This document is part of a series that
explain the newly released PMBOK 5th
edition. These documents provide simple
explanation and summary of the book.
However they do not replace the necessity
of reading the book.
The 10
Knowledge Areas
&
ITTOs
Based on PMBOK® Guide 5th Edition
Amr Miqdadi,PMP
info@pmlead.net
http://www.pmlead.net
www.pmlead.
The 10 knowledge Areas and the 47 Processes…
Based on the PMBoK® 5th
http://www.pmlead.net
PMI®, PMP®, CAPM® and PMBOK® Guide are trademarks of the Project Management Institute, Inc.
PMI® has not endorsed and did not participate in the development of this product.
http://www.pmlead.net
Project Integration Management
Process Name Inputs Outputs Tools & Techniques
Develop Project
Charter
Project Statement of Work Project Charter Experts Judgment
Business Case Facilitation
Techniques
Agreements
Enterprise Environmental Factors
Organizational Process Assets
Develop Project
Management Plan
Project Charter Project Management Plan Experts Judgment
Outputs From other Processes Facilitation
Techniques
Enterprise Environmental Factors
Organizational Process Assets
Direct and Manage
Project Work
Project Management Plan Deliverables Experts Judgment
Approved Change Requests Work Performance data Project management
information system
Enterprise Environmental Factors Change requests Meetings
Organizational Process Assets Project management plan
updates
Monitor and Control
Project Work
Project Management Plan Change Requests Experts Judgment
Costs forecasts Work performance reports Analytical techniques
Schedule forecasts Project management plan
updates
Project management
information system
Validated changes Project documents
updates
Meetings
Work performance information
Enterprise Environmental Factors
Organizational Process Assets
Perform Integrated
Change Control
Project Management Plan Approved change requests Experts Judgment
Work Performance reports Change log Meetings
Change Requests Project management plan
updates
Change log tools
Enterprise Environmental Factors Project documents
updates
Organizational Process Assets
Close Project or Phase Project Management Plan Final product, service, or
result transition
Experts Judgment
Accepted deliverables Organizational Process
Assets updates
Analytical techniques
Organizational Process Assets Meetings
Project Integration Management
Unification, consolidation, articulation and interactive actions those are crucial to project
completion. Integration is about making choices, about where to concentrate resources and
efforts. It also involves making tradeoffs among competing objectives and alternatives.
Integration is primarily concerned with effectively integrating the processes among the Project
Management Process Groups.
• The project Charter
o Authorizes Project Manager
o Created based on a business need, a customer request, or a market demand
o Signed by the performing organization’s senior management.
o Officially confirms the start of the project
o Includes high level project requirements, acceptance criteria, project objectives,
product requirements, and key milestone dates.
• Develop Project management Plan
o A formal, approved document that defines how the project is managed,
executed, and controlled. It may be summary or detailed and may be composed
of one or more subsidiary management plans and other planning documents
o The plan guides your work on the project
o It is iterative and progressively elaborated
o PMBOK does not offer Project Management Methodology
• Direct and Manage Project Work
o The process of leading and performing the work defined in the project
management plan, and implementing approved changes to achieve the project’s
objectives.
• Monitor and Control Project Work
o The process of tracking, reviewing, and reporting project progress against the
performance objectives defined in the project management plan
• Perform Integrated Change Control
o The process of reviewing, approving, and managing changes across the project
• Close Project / Phase
o The process of finalizing all activities to close the project/phase
o Main risk here is resources tend to leave even before closing the project
properly.
o Evaluating project success/failure, formal acceptance, project records, lessons
learned
http://www.pmlead.net
Project Scope Management
Process Name Inputs Outputs Tools & Techniques
Plan Scope
Management
Project management plan Scope management plan Experts Judgment
Project charter Requirements management
plan
Meetings
Enterprise Environmental Factors
Organizational Process Assets
Collect Requirements Scope management plan Requirements
documentation
Interviews
Requirements management plan Requirements traceability
matrix
Focus group
Stakeholder management plan Facilitated workshops
Project charter Group creativity
techniques
Stakeholder register Group decision-making
techniques
Questionnaires and
surveys
Observations
Prototypes
Benchmarking
Context diagram
Document analysis
Define Scope Scope management plan Project scope statement Experts Judgment
Project charter Project documents updates Product analysis
Requirements documentation Alternative generation
Organizational Process Assets Facilitated workshops
Create WBS Scope management plan Scope baseline Experts Judgment
Project scope statement Project documents updates Decomposition
Requirements documentation
Enterprise Environmental Factors
Organizational Process Assets
Validate Scope Project management plan Accepted deliverables Inspection
Requirements documentation Change requests Group decision-making
techniques
Requirements traceability matrix Work performance
information
Verified deliverables Project documents updates
Work performance data
Control Scope Project management plan Work performance
information
Variance analysis
Requirements documentation Change requests
Requirements traceability matrix Project management plan
updates
Work performance data Project documents updates
Organizational process assets Org. process assets updates
Project Scope Management
Includes the processes required to ensure that the project includes all the work required, and
only the work required, to complete the project successfully.
• Plan Scope Management
o The process of creating a scope management plan the documents how the
project scope will be defined, validated, and controlled
• Collect Requirements
o The process of determining, defining and documenting stakeholders’ needs to
meet the project objectives
• Define Scope
o The process of developing a detailed description of the project and product
• Create WBS
o The process of subdividing project deliverables and project work into smaller and
more manageable components.
• Validate Scope
o The process of formalizing acceptance of the completed project deliverables.
• Control Scope
o The process of monitoring the status of the project and product scope and
managing changes to the scope baseline
The term scope can refer to:
• Product scope: The features and functions that characterize a product, service, or result.
The completion of product scope is measured against the product requirements
• Project scope: The work performed to deliver a product, service, or result with the
specified features and functions. The project scope is measured against the project
management plan and it is usually include the product scope
http://www.pmlead.net
Project Time Management
Process Name Inputs Outputs Tools & Techniques
Plan Schedule
Management
Project management plan Schedule management plan Experts Judgment
Project charter Analytical techniques
Enterprise Environmental Factors Meetings
Organizational Process Assets
Define Activities Schedule management plan Activity list Decomposition
Scope baseline Activity attributes Rolling wave planning
Enterprise Environmental Factors Milestone list Experts Judgment
Organizational Process Assets
Sequence Activities Schedule management plan Project schedule network
diagram
Precedence
diagramming
method(PDM)
Activity list Project documents updates Dependency
determination
Activity attributes Leads and lags
Milestone list
Project scope statement
Enterprise Environmental Factors
Organizational Process Assets
Estimate Activity
Resources
Schedule management plan Activity resource
requirements
Experts Judgment
Activity list Resource breakdown
structure
Alternative analysis
Activity attributes Project documents updates Published estimating
data
Resource calendars Bottom-up estimating
Risk registrar Project management
software
Activity cost estimates
Enterprise Environmental Factors
Organizational Process Assets
Estimate Activity
Duration
Schedule management plan Activity duration estimate Experts Judgment
Activity list Project documents updates Analogous estimating
Activity attributes Parametric estimating
Activity resource requirements Three-point estimating
Work performance data Group decision-making
techniques
Resource calendars Reserve analysis
Project scope statement
Risk register
Resource breakdown structure
Enterprise Environmental Factors
Organizational Process Assets
Develop Schedule Schedule management plan Schedule baseline Schedule network
analysis
Activity list Project schedule Critical path method
Activity attributes Schedule data Critical chain method
Project schedule network diagram Project calendars Resource optimization
techniques
Activity resource requirements Project management plan
updates
Modeling techniques
Resource calendars Project documents updates Leads and lags
Activity duration estimate Schedule compression
Project scope statement Scheduling tools
Risk register
Project staff assignments
Resource breakdown structure
Enterprise Environmental Factors
Organizational Process Assets
Control Schedule Project management plan Work performance
information
Performance reviews
