Municipality of Greater Amman
   Interim Growth Strategy
      High Density Mixed Use
DEVELOPMENT MANUAL




           Amman Master Plan PMU
              15 November 2007 - Final
Table of Contents

               MESSAGE from the MAYOR                               C     INTERIM DEVELOPMENT CONTROLS                    56
               Preface                                              C.1   Introduction & Overview
                                                                    C.2   Land Use Designations
               A     INTRODUCTION                              1    C.3   Building Heights: Categories & Limits
                                                                    C.4   View Preservation Provisions
               A.1    IGS Intent, Goals & Objectives                C.5   Building Envelope Standards
               A.2    IGS Principles & Policies                     C.6   Design Guidelines
               A.3    Interim HDMU Area Locations                   C.7   Parking Requirements
               A.4    HDMU Area A: Central – Intensification        C.8   Alternative Compliance
               A.5    HDMU Area B: North – Outfill
               A.6    HDMU Area C: South - Outfill
                                                                    D     INTERIM DEVELOPMENT REVIEW                      82
               B      HDMU AREA CONCEPT PLANS                  21   D.1   Principles, Purpose, & Process Overview
                                                                    D.2   Pre-application Consultation
               B.1    Purpose & Content                             D.3   Design Review
               B.2    The Public Realm                              D.4   Detailed Technical Review
               B.3    HDMU Area A Concept Plan                      D.5   Development Charges & Agreements
               B.4    HDMU Area B Concept Plan
               B.5    HDMU Area C Concept Plan                      APPENDICIES
                                                                    1. Project Team:   Amman Commission
                                                                                        Master Plan - Project Management Unit
                                                                    2. Special Provision




                                                                          Municipality of Greater Amman
15 November 2007 - Final
                                                                          Interim Growth Strategy                               i
Message from the Mayor




                           Municipality of Greater Amman
15 November 2007 - Final
                           Interim Growth Strategy         ii
Preface

                                                     The Amman Skyline
                           The IGS is concerned
                           with many issues which
                           are addressed on the
                           pages which follow -
                           but first among them is
                           preserving the Unique
                           Image and Character
                           of Amman.



                                      An Essential Part of the City’s Character

                                                                                                  The IGS, and the
                                                                                                  Master Plan to
                                                                                                  follow, will enable
                                                                                                  Amman to grow and
                                                                                                  modernize without
                                                                                                  losing that which
                                                                                                  makes it Special.



                                                                  Municipality of Greater Amman
15 November 2007 - Final
                                                                  Interim Growth Strategy                               iii
A. Introduction




                            A.1   IGS Intent, Goals & Objectives
                            A.2   IGS Principles & Policies
                            A.3   Interim HDMU Area locations
                            A.4   HDMU Area A: Central – Intensification
                            A.5   HDMU Area B: North – Outfill
                            A.6   HDMU Area C: South – Outfill



15 November 2007 - Final                                                   1
A.1 IGS Goals & Objectives
                Interim Growth Strategy (IGS)
                This IGS is a plan that provides policies, plans, rules, and locations for HDMU development proposals
                that protect the City of Amman and its Communities - while a Master Plan is being prepared. The IGS
                introduces interim elements (Transportation Framework, Transit Corridors, Tall Building Regulations,
                Reformed Zoning, Reformed Development Review, Development Charges) that will become permanent
                with some modifications. The IGS is therefore the first phase of a new Master Plan for Amman.


                General Intent of IGS:                    The IGS supports the achievement of this intent by planning
                                                          High Density Mixed Use (HDMU) development that:
                The IGS strikes a reasonable balance
                                                            Can be serviced efficiently without overloading Amman’s
                between the interests of the
                                                          service networks – water, sewerage & storm water.
                development and investment
                community and the general citizenry of        Provides for safe and efficient transportation access,
                Amman by providing:                       including public transit, and sufficient on-site parking.
                Developers with Reasonable                   Promotes pedestrian-based mixed-use development.
                Certainty – comprising a clear set of
                                                             Protects and complements the City’s heritage, antiquities,
                rules and procedures for design,
                                                          urban fabric and topography.
                approvals, and construction
                                                             Protects existing, stable neighborhoods.
                The Public with Benefits – including
                protection of stable areas, access to        Encourages high-quality architectural design.
                new parks & public space, access to
                                                             Maintains public views of key landmarks and vistas.
                public transit
                                                             Promotes “green” environmental standards.


                                                                        Municipality of Greater Amman
15 November 2007 - Final
                                                                        Interim Growth Strategy                           2
A.3 IGS Goals & Objectives
             Interim Growth Strategy (IGS) Goals & Objectives:
                   Accommodate the immediate demand for high density mixed use development in a manner that
             compliments the Amman Vision and attracts investment.
               Send a clear signal to the investment community that HDMU development is welcome in the
             Municipality of Greater Amman.
               Provide “Interim” alternatives to Developers and Investors for locating HDMU projects while the
             Amman Master Plan is being completed.
                Accommodate HDMU development in a ‘planned way’ and provide clear direction regarding location
             and development standards.
                  Utilize a strategic & systematic approach that begins & supports the Amman Master Plan process.

               Specifically:
                   Identify areas / sites suitable for HDMU developments by clear criteria.
                    Establish modern development guidelines and zoning controls.
                  Establish an efficient, investor-friendly, development review process that
               protects the public interest.
                    Provide for appropriate public input into the design of HDMU projects.
                    Build the capacity in GAM to review & regulate major project proposals.
                    Provide a flexible framework for on-going investment in the City.
                    Begin the process of creating an Amman Master Plan trough the IGS.
                  Create a new framework for sharing the cost of infrastructure, in an
               equitable way, between the Investor and the Community.


                                                                            Municipality of Greater Amman
15 November 2007 - Final
                                                                            Interim Growth Strategy                 3
A.2 IGS Principles & Policies
              Urban Design
              Amman will be developed at a human scale to complement existing neighbourhoods and communities
              and to create a cityscape that is attractive and efficient. HDMU development must:

                    Complement Amman’s unique urban fabric, cityscape and topography.
                    Maintain public views of key landmarks and vistas between hills and between valleys and hills, and
                    from public roads and sidewalks to significant public attractions , natural features.
                    Establish appropriate transitions in scale & design between neighborhoods.
                    Promote high quality design of streetscapes, parks, and public and private buildings in order to
                    reinforce Amman as a comfortable, useable, beautiful and memorable city.
                    Respect and provide continuity with the character of existing adjacent communities and ensures land-
                    use compatibility with adjacent neighborhoods to create a more attractive and efficient city.
                    Encourage high-quality architectural design that blends with the City’s urban fabric and topography.




                                                                            Municipality of Greater Amman
15 November 2007 - Final
                                                                            Interim Growth Strategy                        4
A.2 IGS Principles & Policies
              Culture and Heritage
              Amman is ‘a city with a story’ - a modern urban center that represents one of the oldest inhabited cities in
              the world. Preserving heritage and promoting it as an integral part of the overall contemporary urban living
              experience will be one of the pillars of the Master Plan. HDMU development must be guided so that it:

                      Safeguards Jordan’s antiquities and protects and complements the City’s heritage & historic sites.
                      Protects existing stable neighborhoods and promotes compact urban form.

               Urban Infrastructure
               Urban infrastructure will provide modern and efficient public transportation and systems for vehicle
               traffic and pedestrians, water, sewerage and communication services to our community. These
               networks will be used as instruments to guide the development of the City. HDMU development must:
                      Provide for safe and efficient vehicular transportation access which can be supported by the local
                      road network and which will not create undue traffic impact on stable residential neighborhoods.
                      Provide a sufficient supply of accessible, attractive, and convenient on site parking and vehicular
                      loading and servicing facilities which do not disrupt the operation of adjacent streets.
                      Encourage and support public transit use by providing convenient pedestrian access to suitable
                      public transit services along safe and attractive transit corridors.
                      Provide a welcoming walking environment for pedestrians that is safe, accessible, landscaped,
                      functional and interesting.
                      Provide access to adequate urban infrastructure services, such as water, sewer, storm water and
                      community services without unduly overloading these service networks.


                                                                             Municipality of Greater Amman
15 November 2007 - Final
                                                                             Interim Growth Strategy                         5
A.2 IGS Principles & Policies

               Green City, Environment and Natural Resources
               Amman must be built on sustainable development principles - that is "green" with parks and trees. One
               of the major considerations is to ensure that citizens enjoy a healthy environment. HDMU developments
               must consider:

                           Implementation of “green” environmental standards, including retention of storm-water and re-use of
                           grey-water for irrigation and use of solar and smart energy solutions to reduce carbon emissions
                           Micro climate conditions and integrate these into the design of the developments
                           The integration of parks and green spaces into HDMU developments creating continuous networks
                           of parks that link high-density communities with surrounding communities
                           Minimizing the consumption of lands most suitable for agricultural production




                                                                                Municipality of Greater Amman
15 November 2007 - Final
                                                                                Interim Growth Strategy                          6
A.2 IGS Principles & Policies
               Governance and Service Delivery
               The Master Plan will be the roadmap for development; it will be citizen centered and reflect the aspirations
               of all stakeholders complemented by an implementation framework that is participatory, inclusive and
               improves public service delivery to residents and the business community. GAM will ensure:

                      A streamlined approvals process for investors that is timely, transparent and equitable.
                      A public review of major HDMU project before they are considered for approval.

              Investment and Economic Activity
              The Master Plan will improve the climate for investment by identifying opportunities for sustainable
              economic growth and provide clarity to investors on our community's aspirations. GAM will ensure that:

                      A range of HDMU area locations & density alternatives are provided to absorb market demand.
                      An adequate supply of serviced land for investment in provided within the designated HDMU areas.

               Public Spaces and Social Inclusion
               The Master Plan encourage a livable and social city; a city that draws people to its public spaces; builds
               diverse communities and is inclusive of all its citizens. HDMU development must:

                      Promote public spaces that are accessible, comforting, and welcoming to people from all
                      neighbourhoods, of all physical conditions, male and female, old, young and the disabled.
                      Promote mixed-use development to create self sufficient and pedestrian-friendly neighborhoods
                      Encourage the integration of different income groups within neighborhoods and communities.

                                                                            Municipality of Greater Amman
15 November 2007 - Final
                                                                            Interim Growth Strategy                           7
A.3 Interim HDMU Area Locations

                                                              Selection Criteria:
                                   Area A: Intensification        Suitability for HDMU Development
                                              (Central)
                               B   Area B: Outfill (North)
                                                                  Impact on City-Wide Development
                                                                  Choice & Marketability
                                   Area C: Outfill (South)
                                                                  Access To Transit & Major Roads
                                                                  Opportunity for Urban Design



                                                          B



                           A
                                                      A
                      C                           C




                                                                      Municipality of
                                                                      Greater Amman

                                                  Municipality of Greater Amman
15 November 2007 - Final
                                                  Interim Growth Strategy                           8
A.3 Interim HDMU Area Locations




                                                                             South of Zahran
                                     AREA A:
                                     CENTRAL


                                                                         B




                                                                     A

                           AREA C:                               C

                           SOUTH




                                                  Municipality of Greater Amman
15 November 2007 - Final
                                                  Interim Growth Strategy                      9
A.3 Interim HDMU Area Locations




                           North of Zahran
                                                                   AREA B:
                                                                   NORTH

                                      B




                                  A
                              C




                                                                       ABDALI




                                                Municipality of Greater Amman
15 November 2007 - Final
                                                Interim Growth Strategy         10
A.3 Interim HDMU Area Locations




Area A: Central- Intensification        Area B: North - Outfill                   Area C: South - Outfill
Total Area:                25.6ha       Total Area:         104.3ha               Total Area:        229.6ha
HDMU Zones:                11.9ha       HDMU Zones:          22.6ha               HDMU Zones:         59.0ha
HDMU Lots:                 36           HDMU Lots:           88                   HDMU Lots:         201
   Landmark                   1           Landmark                  1                Landmark                0
   High                       0           High                     10                High                   16
   Medium-High                8           Medium-High              17                Medium-High            37
   Medium                    16           Medium                   25                Medium                 69
   Medium-Low                11           Medium-Low               35                Medium-Low             79
Open Space:                 6.1ha       Open Space:          16.5ha               Open Space:         30.3ha



                                    HDMU Areas – Data Summary
                                                                  Municipality of Greater Amman
15 November 2007 - Final
                                                                  Interim Growth Strategy                        11
A.4 HDMU Area A: Central - Intensification

                  Area A is located in the
                wadi, running northwest to
               southeast, directly south of
              Jabal Amman, from the new
                  Abdoun Bridge to the Al-
                       Qaiseyeh Scattered
             Settlement. Princess Basma
                    Road runs through the
             northern half of the Area and
                  east to the GAM Offices.
                The proposed intersection
               with the new Wadi Abdoun
                    Road (i.e., at the “Ten
               Bridges”) is at the southern
                   end of the Area and will
              connect the City Center with
                     the Airport. Area A is
                   surrounded by existing,
                  stable neighborhoods of
                varying income levels and
                        physical condition.

