InhalteInhalte
1. The coiled GERES®
heat exchanger
2. Focus in the development of the system
3. Pipe properties
4. Ground probe details (Dimensions und weights)
5. The ground probe in the borehole
6. Comparing ground probe systems
7. Workflow with the GERES®
-ground probe system
8. Heat Exchanger Cluster - A new development
9. Heat Exchanger Cluster - Applications
10. Conclusion
©	
  GERES	
  GmbH,	
  Meine,	
  An	
  der	
  Feuerwehr	
  11,	
  38527	
  Meine,	
  Tel.	
  05304	
  -­‐	
  90	
  12	
  31,	
  info@geres-­‐gmbh.com 2hIp://geres-­‐gmbh.com
The coiled GERESThe coiled GERES®®
heat exchangerheat exchanger
 Which solution does the GERES system offer?
 Confronting depth delimitations, a solution until 35 m [115 ft] maximum depth
 Best utilization of the energy in the geology
 Robust pipe material
 Multi-purpose heat exchanger, can be used in a different medium as in the geology (see, river,
lake, sewage treatment plant)
 Low compression effort
 Low effort laying and connecting the pipes
 Facing volume delimitations - saving 60% glycol-mixture
 100% impermeability against gases in the soil
 This properties are the best investment protection,
 the reducing of guarantee risk,
 and best possible protection of the geology
©	
  GERES	
  GmbH,	
  Meine,	
  An	
  der	
  Feuerwehr	
  11,	
  38527	
  Meine,	
  Tel.	
  05304	
  -­‐	
  90	
  12	
  31,	
  info@geres-­‐gmbh.com 3hIp://geres-­‐gmbh.com
Focus in the development of the systemFocus in the development of the system
 Which was the focus GERES
®
had in the development of the system?
1. Security:
 From the beginning GERES was looking for a composite pipe. Why? Applications of force or punctual pressure on the pipe
are well absorbed, because the pressure on the exterior layer is distributed on a larger surface in the next layer. A
further characteristics of the pipe, it expands minimal under pressure and have no crack propagation.
 The ground probe consists out of one pipe, which means you have no joints in the soil
 The ground probe is 100% impermeable against gases in the soil
 Die GERES®
-ground probe can be sinked unfilled, which minimize the the arising forces during the sinking process and
prevent damages on the ground probe
2. Optimal energy absorption:
 Good thermal conductivity of the pipe
 By the coil form we achieve a turbulent-similar flow in the ground probe
 The coil of the ground probe is adjustable and thus you can adapt the ground probe to the individual geology to obtain
the optimal energy extraction
 By the spiral form, the influence of the “cold” conductor on the “heated” conductor is minimized
3. Optimization in the workflow:
 The GERES®
-ground probe can be sinked unfilled
 For connecting pipes we use a press-fitting-system which make you independent from meteorological conditions
 Reducing the compression effort because the pipe expands under pressure very minimal
 The calculation of loss pressure is simplified because the ground probes have standard dimensions
©	
  GERES	
  GmbH,	
  Meine,	
  An	
  der	
  Feuerwehr	
  11,	
  38527	
  Meine,	
  Tel.	
  05304	
  -­‐	
  90	
  12	
  31,	
  info@geres-­‐gmbh.com 4hIp://geres-­‐gmbh.com
Pipe propertiesPipe properties
A confrontation
100 Years / 30 bar100 Years / 15 bar100 Years / 15,7 barat 20°C [68°F]
100 Years / 26 bar100 Years / 13,3 bar50 Years / 13,5 barat 30°C [86°F]
100 Years / 22 bar100 Years / 11,8 bar50 Years / 11,6 barat 40°C [104°F]
100 Years / 20 bar100 Years / 10,5 bar15 Years / 10,4 barat 50°C [122°F]
0,025 mm / (m*K)
[0.00098*10-6
in / in *°F]
0,15 mm / (m*K)
[0.0059*10-6
in / in *°F]
0,20 mm / (m*K)
[0.0787*10-6
in / in *°F]
Coefficient of linear thermal
expansion
No malfunctionNo malfunction200 - 2000 hCrack propagation