Project schedule Schedule forecasts Project management
software
Work performance data Change requests Resource optimization
techniques
Project calendars Project management plan
updates
Modeling techniques
Schedule data Project documents updates Leads and lags
Organizational Process Assets Organizational Process Assets
updates
Schedule compression
Scheduling tools
Project Time Management
Project Time Management includes the processes required to manage timely completion of the
project.
The project time management processes and their associated tools and techniques are
documented in the schedule management plan. The schedule management plan is contained
in, or is a subsidiary plan of, the project management plan.
• Plan Schedule Management
o The process of establishing the policies, procedures, and documentation for
planning, developing, managing, executing, and controlling the project schedule
• Define Activities
o The process of identifying the specific actions to be performed to produce the
project deliverables
• Sequence Activities
o The process of identifying and documenting relationships among the project
activities
• Estimate Activity Resources
o The process of estimating the type and quantities of material, people,
equipment, or supplies required to perform each activity
• Estimate Activity Durations
o The process of approximating the number of work periods needed to complete
individual activities with estimated resources.
• Develop Schedule
o The process of analyzing activity sequences, durations, resource requirements,
and schedule constraints to create the project schedule model.
• Control Schedule
o The process of monitoring the status of the project to update project progress
and managing changes to the schedule baseline.
http://www.pmlead.net
Project Cost Management
Process Name Inputs Outputs Tools & Techniques
Plan Cost
Management
Project management plan Cost management plan Experts Judgment
Project charter Analytical techniques
Enterprise Environmental Factors Meetings
Organizational Process Assets
Estimate Costs Cost management plan Activity cost estimates Experts Judgment
HR management plan Basis of estimates Analogous estimating
Scope baseline Project documents updates Parametric estimating
Project schedule Bottom-up estimating
Risk register Three-point estimating
Requirements documentation Reserve analysis
Organizational Process Assets Cost of quality
Project management
software
Vendor bid analysis
Group decision-making
techniques
Determine Budget Cost management plan Cost baseline Cost aggregation
Scope baseline Project funding requirements Reserve analysis
Activity cost estimates Project documents updates Expert judgment
Basis of estimates Historical relationships
Project schedule Funding limit
reconciliation
Resource calendars
Risk register
Agreements
Organizational Process Assets
Control Costs Project management plan Work performance
information
Earned value
management
Project funding requirements Cost forecasts Forecasting
Work performance data Change requests To-complete
performance
index(TCPI)
Organizational Process Assets Project management plan
updates
Performance reviews
Project documents updates Project management
software
Organizational process assets
updates
Reserve analysis
Project Cost Management
Include the processes Involved in planning, estimating, budgeting, funding, managing, and
controlling costs so that the project can be completed within the approved budget.
• Plan Cost Management
o The process that establishes the policies, procedures, and documentation for
planning, managing, expending, and controlling project costs
• Estimate Costs
o The process of developing an approximation of the monetary resources needed
to complete project activities
• Determine Budget
o The process of aggregating the estimated costs of individual activities or work
packages to establish an authorized cost baseline.
• Control Costs
o The process of monitoring the status of the project to update the project budget
and managing changes to the cost baseline.
http://www.pmlead.net
Project Quality Management
Process Name Inputs Outputs Tools & Techniques
Plan Quality
Management
Project management plan Quality management plan Cost-benefit analysis
Stakeholder register Process improvement plan Cost of quality
Risk register Quality metrics Seven basic quality tools
Requirements documentation Quality checklists benchmarking
Enterprise environmental factors Project documents updates Design of experiments
Organizational Process Assets Statistical sampling
Additional quality
planning tools
Meetings
Perform Quality
Assurance
Quality management plan Change requests Quality management
and control tools
Process improvement plan Project management plan
updates
Quality audits
Quality metrics Project documents updates Process analysis
Quality control measurements Organizational Process Assets
updates
Project documents
Control Quality Project management plan Quality control
measurements
Seven basic quality tools
Quality metrics Validated changes Statistical sampling
Quality Checklists Validated deliverables Inspection
Work performance data Work performance
information
Approved change
requests review
Approved change requests Change requests
Deliverables Project management plan
updates
Project documents Project documents updates
Organizational Process Assets Organizational process assets
updates
Project Quality Management
Includes the processes and activities of the performing organization that determine quality
policies, objectives, and responsibilities so that the project will satisfy the needs for which it
was undertaken. It implements the quality management system through policy and procedures
with continuous process improvement activities conducted throughout, as appropriate.
• Plan Quality Management
o The process of identifying quality requirements and/or standards for the project
and product, and documenting how the project will demonstrate compliance
with quality requirements
• Perform Quality Assurance(QA)
o The process of auditing the quality requirements and the results from quality
control measurements to ensure appropriate quality standards and operational
definitions are used.
• Perform Quality Control(QC)
o The process of monitoring and recording results of executing the quality
activities to assess performance and recommend necessary changes.
http://www.pmlead.net
Project Human Resource Management
Process Name Inputs Outputs Tools & Techniques
Plan HR Management Project management plan HR management plan Organization charts and
position description
Activity resource requirements Networking
Enterprise environmental factors Organizational theory
Organizational process assets Expert judgment
Meetings
Acquire Project Team HR management plan Project staff assignments Pre- assignments
Enterprise environmental factors Resource calendars Negotiation
Organizational process assets Project management plan
updates
Acquisition
Virtual teams
Multi-criteria decision
plan updates
Develop Project Team HR management plan Team performance
assessments
Interpersonal skills
Project staff assignments Enterprise environmental
factors updates
Training
Resource calendars Team-building activities
Ground rules
Colocation
Recognition and
rewards
Personal assessment
tools
Manage Project Team HR management plan Change requests Observation and
conversation
Project staff assignments Project management plan
updates
Project performance
appraisals
Team performance assessments Project documents updates Conflict management
Issue log Project management plan
updates
Interpersonal skills
Work performance reports Organizational process assets
Organizational process assets
Project Human Resource Management
HR management includes the processes that organize, manage, and lead the project team.
“The project management team, is a subset of the project team, and is responsible for the
project management and leadership activities such as initiating, planning, executing,
monitoring, controlling, and closing the various project phases. This group can also be referred
to as the core, executive, or leadership team.”
• Plan Human Resource Management
o The process of identifying and documenting project roles, responsibilities, and
required skills, reporting relationships, and creating a staffing management plan
• Acquire Project Team
o The process of confirming human resource availability and obtaining the team
necessary to complete project assignments
• Develop Project Team
o The process of improving the competencies, team member interaction, and the
overall team environment to enhance project performance.
• Manage Project Team
o The process of tracking team member performance, providing feedback,
resolving issues, and managing changes to optimize project performance
http://www.pmlead.net
Project Communications Management
Process Name Inputs Outputs Tools & Techniques
Plan Communication
Management
Project management plan Communication management
plan
Communication
requirements analysis
Stakeholder register Project documents updates Communication
technology
Enterprise environmental factors Communication models
Organizational process assets Communication
Methods
Meetings
Manage
Communications
Communication management plan Project communications Communication
technology
Work performance reports Project management plan
updates
Communication models
Enterprise environmental factors Project documents updates Communication
methods
Organizational process assets Organizational process assets
updates
Information
management systems
Performance reporting
Control
Communications
Project management plan Work performance
information
Information
management systems
Project communications Change requests Expert judgment
Issue log Project management plan
