
The engineering project manager handled all activities in-
volving the renovation of the filling suite, making use of
contractors from design through construction and qualifi-
cation. He also participated in the design and construction
of the formulation skid, primarily focusing on the software
development. The development scientist and the opera-
tions specialist focused on the design of the formulation
skid and the interface of the skid with the BFS machine to
ensure the system had the proper design and controls to
replicate the process already being used in Europe. The
validation specialist developed the installatoin qualifica-
tion, operational qualification), and product qualification
protocols and had oversight of all factory acceptance test-
ing (FAT) and site-acceptance (SAT) activities. The tech-
nical writer and the quality-assurance product specialist
worked with the NPD project manager to manage the
change-control process for the project and to complete all
the required documentation, including material specifica-
tions, standard operating procedures, and manufacturing
batch records. The NPD Project manager also provided
oversight of the analytical method transfer, development
of secondary packaging materials, and the documentation
of project activities.
Technology transfer. The technology-transfer process was
initiated by creating a comparability document that detailed
every aspect of the manufacturing process. The process used
in the European manufacture was listed step by step in the
document with Catalent’s suggestions and capabilities side
by side. A final agreement for each step was included and
served as the approved path forward. The specifications for
in-process testing at each stage of the formulation as well as
finished-product specifications were included in the docu-
ment. The formulation process required bulk sterilization
of a multicomponent polymer base with a relatively tight
viscosity range. Two APIs were combined in a second part
of the formulation and transferred to the polymer solution
by sterile filtration. Of course, the entire formulation skid
required steam sterilization of the product path through
the BFS machine and maintenance of the sterile boundaries
for the product during the entire filling process. Electronic
documentation of all temperatures, times, and controls for
each process step also were also required.
Communication. The NPD project manager and the stra-
tegic account manager facilitated weekly calls with the
original equipment manufacturers of the formulation and
BFS equipment as well as construction meetings during that
phase of the project. Weekly calls were held with the cus-
tomer representatives who were in liaison with the project
team. A standard methodology was used to ensure that the
meetings had a structured agenda and minutes issued for
review in a timely fashion. A joint Project Steering Com-
mittee was formed, which was comprised of customer senior
leadership members, Woodstock site leadership members,
and Catalent business-development members.
Project Steering Committee meetings were held every
three weeks during the course of the project. A formal pre-
sentation was made at each meeting to discuss progress
toward major milestones in the project plan. Strategic de-
cisions were discussed and developed through the Project
Steering Committee meetings, and the decisions were ulti-
mately made by the joint project team. This management
design reduced the cycle time for critical decision-making
between the customer and Catalent.
Pharmaceutical Technology  Preferred Providers 2012 PharmTech.com s3
An example of such decision mak-
ing was approval of a change to the
SAT/FAT strategy originally planned
for the formulation skid. The formu-
lation skid is a fully automated two-
tank system with over 100 control and
process valves that are actuated in ap-
proximately 20 sequences. When the
software development lagged behind
the construction of the hardware, the
opportunity arose to do a mechani-
cal FAT, ship the formulation skid
to the Woodstock site, complete the
installation and mechanical trouble-
shooting of the skid and wait for the
software to complete the qualification
as a SAT. This decision saved as much
as six weeks in the project schedule
and enabled Catalent to meet the
customer’s timeline for stability and
process-validation manufacturing. It
also resulted in a formulation system
that is part of a robust technical trans-
fer process from the customer through
the NPD group to Catalent’s commer-
cial manufacturing team.
Execution. To date, all of the engineer-
ing, stability, and process-validation
batches have met the in-process and
final-product test specifications. With
nine batches produced, there have been
no out-of-specification results for bulk
or final product. In addition, no human
error deviations have occurred in the
formulation and filling of these batches.
Figures 1–3 (Catalent) show the fa-
cility upgrade and project equipment
after installation.
In summary, Catalent did not em-
ploy new or groundbreaking method-
ology for this project. However, supply-
ing the proper structure and resources
for a project team is the crucial first
step in meeting a customer’s timeline
and supplying the customer with qual-
ity product, reliably supplied.
Figure 1 (Catalent): A blow/fill/seal suite at Catalent’s Woodstock, Illinois, facility.
Figure 2 (Catalent): A blow/fill/seal cavity fill machine at Catalent’s Woodstock, Illinois,
facility.
Figure 3 (Catalent): A fully automated formulation skid at Catalent’s Woodstock,
Illinois, facility.
Figures1-3(Catalent)arecourtesyoftheauthor
Project Management
Excerpted from and posted with permission from the Supplement to the February 2012 issue of Pharmaceutical Technology.
Copyright ©2012, an Advanstar publication. All rights reserved.
www.pharmtech.com
#C6545 Managed by The YGS Group, 800.290.5460. For more information visit www.theYGSgroup.com/content.

More Related Content

What's hot

Standard operating procedure ( SOP)
Standard operating procedure ( SOP)Standard operating procedure ( SOP)
Standard operating procedure ( SOP)Ravish Yadav
 
REGULATORY REQUIREMENTS FOR MARKETING OF COSMETICS BY ROOMA KHALID
REGULATORY REQUIREMENTS FOR MARKETING OF COSMETICS BY ROOMA KHALIDREGULATORY REQUIREMENTS FOR MARKETING OF COSMETICS BY ROOMA KHALID
REGULATORY REQUIREMENTS FOR MARKETING OF COSMETICS BY ROOMA KHALIDRooma Khalid
 
Lean Project Management PowerPoint Presentation Slides
Lean Project Management PowerPoint Presentation Slides Lean Project Management PowerPoint Presentation Slides
Lean Project Management PowerPoint Presentation Slides SlideTeam
 
Pharmaceuticals - Industry Value Chain
Pharmaceuticals - Industry Value ChainPharmaceuticals - Industry Value Chain
Pharmaceuticals - Industry Value ChainSYSPRO
 