                                               Area A: Central - Intensification

                                                          Municipality of Greater Amman
15 November 2007 - Final
                                                          Interim Growth Strategy          12
A.4 HDMU Area A: Central - Intensification




                                                      HDMU Area A: Central
                                                      - Intensification




                                       Municipality of Greater Amman
15 November 2007 - Final
                                       Interim Growth Strategy               13
A.4 HDMU Area A: Central - Intensification




                           Current Subdivision & Zoning                        Built-up Areas




                                                                 Municipality of Greater Amman
15 November 2007 - Final
                                                                 Interim Growth Strategy          14
A.5 HDMU Area B: North - Outfill
                 Area B is located in Al-
            Jubayhah, along the Jordan
              Road, north of Al-Shaheed
             Ring Road, and east of the
           “Northern Corridor” that runs
          along Queen Rania Road that
           serves the University District
         and the Al-Hussein Youth City.
        Jordan Road serves as a major
         corridor, linking the City Center
         with the Northern Suburbs and
               Gerash. Area B is located
                immediately North of the
        Northern Bus Terminal and can
               be easily served by public
        transit in the near future. While
           slopes are less steep than in
                the City Center, they are
         broader and higher, & the Area
                       wadis are relatively
                             undeveloped.
                                              Area B: North - Outfill


                                                    Municipality of Greater Amman
15 November 2007 - Final
                                                    Interim Growth Strategy         15
A.5 HDMU Area B: North - Outfill




                           HDMU Area B North - Outfill




                                                           Municipality of Greater Amman
15 November 2007 - Final
                                                           Interim Growth Strategy          16
A.5 HDMU Area B: North - Outfill




                           Current Subdivision & Zoning                      Built-up Area

                                                            Municipality of Greater Amman
15 November 2007 - Final
                                                            Interim Growth Strategy          17
A.6 HDMU Area C: South - Outfill

                           Area C is already
                developing along the east
               side of Airport Road, south
              of Abdoun. It will be served
             by an extension of the Inner
              Ring Road (currently under
              construction) as well as the
            new Wadi Abdoun Road that
             will link the Central City with
             the Airport, passing through
             Site A. In addition the future
                 LRT western corridor will
              likely pass through Area C,
            on its way to the Airport. The
                      site is quite dramatic
                        topographically and
               significant views extend to
              the inner city to the east, to
              Abdoun to the north, and to
                     Hay Al-Yasamin to the
             south. Area C’s frontage on,
                and access to, the Airport
                    Road presents obvious
                   opportunities for higher-
                     density residential and
                 mixed-use development.


                                               Area C: South - Outfill

                                                     Municipality of Greater Amman
15 November 2007 - Final
                                                     Interim Growth Strategy         18
A.6 HDMU Area C: South - Outfill




                               HDMU Area C South - Outfill




                              Municipality of Greater Amman
15 November 2007 - Final
                              Interim Growth Strategy         19
A.6 HDMU Area C: South - Outfill




                           Built-up Area      Current Subdivision & Zoning




                                              Municipality of Greater Amman
15 November 2007 - Final
                                              Interim Growth Strategy         20
B. HDMU Area Concept Plans


                             B.1 Purpose & Content
                             B.2 The Public Realm
                             B.3 HDMU Area A Concept Plan
                             B.4 HDMU Area B Concept Plan
                             B.5 HDMU Area C Concept Plan




15 November 2007 - Final
                                                            21
B.1 Purpose & Content
               Purpose of HDMU Area Concept Plans (ACP)
               The Area Concept Plans serve as guidelines and ‘Instructions’ that elaborate the Interim Development
               Controls including the Areas Zoning Maps. In concert with the policies and regulations, the ACPs
               demonstrate the intent of the IGS. The specific purposes of the ACPs are as follows:

                       Illustrate the fundamental planning concepts and principles described in Section A
                       Provide the basis for evaluating project proposals in the Design Review Process in Section D
                       Illustrate the application of Interim Regulations including zoning limits described in Section C
                       Propose a structure for the public realm within which individual projects can be located
                       Demonstrate an appropriate relationship between the public realm and private development
                       Provide a basis for estimating development build-outs numbers: floor areas, dwelling units, etc.
                       Provide a basis for estimating servicing and infrastructure costs and requirements
                       Provide a basis for Developers to evaluate project viability and marketability in each HDMU Area

               Content of Area Concept Plans:
                      Road Hierarchy: Arterials, Collectors, Local Streets, etc.
                      Open Space Elements: Active & Passive
                      HDMU Zones & Plots with Building Types
                      Other Land Use: Non-HDMU Commercial and Residential
                      View Preservation: Building Height Ceilings, View Planes


                                                                             Municipality of Greater Amman
15 November 2007 - Final
                                                                             Interim Growth Strategy                      22
B.2 The Public Realm & Private Development
             HDMU Area Concept Plans: The Public Realm
             The Area Concept Plans provide a Public Framework for High Density Development and include:
                  Road Right-Of-Ways: Expressways, Transit Roads, Main Streets, Collectors, Local Streets, Service
                        Alleys, and Public Stairs
                  Open Space: Jabal & Wadi Parks, Stair Parks, Greenbelts, Sportsfields, etc.
                  Public View Corridors & Planes: public views from jabal to jabal, from jabals the wadis below, and
                 from public right-of-ways to significant public landmarks and natural features
                  Community Facilities: land for mosques, schools, medical facilities, public art, etc.

            HDMU Area Concept Plans: Private Development (HDMU)
            The Area Concept Plans regulate the private HDMU development within the Public Framework including:
                  Access: provide direct access to adjacent higher-capacity roads and pedestrian routes
                  Land Use: Zoning Designations for Individual Parcels of Land, public and private
                  Parking: provide adequate on-site parking for residents and visitors
                  Servicing and Loading: provide logical locations for the servicing of high-density buildings
                  Building Height: provide for a range of building heights and densities that allow for transition from
                         high density to lower-density residential areas
                  Building Massing: ensure that building massing does not block public views or views from other,
                         uphill residential developments to the wadi-parks
                  On-Site Landscaped Gardens: provide suitable on-site public space for use by building residents


                                                                           Municipality of Greater Amman
15 November 2007 - Final
                                                                           Interim Growth Strategy                        23
HDMU Areas Locations
                                                                                  B



                                   B



                                                                                  Abdali
                                         Abdali
                               A
                           C

                                                                         A


                                                           C



                                                  Municipality of Greater Amman
15 November 2007 - Final
                                                  Interim Growth Strategy                  24
B.2 The Public Realm: Transportation

                                                   GAM Transportation Framework
                                                 Expressways & Transit Corridors
                                                       HDMU Interim Areas A, B, & C overlap
                                                       with existing and proposed elements of
                                   B
                                                       the GAM Transportation Framework
                                                       including expressways and transit
                                                       corridors proposed for Bus Rapid Transit
                                                       (BRT). The Transportation Framework
                                                       will receive clarification in the Master
                               A                       Plan with an emphasis on the
                           C                           development of BRT corridors and a
                                                       pedestrian friendly transportation
                                                       network. The planning and development
                                                       of the Interim HDMU Areas will
                                                       incorporate the intersecting
                                                       transportation elements shown as part of
                                                       the public realm in anticipation of the
                                                       Master Plan Transportation Framework.
                                                                         Expressways
                                                                         Transit (BRT) Roads
                                                                         Future Loops

                                               Municipality of Greater Amman
15 November 2007 - Final
                                               Interim Growth Strategy                         25
B.2 The Public Realm: Transportation

                                                                                              Public Realm:
                                                                                              Road Hierarchy
                                                                                              The Expressways indicated
                                                                                              on the GAM Transportation
                                                                                              Framework provide access
                                                                                              to each of the Interim
                                                                                              Areas. Within each Area
                                  30 m                                                        Concept Plan is a
                                                                                              proposed network of
                                                                       40 m
                                                                                              Transit Roads, Collectors,
                                                                                              Local Access Streets,
                                                                                              Service Alleys, Public
                                                                                              Stairways & Paths.
                                                                                              The Developer will be
                                                                                              required to pay a
                                                                                              proportional share of costs
               Major Collectors: Main Streets           Arterials - Transit Roads             of building this network.
                                                                                              The designs illustrated on
                   30m RoW                                40m RoW                             this and the following page
                   Parallel parking each side             BRT (bus) in dedicated lane         are preliminary but are
                                                          in each direction with Bus          indicative of the concept
                   Tree row & Street trees both sides
                                                          Stops & Shelters                    and standards intended.
                                                          3 landscaped tree rows              (next page)

                                                                       Municipality of Greater Amman
15 November 2007 - Final
                                                                       Interim Growth Strategy                              26
B.2 The Public Realm: Transportation

                                                                                             Public Realm:
                                                                                             Road Hierarchy (cont.)
                                                                                             The emphasis in the
                                                                                             roadway plans and profiles
                                                                                             indicated and the ACP
                                                                                             networks in general is on:
                                                     18 or                                       Public Transit (BRT)
                                                     20 m                                        Landscaping with
                           8m                                                                drought resistant tree
                                                        24 m                                 species
                                                                                                 Street parking (parallel)
                                                                                                 Grade intersections with
                                                                                             signalization or Stop signs
           Service Alleys           Local Access               Minor Collectors                  Pedestrian friendly
                                                                                             features – sidewalks,
                8m RoW behind        18m Row or 20m              24m RoW                     islands, crosswalks
                HDMU Plots           RoW at Shopping St.                                         Connections to public
                                                                 1 lane - each
                1 lane - each        1 lane - each               direction                   and private open space
                direction (or)       direction
                                                                 2 tree rows - both          The emphasis is on
                1 lane - one way     2 rows of trees             sides                       downsizing the roads,
                (with) stacking                                                              slowing traffic, & favoring
                space on one side    Parking & Sidewalks
                                     on both sides                                           the pedestrian.


                                                                      Municipality of Greater Amman
15 November 2007 - Final
                                                                      Interim Growth Strategy                              27
HDMU Areas: Data Summary




Area A: Central- Intensification    Area B: North - Outfill                 Area C: South - Outfill
Total Area:                25.6ha   Total Area:         104.3ha             Total Area:        229.6ha
HDMU Zones:                11.9ha   HDMU Zones:          22.6ha             HDMU Zones:         59.0ha
HDMU Lots:                 36       HDMU Lots:           88                 HDMU Lots:         201
   Landmark                   1       Landmark                 1               Landmark                0
   High                       0       High                    10               High                   16
   Medium-High                8       Medium-High             17               Medium-High            37
   Medium                    16       Medium                  25               Medium                 69
   Medium-Low                11       Medium-Low              35               Medium-Low             79
Open Space:                 6.1ha   Open Space:          16.5ha             Open Space:         30.3ha




                                                          Municipality of Greater Amman
15 November 2007 - Final
                                                          Interim Growth Strategy                          28
B.3 HDMU Area A Concept Plan – Central




                                          Municipality of Greater Amman
15 November 2007 - Final
                                          Interim Growth Strategy         29
B.3 HDMU Area Concept Plan A – Central

                                                   Zone 1            Open Space or Low-rise
                                                                        Development between
                                                                        HDMU Zones



                                                                          Pedestrian Links from HDMU
                                                                             Zones to Existing Low-rise
                                                                             Communities




                                       Zone 2

                                                                                      Landmark Site
                           Open Space &
                              Community
                              Facilities buffer
                              HDMU Zones
                                                     Zone 3

                                   Open Space or Low-rise
                                      Development between
                                      HDMU Zones
                                                                                   Zone 4




                                                  Municipality of Greater Amman
15 November 2007 - Final
                                                  Interim Growth Strategy                                 30
B.3 HDMU Area A
                                        Concept Plan – Central