updates
Meeting
Work performance data Project documents updates
Organizational process assets Organizational process assets
updates
Project Communications Management
Includes the processes required to ensure timely and appropriate planning, collection,
distribution, storage, retrieval, management, control, monitoring, and ultimate disposition of
project information. Project managers spend the majority of their time communicating with
team members and other project stakeholders.
• Plan Communications Management
o The process of developing an appropriate approach and plan for
communications based on stakeholder’s information needs and requirements,
and available organizational assets
• Manage Communications
o The process of creating, collecting, distributing, storing, retrieving and ultimate
disposition of project information in accordance with communications
management plan
• Control Communications
o The process of monitoring and controlling communications throughout the
entire project life cycle
http://www.pmlead.net
Project Risk Management
Process Name Inputs Outputs Tools & Techniques
Plan Risk Management Project management plan Risk management plan Analytical techniques
Project charter Expert judgment
Stakeholder register Meetings
Enterprise environmental factors
Organizational process assets
Identify Risks Risk management plan Risk register Documentations
reviews
Cost management plan Information gathering
techniques
Schedule management plan Checklist analysis
Quality management plan Assumptions analysis
HR management plan Diagramming
techniques
Scope baseline SWOT analysis
Activity cost estimates Expert judgment
Activity duration estimates
Stakeholder register
Project documents
Procurement documents
Enterprise environmental factors
Organizational process assets
Perform Qualitative
Risk Analysis
Risk management plan Project documents updates Risk probability and
impact assessment
Scope baseline Probability and impact
matrix
Risk register Risk data quality
assessment
Enterprise environmental factors Risk categorization
Organizational process assets Risk urgency assessment
Expert judgment
Perform Quantitative
Risk Analysis
Risk management plan Project documents updates Data gathering and
representation
techniques
Cost management plan Quantitative risk
analysis and modeling
techniques
Schedule management plan Expert judgment
Risk register
Enterprise environmental factors
Organizational process assets
Plan Risk Responses Risk management plan Project management plan
updates
Strategies for negative
risks or threats
Risk register Project documents updates Strategies for positive
risks or opportunity
Contingent response
strategies
Expert judgment
Control Risks Project management plan Work performance
information
Risk reassessment
Risk register Change requests Risk audits
Work performance data Project management plan
updates
Variance and trend
analysis
Work performance reports Project documents updates Technical performance
measurements
Organizational process assets
updates
Reserve analysis
Meetings
Project Risk Management
The processes of conducting risk management planning, identification, analysis, response
planning, and monitoring and control on a project. The objectives of Project Risk Management
are to increase the probability and impact of positive events, and decrease the probability and
impact of negative events in the project.
“Project risk is always in the future. Risk is an uncertain event or condition that, if it occurs, has
an effect on at least one project objective. Objectives can include scope, schedule, cost, and
quality.”
• Plan Risk Management
o The process of defining how to conduct risk management activities for a project
• Identify Risks
o The process of determining which risks may affect the project and documenting
their characteristics
• Perform Qualitative Risk Analysis
o The process of prioritizing risks for further analysis or action by assessing and
combining their probability of occurrence and impact
• Perform Quantitative Risk Analysis
o The process of numerically analyzing the effect of identified risks on overall
project objectives.
• Plan Risk Responses
o The process of developing options and actions to enhance opportunities and to
reduce threats to project objectives.
• Control Risks
o The process of implementing risk response plans, tracking identified risks,
monitoring residual risks, identifying new risks, and evaluating risk process
effectiveness throughout the project.
http://www.pmlead.net
Project Procurement Management
Process Name Inputs Outputs Tools & Techniques
Plan Procurement
Management
Project management plan Procurement management
plan
Make-or-buy analysis
Requirements documentation Procurement statement of
work
Expert judgment
Risk register Procurement documents Market research
Activity resource requirements Source selection criteria Meetings
Project schedule Make-or-buy decision
Activity cost estimates Change requests
Stakeholder register Project document updates
Enterprise environmental factors
Organizational process assets
Conduct Procurements Procurement management plan Selected seller Bidder conference
Procurement documents Agreements Proposal evaluation
techniques
Source selection criteria Resource calendars Independent estimates
Seller proposals Change requests Expert judgment
Project documents Project management plan
updates
Advertising
Make-or-buy decision Project documents updates Analytical techniques
Procurement statement of work Procurement
negotiations
Organizational process assets
Control Procurements Procurement management plan Work performance
information
Contract change control
system
Procurement documents Change requests Procurement
performance review
Agreements Project management plan
updates
Inspections and audits
Approved change request Project documents updates Performance reporting
Work performance reports Organizational process assets
updates
Payment systems
Work performance data Claims administrations
Records management
system
Close Procurements Project management plan Closed Procurement Procurement audits
Procurement documents Organizational process assets
updates
Procurement
negotiations
Records management
system
Project Procurement Management
Includes the processes necessary to purchase or acquire products, services, or results needed
from outside the project team. The organization can be either the buyer or seller of the
products, services, or results of a project.
• Plan Procurement Management
o The process of documenting project purchasing decisions, specifying the
approach, and identifying potential sellers
• Conduct Procurements
o The process of obtaining seller responses, selecting a seller, and awarding a
contract
• Control Procurements
o The process of managing procurement relationships, monitoring contract
performance, and making changes and corrections as needed.
• Close Procurements
o The process of completing each project procurement
http://www.pmlead.net
Project Stakeholder Management
Process Name Inputs Outputs Tools & Techniques
Identify Stakeholders Project Charter Stakeholder register Stakeholder analysis
Procurement documents Expert judgment
Enterprise environmental factors Meetings
Organizational process assets
Plan Stakeholder
Management
Project management plan Stakeholder management
plan
Expert judgment
Stakeholder register Procurement documents
updates
Meetings
Enterprise environmental factors Analytical techniques
Organizational process assets
Manage Stakeholder
Engagement
Stakeholder management plan Issue log Communication
methods
Communication management plan Change requests Interpersonal skills
Change log Project management plan
updates
Management skills
Organizational process assets Project documents updates
Organizational process assets
updates
Control Stakeholder
Engagement
Project management plan Work performance
information
Information
management system
Issue log Change requests Expert judgment
Work performance data Project management plan
updates
Meetings
Project documents Project documents updates
Organizational process assets
updates
Project Stakeholder Management
Includes the processes required to identify the people, groups, or organizations that could
impact or be impacted by the project, to analyze stakeholder expectations and their impact on
the project, and to develop appropriate management strategies for effectively engaging
stakeholders in project decisions and execution.
• Identify Stakeholders
o The process of identifying all people or organizations could impact or be
impacted by a decision, activity, or outcome of the project; and analyzing and
documenting relevant information regarding their interests, involvement,
influence and impact on project success.
• Plan Stakeholder Management
o The process of developing appropriate management strategies to effectively
engage stakeholders throughout the project life cycle
• Manage Stakeholder Engagement
o The process of communicating and working with stakeholders to meet their
needs/expectations
• Control Stakeholder Engagement
o The process of monitoring overall project stakeholder relationships and adjusting
strategies and plans for engaging stakeholders
You need to understand the terms and the logic relationships between the inputs, outputs and
tools& techniques. Memorizing them is not enough and will lead you nowhere.
Refer to the PMBoK 5h Edition for more details. &
Please do not hesitate to contact me anytime if you have any questions, comments, and feedbacks.
Success is yours,
Prepared By: Amr Miqdadi, PMP
info@pmlead.net
http://www.pmlead.net
PMI®, PMP®, CAPM® and PMBOK® Guide are trademarks of the Project Management Institute, Inc.
PMI® has not endorsed and did not participate in the development of this product.