Project management
Project managementProject management
Project managementTom Thand
 
Strategic Analysis of the Indian Pharmaceutical Contract Manufacturing Market...
Strategic Analysis of the Indian Pharmaceutical Contract Manufacturing Market...Strategic Analysis of the Indian Pharmaceutical Contract Manufacturing Market...
Strategic Analysis of the Indian Pharmaceutical Contract Manufacturing Market...Aiswariya Chidambaram
 
Product Development Charter
Product Development CharterProduct Development Charter
Product Development CharterDemand Metric
 
Pharma Digital Marketing - 5 future trends
Pharma Digital Marketing - 5 future trendsPharma Digital Marketing - 5 future trends
Pharma Digital Marketing - 5 future trendsmarcmunch2014
 
Writing sop and its relvacne to perfromace mangement system 15th march 2015
Writing sop and its relvacne to perfromace mangement system   15th march 2015Writing sop and its relvacne to perfromace mangement system   15th march 2015
Writing sop and its relvacne to perfromace mangement system 15th march 2015Ranjith Raddalgoda
 
Pharmaceutical Contract Manufacturing
Pharmaceutical Contract ManufacturingPharmaceutical Contract Manufacturing
Pharmaceutical Contract ManufacturingFarhad Zargari
 
Pharmaceutical Lifecycle Management Challenges - Slides from Pharmaceutical P...
Pharmaceutical Lifecycle Management Challenges - Slides from Pharmaceutical P...Pharmaceutical Lifecycle Management Challenges - Slides from Pharmaceutical P...
Pharmaceutical Lifecycle Management Challenges - Slides from Pharmaceutical P...IHS
 
Implementing Project Portfolio Management
Implementing Project Portfolio ManagementImplementing Project Portfolio Management
Implementing Project Portfolio Managementdlipper
 
The new product development process for cosmetics, Toiletries, Insecticides, ...
The new product development process for cosmetics, Toiletries, Insecticides, ...The new product development process for cosmetics, Toiletries, Insecticides, ...
The new product development process for cosmetics, Toiletries, Insecticides, ...Murray Hunter
 
Documentation of raw material analysis for croscarmellose sodium
Documentation of raw material analysis for croscarmellose sodiumDocumentation of raw material analysis for croscarmellose sodium
Documentation of raw material analysis for croscarmellose sodiumJAYA PRAKASH VELUCHURI
 
Project Charter Template
Project Charter TemplateProject Charter Template
Project Charter Templatedmdk12
 
Creating Competency Models
Creating Competency Models  Creating Competency Models
Creating Competency Models Russell Sarder
 
Pharmaceutical Portfolio & Product Life Cycle Management
Pharmaceutical Portfolio & Product Life Cycle ManagementPharmaceutical Portfolio & Product Life Cycle Management
Pharmaceutical Portfolio & Product Life Cycle Managementsbryant89
 
BioPharma Projects: Essentials in Project Controls
BioPharma Projects: Essentials in Project ControlsBioPharma Projects: Essentials in Project Controls
BioPharma Projects: Essentials in Project ControlsPMA Consultants
 

What's hot (20)

Ups Case Study
Ups Case StudyUps Case Study
Ups Case Study
 
Six sigma QMS
Six sigma QMS Six sigma QMS
Six sigma QMS
 
Standard operating procedure ( SOP)
Standard operating procedure ( SOP)Standard operating procedure ( SOP)
Standard operating procedure ( SOP)
 
REGULATORY REQUIREMENTS FOR MARKETING OF COSMETICS BY ROOMA KHALID
REGULATORY REQUIREMENTS FOR MARKETING OF COSMETICS BY ROOMA KHALIDREGULATORY REQUIREMENTS FOR MARKETING OF COSMETICS BY ROOMA KHALID
REGULATORY REQUIREMENTS FOR MARKETING OF COSMETICS BY ROOMA KHALID
 
Lean Project Management PowerPoint Presentation Slides
Lean Project Management PowerPoint Presentation Slides Lean Project Management PowerPoint Presentation Slides
Lean Project Management PowerPoint Presentation Slides
 
Pharmaceuticals - Industry Value Chain
Pharmaceuticals - Industry Value ChainPharmaceuticals - Industry Value Chain
Pharmaceuticals - Industry Value Chain
 
Project management
Project managementProject management
Project management
 
Strategic Analysis of the Indian Pharmaceutical Contract Manufacturing Market...
Strategic Analysis of the Indian Pharmaceutical Contract Manufacturing Market...Strategic Analysis of the Indian Pharmaceutical Contract Manufacturing Market...
Strategic Analysis of the Indian Pharmaceutical Contract Manufacturing Market...
 
Product Development Charter
Product Development CharterProduct Development Charter
Product Development Charter
 
Pharma Digital Marketing - 5 future trends
Pharma Digital Marketing - 5 future trendsPharma Digital Marketing - 5 future trends
Pharma Digital Marketing - 5 future trends
 
Writing sop and its relvacne to perfromace mangement system 15th march 2015
Writing sop and its relvacne to perfromace mangement system   15th march 2015Writing sop and its relvacne to perfromace mangement system   15th march 2015
Writing sop and its relvacne to perfromace mangement system 15th march 2015
 
Pharmaceutical Contract Manufacturing
Pharmaceutical Contract ManufacturingPharmaceutical Contract Manufacturing
Pharmaceutical Contract Manufacturing
 
Pharmaceutical Lifecycle Management Challenges - Slides from Pharmaceutical P...
Pharmaceutical Lifecycle Management Challenges - Slides from Pharmaceutical P...Pharmaceutical Lifecycle Management Challenges - Slides from Pharmaceutical P...
Pharmaceutical Lifecycle Management Challenges - Slides from Pharmaceutical P...
 
