SlideShare a Scribd company logo
1 of 129
Improvement of Public Transport by Procurement of Public Transport
1
Gwalior
Vidisha Sagar
Jabalpur
Satna
Rewa
Ratlam
Singrauli
Bhopal
katniSagar
Gwalior
Vidisha
1. Bhopal
2. Jabalpur
3. Gwalior
4. Singrauli
5. Ratlam
6. Rewa
7. Satna
8. Murwara (Katni)
9. Vidisha
10.Sagar
Map of Madhya Pradesh showing the identified 10 cities
The assignment focuses on 10 major cities in the state of Madhya Pradesh
2
JnNURM : Bus Procurement Scheme I & II
JnNURM
Bus
Procurement 1
Bus Procurement
2
15000 Buses
525 Buses
For 4 Cities of M.P
SPV Constitution
Package II
10 Cities/Cluster
identification
Ancillary
structure
Proposed 935
Buses
Bhopal
225
Indore
175
Jabalpur
75
Ujjain
50
10000 Buses
3
1. Identification of Route Network for Public Transport.
2. Identification of clusters
3. Calculation of fleet size for city and clusters
4. Selection of feasible mode
5. Identification of Ancillary Infrastructure
6. Financial Viability of Organised Public
Transportation System
Objective of the Interim Report
4
Progress of the Project
Study of D.P, CDP, CMP, CTTS Related documents
Reconnaissance survey
Secondary Data collection
Ridership estimation as per MoUD Guideline
O & M Plan, Financial Model & Business
PLAN/Life Cycle Cost Analysis
Detail study of RFP, Guideline and Model D.P.R
Route Rationalization For City/Cluster
Literature
Review
Data
Requireme
nt
Dataanalysis
Stakeholder
consultation
InceptionreportInterimReport
Mode selection
Primary Data Collection
Inception
Interim
Report
Draft DPR
Final DPR
5
Policy formation
SPV Formation
Review & Assistance to
take up JnNURM reforms
Procurement and
operation
Handover to SPV
ReCommendation
/Proposals/Reports
D.P.R
Stakeholder
consultation
DraftDPRFinalDPR
6
Methodology/Approach
7
Methodology
Landuse Integration
With Route Network
Classified Volume
Count
Road Inventory
Occupancy Survey
Identification of
Cluster
Opinion Survey at Bus
Stand
Infrastructure Gap
Assessment
Financial Assumption
Out Come
Ridership
Estimation
Corridor Wise
/Clusters
Ancillary
Infrastructure Need
Mode Selection For
City/ Cluster
Financial Out
Comes (IRR)
Stake Holder Consultation With ULB, Bus Operators
Primary
Survey
Secondary
Data
CMP,DP,CDP
Public
Transport
Network for City
And Cluster
Fleet Size for
City And
Clusters
Bus Ancillary
Infrastructure
8
Approach to the Project
Primary Data
collection
•Reconnaissance
Survey and
Road Inventory
Surveys
•Traffic volume
count survey
•Origin
destination
survey
•Road user
opinion survey
Secondary data
collection:
•Existing
transport
related
documents like
CTTS, CMP,CDP
•Existing
ridership
details and the
details of
ancillary
structures
Road network
selection/ Route
rationalisation:
•Accessibilities
from all parts of
developmental
areas to the city
centre
•Identifying and
converting
existing IPT and
Complementary
routes into bus
routes where
feasible
•Prepare routes
providing
public transport
under main
cities with the
nearby small
towns
Travel demand
analysis:
•Analyse the
existing public
transport
demand beside
the routes
•Forecast the
transport
demand for the
analysis period
Headway
calculation
•For different
types of buses
based on travel
demand on the
various routes
Fleet assessment
(As per model
DPR Methods):
•As per method
2: fleet
assessment on
existing bus
routes based on
increasing
calculated
frequencies
(headways)
•As per method
3: fleet
assessment for
the new routes
based on
calculated
frequencies.
Costing and
Funding Pattern:
•Costing of the
buses for
selected
specifications
•Costing for
proposed
ancillary
structures and
ITS facilities
The funding
pattern
•calculating the
share between
central and
state govt.
Financial
Analysis:
•Prepare input
data for
financial
analysis
•Calculating year
wise net surplus
•Calculating IRR
9
City wise Description
10
Bhopal
Jabalpur
Gwalior
Singrauli
Ratlam
Rewa
Satna
Murwara (Katni)
Vidisha
Sagar
Bhopal
11
Public Transport System
Organised
BCLL(SPV)
200 City
Buses
20 AC Buses
BRTS
Unorganised
Private Party
Operator
507 Mini
Buses
450 IPT
4 Trunk route (1 for
BRTS)
8 Standard route
7 Complementary route
10 Intermediate Para-
transit route
Bhopal
12
Exsisting Organised Public Transport Network
TR-1
TR-2
TR-3TR-4
SR-5
SR-4
SR-3
SR-2
SR-1
SR-8
SR-6
AIRPOR
T
UPPERLAKE
BHE
L
Bairagarh
Shyamlahills
MACT
Laharp
ur Dam
Kaliyaso
t Dam
Arera
colony v
Neelbad, Ratibad
Biargarh Chicahli Baghmugahlia extension, Maksi
Bhaori,Meerpur,Prempura,etc Pipaliya Jaheerpir,
Kanasayyea
Khajurikalan,
Basia
TR-4
Route
Route
length
No of
Buses
Headway
in minute
Origin & Destination
TR-1 25.27 23 10
Chirayu Hospital –
Aakriti Eco City
TR-2 23.32 20 8
Bus Station – HEG
Mandideep
TR-3 27 13 16
Nariyel Kheda –
Ayodhya Nagar
TR-4 24 20 12
Bairagarh -HEG
Mandideep
SR -1 19.27 13 12
Lal ghati to to
Bairagarh Chichali
SR-2 19 13 16
Katara Hills-Nehru
Nagar
SR-3 20 14 12
Gandhi Nagar –
Alpana Tiraha
SR-4 26 24 8
Karond Chouraha-
Baira Garh
SR-5 26 21 12
Chirayu Hospital –
Handicapped College
SR-6 24 15 15
Oriental College –
Rajiv Gandhi College
SR-8 22 21 10
Bairagh Chichli –
Coach Factory
13
Neelbad/Ratibad
Mandideep/ob
edullaganj
Bhauri
Berasia
Road
Raisen Road
Route Detail length No of Minibus
Com 1 ( Ratibad to habibganj Naka) 15 78
Com 2 (Purani jail to Bairagarh chichali ) 11.32 74
Com 3 ( Misrod to hig misrod) 8.6 69
Com 4 (ISBT to Bgali gram ) 11.5 66
Com 5 (Mali khedi to Prabhat petrol pum) 19.27 78
Com 6 ( Daam kheda 1 to Habibganj naka) 19.27 77
Com 7 ( ISBT to rajeev Gandhi nagar) 12 65
Total Mini Bus 507
Magic Route No of Magic
I.P.T 1 ( Khazoori sadak to Bairagarh Station) 10.1 55
I.P.T 2 (Khanugaon to Tajmahal ) 6 37
I.P.T 3(Borbai to railway colony) 9.8 47
I.P.T 4( Jagdish pur to Kroond chouraha) 7 45
I.P.T 5( Sas girls college to Jublie gate) 8.2 45
I.P.T 6 (Career college to ISRO GATE) 7.78 47
I.P.T 7 (Anand nagar to Bilkhiriya) 8.43 48
I.P.T 8 ( Avadhpuri khajuri kalan to Transport nagar) 8.47 49
I.P.T 9 (Akash ganga colony, to Salayeea ) 3.46 30
I.P.T 10( Manisha market to Baghmugaliya ) 7.9 47
Total 450
Existing IPT & Complementary Route
14
• ISBT Terminal, Near
Habibganj
• Nadra Bus Stand,
• Jawahar Chowk
• Halalpura
• Putlighar
Halalpura
Jawahar chowk ISBT
Habibganj
Nadra Bus stand
Putlighar
Public Transport Infrastructure In Bhopal
Bus Depot/Stand/Terminal15
Anandpur
BCLL Bairagarh
Primary Survey Points (Outer Cordon)
Mubarak pur
Berasia Road
Vidisha Road
Raisen Road
Hosangabad
Road
Kolar Road
Bhadbhada
Check Post
Phanda Bypass
40KM
40KM
16
Origin Destination Survey User Opinion Survey
Trip Purpose Percentage
Work 33.40%
Business 13.30%
Education 20.30%
Social 21.10%
Shopping 3.10%
Recreation/ Tourism 0.80%
Religious 3.90%
Medical 4.10%
Travel Time
(minutes)
Percentage
<15 5.50%
15-30 71.90%
30-45 17.20%
45-60 3.80%
>60 1.60%
Mode Trip Length (km)
Walk 0.54
Cycle 1.69
Two Wheeler 5.08
Auto/ Magics 2.47
Car/ Van 5.35
Mini Bus 5.02
Standard Bus 5.81
Travel Characteristics
7.14%
44.64%
5.36%
1.79%
35.71%
5.36%
Modal Split
Cycle Two Wheeler
Car Auto/ Magics
Mini Bus Standard Bus
Auto Magic Mini Bus Bus
Easy Availability 45.00% 63.00% 79.00% 71.00%
Cheap Fare 6.00% 84.00% 86.00% 95.00%
Comfortable 58.00% 84.00% 83.00% 88.00%
Safe 67.00% 65.00% 83.00% 90.00%
Good Crew Behavior 52.00% 72.00% 54.00% 86.00%
Suggestion Auto Magic Mini Bus Bus
Increase the fleet 62.00% 73.00% 72.00% 75.00%
Increase Coverage
Area
65.00% 66.00% 59.00% 73.00%
Increase Frequency
in Peak Hour
73.00% 71.00% 72.00% 80.00%
Improve Crew
Behavior
59.00% 65.00% 55.00% 26.00%
Reduce Fare 90.00% 33.00% 31.00% 16.00%
Questions Car Two Wheeler Auto Magic Mini Bus
Increase the
Frequency
15% 36% 86% 76% 94%
Increase Coverage
Area
23% 38% 88% 82% 96%
Reduce Fare 5% 26% 86% 88% 95%
New Bus Type 7% 15% 22% 35% 88%
Purpose
Per Capita Trip Rate
Excluding Walk (PCTR)
Work 0.54
Education 0.13
Other 0.14
Total 0.81
Year PCTR
2013 0.81
2015 0.82
2021 0.87
2023 0.89
PCTR Forecasting
Travel Demand Calculation Bhopal
Organized Public Transport Demand Calculation for Bhopal City:
Population: 1798218
PCTR: 0.81
Estimated/ Desirable base year travel demand for public transport is 55%
Estimated/ Desirable base year travel demand for bus/ organized public transport is 40%
Total organized public transport trips for city: (Population X PCTR) X 40%
: 579746 person trips
Steps:
1. Defined study area around the routes (500-700 m each side)
2. Estimated travel demand for each routes
3. Forecast travel demand for each routes
4. Estimated peak hour travel demand for each route
5. Estimated/ Calculated Headways:
Headway=(Sitting Capacity × Load Factor×60)÷Peak Hour Demand
6. Estimated net fleet size calculation:
Required No of fleet=(Round travel time by bus including stopping time ÷ Headways) + No of extra
vehicle + Maintenance float
7. Calculated Total no of fleets taking 90% fleet utilization:
Total no of fleet=required no of fleets÷90%
Route Wise Fleet Size Calculation Methods
19
Routes Total Demand
Peak Point
Demand
Sitting Capacity Load Factor Headway
Number of
Vehicles
TR1 41638 4934 44 0.65 8 23
TR2 38018 4505 44 0.65 8 21
TR3 18102 2145 44 0.65 12 15
TR4 24684 2925 75 0.65 5 5
TR4 78205 9267 44 0.65 5 27
SR1 18828 2231 44 0.65 10 13
SR2 21722 2574 44 0.65 10 15
SR3 34398 4076 44 0.65 8 19
SR4 62753 7436 44 0.65 6 26
SR5 41638 4934 44 0.65 8 23
SR6 21722 2574 44 0.65 10 15
SR7 15688 1859 44 0.65 12 13
SR8 38018 4505 44 0.65 8 21
Fleet Size for Existing Route
20
Routes Total Demand
Peak Point
Demand
Sitting Capacity Load Factor Headway
Number of
Vehicles
C1 13275 1573 44 0.65 12 11
C2 10861 1287 44 0.65 12 9
C3 9654 1144 44 0.65 12 8
C4 10861 1287 44 0.65 12 9
C5 15688 1859 44 0.65 12 13
C6 15690 1859 44 0.65 12 13
C7 10861 1287 44 0.65 12 9
IPT1 1982 235 24 0.65 20 5
IPT3 1973 234 24 0.65 20 5
IPT4 1979 235 24 0.65 20 5
IPT5 1976 234 24 0.65 20 5
IPT6 1977 234 24 0.65 20 5
IPT8 1975 234 24 0.65 20 5
IPT9 1587 188 24 0.65 20 4
IPT10 1978 235 24 0.65 20 5
Fleet Size for Proposed Routes
21
15 KM
40 KM
50 KM
N
OBEDULLAGANJ
MANDIDEEP
RAISEN
SEHOR
E
BERASIYA
NH-12
NH-12
TOWARDS GWALIOR
TOWARDS VIDISHA
VIDISHA
NH-86
TOWARDS SAGAR
TOWARDS INDORE NH-86
Railway line
BHOPAL
15KM
40KM
50KM
MP SH 19/NH89
NH12
NH-86
22
N
OBEDULLAGANJ
MANDIDEEP
RAISEN
SEHOR
E
BERASIYA
NH-12
NH-12
TOWARDS GWALIOR
TOWARDS VIDISAH
VIDISHA
NH-86
TOWARDS SAGAR
TOWARDS INDORE NH-86
BHOPAL
Phandakalan
Khajuri
sadak
Lambakheda
Eint Khedi
Binapur Village
Nipania Jaat Village
Hinoti Village
Harrakheda
Chopra kalanv
Sukhi sewaniya
Salamtpur
Sanchi
Bilkhiriya
Kalan
Piplakhiriya
Industial Area
Dargahe
shariif
Ratnapu
r
Bishankheda
23
Routes
Total
Demand
Peak Point
Demand
Sitting
Capacity
Load Factor Headway
Number of
Vehicles
Cluster 1 (Bhopal to
Obedullaganj)
4063 482 44 0.65 25 7
Cluster 2 (Bhopal to
Raisen)
4641 550 44 0.65 25 8
Cluster 3 (Bhopal to
Vidisha)
5215 618 44 0.65 25 9
Cluster 4 (Bhopal to
Sehore)
4055 480 44 0.65 25 7
Cluster 5 (Bhopal to
Berasia)
4059 481 44 0.65 25 7
Fleet Size for Cluster Routes
24
Total required buses for Bhopal city (A+B+C)=385
Calculations for net fleet requirement:
Bus fleet required = (385/ 90) × 100 =428 buses
Net fleet required = Bus fleet required – existing buses in good condition
Net fleet required = 428– 197 = 231 buses
Articulated Buses
5 Low Floor (up to
400mm) Fully Built
AC Buses .
11 Semi Low Floor (up
to 900mm) Fully
Built Non-AC Buses
172
Midi buses ( Non –
AC)
43
Inter
City
Intra
city 231
25
Operatingassumptions
Useful Life of
Buses
8.5 Lakh kms
Driver/ Bus 2.5 nos.
Conductor /bus 2.5 nos.
Maintenance
staff/ bus
0.5 nos
Reduction in fuel
efficiency
2% p.a
Load Factor ( For
first two year )
65%
increase in Load
factor
3% p.a.
Max Load factor 75%
BusSpecificationsandRate
Assumptions Standard Low Floor AC
Buses (400 mm
Platform)
44
Standard Semi Low Floor
AC Buses (upto 900 mm)
44
Standard Non A/C Diesel
Midi Bus
24
Articulated Buses 75
Rate Assumptions
Diesel per litre 58
Cost of Driver per month 15,000
Cost of conductor per
month
10,000
Cost of maintenance staff
per month
22,000
Escalation
Manpower cost 7.5 % p.a.
Fare Rates 12.0 % p.a.
Advertisement
Revenue
5.0 % p.a
Fuel cost increase 5.0 % p.a
Maintain cost 12.0% p.a
OtherAssumptions
Depreciation Rate 10 % p.a.
Salvage value of
old Bus (Rs)
2.5 lakh
Residual value for
Depots
25 %
Insurance
3.0 % of
capital
value
Other
maintenance cost
5% of
capital
value
Financial Assumptions
26
• Total Cost Including
State Govt. Taxes (A) Rs
125.98 Crore
Bus fleet cost
231 Buses (A)
• Total cost Rs 4.41 Crore
ITS Facilities
cost ETVMS,PIS
CCR (B)
• Total cost( Up gradation
and development of new
terminal ) Rs 20.50
Crore
Support
Infrastructure
( C )
Total Cost = Rs 150.90 Crore
U.L.B
State
Govt of
India
JnNURM
Funding
Pattern
50%
30%
20%
27
Revenue Distribution
28
Cash Flow Statement
Cash Flow Values (Lakhs)
Capital Expenditure/ Salvage
Value
Buses 577.5
Depots/ Terminal 512.5
ITS 66.15
Total Salvage Value 1156.15
Net Surplus 20190
Total Cashflow 3465
With Grant
Grant amount 5101
Cashflow with grant 11384.55
IRR without grant (in %) 4.75 %
IRR with grant (in %) 17.00 %
29
-169 205 659 1012 1423 1899 2449
3084
3815
4655
-2000
0
2000
4000
6000
8000
10000
12000
14000
16000
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Bhopal
Total Revenue (in Lakh) Total Expenses (in Lakh) Net Surplus (in Lakh)
Year 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Daily Per
Bus
Revenue
-201 244 782 1201 1688 2253 2905 3658 4525 5521
Jabalpur
30
Public Transport System
JCTSL(SPV)
119 City
Buses
(19 Routes)
Proposed
BRTS
Private Party
Operator
Private
Buses
Magic and
Auto
31
Existing Bus Route Network
Existing Route Network
32
Fleet Size for Existing Route
33
Routes
Total
Demand
Peak
Point
Demand
Sitting
Capacity
Load
Factor
Headway
Number
of
Vehicles
Karmeta to Rlwy stn Pf no. 1 via Kachnar city 12816 1153 44 0.65 15 10
Golbazar to tak shila via Jamdar Hospital 6933 624 24 0.65 15 10
Bus stand (Damohnaka) to Gwarighat via Ranital 12711 1144 44 0.65 15 10
Manegaon Ranjhi to Gwarighat Via GCF 9015 811 24 0.65 15 13
Manegaon Ranjhi to Gwarighat Via Satpula 9022 812 24 0.65 15 13
Rlwy stn Pf no. 1 to Bhedaghat Via Nagrath Chaowk 16533 1488 44 0.65 15 13
Richhai Ind arra to Ranjhi Via Maharajpur 7633 687 24 0.65 15 11
Civic Center to Dhanvantri nagar Via Dababazar 5556 500 24 0.65 15 8
Medical to University (IIITDM) Via Shastrinagar 7589 683 24 0.65 15 11
Karmeta to Ghana Via Collectorate 20344 1831 44 0.65 15 16
Mother eresa to Khamariya Via Ghataghar 19067 1716 44 0.65 15 15
Dhanwantri nagar Khamariya Via Collectorate 10086 908 44 0.65 15 8
Panager to Ghaamapur Via Maharajpur 10178 916 44 0.65 15 8
Panager to Gohalpur Via Maharajpur 11444 1030 44 0.65 15 9
Rly Stn PF4 to Bhedaghat Via Medical 6244 562 24 0.65 15 9
Deen Dayal Chowk to Gwarighat Geetadham Via Sajan Chowk 7734 696 24 0.65 15 11
Bus stand (Kshtriya) to Bhedaghat Via Medical 10216 919 44 0.65 15 8
Panaghar To Barela Via Khetriya Bus Stand 12687 1142 44 0.65 15 10
Ghana Tilwara to Gour Barela Via Rasal Chowk 12841 1156 44 0.65 15 10
Fleet Size for Proposed Route
34
Routes
Total
Demand
Peak Point
Demand
Sitting
Capacity
Load
Factor
Headway
Number
of
Vehicles
Agriculture College to Gwari Ghat 17167 1545 44 0.65 10 9
Tilwara Ghat to Khamaria 22889 2060 44 0.65 10 12
Patan
Sahapur
Sihora
Barela
Jabalpur
Jabalpur Clusters
35
Jabalpur
Patan
Bhedaghat/ Barela
Shahpur (via sajapur)
Sihora via Panangra (Ordinance
factory )
36
Routes
Total
Demand
Peak Point
Demand
Sitting
Capacity
Load
Factor
Headway
Number
of
Vehicles
Cluster 1 (Jabalpur to Patan) 6203 558 44 0.65 25 8
Cluster 2 (Jabalpur Bhedaghat) 6111 550 44 0.65 25 8
Cluster 3 (Jabalpur Shahpur (via Sajapur)) 6104 549 44 0.65 25 8
Cluster 4 (Jabalpur Sihora via Panangra
(Ordinance factory ))
6876 619 44 0.65 25 9
Calculations for net fleet requirement:
Considering fleet utilization of 90% for Jabalpur;
Bus fleet required = (buses required in operations / 90) * 100
Bus fleet required = (250/ 90) * 100 =278 buses
Net fleet required = Bus fleet required – existing buses in
good condition
Net fleet required = 278– 120 = 158 buses
Inter
City
Intra
city 158
37
Funding Pattern
• Total Cost Including
State Govt. Taxes (A)
• 9023.25 Lakh
Bus fleet cost
158 Buses (A)
• Total cost 154 Lakh
ITS Facilities
cost ETVMS,PIS
CCR (B)
• Total cost( Up gradation
and development of new
terminal )2475 Lakh
Support
Infrastructure (
C )
U.L.B
State
Govt of
India
JnNUM
Funding
Pattern
50%
30
%
20%
38
39
40
Cash Flow Values (Lakhs)
Capital Expenditure/ Salvage
Value
Buses 395
Depots/ Terminal 618.75
ITS 23.10
Total Salvage Value 1036.85
Net Surplus 15095.84
Total Cashflow 3443.59
With Grant
Grant amount 4611.63
Cashflow with grant 7976.21
IRR without grant (in %) 3.83%
IRR with grant (in %) 14.8 %
-240 11 315
683
1126 1481
1891
2363
2905
3528
-2000
0
2000
4000
6000
8000
10000
12000
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Jabalpur
Total Revenue (in Lakh) Total Expenses (in Lakh) Net Surplus (in Lakh)
Year 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Daily Per
Bus
Revenue
-417 20 547 1185 1953 2569 3280 4098 5038 6118
Gwalior
41
Gwalior
4th Largest city in Madhya Pradesh in
term of population
Organised Public Transport Absent