50 Years / 14 bar--at 95°C [203°F]
0,0004 mm
[0.000015 in]
0,007 mm
[0.0027 in]
0,04 mm
[0.0014 in]
Surface roughness
50 Years / 16 bar15 Years / 6,9 bar-at 90°C [194°F]
at 80°C [176°F]
at 70°C [158°F]
at 60°C [140°F]
Creep values
25 Years / 20 bar25 Years / 7,6 bar-
50 Years / 18 bar50 Years / 8,5 bar2 Years / 6,2 bar
50 Years / 20 bar50 Years / 9,5 bar5 Years / 7,5 bar
PE-RT - AL - PE-RT (GERES®-probe)PE-XaPE-100
©	
  GERES	
  GmbH,	
  Meine,	
  An	
  der	
  Feuerwehr	
  11,	
  38527	
  Meine,	
  Tel.	
  05304	
  -­‐	
  90	
  12	
  31,	
  info@geres-­‐gmbh.com 5hIp://geres-­‐gmbh.com
Ground probe detailsGround probe details
a.) 600 L/h at 300 mbar [131.98 gal/h ]
b.) 480 L/h at 250 mbar [105.58 gal|h]
a.) 540 L/h at 300 mbar [118.78 gal/h]
b.) 460 L/h at 250 mbar [101.18 gal/h]
c.) 360 L/h at 200 mbar [79.18 gal/h]
a.) 600 L/h at 300 mbar [131.98 gal/h ]
b.) 700 L/h at 400 mbar [153.97 gal/h]
Flow rate
(Water/Glycol-mixture 27%)
14 L [3.07 gal]14 L [3.07 gal]32 L [7.03 gal]Glycol-mixture
55 m [180 ft]55 m [180 ft]93 m [305 ft]Pipe length
--20 kg [44 lb]Additional weight
22,5 kg [49.6 lb]35,5 kg [78.2 lb]78 kg [172 lb]Entire weight
-13 kg [28.6 lb]10 kg [22 lb]Casted weight
8,5 kg [18,73 lb]8,5 kg [18,73 lb]16 kg [35.27 lb]Pipe weight
300 mm [11.8 in ]125 mm - 130 mm [4.9 in - 5.1 in ]150 mm - 155 mm [5.9 in - 6.1 in]Ground probe diameter
3 m - 8 m [10 ft - 26 ft]6 m - 23 m [19 ft - 75 ft]10 m - 34 m [32 ft - 111 ft]Telescopic (installation depth)
10 m [32 ft]23 m [75 ft]36 m [118 ft] (+ add. Weight)Depth
22 mm x 2,0 mm [0.86 in x 0.078 in]22 mm x 2,0 mm [0.86 in x 0.078 in]25 mm x 2,0 mm [0.98 in x 0.078 in]Pipe dimension
Energy pile 10 m [32 ft]Ground probe 23 m [75 ft]Ground probe 35 m [115 ft]Properties
©	
  GERES	
  GmbH,	
  Meine,	
  An	
  der	
  Feuerwehr	
  11,	
  38527	
  Meine,	
  Tel.	
  05304	
  -­‐	
  90	
  12	
  31,	
  info@geres-­‐gmbh.com 6hIp://geres-­‐gmbh.com
The ground probe in the boreholeThe ground probe in the borehole
GERES®
-ground probe (35 m - 115 ft) and additional weight
Parts of the ground probe:
a) 1 x pipe
b) Casted weight
c) 1 x additional weight
Facts about the ground probe in the borehole:
 First 5 m [16 ft] no coils
 Between 5 m and 34 m [16 ft - 111.5 ft] coiled ground probe
 The coiled part of the ground probe is at the exterior part of the
borehole, which improve the energy absorption
Facts borehole (in some countries very relevant aspects for authorities):
 At the first 5 m [16 ft] are used 2 m [6.5 ft] pipe/meter
 Between 5 m and 34 m [16 ft - 111.5 ft], are used 2,75 m [9 ft]
pipe/meter
 Between the spreaded coils the grouting material can be better
distributed
 More grouting material as used at a Duplex ground probe, which makes
the filled borehole more stable
 The composite pipe expands very low under pressure, which cause less
motion in the filled and cured borehole and makes the cured borehole
more stable
 By the spiral form is the ground probe more in the exterior part of the
borehole which offer a more homogenous cured borehole, because of
the more of grouting material in the interior of the borehole which is
seamless connected to the grouting material between the coils unto the
borehole wall
 4 walls to the geology (3 layers of the composite pipe and the cured
borehole)
 1 pipe, no joints
 Minimal reciprocal influence
 Turbulent-similar flow
 Can be unfilled sinked
 100% impermeability against gases
Switching arc in the casted weight
Distance between the spreaded
coils, 25 - 30 cm [9 in - 11.8 in]
Additional weight
©	
  GERES	
  GmbH,	
  Meine,	
  An	
  der	
  Feuerwehr	
  11,	
  38527	
  Meine,	
  Tel.	
  05304	
  -­‐	
  90	
  12	
  31,	
  info@geres-­‐gmbh.com 7hIp://geres-­‐gmbh.com
Comparing ground probe systemsComparing ground probe systems