Implementing Project Portfolio Management
Implementing Project Portfolio ManagementImplementing Project Portfolio Management
Implementing Project Portfolio Management
 
The new product development process for cosmetics, Toiletries, Insecticides, ...
The new product development process for cosmetics, Toiletries, Insecticides, ...The new product development process for cosmetics, Toiletries, Insecticides, ...
The new product development process for cosmetics, Toiletries, Insecticides, ...
 
Documentation of raw material analysis for croscarmellose sodium
Documentation of raw material analysis for croscarmellose sodiumDocumentation of raw material analysis for croscarmellose sodium
Documentation of raw material analysis for croscarmellose sodium
 
Project Charter Template
Project Charter TemplateProject Charter Template
Project Charter Template
 
Creating Competency Models
Creating Competency Models  Creating Competency Models
Creating Competency Models
 
Pharmaceutical Portfolio & Product Life Cycle Management
Pharmaceutical Portfolio & Product Life Cycle ManagementPharmaceutical Portfolio & Product Life Cycle Management
Pharmaceutical Portfolio & Product Life Cycle Management
 
BioPharma Projects: Essentials in Project Controls
BioPharma Projects: Essentials in Project ControlsBioPharma Projects: Essentials in Project Controls
BioPharma Projects: Essentials in Project Controls
 

Viewers also liked

6 Signs A Company Takes Marketing Seriously
6 Signs A Company Takes Marketing Seriously6 Signs A Company Takes Marketing Seriously
6 Signs A Company Takes Marketing SeriouslyAdobe
 
Grafico diario del dax perfomance index para el 10 10-2013
Grafico diario del dax perfomance index para el 10 10-2013Grafico diario del dax perfomance index para el 10 10-2013
Grafico diario del dax perfomance index para el 10 10-2013Experiencia Trading
 
Buyer Personas 101: How to Build Perfect Profile
Buyer Personas 101: How to Build Perfect ProfileBuyer Personas 101: How to Build Perfect Profile
Buyer Personas 101: How to Build Perfect ProfileUberflip
 
Tips and Tools for Great Financial Management
Tips and Tools for Great Financial ManagementTips and Tools for Great Financial Management
Tips and Tools for Great Financial ManagementGreenlights
 
Video Marketing is the New Black: How to Drive Sales and Marketing Success
Video Marketing is the New Black: How to Drive Sales and Marketing SuccessVideo Marketing is the New Black: How to Drive Sales and Marketing Success
Video Marketing is the New Black: How to Drive Sales and Marketing SuccessMarketo
 
Last news from the 2.0 World
Last news from the 2.0 WorldLast news from the 2.0 World
Last news from the 2.0 WorldHenri Kaufman
 
Empowering women to be the ambassadors of climate
Empowering women to be the ambassadors of climateEmpowering women to be the ambassadors of climate
Empowering women to be the ambassadors of climateKrithika Thushyantha
 
Immediate Media General Agency Deck
Immediate Media General Agency DeckImmediate Media General Agency Deck
Immediate Media General Agency DeckJamie Hall
 
Soundtrack brief
Soundtrack briefSoundtrack brief
Soundtrack briefiain bruce
 
Impacto de las tic en las universidades
Impacto de las tic en las universidadesImpacto de las tic en las universidades
Impacto de las tic en las universidadesrochopater
 
נושאים מתקדמים בניורו-חישוביים הרצאת מבוא
נושאים מתקדמים בניורו-חישוביים הרצאת מבואנושאים מתקדמים בניורו-חישוביים הרצאת מבוא
נושאים מתקדמים בניורו-חישוביים הרצאת מבואbutest
 
Kokomo Twitter Seminar
Kokomo Twitter SeminarKokomo Twitter Seminar
Kokomo Twitter SeminarKyle Lacy
 
交點台北2016.3月 - 童騫 - 分享的起點
交點台北2016.3月 - 童騫 - 分享的起點 交點台北2016.3月 - 童騫 - 分享的起點
交點台北2016.3月 - 童騫 - 分享的起點 交點
 
Soundtrack production for the moving image
Soundtrack production for the moving imageSoundtrack production for the moving image
Soundtrack production for the moving imageJohnRobson15
 
創人物2016.3月 - 楊雅筑 - 李奧納多迪卡皮歐
創人物2016.3月 - 楊雅筑 - 李奧納多迪卡皮歐 創人物2016.3月 - 楊雅筑 - 李奧納多迪卡皮歐
創人物2016.3月 - 楊雅筑 - 李奧納多迪卡皮歐 交點
 

Viewers also liked (19)

6 Signs A Company Takes Marketing Seriously
6 Signs A Company Takes Marketing Seriously6 Signs A Company Takes Marketing Seriously
6 Signs A Company Takes Marketing Seriously
 
Grafico diario del dax perfomance index para el 10 10-2013
Grafico diario del dax perfomance index para el 10 10-2013Grafico diario del dax perfomance index para el 10 10-2013
Grafico diario del dax perfomance index para el 10 10-2013
 
8 Leo Abaya
8 Leo Abaya8 Leo Abaya
8 Leo Abaya
 
网人
网人网人
网人
 
Buyer Personas 101: How to Build Perfect Profile
Buyer Personas 101: How to Build Perfect ProfileBuyer Personas 101: How to Build Perfect Profile
Buyer Personas 101: How to Build Perfect Profile
 
Tips and Tools for Great Financial Management
Tips and Tools for Great Financial ManagementTips and Tools for Great Financial Management
Tips and Tools for Great Financial Management
 
Video Marketing is the New Black: How to Drive Sales and Marketing Success
Video Marketing is the New Black: How to Drive Sales and Marketing SuccessVideo Marketing is the New Black: How to Drive Sales and Marketing Success
Video Marketing is the New Black: How to Drive Sales and Marketing Success
 
Last news from the 2.0 World
Last news from the 2.0 WorldLast news from the 2.0 World
Last news from the 2.0 World
 