Gwalior Municipal corporation
Population. 10,53,505
Vikram are the major form of public
transport in Gwalior city
• Large percentage of land is still not
developed and can be acquired for future
development
Real estate
Development(TOD)
Public
Transport
SustainableDevelopment
42
Existing Travel Characteristics
38.04%
30.80%
1.82%
3.62%
5.41%
18.12%
1.64% 0.55%
Modal Split
Cycle Two Wheeler Car
Vikram Bus Tampo
Mode
Trip Length
< 2
kms
2 - 4
kms
4-6 kms 6-8 kms > 8 kms
Car 3% 7% 12% 16% 22%
Two Wheeler 46% 49% 51% 46% 40%
Vikram/IPTs 9% 18% 19% 23% 32%
Cycles/NMV 42% 26% 18% 15% 6%
Per capita trip rate (PCTR) has been estimated as
given below for the City.
Including walk trips : 1.4
Excluding walk trips : 1.1
Purpose Percentage
Work 38%
Bussiness 16%
Education 23%
Social/
Recreation 8%
Leisure 9%
Other 6%
Existing daily ridership by
public vehicle: 153823
Existing Public Transport
Demand: 185549
Modes
No of Vehicle
Operating
Vikram 306
Magic 86
Minibus 5
Tempo 139
Tongas 15
Total 551
43
44
Sl.No. Route
Length of
Route
Peak hour
PCU
lane configuration
travel speed
(kmph)
Level of
Service (LoS)
1
Murar To Central Library
(Maharaja Bada)
10 4167 4 lane 25 C
2 Deendayal Nagar to Sindhi Colony 15 3245 2 lane 15 C
3 IIITM Gwalior to Sindhi Colony 11 4208 4 lane 15 D
4
Hurawali Square Murar to Gwalior
Fort
13 2961 2 lane 20 D
5
Murar 7 No. Sq to Chandra Wadani
Naka
9 3364 2 lane 25 C
6
IIITM Gwalior to Harikheda Jagar
road
13 2858 4 Lane 25 C
7
Nav Graha Mandir Tighra Road to
Gole ka Mandir
12 3156 4 Lane 20 C
8
Gwalior Railway Station to
Gudagudi Ka Naka
11 3950 2 Lane 25 D
Existing Routes
45
Proposed Bus Route and Fleet size for Gwalior
11 Buses
Central
Library
Murar
10km
14 Buses
DeenDa
yal
Nagar
Sindhi
colony
20km
12 BusesIIITM
Gwalior
Sindhi
Colony
16km
13 BusesHurawa
li
Gwalior
fort
18km
Murar 7
14km
Chandra
wadhni
Naka
11 Buses
IIITM
Gwalior
18km
Harikhe
da Jagar
Road
13 Buses
Nav
Graha
mandir
17km
Gole ka
mandir
13 Buses
Gwalior
Railway
Station
16km
Gudaga
udi Ka
Naka
12 Buses
Proposed Public Route Network
Total Required buses for
Gwalior city =99
46
Gwalior
Route Name
Daily Travel
Demand
Murar To Central Library (Maharaja Bada) 18386
Deendayal Nagar to Sindhi Colony 23400
IIITM Gwalior to Sindhi Colony 20057
Hurawali Square Murar to Gwalior Fort 21729
Murar 7 No. Sq to Chandra Wadani Naka 18386
IIITM Gwalior to Harikheda Jagar road 21725
Nav Graha Mandir Tighra Road to Gole ka Mandir 21729
Bamore Malanpur
BSF Colony(Beragarh)
CRPF Colony
Panihar
Proposed Clusters
8 BusesGwalior Morena
38 km
8 BusesGwalior Dabra
38 km
8 BusesGwalior
Gohad
45 km
6 BusesGwalior Anatari
26 km
Total Required buses for Cluster cities = 30
47
Route Name
Daily Travel
Demand
Gohad Via Malanur 5355
Dabra (Via Bilaua ) 5357
Morena (Via Bamore) 5359
Antari 4014
Calculations for net fleet requirement:
Considering fleet utilization of 90% for Gwalior;
Bus fleet required = (buses required in operations /
90) * 100
Bus fleet required = (129/ 90) * 100 = 144 buses
Net fleet required = Bus fleet required – existing buses
in good condition
Net fleet required =144 – 0 = 144 buses
Inter
City
Intra
city 144
Standard
AC Midi
Buses
15 Standard
Non-AC
Midi Buses.
129
48
• Total Cost Including
State Govt. Taxes (A)
• 4256.25 Lakh
Bus fleet cost
144 Buses (A)
• Total cost 147 Lakh
ITS Facilities
cost ETVMS,PIS
CCR (B)
• Total cost( Up gradation
and development of new
terminal )1150 Lakh
Support
Infrastructure (
C )
Total Cost = 5553.2 Lakh
U.L.B
State
Govt of
India
JnNUM
Funding
Pattern
50%
30
%
20%
49
Revenue Distribution
50
Cashflow
Capital Expenditure/ Salvage
Value
Buses 360
Depots/ Terminal 287.5
ITS 22.05
Total Salvage Value 669.55
Net Surplus 7540.26
Add: Description
Total Cashflow 1987.01
With Grant
Grant amount 2228.125
Cashflow with grant 4143.13
IRR without grant (in %) 4.35
IRR with grant (in %) 15.6
Cash Flow Statement
51
-300 -121 99 264 458 683
944
1247
1598
2002
-1000
0
1000
2000
3000
4000
5000
6000
7000
8000
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Gwalior
Total Revenue (in Lakh) Total Expenses (in Lakh)
Net Surplus (in Lakh)
Year 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Daily Per
Bus Revenue -571 -231 189 503 872 1300 1797 2373 3041 3809
Singrauli
52
U.P
U.P
Singraullia
Singrauli
Waidhan
VINDHAYNAGAR
Bargawan
Railway station
Singrauli Bus Stand
Sankat Mochan Mandir
Oasis Medical Store
Shivaji Complex
Dr Lal Patho Lab
53
Singrauli
Vindhya Nagar
Waidhan
Sankat Mochan Mandir
Oasis Medical Store
Shivaji Complex
Dr Lal Patho Lab
54
Proposed Bus Route for Singrauli
4 BusesNCL
Hospital
Coal
mine
morwa
6 km
Circuit
House
Junction
14km
Navjeevn
vihar
junction
13 Buses
Civil
Court
Waidhan 20 km
Khadia
Market
7 Buses
Ragahv
Nagar
10km
Officers
Club
6 Buses
Khadia
Colony
11km
Khadia
Junction
7 Buses
55
Bus Stand
Route Name
Daily Travel
Demand
Raghavnagar(Morwa) to Officers Club via. NCL Hospital 8643
NCL Hospital to Coal Mines via. Govt Girls School 3843
Khadia Colony to Khadia Market via. NTPC Area 10086
Vidhyanagar to Khadia Market via. Jayant Police Station 6729
Calculations for net fleet requirement as per proposed
frequency/headway (B):
Net fleet required = Bus fleet required – existing buses in
good condition
Net fleet required = 24– 0
= 24
Considering fleet utilization of 90% for Singrauli;
Bus fleet required = (buses required in operations (A+B) /
90) * 100
Bus fleet required = ( ( 24 + 10 ) / 90) * 100 = 38 buses
= 38 buses
Inter
City
Intra
city 38
Non-AC Midi
Buses for
intra city
12 Non-AC Midi
Buses for
cluster city
service
26
56
• Total Cost Including
State Govt. Taxes (A)
• 863 Lakh
Bus fleet cost 38
Buses (A)
• Total cost 94 Lakh
ITS Facilities
cost ETVMS,PIS
CCR (B)
• Total cost( Up gradation
and development of new
terminal) 505 Lakh
Support
Infrastructure (
C )
Total Cost = 1461.60 Lakh
• 790.00 LakhGoI
• 671.52 Lakh
State &
ULB
• 1461.60 LakhTotal
State
and ULB
Govt. of India
JnNURM
Funding
Pattern
80%
20%
57
0
200
400
600
800
1000
1200
1400
1600
1800
2000
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Fare Revenue (in Lakh)
Non- fare Revenue (in Lakh)
58
Cash flow Statement
Cash Flow
Values in
Lakhs
Capital Expenditure/ Salvage
Value
Buses 95
Depots/ Terminal 126.25
ITS 14.1
Total Salvage Value 235.35
Net Surplus 1996
Total Cashflow 534
With Grant
Grant amount 790.08
Cash flow with grant 1305.39
IRR without grant (in %) 3.79%
IRR with grant (in %) 21.3%
0
500
1000
1500
2000
2500
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Total Revenue (in Lakh)
Total Expenses (in Lakh)
59
-101 -52 9 56 111 174 248 334
433
548
-500
0
500
1000
1500
2000
2500
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Singrauli
Total Revenue (in Lakh) Total Expenses (in Lakh)
Net Surplus (in Lakh)
Year 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Daily Per
Bus
Revenue -729 -375 65 404 801 1255 1789 2409 3122 3951
Ratlam
60
Ratlam
Ratlam Municipal corporation
Population 264,810
Organised Public Transport Absent
Auto, Tempo, Magic are the existing
public transport in Ratlam city
• Existing daily public transport ridership is
44603
• Ratlam has many major industries like
G.P.Wires, Ratlam Wires, IPCA laboratories
that produce enough trips of public transport
61
Landuse and Road Network Ratlam
Jain Hospital
HPCL Petrol Pump
VIP Road Bypass
Intersection
Ajmera Steels
5 Survey Points
Jain Hospital
VIP Road Bypass
Intersection
Ajmera Steels
HPCL Petrol Pump
Bus Stand
62
63
Existing Travel Characteristics
Mode
Trip Length
< 2 kms 2 - 4 kms 4-6 kms 6-8 kms > 8 kms
Car 5% 8% 14% 15% 21%
Two
Wheeler
48% 50% 55% 53% 43%
Autos/IPTs 11% 13% 20% 20% 28%
Cycles/NMV 36% 29% 11% 12% 8%
Per capita trip rate (PCTR) has been
estimated as given below for the City.
Including walk trips : 1.4
Excluding walk trips : 1.0
Mode No
Autos 62
Magic 75
Tempo
Rikshaws
40
Total 177
49.32%
10.96%
21.92%
17.81%
Modal Split
Two Wheeler Car Auto/ Magics Cycle
Purpose Percentage
Work 35%
Business 22%
Education 11%
Social/
Recreation
13%
Leisure 10%
Other 9%
Existing daily travel demand in
proposed public transport coverage
area is 38429 i.e. per capita trip rate
(bus) is 0.17
Forecasted daily public transport travel
demand (bus) estimated as near 82091
in next 10 years
64
Proposed Bus Route and Fleet Size
Hanuma
n
temple
9 km
Nahar
convent
school
06 km
Shakti
fuel Point
Triveni
kund
12 km
Ayodhya
Basti
Railway
station
5 Bus
5 Bus
5 Bus
Headway variation
Proposed Bus Route and fleet size
Industrial
Belt
65
Route Name
Daily Travel
Demand
Ayodhya Basti - Railway Station (via District Civil Hospital) 10286
Shakti fuel point (Jaora road- Ratlam By-pass junction) Via
Anaj mandi (NH-927 A) to Triveni Kund (triveni Road) 6857
Bada Hanuman Mandir (NH-927 A) - Shri Nahar convent
Playground (Ratlam Shivgarh Road) via. Amrit Sagar Garden 6855
Ratlam
9 km
Sailana
06 km
Ratlam Jaora
12 km
Ratlam Petalwad
5 Bus
5 Bus
5 Bus
Ratlam
9 km
Badanw
ar
5 Bus
66
Route Name
Daily Travel
Demand
Ayodhya Basti - Railway Station (via District Civil Hospital) 10286
Shakti fuel point (Jaora road- Ratlam By-pass junction) Via
Anaj mandi (NH-927 A) to Triveni Kund (triveni Road) 6857
Bada Hanuman Mandir (NH-927 A) - Shri Nahar convent
Playground (Ratlam Shivgarh Road) via. Amrit Sagar Garden 6855
Calculations for net fleet requirement:
Considering fleet utilization of 90% for Ratlam;
Bus fleet required = (45/ 90) * 100 = 50 buses
Net fleet required = Bus fleet required – existing buses in
good condition
Net fleet required =50 – 0 = 50 buses
Inter
City
Intra
city 50
Non-AC Midi
Buses for
intra city
17 Non-AC Midi
Buses for
cluster city
service
33
67
• Total Cost Including
State Govt. Taxes (A)
• 1418.75 Lakh
Bus fleet cost 50
Buses (A)
• Total cost 100 Lakh
ITS Facilities
cost ETVMS,PIS
CCR (B)
• Total cost( Up gradation
and development of new
terminal) 460 Lakh
Support
Infrastructure (
C )
Total Cost = 1978.75 Lakh
• 1235 LakhJnNURM
• 743.75 LakhState &
ULB
• 1978.75 LakhTotal
State
and ULB
JnNURM
Funding
Pattern
80%
20%
68
0
500
1000
1500
2000
2500
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Fare Revenue (in Lakh)
Non- fare Revenue (in Lakh)
69
Cash flow Statement
Cash Flow
Values in
Lakhs
Capital Expenditure/ Salvage
Value
Buses 125
Depots/ Terminal 115
ITS 15
Total Salvage Value 255
Net Surplus 2572
Total Cashflow 593
With Grant
Grant amount 1235
Cash flow with grant 1802.78
IRR without grant (in %) 3.20%
IRR with grant (in %) 25.5%
0
500
1000
1500
2000
2500
3000
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Total Revenue (in Lakh)
Total Expenses (in Lakh)
70
-133 -68 12 73 145 229
326
440
570
721
-500
0
500
1000
1500
2000
2500
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Ratlam
Total Revenue (in Lakh) Total Expenses (in Lakh)
Net Surplus (in Lakh)
Year 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Daily Per
Bus
Revenue
-729 -373 66 400 795 1255 1787 2411 3124 3951
71
Rewa
Rewa
Rewa Municipal corporation
Population 2,35,422
Organised Public Transport Absent
IPT is the existing public transport in
Rewa city
• Rewa is a tourist spot which attract trips
from all over India
• Roads are under development with suitable
road width for public transport
• Existing daily public transport ridership is
51679
72
Rewa
NH-7
NH-7
Road Network in Radial Pattern
Gudh
Satna
Gadhwa
Allahabad
NH-7 Divides City into 2 Parts
NH-7 caters the highest traffic of the city
Sufficient Road width is Available
Vindhya Telelink limited
APS University
Govt Engg College Rewa
Rewa Railway Station
Major Land Mark
Anantpur
Karahiya Mandi
Chorhat
Badraon
Babpur
Industrial
Area
Rathara
Vindya Telelinks
Rewa Engineering College
Hospital Chowk
Bus Stand
73
74
Existing Travel Characteristics
Per capita trip rate (PCTR) has been
estimated as given below for the City.
Including walk trips : 1.4
Excluding walk trips : 1.1
Purpose Percentage
Work 37%
Business 18%
Education 19%
Social/
Recreation
12%
Leisure 8%
Other 6%
Existing daily travel demand in
proposed public transport coverage
area is 50308.
Forecasted daily public transport travel
demand (bus) estimated as near about
71869 in next 10 years
Mode
Trip Length
< 2 kms 2 - 4 Kms 4-6 Kms 6-8 Kms > 8 Kms
Car 3% 9% 12% 14% 20%
Two
Wheeler
49% 55% 56% 53% 42%
Autos/IPTs 12% 12% 20% 22% 30%
Cycles/NMV 36% 24% 12% 11% 8%
Vehicle Mode Total
Autos 100
Jeep 10
Magic 80
Tempo Rikshaw 35
Grand Total 225
48.05%
15.58%
24.68%
11.69%
Modal Split
Two Wheeler Car
Auto/ Magics Cycle
75
Rewa Proposed Bus Route Network
Maihar
railway
station
13 km
Bichiya
Kabrista
n
8 Buses
Hospital
Chowk
07 km
Ituara
4 Buses
Sardar
Patel
06 km
Area
Jori
4 Buses
Hotel
Land
mark 14 km
Pentium
Point
8 Buses
Proposed Bus route for Rewa
11456
10989
3567
3998
76
Rewa Proposed Bus Route Network
Rewa
38 km
semaria6 Buses
Rewa
22 km
Gruh
5 Buses
Rewa
20 km
Govind
garh
5 Buses
Rewa
27 km
Sirmor
5 Buses
Rewa
30 km
Mangw
an
6 Buses
Rewa
53 km
Satna
8 Buses
Sirmor
Semaria
Satna
Govindgarh
Gurh
Mangawan
Cluster Demand
Govindgarh 2901
Mangawa 3332
Sirmour 2799
Gurh 2989
Satna 4599
Semaria 3678
77
Calculations for net fleet requirement:
Considering fleet utilization of 90% for Ratlam;
Bus fleet required = (59/ 90) * 100 = 66 buses
Net fleet required = Bus fleet required – existing buses in
good condition
Net fleet required =66 – 0 = 66 buses
Inter
City
Intra
city
66
Non-AC Midi
Buses for
intra city
27 Non-AC Midi
Buses for
cluster city
service
39
78
• Total Cost Including
State Govt. Taxes (A)
• 1872.75 Lakh
Bus fleet cost 66
Buses (A)
• Total cost 108 Lakh
ITS Facilities
cost ETVMS,PIS
CCR (B)
• Total cost( Up gradation
and development of new
terminal) 575 Lakh
Support
Infrastructure (
C )
Total Cost = 2555.75 Lakh
• 1598.20 LakhGoI
• 957.55 Lakh
State &
ULB
• 2555.75 LakhTotal
State
and ULB
Govt. of India
JnNURM
Funding
Pattern
80%
20%
79
0
500
1000
1500
2000
2500
3000
3500
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Fare Revenue (in Lakh)
Non- fare Revenue (in Lakh)
80
Cash flow Statement
Cash Flow
Values in
Lakhs
Capital Expenditure/ Salvage
Value
Buses 165
Depots/ Terminal 143.75
ITS 16.2
Total Salvage Value 324.95
Net Surplus 3383
Total Cashflow 827
With Grant
Grant amount 1598.2
Cash flow with grant 2392.22
IRR without grant (in %) 3.65%
IRR with grant (in %) 26.1%
0
500
1000
1500
2000
2500
3000
3500
4000
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Total Revenue (in Lakh)
Total Expenses (in Lakh)
81
-176 -89 15 97 192 303 431 580
753
951
-500
0
500
1000
1500
2000
2500
3000
3500
4000
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Rewa
Total Revenue (in Lakh) Total Expenses (in Lakh)
Net Surplus (in Lakh)
Year 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Daily Per
Bus
Revenue -731 -370 63 403 798 1258 1790 2408 3126 3948
Satna
82
Satna
Satna Municipal Corporation
Population 2,29,307
Organised Public Transport Absent
IPT is the existing public transport in
Satna city
• A number of cement factories are situated in
Satna that is major trip generator
• Roads are newly developed with suitable
road width for public transport
• Existing daily public transport ridership is
29420
83
Satna Landuse
Satna
Station
Satna Bus Stand
Allahabad
Chitrakoot Road (Khaira)
Kripalpur Basti
Chakbandi
Etora
Panna Khajuraho Road
Yash Petrol Pump
Vindya Club
City Police Station
Birla Cancer Hospital
5 Survey Points
Bus Stand
Panna Khajuraho Road = 30 m
Chitrakot Road = 25 m
Birla Cement Factory Road = 27 m
Bus Stand
84
85
Existing Travel Characteristics
Per capita trip rate (PCTR) has been
estimated as given below for the City.
Including walk trips : 1.42
Excluding walk trips : 1.05
Purpose Percentage
Work 32%
Business 22%
Education 19%
Social/
Recreation
12%
Leisure 11%
Other 4%
Existing daily travel demand in
proposed public transport coverage
area is 38130 i.e. per capita trip rate
(bus) is 0.13
Forecasted daily public transport travel
demand (bus) estimated as near about
60000 in next 10 years
Average trip length
• Public transport user trip: 4 kms
• Excluding walk trip: 6.2 kms
41.67%
11.11%
16.67%
30.56%
Modal Split
Two Wheeler Car
Auto/ Magics Cycle
86
Satna
Maiher
Bypass
MDR11
10 km
Lovedal
e
school
7 Buses
Mukhtiy
arganj
9 km
Trichi
colony
6 Buses
Maiher
bye
pass 11km
Sohawa
l Road
7 Buses
Proposed Bus Route for Satna
87
Route Name
Daily Travel
Demand
Maihar Bye pass road junction to (PEPTECH City)Sohawal Road
Junction via Circuit House
7060
Mukhtiyarganj Civil line road to TRICHI Colony on Satna
Birsinghpur Road( via railway station and bus stand)
6050
Mukhtiyarganj Civil line road to TRICHI Colony on Satna
10084
Satna Cluster
Satna
40 Km
Maihar
(VIA
Uccher
a)
8 Buses
Satna
32 km
Birsingh
pur
7 Buses
Satna
28 Km
Nagod
5 Buses
Satna
38 km
Amarpa
tan6 Buses
Satna
37 km
Majhga
wa
6 Buses
Satna
33 km
Rampur
Baghel
an
7 Buses
88
Route Name
Daily Travel
Demand
Satna to Nagod 2020
Satna to Birsinghpur 5044
Satna to Maihar (VIA Ucchera) 5764
Satna to Rampur Baghelan 3530
Satna to Majhgawa 3466
Satna to Amarpatan 2420
Calculations for net fleet requirement:
Considering fleet utilization of 90% for Ratlam;
Bus fleet required = (59/ 90) * 100 = 66 buses
Net fleet required = Bus fleet required – existing buses in
good condition
Net fleet required =66 – 0 = 66 buses
Inter
City
Intra
city
66
Non-AC Midi