                                           Area A Zoning Map



                           Municipality of Greater Amman
15 November 2007 - Final
                           Interim Growth Strategy               31
B.3 HDMU Area A Concept Plan – Central

                           Public Stairs                          HDMU Medium Sites,                  1
                                                                    Podium Optional




                  HDMU Required
                    Podium Sites       P


                                                                                                      BRT Stop

                                                              P
                                                                                                           Public Open
                                                                      P                                       Space
                                                                          P
                                                                                                             Collector Access
                   Community                                                                                    Road
                     Facility Site


                            Build-to Line for
                               Shopping Street
                                                 HDMU Medium-Low
                                                   Sites, No-Podium        Public Stairs
                                                                                               Area A - Zone 1
                                                                                                    9 HDMU Plots


                                                                          Municipality of Greater Amman
15 November 2007 - Final
                                                                          Interim Growth Strategy                               32
B.3 HDMU Area A Concept Plan – Central


                  HDMU Required
                    Podium Sites      P               BRT Stop                                      2

                   Collector Access
                      Road
                                            P
                  HDMU Medium-Low
                    Sites, No-Podium
                                                  P
                  Build-to Line for
                     Shopping Street                                                             Public Stairs
                                                        P
                                                                                                 HDMU Sites,
                  Public Stairs                                                                    Podium Optional


                                                                                                 Public Open
                                                                                                    Space
                  Community Facility Site



                                                                                        Area A - Zone 2
                                                                                            13 HDMU Plots


                                                                 Municipality of Greater Amman
15 November 2007 - Final
                                                                 Interim Growth Strategy                             33
B.3 HDMU Area A Concept Plan – Central


                  Collector Access
                     Road                                               Public Stairs
                                                            P
                                                                                                               3
                  Public Open
                     Space
                                                                P


                                                                    P                                              BRT Stop

                                                                                                            Landmark Site
                                                                        P
                                                                                                        HDMU Required
                                                                                                          Podium Sites   P
                  HDMU Sites,                                                P
                    Podium Optional



                                      Build-to Line for
                                         Shopping Street
                                                                                                 Area A - Zone 3
                                                                                                      8 HDMU Plots


                                                                            Municipality of Greater Amman
15 November 2007 - Final
                                                                            Interim Growth Strategy                           34
B.3 HDMU Area A Concept Plan – Central

                  Community
                    Facility Site                   HDMU Medium-Low
                                                      Sites, No-Podium

                  Public Open
                     Space
                                                                                         4
                   Collector Access
                      Road                     P
                                                                    BRT Stop

                  Build-to Line for            P
                     Shopping Street                                HDMU Required
                                                                      Podium Sites   P
                                           P
                  Public Stairs
                                       P
                                                                    Transit Road



                                                     Public Open
                                                        Space
                                                                          Area A - Zone 4
                                                                               6 HDMU Plots


                                                   Municipality of Greater Amman
15 November 2007 - Final
                                                   Interim Growth Strategy                    35
B.3 HDMU Area A Concept Plan – Central

   Area A is surrounded and framed by hills and
       the maximum building height is directly
       related to the elevation of surrounding
       hilltops. The plane defined by the three
       points shown defines a Building Height
       Ceiling that only a building on a landmark
       development lot is permitted to penetrate.


   Each HDMU Zone (1, 2, 3 & 4) shows an
      average grade elevation and the
      distance to the Ceiling above (Max.
      Ht.). This determines the maximum
      building height permitted in the Zone
      subject to verification of the Datum
      Point for a specific Development Lot.




    Building Height Ceiling


                                                                                       Landmark Building



                                                                                     Area A: Building
                                                                                      Height Ceiling
                                                               Municipality of Greater Amman
15 November 2007 - Final
                                                               Interim Growth Strategy                     36
B.3 HDMU Area A Concept Plan – Central



                                                  Zone 1
                                                                                   Zone 2



                 View Planes are linear view perspectives running
                    along Corridors (usually transportation) that                                 The open areas between
                    provide continuous vistas of the hills and City-                                 HDMU Zones will be
                    scape. View Planes along wadi corridors                                          acquired and established
                    adjacent to HDMU Areas must be at least 67%                                      as Public Open Space.
                    unobstructed. The spacing of HDMU Zones,
                    the slender tower permitted (maximum floor         Zone 3
                    plates), and the minimum 25 meter separation
                    between towers ensure the maintenance of
                    significant vistas from wadi corridors.




                                                                                                   Zone 4


                                                                                          Area A: View Planes


                                                                          Municipality of Greater Amman
15 November 2007 - Final
                                                                          Interim Growth Strategy                               37
B.4 HDMU Area B Concept Plan – North




                                        Municipality of Greater Amman
15 November 2007 - Final
                                        Interim Growth Strategy         38
B.4 HDMU Area B Concept Plan – North



                       Zone 1                           Commercial


                                                        Pedestrian Links through
                                                           HDMU Zones to
                                                           Transit Stops


 Low-rise Development                                       Zone 2
    between HDMU Zones
                                                                            Linear Wadi Parks




                     Zone 3


 Landmark Site

                                                     Open Space &             Zone 4
                                                        Community
                                                        Facilities buffer
 Commercial                                             HDMU Zones



                           LOW DENSITY RESIDENTIAL




                                                                                   Municipality of Greater Amman
15 November 2007 - Final
                                                                                   Interim Growth Strategy         39
B.4 HDMU Area B Concept Plan – North



                                           Zone 1




                                                    Zone 2

                                                                              Zone 4


                           Zone 3




                                         Area B Zoning Map
                                              Municipality of Greater Amman
15 November 2007 - Final
                                              Interim Growth Strategy                  40
HDMU Medium-Low                        Commercial        B.4 HDMU Area B Concept Plan – North
  Sites, No-Podium

HDMU Medium Sites,
  Podium Optional                                                                                     1

Public Walkway
   & Stairs


Public Open
   Space


                                                                                  Low-density Residential
BRT Stop
                                                                                   HDMU Medium-Low
Community                                                                            Sites, No-Podium
  Facility Site
                                                              P       P

Public Open Space                                             P       P
                                                                                          HDMU Required Podium Sites       P

                                                     P    P           P
Commercial                                                                                  Build-to Line for Shopping Street
                                                                                               along Walkway& Stairs
                                                          P       P
                                                     P
Service Alley                                                                                  Area B - Zone 1
                           LOW DENSITY RESIDENTIAL
                                                                           Public Walkway & Stairs 20 HDMU Plots
                                                                      Municipality of Greater Amman
15 November 2007 - Final
                                                                      Interim Growth Strategy                               41
B.4 HDMU Area B Concept Plan – North
                  Public Open
                     Space                                    HDMU Required
                                                                Podium Sites P
                  Build-to Line for
                     Shopping Street                                         BRT Stop
                                        P   P                                                           2
                  Service Alley                     P

                  Commercial                P                    P
                                                P
                                                                         P
                                                             P                                              Public Open
                                                                               P                               Space
                  HDMU Sites,                                        P
                    Podium Optional                                                                HDMU Required
                                                                                                     Podium Sites P
                   HDMU Medium-Low
                     Sites, No-Podium
                                                                                           Commercial
                   Community
                     Facility Site                                                 Service Alley

                                                    Public Walkway & Stairs
                                                                                        Area B - Zone 2
                                                                                            22 HDMU Plots


                                                              Municipality of Greater Amman
15 November 2007 - Final
                                                              Interim Growth Strategy                                 42
B.4 HDMU Area B Concept Plan – North
                  HDMU Required
                    Podium Sites       P                                                     Low-density
                                                                                                Residential
          Landmark Site                                                P

                                                           P           P           P
          BRT Stop                                                                                                     3
                                                   P                           P
                                                                   P
Build-to Line for                          P
   Shopping Street                                                         P
                                                                                                              HDMU Medium-Low
                              P                    P                                                            Sites, No-Podium
                                           P

                                                               P                                                       Public Open Space
                                   P           P       P
                                                                                                                       Public Walkway
                                                                                                                          & Stairs
        HDMU Sites,
          Podium Optional                                                                                  Community
                                                                                                             Facility Site
         Public Walkway
            & Stairs
                                                                                         Service Alley

        Low-density Residential
                                                                                                              Area B - Zone 3
                                                                                                                  30 HDMU Plots


                                                                                       Municipality of Greater Amman
15 November 2007 - Final
                                                                                       Interim Growth Strategy                             43
B.4 HDMU Area B Concept Plan – North
                               Build-to Line for        BRT Stop
                                  Shopping Street




                                                                                                                   4
                                                    P
                                                        P      P
                  Commercial                                           P
                                                         P
                                                               P
                  HDMU Medium-Low                                              P           HDMU Required
                    Sites, No-Podium                                                         Podium Sites    P
                                                                   P
                  Community
                                                                           P                       Service Alley
                    Facility Site                                  P
                                                                           P

                  Low-density
                     Residential
                                                                                            Public Open Space

                   Public Walkway & Stairs
                      with Build-to Lines
                                                                                             Area B - Zone 4
                                                                                                 16 HDMU Plots


                                                                       Municipality of Greater Amman
15 November 2007 - Final
                                                                       Interim Growth Strategy                         44
B.4 HDMU Area B Concept Plan – North

              Area B is framed by adjacent short hills & higher hills beyond.
                   The maximum building height is directly related to the elevation
                   of the higher hilltops. The plane defined by the three points
                   shown defines a Building Height Ceiling that only a building
                   on a landmark development lot is permitted to penetrate.

              Each HDMU Zone (1, 2, 3 & 4) shows an average grade
                 elevation and the distance to the Ceiling above (Max.
                 Ht.). This determines the maximum building height
                 permitted in the Zone subject to verification of the
                 Datum Point for a specific Development Lot.
                                                                                                        2

                                                                                           3



                     Building Height Ceiling                                                            Landmark Building

                                                                           ELEV: 955
                                                                                                            Area B: Building
                                                                                                              Height Ceiling




                                                                                       Municipality of Greater Amman
15 November 2007 - Final
                                                                                       Interim Growth Strategy                 45
B.4 HDMU Area B Concept Plan – North

             View Planes are linear view
                perspectives running along
                Corridors (usually
                transportation) that provide
                continuous vistas of the hills                        Zone 1
                and City-scape. View Planes
                along wadi corridors adjacent to
                HDMU Areas must be at least
                67% unobstructed. The
                spacing of HDMU Zones, the                                     Zone 2
                slender tower permitted
                (maximum floor plates), and the
                minimum 25 meter separation
                between towers ensure the          Zone 3
                maintenance of significant
                vistas from wadi corridors.
                                                                                                     Zone 4

                                                                      The open areas between HDMU Zones
                                                                         will be acquired and established as
                                                                         Public Open Space or developed as
                                                                         low density residential & commercial



                                                                                        Area B: View Planes



                                                                     Municipality of Greater Amman
15 November 2007 - Final
                                                                     Interim Growth Strategy                    46
B.5 HDMU Area C
                              Concept Plan – South




                           Municipality of Greater Amman
15 November 2007 - Final
                           Interim Growth Strategy         47
B.5 HDMU Area C Concept Plan – South
                                                          Low-rise Development between                               Pedestrian Links -
                                                             HDMU Zones                                                 HDMU Zones
                                                                                                                        to Low-rise
                           Zone 1                                                                                       Communities



                                                                                                                 Zone 2

                                                                                                                    Open Space &
                                                                                                                       Community
                                                                                                                       Facilities buffer
                                                                                                                       HDMU Zones




                                                                                                                    Zone 4


                                                    Zone 3                                                           Linear Wadi Parks



                                                                                                           Open Space between
                                    Pedestrian Links through                                                  HDMU Zones
                                       HDMU Zones to
                                       Transit Stops




                                                                           Municipality of Greater Amman
15 November 2007 - Final
                                                                           Interim Growth Strategy                                    48
B.5 HDMU Area C Concept Plan – South


                                                                                      Zone 2

                           Zone 1




                                    Zone 3
                                                                              Zone 4




                                                                      Area C: Zoning Map


                                                      Municipality of Greater Amman
15 November 2007 - Final
                                                      Interim Growth Strategy                  49
B.5 HDMU Area C Concept Plan – South
                  HDMU Medium-Low
                    Sites, No-Podium
                                                                                                     1

                                                                                 Service Alley
                                                   P
                                                                                    Public Walkway
                  Community                                                            & Stairs
                                                         P
                    Facility Site
                                                             P