Weitere ähnliche Inhalte

Was ist angesagt?

PMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management ProcessesPMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management ProcessesMohamed Loey
 
7.0 Project Cost Management Overview
7.0 Project Cost Management Overview7.0 Project Cost Management Overview
7.0 Project Cost Management OverviewDavidMcLachlan1
 
Project Management
Project ManagementProject Management
Project ManagementMark Roman
 
Online PMP Prep Material for PMP Exam - Project management process groups
Online PMP Prep Material for PMP Exam - Project management process groupsOnline PMP Prep Material for PMP Exam - Project management process groups
Online PMP Prep Material for PMP Exam - Project management process groupsGlobalSkillup
 
Project Integration Management
Project Integration ManagementProject Integration Management
Project Integration Managementpankajsh10
 
PMP Prep 3 - Project Integration Management
PMP Prep 3 - Project Integration ManagementPMP Prep 3 - Project Integration Management
PMP Prep 3 - Project Integration ManagementAndrew Mikityuk
 
Project Management Framework
Project Management FrameworkProject Management Framework
Project Management FrameworkRahul Sudame
 
Understand PMBoK 5th edition
Understand PMBoK 5th editionUnderstand PMBoK 5th edition
Understand PMBoK 5th editionAmr Miqdadi
 
PMP-Integration Management area
PMP-Integration Management  areaPMP-Integration Management  area
PMP-Integration Management areaZaur Ahmadov, PMP
 
DISE - Introduction to Project Management
DISE - Introduction to Project ManagementDISE - Introduction to Project Management
DISE - Introduction to Project ManagementRasan Samarasinghe
 

Was ist angesagt? (20)

PMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management ProcessesPMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management Processes
 
7.0 Project Cost Management Overview
7.0 Project Cost Management Overview7.0 Project Cost Management Overview
7.0 Project Cost Management Overview
 
1. project integration management
1. project integration management1. project integration management
1. project integration management
 
Project Management Framework
Project Management FrameworkProject Management Framework
Project Management Framework
 
Project Management
Project ManagementProject Management
Project Management
 
Online PMP Prep Material for PMP Exam - Project management process groups
Online PMP Prep Material for PMP Exam - Project management process groupsOnline PMP Prep Material for PMP Exam - Project management process groups
Online PMP Prep Material for PMP Exam - Project management process groups
 
Project Integration Management
Project Integration ManagementProject Integration Management
Project Integration Management
 
PMP PMBOK5 project management processes
PMP PMBOK5 project management processesPMP PMBOK5 project management processes
PMP PMBOK5 project management processes
 
Chap04 project integration management
Chap04 project integration managementChap04 project integration management
Chap04 project integration management
 
PMP Prep 3 - Project Integration Management
PMP Prep 3 - Project Integration ManagementPMP Prep 3 - Project Integration Management
PMP Prep 3 - Project Integration Management
 
11.7 Monitor Risks
11.7 Monitor Risks11.7 Monitor Risks
11.7 Monitor Risks
 
Project Management Framework
Project Management FrameworkProject Management Framework
Project Management Framework
 
Understand PMBoK 5th edition
Understand PMBoK 5th editionUnderstand PMBoK 5th edition
Understand PMBoK 5th edition
 
The Project Management Plan in 20 steps
The Project Management Plan in 20 stepsThe Project Management Plan in 20 steps
The Project Management Plan in 20 steps
 
Project management professional (pmi) study guide
Project management professional (pmi) study guideProject management professional (pmi) study guide
Project management professional (pmi) study guide
 
PMP-Integration Management area
PMP-Integration Management  areaPMP-Integration Management  area
PMP-Integration Management area
 
DISE - Introduction to Project Management
DISE - Introduction to Project ManagementDISE - Introduction to Project Management
DISE - Introduction to Project Management
 
Different project management methodologies
Different project management methodologiesDifferent project management methodologies
Different project management methodologies
 
Ch1 ch2
Ch1 ch2Ch1 ch2
Ch1 ch2
 
PMP PMbok 5th CH1 - CH2
PMP PMbok 5th CH1 - CH2PMP PMbok 5th CH1 - CH2
PMP PMbok 5th CH1 - CH2
 

Andere mochten auch

PMP Knowledge Areas Summary
PMP Knowledge Areas SummaryPMP Knowledge Areas Summary
PMP Knowledge Areas SummaryAmr Miqdadi
 
Risk management plan tyre recycling plant
Risk management plan  tyre recycling plantRisk management plan  tyre recycling plant
Risk management plan tyre recycling plantabhishekthakur309
 
Understand PMBoK 4th
Understand PMBoK 4thUnderstand PMBoK 4th
Understand PMBoK 4thAmr Miqdadi
 
Code of Ethics and Professional Conduct
Code of Ethics and Professional Conduct Code of Ethics and Professional Conduct
Code of Ethics and Professional Conduct Amr Miqdadi
 
Create your first_website_now
Create your first_website_nowCreate your first_website_now
Create your first_website_nowAmr Miqdadi
 
Time management
Time management Time management
Time management Pm Joe
 
Project Management Class ( based on PMBOK) - Day 1
Project Management Class ( based on PMBOK) - Day 1Project Management Class ( based on PMBOK) - Day 1
Project Management Class ( based on PMBOK) - Day 1Highmark Health
 
PMP Exam Prep-ITTOs and KP
PMP Exam Prep-ITTOs and KPPMP Exam Prep-ITTOs and KP
PMP Exam Prep-ITTOs and KPAmr Miqdadi
 
Project Management Class ( based on PMBOK) - Day 4
Project Management Class ( based on PMBOK) - Day 4Project Management Class ( based on PMBOK) - Day 4
Project Management Class ( based on PMBOK) - Day 4Highmark Health
 
Project Management Class ( based on PMBOK) - Day 2
Project Management Class ( based on PMBOK) - Day 2Project Management Class ( based on PMBOK) - Day 2
Project Management Class ( based on PMBOK) - Day 2Highmark Health
 
Project Management Class ( based on PMBOK) - Day 6
Project Management Class ( based on PMBOK) - Day 6Project Management Class ( based on PMBOK) - Day 6
Project Management Class ( based on PMBOK) - Day 6Highmark Health
 
Mapping PMBOK® to Agile
Mapping PMBOK® to AgileMapping PMBOK® to Agile
Mapping PMBOK® to AgileDidier Soriano
 
Mapping GSD and PMBOK Guide
Mapping GSD and PMBOK GuideMapping GSD and PMBOK Guide
Mapping GSD and PMBOK GuideAchmad Giovani
 
PMBOK 5th Edition Project Management Processes and Knowledge Areas
PMBOK 5th Edition Project Management Processes and Knowledge AreasPMBOK 5th Edition Project Management Processes and Knowledge Areas
PMBOK 5th Edition Project Management Processes and Knowledge AreasMr.Sohail Amin
 

Andere mochten auch (15)

PMP Knowledge Areas Summary
PMP Knowledge Areas SummaryPMP Knowledge Areas Summary
PMP Knowledge Areas Summary
 
Duquesne Presentation
Duquesne PresentationDuquesne Presentation
Duquesne Presentation
 
Risk management plan tyre recycling plant
Risk management plan  tyre recycling plantRisk management plan  tyre recycling plant
Risk management plan tyre recycling plant
 
Understand PMBoK 4th
Understand PMBoK 4thUnderstand PMBoK 4th
Understand PMBoK 4th
 
Code of Ethics and Professional Conduct
Code of Ethics and Professional Conduct Code of Ethics and Professional Conduct
Code of Ethics and Professional Conduct
 