Buses for
intra city
23 Non-AC Midi
Buses for
cluster city
service
43
89
• Total Cost Including
State Govt. Taxes (A)
• 1872.75 Lakh
Bus fleet cost 66
Buses (A)
• Total cost 108 Lakh
ITS Facilities
cost ETVMS,PIS
CCR (B)
• Total cost( Up gradation
and development of new
terminal) 575 Lakh
Support
Infrastructure (
C )
Total Cost = 2555.75 Lakh
• 1598.20 LakhJnNURM
• 957.55 LakhState &
ULB
• 2555.75 LakhTotal
State
and ULB
JnNURM
Funding
Pattern
80%
20%
90
0
500
1000
1500
2000
2500
3000
3500
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Fare Revenue (in Lakh)
Non- fare Revenue (in Lakh)
91
Cash flow Statement
Cash Flow
Values in
Lakhs
Capital Expenditure/ Salvage
Value
Buses 165
Depots/ Terminal 143.75
ITS 16.2
Total Salvage Value 324.95
Net Surplus 3383
Total Cashflow 827
With Grant
Grant amount 1598.2
Cash flow with grant 2392.22
IRR without grant (in %) 3.65%
IRR with grant (in %) 26.1%
0
500
1000
1500
2000
2500
3000
3500
4000
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Total Revenue (in Lakh)
Total Expenses (in Lakh)
92
-176 -89 15 97 192 303 431
580
753
951
-500
0
500
1000
1500
2000
2500
3000
3500
4000
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Satna
Total Revenue (in Lakh) Total Expenses (in Lakh)
Net Surplus (in Lakh)
Year 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Daily Per
Bus
Revenue -731 -370 63 403 798 1258 1790 2408 3126 3948
93
Katni
Katni
Katni Municipal Corporation
Population 2,21,875
Organised Public Transport Absent
IPT is the existing public transport in
Katni city
• Katni is an industrial city that is major trip
generator
• Roads have ROW but encroachment is
prominent
• Existing daily public transport ridership is
21265
94
95
Existing Travel Characteristics
Per capita trip rate (PCTR) has been
estimated as given below for the City.
Including walk trips : 1.2
Excluding walk trips : 1.1
Purpose Percentage
Work 39%
Business 16%
Education 19%
Social/
Recreation
12%
Leisure 8%
Other 6%
Existing daily travel demand in
proposed public transport coverage
area is 34240 i.e. per capita trip rate
(bus) is 0.16
Forecasted daily public transport travel
demand (bus) estimated as near about
55990 in next 10 years
Mode
Trip Length
< 2 kms 2 - 4 Kms 4-6 Kms 6-8 Kms > 8 Kms
Car 2% 4% 7% 10% 12%
Two
Wheeler
49% 54% 58% 56% 56%
Autos/IPTs 11% 13% 14% 20% 24%
Cycles/NMV 38% 29% 21% 14% 8%
49.38%
17.28%
20.99%
12.35%
Modal Split
Two Wheeler Car
Auto/ Magics Cycle
96
97
Bus Stand
Railway Station
Radhika hotel
Kanahiya Hospital
KV
Katni Proposed Bus Route Network
Tilak
colleg
3 km
kendriy
a
vidalay
a
3 Buses
Chanda
k
CHOWK 6.4 km
Overhe
ad tank
jhola
4 Buses
Imaliya
12km
Murwar
a
Railway
Station
6 Buses
Syna
Public
12km
Near
Electric
board
8 Buses
98
Route Name
Daily Travel
Demand
Syna Public School- Near ElectricBoard Yard 6340
Imaliya - Murwara Railway Station (Via Mission chowk and
Katni Railway Station) 3172
Chandak Chowk - Overhead Tank (Johla) 2125
Tilak college road junction- Near Kendriya Vidyalay 1593
Katni
Katni
73 km
Umaria11 Buses
Katni
50 km
Barhi
9 Buses
Katni
37 km
Vijayra
ghogar
h
9 Buses
Katni
35 km
Sahana
gar
9 Buses
Katni
50 km
Sihora9 Buses
Chandi
Sihora
Vijayeraghogarh
99
Calculations for net fleet requirement:
Considering fleet utilization of 90% for Ratlam;
Bus fleet required = (68/ 90) * 100 = 76 buses
Net fleet required = Bus fleet required – existing buses in
good condition
Net fleet required =76 – 0 = 76 buses
Inter
City
Intra
city
76
Non-AC Midi
Buses for
intra city
24 Non-AC Midi
Buses for
cluster city
service
52
100
• Total Cost Including
State Govt. Taxes (A)
• 2156.50 Lakh
Bus fleet cost 76
Buses (A)
• Total cost 113 Lakh
ITS Facilities
cost ETVMS,PIS
CCR (B)
• Total cost( Up gradation
and development of new
terminal) 650 Lakh
Support
Infrastructure (
C )
Total Cost = 2919.50 Lakh
• 1825.20 LakhJnNURM
• 1094.30 LakhState &
ULB
• 2919.50 LakhTotal
State
and ULB
JnNURM
Funding
Pattern
80%
20%
101
0
500
1000
1500
2000
2500
3000
3500
4000
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Fare Revenue (in Lakh)
Non- Fare Revenue (in Lakh)
102
Cash flow Statement
Cash Flow
Values in
Lakhs
Capital Expenditure/ Salvage
Value
Buses 190
Depots/ Terminal 162.5
ITS 16.95
Total Salvage Value 369.45
Net Surplus 3891
Total Cashflow 971
With Grant
Grant amount 1825.2
Cash flow with grant 2758.27
IRR without grant (in %) 3.82%
IRR with grant (in %) 26.3%
0
500
1000
1500
2000
2500
3000
3500
4000
4500
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Total Revenue (in Lakh)
Total Expenses (in Lakh)
103
-202 -104 18 112 221 348
496
669
867
1096
-500
0
500
1000
1500
2000
2500
3000
3500
4000
4500
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Katni
Total Revenue (in Lakh) Total Expenses (in Lakh)
Net Surplus (in Lakh)
Year 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Daily Per
Bus
Revenue -729 -375 65 404 797 1255 1789 2412 3126 3951
104
Vidisha
Vidisha
Vidisha Municipal area population
155,951
Organised Public Transport Absent
IPT is only existing public transport in
Vidisha city
• Vidisha is a tourist place and one of the world
heritage sites
• Leading agro based industries in Madhya
Pradesh
• Existing daily public transport ridership is
23400
105
Vidisha Proposed Bus Route Network
Bus Stand
Rangrai Petro Pump
Saffron Caffe
Ramlela Chouraha
M.P Iron Industries
Bus Stand
Bus Stand
106
107
Existing Travel Characteristics
Mode
Trip Length
< 2 kms 2 - 4 kms 4-6 kms 6-8 kms > 8 kms
Car 2% 4% 7% 10% 12%
Two
Wheeler
49% 54% 58% 56% 56%
Autos/IPTs 11% 13% 14% 20% 24%
Cycles/NMV 38% 29% 21% 14% 8%
Per capita trip rate (PCTR) has been
estimated as given below for the City.
Including walk trips : 1.39
Excluding walk trips : 1.02
Mode No
Autos 125
Tonga 15
Total 140
Purpose Percentage
Work 42%
Business 28%
Education 12%
Social/
Recreation
15%
Leisure 2%
Other 1%
Existing daily travel demand in
proposed public transport coverage
area is 38730
Forecasted daily public transport travel
demand (bus) estimated as near 55310
in next 10 years
39.39%
9.09%
24.24%
27.27%
Modal Split
Two Wheeler Car
Auto/ Magics Cycle
108
N
Rangai
Mandir
16 km
Tilakhe
di
7 km
Gandhi
Chowk
Pole
Factory
6 km
Tilakhedi
New
Krishi
Upaj
Mandir
12 Bus
6 Bus
7 Bus
Eidgah
5 km
Old
Krish
Upaj
Mandir
5 Bus
Vidisha Proposed Bus Route Network
Proposed Bus Route for Vidisha
109
Route Name
Daily Travel
Demand
Tilakhedi - Rangai Mandir- Sanchi 17286
Eidgah to Old KrishiUpajMandi 7200
Tilakhedi to New KrishiUpajMandi 8643
Gandhi Chowk to Pole Factory 10086
Vidisha Proposed Bus Route Network
Vidisha
50 km
Gnajba
soda
31 km
Vidisha
Raisen
8 Bus
6 Bus
Vidisha
43 km
Berasia
7 Bus
Raisen
Ganj Basoda
Berasia
110
Route Name
Daily Travel
Demand
Vidisha to Bairasia 4043
Vidisha to Ganjbasoda 4614
Vidisha to Raisen 3457
Calculations for net fleet requirement:
Considering fleet utilization of 90% for Ratlam;
Bus fleet required = (51/ 90) * 100 = 57 buses
Net fleet required = Bus fleet required – existing buses in
good condition
Net fleet required =57 – 0 = 57 buses
Inter
City
Intra
city
57
Non-AC Midi
Buses for
intra city
34 Non-AC Midi
Buses for
cluster city
service
23
111
• Total Cost Including
State Govt. Taxes (A)
• 1620 Lakh
Bus fleet cost 57
Buses (A)
• Total cost 104 Lakh
ITS Facilities
cost ETVMS,PIS
CCR (B)
• Total cost( Up gradation
and development of new
terminal) 412.50 Lakh
Support
Infrastructure (
C )
Total Cost = 2136.50 Lakh
• 1396 LakhGoI
• 740.50 Lakh
State &
ULB
• 2136.50 LakhTotal
State
and ULB
Govt. of India
JnNURM
Funding
Pattern
80%
20%
112
0
500
1000
1500
2000
2500
3000
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Fare Revenue (in Lakh)
Non- fare Revenue (in Lakh)
113
Cash flow Statement
Cash Flow
Values in
Lakhs
Capital Expenditure/ Salvage
Value
Buses 142.5
Depots/ Terminal 103.125
ITS 15.6
Total Salvage Value 261.225
Net Surplus 2902
Total Cashflow 766
With Grant
Grant amount 1396.0
Cash flow with grant 2133.1
IRR without grant (in %) 4.3%
IRR with grant (in %) 29.0%
0
500
1000
1500
2000
2500
3000
3500
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Total Revenue (in Lakh)
Total Expenses (in Lakh)
114
-152 -77 13 83 165 261 373
501
650
822
-500
0
500
1000
1500
2000
2500
3000
3500
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Vidisha
Total Revenue (in Lakh) Total Expenses (in Lakh)
Net Surplus (in Lakh)
Year 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Daily Per Bus
Revenue -731 -371 63 399 794 1255 1793 2409 3125 3951
115
Sagar
Sagar
Sagar Municipal area population
274,556
Organised Public Transport Absent
IPT is only existing public transport in
Sagar city
• Existing daily public transport ridership is
67082
• The financial status of the City mainly
depends on agriculture products, Bidi Udyog
and Agarbatti Udyog
116
Sagar
Chawani
Dr Hari Singh Gour University
S.N
o
Route
Distance
of Stretch
(in Kms)
Peak
hour
PCU
lane
Conf
ig.
travel
speed
V/C
Rati
o
Level of
Service
(LoS)
1
Rajakhedi (Deen
Dayal Nagar) to Mandi
(Khurai Road) via
Sagar Bus Stand
14 3875
4
lane
40
Kmph
0.74 C
2
Bhagwan Ganj to Dr.
Gaur University via
Mahar Regiment
Center
8 3214
2
lane
30
Kmph
0.81 D
3
Kasab Mandi Mosque
to Bus stand via Tilli 11 2857
2
lane
30
Kmph
0.83 D
4
Bhagwan Ganj to
MPEB Junction via
Sagar Cantt.
9 2901
2
lane
31
Kmph
0.8 D
Bus Stand
ITI Sagar
Makroniya Taxi Stand
Shailesh Memorial School
Mahila Vidayalaya
Sagar
Income Ttax Office
Jhansi
Beena
Bhopal
Narsinghpur
Jabalpur
Chatarpur
117
Existing Travel Characteristics
Mode
Trip Length
< 2 kms 2 - 4 kms 4-6 kms 6-8 kms > 8 kms
Car 2% 4% 7% 10% 12%
Two
Wheeler
49% 54% 58% 56% 56%
Autos/IPTs 11% 13% 14% 20% 24%
Cycles/NMV 38% 29% 21% 14% 8%
Per capita trip rate (PCTR) has been
estimated as given below for the City.
Including walk trips : 1.5
Excluding walk trips : 1.0
Mode No
Autos 75
Magic 115
Total 185
Purpose Percentage
Work 36%
Business 18%
Education 17%
Social/
Recreation
9%
Leisure 12%
Other 8%
Existing daily travel demand in
proposed public transport coverage
area is 61634 i.e. per capita trip rate
(bus) is 0.27
Forecasted daily public transport travel
demand (bus) estimated as near 90254
in next 10 years33.82%
13.24%
26.47%
26.47%
Modal Split
Two Wheeler Car Auto/ Magics Cycle
118
119
Proposed Bus Route and fleet size for Sagar
Rajakh
edi
14km
Mandi
Bhagwan
ganj to
8km
Dr Gaur
University
11km
Bhagwan
ganj MPEB
Railway Station
24 km
Bus Route for Sagar
Kasab
mandi
mosque
Bus
stand via
Tiilli
10 Bus
7 Bus
9 Bus
7 Bus
Makroniya Taxi Stand
120
Route Name
Daily Travel
Demand
Rajakhedi (Deen Dayal Nagar) to Mandi (Khurai Road) via Sagar Bus
Stand 16812
Bhagwan Ganj to Dr. Gaur University via Mahar Regiment Center 11767
Kasab Mandi Mosque to Bus stand via Tilli 15133
Bhagwan Ganj to MPEB Junction via Sagar Cantt. 11763
Fleet size for Cluster Sagar
Banda
Rahatgarh
35 km
Sagar
Rahatgar
h
36 km
Sagar
Banda
9 Bus
7 Bus
121
Sagar Fleet Size Calculation
Calculations for net fleet requirement:
Considering fleet utilization of 90% for Ratlam;
Bus fleet required = (44/ 90) * 100 = 49 buses
Net fleet required = Bus fleet required – existing buses in
good condition
Net fleet required =49 – 0 = 49 buses
Inter
City
Intra
city 49
Non-AC Midi
Buses for
intra city
37 Non-AC Midi
Buses for
cluster city
service
12
122
Sagarar
• Total Cost Including
State Govt. Taxes (A)
• 1400 Lakh
Bus fleet cost 49
Buses (A)
• Total cost 100 Lakh
ITS Facilities
cost ETVMS,PIS
CCR (B)
• Total cost( Up gradation
and development of new
terminal) 475 Lakh
Support
Infrastructure (
C )
Total Cost = 1975.00 Lakh
• 1220 LakhJnNURM
• 775 LakhState &
ULB
• 1975 LakhTotal
State
and ULB
JnNURM
Funding
Pattern
80%
20%
123
0
500
1000
1500
2000
2500
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Fare Revenue (in Lakh)
Non- fare Revenue (in Lakh)
124
Cash flow Statement
Cash Flow
Values in
Lakhs
Capital Expenditure/ Salvage
Value
Buses 122.50
Depots/ Terminal 118.75
ITS 15
Total Salvage Value 256.25
Net Surplus 2526
Total Cashflow 551
With Grant
Grant amount 1220.00
Cash flow with grant 1746.90
IRR without grant (in %) 2.8%
IRR with grant (in %) 24.6%
0
500
1000
1500
2000
2500
3000
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Total Revenue (in Lakh)
Total Expenses (in Lakh)
125
-130 -67 11 72 142 225 320
431
559
707
-500
0
500
1000
1500
2000
2500
3000
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Sagar
Total Revenue (in Lakh) Total Expenses (in Lakh)
Net Surplus (in Lakh)
Year 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Daily Per Bus
Revenue -727 -375 62 403 794 1259 1790 2410 3126 3954
Summery of Capital Cost
City
Proposed Fleet Requirement Financial inlay for Buses
Financial inlay for Ancillary
Infrastructure and ITS
Articulated
Low Floor
(400mm)
AC Bus
Semi Low
Floor
(900mm)
Non AC Bus
Non AC
Midi Bus
(900mm)
Total
Govt. of
India Grant
(in Crore)
State Govt.
Share (in
Crore)
ULB Share
(in Crore)
TOTAL (in
Crore)
Govt. of
India Grant
(in Crore)
State Govt.
Share (in
Crore)
Total Cost
(in Crore)
Bhopal 5 11 172 43 231 62.99 25.88 37.12 125.99 1.00 23.91 24.91
Jabalpur 0 24 112 22 158 45.12 18.05 27.07 90.24 1.00 25.29 26.29
Gwalior 0 0 0 144 144 34.05 8.51 12.77 55.33 1.00 11.97 12.97
Satna 0 0 0 66 66 14.98 3.75 0.00 18.73 1.00 5.83 6.83
Sagar 0 0 0 49 49 11.20 2.80 0.00 14.00 1.00 4.75 5.75
Ratlam 0 0 0 50 50 11.35 2.84 0.00 14.19 1.00 4.60 5.60
Rewa 0 0 0 66 66 14.98 3.75 0.00 18.73 1.00 5.83 6.83
Katni 0 0 0 76 76 17.25 4.31 0.00 21.56 1.00 6.63 7.63
Singrauli 0 0 0 38 38 6.90 1.73 0.00 8.63 1.00 4.99 5.99
Vidisha 0 0 0 57 57 12.96 3.24 0.00 16.20 1.00 4.17 5.17
Grand Total 5 35 284 611 935 231.78 74.86 76.96 383.60 10.00 97.97 107.97
Summery of Cash flow Distribution
City
Cash flow
Without Grant
Cash flow With
Grant
IRR Without
Grant
IRR With Grant
Bhopal 34.65 113.84 4.75% 17.00%
Jabalpur 34.43 79.76 3.83% 14.80%
Gwalior 19.87 41.43 4.35% 15.60%
Satna 8.27 23.92 3.65% 26.10%
Sagar 5.51 17.46 2.80% 24.60%
Ratlam 5.93 18.02 3.20% 25.50%
Rewa 8.27 23.92 3.65% 26.10%
Katni 9.71 27.58 3.82% 26.30%
Singrauli 5.34 13.05 3.79% 21.30%
Vidisha 7.66 21.33 4.30% 29.00%
Comments of Principal Secretary from Inception Report
Sl No Comments Response
1 Issues and observation should be city specific. All the city specific issues and observations have been provided
2
DPR’s should be bankable on the basis of which a viable public transport could be establishment in the various cities of
state.
It already has been incorporated
3 Hub and spoke model should be adopted for formation of cluster. Already have been incorporated
4. A
DPR should elaborate current roles and responsibilities of RTO and other stakeholders indulged in operation and
regulation of public transport system in the cities.
Already have been incorporated in reports
4. B
Institutional mechanism and clear cut roles and responsibilities of various agencies engaged to regulate public
transport such as RTO ,SPV , traffic police , ULB wrt route rationalstion , fare fixation , regulating permit should be
elaborated .
RTO: Issuing temporary permit, sending fare fixation report to Nodal Officer, sending
reports on route rationalization plans to transport department, tax collection and
maintaining Motor Vehicle Act.
SPV: Existing SPVs are responsible for O&M of existing organized transport system.
Traffic Police: No traffic plans are there. They mainly collect Challun and maintain VIP
movements
ULB: they are responsible for improvements and ,maintenance of existing road networks.
5. A
Requisite frequency of public transport mode for sustainable operation and required viability gap funding should be
detailed out.
It has been incorporated in details in the reports
5. B Type of mode (size) and fleet size for different clusters should be specifically spelled out. It has been incorporated
5. C Operations plan carrying Capex and Opex with respect to financial viability of buses should be detailed out. It has been detailed out.
6
In case of non-viability of mode specified ob GoI, alternative analysis should be done and viable mode or that city
including financial operational plan (FOP) should be detailed out.
It has been provided in every DPRs
7
City specific photographs such as roads, intersections, existing and proposed bus stand and other ancillary structures
should be portyed in the presentation.
All relevant photos have been incorporated in the reports
8 In cluster along with origin and destination intermediate cities/town should be motioned with distance from local city. All have been incorporated
9 Model on the basis of which bus system is proposed should be detailed out. All have been incorporated in reports
Recommendation
•UADD, as early possible, should submit copies of interims DPRS of 10 cities to JnNURM and related
•central govt department for their further action .
•Various Policy formation and their implementation work at state level in various identified cities
should
• start immediately
•Discussion on the project implementation with various city authorities in each of the 10 cities
•SPV will run on Net cost Model
•IPT Route and Public Transport route should be Segregated
•Formulation of UMTC
•To Increases the non fare box revenue policy such as advertisement, Parking etc should be formed
at city level.