                  Build-to Line for                                                          BRT Stop
                                                                 P
                     Shopping Street
                                                                                                                 Linear Commercial
                                                                 P
                  HDMU Required
                    Podium Sites    P                                  P
                                                                           P
                                                                                P
                               Public Open                                              P                             Low-density
                                  Space                                                                                  Residential


                               HDMU Sites,                                                           HDMU Medium-Low
                                 Podium Optional                                                       Sites, No-Podium

                                        Public Walkway
                                           & Stairs                                                      Area C - Zone 1
                                                                                                             28 HDMU Plots


                                                                               Municipality of Greater Amman
15 November 2007 - Final
                                                                               Interim Growth Strategy                               50
B.5 HDMU Area C Concept Plan – South
                  HDMU Medium-Low                                                    Service Alley
                    Sites, No-Podium                                                                                         2
                                                  P
        HDMU Medium Sites,
          Podium Optional                             P                                 BRT Stop


        Public Walkway
           & Stairs
                                                           P
                                                      P                                                 HDMU Required
                                                               P                                          Podium Sites   P
                                                                   P
                                                                                                        Service Alley
                                                                       P
          Linear Commercial

          Low-density
             Residential                                                   P

                                                                                                        Build-to Line for
          Community                                                                                        Shopping Street
                                                                               P
            Facility Site


          Public Open Space
                                       HDMU Sites,                                                        Area C - Zone 2
                                         Podium Optional
                                                                                                              46 HDMU Plots


                                                                                   Municipality of Greater Amman
15 November 2007 - Final
                                                                                   Interim Growth Strategy                       51
B.5 HDMU Area C Concept Plan – South
          Public Walkway
             & Stairs                                                                                      HDMU Medium-Low
                                                                                                             Sites, No-Podium

                                                                                                           Service Alley

         Low-density               P                  P                                   P
                                                                  P
            Residential                   P
                                                                                  P
                                              P
                                                                              P                                                      3
          Build-to Lines for                              P           P
             Shopping                                                                                 P
             Street &                                                                             P                               HDMU Required
             Walkway                P
                                          P
                                                                                              P                                     Podium Sites    P
                                              P                                       P
                                                      P

                                                                                                                                       Community
                                                  P                                                                                      Facility Site
         HDMU Sites,
           Podium                             P                           P
           Optional                                                                                                               Public Open Space
                                                                      P
                                          P                                                                                HDMU Medium-Low
                                                                  P                                                          Sites, No-Podium
                               BRT Stop                       P


                               Low-density Residential
                                                                                                                           Area C - Zone 3
                                                                                                                               83 HDMU Plots


                                                                                                  Municipality of Greater Amman
15 November 2007 - Final
                                                                                                  Interim Growth Strategy                                52
Public Walkway             B.5 HDMU Area C Concept Plan – South
Community                             & Stairs
  Facility Site

Low-density
                                                  P
   Residential
                                          P
                                                                      P
                                                              P
HDMU Sites,
                                              P
                                                          P                                                                 4
  Podium                              P
  Optional                                                                                      BRT Stop
                               P
                           P


                                                                              P
                                                                          P                     HDMU Required
                                                                  P                               Podium Sites     P
                                                      P
Public Open Space                             P
                                      P
                                                                                                Build-to Line for
                                                    P                                              Shopping Street


Service Alley
                                                  P
HDMU Medium-Low                                                                                             HDMU Medium-Low
  Sites, No-Podium                                                                Public Open                 Sites, No-Podium
                                              P                                      Space
Low-density
   Residentia                                                                                              Area C - Zone 4
   l
                                                                                                               44 HDMU Plots


                                                                                   Municipality of Greater Amman
15 November 2007 - Final
                                                                                   Interim Growth Strategy                       53
B.5 HDMU Area C Concept Plan – South
                                        Area C is a series of wadis surrounding a short hill & is framed by higher
                                           hills beyond. The maximum building height is directly related to the
                                           elevation of the higher hilltops. The plane defined by the three points
                                           shown defines a Building Height Ceiling that cannot be penetrated.


                                                                                   Each HDMU Zone (1, 2, 3 &
                                                                                      4) shows an average
                                                                                      grade elevation and the
                                                                                      distance to the Ceiling
                                                                                      above (Max. Ht.). This
                                                                                      determines the maximum
                                                                                      building height permitted in
                                                                                      the Zone subject to
                                                                                      verification of the Datum
                                                                                      Point for a specific
                                                                                      Development Lot.




              Building Height Ceiling
                                                       Area C: Building Height Ceiling




                                                          Municipality of Greater Amman
15 November 2007 - Final
                                                          Interim Growth Strategy                                54
B.5 HDMU Area C Concept Plan – South
                                                                                View Planes are linear
                                                                                   view perspectives
                                                                                   running along Corridors
                           Zone 1                                                  (usually transportation)
                                                                                   that provide continuous
                                                                                   vistas of the hills and
                                                            Zone 2                 City-scape. View
                                                                                   Planes along wadi
                                                                                   corridors adjacent to
                                                                                   HDMU Areas must be
                                                                                   at least 67%
                                                                                   unobstructed. The
                                                                                   spacing of HDMU
                                                                                   Zones, the slender
                                                                                   tower permitted
                                                                                   (maximum floor plates),
                                                                                   and the minimum 25
                                                                                   meter separation
                                                                                   between towers ensure
                                                                                   the maintenance of
                                                        Zone 4                     significant vistas from
                                                                                   wadi corridors.


                                                 The open areas between HDMU Zones will be
                                                    acquired and established as Public Open Space.
                              Zone 3
                                                           Area C: View Planes


                                                Municipality of Greater Amman
15 November 2007 - Final
                                                Interim Growth Strategy                                  55
C. Interim Development Controls


                           C.1 Introduction & Overview
                           C.2 Land Use Designations
                           C.3 Building Height: Categories & Limits
                           C.4 View Preservation Provisions
                           C.5 Building Envelope Standards
                           C.6 Design Guidelines
                           C.7 Parking Requirements
                           C.8 Alternative Compliance


15 November 2007 - Final
                                                                      56
C.1 Introduction & Overview
           Interim Development Controls: Overview
           The following is a summary of the Regulations that govern development proposals within the Interim Areas
           (A, B, & C) – the complete document is available at the DSAP Offices at GAM. The specifics of the
           regulations are intended to implement the principles, policies, goals, and objectives identified in Section A
           and the Area specific policies described in Section C. The regulations address land use, building height,
           building form, and view preservation and are used in concert with the Area Zoning Map and Area Concept
           Plans to achieve the planning intent of the IGS.

             Key Concepts:
                 As-of-Right Provisions: The provisions of the existing GAM Zoning Ordinance, especially with
                 respect to building height limits (30 meters or 8 stories, whichever is less), are the limit of a property
                 owner’s automatic entitlement under this interim regulation – ‘as-of-right’. The provisions of the
                 Interim Regulation that differ from the existing zoning are available only on the basis of the Interim
                 Design Review process described in Section F.
                 Discretionary & Conditional Provisions: The provisions of the IGS and the Interim Regulation are
                 discretionary and are granted by the GAM Council through the Regional Committee to a Developer for
                 application to a specific project. This grant of development rights under the provisions of the Interim
                 Regulation is conditional and based on an assessment of development proposal for consistency with
                 the intent of the IGS as reflected in the Policies, Regulations, and Area Concept Plans.
                 View Preservation: Significant portions of the Interim Regulation (Building Envelope Standards) are
                 determined in part by the policy of preserving view corridors and vistas and work in concert with the
                 Area Concept plans toward this end.



                                                                             Municipality of Greater Amman
15 November 2007 - Final
                                                                             Interim Growth Strategy                          57
C.2 Land Use Designations
          The following is the Land Use Classifications are utilized in this Interim Regulation and applied on the
          Area Zoning Maps and the Area Concept Plans. The designations are general and provide a flexible
          framework for development proposals.

                 HDMU: This is the core zoning designation for the development plots upon which high density development will be
                 considered. This includes all development that is greater in height than the current ‘as-of-right’ provisions. Permitted
                 uses under HDMU (High Density Mixed use) include: Residential (Housing Units), Hotels, Retail, Restaurants, Offices,
                 Clubs (sports, social, & recreational) and other compatible Commercial uses such as Cinemas (entertainment). The
                 predominant use within each HDMU Cluster (Area Concept Plans) should be Residential supported by other the other
                 permitted uses. Office Buildings and Hotels are permitted but should not become the predominant use in an Area.
                 Open Space: This general designation can ultimately contain both active and passive open space and constitutes
                 ‘Green Areas’ that contain limited physical (buildings) development. Open space includes Parks (Jabal Parks, Wadi
                 Parks, Stair Parks, Trails/Paths), Sports Fields, Buffer Strips, Public Gardens / Landscaping, and Civic Monuments.
                 Community Facilities: This is a broad designation that includes both public and private facilities that provide
                 services and amenities to the general public. This includes religious facilities, education facilities, health facilities,
                 libraries, social service offices, community centers, Government offices, etc.
                 Road Reserves: This is land dedicated to roads, service alleys, public paths and stairways. In addition to car and
                 bus lanes, the reserves contain space for landscaping, sidewalks, and transit facilities (bus turn-offs and shelters).
                 Residential: This includes the current low density, low rise (4 story as-of-right limit) residential zoning classifications
                 (A, B, C, & D) in the current zoning regulation. The mix and distribution of the four types is unspecified on the Area
                 Zoning Maps and Area Concept plans, but a mix of plot sizes is recommended.
                 Local Commercial: This includes the current low density, low rise (4 story as-of-right limit) commercial zoning
                 classification in the current zoning regulation (Local Commercial within Residential A with Special Regulations).

           Low Density Residential (A, B, C, or D) or Linear Commercial developments are not permitted in the HDMU
           zones indicated on the Area Concept Plans and Area Zoning Maps. Some low density development is
           permitted within the Interim Areas as indicated on the Areas Concept Plans.

                                                                                        Municipality of Greater Amman
15 November 2007 - Final
                                                                                        Interim Growth Strategy                                58
C.3 Building Height: Categories & Limits
          An absolute Building Height Ceiling has been established for each of the Interim Areas. This ceiling
          relates to surrounding topography with the elevations at selected hilltops setting the absolute limits. This
          provides a reasonable upper limit that prevents tall buildings from dominating an existing skyline and
          cityscape that is largely determined by natural topography. Three hilltop points define a plane that
          represents a ceiling that only designated Landmark buildings can penetrate.

          The Area Concept Plans indicates an average grade elevation for each HDMU Zone and the elevation at
          the Building Height Ceiling directly overhead. This provides a general indication of the overall height limit at
          that cluster based on the general topographic mapping available which features 10 m contour intervals. The
          Developer can provide specific surveyed elevations at hilltops and the proposed project site and request a
          refinement of the building height ceiling.

          The HDMU Zones allow five Building Height Categories with the locations indicated on the Area Concept
          Plans. In addition the existing low rise residential and commercial types (4 & 8 story limits respectively) are
          allowed in the designated residential and commercial zones indicated on the Area Zoning Map and Area
          Concept Plans. The height limits for each of the HDMU categories are defined in minimum and maximum
          meters from a designated datum point for each plot (ref. Zoning Definitions). The number of stories possible
          under these limits is determined by the Architect’s floor to floor heights. The Landmark designation does
          not have an upper limit and is the only building type that is allowed to exceed the Building Height Ceiling.

          The Building Height Categories are as follows (reference Building Envelope Standards):

             Medium-low:            Min. 18 meters to Max.30 meters
             Medium:                31m to 50m              High:                    76m to 100m
             Medium-high:           51m to 75m              Landmark:                101m and higher

                                                                         Municipality of Greater Amman
15 November 2007 - Final
                                                                         Interim Growth Strategy                         59
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute

Weitere ähnliche Inhalte

Was ist angesagt?