A low thermal resistance in the drilled borehole, because the coiled segment is in the
exterior part of the borehole.
A high thermal resistance in the drilled borehole, because the pipes are in the
middle of the borehole.
If the ground probe is sinked unfilled, the probability of scoring the pipes are very low.
If the ground probe face resistance in the borehole, the force effect is on the exterior
layer (PE-RT) of the pipe. The force effect will be forwarded in reduced form, on a
larger surface on the second layer (Al). The Aluminum layer which also absorb a part
of the received force, will forward a lower part of the received force, on a larger
surface to the interior layer (PE-RT). [A common characteristic of composite materials
is to distribute the energy of arising forces on larger surfaces to incorporated layers.
This characteristic prevent possible damages.] No score propagation.
The pipe-material is sensitive to notches , scoring and crack propagation.
8 x lower dilatation: 0,025 mm / (m*K)
[0.00098*10-6
in / in *°F]
Coefficient of linear thermal Expansion: 0,20 mm / (m*K)
[0.0787*10-6
in / in *°F]
The coiled part of the ground probe cross just with the exterior part of the pipe the
sharp edges. If the ground probe is sinked unfilled, it will slide and rotate along the
edges because there is no weight behind. Arising scratches can be 2-4 mm length at
the exterior part of the coiled part of the ground probe.
Sharp edges in the borehole can damage the pipe material, along a big
distance, because the pipe cross the edges during the complete sinking.
The coils can be adjusted to the individual geology.Not adjustable to the geology.
100 % diffusion sealed against gases in the soil.Penetrable for gases in the soil.
Because of the coiled construction, a turbulent similar flow.Because of the construction, a laminar flow in the pipe.
Can be sinked without being filled.Can be sinked just filled.
Low reciprocal influence, because the coil is in the external area of the borehole. The
straight pipe segment, in the interior of the coil, cross the coiled segment at 3-4
points per meter.
Reciprocal influence.
1 Pipe, no joints in the geology.4 Pipes, 4 joints in the geology.
GERES
®
-ground probeDuplex-ground probe
©	
  GERES	
  GmbH,	
  Meine,	
  An	
  der	
  Feuerwehr	
  11,	
  38527	
  Meine,	
  Tel.	
  05304	
  -­‐	
  90	
  12	
  31,	
  info@geres-­‐gmbh.com 8hIp://geres-­‐gmbh.com
Workflow with the GERESWorkflow with the GERES®®
-ground probe system-ground probe system
- 10 Min. 10 bar (Temperature compensation),
- 30 Min. 10 bar (Final compression check)
- Simplified hydraulic calculation, since the probe length is always alike
- Small filling and exhaust expenditure, due to smaller volume contents (only 40% of the volume
of a PE 100 duplex probe)
6. Compression check of the entire
installation
- Connecting pipe is fast installable without the need of moldings, with small bending radii (5 x Ø)
- Connecting pipe is fast installable with a press-fitting-system
- Modular distributor
5. Connecting pipe transfer and
distributor installation
- No mounting of spacer, because the probe is inherently stable
- The probe can be unfilled sinked - a weight is already installed in the factory
- Insensitively to notches, scoring and crack propagation
- Easily installation of a re-usable injection pipe/tube by the large interior of the probe
4. Sinking the probe
- Adjusting the probe on the drilling depth
- Visual check, no leakage test necessarily
3. Probe preparation for appropriate
depth
- Protection of deeper water layer
- Minimized drilling risk, because the borehole is never deeper as 36 m [118 ft]
2. Drilling