Create your first_website_now
Create your first_website_nowCreate your first_website_now
Create your first_website_now
 
Time management
Time management Time management
Time management
 
Project Management Class ( based on PMBOK) - Day 1
Project Management Class ( based on PMBOK) - Day 1Project Management Class ( based on PMBOK) - Day 1
Project Management Class ( based on PMBOK) - Day 1
 
PMP Exam Prep-ITTOs and KP
PMP Exam Prep-ITTOs and KPPMP Exam Prep-ITTOs and KP
PMP Exam Prep-ITTOs and KP
 
Project Management Class ( based on PMBOK) - Day 4
Project Management Class ( based on PMBOK) - Day 4Project Management Class ( based on PMBOK) - Day 4
Project Management Class ( based on PMBOK) - Day 4
 
Project Management Class ( based on PMBOK) - Day 2
Project Management Class ( based on PMBOK) - Day 2Project Management Class ( based on PMBOK) - Day 2
Project Management Class ( based on PMBOK) - Day 2
 
Project Management Class ( based on PMBOK) - Day 6
Project Management Class ( based on PMBOK) - Day 6Project Management Class ( based on PMBOK) - Day 6
Project Management Class ( based on PMBOK) - Day 6
 
Mapping PMBOK® to Agile
Mapping PMBOK® to AgileMapping PMBOK® to Agile
Mapping PMBOK® to Agile
 
Mapping GSD and PMBOK Guide
Mapping GSD and PMBOK GuideMapping GSD and PMBOK Guide
Mapping GSD and PMBOK Guide
 
PMBOK 5th Edition Project Management Processes and Knowledge Areas
PMBOK 5th Edition Project Management Processes and Knowledge AreasPMBOK 5th Edition Project Management Processes and Knowledge Areas
PMBOK 5th Edition Project Management Processes and Knowledge Areas
 

Ähnlich wie Undestand PMBok 5th, Section 4

L1-Project Integration Management.pdf
L1-Project Integration Management.pdfL1-Project Integration Management.pdf
L1-Project Integration Management.pdfMUST
 
CAPM Exam preparation - series 1
CAPM Exam preparation - series 1CAPM Exam preparation - series 1
CAPM Exam preparation - series 1Toe Myint Naing
 
Project Time Management | Project Schedule Management | Edureka
Project Time Management | Project Schedule Management | EdurekaProject Time Management | Project Schedule Management | Edureka
Project Time Management | Project Schedule Management | EdurekaEdureka!
 
L2_Scope Management.ppt
L2_Scope Management.pptL2_Scope Management.ppt
L2_Scope Management.pptMUST
 
Pmp training sigmora
Pmp training sigmoraPmp training sigmora
Pmp training sigmorabgadicha
 
L2_Scope Management.ppt
L2_Scope Management.pptL2_Scope Management.ppt
L2_Scope Management.pptMUST
 
PMI Project Management Principles
PMI Project Management PrinciplesPMI Project Management Principles
PMI Project Management Principlestltiede
 
Proposed Project Management Office
Proposed Project Management OfficeProposed Project Management Office
Proposed Project Management OfficeJosh Folgado
 
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
Project Management Cycle and  MS Project 2013  By Subodh Kumar PMPProject Management Cycle and  MS Project 2013  By Subodh Kumar PMP
Project Management Cycle and MS Project 2013 By Subodh Kumar PMPSubodh Kumar
 
2013 Project Management Institute. A Guide To The Project Management Body Of ...
2013 Project Management Institute. A Guide To The Project Management Body Of ...2013 Project Management Institute. A Guide To The Project Management Body Of ...
2013 Project Management Institute. A Guide To The Project Management Body Of ...Arlene Smith
 
Project Integration Management - PMP Preparation
Project Integration Management - PMP PreparationProject Integration Management - PMP Preparation
Project Integration Management - PMP PreparationVladimir Vujovic
 

Ähnlich wie Undestand PMBok 5th, Section 4 (20)

L1-Project Integration Management.pdf
L1-Project Integration Management.pdfL1-Project Integration Management.pdf
L1-Project Integration Management.pdf
 
CAPM Exam preparation - series 1
CAPM Exam preparation - series 1CAPM Exam preparation - series 1
CAPM Exam preparation - series 1
 
PMP Prep Handout_Integration
PMP Prep Handout_IntegrationPMP Prep Handout_Integration
PMP Prep Handout_Integration
 
05 project scope management
05 project scope management05 project scope management
05 project scope management
 
05 project scope management
05 project scope management05 project scope management
05 project scope management
 
Project Time Management | Project Schedule Management | Edureka
Project Time Management | Project Schedule Management | EdurekaProject Time Management | Project Schedule Management | Edureka
Project Time Management | Project Schedule Management | Edureka
 
L2_Scope Management.ppt
L2_Scope Management.pptL2_Scope Management.ppt
L2_Scope Management.ppt
 
PMP-Scope Management area
PMP-Scope Management areaPMP-Scope Management area
PMP-Scope Management area
 
PMP CAPM study-guide-integration
PMP CAPM study-guide-integrationPMP CAPM study-guide-integration
PMP CAPM study-guide-integration
 
Pmp training sigmora
Pmp training sigmoraPmp training sigmora
Pmp training sigmora
 
L2_Scope Management.ppt
L2_Scope Management.pptL2_Scope Management.ppt
L2_Scope Management.ppt
 
PMI Project Management Principles
PMI Project Management PrinciplesPMI Project Management Principles
PMI Project Management Principles
 
04 project integration management
04 project integration management04 project integration management
04 project integration management
 
Proposed Project Management Office
Proposed Project Management OfficeProposed Project Management Office
Proposed Project Management Office
 
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
Project Management Cycle and  MS Project 2013  By Subodh Kumar PMPProject Management Cycle and  MS Project 2013  By Subodh Kumar PMP
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
 
2013 Project Management Institute. A Guide To The Project Management Body Of ...
2013 Project Management Institute. A Guide To The Project Management Body Of ...2013 Project Management Institute. A Guide To The Project Management Body Of ...
2013 Project Management Institute. A Guide To The Project Management Body Of ...
 
Pm training day 2
Pm training   day 2Pm training   day 2
Pm training day 2
 
Project Integration Management - PMP Preparation
Project Integration Management - PMP PreparationProject Integration Management - PMP Preparation
Project Integration Management - PMP Preparation
 
The role of the project manager
The role of the project managerThe role of the project manager
The role of the project manager
 
Pmp scope chapter 5
Pmp scope chapter 5Pmp scope chapter 5
Pmp scope chapter 5
 

Mehr von Amr Miqdadi

PMBOK GUIDE 7th Summary
PMBOK GUIDE 7th Summary PMBOK GUIDE 7th Summary
PMBOK GUIDE 7th Summary Amr Miqdadi
 
PMBOK 6th edition Guide Summary
PMBOK 6th edition Guide SummaryPMBOK 6th edition Guide Summary
PMBOK 6th edition Guide SummaryAmr Miqdadi
 
Understand PMBOK 6TH GUIDE
Understand PMBOK 6TH GUIDEUnderstand PMBOK 6TH GUIDE
Understand PMBOK 6TH GUIDEAmr Miqdadi
 
PMBok 4th Processes Summary Sheet
PMBok 4th Processes Summary SheetPMBok 4th Processes Summary Sheet
PMBok 4th Processes Summary SheetAmr Miqdadi
 
Pmp exam prep Pdf- 2
Pmp exam prep Pdf- 2Pmp exam prep Pdf- 2
Pmp exam prep Pdf- 2Amr Miqdadi
 
PMP Exam Formulas
PMP Exam FormulasPMP Exam Formulas
PMP Exam FormulasAmr Miqdadi
 