Corridor Intensification Strategy (CIS) | Amman Institute
Corridor Intensification Strategy (CIS) | Amman InstituteCorridor Intensification Strategy (CIS) | Amman Institute
Corridor Intensification Strategy (CIS) | Amman InstituteAmman Institute
 
Amman Plan: Metropolitan Growth Arabic |Amman Institute
Amman Plan: Metropolitan Growth Arabic |Amman InstituteAmman Plan: Metropolitan Growth Arabic |Amman Institute
Amman Plan: Metropolitan Growth Arabic |Amman InstituteAmman Institute
 
Interim Industrial Land Detailed Plan | Amman Institute
Interim Industrial Land Detailed Plan | Amman InstituteInterim Industrial Land Detailed Plan | Amman Institute
Interim Industrial Land Detailed Plan | Amman InstituteAmman Institute
 
Airport Road Land Use Concept Plan Arabic | Amman Institute
Airport Road Land Use Concept Plan Arabic | Amman InstituteAirport Road Land Use Concept Plan Arabic | Amman Institute
Airport Road Land Use Concept Plan Arabic | Amman InstituteAmman Institute
 
Amman 2025 A 21st CENTURY MASTER PLAN
Amman 2025 A 21st CENTURY MASTER PLANAmman 2025 A 21st CENTURY MASTER PLAN
Amman 2025 A 21st CENTURY MASTER PLANAmman Institute
 
Interim Rural Residential policy | Amman Institute
Interim Rural Residential policy | Amman Institute Interim Rural Residential policy | Amman Institute
Interim Rural Residential policy | Amman Institute Amman Institute
 
Airport Road Land Use Concept Plan Arabic | Amman Institute
Airport Road Land Use Concept Plan Arabic | Amman InstituteAirport Road Land Use Concept Plan Arabic | Amman Institute
Airport Road Land Use Concept Plan Arabic | Amman InstituteAmman Institute
 
My Amman
My AmmanMy Amman
My AmmanSYNTAX
 
Ever growing amman, jordan_urban expansion social polarisation and contempora...
Ever growing amman, jordan_urban expansion social polarisation and contempora...Ever growing amman, jordan_urban expansion social polarisation and contempora...
Ever growing amman, jordan_urban expansion social polarisation and contempora...Dania Abdel-aziz
 
Al ramtha city in jordan analysis by space syntax
Al ramtha city in jordan analysis by  space syntaxAl ramtha city in jordan analysis by  space syntax
Al ramtha city in jordan analysis by space syntaxShomou' Aljizawi
 
Soria y mata
Soria y mataSoria y mata
Soria y mataAyaz Khan
 
Amman Review - January 2011| Amman Institute
Amman Review - January 2011| Amman InstituteAmman Review - January 2011| Amman Institute
Amman Review - January 2011| Amman InstituteAmman Institute
 
Architecture in Amman During the Emirate
Architecture in Amman During the EmirateArchitecture in Amman During the Emirate
Architecture in Amman During the EmirateDania Abdel-aziz
 
Lecture 1: مقدمة تاريخية عن عمان
Lecture 1: مقدمة تاريخية عن عمانLecture 1: مقدمة تاريخية عن عمان
Lecture 1: مقدمة تاريخية عن عمانDania Abdel-aziz
 
Lecture 6: خصائص العمارة في السبعينيات و حتى التسعينيات
Lecture 6: خصائص العمارة في السبعينيات و حتى التسعينياتLecture 6: خصائص العمارة في السبعينيات و حتى التسعينيات
Lecture 6: خصائص العمارة في السبعينيات و حتى التسعينياتDania Abdel-aziz
 
Master thesis presentation 2011.12.21
Master thesis presentation  2011.12.21Master thesis presentation  2011.12.21
Master thesis presentation 2011.12.21ABDUXUKUR ZAYIT
 

Was ist angesagt? (20)

Corridor Intensification Strategy (CIS) | Amman Institute
Corridor Intensification Strategy (CIS) | Amman InstituteCorridor Intensification Strategy (CIS) | Amman Institute
Corridor Intensification Strategy (CIS) | Amman Institute
 
Amman Plan: Metropolitan Growth Arabic |Amman Institute
Amman Plan: Metropolitan Growth Arabic |Amman InstituteAmman Plan: Metropolitan Growth Arabic |Amman Institute
Amman Plan: Metropolitan Growth Arabic |Amman Institute
 
Interim Industrial Land Detailed Plan | Amman Institute
Interim Industrial Land Detailed Plan | Amman InstituteInterim Industrial Land Detailed Plan | Amman Institute
Interim Industrial Land Detailed Plan | Amman Institute
 
Airport Road Land Use Concept Plan Arabic | Amman Institute
Airport Road Land Use Concept Plan Arabic | Amman InstituteAirport Road Land Use Concept Plan Arabic | Amman Institute
Airport Road Land Use Concept Plan Arabic | Amman Institute
 
Amman 2025 A 21st CENTURY MASTER PLAN
Amman 2025 A 21st CENTURY MASTER PLANAmman 2025 A 21st CENTURY MASTER PLAN
Amman 2025 A 21st CENTURY MASTER PLAN
 
Urban Design project 1
Urban Design project 1Urban Design project 1
Urban Design project 1
 
Interim Rural Residential policy | Amman Institute
Interim Rural Residential policy | Amman Institute Interim Rural Residential policy | Amman Institute
Interim Rural Residential policy | Amman Institute
 
Amman Downtown
Amman DowntownAmman Downtown
Amman Downtown
 
Airport Road Land Use Concept Plan Arabic | Amman Institute
Airport Road Land Use Concept Plan Arabic | Amman InstituteAirport Road Land Use Concept Plan Arabic | Amman Institute
Airport Road Land Use Concept Plan Arabic | Amman Institute
 
Airport Corridor Plan
Airport Corridor PlanAirport Corridor Plan
Airport Corridor Plan
 
My Amman
My AmmanMy Amman
My Amman
 
Ever growing amman, jordan_urban expansion social polarisation and contempora...
Ever growing amman, jordan_urban expansion social polarisation and contempora...Ever growing amman, jordan_urban expansion social polarisation and contempora...
Ever growing amman, jordan_urban expansion social polarisation and contempora...
 
Al ramtha city in jordan analysis by space syntax
Al ramtha city in jordan analysis by  space syntaxAl ramtha city in jordan analysis by  space syntax
Al ramtha city in jordan analysis by space syntax
 
Soria y mata
Soria y mataSoria y mata
Soria y mata
 
Amman Review - January 2011| Amman Institute
Amman Review - January 2011| Amman InstituteAmman Review - January 2011| Amman Institute
Amman Review - January 2011| Amman Institute
 
Architecture in Amman During the Emirate
Architecture in Amman During the EmirateArchitecture in Amman During the Emirate
Architecture in Amman During the Emirate
 
Lecture 1: مقدمة تاريخية عن عمان
Lecture 1: مقدمة تاريخية عن عمانLecture 1: مقدمة تاريخية عن عمان
Lecture 1: مقدمة تاريخية عن عمان
 
2 مدينة مادبا
 2 مدينة مادبا 2 مدينة مادبا
2 مدينة مادبا
 
Lecture 6: خصائص العمارة في السبعينيات و حتى التسعينيات
Lecture 6: خصائص العمارة في السبعينيات و حتى التسعينياتLecture 6: خصائص العمارة في السبعينيات و حتى التسعينيات
Lecture 6: خصائص العمارة في السبعينيات و حتى التسعينيات
 
Master thesis presentation 2011.12.21
Master thesis presentation  2011.12.21Master thesis presentation  2011.12.21
Master thesis presentation 2011.12.21
 

Mehr von Amman Institute

Adaptation to a changing climate in the arab countries
Adaptation to a changing climate in the arab countriesAdaptation to a changing climate in the arab countries
Adaptation to a changing climate in the arab countriesAmman Institute
 
هل عمان مستعدة لمواجهة خطر الزلازِل؟ ملخص ورشة العمل الوطنية | Amman Institute
هل عمان مستعدة لمواجهة خطر الزلازِل؟ ملخص ورشة العمل الوطنية | Amman Instituteهل عمان مستعدة لمواجهة خطر الزلازِل؟ ملخص ورشة العمل الوطنية | Amman Institute
هل عمان مستعدة لمواجهة خطر الزلازِل؟ ملخص ورشة العمل الوطنية | Amman InstituteAmman Institute
 
نحو تخطيط مدن أكثر إستدامة | Amman Institute
نحو تخطيط مدن أكثر إستدامة | Amman Institute نحو تخطيط مدن أكثر إستدامة | Amman Institute
نحو تخطيط مدن أكثر إستدامة | Amman Institute Amman Institute
 
سيارات لا تسير بقلم ربى عاصي | Amman Institute
سيارات لا تسير بقلم ربى عاصي | Amman Instituteسيارات لا تسير بقلم ربى عاصي | Amman Institute
سيارات لا تسير بقلم ربى عاصي | Amman InstituteAmman Institute
 
التخطيط العمراني في العراق
التخطيط العمراني في العراقالتخطيط العمراني في العراق
التخطيط العمراني في العراقAmman Institute
 
مخططات الزرقاء والرصيفة وبيرين الجديدة
مخططات الزرقاء والرصيفة وبيرين الجديدة مخططات الزرقاء والرصيفة وبيرين الجديدة
مخططات الزرقاء والرصيفة وبيرين الجديدة Amman Institute
 
شفا البلقاء 2030
شفا البلقاء 2030 شفا البلقاء 2030
شفا البلقاء 2030 Amman Institute
 
From Documentation to Policy Making: managing Old Aleppo’s Built Heritage
	From Documentation to Policy Making: managing Old Aleppo’s Built Heritage 	From Documentation to Policy Making: managing Old Aleppo’s Built Heritage
From Documentation to Policy Making: managing Old Aleppo’s Built Heritage Amman Institute
 
Community Organizing & Public Narrative
Community Organizing & Public NarrativeCommunity Organizing & Public Narrative
Community Organizing & Public NarrativeAmman Institute
 
Twenty Minutes In Amman With Michael Sorkin | Amman Institute
Twenty Minutes In Amman With Michael Sorkin | Amman InstituteTwenty Minutes In Amman With Michael Sorkin | Amman Institute
Twenty Minutes In Amman With Michael Sorkin | Amman InstituteAmman Institute
 
Green Economy Amman | Amman Institute
Green Economy Amman | Amman InstituteGreen Economy Amman | Amman Institute
Green Economy Amman | Amman InstituteAmman Institute
 
Amman Institute is partnering with UNHABITAT
Amman Institute is partnering with UNHABITATAmman Institute is partnering with UNHABITAT
Amman Institute is partnering with UNHABITATAmman Institute
 
Amman Plan Summary Report Arabic | Amman Institute
Amman Plan Summary Report Arabic | Amman InstituteAmman Plan Summary Report Arabic | Amman Institute
Amman Plan Summary Report Arabic | Amman InstituteAmman Institute
 
Interim Industrial Land Policy Development Manual | Amman Institute
Interim Industrial Land Policy Development Manual | Amman InstituteInterim Industrial Land Policy Development Manual | Amman Institute
Interim Industrial Land Policy Development Manual | Amman InstituteAmman Institute
 
Interim Industrial Land Detailed PlansArabic | Amman Institute
Interim Industrial Land Detailed PlansArabic | Amman InstituteInterim Industrial Land Detailed PlansArabic | Amman Institute
Interim Industrial Land Detailed PlansArabic | Amman InstituteAmman Institute
 
Regulations updated for HDMU (arabic & english) | Amman Institute
Regulations updated for HDMU (arabic & english) | Amman InstituteRegulations updated for HDMU (arabic & english) | Amman Institute
Regulations updated for HDMU (arabic & english) | Amman InstituteAmman Institute
 
IGS policy for HDMU | Amman Institute
IGS policy for HDMU | Amman InstituteIGS policy for HDMU | Amman Institute
IGS policy for HDMU | Amman InstituteAmman Institute
 

Mehr von Amman Institute (20)

Adaptation to a changing climate in the arab countries
Adaptation to a changing climate in the arab countriesAdaptation to a changing climate in the arab countries
Adaptation to a changing climate in the arab countries
 
Amman think green
Amman think greenAmman think green
Amman think green
 
هل عمان مستعدة لمواجهة خطر الزلازِل؟ ملخص ورشة العمل الوطنية | Amman Institute
هل عمان مستعدة لمواجهة خطر الزلازِل؟ ملخص ورشة العمل الوطنية | Amman Instituteهل عمان مستعدة لمواجهة خطر الزلازِل؟ ملخص ورشة العمل الوطنية | Amman Institute
هل عمان مستعدة لمواجهة خطر الزلازِل؟ ملخص ورشة العمل الوطنية | Amman Institute
 