More Related Content

What's hot

Role of centre and state in finance of urban development project
Role of centre and state in finance of urban development projectRole of centre and state in finance of urban development project
Role of centre and state in finance of urban development projectanupriya sharma
 
Comprehensive mobility plan , patna
Comprehensive mobility plan , patnaComprehensive mobility plan , patna
Comprehensive mobility plan , patnaMd Faizan Danish
 
JnNURM Bus Financing - Delhi Experience
JnNURM Bus Financing - Delhi ExperienceJnNURM Bus Financing - Delhi Experience
JnNURM Bus Financing - Delhi ExperienceJaspal Singh
 
Regional tranport system RTP
Regional tranport system RTPRegional tranport system RTP
Regional tranport system RTPSatyam Rai
 
CUSTOMER SATISFACTION LEVELS IN PUNE MUNICIPAL TRANSPORT
CUSTOMER SATISFACTION LEVELS IN PUNE MUNICIPAL TRANSPORTCUSTOMER SATISFACTION LEVELS IN PUNE MUNICIPAL TRANSPORT
CUSTOMER SATISFACTION LEVELS IN PUNE MUNICIPAL TRANSPORTCurator PPT
 
Presentation Urban Mobility Final
Presentation Urban Mobility FinalPresentation Urban Mobility Final
Presentation Urban Mobility Finalkatja.kavcic
 
KA6564 Assignment 4 - Urban Public Transport Report
KA6564 Assignment 4 - Urban Public Transport ReportKA6564 Assignment 4 - Urban Public Transport Report
KA6564 Assignment 4 - Urban Public Transport Reportarmada7000
 
Webinar Session: "BRT in India – a way forward"
Webinar Session: "BRT in India – a way forward"Webinar Session: "BRT in India – a way forward"
Webinar Session: "BRT in India – a way forward"BRTCoE
 
Note on T&T Issues in GM and MCGM's Initiatives and Policies_13th Jan 2015_V3
Note on T&T Issues in GM and MCGM's Initiatives and Policies_13th Jan 2015_V3Note on T&T Issues in GM and MCGM's Initiatives and Policies_13th Jan 2015_V3
Note on T&T Issues in GM and MCGM's Initiatives and Policies_13th Jan 2015_V3Abhinav miryala
 
Moscow, comprehensive mobility plan
Moscow, comprehensive mobility planMoscow, comprehensive mobility plan
Moscow, comprehensive mobility planshubham sharma
 
Urban Transportation Market In India
Urban Transportation Market In IndiaUrban Transportation Market In India
Urban Transportation Market In IndiaJaspal Singh
 
Afa Interpretation Of Financial Statements Sbs Transist Vs Smrt
Afa Interpretation Of Financial Statements   Sbs Transist Vs SmrtAfa Interpretation Of Financial Statements   Sbs Transist Vs Smrt
Afa Interpretation Of Financial Statements Sbs Transist Vs Smrtruoting
 
Data Compilation on Urban Metropolitan Transport Authority (UMTA) of Differen...
Data Compilation on Urban Metropolitan Transport Authority (UMTA) of Differen...Data Compilation on Urban Metropolitan Transport Authority (UMTA) of Differen...
Data Compilation on Urban Metropolitan Transport Authority (UMTA) of Differen...Centre for Public Policy Research
 

What's hot (20)

Bus Rapid Transit (BRT)
Bus Rapid Transit (BRT)Bus Rapid Transit (BRT)
Bus Rapid Transit (BRT)
 
City Structure and Urban Mobility
City Structure and Urban MobilityCity Structure and Urban Mobility
City Structure and Urban Mobility
 
Role of centre and state in finance of urban development project
Role of centre and state in finance of urban development projectRole of centre and state in finance of urban development project
Role of centre and state in finance of urban development project
 
Sustainable Urban Mobility Planning
Sustainable Urban Mobility PlanningSustainable Urban Mobility Planning
Sustainable Urban Mobility Planning
 
Comprehensive mobility plan , patna
Comprehensive mobility plan , patnaComprehensive mobility plan , patna
Comprehensive mobility plan , patna
 
JnNURM Bus Financing - Delhi Experience
JnNURM Bus Financing - Delhi ExperienceJnNURM Bus Financing - Delhi Experience
JnNURM Bus Financing - Delhi Experience
 
Regional Transportation Planning
Regional Transportation PlanningRegional Transportation Planning
Regional Transportation Planning
 
Regional tranport system RTP
Regional tranport system RTPRegional tranport system RTP
Regional tranport system RTP
 
Bus Rapid Transit (BRT) in Gauteng, S.A.
Bus Rapid Transit (BRT) in Gauteng, S.A.Bus Rapid Transit (BRT) in Gauteng, S.A.
Bus Rapid Transit (BRT) in Gauteng, S.A.
 
CUSTOMER SATISFACTION LEVELS IN PUNE MUNICIPAL TRANSPORT
CUSTOMER SATISFACTION LEVELS IN PUNE MUNICIPAL TRANSPORTCUSTOMER SATISFACTION LEVELS IN PUNE MUNICIPAL TRANSPORT
CUSTOMER SATISFACTION LEVELS IN PUNE MUNICIPAL TRANSPORT
 
Presentation Urban Mobility Final
Presentation Urban Mobility FinalPresentation Urban Mobility Final
Presentation Urban Mobility Final
 
KA6564 Assignment 4 - Urban Public Transport Report
KA6564 Assignment 4 - Urban Public Transport ReportKA6564 Assignment 4 - Urban Public Transport Report
KA6564 Assignment 4 - Urban Public Transport Report
 
Pimpri-Chinchwad Municipal Corporation BRTS Project
Pimpri-Chinchwad Municipal Corporation BRTS ProjectPimpri-Chinchwad Municipal Corporation BRTS Project
Pimpri-Chinchwad Municipal Corporation BRTS Project
 
Webinar Session: "BRT in India – a way forward"
Webinar Session: "BRT in India – a way forward"Webinar Session: "BRT in India – a way forward"
Webinar Session: "BRT in India – a way forward"
 
Note on T&T Issues in GM and MCGM's Initiatives and Policies_13th Jan 2015_V3
Note on T&T Issues in GM and MCGM's Initiatives and Policies_13th Jan 2015_V3Note on T&T Issues in GM and MCGM's Initiatives and Policies_13th Jan 2015_V3
Note on T&T Issues in GM and MCGM's Initiatives and Policies_13th Jan 2015_V3
 
Brts
BrtsBrts
Brts
 
Moscow, comprehensive mobility plan
Moscow, comprehensive mobility planMoscow, comprehensive mobility plan
Moscow, comprehensive mobility plan
 
Urban Transportation Market In India
Urban Transportation Market In IndiaUrban Transportation Market In India
Urban Transportation Market In India
 
Afa Interpretation Of Financial Statements Sbs Transist Vs Smrt
Afa Interpretation Of Financial Statements   Sbs Transist Vs SmrtAfa Interpretation Of Financial Statements   Sbs Transist Vs Smrt
Afa Interpretation Of Financial Statements Sbs Transist Vs Smrt
 
Data Compilation on Urban Metropolitan Transport Authority (UMTA) of Differen...
Data Compilation on Urban Metropolitan Transport Authority (UMTA) of Differen...Data Compilation on Urban Metropolitan Transport Authority (UMTA) of Differen...
Data Compilation on Urban Metropolitan Transport Authority (UMTA) of Differen...
 