Empowering women to be the ambassadors of climate
Empowering women to be the ambassadors of climateEmpowering women to be the ambassadors of climate
Empowering women to be the ambassadors of climate
 
Immediate Media General Agency Deck
Immediate Media General Agency DeckImmediate Media General Agency Deck
Immediate Media General Agency Deck
 
Drept fiscal
Drept fiscalDrept fiscal
Drept fiscal
 
Soundtrack brief
Soundtrack briefSoundtrack brief
Soundtrack brief
 
Impacto de las tic en las universidades
Impacto de las tic en las universidadesImpacto de las tic en las universidades
Impacto de las tic en las universidades
 
נושאים מתקדמים בניורו-חישוביים הרצאת מבוא
נושאים מתקדמים בניורו-חישוביים הרצאת מבואנושאים מתקדמים בניורו-חישוביים הרצאת מבוא
נושאים מתקדמים בניורו-חישוביים הרצאת מבוא
 
Kokomo Twitter Seminar
Kokomo Twitter SeminarKokomo Twitter Seminar
Kokomo Twitter Seminar
 
交點台北2016.3月 - 童騫 - 分享的起點
交點台北2016.3月 - 童騫 - 分享的起點 交點台北2016.3月 - 童騫 - 分享的起點
交點台北2016.3月 - 童騫 - 分享的起點
 
CloudFlare CDN + Drupal
CloudFlare CDN + DrupalCloudFlare CDN + Drupal
CloudFlare CDN + Drupal
 
Soundtrack production for the moving image
Soundtrack production for the moving imageSoundtrack production for the moving image
Soundtrack production for the moving image
 
創人物2016.3月 - 楊雅筑 - 李奧納多迪卡皮歐
創人物2016.3月 - 楊雅筑 - 李奧納多迪卡皮歐 創人物2016.3月 - 楊雅筑 - 李奧納多迪卡皮歐
創人物2016.3月 - 楊雅筑 - 李奧納多迪卡皮歐
 

Similar to Case Studies in Pharmaceutical Project Management.

Optimizing Product Realization Costs Across the Value Chain
Optimizing Product Realization Costs Across the Value ChainOptimizing Product Realization Costs Across the Value Chain
Optimizing Product Realization Costs Across the Value ChainCognizant
 
w-o summary 10-27-15
w-o summary 10-27-15w-o summary 10-27-15
w-o summary 10-27-15Bill Moran
 
Essentials of Validation Project Management - Part 1
Essentials of Validation Project Management - Part 1Essentials of Validation Project Management - Part 1
Essentials of Validation Project Management - Part 1William Garvey and Associates
 
Eric_Stemen_Resume_07MAY16
Eric_Stemen_Resume_07MAY16Eric_Stemen_Resume_07MAY16
Eric_Stemen_Resume_07MAY16Eric Stemen
 
Resume marty hudson bloomington
Resume marty hudson bloomingtonResume marty hudson bloomington
Resume marty hudson bloomingtonMarty Hudson
 
Brian D. Wilson resume 2015 share
Brian D. Wilson  resume 2015 shareBrian D. Wilson  resume 2015 share
Brian D. Wilson resume 2015 shareBrian Wilson
 
Brian D. Wilson resume 2014
Brian D. Wilson  resume 2014Brian D. Wilson  resume 2014
Brian D. Wilson resume 2014Brian Wilson
 
Bruce Shaver Operations 2011
Bruce Shaver   Operations 2011Bruce Shaver   Operations 2011
Bruce Shaver Operations 2011tbshaver
 
Product development and technology transfer M pharm
Product development and technology transfer M pharmProduct development and technology transfer M pharm
Product development and technology transfer M pharmPoojaWadgave
 
Resume Kevin_Koski_August_2016
Resume Kevin_Koski_August_2016Resume Kevin_Koski_August_2016
Resume Kevin_Koski_August_2016Kevin Koski
 
James a.hinkle resume quality manufacturing 1976 - 2016
James a.hinkle resume quality   manufacturing 1976 - 2016James a.hinkle resume quality   manufacturing 1976 - 2016
James a.hinkle resume quality manufacturing 1976 - 2016James Hinkle
 
Wilson portfolio2013
Wilson portfolio2013Wilson portfolio2013
Wilson portfolio2013Brian Wilson
 
Technology transfer plan & exhibit
Technology transfer plan & exhibit Technology transfer plan & exhibit
Technology transfer plan & exhibit Akshay Nehe
 
Gyasi Brown Resume 6-8-16
Gyasi Brown Resume 6-8-16Gyasi Brown Resume 6-8-16
Gyasi Brown Resume 6-8-16Gyasi Brown
 

Similar to Case Studies in Pharmaceutical Project Management. (20)

Optimizing Product Realization Costs Across the Value Chain
Optimizing Product Realization Costs Across the Value ChainOptimizing Product Realization Costs Across the Value Chain
Optimizing Product Realization Costs Across the Value Chain
 
w-o summary 10-27-15
w-o summary 10-27-15w-o summary 10-27-15
w-o summary 10-27-15
 
Essentials of Validation Project Management - Part 1
Essentials of Validation Project Management - Part 1Essentials of Validation Project Management - Part 1
Essentials of Validation Project Management - Part 1
 
Eric_Stemen_Resume_07MAY16
Eric_Stemen_Resume_07MAY16Eric_Stemen_Resume_07MAY16
Eric_Stemen_Resume_07MAY16
 
Resume marty hudson bloomington
Resume marty hudson bloomingtonResume marty hudson bloomington
Resume marty hudson bloomington
 
Umar inam karim CV
Umar inam karim  CVUmar inam karim  CV
Umar inam karim CV
 
Crivac Mark
Crivac MarkCrivac Mark
Crivac Mark
 
SRCV
SRCVSRCV
SRCV
 
Brian D. Wilson resume 2015 share
Brian D. Wilson  resume 2015 shareBrian D. Wilson  resume 2015 share
Brian D. Wilson resume 2015 share
 