نحو تخطيط مدن أكثر إستدامة | Amman Institute
نحو تخطيط مدن أكثر إستدامة | Amman Institute نحو تخطيط مدن أكثر إستدامة | Amman Institute
نحو تخطيط مدن أكثر إستدامة | Amman Institute
 
سيارات لا تسير بقلم ربى عاصي | Amman Institute
سيارات لا تسير بقلم ربى عاصي | Amman Instituteسيارات لا تسير بقلم ربى عاصي | Amman Institute
سيارات لا تسير بقلم ربى عاصي | Amman Institute
 
التخطيط العمراني في العراق
التخطيط العمراني في العراقالتخطيط العمراني في العراق
التخطيط العمراني في العراق
 
مخططات الزرقاء والرصيفة وبيرين الجديدة
مخططات الزرقاء والرصيفة وبيرين الجديدة مخططات الزرقاء والرصيفة وبيرين الجديدة
مخططات الزرقاء والرصيفة وبيرين الجديدة
 
شفا البلقاء 2030
شفا البلقاء 2030 شفا البلقاء 2030
شفا البلقاء 2030
 
مخطط اربد 2030
مخطط اربد 2030مخطط اربد 2030
مخطط اربد 2030
 
From Documentation to Policy Making: managing Old Aleppo’s Built Heritage
	From Documentation to Policy Making: managing Old Aleppo’s Built Heritage 	From Documentation to Policy Making: managing Old Aleppo’s Built Heritage
From Documentation to Policy Making: managing Old Aleppo’s Built Heritage
 
Community Organizing & Public Narrative
Community Organizing & Public NarrativeCommunity Organizing & Public Narrative
Community Organizing & Public Narrative
 
Twenty Minutes In Amman With Michael Sorkin | Amman Institute
Twenty Minutes In Amman With Michael Sorkin | Amman InstituteTwenty Minutes In Amman With Michael Sorkin | Amman Institute
Twenty Minutes In Amman With Michael Sorkin | Amman Institute
 
Green Economy Amman | Amman Institute
Green Economy Amman | Amman InstituteGreen Economy Amman | Amman Institute
Green Economy Amman | Amman Institute
 
Rent De-Control
Rent De-Control Rent De-Control
Rent De-Control
 
Amman Institute is partnering with UNHABITAT
Amman Institute is partnering with UNHABITATAmman Institute is partnering with UNHABITAT
Amman Institute is partnering with UNHABITAT
 
Amman Plan Summary Report Arabic | Amman Institute
Amman Plan Summary Report Arabic | Amman InstituteAmman Plan Summary Report Arabic | Amman Institute
Amman Plan Summary Report Arabic | Amman Institute
 
Interim Industrial Land Policy Development Manual | Amman Institute
Interim Industrial Land Policy Development Manual | Amman InstituteInterim Industrial Land Policy Development Manual | Amman Institute
Interim Industrial Land Policy Development Manual | Amman Institute
 
Interim Industrial Land Detailed PlansArabic | Amman Institute
Interim Industrial Land Detailed PlansArabic | Amman InstituteInterim Industrial Land Detailed PlansArabic | Amman Institute
Interim Industrial Land Detailed PlansArabic | Amman Institute
 
Regulations updated for HDMU (arabic & english) | Amman Institute
Regulations updated for HDMU (arabic & english) | Amman InstituteRegulations updated for HDMU (arabic & english) | Amman Institute
Regulations updated for HDMU (arabic & english) | Amman Institute
 
IGS policy for HDMU | Amman Institute
IGS policy for HDMU | Amman InstituteIGS policy for HDMU | Amman Institute
IGS policy for HDMU | Amman Institute
 