Similar to BUS PROCUREMENT

Webinar: Planning, design, implementation and operation of the Yichang BRT co...
Webinar: Planning, design, implementation and operation of the Yichang BRT co...Webinar: Planning, design, implementation and operation of the Yichang BRT co...
Webinar: Planning, design, implementation and operation of the Yichang BRT co...BRTCoE
 
Bus system reform in India through JnNURM
Bus system reform in India through JnNURMBus system reform in India through JnNURM
Bus system reform in India through JnNURMJaspal Singh
 
Traffic Queueing analysis using VISSIM Software by RK
Traffic Queueing analysis using VISSIM Software by RKTraffic Queueing analysis using VISSIM Software by RK
Traffic Queueing analysis using VISSIM Software by RKRaam Krishna Prakash Jagali
 
Financial analysis of sahara darwaja case study
Financial analysis of sahara darwaja case studyFinancial analysis of sahara darwaja case study
Financial analysis of sahara darwaja case studyshubham sharma
 
IRJET- Traffic Analysis and Alternative Solution
IRJET- Traffic Analysis and Alternative SolutionIRJET- Traffic Analysis and Alternative Solution
IRJET- Traffic Analysis and Alternative SolutionIRJET Journal
 
BRT-System-in-Delhi-Presen-and-Future-Scenario_2010.pdf
BRT-System-in-Delhi-Presen-and-Future-Scenario_2010.pdfBRT-System-in-Delhi-Presen-and-Future-Scenario_2010.pdf
BRT-System-in-Delhi-Presen-and-Future-Scenario_2010.pdfranvirsahi1
 
94f86e45 9650-4b3c-8899-11ee30369769-converted
94f86e45 9650-4b3c-8899-11ee30369769-converted94f86e45 9650-4b3c-8899-11ee30369769-converted
94f86e45 9650-4b3c-8899-11ee30369769-convertedPARASMONGIA2
 
International Experience with Electric and Zero Emission Buses
International Experience with Electric and Zero Emission BusesInternational Experience with Electric and Zero Emission Buses
International Experience with Electric and Zero Emission BusesRay Minjares
 
SMART Seminar Series: A Systems approach to Transport Planning for Revitalizi...
SMART Seminar Series: A Systems approach to Transport Planning for Revitalizi...SMART Seminar Series: A Systems approach to Transport Planning for Revitalizi...
SMART Seminar Series: A Systems approach to Transport Planning for Revitalizi...SMART Infrastructure Facility
 
Dr. mohd . montazeri tehran metro
Dr. mohd . montazeri  tehran metroDr. mohd . montazeri  tehran metro
Dr. mohd . montazeri tehran metroIbrahim Al-Hudhaif
 
Minimization of Transportation Cost in Dairy Industry
Minimization of Transportation Cost in Dairy IndustryMinimization of Transportation Cost in Dairy Industry
Minimization of Transportation Cost in Dairy IndustryTHIRUPATHIRAJK
 
Indian railway ajmer
Indian railway ajmerIndian railway ajmer
Indian railway ajmerANKIT SHARMA
 
Indian railway ajmer
Indian railway ajmerIndian railway ajmer
Indian railway ajmerAkash Sharma
 
Bus-rev002.pptx
Bus-rev002.pptxBus-rev002.pptx
Bus-rev002.pptxRawanOdeh6
 

Similar to BUS PROCUREMENT (20)

Bus Karo 2.0 Webinar 1: Initiating City Bus Services
Bus Karo 2.0 Webinar 1: Initiating City Bus Services Bus Karo 2.0 Webinar 1: Initiating City Bus Services
Bus Karo 2.0 Webinar 1: Initiating City Bus Services
 
Webinar: Planning, design, implementation and operation of the Yichang BRT co...
Webinar: Planning, design, implementation and operation of the Yichang BRT co...Webinar: Planning, design, implementation and operation of the Yichang BRT co...
Webinar: Planning, design, implementation and operation of the Yichang BRT co...
 
City Bus Service Modernisation "BusKaroPlus" - Anjum Parwez, IAS
City Bus Service Modernisation "BusKaroPlus" - Anjum Parwez, IASCity Bus Service Modernisation "BusKaroPlus" - Anjum Parwez, IAS
City Bus Service Modernisation "BusKaroPlus" - Anjum Parwez, IAS
 
Bus system reform in India through JnNURM
Bus system reform in India through JnNURMBus system reform in India through JnNURM
Bus system reform in India through JnNURM
 
Traffic Queueing analysis using VISSIM Software by RK
Traffic Queueing analysis using VISSIM Software by RKTraffic Queueing analysis using VISSIM Software by RK
Traffic Queueing analysis using VISSIM Software by RK
 
Financial analysis of sahara darwaja case study
Financial analysis of sahara darwaja case studyFinancial analysis of sahara darwaja case study
Financial analysis of sahara darwaja case study
 
IRJET- Traffic Analysis and Alternative Solution
IRJET- Traffic Analysis and Alternative SolutionIRJET- Traffic Analysis and Alternative Solution
IRJET- Traffic Analysis and Alternative Solution
 
BRT-System-in-Delhi-Presen-and-Future-Scenario_2010.pdf
BRT-System-in-Delhi-Presen-and-Future-Scenario_2010.pdfBRT-System-in-Delhi-Presen-and-Future-Scenario_2010.pdf
BRT-System-in-Delhi-Presen-and-Future-Scenario_2010.pdf
 
94f86e45 9650-4b3c-8899-11ee30369769-converted
94f86e45 9650-4b3c-8899-11ee30369769-converted94f86e45 9650-4b3c-8899-11ee30369769-converted
94f86e45 9650-4b3c-8899-11ee30369769-converted
 
International Experience with Electric and Zero Emission Buses
International Experience with Electric and Zero Emission BusesInternational Experience with Electric and Zero Emission Buses
International Experience with Electric and Zero Emission Buses
 
Improvement of urban transport system
Improvement of urban transport systemImprovement of urban transport system
Improvement of urban transport system
 
Ind Rly
Ind RlyInd Rly
Ind Rly
 
SMART Seminar Series: A Systems approach to Transport Planning for Revitalizi...
SMART Seminar Series: A Systems approach to Transport Planning for Revitalizi...SMART Seminar Series: A Systems approach to Transport Planning for Revitalizi...
SMART Seminar Series: A Systems approach to Transport Planning for Revitalizi...
 
Dr. mohd . montazeri tehran metro
Dr. mohd . montazeri  tehran metroDr. mohd . montazeri  tehran metro
Dr. mohd . montazeri tehran metro
 
Minimization of Transportation Cost in Dairy Industry
Minimization of Transportation Cost in Dairy IndustryMinimization of Transportation Cost in Dairy Industry
Minimization of Transportation Cost in Dairy Industry
 
Rajkot BRTS
Rajkot BRTSRajkot BRTS
Rajkot BRTS
 
The white elephant -KSRTC
The white elephant -KSRTCThe white elephant -KSRTC
The white elephant -KSRTC
 
Indian railway ajmer
Indian railway ajmerIndian railway ajmer
Indian railway ajmer
 
Indian railway ajmer
Indian railway ajmerIndian railway ajmer
Indian railway ajmer
 
Bus-rev002.pptx
Bus-rev002.pptxBus-rev002.pptx
Bus-rev002.pptx
 

Recently uploaded

Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxkarenfajardo43
 
Mental Health Awareness - a toolkit for supporting young minds
Mental Health Awareness - a toolkit for supporting young mindsMental Health Awareness - a toolkit for supporting young minds
Mental Health Awareness - a toolkit for supporting young mindsPooky Knightsmith
 
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITWQ-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITWQuiz Club NITW
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfPrerana Jadhav
 
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxDIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxMichelleTuguinay1
 
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQ-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQuiz Club NITW
 
Scientific Writing :Research Discourse
Scientific  Writing :Research  DiscourseScientific  Writing :Research  Discourse
Scientific Writing :Research DiscourseAnita GoswamiGiri
 
How to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 DatabaseHow to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 DatabaseCeline George
 
Using Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea DevelopmentUsing Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea Developmentchesterberbo7
 
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnvESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnvRicaMaeCastro1
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Seán Kennedy
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17Celine George
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Association for Project Management
 
Multi Domain Alias In the Odoo 17 ERP Module
Multi Domain Alias In the Odoo 17 ERP ModuleMulti Domain Alias In the Odoo 17 ERP Module
Multi Domain Alias In the Odoo 17 ERP ModuleCeline George
 

Recently uploaded (20)

Mattingly "AI & Prompt Design: Large Language Models"
Mattingly "AI & Prompt Design: Large Language Models"Mattingly "AI & Prompt Design: Large Language Models"
Mattingly "AI & Prompt Design: Large Language Models"
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
 
Mental Health Awareness - a toolkit for supporting young minds
Mental Health Awareness - a toolkit for supporting young mindsMental Health Awareness - a toolkit for supporting young minds
Mental Health Awareness - a toolkit for supporting young minds
 
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITWQ-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdf
 
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxDIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
 
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQ-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
 
Scientific Writing :Research Discourse
Scientific  Writing :Research  DiscourseScientific  Writing :Research  Discourse
Scientific Writing :Research Discourse
 
How to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 DatabaseHow to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 Database
 
Using Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea DevelopmentUsing Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea Development
 
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnvESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
 
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of EngineeringFaculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
prashanth updated resume 2024 for Teaching Profession
prashanth updated resume 2024 for Teaching Professionprashanth updated resume 2024 for Teaching Profession
prashanth updated resume 2024 for Teaching Profession
 
How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
 
Multi Domain Alias In the Odoo 17 ERP Module
Multi Domain Alias In the Odoo 17 ERP ModuleMulti Domain Alias In the Odoo 17 ERP Module
Multi Domain Alias In the Odoo 17 ERP Module
 
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptxINCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
 