Brian D. Wilson resume 2014
Brian D. Wilson  resume 2014Brian D. Wilson  resume 2014
Brian D. Wilson resume 2014
 
Bruce Shaver Operations 2011
Bruce Shaver   Operations 2011Bruce Shaver   Operations 2011
Bruce Shaver Operations 2011
 
Debahis CV
Debahis CVDebahis CV
Debahis CV
 
Product development and technology transfer M pharm
Product development and technology transfer M pharmProduct development and technology transfer M pharm
Product development and technology transfer M pharm
 
Resume Kevin_Koski_August_2016
Resume Kevin_Koski_August_2016Resume Kevin_Koski_August_2016
Resume Kevin_Koski_August_2016
 
James a.hinkle resume quality manufacturing 1976 - 2016
James a.hinkle resume quality   manufacturing 1976 - 2016James a.hinkle resume quality   manufacturing 1976 - 2016
James a.hinkle resume quality manufacturing 1976 - 2016
 
Bhattacharyya_Keya-Elec.Eng
Bhattacharyya_Keya-Elec.EngBhattacharyya_Keya-Elec.Eng
Bhattacharyya_Keya-Elec.Eng
 
Wilson portfolio2013
Wilson portfolio2013Wilson portfolio2013
Wilson portfolio2013
 
Technology transfer plan & exhibit
Technology transfer plan & exhibit Technology transfer plan & exhibit
Technology transfer plan & exhibit
 
Gyasi Brown Resume 6-8-16
Gyasi Brown Resume 6-8-16Gyasi Brown Resume 6-8-16
Gyasi Brown Resume 6-8-16
 
aaaQA_Dir. SteveCVQ216
aaaQA_Dir. SteveCVQ216aaaQA_Dir. SteveCVQ216
aaaQA_Dir. SteveCVQ216
 

More from Anthony Grenier

Pharmaceutical Technology Transfer Best Practices
Pharmaceutical Technology Transfer Best PracticesPharmaceutical Technology Transfer Best Practices
Pharmaceutical Technology Transfer Best PracticesAnthony Grenier
 
Winning Strategies for Tech Transfer Projects
Winning Strategies for Tech Transfer ProjectsWinning Strategies for Tech Transfer Projects
Winning Strategies for Tech Transfer ProjectsAnthony Grenier
 
Winning Strategies for Tech Transfer Projects
Winning Strategies for Tech Transfer ProjectsWinning Strategies for Tech Transfer Projects
Winning Strategies for Tech Transfer ProjectsAnthony Grenier
 
Tips for transferring legacy products and processes
Tips for transferring legacy products and processesTips for transferring legacy products and processes
Tips for transferring legacy products and processesAnthony Grenier
 
A Framework for Technology Transfer
A Framework for Technology TransferA Framework for Technology Transfer
A Framework for Technology TransferAnthony Grenier
 
Quality by Design for Legacy Products - A Contradiction ?
Quality by Design for Legacy Products - A Contradiction ?Quality by Design for Legacy Products - A Contradiction ?
Quality by Design for Legacy Products - A Contradiction ?Anthony Grenier
 

More from Anthony Grenier (6)

Pharmaceutical Technology Transfer Best Practices
Pharmaceutical Technology Transfer Best PracticesPharmaceutical Technology Transfer Best Practices
Pharmaceutical Technology Transfer Best Practices
 
Winning Strategies for Tech Transfer Projects
Winning Strategies for Tech Transfer ProjectsWinning Strategies for Tech Transfer Projects
Winning Strategies for Tech Transfer Projects
 
Winning Strategies for Tech Transfer Projects
Winning Strategies for Tech Transfer ProjectsWinning Strategies for Tech Transfer Projects
Winning Strategies for Tech Transfer Projects
 
Tips for transferring legacy products and processes
Tips for transferring legacy products and processesTips for transferring legacy products and processes
Tips for transferring legacy products and processes
 
A Framework for Technology Transfer
A Framework for Technology TransferA Framework for Technology Transfer
A Framework for Technology Transfer
 
Quality by Design for Legacy Products - A Contradiction ?
Quality by Design for Legacy Products - A Contradiction ?Quality by Design for Legacy Products - A Contradiction ?
Quality by Design for Legacy Products - A Contradiction ?
 

Recently uploaded

College Call Girls Mumbai Alia 9910780858 Independent Escort Service Mumbai
College Call Girls Mumbai Alia 9910780858 Independent Escort Service MumbaiCollege Call Girls Mumbai Alia 9910780858 Independent Escort Service Mumbai
College Call Girls Mumbai Alia 9910780858 Independent Escort Service Mumbaisonalikaur4
 
EMS and Extrication: Coordinating Critical Care
EMS and Extrication: Coordinating Critical CareEMS and Extrication: Coordinating Critical Care
EMS and Extrication: Coordinating Critical CareRommie Duckworth
 
Gurgaon Sector 68 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few ...
Gurgaon Sector 68 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few ...Gurgaon Sector 68 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few ...
Gurgaon Sector 68 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few ...ggsonu500
 
Hi,Fi Call Girl In Whitefield - [ Cash on Delivery ] Contact 7001305949 Escor...
Hi,Fi Call Girl In Whitefield - [ Cash on Delivery ] Contact 7001305949 Escor...Hi,Fi Call Girl In Whitefield - [ Cash on Delivery ] Contact 7001305949 Escor...
Hi,Fi Call Girl In Whitefield - [ Cash on Delivery ] Contact 7001305949 Escor...narwatsonia7
 
Call Girls Secunderabad 7001305949 all area service COD available Any Time
Call Girls Secunderabad 7001305949 all area service COD available Any TimeCall Girls Secunderabad 7001305949 all area service COD available Any Time
Call Girls Secunderabad 7001305949 all area service COD available Any Timedelhimodelshub1
 