Development manual for HDMU | Amman Institute

  • 1. Municipality of Greater Amman Interim Growth Strategy High Density Mixed Use DEVELOPMENT MANUAL Amman Master Plan PMU 15 November 2007 - Final
  • 2. Table of Contents MESSAGE from the MAYOR C INTERIM DEVELOPMENT CONTROLS 56 Preface C.1 Introduction & Overview C.2 Land Use Designations A INTRODUCTION 1 C.3 Building Heights: Categories & Limits C.4 View Preservation Provisions A.1 IGS Intent, Goals & Objectives C.5 Building Envelope Standards A.2 IGS Principles & Policies C.6 Design Guidelines A.3 Interim HDMU Area Locations C.7 Parking Requirements A.4 HDMU Area A: Central – Intensification C.8 Alternative Compliance A.5 HDMU Area B: North – Outfill A.6 HDMU Area C: South - Outfill D INTERIM DEVELOPMENT REVIEW 82 B HDMU AREA CONCEPT PLANS 21 D.1 Principles, Purpose, & Process Overview D.2 Pre-application Consultation B.1 Purpose & Content D.3 Design Review B.2 The Public Realm D.4 Detailed Technical Review B.3 HDMU Area A Concept Plan D.5 Development Charges & Agreements B.4 HDMU Area B Concept Plan B.5 HDMU Area C Concept Plan APPENDICIES 1. Project Team: Amman Commission Master Plan - Project Management Unit 2. Special Provision Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy i
  • 3. Message from the Mayor Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy ii
  • 4. Preface The Amman Skyline The IGS is concerned with many issues which are addressed on the pages which follow - but first among them is preserving the Unique Image and Character of Amman. An Essential Part of the City’s Character The IGS, and the Master Plan to follow, will enable Amman to grow and modernize without losing that which makes it Special. Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy iii
  • 5. A. Introduction A.1 IGS Intent, Goals & Objectives A.2 IGS Principles & Policies A.3 Interim HDMU Area locations A.4 HDMU Area A: Central – Intensification A.5 HDMU Area B: North – Outfill A.6 HDMU Area C: South – Outfill 15 November 2007 - Final 1
  • 6. A.1 IGS Goals & Objectives Interim Growth Strategy (IGS) This IGS is a plan that provides policies, plans, rules, and locations for HDMU development proposals that protect the City of Amman and its Communities - while a Master Plan is being prepared. The IGS introduces interim elements (Transportation Framework, Transit Corridors, Tall Building Regulations, Reformed Zoning, Reformed Development Review, Development Charges) that will become permanent with some modifications. The IGS is therefore the first phase of a new Master Plan for Amman. General Intent of IGS: The IGS supports the achievement of this intent by planning High Density Mixed Use (HDMU) development that: The IGS strikes a reasonable balance Can be serviced efficiently without overloading Amman’s between the interests of the service networks – water, sewerage & storm water. development and investment community and the general citizenry of Provides for safe and efficient transportation access, Amman by providing: including public transit, and sufficient on-site parking. Developers with Reasonable Promotes pedestrian-based mixed-use development. Certainty – comprising a clear set of Protects and complements the City’s heritage, antiquities, rules and procedures for design, urban fabric and topography. approvals, and construction Protects existing, stable neighborhoods. The Public with Benefits – including protection of stable areas, access to Encourages high-quality architectural design. new parks & public space, access to Maintains public views of key landmarks and vistas. public transit Promotes “green” environmental standards. Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 2
  • 7. A.3 IGS Goals & Objectives Interim Growth Strategy (IGS) Goals & Objectives: Accommodate the immediate demand for high density mixed use development in a manner that compliments the Amman Vision and attracts investment. Send a clear signal to the investment community that HDMU development is welcome in the Municipality of Greater Amman. Provide “Interim” alternatives to Developers and Investors for locating HDMU projects while the Amman Master Plan is being completed. Accommodate HDMU development in a ‘planned way’ and provide clear direction regarding location and development standards. Utilize a strategic & systematic approach that begins & supports the Amman Master Plan process. Specifically: Identify areas / sites suitable for HDMU developments by clear criteria. Establish modern development guidelines and zoning controls. Establish an efficient, investor-friendly, development review process that protects the public interest. Provide for appropriate public input into the design of HDMU projects. Build the capacity in GAM to review & regulate major project proposals. Provide a flexible framework for on-going investment in the City. Begin the process of creating an Amman Master Plan trough the IGS. Create a new framework for sharing the cost of infrastructure, in an equitable way, between the Investor and the Community. Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 3
  • 8. A.2 IGS Principles & Policies Urban Design Amman will be developed at a human scale to complement existing neighbourhoods and communities and to create a cityscape that is attractive and efficient. HDMU development must: Complement Amman’s unique urban fabric, cityscape and topography. Maintain public views of key landmarks and vistas between hills and between valleys and hills, and from public roads and sidewalks to significant public attractions , natural features. Establish appropriate transitions in scale & design between neighborhoods. Promote high quality design of streetscapes, parks, and public and private buildings in order to reinforce Amman as a comfortable, useable, beautiful and memorable city. Respect and provide continuity with the character of existing adjacent communities and ensures land- use compatibility with adjacent neighborhoods to create a more attractive and efficient city. Encourage high-quality architectural design that blends with the City’s urban fabric and topography. Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 4
  • 9. A.2 IGS Principles & Policies Culture and Heritage Amman is ‘a city with a story’ - a modern urban center that represents one of the oldest inhabited cities in the world. Preserving heritage and promoting it as an integral part of the overall contemporary urban living experience will be one of the pillars of the Master Plan. HDMU development must be guided so that it: Safeguards Jordan’s antiquities and protects and complements the City’s heritage & historic sites. Protects existing stable neighborhoods and promotes compact urban form. Urban Infrastructure Urban infrastructure will provide modern and efficient public transportation and systems for vehicle traffic and pedestrians, water, sewerage and communication services to our community. These networks will be used as instruments to guide the development of the City. HDMU development must: Provide for safe and efficient vehicular transportation access which can be supported by the local road network and which will not create undue traffic impact on stable residential neighborhoods. Provide a sufficient supply of accessible, attractive, and convenient on site parking and vehicular loading and servicing facilities which do not disrupt the operation of adjacent streets. Encourage and support public transit use by providing convenient pedestrian access to suitable public transit services along safe and attractive transit corridors. Provide a welcoming walking environment for pedestrians that is safe, accessible, landscaped, functional and interesting. Provide access to adequate urban infrastructure services, such as water, sewer, storm water and community services without unduly overloading these service networks. Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 5
  • 10. A.2 IGS Principles & Policies Green City, Environment and Natural Resources Amman must be built on sustainable development principles - that is "green" with parks and trees. One of the major considerations is to ensure that citizens enjoy a healthy environment. HDMU developments must consider: Implementation of “green” environmental standards, including retention of storm-water and re-use of grey-water for irrigation and use of solar and smart energy solutions to reduce carbon emissions Micro climate conditions and integrate these into the design of the developments The integration of parks and green spaces into HDMU developments creating continuous networks of parks that link high-density communities with surrounding communities Minimizing the consumption of lands most suitable for agricultural production Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 6
  • 11. A.2 IGS Principles & Policies Governance and Service Delivery The Master Plan will be the roadmap for development; it will be citizen centered and reflect the aspirations of all stakeholders complemented by an implementation framework that is participatory, inclusive and improves public service delivery to residents and the business community. GAM will ensure: A streamlined approvals process for investors that is timely, transparent and equitable. A public review of major HDMU project before they are considered for approval. Investment and Economic Activity The Master Plan will improve the climate for investment by identifying opportunities for sustainable economic growth and provide clarity to investors on our community's aspirations. GAM will ensure that: A range of HDMU area locations & density alternatives are provided to absorb market demand. An adequate supply of serviced land for investment in provided within the designated HDMU areas. Public Spaces and Social Inclusion The Master Plan encourage a livable and social city; a city that draws people to its public spaces; builds diverse communities and is inclusive of all its citizens. HDMU development must: Promote public spaces that are accessible, comforting, and welcoming to people from all neighbourhoods, of all physical conditions, male and female, old, young and the disabled. Promote mixed-use development to create self sufficient and pedestrian-friendly neighborhoods Encourage the integration of different income groups within neighborhoods and communities. Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 7
  • 12. A.3 Interim HDMU Area Locations Selection Criteria: Area A: Intensification Suitability for HDMU Development (Central) B Area B: Outfill (North) Impact on City-Wide Development Choice & Marketability Area C: Outfill (South) Access To Transit & Major Roads Opportunity for Urban Design B A A C C Municipality of Greater Amman Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 8
  • 13. A.3 Interim HDMU Area Locations South of Zahran AREA A: CENTRAL B A AREA C: C SOUTH Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 9
  • 14. A.3 Interim HDMU Area Locations North of Zahran AREA B: NORTH B A C ABDALI Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 10
  • 15. A.3 Interim HDMU Area Locations Area A: Central- Intensification Area B: North - Outfill Area C: South - Outfill Total Area: 25.6ha Total Area: 104.3ha Total Area: 229.6ha HDMU Zones: 11.9ha HDMU Zones: 22.6ha HDMU Zones: 59.0ha HDMU Lots: 36 HDMU Lots: 88 HDMU Lots: 201 Landmark 1 Landmark 1 Landmark 0 High 0 High 10 High 16 Medium-High 8 Medium-High 17 Medium-High 37 Medium 16 Medium 25 Medium 69 Medium-Low 11 Medium-Low 35 Medium-Low 79 Open Space: 6.1ha Open Space: 16.5ha Open Space: 30.3ha HDMU Areas – Data Summary Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 11
  • 16. A.4 HDMU Area A: Central - Intensification Area A is located in the wadi, running northwest to southeast, directly south of Jabal Amman, from the new Abdoun Bridge to the Al- Qaiseyeh Scattered Settlement. Princess Basma Road runs through the northern half of the Area and east to the GAM Offices. The proposed intersection with the new Wadi Abdoun Road (i.e., at the “Ten Bridges”) is at the southern end of the Area and will connect the City Center with the Airport. Area A is surrounded by existing, stable neighborhoods of varying income levels and physical condition. Area A: Central - Intensification Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 12
  • 17. A.4 HDMU Area A: Central - Intensification HDMU Area A: Central - Intensification Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 13
  • 18. A.4 HDMU Area A: Central - Intensification Current Subdivision & Zoning Built-up Areas Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 14
  • 19. A.5 HDMU Area B: North - Outfill Area B is located in Al- Jubayhah, along the Jordan Road, north of Al-Shaheed Ring Road, and east of the “Northern Corridor” that runs along Queen Rania Road that serves the University District and the Al-Hussein Youth City. Jordan Road serves as a major corridor, linking the City Center with the Northern Suburbs and Gerash. Area B is located immediately North of the Northern Bus Terminal and can be easily served by public transit in the near future. While slopes are less steep than in the City Center, they are broader and higher, & the Area wadis are relatively undeveloped. Area B: North - Outfill Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 15
  • 20. A.5 HDMU Area B: North - Outfill HDMU Area B North - Outfill Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 16
  • 21. A.5 HDMU Area B: North - Outfill Current Subdivision & Zoning Built-up Area Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 17
  • 22. A.6 HDMU Area C: South - Outfill Area C is already developing along the east side of Airport Road, south of Abdoun. It will be served by an extension of the Inner Ring Road (currently under construction) as well as the new Wadi Abdoun Road that will link the Central City with the Airport, passing through Site A. In addition the future LRT western corridor will likely pass through Area C, on its way to the Airport. The site is quite dramatic topographically and significant views extend to the inner city to the east, to Abdoun to the north, and to Hay Al-Yasamin to the south. Area C’s frontage on, and access to, the Airport Road presents obvious opportunities for higher- density residential and mixed-use development. Area C: South - Outfill Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 18
  • 23. A.6 HDMU Area C: South - Outfill HDMU Area C South - Outfill Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 19
  • 24. A.6 HDMU Area C: South - Outfill Built-up Area Current Subdivision & Zoning Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 20
  • 25. B. HDMU Area Concept Plans B.1 Purpose & Content B.2 The Public Realm B.3 HDMU Area A Concept Plan B.4 HDMU Area B Concept Plan B.5 HDMU Area C Concept Plan 15 November 2007 - Final 21
  • 26. B.1 Purpose & Content Purpose of HDMU Area Concept Plans (ACP) The Area Concept Plans serve as guidelines and ‘Instructions’ that elaborate the Interim Development Controls including the Areas Zoning Maps. In concert with the policies and regulations, the ACPs demonstrate the intent of the IGS. The specific purposes of the ACPs are as follows: Illustrate the fundamental planning concepts and principles described in Section A Provide the basis for evaluating project proposals in the Design Review Process in Section D Illustrate the application of Interim Regulations including zoning limits described in Section C Propose a structure for the public realm within which individual projects can be located Demonstrate an appropriate relationship between the public realm and private development Provide a basis for estimating development build-outs numbers: floor areas, dwelling units, etc. Provide a basis for estimating servicing and infrastructure costs and requirements Provide a basis for Developers to evaluate project viability and marketability in each HDMU Area Content of Area Concept Plans: Road Hierarchy: Arterials, Collectors, Local Streets, etc. Open Space Elements: Active & Passive HDMU Zones & Plots with Building Types Other Land Use: Non-HDMU Commercial and Residential View Preservation: Building Height Ceilings, View Planes Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 22
  • 27. B.2 The Public Realm & Private Development HDMU Area Concept Plans: The Public Realm The Area Concept Plans provide a Public Framework for High Density Development and include: Road Right-Of-Ways: Expressways, Transit Roads, Main Streets, Collectors, Local Streets, Service Alleys, and Public Stairs Open Space: Jabal & Wadi Parks, Stair Parks, Greenbelts, Sportsfields, etc. Public View Corridors & Planes: public views from jabal to jabal, from jabals the wadis below, and from public right-of-ways to significant public landmarks and natural features Community Facilities: land for mosques, schools, medical facilities, public art, etc. HDMU Area Concept Plans: Private Development (HDMU) The Area Concept Plans regulate the private HDMU development within the Public Framework including: Access: provide direct access to adjacent higher-capacity roads and pedestrian routes Land Use: Zoning Designations for Individual Parcels of Land, public and private Parking: provide adequate on-site parking for residents and visitors Servicing and Loading: provide logical locations for the servicing of high-density buildings Building Height: provide for a range of building heights and densities that allow for transition from high density to lower-density residential areas Building Massing: ensure that building massing does not block public views or views from other, uphill residential developments to the wadi-parks On-Site Landscaped Gardens: provide suitable on-site public space for use by building residents Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 23
  • 28. HDMU Areas Locations B B Abdali Abdali A C A C Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 24
  • 29. B.2 The Public Realm: Transportation GAM Transportation Framework Expressways & Transit Corridors HDMU Interim Areas A, B, & C overlap with existing and proposed elements of B the GAM Transportation Framework including expressways and transit corridors proposed for Bus Rapid Transit (BRT). The Transportation Framework will receive clarification in the Master A Plan with an emphasis on the C development of BRT corridors and a pedestrian friendly transportation network. The planning and development of the Interim HDMU Areas will incorporate the intersecting transportation elements shown as part of the public realm in anticipation of the Master Plan Transportation Framework. Expressways Transit (BRT) Roads Future Loops Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 25
  • 30. B.2 The Public Realm: Transportation Public Realm: Road Hierarchy The Expressways indicated on the GAM Transportation Framework provide access to each of the Interim Areas. Within each Area 30 m Concept Plan is a proposed network of 40 m Transit Roads, Collectors, Local Access Streets, Service Alleys, Public Stairways & Paths. The Developer will be required to pay a proportional share of costs Major Collectors: Main Streets Arterials - Transit Roads of building this network. The designs illustrated on 30m RoW 40m RoW this and the following page Parallel parking each side BRT (bus) in dedicated lane are preliminary but are in each direction with Bus indicative of the concept Tree row & Street trees both sides Stops & Shelters and standards intended. 3 landscaped tree rows (next page) Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 26