- Use of small drilling equipment; close space conditions are well attainable1. Setting up the installation site
©	
  GERES	
  GmbH,	
  Meine,	
  An	
  der	
  Feuerwehr	
  11,	
  38527	
  Meine,	
  Tel.	
  05304	
  -­‐	
  90	
  12	
  31,	
  info@geres-­‐gmbh.com 9hIp://geres-­‐gmbh.com
Heat Exchanger Cluster - A new developmentHeat Exchanger Cluster - A new development
Cluster short description
Supporting construction out of stainless steel, Distributor square tube
40/40/3 mm [1.57/1.57/0.11 in], 6 angle supports, 36 tubular
supports for the heat exchanger, 9 heat exchanger out of composite
pipe
Support material
Stainless steel : 1.4571
Technical data heat exchanger
Tube length / heat exchanger: 55 m [180 ft]
Composite pipe: 22 x 2,0 mm [0.86 in x 0.078 in]
Heat-abstraction capacity / cluster : 12,000 W at a temperature
difference of 3 K to the medium in which the clusters are used
Loss of pressure : 270 mbar at 4000 L/h [880 gal/h]
Connections
18 Pressing connections 22 x 3/4" AG to the distributor
Distributor : 1" AG
Dimensions
Width: 3000 mm [118 in]
Height: 2200 - 3000 mm [86.6 - 118 in]
Ø heat exchanger: 300 mm [1.18 in]
The distributor tubes must be connected by the Tichelmann system.
©	
  GERES	
  GmbH,	
  Meine,	
  An	
  der	
  Feuerwehr	
  11,	
  38527	
  Meine,	
  Tel.	
  05304	
  -­‐	
  90	
  12	
  31,	
  info@geres-­‐gmbh.com 10hIp://geres-­‐gmbh.com
Heat Exchanger Cluster - ApplicationsHeat Exchanger Cluster - Applications
The heat exchangers used in the clusters are like the
GERES® heat exchanger for geothermal use, out of the
same composite pipe. The same composite pipe serves
at this specific usage also for energy extraction out of
clarified and unclarified liquids.
The heat exchangers used in the GERES®-clusters are
made out of one pipe and seamless in the used
medium.
PE-RT
Adhesive
Aluminium (centred; 0,3 mm - 11.8 th)
Adhesive
PE-RT
There are many possibilities to obtain energy for solutions
driven by heat pump technology!
GERES® GmbH develop a cluster of heat exchangers which
can be used in a liquid medium.
Lakes, Rivers, Sea, Sewage treatment plants,
Textile industry, Chemical industry, Food industry
to name some of the possible opportunities, where the
clustered heat exchanger offer a good and efficient service
its operators.
The particular advantage of the clusters is that reservoirs
do not have to be rebuilt or modified, because the register
fit into each bowl and do not need a clarified liquid.
When used in unclarified liquids the cluster can be easily
cleaned, using a high pressure lance, from the bowl edge.
The clusters can be also used in aggressive media. In the
case of specific use in an aggressive media, we
recommend to contact us to adapt the material for the
supporting construction to the specific requirements.
©	
  GERES	
  GmbH,	
  Meine,	
  An	
  der	
  Feuerwehr	
  11,	
  38527	
  Meine,	
  Tel.	
  05304	
  -­‐	
  90	
  12	
  31,	
  info@geres-­‐gmbh.com 11hIp://geres-­‐gmbh.com
ConclusionConclusion
 Does GERES
®
offer more then a product?
GERES®
GmbH offer its customers, engineer-offices and drilling partners beside the optimized products reliable
technology. Every customer of GERES will consider to plan his projects accurate, optimized in costs and benefit. But
also being ambitious in delivering sustainable services.
A system with good abstraction capabilities is one of the persistent impressions. The partner of GERES®
focus their
attention also at the business relevant aspects:
1. To install the ground probes easy as possible
2. So fast as possible.
3. The used material should exclude so good as possible guarantee claims.
4. GERES®
GmbH offer its customer a multi-purpose system which can be used also in the sea, a river, a lake, or
sewage treatment plant.