BUS PROCUREMENT

  • 1. Improvement of Public Transport by Procurement of Public Transport 1
  • 2. Gwalior Vidisha Sagar Jabalpur Satna Rewa Ratlam Singrauli Bhopal katniSagar Gwalior Vidisha 1. Bhopal 2. Jabalpur 3. Gwalior 4. Singrauli 5. Ratlam 6. Rewa 7. Satna 8. Murwara (Katni) 9. Vidisha 10.Sagar Map of Madhya Pradesh showing the identified 10 cities The assignment focuses on 10 major cities in the state of Madhya Pradesh 2
  • 3. JnNURM : Bus Procurement Scheme I & II JnNURM Bus Procurement 1 Bus Procurement 2 15000 Buses 525 Buses For 4 Cities of M.P SPV Constitution Package II 10 Cities/Cluster identification Ancillary structure Proposed 935 Buses Bhopal 225 Indore 175 Jabalpur 75 Ujjain 50 10000 Buses 3
  • 4. 1. Identification of Route Network for Public Transport. 2. Identification of clusters 3. Calculation of fleet size for city and clusters 4. Selection of feasible mode 5. Identification of Ancillary Infrastructure 6. Financial Viability of Organised Public Transportation System Objective of the Interim Report 4
  • 5. Progress of the Project Study of D.P, CDP, CMP, CTTS Related documents Reconnaissance survey Secondary Data collection Ridership estimation as per MoUD Guideline O & M Plan, Financial Model & Business PLAN/Life Cycle Cost Analysis Detail study of RFP, Guideline and Model D.P.R Route Rationalization For City/Cluster Literature Review Data Requireme nt Dataanalysis Stakeholder consultation InceptionreportInterimReport Mode selection Primary Data Collection Inception Interim Report Draft DPR Final DPR 5
  • 6. Policy formation SPV Formation Review & Assistance to take up JnNURM reforms Procurement and operation Handover to SPV ReCommendation /Proposals/Reports D.P.R Stakeholder consultation DraftDPRFinalDPR 6
  • 8. Methodology Landuse Integration With Route Network Classified Volume Count Road Inventory Occupancy Survey Identification of Cluster Opinion Survey at Bus Stand Infrastructure Gap Assessment Financial Assumption Out Come Ridership Estimation Corridor Wise /Clusters Ancillary Infrastructure Need Mode Selection For City/ Cluster Financial Out Comes (IRR) Stake Holder Consultation With ULB, Bus Operators Primary Survey Secondary Data CMP,DP,CDP Public Transport Network for City And Cluster Fleet Size for City And Clusters Bus Ancillary Infrastructure 8
  • 9. Approach to the Project Primary Data collection •Reconnaissance Survey and Road Inventory Surveys •Traffic volume count survey •Origin destination survey •Road user opinion survey Secondary data collection: •Existing transport related documents like CTTS, CMP,CDP •Existing ridership details and the details of ancillary structures Road network selection/ Route rationalisation: •Accessibilities from all parts of developmental areas to the city centre •Identifying and converting existing IPT and Complementary routes into bus routes where feasible •Prepare routes providing public transport under main cities with the nearby small towns Travel demand analysis: •Analyse the existing public transport demand beside the routes •Forecast the transport demand for the analysis period Headway calculation •For different types of buses based on travel demand on the various routes Fleet assessment (As per model DPR Methods): •As per method 2: fleet assessment on existing bus routes based on increasing calculated frequencies (headways) •As per method 3: fleet assessment for the new routes based on calculated frequencies. Costing and Funding Pattern: •Costing of the buses for selected specifications •Costing for proposed ancillary structures and ITS facilities The funding pattern •calculating the share between central and state govt. Financial Analysis: •Prepare input data for financial analysis •Calculating year wise net surplus •Calculating IRR 9
  • 12. Public Transport System Organised BCLL(SPV) 200 City Buses 20 AC Buses BRTS Unorganised Private Party Operator 507 Mini Buses 450 IPT 4 Trunk route (1 for BRTS) 8 Standard route 7 Complementary route 10 Intermediate Para- transit route Bhopal 12
  • 13. Exsisting Organised Public Transport Network TR-1 TR-2 TR-3TR-4 SR-5 SR-4 SR-3 SR-2 SR-1 SR-8 SR-6 AIRPOR T UPPERLAKE BHE L Bairagarh Shyamlahills MACT Laharp ur Dam Kaliyaso t Dam Arera colony v Neelbad, Ratibad Biargarh Chicahli Baghmugahlia extension, Maksi Bhaori,Meerpur,Prempura,etc Pipaliya Jaheerpir, Kanasayyea Khajurikalan, Basia TR-4 Route Route length No of Buses Headway in minute Origin & Destination TR-1 25.27 23 10 Chirayu Hospital – Aakriti Eco City TR-2 23.32 20 8 Bus Station – HEG Mandideep TR-3 27 13 16 Nariyel Kheda – Ayodhya Nagar TR-4 24 20 12 Bairagarh -HEG Mandideep SR -1 19.27 13 12 Lal ghati to to Bairagarh Chichali SR-2 19 13 16 Katara Hills-Nehru Nagar SR-3 20 14 12 Gandhi Nagar – Alpana Tiraha SR-4 26 24 8 Karond Chouraha- Baira Garh SR-5 26 21 12 Chirayu Hospital – Handicapped College SR-6 24 15 15 Oriental College – Rajiv Gandhi College SR-8 22 21 10 Bairagh Chichli – Coach Factory 13
  • 14. Neelbad/Ratibad Mandideep/ob edullaganj Bhauri Berasia Road Raisen Road Route Detail length No of Minibus Com 1 ( Ratibad to habibganj Naka) 15 78 Com 2 (Purani jail to Bairagarh chichali ) 11.32 74 Com 3 ( Misrod to hig misrod) 8.6 69 Com 4 (ISBT to Bgali gram ) 11.5 66 Com 5 (Mali khedi to Prabhat petrol pum) 19.27 78 Com 6 ( Daam kheda 1 to Habibganj naka) 19.27 77 Com 7 ( ISBT to rajeev Gandhi nagar) 12 65 Total Mini Bus 507 Magic Route No of Magic I.P.T 1 ( Khazoori sadak to Bairagarh Station) 10.1 55 I.P.T 2 (Khanugaon to Tajmahal ) 6 37 I.P.T 3(Borbai to railway colony) 9.8 47 I.P.T 4( Jagdish pur to Kroond chouraha) 7 45 I.P.T 5( Sas girls college to Jublie gate) 8.2 45 I.P.T 6 (Career college to ISRO GATE) 7.78 47 I.P.T 7 (Anand nagar to Bilkhiriya) 8.43 48 I.P.T 8 ( Avadhpuri khajuri kalan to Transport nagar) 8.47 49 I.P.T 9 (Akash ganga colony, to Salayeea ) 3.46 30 I.P.T 10( Manisha market to Baghmugaliya ) 7.9 47 Total 450 Existing IPT & Complementary Route 14
  • 15. • ISBT Terminal, Near Habibganj • Nadra Bus Stand, • Jawahar Chowk • Halalpura • Putlighar Halalpura Jawahar chowk ISBT Habibganj Nadra Bus stand Putlighar Public Transport Infrastructure In Bhopal Bus Depot/Stand/Terminal15 Anandpur BCLL Bairagarh
  • 16. Primary Survey Points (Outer Cordon) Mubarak pur Berasia Road Vidisha Road Raisen Road Hosangabad Road Kolar Road Bhadbhada Check Post Phanda Bypass 40KM 40KM 16
  • 17. Origin Destination Survey User Opinion Survey Trip Purpose Percentage Work 33.40% Business 13.30% Education 20.30% Social 21.10% Shopping 3.10% Recreation/ Tourism 0.80% Religious 3.90% Medical 4.10% Travel Time (minutes) Percentage <15 5.50% 15-30 71.90% 30-45 17.20% 45-60 3.80% >60 1.60% Mode Trip Length (km) Walk 0.54 Cycle 1.69 Two Wheeler 5.08 Auto/ Magics 2.47 Car/ Van 5.35 Mini Bus 5.02 Standard Bus 5.81 Travel Characteristics 7.14% 44.64% 5.36% 1.79% 35.71% 5.36% Modal Split Cycle Two Wheeler Car Auto/ Magics Mini Bus Standard Bus Auto Magic Mini Bus Bus Easy Availability 45.00% 63.00% 79.00% 71.00% Cheap Fare 6.00% 84.00% 86.00% 95.00% Comfortable 58.00% 84.00% 83.00% 88.00% Safe 67.00% 65.00% 83.00% 90.00% Good Crew Behavior 52.00% 72.00% 54.00% 86.00% Suggestion Auto Magic Mini Bus Bus Increase the fleet 62.00% 73.00% 72.00% 75.00% Increase Coverage Area 65.00% 66.00% 59.00% 73.00% Increase Frequency in Peak Hour 73.00% 71.00% 72.00% 80.00% Improve Crew Behavior 59.00% 65.00% 55.00% 26.00% Reduce Fare 90.00% 33.00% 31.00% 16.00% Questions Car Two Wheeler Auto Magic Mini Bus Increase the Frequency 15% 36% 86% 76% 94% Increase Coverage Area 23% 38% 88% 82% 96% Reduce Fare 5% 26% 86% 88% 95% New Bus Type 7% 15% 22% 35% 88%
  • 18. Purpose Per Capita Trip Rate Excluding Walk (PCTR) Work 0.54 Education 0.13 Other 0.14 Total 0.81 Year PCTR 2013 0.81 2015 0.82 2021 0.87 2023 0.89 PCTR Forecasting Travel Demand Calculation Bhopal Organized Public Transport Demand Calculation for Bhopal City: Population: 1798218 PCTR: 0.81 Estimated/ Desirable base year travel demand for public transport is 55% Estimated/ Desirable base year travel demand for bus/ organized public transport is 40% Total organized public transport trips for city: (Population X PCTR) X 40% : 579746 person trips
  • 19. Steps: 1. Defined study area around the routes (500-700 m each side) 2. Estimated travel demand for each routes 3. Forecast travel demand for each routes 4. Estimated peak hour travel demand for each route 5. Estimated/ Calculated Headways: Headway=(Sitting Capacity × Load Factor×60)÷Peak Hour Demand 6. Estimated net fleet size calculation: Required No of fleet=(Round travel time by bus including stopping time ÷ Headways) + No of extra vehicle + Maintenance float 7. Calculated Total no of fleets taking 90% fleet utilization: Total no of fleet=required no of fleets÷90% Route Wise Fleet Size Calculation Methods 19
  • 20. Routes Total Demand Peak Point Demand Sitting Capacity Load Factor Headway Number of Vehicles TR1 41638 4934 44 0.65 8 23 TR2 38018 4505 44 0.65 8 21 TR3 18102 2145 44 0.65 12 15 TR4 24684 2925 75 0.65 5 5 TR4 78205 9267 44 0.65 5 27 SR1 18828 2231 44 0.65 10 13 SR2 21722 2574 44 0.65 10 15 SR3 34398 4076 44 0.65 8 19 SR4 62753 7436 44 0.65 6 26 SR5 41638 4934 44 0.65 8 23 SR6 21722 2574 44 0.65 10 15 SR7 15688 1859 44 0.65 12 13 SR8 38018 4505 44 0.65 8 21 Fleet Size for Existing Route 20
  • 21. Routes Total Demand Peak Point Demand Sitting Capacity Load Factor Headway Number of Vehicles C1 13275 1573 44 0.65 12 11 C2 10861 1287 44 0.65 12 9 C3 9654 1144 44 0.65 12 8 C4 10861 1287 44 0.65 12 9 C5 15688 1859 44 0.65 12 13 C6 15690 1859 44 0.65 12 13 C7 10861 1287 44 0.65 12 9 IPT1 1982 235 24 0.65 20 5 IPT3 1973 234 24 0.65 20 5 IPT4 1979 235 24 0.65 20 5 IPT5 1976 234 24 0.65 20 5 IPT6 1977 234 24 0.65 20 5 IPT8 1975 234 24 0.65 20 5 IPT9 1587 188 24 0.65 20 4 IPT10 1978 235 24 0.65 20 5 Fleet Size for Proposed Routes 21
  • 22. 15 KM 40 KM 50 KM N OBEDULLAGANJ MANDIDEEP RAISEN SEHOR E BERASIYA NH-12 NH-12 TOWARDS GWALIOR TOWARDS VIDISHA VIDISHA NH-86 TOWARDS SAGAR TOWARDS INDORE NH-86 Railway line BHOPAL 15KM 40KM 50KM MP SH 19/NH89 NH12 NH-86 22
  • 23. N OBEDULLAGANJ MANDIDEEP RAISEN SEHOR E BERASIYA NH-12 NH-12 TOWARDS GWALIOR TOWARDS VIDISAH VIDISHA NH-86 TOWARDS SAGAR TOWARDS INDORE NH-86 BHOPAL Phandakalan Khajuri sadak Lambakheda Eint Khedi Binapur Village Nipania Jaat Village Hinoti Village Harrakheda Chopra kalanv Sukhi sewaniya Salamtpur Sanchi Bilkhiriya Kalan Piplakhiriya Industial Area Dargahe shariif Ratnapu r Bishankheda 23
  • 24. Routes Total Demand Peak Point Demand Sitting Capacity Load Factor Headway Number of Vehicles Cluster 1 (Bhopal to Obedullaganj) 4063 482 44 0.65 25 7 Cluster 2 (Bhopal to Raisen) 4641 550 44 0.65 25 8 Cluster 3 (Bhopal to Vidisha) 5215 618 44 0.65 25 9 Cluster 4 (Bhopal to Sehore) 4055 480 44 0.65 25 7 Cluster 5 (Bhopal to Berasia) 4059 481 44 0.65 25 7 Fleet Size for Cluster Routes 24
  • 25. Total required buses for Bhopal city (A+B+C)=385 Calculations for net fleet requirement: Bus fleet required = (385/ 90) × 100 =428 buses Net fleet required = Bus fleet required – existing buses in good condition Net fleet required = 428– 197 = 231 buses Articulated Buses 5 Low Floor (up to 400mm) Fully Built AC Buses . 11 Semi Low Floor (up to 900mm) Fully Built Non-AC Buses 172 Midi buses ( Non – AC) 43 Inter City Intra city 231 25
  • 26. Operatingassumptions Useful Life of Buses 8.5 Lakh kms Driver/ Bus 2.5 nos. Conductor /bus 2.5 nos. Maintenance staff/ bus 0.5 nos Reduction in fuel efficiency 2% p.a Load Factor ( For first two year ) 65% increase in Load factor 3% p.a. Max Load factor 75% BusSpecificationsandRate Assumptions Standard Low Floor AC Buses (400 mm Platform) 44 Standard Semi Low Floor AC Buses (upto 900 mm) 44 Standard Non A/C Diesel Midi Bus 24 Articulated Buses 75 Rate Assumptions Diesel per litre 58 Cost of Driver per month 15,000 Cost of conductor per month 10,000 Cost of maintenance staff per month 22,000 Escalation Manpower cost 7.5 % p.a. Fare Rates 12.0 % p.a. Advertisement Revenue 5.0 % p.a Fuel cost increase 5.0 % p.a Maintain cost 12.0% p.a OtherAssumptions Depreciation Rate 10 % p.a. Salvage value of old Bus (Rs) 2.5 lakh Residual value for Depots 25 % Insurance 3.0 % of capital value Other maintenance cost 5% of capital value Financial Assumptions 26
  • 27. • Total Cost Including State Govt. Taxes (A) Rs 125.98 Crore Bus fleet cost 231 Buses (A) • Total cost Rs 4.41 Crore ITS Facilities cost ETVMS,PIS CCR (B) • Total cost( Up gradation and development of new terminal ) Rs 20.50 Crore Support Infrastructure ( C ) Total Cost = Rs 150.90 Crore U.L.B State Govt of India JnNURM Funding Pattern 50% 30% 20% 27
  • 29. Cash Flow Statement Cash Flow Values (Lakhs) Capital Expenditure/ Salvage Value Buses 577.5 Depots/ Terminal 512.5 ITS 66.15 Total Salvage Value 1156.15 Net Surplus 20190 Total Cashflow 3465 With Grant Grant amount 5101 Cashflow with grant 11384.55 IRR without grant (in %) 4.75 % IRR with grant (in %) 17.00 % 29 -169 205 659 1012 1423 1899 2449 3084 3815 4655 -2000 0 2000 4000 6000 8000 10000 12000 14000 16000 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Bhopal Total Revenue (in Lakh) Total Expenses (in Lakh) Net Surplus (in Lakh) Year 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Daily Per Bus Revenue -201 244 782 1201 1688 2253 2905 3658 4525 5521
  • 31. Public Transport System JCTSL(SPV) 119 City Buses (19 Routes) Proposed BRTS Private Party Operator Private Buses Magic and Auto 31
  • 32. Existing Bus Route Network Existing Route Network 32
  • 33. Fleet Size for Existing Route 33 Routes Total Demand Peak Point Demand Sitting Capacity Load Factor Headway Number of Vehicles Karmeta to Rlwy stn Pf no. 1 via Kachnar city 12816 1153 44 0.65 15 10 Golbazar to tak shila via Jamdar Hospital 6933 624 24 0.65 15 10 Bus stand (Damohnaka) to Gwarighat via Ranital 12711 1144 44 0.65 15 10 Manegaon Ranjhi to Gwarighat Via GCF 9015 811 24 0.65 15 13 Manegaon Ranjhi to Gwarighat Via Satpula 9022 812 24 0.65 15 13 Rlwy stn Pf no. 1 to Bhedaghat Via Nagrath Chaowk 16533 1488 44 0.65 15 13 Richhai Ind arra to Ranjhi Via Maharajpur 7633 687 24 0.65 15 11 Civic Center to Dhanvantri nagar Via Dababazar 5556 500 24 0.65 15 8 Medical to University (IIITDM) Via Shastrinagar 7589 683 24 0.65 15 11 Karmeta to Ghana Via Collectorate 20344 1831 44 0.65 15 16 Mother eresa to Khamariya Via Ghataghar 19067 1716 44 0.65 15 15 Dhanwantri nagar Khamariya Via Collectorate 10086 908 44 0.65 15 8 Panager to Ghaamapur Via Maharajpur 10178 916 44 0.65 15 8 Panager to Gohalpur Via Maharajpur 11444 1030 44 0.65 15 9 Rly Stn PF4 to Bhedaghat Via Medical 6244 562 24 0.65 15 9 Deen Dayal Chowk to Gwarighat Geetadham Via Sajan Chowk 7734 696 24 0.65 15 11 Bus stand (Kshtriya) to Bhedaghat Via Medical 10216 919 44 0.65 15 8 Panaghar To Barela Via Khetriya Bus Stand 12687 1142 44 0.65 15 10 Ghana Tilwara to Gour Barela Via Rasal Chowk 12841 1156 44 0.65 15 10
  • 34. Fleet Size for Proposed Route 34 Routes Total Demand Peak Point Demand Sitting Capacity Load Factor Headway Number of Vehicles Agriculture College to Gwari Ghat 17167 1545 44 0.65 10 9 Tilwara Ghat to Khamaria 22889 2060 44 0.65 10 12
  • 36. 36 Routes Total Demand Peak Point Demand Sitting Capacity Load Factor Headway Number of Vehicles Cluster 1 (Jabalpur to Patan) 6203 558 44 0.65 25 8 Cluster 2 (Jabalpur Bhedaghat) 6111 550 44 0.65 25 8 Cluster 3 (Jabalpur Shahpur (via Sajapur)) 6104 549 44 0.65 25 8 Cluster 4 (Jabalpur Sihora via Panangra (Ordinance factory )) 6876 619 44 0.65 25 9
  • 37. Calculations for net fleet requirement: Considering fleet utilization of 90% for Jabalpur; Bus fleet required = (buses required in operations / 90) * 100 Bus fleet required = (250/ 90) * 100 =278 buses Net fleet required = Bus fleet required – existing buses in good condition Net fleet required = 278– 120 = 158 buses Inter City Intra city 158 37
  • 38. Funding Pattern • Total Cost Including State Govt. Taxes (A) • 9023.25 Lakh Bus fleet cost 158 Buses (A) • Total cost 154 Lakh ITS Facilities cost ETVMS,PIS CCR (B) • Total cost( Up gradation and development of new terminal )2475 Lakh Support Infrastructure ( C ) U.L.B State Govt of India JnNUM Funding Pattern 50% 30 % 20% 38
  • 39. 39
  • 40. 40 Cash Flow Values (Lakhs) Capital Expenditure/ Salvage Value Buses 395 Depots/ Terminal 618.75 ITS 23.10 Total Salvage Value 1036.85 Net Surplus 15095.84 Total Cashflow 3443.59 With Grant Grant amount 4611.63 Cashflow with grant 7976.21 IRR without grant (in %) 3.83% IRR with grant (in %) 14.8 % -240 11 315 683 1126 1481 1891 2363 2905 3528 -2000 0 2000 4000 6000 8000 10000 12000 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Jabalpur Total Revenue (in Lakh) Total Expenses (in Lakh) Net Surplus (in Lakh) Year 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Daily Per Bus Revenue -417 20 547 1185 1953 2569 3280 4098 5038 6118
  • 42. Gwalior 4th Largest city in Madhya Pradesh in term of population Organised Public Transport Absent Gwalior Municipal corporation Population. 10,53,505 Vikram are the major form of public transport in Gwalior city • Large percentage of land is still not developed and can be acquired for future development Real estate Development(TOD) Public Transport SustainableDevelopment 42