  • 31. B.2 The Public Realm: Transportation Public Realm: Road Hierarchy (cont.) The emphasis in the roadway plans and profiles indicated and the ACP networks in general is on: 18 or Public Transit (BRT) 20 m Landscaping with 8m drought resistant tree 24 m species Street parking (parallel) Grade intersections with signalization or Stop signs Service Alleys Local Access Minor Collectors Pedestrian friendly features – sidewalks, 8m RoW behind 18m Row or 20m 24m RoW islands, crosswalks HDMU Plots RoW at Shopping St. Connections to public 1 lane - each 1 lane - each 1 lane - each direction and private open space direction (or) direction 2 tree rows - both The emphasis is on 1 lane - one way 2 rows of trees sides downsizing the roads, (with) stacking slowing traffic, & favoring space on one side Parking & Sidewalks on both sides the pedestrian. Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 27
  • 32. HDMU Areas: Data Summary Area A: Central- Intensification Area B: North - Outfill Area C: South - Outfill Total Area: 25.6ha Total Area: 104.3ha Total Area: 229.6ha HDMU Zones: 11.9ha HDMU Zones: 22.6ha HDMU Zones: 59.0ha HDMU Lots: 36 HDMU Lots: 88 HDMU Lots: 201 Landmark 1 Landmark 1 Landmark 0 High 0 High 10 High 16 Medium-High 8 Medium-High 17 Medium-High 37 Medium 16 Medium 25 Medium 69 Medium-Low 11 Medium-Low 35 Medium-Low 79 Open Space: 6.1ha Open Space: 16.5ha Open Space: 30.3ha Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 28
  • 33. B.3 HDMU Area A Concept Plan – Central Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 29
  • 34. B.3 HDMU Area Concept Plan A – Central Zone 1 Open Space or Low-rise Development between HDMU Zones Pedestrian Links from HDMU Zones to Existing Low-rise Communities Zone 2 Landmark Site Open Space & Community Facilities buffer HDMU Zones Zone 3 Open Space or Low-rise Development between HDMU Zones Zone 4 Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 30
  • 35. B.3 HDMU Area A Concept Plan – Central Area A Zoning Map Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 31
  • 36. B.3 HDMU Area A Concept Plan – Central Public Stairs HDMU Medium Sites, 1 Podium Optional HDMU Required Podium Sites P BRT Stop P Public Open P Space P Collector Access Community Road Facility Site Build-to Line for Shopping Street HDMU Medium-Low Sites, No-Podium Public Stairs Area A - Zone 1 9 HDMU Plots Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 32
  • 37. B.3 HDMU Area A Concept Plan – Central HDMU Required Podium Sites P BRT Stop 2 Collector Access Road P HDMU Medium-Low Sites, No-Podium P Build-to Line for Shopping Street Public Stairs P HDMU Sites, Public Stairs Podium Optional Public Open Space Community Facility Site Area A - Zone 2 13 HDMU Plots Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 33
  • 38. B.3 HDMU Area A Concept Plan – Central Collector Access Road Public Stairs P 3 Public Open Space P P BRT Stop Landmark Site P HDMU Required Podium Sites P HDMU Sites, P Podium Optional Build-to Line for Shopping Street Area A - Zone 3 8 HDMU Plots Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 34
  • 39. B.3 HDMU Area A Concept Plan – Central Community Facility Site HDMU Medium-Low Sites, No-Podium Public Open Space 4 Collector Access Road P BRT Stop Build-to Line for P Shopping Street HDMU Required Podium Sites P P Public Stairs P Transit Road Public Open Space Area A - Zone 4 6 HDMU Plots Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 35
  • 40. B.3 HDMU Area A Concept Plan – Central Area A is surrounded and framed by hills and the maximum building height is directly related to the elevation of surrounding hilltops. The plane defined by the three points shown defines a Building Height Ceiling that only a building on a landmark development lot is permitted to penetrate. Each HDMU Zone (1, 2, 3 & 4) shows an average grade elevation and the distance to the Ceiling above (Max. Ht.). This determines the maximum building height permitted in the Zone subject to verification of the Datum Point for a specific Development Lot. Building Height Ceiling Landmark Building Area A: Building Height Ceiling Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 36
  • 41. B.3 HDMU Area A Concept Plan – Central Zone 1 Zone 2 View Planes are linear view perspectives running along Corridors (usually transportation) that The open areas between provide continuous vistas of the hills and City- HDMU Zones will be scape. View Planes along wadi corridors acquired and established adjacent to HDMU Areas must be at least 67% as Public Open Space. unobstructed. The spacing of HDMU Zones, the slender tower permitted (maximum floor Zone 3 plates), and the minimum 25 meter separation between towers ensure the maintenance of significant vistas from wadi corridors. Zone 4 Area A: View Planes Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 37
  • 42. B.4 HDMU Area B Concept Plan – North Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 38
  • 43. B.4 HDMU Area B Concept Plan – North Zone 1 Commercial Pedestrian Links through HDMU Zones to Transit Stops Low-rise Development Zone 2 between HDMU Zones Linear Wadi Parks Zone 3 Landmark Site Open Space & Zone 4 Community Facilities buffer Commercial HDMU Zones LOW DENSITY RESIDENTIAL Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 39
  • 44. B.4 HDMU Area B Concept Plan – North Zone 1 Zone 2 Zone 4 Zone 3 Area B Zoning Map Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 40
  • 45. HDMU Medium-Low Commercial B.4 HDMU Area B Concept Plan – North Sites, No-Podium HDMU Medium Sites, Podium Optional 1 Public Walkway & Stairs Public Open Space Low-density Residential BRT Stop HDMU Medium-Low Community Sites, No-Podium Facility Site P P Public Open Space P P HDMU Required Podium Sites P P P P Commercial Build-to Line for Shopping Street along Walkway& Stairs P P P Service Alley Area B - Zone 1 LOW DENSITY RESIDENTIAL Public Walkway & Stairs 20 HDMU Plots Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 41
  • 46. B.4 HDMU Area B Concept Plan – North Public Open Space HDMU Required Podium Sites P Build-to Line for Shopping Street BRT Stop P P 2 Service Alley P Commercial P P P P P Public Open P Space HDMU Sites, P Podium Optional HDMU Required Podium Sites P HDMU Medium-Low Sites, No-Podium Commercial Community Facility Site Service Alley Public Walkway & Stairs Area B - Zone 2 22 HDMU Plots Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 42
  • 47. B.4 HDMU Area B Concept Plan – North HDMU Required Podium Sites P Low-density Residential Landmark Site P P P P BRT Stop 3 P P P Build-to Line for P Shopping Street P HDMU Medium-Low P P Sites, No-Podium P P Public Open Space P P P Public Walkway & Stairs HDMU Sites, Podium Optional Community Facility Site Public Walkway & Stairs Service Alley Low-density Residential Area B - Zone 3 30 HDMU Plots Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 43
  • 48. B.4 HDMU Area B Concept Plan – North Build-to Line for BRT Stop Shopping Street 4 P P P Commercial P P P HDMU Medium-Low P HDMU Required Sites, No-Podium Podium Sites P P Community P Service Alley Facility Site P P Low-density Residential Public Open Space Public Walkway & Stairs with Build-to Lines Area B - Zone 4 16 HDMU Plots Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 44
  • 49. B.4 HDMU Area B Concept Plan – North Area B is framed by adjacent short hills & higher hills beyond. The maximum building height is directly related to the elevation of the higher hilltops. The plane defined by the three points shown defines a Building Height Ceiling that only a building on a landmark development lot is permitted to penetrate. Each HDMU Zone (1, 2, 3 & 4) shows an average grade elevation and the distance to the Ceiling above (Max. Ht.). This determines the maximum building height permitted in the Zone subject to verification of the Datum Point for a specific Development Lot. 2 3 Building Height Ceiling Landmark Building ELEV: 955 Area B: Building Height Ceiling Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 45
  • 50. B.4 HDMU Area B Concept Plan – North View Planes are linear view perspectives running along Corridors (usually transportation) that provide continuous vistas of the hills Zone 1 and City-scape. View Planes along wadi corridors adjacent to HDMU Areas must be at least 67% unobstructed. The spacing of HDMU Zones, the Zone 2 slender tower permitted (maximum floor plates), and the minimum 25 meter separation between towers ensure the Zone 3 maintenance of significant vistas from wadi corridors. Zone 4 The open areas between HDMU Zones will be acquired and established as Public Open Space or developed as low density residential & commercial Area B: View Planes Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 46
  • 51. B.5 HDMU Area C Concept Plan – South Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 47
  • 52. B.5 HDMU Area C Concept Plan – South Low-rise Development between Pedestrian Links - HDMU Zones HDMU Zones to Low-rise Zone 1 Communities Zone 2 Open Space & Community Facilities buffer HDMU Zones Zone 4 Zone 3 Linear Wadi Parks Open Space between Pedestrian Links through HDMU Zones HDMU Zones to Transit Stops Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 48
  • 53. B.5 HDMU Area C Concept Plan – South Zone 2 Zone 1 Zone 3 Zone 4 Area C: Zoning Map Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 49
  • 54. B.5 HDMU Area C Concept Plan – South HDMU Medium-Low Sites, No-Podium 1 Service Alley P Public Walkway Community & Stairs P Facility Site P Build-to Line for BRT Stop P Shopping Street Linear Commercial P HDMU Required Podium Sites P P P P Public Open P Low-density Space Residential HDMU Sites, HDMU Medium-Low Podium Optional Sites, No-Podium Public Walkway & Stairs Area C - Zone 1 28 HDMU Plots Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 50
  • 55. B.5 HDMU Area C Concept Plan – South HDMU Medium-Low Service Alley Sites, No-Podium 2 P HDMU Medium Sites, Podium Optional P BRT Stop Public Walkway & Stairs P P HDMU Required P Podium Sites P P Service Alley P Linear Commercial Low-density Residential P Build-to Line for Community Shopping Street P Facility Site Public Open Space HDMU Sites, Area C - Zone 2 Podium Optional 46 HDMU Plots Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 51
  • 56. B.5 HDMU Area C Concept Plan – South Public Walkway & Stairs HDMU Medium-Low Sites, No-Podium Service Alley Low-density P P P P Residential P P P P 3 Build-to Lines for P P Shopping P Street & P HDMU Required Walkway P P P Podium Sites P P P P Community P Facility Site HDMU Sites, Podium P P Optional Public Open Space P P HDMU Medium-Low P Sites, No-Podium BRT Stop P Low-density Residential Area C - Zone 3 83 HDMU Plots Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 52
  • 57. Public Walkway B.5 HDMU Area C Concept Plan – South Community & Stairs Facility Site Low-density P Residential P P P HDMU Sites, P P 4 Podium P Optional BRT Stop P P P P HDMU Required P Podium Sites P P Public Open Space P P Build-to Line for P Shopping Street Service Alley P HDMU Medium-Low HDMU Medium-Low Sites, No-Podium Public Open Sites, No-Podium P Space Low-density Residentia Area C - Zone 4 l 44 HDMU Plots Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 53
  • 58. B.5 HDMU Area C Concept Plan – South Area C is a series of wadis surrounding a short hill & is framed by higher hills beyond. The maximum building height is directly related to the elevation of the higher hilltops. The plane defined by the three points shown defines a Building Height Ceiling that cannot be penetrated. Each HDMU Zone (1, 2, 3 & 4) shows an average grade elevation and the distance to the Ceiling above (Max. Ht.). This determines the maximum building height permitted in the Zone subject to verification of the Datum Point for a specific Development Lot. Building Height Ceiling Area C: Building Height Ceiling Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 54
  • 59. B.5 HDMU Area C Concept Plan – South View Planes are linear view perspectives running along Corridors Zone 1 (usually transportation) that provide continuous vistas of the hills and Zone 2 City-scape. View Planes along wadi corridors adjacent to HDMU Areas must be at least 67% unobstructed. The spacing of HDMU Zones, the slender tower permitted (maximum floor plates), and the minimum 25 meter separation between towers ensure the maintenance of Zone 4 significant vistas from wadi corridors. The open areas between HDMU Zones will be acquired and established as Public Open Space. Zone 3 Area C: View Planes Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 55
  • 60. C. Interim Development Controls C.1 Introduction & Overview C.2 Land Use Designations C.3 Building Height: Categories & Limits C.4 View Preservation Provisions C.5 Building Envelope Standards C.6 Design Guidelines C.7 Parking Requirements C.8 Alternative Compliance 15 November 2007 - Final 56
  • 61. C.1 Introduction & Overview Interim Development Controls: Overview The following is a summary of the Regulations that govern development proposals within the Interim Areas (A, B, & C) – the complete document is available at the DSAP Offices at GAM. The specifics of the regulations are intended to implement the principles, policies, goals, and objectives identified in Section A and the Area specific policies described in Section C. The regulations address land use, building height, building form, and view preservation and are used in concert with the Area Zoning Map and Area Concept Plans to achieve the planning intent of the IGS. Key Concepts: As-of-Right Provisions: The provisions of the existing GAM Zoning Ordinance, especially with respect to building height limits (30 meters or 8 stories, whichever is less), are the limit of a property owner’s automatic entitlement under this interim regulation – ‘as-of-right’. The provisions of the Interim Regulation that differ from the existing zoning are available only on the basis of the Interim Design Review process described in Section F. Discretionary & Conditional Provisions: The provisions of the IGS and the Interim Regulation are discretionary and are granted by the GAM Council through the Regional Committee to a Developer for application to a specific project. This grant of development rights under the provisions of the Interim Regulation is conditional and based on an assessment of development proposal for consistency with the intent of the IGS as reflected in the Policies, Regulations, and Area Concept Plans. View Preservation: Significant portions of the Interim Regulation (Building Envelope Standards) are determined in part by the policy of preserving view corridors and vistas and work in concert with the Area Concept plans toward this end. Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 57
  • 62. C.2 Land Use Designations The following is the Land Use Classifications are utilized in this Interim Regulation and applied on the Area Zoning Maps and the Area Concept Plans. The designations are general and provide a flexible framework for development proposals. HDMU: This is the core zoning designation for the development plots upon which high density development will be considered. This includes all development that is greater in height than the current ‘as-of-right’ provisions. Permitted uses under HDMU (High Density Mixed use) include: Residential (Housing Units), Hotels, Retail, Restaurants, Offices, Clubs (sports, social, & recreational) and other compatible Commercial uses such as Cinemas (entertainment). The predominant use within each HDMU Cluster (Area Concept Plans) should be Residential supported by other the other permitted uses. Office Buildings and Hotels are permitted but should not become the predominant use in an Area. Open Space: This general designation can ultimately contain both active and passive open space and constitutes ‘Green Areas’ that contain limited physical (buildings) development. Open space includes Parks (Jabal Parks, Wadi Parks, Stair Parks, Trails/Paths), Sports Fields, Buffer Strips, Public Gardens / Landscaping, and Civic Monuments. Community Facilities: This is a broad designation that includes both public and private facilities that provide services and amenities to the general public. This includes religious facilities, education facilities, health facilities, libraries, social service offices, community centers, Government offices, etc. Road Reserves: This is land dedicated to roads, service alleys, public paths and stairways. In addition to car and bus lanes, the reserves contain space for landscaping, sidewalks, and transit facilities (bus turn-offs and shelters). Residential: This includes the current low density, low rise (4 story as-of-right limit) residential zoning classifications (A, B, C, & D) in the current zoning regulation. The mix and distribution of the four types is unspecified on the Area Zoning Maps and Area Concept plans, but a mix of plot sizes is recommended. Local Commercial: This includes the current low density, low rise (4 story as-of-right limit) commercial zoning classification in the current zoning regulation (Local Commercial within Residential A with Special Regulations). Low Density Residential (A, B, C, or D) or Linear Commercial developments are not permitted in the HDMU zones indicated on the Area Concept Plans and Area Zoning Maps. Some low density development is permitted within the Interim Areas as indicated on the Areas Concept Plans. Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 58
  • 63. C.3 Building Height: Categories & Limits An absolute Building Height Ceiling has been established for each of the Interim Areas. This ceiling relates to surrounding topography with the elevations at selected hilltops setting the absolute limits. This provides a reasonable upper limit that prevents tall buildings from dominating an existing skyline and cityscape that is largely determined by natural topography. Three hilltop points define a plane that represents a ceiling that only designated Landmark buildings can penetrate. The Area Concept Plans indicates an average grade elevation for each HDMU Zone and the elevation at the Building Height Ceiling directly overhead. This provides a general indication of the overall height limit at that cluster based on the general topographic mapping available which features 10 m contour intervals. The Developer can provide specific surveyed elevations at hilltops and the proposed project site and request a refinement of the building height ceiling. The HDMU Zones allow five Building Height Categories with the locations indicated on the Area Concept Plans. In addition the existing low rise residential and commercial types (4 & 8 story limits respectively) are allowed in the designated residential and commercial zones indicated on the Area Zoning Map and Area Concept Plans. The height limits for each of the HDMU categories are defined in minimum and maximum meters from a designated datum point for each plot (ref. Zoning Definitions). The number of stories possible under these limits is determined by the Architect’s floor to floor heights. The Landmark designation does not have an upper limit and is the only building type that is allowed to exceed the Building Height Ceiling. The Building Height Categories are as follows (reference Building Envelope Standards): Medium-low: Min. 18 meters to Max.30 meters Medium: 31m to 50m High: 76m to 100m Medium-high: 51m to 75m Landmark: 101m and higher Municipality of Greater Amman 15 November 2007 - Final Interim Growth Strategy 59