Weitere ähnliche Inhalte

Was ist angesagt?

IRJET- Strength and Cost Comparision of Bagasse Concrete with the Applicat...
IRJET- 	  Strength and Cost Comparision of Bagasse Concrete with the Applicat...IRJET- 	  Strength and Cost Comparision of Bagasse Concrete with the Applicat...
IRJET- Strength and Cost Comparision of Bagasse Concrete with the Applicat...IRJET Journal
 
DONIT Gasket Sheets Pamphlet 2017
DONIT Gasket Sheets Pamphlet 2017DONIT Gasket Sheets Pamphlet 2017
DONIT Gasket Sheets Pamphlet 2017donitmarketing
 
Bolsas filtrantes para filtros de mangas de Zukun Filtration
Bolsas filtrantes para filtros de mangas de Zukun FiltrationBolsas filtrantes para filtros de mangas de Zukun Filtration
Bolsas filtrantes para filtros de mangas de Zukun FiltrationVivian Lu
 
FJM Cylinders Pvt. Ltd.
FJM Cylinders Pvt. Ltd.FJM Cylinders Pvt. Ltd.
FJM Cylinders Pvt. Ltd.Sahil Garg
 
Warmline range Data Sheets
Warmline range  Data SheetsWarmline range  Data Sheets
Warmline range Data SheetsMarcus Maher
 
Cost Reduction In Heat Treatment, Hot Rolling and Hot Forging by the use of P...
Cost Reduction In Heat Treatment, Hot Rolling and Hot Forging by the use of P...Cost Reduction In Heat Treatment, Hot Rolling and Hot Forging by the use of P...
Cost Reduction In Heat Treatment, Hot Rolling and Hot Forging by the use of P...Srikar Shenoy
 
Refratechnik | Energy Saving Series
Refratechnik | Energy Saving SeriesRefratechnik | Energy Saving Series
Refratechnik | Energy Saving SeriesRefratechnik Group
 
Case study for slough police station
Case study for slough police stationCase study for slough police station
Case study for slough police stationAndy Brown
 
Flotex Starck Rulo Halı - Anıl Zemin Market
Flotex Starck Rulo Halı - Anıl Zemin MarketFlotex Starck Rulo Halı - Anıl Zemin Market
Flotex Starck Rulo Halı - Anıl Zemin MarketBurak Yıldız
 
Butyl mastic tapes and sealants for automotive vaccum bagging cable jointing
Butyl mastic tapes and sealants for automotive vaccum bagging cable jointingButyl mastic tapes and sealants for automotive vaccum bagging cable jointing
Butyl mastic tapes and sealants for automotive vaccum bagging cable jointingNikhilMathew45
 
BTC: Bottom Termination Component or Biggest Technical Challenge?
BTC: Bottom Termination Component or Biggest Technical Challenge?BTC: Bottom Termination Component or Biggest Technical Challenge?
BTC: Bottom Termination Component or Biggest Technical Challenge?Cheryl Tulkoff
 
Centroid adhesives, sealants, butyl tapes, silicone
Centroid adhesives, sealants, butyl tapes, silicone Centroid adhesives, sealants, butyl tapes, silicone
Centroid adhesives, sealants, butyl tapes, silicone CentroidPolymer
 
Industrial product presentation
Industrial product presentationIndustrial product presentation
Industrial product presentationBhawin Patel
 
The 2. Generation Metallurgical Coke
The 2. Generation Metallurgical CokeThe 2. Generation Metallurgical Coke
The 2. Generation Metallurgical CokeFUAT CAN
 

Was ist angesagt? (17)

IRJET- Strength and Cost Comparision of Bagasse Concrete with the Applicat...
IRJET- 	  Strength and Cost Comparision of Bagasse Concrete with the Applicat...IRJET- 	  Strength and Cost Comparision of Bagasse Concrete with the Applicat...
IRJET- Strength and Cost Comparision of Bagasse Concrete with the Applicat...
 
DONIT Gasket Sheets Pamphlet 2017
DONIT Gasket Sheets Pamphlet 2017DONIT Gasket Sheets Pamphlet 2017
DONIT Gasket Sheets Pamphlet 2017
 
Bolsas filtrantes para filtros de mangas de Zukun Filtration
Bolsas filtrantes para filtros de mangas de Zukun FiltrationBolsas filtrantes para filtros de mangas de Zukun Filtration
Bolsas filtrantes para filtros de mangas de Zukun Filtration
 
FJM Cylinders Pvt. Ltd.
FJM Cylinders Pvt. Ltd.FJM Cylinders Pvt. Ltd.
FJM Cylinders Pvt. Ltd.
 