Master MSProject 2010
Master MSProject 2010Master MSProject 2010
Master MSProject 2010Amr Miqdadi
 

Mehr von Amr Miqdadi (8)

PMBOK GUIDE 7th Summary
PMBOK GUIDE 7th Summary PMBOK GUIDE 7th Summary
PMBOK GUIDE 7th Summary
 
PMBOK 6th edition Guide Summary
PMBOK 6th edition Guide SummaryPMBOK 6th edition Guide Summary
PMBOK 6th edition Guide Summary
 
Understand PMBOK 6TH GUIDE
Understand PMBOK 6TH GUIDEUnderstand PMBOK 6TH GUIDE
Understand PMBOK 6TH GUIDE
 
PMBok 4th Processes Summary Sheet
PMBok 4th Processes Summary SheetPMBok 4th Processes Summary Sheet
PMBok 4th Processes Summary Sheet
 
Pmp exam prep Pdf- 2
Pmp exam prep Pdf- 2Pmp exam prep Pdf- 2
Pmp exam prep Pdf- 2
 
PMP Exam Formulas
PMP Exam FormulasPMP Exam Formulas
PMP Exam Formulas
 
Master MSProject 2010
Master MSProject 2010Master MSProject 2010
Master MSProject 2010
 
Pmp flash cards
Pmp flash cardsPmp flash cards
Pmp flash cards
 

Kürzlich hochgeladen

Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...RKavithamani
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 

Kürzlich hochgeladen (20)

Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 

Undestand PMBok 5th, Section 4

  • 1. http://www.pmlead.net This document is part of a series that explain the newly released PMBOK 5th edition. These documents provide simple explanation and summary of the book. However they do not replace the necessity of reading the book. The 10 Knowledge Areas & ITTOs Based on PMBOK® Guide 5th Edition Amr Miqdadi,PMP info@pmlead.net
  • 2. http://www.pmlead.net www.pmlead. The 10 knowledge Areas and the 47 Processes… Based on the PMBoK® 5th
  • 3. http://www.pmlead.net PMI®, PMP®, CAPM® and PMBOK® Guide are trademarks of the Project Management Institute, Inc. PMI® has not endorsed and did not participate in the development of this product.
  • 4. http://www.pmlead.net Project Integration Management Process Name Inputs Outputs Tools & Techniques Develop Project Charter Project Statement of Work Project Charter Experts Judgment Business Case Facilitation Techniques Agreements Enterprise Environmental Factors Organizational Process Assets Develop Project Management Plan Project Charter Project Management Plan Experts Judgment Outputs From other Processes Facilitation Techniques Enterprise Environmental Factors Organizational Process Assets Direct and Manage Project Work Project Management Plan Deliverables Experts Judgment Approved Change Requests Work Performance data Project management information system Enterprise Environmental Factors Change requests Meetings Organizational Process Assets Project management plan updates Monitor and Control Project Work Project Management Plan Change Requests Experts Judgment Costs forecasts Work performance reports Analytical techniques Schedule forecasts Project management plan updates Project management information system Validated changes Project documents updates Meetings Work performance information Enterprise Environmental Factors Organizational Process Assets Perform Integrated Change Control Project Management Plan Approved change requests Experts Judgment Work Performance reports Change log Meetings Change Requests Project management plan updates Change log tools Enterprise Environmental Factors Project documents updates Organizational Process Assets Close Project or Phase Project Management Plan Final product, service, or result transition Experts Judgment Accepted deliverables Organizational Process Assets updates Analytical techniques Organizational Process Assets Meetings
  • 5. Project Integration Management Unification, consolidation, articulation and interactive actions those are crucial to project completion. Integration is about making choices, about where to concentrate resources and efforts. It also involves making tradeoffs among competing objectives and alternatives. Integration is primarily concerned with effectively integrating the processes among the Project Management Process Groups. • The project Charter o Authorizes Project Manager o Created based on a business need, a customer request, or a market demand o Signed by the performing organization’s senior management. o Officially confirms the start of the project o Includes high level project requirements, acceptance criteria, project objectives, product requirements, and key milestone dates. • Develop Project management Plan o A formal, approved document that defines how the project is managed, executed, and controlled. It may be summary or detailed and may be composed of one or more subsidiary management plans and other planning documents o The plan guides your work on the project o It is iterative and progressively elaborated o PMBOK does not offer Project Management Methodology • Direct and Manage Project Work o The process of leading and performing the work defined in the project management plan, and implementing approved changes to achieve the project’s objectives. • Monitor and Control Project Work o The process of tracking, reviewing, and reporting project progress against the performance objectives defined in the project management plan • Perform Integrated Change Control o The process of reviewing, approving, and managing changes across the project • Close Project / Phase o The process of finalizing all activities to close the project/phase o Main risk here is resources tend to leave even before closing the project properly. o Evaluating project success/failure, formal acceptance, project records, lessons learned
  • 6. http://www.pmlead.net Project Scope Management Process Name Inputs Outputs Tools & Techniques Plan Scope Management Project management plan Scope management plan Experts Judgment Project charter Requirements management plan Meetings Enterprise Environmental Factors Organizational Process Assets Collect Requirements Scope management plan Requirements documentation Interviews Requirements management plan Requirements traceability matrix Focus group Stakeholder management plan Facilitated workshops Project charter Group creativity techniques Stakeholder register Group decision-making techniques Questionnaires and surveys Observations Prototypes Benchmarking Context diagram Document analysis Define Scope Scope management plan Project scope statement Experts Judgment Project charter Project documents updates Product analysis Requirements documentation Alternative generation Organizational Process Assets Facilitated workshops Create WBS Scope management plan Scope baseline Experts Judgment Project scope statement Project documents updates Decomposition Requirements documentation Enterprise Environmental Factors Organizational Process Assets Validate Scope Project management plan Accepted deliverables Inspection Requirements documentation Change requests Group decision-making techniques Requirements traceability matrix Work performance information Verified deliverables Project documents updates Work performance data Control Scope Project management plan Work performance information Variance analysis Requirements documentation Change requests Requirements traceability matrix Project management plan updates Work performance data Project documents updates Organizational process assets Org. process assets updates
  • 7. Project Scope Management Includes the processes required to ensure that the project includes all the work required, and only the work required, to complete the project successfully. • Plan Scope Management o The process of creating a scope management plan the documents how the project scope will be defined, validated, and controlled • Collect Requirements o The process of determining, defining and documenting stakeholders’ needs to meet the project objectives • Define Scope o The process of developing a detailed description of the project and product • Create WBS o The process of subdividing project deliverables and project work into smaller and more manageable components. • Validate Scope o The process of formalizing acceptance of the completed project deliverables. • Control Scope o The process of monitoring the status of the project and product scope and managing changes to the scope baseline The term scope can refer to: • Product scope: The features and functions that characterize a product, service, or result. The completion of product scope is measured against the product requirements • Project scope: The work performed to deliver a product, service, or result with the specified features and functions. The project scope is measured against the project management plan and it is usually include the product scope
  • 8. http://www.pmlead.net Project Time Management Process Name Inputs Outputs Tools & Techniques Plan Schedule Management Project management plan Schedule management plan Experts Judgment Project charter Analytical techniques Enterprise Environmental Factors Meetings Organizational Process Assets Define Activities Schedule management plan Activity list Decomposition Scope baseline Activity attributes Rolling wave planning Enterprise Environmental Factors Milestone list Experts Judgment Organizational Process Assets Sequence Activities Schedule management plan Project schedule network diagram Precedence diagramming method(PDM) Activity list Project documents updates Dependency determination Activity attributes Leads and lags Milestone list Project scope statement Enterprise Environmental Factors Organizational Process Assets Estimate Activity Resources Schedule management plan Activity resource requirements Experts Judgment Activity list Resource breakdown structure Alternative analysis Activity attributes Project documents updates Published estimating data Resource calendars Bottom-up estimating Risk registrar Project management software Activity cost estimates Enterprise Environmental Factors Organizational Process Assets Estimate Activity Duration Schedule management plan Activity duration estimate Experts Judgment Activity list Project documents updates Analogous estimating Activity attributes Parametric estimating Activity resource requirements Three-point estimating Work performance data Group decision-making techniques Resource calendars Reserve analysis Project scope statement Risk register Resource breakdown structure Enterprise Environmental Factors Organizational Process Assets
  • 9. Develop Schedule Schedule management plan Schedule baseline Schedule network analysis Activity list Project schedule Critical path method Activity attributes Schedule data Critical chain method Project schedule network diagram Project calendars Resource optimization techniques Activity resource requirements Project management plan updates Modeling techniques Resource calendars Project documents updates Leads and lags Activity duration estimate Schedule compression Project scope statement Scheduling tools Risk register Project staff assignments Resource breakdown structure Enterprise Environmental Factors Organizational Process Assets Control Schedule Project management plan Work performance information Performance reviews Project schedule Schedule forecasts Project management software Work performance data Change requests Resource optimization techniques Project calendars Project management plan updates Modeling techniques Schedule data Project documents updates Leads and lags Organizational Process Assets Organizational Process Assets updates Schedule compression Scheduling tools
  • 10. Project Time Management Project Time Management includes the processes required to manage timely completion of the project. The project time management processes and their associated tools and techniques are documented in the schedule management plan. The schedule management plan is contained in, or is a subsidiary plan of, the project management plan. • Plan Schedule Management o The process of establishing the policies, procedures, and documentation for planning, developing, managing, executing, and controlling the project schedule • Define Activities o The process of identifying the specific actions to be performed to produce the project deliverables • Sequence Activities o The process of identifying and documenting relationships among the project activities • Estimate Activity Resources o The process of estimating the type and quantities of material, people, equipment, or supplies required to perform each activity • Estimate Activity Durations o The process of approximating the number of work periods needed to complete individual activities with estimated resources. • Develop Schedule o The process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule model. • Control Schedule o The process of monitoring the status of the project to update project progress and managing changes to the schedule baseline.
  • 11. http://www.pmlead.net Project Cost Management Process Name Inputs Outputs Tools & Techniques Plan Cost Management Project management plan Cost management plan Experts Judgment Project charter Analytical techniques Enterprise Environmental Factors Meetings Organizational Process Assets Estimate Costs Cost management plan Activity cost estimates Experts Judgment HR management plan Basis of estimates Analogous estimating Scope baseline Project documents updates Parametric estimating Project schedule Bottom-up estimating Risk register Three-point estimating Requirements documentation Reserve analysis Organizational Process Assets Cost of quality Project management software Vendor bid analysis Group decision-making techniques Determine Budget Cost management plan Cost baseline Cost aggregation Scope baseline Project funding requirements Reserve analysis Activity cost estimates Project documents updates Expert judgment Basis of estimates Historical relationships Project schedule Funding limit reconciliation Resource calendars Risk register Agreements Organizational Process Assets Control Costs Project management plan Work performance information Earned value management Project funding requirements Cost forecasts Forecasting Work performance data Change requests To-complete performance index(TCPI) Organizational Process Assets Project management plan updates Performance reviews Project documents updates Project management software Organizational process assets updates Reserve analysis
  • 12. Project Cost Management Include the processes Involved in planning, estimating, budgeting, funding, managing, and controlling costs so that the project can be completed within the approved budget. • Plan Cost Management o The process that establishes the policies, procedures, and documentation for planning, managing, expending, and controlling project costs • Estimate Costs o The process of developing an approximation of the monetary resources needed to complete project activities • Determine Budget o The process of aggregating the estimated costs of individual activities or work packages to establish an authorized cost baseline. • Control Costs o The process of monitoring the status of the project to update the project budget and managing changes to the cost baseline.
  • 13. http://www.pmlead.net Project Quality Management Process Name Inputs Outputs Tools & Techniques Plan Quality Management Project management plan Quality management plan Cost-benefit analysis Stakeholder register Process improvement plan Cost of quality Risk register Quality metrics Seven basic quality tools Requirements documentation Quality checklists benchmarking Enterprise environmental factors Project documents updates Design of experiments Organizational Process Assets Statistical sampling Additional quality planning tools Meetings Perform Quality Assurance Quality management plan Change requests Quality management and control tools Process improvement plan Project management plan updates Quality audits Quality metrics Project documents updates Process analysis Quality control measurements Organizational Process Assets updates Project documents Control Quality Project management plan Quality control measurements Seven basic quality tools Quality metrics Validated changes Statistical sampling Quality Checklists Validated deliverables Inspection Work performance data Work performance information Approved change requests review Approved change requests Change requests Deliverables Project management plan updates Project documents Project documents updates Organizational Process Assets Organizational process assets updates