  • 43. Existing Travel Characteristics 38.04% 30.80% 1.82% 3.62% 5.41% 18.12% 1.64% 0.55% Modal Split Cycle Two Wheeler Car Vikram Bus Tampo Mode Trip Length < 2 kms 2 - 4 kms 4-6 kms 6-8 kms > 8 kms Car 3% 7% 12% 16% 22% Two Wheeler 46% 49% 51% 46% 40% Vikram/IPTs 9% 18% 19% 23% 32% Cycles/NMV 42% 26% 18% 15% 6% Per capita trip rate (PCTR) has been estimated as given below for the City. Including walk trips : 1.4 Excluding walk trips : 1.1 Purpose Percentage Work 38% Bussiness 16% Education 23% Social/ Recreation 8% Leisure 9% Other 6% Existing daily ridership by public vehicle: 153823 Existing Public Transport Demand: 185549 Modes No of Vehicle Operating Vikram 306 Magic 86 Minibus 5 Tempo 139 Tongas 15 Total 551 43
  • 44. 44
  • 45. Sl.No. Route Length of Route Peak hour PCU lane configuration travel speed (kmph) Level of Service (LoS) 1 Murar To Central Library (Maharaja Bada) 10 4167 4 lane 25 C 2 Deendayal Nagar to Sindhi Colony 15 3245 2 lane 15 C 3 IIITM Gwalior to Sindhi Colony 11 4208 4 lane 15 D 4 Hurawali Square Murar to Gwalior Fort 13 2961 2 lane 20 D 5 Murar 7 No. Sq to Chandra Wadani Naka 9 3364 2 lane 25 C 6 IIITM Gwalior to Harikheda Jagar road 13 2858 4 Lane 25 C 7 Nav Graha Mandir Tighra Road to Gole ka Mandir 12 3156 4 Lane 20 C 8 Gwalior Railway Station to Gudagudi Ka Naka 11 3950 2 Lane 25 D Existing Routes 45
  • 46. Proposed Bus Route and Fleet size for Gwalior 11 Buses Central Library Murar 10km 14 Buses DeenDa yal Nagar Sindhi colony 20km 12 BusesIIITM Gwalior Sindhi Colony 16km 13 BusesHurawa li Gwalior fort 18km Murar 7 14km Chandra wadhni Naka 11 Buses IIITM Gwalior 18km Harikhe da Jagar Road 13 Buses Nav Graha mandir 17km Gole ka mandir 13 Buses Gwalior Railway Station 16km Gudaga udi Ka Naka 12 Buses Proposed Public Route Network Total Required buses for Gwalior city =99 46 Gwalior Route Name Daily Travel Demand Murar To Central Library (Maharaja Bada) 18386 Deendayal Nagar to Sindhi Colony 23400 IIITM Gwalior to Sindhi Colony 20057 Hurawali Square Murar to Gwalior Fort 21729 Murar 7 No. Sq to Chandra Wadani Naka 18386 IIITM Gwalior to Harikheda Jagar road 21725 Nav Graha Mandir Tighra Road to Gole ka Mandir 21729
  • 47. Bamore Malanpur BSF Colony(Beragarh) CRPF Colony Panihar Proposed Clusters 8 BusesGwalior Morena 38 km 8 BusesGwalior Dabra 38 km 8 BusesGwalior Gohad 45 km 6 BusesGwalior Anatari 26 km Total Required buses for Cluster cities = 30 47 Route Name Daily Travel Demand Gohad Via Malanur 5355 Dabra (Via Bilaua ) 5357 Morena (Via Bamore) 5359 Antari 4014
  • 48. Calculations for net fleet requirement: Considering fleet utilization of 90% for Gwalior; Bus fleet required = (buses required in operations / 90) * 100 Bus fleet required = (129/ 90) * 100 = 144 buses Net fleet required = Bus fleet required – existing buses in good condition Net fleet required =144 – 0 = 144 buses Inter City Intra city 144 Standard AC Midi Buses 15 Standard Non-AC Midi Buses. 129 48
  • 49. • Total Cost Including State Govt. Taxes (A) • 4256.25 Lakh Bus fleet cost 144 Buses (A) • Total cost 147 Lakh ITS Facilities cost ETVMS,PIS CCR (B) • Total cost( Up gradation and development of new terminal )1150 Lakh Support Infrastructure ( C ) Total Cost = 5553.2 Lakh U.L.B State Govt of India JnNUM Funding Pattern 50% 30 % 20% 49
  • 51. Cashflow Capital Expenditure/ Salvage Value Buses 360 Depots/ Terminal 287.5 ITS 22.05 Total Salvage Value 669.55 Net Surplus 7540.26 Add: Description Total Cashflow 1987.01 With Grant Grant amount 2228.125 Cashflow with grant 4143.13 IRR without grant (in %) 4.35 IRR with grant (in %) 15.6 Cash Flow Statement 51 -300 -121 99 264 458 683 944 1247 1598 2002 -1000 0 1000 2000 3000 4000 5000 6000 7000 8000 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Gwalior Total Revenue (in Lakh) Total Expenses (in Lakh) Net Surplus (in Lakh) Year 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Daily Per Bus Revenue -571 -231 189 503 872 1300 1797 2373 3041 3809
  • 53. U.P U.P Singraullia Singrauli Waidhan VINDHAYNAGAR Bargawan Railway station Singrauli Bus Stand Sankat Mochan Mandir Oasis Medical Store Shivaji Complex Dr Lal Patho Lab 53 Singrauli Vindhya Nagar Waidhan Sankat Mochan Mandir Oasis Medical Store Shivaji Complex Dr Lal Patho Lab
  • 54. 54
  • 55. Proposed Bus Route for Singrauli 4 BusesNCL Hospital Coal mine morwa 6 km Circuit House Junction 14km Navjeevn vihar junction 13 Buses Civil Court Waidhan 20 km Khadia Market 7 Buses Ragahv Nagar 10km Officers Club 6 Buses Khadia Colony 11km Khadia Junction 7 Buses 55 Bus Stand Route Name Daily Travel Demand Raghavnagar(Morwa) to Officers Club via. NCL Hospital 8643 NCL Hospital to Coal Mines via. Govt Girls School 3843 Khadia Colony to Khadia Market via. NTPC Area 10086 Vidhyanagar to Khadia Market via. Jayant Police Station 6729
  • 56. Calculations for net fleet requirement as per proposed frequency/headway (B): Net fleet required = Bus fleet required – existing buses in good condition Net fleet required = 24– 0 = 24 Considering fleet utilization of 90% for Singrauli; Bus fleet required = (buses required in operations (A+B) / 90) * 100 Bus fleet required = ( ( 24 + 10 ) / 90) * 100 = 38 buses = 38 buses Inter City Intra city 38 Non-AC Midi Buses for intra city 12 Non-AC Midi Buses for cluster city service 26 56
  • 57. • Total Cost Including State Govt. Taxes (A) • 863 Lakh Bus fleet cost 38 Buses (A) • Total cost 94 Lakh ITS Facilities cost ETVMS,PIS CCR (B) • Total cost( Up gradation and development of new terminal) 505 Lakh Support Infrastructure ( C ) Total Cost = 1461.60 Lakh • 790.00 LakhGoI • 671.52 Lakh State & ULB • 1461.60 LakhTotal State and ULB Govt. of India JnNURM Funding Pattern 80% 20% 57
  • 58. 0 200 400 600 800 1000 1200 1400 1600 1800 2000 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Fare Revenue (in Lakh) Non- fare Revenue (in Lakh) 58
  • 59. Cash flow Statement Cash Flow Values in Lakhs Capital Expenditure/ Salvage Value Buses 95 Depots/ Terminal 126.25 ITS 14.1 Total Salvage Value 235.35 Net Surplus 1996 Total Cashflow 534 With Grant Grant amount 790.08 Cash flow with grant 1305.39 IRR without grant (in %) 3.79% IRR with grant (in %) 21.3% 0 500 1000 1500 2000 2500 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Total Revenue (in Lakh) Total Expenses (in Lakh) 59 -101 -52 9 56 111 174 248 334 433 548 -500 0 500 1000 1500 2000 2500 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Singrauli Total Revenue (in Lakh) Total Expenses (in Lakh) Net Surplus (in Lakh) Year 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Daily Per Bus Revenue -729 -375 65 404 801 1255 1789 2409 3122 3951
  • 61. Ratlam Ratlam Municipal corporation Population 264,810 Organised Public Transport Absent Auto, Tempo, Magic are the existing public transport in Ratlam city • Existing daily public transport ridership is 44603 • Ratlam has many major industries like G.P.Wires, Ratlam Wires, IPCA laboratories that produce enough trips of public transport 61
  • 62. Landuse and Road Network Ratlam Jain Hospital HPCL Petrol Pump VIP Road Bypass Intersection Ajmera Steels 5 Survey Points Jain Hospital VIP Road Bypass Intersection Ajmera Steels HPCL Petrol Pump Bus Stand 62
  • 63. 63
  • 64. Existing Travel Characteristics Mode Trip Length < 2 kms 2 - 4 kms 4-6 kms 6-8 kms > 8 kms Car 5% 8% 14% 15% 21% Two Wheeler 48% 50% 55% 53% 43% Autos/IPTs 11% 13% 20% 20% 28% Cycles/NMV 36% 29% 11% 12% 8% Per capita trip rate (PCTR) has been estimated as given below for the City. Including walk trips : 1.4 Excluding walk trips : 1.0 Mode No Autos 62 Magic 75 Tempo Rikshaws 40 Total 177 49.32% 10.96% 21.92% 17.81% Modal Split Two Wheeler Car Auto/ Magics Cycle Purpose Percentage Work 35% Business 22% Education 11% Social/ Recreation 13% Leisure 10% Other 9% Existing daily travel demand in proposed public transport coverage area is 38429 i.e. per capita trip rate (bus) is 0.17 Forecasted daily public transport travel demand (bus) estimated as near 82091 in next 10 years 64
  • 65. Proposed Bus Route and Fleet Size Hanuma n temple 9 km Nahar convent school 06 km Shakti fuel Point Triveni kund 12 km Ayodhya Basti Railway station 5 Bus 5 Bus 5 Bus Headway variation Proposed Bus Route and fleet size Industrial Belt 65 Route Name Daily Travel Demand Ayodhya Basti - Railway Station (via District Civil Hospital) 10286 Shakti fuel point (Jaora road- Ratlam By-pass junction) Via Anaj mandi (NH-927 A) to Triveni Kund (triveni Road) 6857 Bada Hanuman Mandir (NH-927 A) - Shri Nahar convent Playground (Ratlam Shivgarh Road) via. Amrit Sagar Garden 6855
  • 66. Ratlam 9 km Sailana 06 km Ratlam Jaora 12 km Ratlam Petalwad 5 Bus 5 Bus 5 Bus Ratlam 9 km Badanw ar 5 Bus 66 Route Name Daily Travel Demand Ayodhya Basti - Railway Station (via District Civil Hospital) 10286 Shakti fuel point (Jaora road- Ratlam By-pass junction) Via Anaj mandi (NH-927 A) to Triveni Kund (triveni Road) 6857 Bada Hanuman Mandir (NH-927 A) - Shri Nahar convent Playground (Ratlam Shivgarh Road) via. Amrit Sagar Garden 6855
  • 67. Calculations for net fleet requirement: Considering fleet utilization of 90% for Ratlam; Bus fleet required = (45/ 90) * 100 = 50 buses Net fleet required = Bus fleet required – existing buses in good condition Net fleet required =50 – 0 = 50 buses Inter City Intra city 50 Non-AC Midi Buses for intra city 17 Non-AC Midi Buses for cluster city service 33 67
  • 68. • Total Cost Including State Govt. Taxes (A) • 1418.75 Lakh Bus fleet cost 50 Buses (A) • Total cost 100 Lakh ITS Facilities cost ETVMS,PIS CCR (B) • Total cost( Up gradation and development of new terminal) 460 Lakh Support Infrastructure ( C ) Total Cost = 1978.75 Lakh • 1235 LakhJnNURM • 743.75 LakhState & ULB • 1978.75 LakhTotal State and ULB JnNURM Funding Pattern 80% 20% 68
  • 69. 0 500 1000 1500 2000 2500 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Fare Revenue (in Lakh) Non- fare Revenue (in Lakh) 69
  • 70. Cash flow Statement Cash Flow Values in Lakhs Capital Expenditure/ Salvage Value Buses 125 Depots/ Terminal 115 ITS 15 Total Salvage Value 255 Net Surplus 2572 Total Cashflow 593 With Grant Grant amount 1235 Cash flow with grant 1802.78 IRR without grant (in %) 3.20% IRR with grant (in %) 25.5% 0 500 1000 1500 2000 2500 3000 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Total Revenue (in Lakh) Total Expenses (in Lakh) 70 -133 -68 12 73 145 229 326 440 570 721 -500 0 500 1000 1500 2000 2500 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Ratlam Total Revenue (in Lakh) Total Expenses (in Lakh) Net Surplus (in Lakh) Year 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Daily Per Bus Revenue -729 -373 66 400 795 1255 1787 2411 3124 3951
  • 72. Rewa Rewa Municipal corporation Population 2,35,422 Organised Public Transport Absent IPT is the existing public transport in Rewa city • Rewa is a tourist spot which attract trips from all over India • Roads are under development with suitable road width for public transport • Existing daily public transport ridership is 51679 72
  • 73. Rewa NH-7 NH-7 Road Network in Radial Pattern Gudh Satna Gadhwa Allahabad NH-7 Divides City into 2 Parts NH-7 caters the highest traffic of the city Sufficient Road width is Available Vindhya Telelink limited APS University Govt Engg College Rewa Rewa Railway Station Major Land Mark Anantpur Karahiya Mandi Chorhat Badraon Babpur Industrial Area Rathara Vindya Telelinks Rewa Engineering College Hospital Chowk Bus Stand 73
  • 74. 74
  • 75. Existing Travel Characteristics Per capita trip rate (PCTR) has been estimated as given below for the City. Including walk trips : 1.4 Excluding walk trips : 1.1 Purpose Percentage Work 37% Business 18% Education 19% Social/ Recreation 12% Leisure 8% Other 6% Existing daily travel demand in proposed public transport coverage area is 50308. Forecasted daily public transport travel demand (bus) estimated as near about 71869 in next 10 years Mode Trip Length < 2 kms 2 - 4 Kms 4-6 Kms 6-8 Kms > 8 Kms Car 3% 9% 12% 14% 20% Two Wheeler 49% 55% 56% 53% 42% Autos/IPTs 12% 12% 20% 22% 30% Cycles/NMV 36% 24% 12% 11% 8% Vehicle Mode Total Autos 100 Jeep 10 Magic 80 Tempo Rikshaw 35 Grand Total 225 48.05% 15.58% 24.68% 11.69% Modal Split Two Wheeler Car Auto/ Magics Cycle 75
  • 76. Rewa Proposed Bus Route Network Maihar railway station 13 km Bichiya Kabrista n 8 Buses Hospital Chowk 07 km Ituara 4 Buses Sardar Patel 06 km Area Jori 4 Buses Hotel Land mark 14 km Pentium Point 8 Buses Proposed Bus route for Rewa 11456 10989 3567 3998 76
  • 77. Rewa Proposed Bus Route Network Rewa 38 km semaria6 Buses Rewa 22 km Gruh 5 Buses Rewa 20 km Govind garh 5 Buses Rewa 27 km Sirmor 5 Buses Rewa 30 km Mangw an 6 Buses Rewa 53 km Satna 8 Buses Sirmor Semaria Satna Govindgarh Gurh Mangawan Cluster Demand Govindgarh 2901 Mangawa 3332 Sirmour 2799 Gurh 2989 Satna 4599 Semaria 3678 77
  • 78. Calculations for net fleet requirement: Considering fleet utilization of 90% for Ratlam; Bus fleet required = (59/ 90) * 100 = 66 buses Net fleet required = Bus fleet required – existing buses in good condition Net fleet required =66 – 0 = 66 buses Inter City Intra city 66 Non-AC Midi Buses for intra city 27 Non-AC Midi Buses for cluster city service 39 78
  • 79. • Total Cost Including State Govt. Taxes (A) • 1872.75 Lakh Bus fleet cost 66 Buses (A) • Total cost 108 Lakh ITS Facilities cost ETVMS,PIS CCR (B) • Total cost( Up gradation and development of new terminal) 575 Lakh Support Infrastructure ( C ) Total Cost = 2555.75 Lakh • 1598.20 LakhGoI • 957.55 Lakh State & ULB • 2555.75 LakhTotal State and ULB Govt. of India JnNURM Funding Pattern 80% 20% 79
  • 80. 0 500 1000 1500 2000 2500 3000 3500 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Fare Revenue (in Lakh) Non- fare Revenue (in Lakh) 80
  • 81. Cash flow Statement Cash Flow Values in Lakhs Capital Expenditure/ Salvage Value Buses 165 Depots/ Terminal 143.75 ITS 16.2 Total Salvage Value 324.95 Net Surplus 3383 Total Cashflow 827 With Grant Grant amount 1598.2 Cash flow with grant 2392.22 IRR without grant (in %) 3.65% IRR with grant (in %) 26.1% 0 500 1000 1500 2000 2500 3000 3500 4000 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Total Revenue (in Lakh) Total Expenses (in Lakh) 81 -176 -89 15 97 192 303 431 580 753 951 -500 0 500 1000 1500 2000 2500 3000 3500 4000 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Rewa Total Revenue (in Lakh) Total Expenses (in Lakh) Net Surplus (in Lakh) Year 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Daily Per Bus Revenue -731 -370 63 403 798 1258 1790 2408 3126 3948
  • 83. Satna Satna Municipal Corporation Population 2,29,307 Organised Public Transport Absent IPT is the existing public transport in Satna city • A number of cement factories are situated in Satna that is major trip generator • Roads are newly developed with suitable road width for public transport • Existing daily public transport ridership is 29420 83
  • 84. Satna Landuse Satna Station Satna Bus Stand Allahabad Chitrakoot Road (Khaira) Kripalpur Basti Chakbandi Etora Panna Khajuraho Road Yash Petrol Pump Vindya Club City Police Station Birla Cancer Hospital 5 Survey Points Bus Stand Panna Khajuraho Road = 30 m Chitrakot Road = 25 m Birla Cement Factory Road = 27 m Bus Stand 84
  • 85. 85
  • 86. Existing Travel Characteristics Per capita trip rate (PCTR) has been estimated as given below for the City. Including walk trips : 1.42 Excluding walk trips : 1.05 Purpose Percentage Work 32% Business 22% Education 19% Social/ Recreation 12% Leisure 11% Other 4% Existing daily travel demand in proposed public transport coverage area is 38130 i.e. per capita trip rate (bus) is 0.13 Forecasted daily public transport travel demand (bus) estimated as near about 60000 in next 10 years Average trip length • Public transport user trip: 4 kms • Excluding walk trip: 6.2 kms 41.67% 11.11% 16.67% 30.56% Modal Split Two Wheeler Car Auto/ Magics Cycle 86
  • 87. Satna Maiher Bypass MDR11 10 km Lovedal e school 7 Buses Mukhtiy arganj 9 km Trichi colony 6 Buses Maiher bye pass 11km Sohawa l Road 7 Buses Proposed Bus Route for Satna 87 Route Name Daily Travel Demand Maihar Bye pass road junction to (PEPTECH City)Sohawal Road Junction via Circuit House 7060 Mukhtiyarganj Civil line road to TRICHI Colony on Satna Birsinghpur Road( via railway station and bus stand) 6050 Mukhtiyarganj Civil line road to TRICHI Colony on Satna 10084
  • 88. Satna Cluster Satna 40 Km Maihar (VIA Uccher a) 8 Buses Satna 32 km Birsingh pur 7 Buses Satna 28 Km Nagod 5 Buses Satna 38 km Amarpa tan6 Buses Satna 37 km Majhga wa 6 Buses Satna 33 km Rampur Baghel an 7 Buses 88 Route Name Daily Travel Demand Satna to Nagod 2020 Satna to Birsinghpur 5044 Satna to Maihar (VIA Ucchera) 5764 Satna to Rampur Baghelan 3530 Satna to Majhgawa 3466 Satna to Amarpatan 2420
  • 89. Calculations for net fleet requirement: Considering fleet utilization of 90% for Ratlam; Bus fleet required = (59/ 90) * 100 = 66 buses Net fleet required = Bus fleet required – existing buses in good condition Net fleet required =66 – 0 = 66 buses Inter City Intra city 66 Non-AC Midi Buses for intra city 23 Non-AC Midi Buses for cluster city service 43 89