Warmline range Data Sheets
Warmline range  Data SheetsWarmline range  Data Sheets
Warmline range Data Sheets
 
Cost Reduction In Heat Treatment, Hot Rolling and Hot Forging by the use of P...
Cost Reduction In Heat Treatment, Hot Rolling and Hot Forging by the use of P...Cost Reduction In Heat Treatment, Hot Rolling and Hot Forging by the use of P...
Cost Reduction In Heat Treatment, Hot Rolling and Hot Forging by the use of P...
 
Tobslak tbyrothane 1 k
Tobslak tbyrothane 1 kTobslak tbyrothane 1 k
Tobslak tbyrothane 1 k
 
Refratechnik | Energy Saving Series
Refratechnik | Energy Saving SeriesRefratechnik | Energy Saving Series
Refratechnik | Energy Saving Series
 
Case study for slough police station
Case study for slough police stationCase study for slough police station
Case study for slough police station
 
Flotex Starck Rulo Halı - Anıl Zemin Market
Flotex Starck Rulo Halı - Anıl Zemin MarketFlotex Starck Rulo Halı - Anıl Zemin Market
Flotex Starck Rulo Halı - Anıl Zemin Market
 
risong brochure
risong brochurerisong brochure
risong brochure
 
Butyl mastic tapes and sealants for automotive vaccum bagging cable jointing
Butyl mastic tapes and sealants for automotive vaccum bagging cable jointingButyl mastic tapes and sealants for automotive vaccum bagging cable jointing
Butyl mastic tapes and sealants for automotive vaccum bagging cable jointing
 
BTC: Bottom Termination Component or Biggest Technical Challenge?
BTC: Bottom Termination Component or Biggest Technical Challenge?BTC: Bottom Termination Component or Biggest Technical Challenge?
BTC: Bottom Termination Component or Biggest Technical Challenge?
 
Centroid adhesives, sealants, butyl tapes, silicone
Centroid adhesives, sealants, butyl tapes, silicone Centroid adhesives, sealants, butyl tapes, silicone
Centroid adhesives, sealants, butyl tapes, silicone
 
F-CLEAN® Greenhouse Film
F-CLEAN® Greenhouse FilmF-CLEAN® Greenhouse Film
F-CLEAN® Greenhouse Film
 
Industrial product presentation
Industrial product presentationIndustrial product presentation
Industrial product presentation
 
The 2. Generation Metallurgical Coke
The 2. Generation Metallurgical CokeThe 2. Generation Metallurgical Coke
The 2. Generation Metallurgical Coke
 

Andere mochten auch

Assurdo Di Auschwitz
Assurdo Di AuschwitzAssurdo Di Auschwitz
Assurdo Di AuschwitzMauro Calbi
 
Final kvk presentation dated 14th july 2010 in office 2003
Final kvk presentation dated 14th july 2010 in office 2003Final kvk presentation dated 14th july 2010 in office 2003
Final kvk presentation dated 14th july 2010 in office 2003Jitendra Dholakiya
 
Geotermia a Bassa Entalpia
Geotermia a Bassa EntalpiaGeotermia a Bassa Entalpia
Geotermia a Bassa EntalpiaFelicetto Massa
 
Optimizing ground heat exchanger length with GeoperformX pipe
Optimizing ground heat exchanger length with  GeoperformX pipeOptimizing ground heat exchanger length with  GeoperformX pipe
Optimizing ground heat exchanger length with GeoperformX pipeJasmin Raymond
 
05 ing. Misceo - Efficientamento energetico, Esempi pratici di interventi ina...
05 ing. Misceo - Efficientamento energetico, Esempi pratici di interventi ina...05 ing. Misceo - Efficientamento energetico, Esempi pratici di interventi ina...
05 ing. Misceo - Efficientamento energetico, Esempi pratici di interventi ina...Murgiasmart
 

Andere mochten auch (7)

Beautiful
BeautifulBeautiful
Beautiful
 
Assurdo Di Auschwitz
Assurdo Di AuschwitzAssurdo Di Auschwitz
Assurdo Di Auschwitz
 
Final kvk presentation dated 14th july 2010 in office 2003
Final kvk presentation dated 14th july 2010 in office 2003Final kvk presentation dated 14th july 2010 in office 2003
Final kvk presentation dated 14th july 2010 in office 2003
 