Models Call Girls Electronic City | 7001305949 At Low Cost Cash Payment Booking
Models Call Girls Electronic City | 7001305949 At Low Cost Cash Payment BookingModels Call Girls Electronic City | 7001305949 At Low Cost Cash Payment Booking
Models Call Girls Electronic City | 7001305949 At Low Cost Cash Payment Bookingnarwatsonia7
 
Leading transformational change: inner and outer skills
Leading transformational change: inner and outer skillsLeading transformational change: inner and outer skills
Leading transformational change: inner and outer skillsHelenBevan4
 
VIP Call Girls Hyderabad Megha 9907093804 Independent Escort Service Hyderabad
VIP Call Girls Hyderabad Megha 9907093804 Independent Escort Service HyderabadVIP Call Girls Hyderabad Megha 9907093804 Independent Escort Service Hyderabad
VIP Call Girls Hyderabad Megha 9907093804 Independent Escort Service Hyderabaddelhimodelshub1
 
2025 Inpatient Prospective Payment System (IPPS) Proposed Rule
2025 Inpatient Prospective Payment System (IPPS) Proposed Rule2025 Inpatient Prospective Payment System (IPPS) Proposed Rule
2025 Inpatient Prospective Payment System (IPPS) Proposed RuleShelby Lewis
 
Russian Call Girls in Raipur 9873940964 Book Hot And Sexy Girls
Russian Call Girls in Raipur 9873940964 Book Hot And Sexy GirlsRussian Call Girls in Raipur 9873940964 Book Hot And Sexy Girls
Russian Call Girls in Raipur 9873940964 Book Hot And Sexy Girlsddev2574
 
Book Call Girls in Noida Pick Up Drop With Cash Payment 9711199171 Call Girls
Book Call Girls in Noida Pick Up Drop With Cash Payment 9711199171 Call GirlsBook Call Girls in Noida Pick Up Drop With Cash Payment 9711199171 Call Girls
Book Call Girls in Noida Pick Up Drop With Cash Payment 9711199171 Call GirlsCall Girls Noida
 
Call Girls Uppal 7001305949 all area service COD available Any Time
Call Girls Uppal 7001305949 all area service COD available Any TimeCall Girls Uppal 7001305949 all area service COD available Any Time
Call Girls Uppal 7001305949 all area service COD available Any Timedelhimodelshub1
 
Russian Escorts Delhi | 9711199171 | all area service available
Russian Escorts Delhi | 9711199171 | all area service availableRussian Escorts Delhi | 9711199171 | all area service available
Russian Escorts Delhi | 9711199171 | all area service availablesandeepkumar69420
 
Call Girls Hyderabad Kirti 9907093804 Independent Escort Service Hyderabad
Call Girls Hyderabad Kirti 9907093804 Independent Escort Service HyderabadCall Girls Hyderabad Kirti 9907093804 Independent Escort Service Hyderabad
Call Girls Hyderabad Kirti 9907093804 Independent Escort Service Hyderabaddelhimodelshub1
 

Recently uploaded (20)

College Call Girls Mumbai Alia 9910780858 Independent Escort Service Mumbai
College Call Girls Mumbai Alia 9910780858 Independent Escort Service MumbaiCollege Call Girls Mumbai Alia 9910780858 Independent Escort Service Mumbai
College Call Girls Mumbai Alia 9910780858 Independent Escort Service Mumbai
 
EMS and Extrication: Coordinating Critical Care
EMS and Extrication: Coordinating Critical CareEMS and Extrication: Coordinating Critical Care
EMS and Extrication: Coordinating Critical Care
 
Gurgaon Sector 68 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few ...
Gurgaon Sector 68 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few ...Gurgaon Sector 68 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few ...
Gurgaon Sector 68 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few ...
 
Hi,Fi Call Girl In Whitefield - [ Cash on Delivery ] Contact 7001305949 Escor...
Hi,Fi Call Girl In Whitefield - [ Cash on Delivery ] Contact 7001305949 Escor...Hi,Fi Call Girl In Whitefield - [ Cash on Delivery ] Contact 7001305949 Escor...
Hi,Fi Call Girl In Whitefield - [ Cash on Delivery ] Contact 7001305949 Escor...
 
Call Girls Secunderabad 7001305949 all area service COD available Any Time
Call Girls Secunderabad 7001305949 all area service COD available Any TimeCall Girls Secunderabad 7001305949 all area service COD available Any Time
Call Girls Secunderabad 7001305949 all area service COD available Any Time
 
Call Girl Dehradun Aashi 🔝 7001305949 🔝 💃 Independent Escort Service Dehradun
Call Girl Dehradun Aashi 🔝 7001305949 🔝 💃 Independent Escort Service DehradunCall Girl Dehradun Aashi 🔝 7001305949 🔝 💃 Independent Escort Service Dehradun
Call Girl Dehradun Aashi 🔝 7001305949 🔝 💃 Independent Escort Service Dehradun
 
VIP Call Girls Lucknow Isha 🔝 9719455033 🔝 🎶 Independent Escort Service Lucknow
VIP Call Girls Lucknow Isha 🔝 9719455033 🔝 🎶 Independent Escort Service LucknowVIP Call Girls Lucknow Isha 🔝 9719455033 🔝 🎶 Independent Escort Service Lucknow
VIP Call Girls Lucknow Isha 🔝 9719455033 🔝 🎶 Independent Escort Service Lucknow
 
Models Call Girls Electronic City | 7001305949 At Low Cost Cash Payment Booking
Models Call Girls Electronic City | 7001305949 At Low Cost Cash Payment BookingModels Call Girls Electronic City | 7001305949 At Low Cost Cash Payment Booking
Models Call Girls Electronic City | 7001305949 At Low Cost Cash Payment Booking
 
Leading transformational change: inner and outer skills
Leading transformational change: inner and outer skillsLeading transformational change: inner and outer skills
Leading transformational change: inner and outer skills
 
Russian Call Girls Lucknow Khushi 🔝 7001305949 🔝 🎶 Independent Escort Service...
Russian Call Girls Lucknow Khushi 🔝 7001305949 🔝 🎶 Independent Escort Service...Russian Call Girls Lucknow Khushi 🔝 7001305949 🔝 🎶 Independent Escort Service...
Russian Call Girls Lucknow Khushi 🔝 7001305949 🔝 🎶 Independent Escort Service...
 