  • 90. • Total Cost Including State Govt. Taxes (A) • 1872.75 Lakh Bus fleet cost 66 Buses (A) • Total cost 108 Lakh ITS Facilities cost ETVMS,PIS CCR (B) • Total cost( Up gradation and development of new terminal) 575 Lakh Support Infrastructure ( C ) Total Cost = 2555.75 Lakh • 1598.20 LakhJnNURM • 957.55 LakhState & ULB • 2555.75 LakhTotal State and ULB JnNURM Funding Pattern 80% 20% 90
  • 91. 0 500 1000 1500 2000 2500 3000 3500 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Fare Revenue (in Lakh) Non- fare Revenue (in Lakh) 91
  • 92. Cash flow Statement Cash Flow Values in Lakhs Capital Expenditure/ Salvage Value Buses 165 Depots/ Terminal 143.75 ITS 16.2 Total Salvage Value 324.95 Net Surplus 3383 Total Cashflow 827 With Grant Grant amount 1598.2 Cash flow with grant 2392.22 IRR without grant (in %) 3.65% IRR with grant (in %) 26.1% 0 500 1000 1500 2000 2500 3000 3500 4000 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Total Revenue (in Lakh) Total Expenses (in Lakh) 92 -176 -89 15 97 192 303 431 580 753 951 -500 0 500 1000 1500 2000 2500 3000 3500 4000 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Satna Total Revenue (in Lakh) Total Expenses (in Lakh) Net Surplus (in Lakh) Year 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Daily Per Bus Revenue -731 -370 63 403 798 1258 1790 2408 3126 3948
  • 94. Katni Katni Municipal Corporation Population 2,21,875 Organised Public Transport Absent IPT is the existing public transport in Katni city • Katni is an industrial city that is major trip generator • Roads have ROW but encroachment is prominent • Existing daily public transport ridership is 21265 94
  • 95. 95
  • 96. Existing Travel Characteristics Per capita trip rate (PCTR) has been estimated as given below for the City. Including walk trips : 1.2 Excluding walk trips : 1.1 Purpose Percentage Work 39% Business 16% Education 19% Social/ Recreation 12% Leisure 8% Other 6% Existing daily travel demand in proposed public transport coverage area is 34240 i.e. per capita trip rate (bus) is 0.16 Forecasted daily public transport travel demand (bus) estimated as near about 55990 in next 10 years Mode Trip Length < 2 kms 2 - 4 Kms 4-6 Kms 6-8 Kms > 8 Kms Car 2% 4% 7% 10% 12% Two Wheeler 49% 54% 58% 56% 56% Autos/IPTs 11% 13% 14% 20% 24% Cycles/NMV 38% 29% 21% 14% 8% 49.38% 17.28% 20.99% 12.35% Modal Split Two Wheeler Car Auto/ Magics Cycle 96
  • 97. 97 Bus Stand Railway Station Radhika hotel Kanahiya Hospital KV
  • 98. Katni Proposed Bus Route Network Tilak colleg 3 km kendriy a vidalay a 3 Buses Chanda k CHOWK 6.4 km Overhe ad tank jhola 4 Buses Imaliya 12km Murwar a Railway Station 6 Buses Syna Public 12km Near Electric board 8 Buses 98 Route Name Daily Travel Demand Syna Public School- Near ElectricBoard Yard 6340 Imaliya - Murwara Railway Station (Via Mission chowk and Katni Railway Station) 3172 Chandak Chowk - Overhead Tank (Johla) 2125 Tilak college road junction- Near Kendriya Vidyalay 1593
  • 99. Katni Katni 73 km Umaria11 Buses Katni 50 km Barhi 9 Buses Katni 37 km Vijayra ghogar h 9 Buses Katni 35 km Sahana gar 9 Buses Katni 50 km Sihora9 Buses Chandi Sihora Vijayeraghogarh 99
  • 100. Calculations for net fleet requirement: Considering fleet utilization of 90% for Ratlam; Bus fleet required = (68/ 90) * 100 = 76 buses Net fleet required = Bus fleet required – existing buses in good condition Net fleet required =76 – 0 = 76 buses Inter City Intra city 76 Non-AC Midi Buses for intra city 24 Non-AC Midi Buses for cluster city service 52 100
  • 101. • Total Cost Including State Govt. Taxes (A) • 2156.50 Lakh Bus fleet cost 76 Buses (A) • Total cost 113 Lakh ITS Facilities cost ETVMS,PIS CCR (B) • Total cost( Up gradation and development of new terminal) 650 Lakh Support Infrastructure ( C ) Total Cost = 2919.50 Lakh • 1825.20 LakhJnNURM • 1094.30 LakhState & ULB • 2919.50 LakhTotal State and ULB JnNURM Funding Pattern 80% 20% 101
  • 102. 0 500 1000 1500 2000 2500 3000 3500 4000 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Fare Revenue (in Lakh) Non- Fare Revenue (in Lakh) 102
  • 103. Cash flow Statement Cash Flow Values in Lakhs Capital Expenditure/ Salvage Value Buses 190 Depots/ Terminal 162.5 ITS 16.95 Total Salvage Value 369.45 Net Surplus 3891 Total Cashflow 971 With Grant Grant amount 1825.2 Cash flow with grant 2758.27 IRR without grant (in %) 3.82% IRR with grant (in %) 26.3% 0 500 1000 1500 2000 2500 3000 3500 4000 4500 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Total Revenue (in Lakh) Total Expenses (in Lakh) 103 -202 -104 18 112 221 348 496 669 867 1096 -500 0 500 1000 1500 2000 2500 3000 3500 4000 4500 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Katni Total Revenue (in Lakh) Total Expenses (in Lakh) Net Surplus (in Lakh) Year 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Daily Per Bus Revenue -729 -375 65 404 797 1255 1789 2412 3126 3951
  • 105. Vidisha Vidisha Municipal area population 155,951 Organised Public Transport Absent IPT is only existing public transport in Vidisha city • Vidisha is a tourist place and one of the world heritage sites • Leading agro based industries in Madhya Pradesh • Existing daily public transport ridership is 23400 105
  • 106. Vidisha Proposed Bus Route Network Bus Stand Rangrai Petro Pump Saffron Caffe Ramlela Chouraha M.P Iron Industries Bus Stand Bus Stand 106
  • 107. 107
  • 108. Existing Travel Characteristics Mode Trip Length < 2 kms 2 - 4 kms 4-6 kms 6-8 kms > 8 kms Car 2% 4% 7% 10% 12% Two Wheeler 49% 54% 58% 56% 56% Autos/IPTs 11% 13% 14% 20% 24% Cycles/NMV 38% 29% 21% 14% 8% Per capita trip rate (PCTR) has been estimated as given below for the City. Including walk trips : 1.39 Excluding walk trips : 1.02 Mode No Autos 125 Tonga 15 Total 140 Purpose Percentage Work 42% Business 28% Education 12% Social/ Recreation 15% Leisure 2% Other 1% Existing daily travel demand in proposed public transport coverage area is 38730 Forecasted daily public transport travel demand (bus) estimated as near 55310 in next 10 years 39.39% 9.09% 24.24% 27.27% Modal Split Two Wheeler Car Auto/ Magics Cycle 108
  • 109. N Rangai Mandir 16 km Tilakhe di 7 km Gandhi Chowk Pole Factory 6 km Tilakhedi New Krishi Upaj Mandir 12 Bus 6 Bus 7 Bus Eidgah 5 km Old Krish Upaj Mandir 5 Bus Vidisha Proposed Bus Route Network Proposed Bus Route for Vidisha 109 Route Name Daily Travel Demand Tilakhedi - Rangai Mandir- Sanchi 17286 Eidgah to Old KrishiUpajMandi 7200 Tilakhedi to New KrishiUpajMandi 8643 Gandhi Chowk to Pole Factory 10086
  • 110. Vidisha Proposed Bus Route Network Vidisha 50 km Gnajba soda 31 km Vidisha Raisen 8 Bus 6 Bus Vidisha 43 km Berasia 7 Bus Raisen Ganj Basoda Berasia 110 Route Name Daily Travel Demand Vidisha to Bairasia 4043 Vidisha to Ganjbasoda 4614 Vidisha to Raisen 3457
  • 111. Calculations for net fleet requirement: Considering fleet utilization of 90% for Ratlam; Bus fleet required = (51/ 90) * 100 = 57 buses Net fleet required = Bus fleet required – existing buses in good condition Net fleet required =57 – 0 = 57 buses Inter City Intra city 57 Non-AC Midi Buses for intra city 34 Non-AC Midi Buses for cluster city service 23 111
  • 112. • Total Cost Including State Govt. Taxes (A) • 1620 Lakh Bus fleet cost 57 Buses (A) • Total cost 104 Lakh ITS Facilities cost ETVMS,PIS CCR (B) • Total cost( Up gradation and development of new terminal) 412.50 Lakh Support Infrastructure ( C ) Total Cost = 2136.50 Lakh • 1396 LakhGoI • 740.50 Lakh State & ULB • 2136.50 LakhTotal State and ULB Govt. of India JnNURM Funding Pattern 80% 20% 112
  • 113. 0 500 1000 1500 2000 2500 3000 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Fare Revenue (in Lakh) Non- fare Revenue (in Lakh) 113
  • 114. Cash flow Statement Cash Flow Values in Lakhs Capital Expenditure/ Salvage Value Buses 142.5 Depots/ Terminal 103.125 ITS 15.6 Total Salvage Value 261.225 Net Surplus 2902 Total Cashflow 766 With Grant Grant amount 1396.0 Cash flow with grant 2133.1 IRR without grant (in %) 4.3% IRR with grant (in %) 29.0% 0 500 1000 1500 2000 2500 3000 3500 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Total Revenue (in Lakh) Total Expenses (in Lakh) 114 -152 -77 13 83 165 261 373 501 650 822 -500 0 500 1000 1500 2000 2500 3000 3500 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Vidisha Total Revenue (in Lakh) Total Expenses (in Lakh) Net Surplus (in Lakh) Year 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Daily Per Bus Revenue -731 -371 63 399 794 1255 1793 2409 3125 3951
  • 116. Sagar Sagar Municipal area population 274,556 Organised Public Transport Absent IPT is only existing public transport in Sagar city • Existing daily public transport ridership is 67082 • The financial status of the City mainly depends on agriculture products, Bidi Udyog and Agarbatti Udyog 116
  • 117. Sagar Chawani Dr Hari Singh Gour University S.N o Route Distance of Stretch (in Kms) Peak hour PCU lane Conf ig. travel speed V/C Rati o Level of Service (LoS) 1 Rajakhedi (Deen Dayal Nagar) to Mandi (Khurai Road) via Sagar Bus Stand 14 3875 4 lane 40 Kmph 0.74 C 2 Bhagwan Ganj to Dr. Gaur University via Mahar Regiment Center 8 3214 2 lane 30 Kmph 0.81 D 3 Kasab Mandi Mosque to Bus stand via Tilli 11 2857 2 lane 30 Kmph 0.83 D 4 Bhagwan Ganj to MPEB Junction via Sagar Cantt. 9 2901 2 lane 31 Kmph 0.8 D Bus Stand ITI Sagar Makroniya Taxi Stand Shailesh Memorial School Mahila Vidayalaya Sagar Income Ttax Office Jhansi Beena Bhopal Narsinghpur Jabalpur Chatarpur 117
  • 118. Existing Travel Characteristics Mode Trip Length < 2 kms 2 - 4 kms 4-6 kms 6-8 kms > 8 kms Car 2% 4% 7% 10% 12% Two Wheeler 49% 54% 58% 56% 56% Autos/IPTs 11% 13% 14% 20% 24% Cycles/NMV 38% 29% 21% 14% 8% Per capita trip rate (PCTR) has been estimated as given below for the City. Including walk trips : 1.5 Excluding walk trips : 1.0 Mode No Autos 75 Magic 115 Total 185 Purpose Percentage Work 36% Business 18% Education 17% Social/ Recreation 9% Leisure 12% Other 8% Existing daily travel demand in proposed public transport coverage area is 61634 i.e. per capita trip rate (bus) is 0.27 Forecasted daily public transport travel demand (bus) estimated as near 90254 in next 10 years33.82% 13.24% 26.47% 26.47% Modal Split Two Wheeler Car Auto/ Magics Cycle 118
  • 119. 119
  • 120. Proposed Bus Route and fleet size for Sagar Rajakh edi 14km Mandi Bhagwan ganj to 8km Dr Gaur University 11km Bhagwan ganj MPEB Railway Station 24 km Bus Route for Sagar Kasab mandi mosque Bus stand via Tiilli 10 Bus 7 Bus 9 Bus 7 Bus Makroniya Taxi Stand 120 Route Name Daily Travel Demand Rajakhedi (Deen Dayal Nagar) to Mandi (Khurai Road) via Sagar Bus Stand 16812 Bhagwan Ganj to Dr. Gaur University via Mahar Regiment Center 11767 Kasab Mandi Mosque to Bus stand via Tilli 15133 Bhagwan Ganj to MPEB Junction via Sagar Cantt. 11763
  • 121. Fleet size for Cluster Sagar Banda Rahatgarh 35 km Sagar Rahatgar h 36 km Sagar Banda 9 Bus 7 Bus 121
  • 122. Sagar Fleet Size Calculation Calculations for net fleet requirement: Considering fleet utilization of 90% for Ratlam; Bus fleet required = (44/ 90) * 100 = 49 buses Net fleet required = Bus fleet required – existing buses in good condition Net fleet required =49 – 0 = 49 buses Inter City Intra city 49 Non-AC Midi Buses for intra city 37 Non-AC Midi Buses for cluster city service 12 122
  • 123. Sagarar • Total Cost Including State Govt. Taxes (A) • 1400 Lakh Bus fleet cost 49 Buses (A) • Total cost 100 Lakh ITS Facilities cost ETVMS,PIS CCR (B) • Total cost( Up gradation and development of new terminal) 475 Lakh Support Infrastructure ( C ) Total Cost = 1975.00 Lakh • 1220 LakhJnNURM • 775 LakhState & ULB • 1975 LakhTotal State and ULB JnNURM Funding Pattern 80% 20% 123
  • 124. 0 500 1000 1500 2000 2500 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Fare Revenue (in Lakh) Non- fare Revenue (in Lakh) 124
  • 125. Cash flow Statement Cash Flow Values in Lakhs Capital Expenditure/ Salvage Value Buses 122.50 Depots/ Terminal 118.75 ITS 15 Total Salvage Value 256.25 Net Surplus 2526 Total Cashflow 551 With Grant Grant amount 1220.00 Cash flow with grant 1746.90 IRR without grant (in %) 2.8% IRR with grant (in %) 24.6% 0 500 1000 1500 2000 2500 3000 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Total Revenue (in Lakh) Total Expenses (in Lakh) 125 -130 -67 11 72 142 225 320 431 559 707 -500 0 500 1000 1500 2000 2500 3000 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Sagar Total Revenue (in Lakh) Total Expenses (in Lakh) Net Surplus (in Lakh) Year 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Daily Per Bus Revenue -727 -375 62 403 794 1259 1790 2410 3126 3954
  • 126. Summery of Capital Cost City Proposed Fleet Requirement Financial inlay for Buses Financial inlay for Ancillary Infrastructure and ITS Articulated Low Floor (400mm) AC Bus Semi Low Floor (900mm) Non AC Bus Non AC Midi Bus (900mm) Total Govt. of India Grant (in Crore) State Govt. Share (in Crore) ULB Share (in Crore) TOTAL (in Crore) Govt. of India Grant (in Crore) State Govt. Share (in Crore) Total Cost (in Crore) Bhopal 5 11 172 43 231 62.99 25.88 37.12 125.99 1.00 23.91 24.91 Jabalpur 0 24 112 22 158 45.12 18.05 27.07 90.24 1.00 25.29 26.29 Gwalior 0 0 0 144 144 34.05 8.51 12.77 55.33 1.00 11.97 12.97 Satna 0 0 0 66 66 14.98 3.75 0.00 18.73 1.00 5.83 6.83 Sagar 0 0 0 49 49 11.20 2.80 0.00 14.00 1.00 4.75 5.75 Ratlam 0 0 0 50 50 11.35 2.84 0.00 14.19 1.00 4.60 5.60 Rewa 0 0 0 66 66 14.98 3.75 0.00 18.73 1.00 5.83 6.83 Katni 0 0 0 76 76 17.25 4.31 0.00 21.56 1.00 6.63 7.63 Singrauli 0 0 0 38 38 6.90 1.73 0.00 8.63 1.00 4.99 5.99 Vidisha 0 0 0 57 57 12.96 3.24 0.00 16.20 1.00 4.17 5.17 Grand Total 5 35 284 611 935 231.78 74.86 76.96 383.60 10.00 97.97 107.97
  • 127. Summery of Cash flow Distribution City Cash flow Without Grant Cash flow With Grant IRR Without Grant IRR With Grant Bhopal 34.65 113.84 4.75% 17.00% Jabalpur 34.43 79.76 3.83% 14.80% Gwalior 19.87 41.43 4.35% 15.60% Satna 8.27 23.92 3.65% 26.10% Sagar 5.51 17.46 2.80% 24.60% Ratlam 5.93 18.02 3.20% 25.50% Rewa 8.27 23.92 3.65% 26.10% Katni 9.71 27.58 3.82% 26.30% Singrauli 5.34 13.05 3.79% 21.30% Vidisha 7.66 21.33 4.30% 29.00%
  • 128. Comments of Principal Secretary from Inception Report Sl No Comments Response 1 Issues and observation should be city specific. All the city specific issues and observations have been provided 2 DPR’s should be bankable on the basis of which a viable public transport could be establishment in the various cities of state. It already has been incorporated 3 Hub and spoke model should be adopted for formation of cluster. Already have been incorporated 4. A DPR should elaborate current roles and responsibilities of RTO and other stakeholders indulged in operation and regulation of public transport system in the cities. Already have been incorporated in reports 4. B Institutional mechanism and clear cut roles and responsibilities of various agencies engaged to regulate public transport such as RTO ,SPV , traffic police , ULB wrt route rationalstion , fare fixation , regulating permit should be elaborated . RTO: Issuing temporary permit, sending fare fixation report to Nodal Officer, sending reports on route rationalization plans to transport department, tax collection and maintaining Motor Vehicle Act. SPV: Existing SPVs are responsible for O&M of existing organized transport system. Traffic Police: No traffic plans are there. They mainly collect Challun and maintain VIP movements ULB: they are responsible for improvements and ,maintenance of existing road networks. 5. A Requisite frequency of public transport mode for sustainable operation and required viability gap funding should be detailed out. It has been incorporated in details in the reports 5. B Type of mode (size) and fleet size for different clusters should be specifically spelled out. It has been incorporated 5. C Operations plan carrying Capex and Opex with respect to financial viability of buses should be detailed out. It has been detailed out. 6 In case of non-viability of mode specified ob GoI, alternative analysis should be done and viable mode or that city including financial operational plan (FOP) should be detailed out. It has been provided in every DPRs 7 City specific photographs such as roads, intersections, existing and proposed bus stand and other ancillary structures should be portyed in the presentation. All relevant photos have been incorporated in the reports 8 In cluster along with origin and destination intermediate cities/town should be motioned with distance from local city. All have been incorporated 9 Model on the basis of which bus system is proposed should be detailed out. All have been incorporated in reports
  • 129. Recommendation •UADD, as early possible, should submit copies of interims DPRS of 10 cities to JnNURM and related •central govt department for their further action . •Various Policy formation and their implementation work at state level in various identified cities should • start immediately •Discussion on the project implementation with various city authorities in each of the 10 cities •SPV will run on Net cost Model •IPT Route and Public Transport route should be Segregated •Formulation of UMTC •To Increases the non fare box revenue policy such as advertisement, Parking etc should be formed at city level.