  • 14. Project Quality Management Includes the processes and activities of the performing organization that determine quality policies, objectives, and responsibilities so that the project will satisfy the needs for which it was undertaken. It implements the quality management system through policy and procedures with continuous process improvement activities conducted throughout, as appropriate. • Plan Quality Management o The process of identifying quality requirements and/or standards for the project and product, and documenting how the project will demonstrate compliance with quality requirements • Perform Quality Assurance(QA) o The process of auditing the quality requirements and the results from quality control measurements to ensure appropriate quality standards and operational definitions are used. • Perform Quality Control(QC) o The process of monitoring and recording results of executing the quality activities to assess performance and recommend necessary changes.
  • 15. http://www.pmlead.net Project Human Resource Management Process Name Inputs Outputs Tools & Techniques Plan HR Management Project management plan HR management plan Organization charts and position description Activity resource requirements Networking Enterprise environmental factors Organizational theory Organizational process assets Expert judgment Meetings Acquire Project Team HR management plan Project staff assignments Pre- assignments Enterprise environmental factors Resource calendars Negotiation Organizational process assets Project management plan updates Acquisition Virtual teams Multi-criteria decision plan updates Develop Project Team HR management plan Team performance assessments Interpersonal skills Project staff assignments Enterprise environmental factors updates Training Resource calendars Team-building activities Ground rules Colocation Recognition and rewards Personal assessment tools Manage Project Team HR management plan Change requests Observation and conversation Project staff assignments Project management plan updates Project performance appraisals Team performance assessments Project documents updates Conflict management Issue log Project management plan updates Interpersonal skills Work performance reports Organizational process assets Organizational process assets
  • 16. Project Human Resource Management HR management includes the processes that organize, manage, and lead the project team. “The project management team, is a subset of the project team, and is responsible for the project management and leadership activities such as initiating, planning, executing, monitoring, controlling, and closing the various project phases. This group can also be referred to as the core, executive, or leadership team.” • Plan Human Resource Management o The process of identifying and documenting project roles, responsibilities, and required skills, reporting relationships, and creating a staffing management plan • Acquire Project Team o The process of confirming human resource availability and obtaining the team necessary to complete project assignments • Develop Project Team o The process of improving the competencies, team member interaction, and the overall team environment to enhance project performance. • Manage Project Team o The process of tracking team member performance, providing feedback, resolving issues, and managing changes to optimize project performance
  • 17. http://www.pmlead.net Project Communications Management Process Name Inputs Outputs Tools & Techniques Plan Communication Management Project management plan Communication management plan Communication requirements analysis Stakeholder register Project documents updates Communication technology Enterprise environmental factors Communication models Organizational process assets Communication Methods Meetings Manage Communications Communication management plan Project communications Communication technology Work performance reports Project management plan updates Communication models Enterprise environmental factors Project documents updates Communication methods Organizational process assets Organizational process assets updates Information management systems Performance reporting Control Communications Project management plan Work performance information Information management systems Project communications Change requests Expert judgment Issue log Project management plan updates Meeting Work performance data Project documents updates Organizational process assets Organizational process assets updates
  • 18. Project Communications Management Includes the processes required to ensure timely and appropriate planning, collection, distribution, storage, retrieval, management, control, monitoring, and ultimate disposition of project information. Project managers spend the majority of their time communicating with team members and other project stakeholders. • Plan Communications Management o The process of developing an appropriate approach and plan for communications based on stakeholder’s information needs and requirements, and available organizational assets • Manage Communications o The process of creating, collecting, distributing, storing, retrieving and ultimate disposition of project information in accordance with communications management plan • Control Communications o The process of monitoring and controlling communications throughout the entire project life cycle
  • 19. http://www.pmlead.net Project Risk Management Process Name Inputs Outputs Tools & Techniques Plan Risk Management Project management plan Risk management plan Analytical techniques Project charter Expert judgment Stakeholder register Meetings Enterprise environmental factors Organizational process assets Identify Risks Risk management plan Risk register Documentations reviews Cost management plan Information gathering techniques Schedule management plan Checklist analysis Quality management plan Assumptions analysis HR management plan Diagramming techniques Scope baseline SWOT analysis Activity cost estimates Expert judgment Activity duration estimates Stakeholder register Project documents Procurement documents Enterprise environmental factors Organizational process assets Perform Qualitative Risk Analysis Risk management plan Project documents updates Risk probability and impact assessment Scope baseline Probability and impact matrix Risk register Risk data quality assessment Enterprise environmental factors Risk categorization Organizational process assets Risk urgency assessment Expert judgment Perform Quantitative Risk Analysis Risk management plan Project documents updates Data gathering and representation techniques Cost management plan Quantitative risk analysis and modeling techniques Schedule management plan Expert judgment Risk register Enterprise environmental factors Organizational process assets Plan Risk Responses Risk management plan Project management plan updates Strategies for negative risks or threats Risk register Project documents updates Strategies for positive risks or opportunity Contingent response
  • 20. strategies Expert judgment Control Risks Project management plan Work performance information Risk reassessment Risk register Change requests Risk audits Work performance data Project management plan updates Variance and trend analysis Work performance reports Project documents updates Technical performance measurements Organizational process assets updates Reserve analysis Meetings Project Risk Management The processes of conducting risk management planning, identification, analysis, response planning, and monitoring and control on a project. The objectives of Project Risk Management are to increase the probability and impact of positive events, and decrease the probability and impact of negative events in the project. “Project risk is always in the future. Risk is an uncertain event or condition that, if it occurs, has an effect on at least one project objective. Objectives can include scope, schedule, cost, and quality.” • Plan Risk Management o The process of defining how to conduct risk management activities for a project • Identify Risks o The process of determining which risks may affect the project and documenting their characteristics • Perform Qualitative Risk Analysis o The process of prioritizing risks for further analysis or action by assessing and combining their probability of occurrence and impact • Perform Quantitative Risk Analysis o The process of numerically analyzing the effect of identified risks on overall project objectives. • Plan Risk Responses o The process of developing options and actions to enhance opportunities and to reduce threats to project objectives. • Control Risks o The process of implementing risk response plans, tracking identified risks, monitoring residual risks, identifying new risks, and evaluating risk process effectiveness throughout the project.
  • 21. http://www.pmlead.net Project Procurement Management Process Name Inputs Outputs Tools & Techniques Plan Procurement Management Project management plan Procurement management plan Make-or-buy analysis Requirements documentation Procurement statement of work Expert judgment Risk register Procurement documents Market research Activity resource requirements Source selection criteria Meetings Project schedule Make-or-buy decision Activity cost estimates Change requests Stakeholder register Project document updates Enterprise environmental factors Organizational process assets Conduct Procurements Procurement management plan Selected seller Bidder conference Procurement documents Agreements Proposal evaluation techniques Source selection criteria Resource calendars Independent estimates Seller proposals Change requests Expert judgment Project documents Project management plan updates Advertising Make-or-buy decision Project documents updates Analytical techniques Procurement statement of work Procurement negotiations Organizational process assets Control Procurements Procurement management plan Work performance information Contract change control system Procurement documents Change requests Procurement performance review Agreements Project management plan updates Inspections and audits Approved change request Project documents updates Performance reporting Work performance reports Organizational process assets updates Payment systems Work performance data Claims administrations Records management system Close Procurements Project management plan Closed Procurement Procurement audits Procurement documents Organizational process assets updates Procurement negotiations Records management system
  • 22. Project Procurement Management Includes the processes necessary to purchase or acquire products, services, or results needed from outside the project team. The organization can be either the buyer or seller of the products, services, or results of a project. • Plan Procurement Management o The process of documenting project purchasing decisions, specifying the approach, and identifying potential sellers • Conduct Procurements o The process of obtaining seller responses, selecting a seller, and awarding a contract • Control Procurements o The process of managing procurement relationships, monitoring contract performance, and making changes and corrections as needed. • Close Procurements o The process of completing each project procurement
  • 23. http://www.pmlead.net Project Stakeholder Management Process Name Inputs Outputs Tools & Techniques Identify Stakeholders Project Charter Stakeholder register Stakeholder analysis Procurement documents Expert judgment Enterprise environmental factors Meetings Organizational process assets Plan Stakeholder Management Project management plan Stakeholder management plan Expert judgment Stakeholder register Procurement documents updates Meetings Enterprise environmental factors Analytical techniques Organizational process assets Manage Stakeholder Engagement Stakeholder management plan Issue log Communication methods Communication management plan Change requests Interpersonal skills Change log Project management plan updates Management skills Organizational process assets Project documents updates Organizational process assets updates Control Stakeholder Engagement Project management plan Work performance information Information management system Issue log Change requests Expert judgment Work performance data Project management plan updates Meetings Project documents Project documents updates Organizational process assets updates
  • 24. Project Stakeholder Management Includes the processes required to identify the people, groups, or organizations that could impact or be impacted by the project, to analyze stakeholder expectations and their impact on the project, and to develop appropriate management strategies for effectively engaging stakeholders in project decisions and execution. • Identify Stakeholders o The process of identifying all people or organizations could impact or be impacted by a decision, activity, or outcome of the project; and analyzing and documenting relevant information regarding their interests, involvement, influence and impact on project success. • Plan Stakeholder Management o The process of developing appropriate management strategies to effectively engage stakeholders throughout the project life cycle • Manage Stakeholder Engagement o The process of communicating and working with stakeholders to meet their needs/expectations • Control Stakeholder Engagement o The process of monitoring overall project stakeholder relationships and adjusting strategies and plans for engaging stakeholders
  • 25. You need to understand the terms and the logic relationships between the inputs, outputs and tools& techniques. Memorizing them is not enough and will lead you nowhere. Refer to the PMBoK 5h Edition for more details. & Please do not hesitate to contact me anytime if you have any questions, comments, and feedbacks. Success is yours, Prepared By: Amr Miqdadi, PMP info@pmlead.net http://www.pmlead.net PMI®, PMP®, CAPM® and PMBOK® Guide are trademarks of the Project Management Institute, Inc. PMI® has not endorsed and did not participate in the development of this product.