Call Girl Lucknow Gauri 🔝 8923113531 🔝 🎶 Independent Escort Service Lucknow
Call Girl Lucknow Gauri 🔝 8923113531  🔝 🎶 Independent Escort Service LucknowCall Girl Lucknow Gauri 🔝 8923113531  🔝 🎶 Independent Escort Service Lucknow
Call Girl Lucknow Gauri 🔝 8923113531 🔝 🎶 Independent Escort Service Lucknow
 
Model Call Girl in Subhash Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Subhash Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Subhash Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Subhash Nagar Delhi reach out to us at 🔝9953056974🔝
 
VIP Call Girls Hyderabad Megha 9907093804 Independent Escort Service Hyderabad
VIP Call Girls Hyderabad Megha 9907093804 Independent Escort Service HyderabadVIP Call Girls Hyderabad Megha 9907093804 Independent Escort Service Hyderabad
VIP Call Girls Hyderabad Megha 9907093804 Independent Escort Service Hyderabad
 
2025 Inpatient Prospective Payment System (IPPS) Proposed Rule
2025 Inpatient Prospective Payment System (IPPS) Proposed Rule2025 Inpatient Prospective Payment System (IPPS) Proposed Rule
2025 Inpatient Prospective Payment System (IPPS) Proposed Rule
 
Russian Call Girls in Raipur 9873940964 Book Hot And Sexy Girls
Russian Call Girls in Raipur 9873940964 Book Hot And Sexy GirlsRussian Call Girls in Raipur 9873940964 Book Hot And Sexy Girls
Russian Call Girls in Raipur 9873940964 Book Hot And Sexy Girls
 
Call Girl Guwahati Aashi 👉 7001305949 👈 🔝 Independent Escort Service Guwahati
Call Girl Guwahati Aashi 👉 7001305949 👈 🔝 Independent Escort Service GuwahatiCall Girl Guwahati Aashi 👉 7001305949 👈 🔝 Independent Escort Service Guwahati
Call Girl Guwahati Aashi 👉 7001305949 👈 🔝 Independent Escort Service Guwahati
 
Book Call Girls in Noida Pick Up Drop With Cash Payment 9711199171 Call Girls
Book Call Girls in Noida Pick Up Drop With Cash Payment 9711199171 Call GirlsBook Call Girls in Noida Pick Up Drop With Cash Payment 9711199171 Call Girls
Book Call Girls in Noida Pick Up Drop With Cash Payment 9711199171 Call Girls
 
Call Girls Uppal 7001305949 all area service COD available Any Time
Call Girls Uppal 7001305949 all area service COD available Any TimeCall Girls Uppal 7001305949 all area service COD available Any Time
Call Girls Uppal 7001305949 all area service COD available Any Time
 
Russian Escorts Delhi | 9711199171 | all area service available
Russian Escorts Delhi | 9711199171 | all area service availableRussian Escorts Delhi | 9711199171 | all area service available
Russian Escorts Delhi | 9711199171 | all area service available
 
Call Girls Hyderabad Kirti 9907093804 Independent Escort Service Hyderabad
Call Girls Hyderabad Kirti 9907093804 Independent Escort Service HyderabadCall Girls Hyderabad Kirti 9907093804 Independent Escort Service Hyderabad
Call Girls Hyderabad Kirti 9907093804 Independent Escort Service Hyderabad
 

Case Studies in Pharmaceutical Project Management.

