Anant Bodhankar has over 9 years of experience in infrastructure projects. He is currently working as a Section Engineer for Bechtel Corporation on the Riyadh Metro project in Saudi Arabia. Previously, he worked as an Assistant Construction Manager for Larsen & Toubro on metro rail projects in Hyderabad and Chennai. He also has experience as a Structure Engineer for road projects with IRB Infrastructure Developers and as a Support Engineer for an urban development project in Nanded, India. Bodhankar holds a BE in Civil Engineering and PGPCM in construction management.
1. CURRICULUM VITAE
ANANT S.BODHANKAR
At.post. Islapur
Ta.kinwat Dist. NANDED
MAHARASHTRA ,INDIA
bodhankaras@gmail.com
+91-9553847511
+966-541724546
+966581818478
Career Objective:
To pursue an outstanding career in present day fast growing and highly competitive world, while
contributing creative solutions for the advancement of the organization.
Educational Qualifications:
Examination
Discipline/
Specialization
School/college
Board/
University
Year of
Passing Division
B.E
Civil
Engineering
S.G.G.S. Institute of
Engineering & Technology
NANDED
S.R.T.M.U
University
2007
Second
division
H.S.C Science H.J.P. college NANDED Latur Board 1999 First Class
Additional Qualification :- PGPCM (post-graduation in construction Management) – from
NICMAR,PUNE.
2 years’ distance learning programme.
Computer Skills: MS Office (Word,Excel)
Experience Profile:
Total experience: 9yrs.
Metro Project Experience: - 5yrs, 6 Months.
Company: - Bechtel Corporation Ltd.(BACS Consortium).
Period :- 12Dec2015 – Present
Designation: - Section- Engineer (Grade25)
Project: - RIYADH Metro project.
2. Company: LARSEN & TOUBRO LTD.
Period: 27dec2010 – 28Nov2015
Designation: -Asst. Construction Manager
Project: Hyderabad Metro Rail project, Chennai Metro Rail Project.
3. Company: IRB infrastructure Developers Ltd.
Period: 16Jan2008 – 17sept 2010
Project: 6 Laining of NH 8 (SD-BOT) From Km 263.000 to
Km 502.00
Designation: Structure Engineer
2. PROJECT DETAILS
Project Length: - 239km.
Project Type: - BOT project.
Structures: - fly- over, Major-Bridge, Minor-Bridge, pile foundation, open foundation.
Client: - N.H.A.I
Contractor: - IRB (Modern Road Makers pvt ltd.)
-N.H.A.I. project on NH-7 at Nagpur-Hyderabad National Highway Package No. NS-59.
Work period- 1 year 2 months
Project type: - BOQ, we worked as a contractor. (4-Laning& 6 – Laning)
Client: - N.H.A.I
Consultant: - CPCS-UPHAM joint venture
Contractor: - IRB (Modern Road Makers pvt.ltd.)
Work experience: - construction of box culvert, pipe culvert, retaining wall, underpass, minor
bridge, fly-over, major bridge etc.
4. Company: Shah Technical Consultancy. Mumbai
Period: July 07 – Jan08
Project: Urban Development ofNanded City.
Designation: Support Engineer
Responsibilities held: Environmental project at urban development at Nanded Maharashtra
-worked as a support engineer in sewerage section
Personal Profile:
Name:Anant S. Bodhankar
Father's Name:Sambhajirao N. Bodhankar
Sex:Male
Marital Status: Married
Nationality: Indian
Hobbies:Singing, Cricket
Date ofBirth: 03/04/1981
PASSPORT NO:- G5465927
VALIDITY:- 02/12/2017
Notice Period :- Immediately
Declaration:
I hereby declare that the above-mentioned information is correct up to my knowledge and I bear the
responsibility for the correctness of the above-mentioned particulars.
Place: Nanded. (Anant S.Bodhankar)
--------------------------------
3. Details of work
1) Company - Bechtel Corporation. (BACS Consortium).
Time period- 12Dec – present
Designation – Section Engineer (Grade25)
Project Details - The BACS consortium will be responsible for the design and build of Lines
1 and 2 of the Riyadh metro network. These two lines will form part of the six-line metro
system that will run for a total length of 176 kilometers across the city and includes 85
stations.
Our scope of work on Lines 1 and 2 encompasses detailed structural, architectural and transit
system design together with construction, testing and commissioning works. Our scope also
includes the procurement of all products and materials necessary to support project delivery.
We are fully responsible for the design and integration of the transit systems and the civil
infrastructure. Working from the Employers Requirements, the BACS consortium will
manufacture, furnish, install, test and commission all components related to both the transit
systems and the civil infrastructure.
Line 1 will stretch from north to south through the center of Riyadh, along the Olaya-Batha
corridor, covering 38 kilometers. The line will include 22 stations and 4 transfer stations
where it will connect with other new metro lines. Much of Line 1 will be underground.
Line 2 will run east to west along King Abdullah Road and will be built mostly at grade
(15km) with some elevated sections. This line will run east to west and will extend more than
25 kilometers with 13 stations and 3 transfer stations.
Job Role – As a Section Engineer responsible for execution of special pier’s viaduct like
Straddle(portal) piers, C-pier’s(Cantilever) & Hammer head pier’s. weekly progress reports,
ITP’s, material requirement request, resource allocation, work scheduling & approaching to
the client for various inspection for site work.
2) Company- Larsen & Toubro Limited.
Time period – 27Dec2010 – 28Nov2015
1. Hyderabad metro rail project.
Designation- Asst. Construction Manager(Civil) O2
Project details- Metro rail viaduct BOT project 71km length having 3 corridors, 66
stations, 8 ROBs.
Job role- As a shift in charge responsible for execution work at site such as
foundations, pier, piercap (substructure), cast in situ span (superstructure).
4. Piling work for foundations, station pier, portal pier, cantilever pier, ROB pier and
foundation.
Responsible for progress, quality& safety of the work. reporting to construction
manager.
Resource allocation as per WBS(work breakdown structure).training and guidance to
junior and supervisory staff to improve productivity .
2. Chennai metro rail project
Designation – Senior engineer O1
Project details- metro rail viaduct BOQ project 9.5km length. Having 2
corridors,1ROB.
Job role- As a shift in charge responsible for execution work at site as pier, pier cap.
Foundations, piling work with polymer system.
Reporting to construction manager setting plan to achieve the weekly, monthly target.
3) Company- IRB Infrastructure Limited.
period: 16Jan2008 – 17sept 2010
Project: 6 Laining of NH 8 (SD-BOT) From Km 263.000 to Km 502.00
Designation: Junior Engineer
Job role – responsible for site execution work as per quality, safety and as per MORTH
specification. Structures done such as fly- over, Major-Bridge, Minor-Bridge, pile
foundation, open foundation.
Project -N.H.A.I. project on NH-7 at Nagpur-Hyderabad National Highway Package No.
NS-59.
work experience: - construction of box culvert, pipe culvert, retaining wall, underpass, minor
bridge, fly-over, major bridge etc.
4) Company: Shah Technical Consultancy, Mumbai.
Period: 17 Aug 2007 – 01Jan2008
Project: Urban Development of Nanded City.
Designation: Support Engineer
Responsibilities held: Environmental project at urban development at Nanded Maharashtra
-worked as a support engineer in sewerage section.