  • 1. The Authority on Drug Development & Manufacturing PharmTech.com 2012Supplement to the February 2012 Issue of Preferred Providers Findingthe RightPartner
  • 2. s2 Pharmaceutical Technology  Preferred Providers 2012 PharmTech.com Project Management P roject management underpins successful relation- ships between contract technology and service pro- viders and their sponsor companies. As pharmaceuti- cal companies increase their level of outsourcing, it becomes increasingly important for contract technology and service providers to provide not only the technical capabili- ties needed to execute a given project, but the management skills to deliver a project on time, to specifications, and with the necessary communication to prevent or mitigate project delays. To illustrate the importance of project management in outsourcing, several industry members provided case studies on how to coordinate, organize, and implement a successful project. Blow/fill/seal manufacturing Norman Weichbrodt, strategic account manager at Catalent Pharma Solutions Catalent Pharma Solutions is a provider of drug and biologic development services, delivery technologies, and supply so- lutions. Effective project management is the cornerstone of being a complete provider of services ranging from devel- opment of new products to technical transfer of existing products. Building the proper project team and employing the correct methodology for handling a complex project is the foundation on which success is achieved. In July 2010, Catalent was approached by a major pharma- ceutical customer to transfer an ophthalmic product approved for sale in Europe to Catalent’s blow/fill/seal (BFS) manufac- turing site in Woodstock, Illinois. The successful technical transfer of the manufacturing process for this product would potentially lead, following FDA approval of the product al- ready made in the European facility, to approval of the drug for manufacture and sale in the United States. Project scope. The actual scope of this project was much larger for the Woodstock facility than a simple technical transfer. The project required the following: • A complete renovation of a formulation and filling suite, including a new separate air-handling system Case Studies in Pharmaceutical Project Management A Technical Forum Moderated by Patricia Van Arnum Effective project management is an invaluable competency in a successful outsourcing relationship. GregorSchuster/GettyImages
  • 3. • Designing, building, and qualifying an automated for- mulation skid • Upgrading an existing BFS filling machine to match the capacity requirements for the product • Designing, building, and qualifying new vial molding and filling systems to duplicate the existing European design • Qualifying the room, formulation skid, BFS machine, and secondary packaging to produce stability and process-validation batches to support the customer’s submission and approval timeline • Developing and approving the required documentation for supply-chain, manufacturing, and quality assurance functions to meet the production timeline • Analytical-method transfer for chemistry and microbial testing • Complete process-validation protocols, test plans, and final reports to meet the submission timeline. Cross-functional teams. To manage a project of this scope, the Catalent New Product Development (NPD) group and the site-management team agreed to form a group of cross-functional resources. The team members served as the primary representative of their functional area for the project and were assigned for the duration of the project. The project team consisted of a project manager from NPD, an engineering project manager, a development scientist, an operations specialist, a validation specialist, a quality- assurance product specialist, a technical writer, and various contract resources as required. A strategic account man- ager had overall responsibility for the project team. The establishment and use of an expanded core project team of cross-functional resources was a new approach for Catal- ent’s Woodstock facility, but the scope and timeline for this project and the Catalent goal of meeting customer needs required an innovative solution. The project was divided into six major activities: the room, the formulation skid, the BFS machine, method transfer, secondary packaging, and documentation. The NPD project manager was the owner of the overall project timeline. Each major activity was included in a Microsoft project schedule and maintained by the project manager. The engineering project manager handled all activities in- volving the renovation of the filling suite, making use of contractors from design through construction and qualifi- cation. He also participated in the design and construction of the formulation skid, primarily focusing on the software development. The development scientist and the opera- tions specialist focused on the design of the formulation skid and the interface of the skid with the BFS machine to ensure the system had the proper design and controls to replicate the process already being used in Europe. The validation specialist developed the installatoin qualifica- tion, operational qualification), and product qualification protocols and had oversight of all factory acceptance test- ing (FAT) and site-acceptance (SAT) activities. The tech- nical writer and the quality-assurance product specialist worked with the NPD project manager to manage the change-control process for the project and to complete all the required documentation, including material specifica- tions, standard operating procedures, and manufacturing batch records. The NPD Project manager also provided oversight of the analytical method transfer, development of secondary packaging materials, and the documentation of project activities. Technology transfer. The technology-transfer process was initiated by creating a comparability document that detailed every aspect of the manufacturing process. The process used in the European manufacture was listed step by step in the document with Catalent’s suggestions and capabilities side by side. A final agreement for each step was included and served as the approved path forward. The specifications for in-process testing at each stage of the formulation as well as finished-product specifications were included in the docu- ment. The formulation process required bulk sterilization of a multicomponent polymer base with a relatively tight viscosity range. Two APIs were combined in a second part of the formulation and transferred to the polymer solution by sterile filtration. Of course, the entire formulation skid required steam sterilization of the product path through the BFS machine and maintenance of the sterile boundaries for the product during the entire filling process. Electronic documentation of all temperatures, times, and controls for each process step also were also required. Communication. The NPD project manager and the stra- tegic account manager facilitated weekly calls with the original equipment manufacturers of the formulation and BFS equipment as well as construction meetings during that phase of the project. Weekly calls were held with the cus- tomer representatives who were in liaison with the project team. A standard methodology was used to ensure that the meetings had a structured agenda and minutes issued for review in a timely fashion. A joint Project Steering Com- mittee was formed, which was comprised of customer senior leadership members, Woodstock site leadership members, and Catalent business-development members. Project Steering Committee meetings were held every three weeks during the course of the project. A formal pre- sentation was made at each meeting to discuss progress toward major milestones in the project plan. Strategic de- cisions were discussed and developed through the Project Steering Committee meetings, and the decisions were ulti- mately made by the joint project team. This management design reduced the cycle time for critical decision-making between the customer and Catalent. Pharmaceutical Technology  Preferred Providers 2012 PharmTech.com s3
  • 4. An example of such decision mak- ing was approval of a change to the SAT/FAT strategy originally planned for the formulation skid. The formu- lation skid is a fully automated two- tank system with over 100 control and process valves that are actuated in ap- proximately 20 sequences. When the software development lagged behind the construction of the hardware, the opportunity arose to do a mechani- cal FAT, ship the formulation skid to the Woodstock site, complete the installation and mechanical trouble- shooting of the skid and wait for the software to complete the qualification as a SAT. This decision saved as much as six weeks in the project schedule and enabled Catalent to meet the customer’s timeline for stability and process-validation manufacturing. It also resulted in a formulation system that is part of a robust technical trans- fer process from the customer through the NPD group to Catalent’s commer- cial manufacturing team. Execution. To date, all of the engineer- ing, stability, and process-validation batches have met the in-process and final-product test specifications. With nine batches produced, there have been no out-of-specification results for bulk or final product. In addition, no human error deviations have occurred in the formulation and filling of these batches. Figures 1–3 (Catalent) show the fa- cility upgrade and project equipment after installation. In summary, Catalent did not em- ploy new or groundbreaking method- ology for this project. However, supply- ing the proper structure and resources for a project team is the crucial first step in meeting a customer’s timeline and supplying the customer with qual- ity product, reliably supplied. Figure 1 (Catalent): A blow/fill/seal suite at Catalent’s Woodstock, Illinois, facility. Figure 2 (Catalent): A blow/fill/seal cavity fill machine at Catalent’s Woodstock, Illinois, facility. Figure 3 (Catalent): A fully automated formulation skid at Catalent’s Woodstock, Illinois, facility. Figures1-3(Catalent)arecourtesyoftheauthor Project Management Excerpted from and posted with permission from the Supplement to the February 2012 issue of Pharmaceutical Technology. Copyright ©2012, an Advanstar publication. All rights reserved. www.pharmtech.com #C6545 Managed by The YGS Group, 800.290.5460. For more information visit www.theYGSgroup.com/content.