Pemph Guj
Pemph GujPemph Guj
Pemph Guj
 
Geotermia a Bassa Entalpia
Geotermia a Bassa EntalpiaGeotermia a Bassa Entalpia
Geotermia a Bassa Entalpia
 
Optimizing ground heat exchanger length with GeoperformX pipe
Optimizing ground heat exchanger length with  GeoperformX pipeOptimizing ground heat exchanger length with  GeoperformX pipe
Optimizing ground heat exchanger length with GeoperformX pipe
 
05 ing. Misceo - Efficientamento energetico, Esempi pratici di interventi ina...
05 ing. Misceo - Efficientamento energetico, Esempi pratici di interventi ina...05 ing. Misceo - Efficientamento energetico, Esempi pratici di interventi ina...
05 ing. Misceo - Efficientamento energetico, Esempi pratici di interventi ina...
 

Ähnlich wie GERES presentation

Ceramic Brochure
Ceramic BrochureCeramic Brochure
Ceramic BrochureSchiedel UK
 
Microtherm For Pipework
Microtherm For PipeworkMicrotherm For Pipework
Microtherm For Pipeworkmpass
 
Final grouting freezing
Final grouting freezingFinal grouting freezing
Final grouting freezingSafdar Ali
 
DMUG 2016 - Bethan Tuckett-Jones, WSP Parsons Brinkerhoff
DMUG 2016 - Bethan Tuckett-Jones, WSP Parsons BrinkerhoffDMUG 2016 - Bethan Tuckett-Jones, WSP Parsons Brinkerhoff
DMUG 2016 - Bethan Tuckett-Jones, WSP Parsons BrinkerhoffIES / IAQM
 
Thermobreak Solar - Brochure 230914 D
Thermobreak Solar - Brochure 230914 DThermobreak Solar - Brochure 230914 D
Thermobreak Solar - Brochure 230914 DGary Haydon
 
Study On The External Gas-Assisted Mold Temperature Control For Thin Wall Inj...
Study On The External Gas-Assisted Mold Temperature Control For Thin Wall Inj...Study On The External Gas-Assisted Mold Temperature Control For Thin Wall Inj...
Study On The External Gas-Assisted Mold Temperature Control For Thin Wall Inj...IJERA Editor
 
Empur preisliste 2014_2015
Empur preisliste 2014_2015Empur preisliste 2014_2015
Empur preisliste 2014_2015Dynamic444
 
The art of troubleshooting mist eliminators - Begg Cousland - COBRAS 2015
The art of troubleshooting mist eliminators - Begg Cousland - COBRAS 2015The art of troubleshooting mist eliminators - Begg Cousland - COBRAS 2015
The art of troubleshooting mist eliminators - Begg Cousland - COBRAS 2015COBRAS
 
GERES Heat Exchanger Cluster
GERES Heat Exchanger ClusterGERES Heat Exchanger Cluster
GERES Heat Exchanger ClusterGERES GmbH
 
Thermobreak Tube - Brochure 230914 D
Thermobreak Tube - Brochure 230914 DThermobreak Tube - Brochure 230914 D
Thermobreak Tube - Brochure 230914 DGary Haydon
 
Gyromat in tunnelling practice
Gyromat in tunnelling practiceGyromat in tunnelling practice
Gyromat in tunnelling practiceNorbert Benecke
 
Experimental Investigation of Reinforced Concrete Beam with Opening for Combi...
Experimental Investigation of Reinforced Concrete Beam with Opening for Combi...Experimental Investigation of Reinforced Concrete Beam with Opening for Combi...
Experimental Investigation of Reinforced Concrete Beam with Opening for Combi...IRJET Journal
 
Thermobreak Thermacoil - Brochure 270814 D
Thermobreak Thermacoil - Brochure 270814 DThermobreak Thermacoil - Brochure 270814 D
Thermobreak Thermacoil - Brochure 270814 DGary Haydon
 
BORED pile and pile cap design.ppt
BORED pile and pile cap design.pptBORED pile and pile cap design.ppt
BORED pile and pile cap design.pptkarsapersada
 
HEAT TRANSFER AUGMENTATION OF LAMINAR NANOFLUID FLOW IN HORIZONTAL TUBE INSER...
HEAT TRANSFER AUGMENTATION OF LAMINAR NANOFLUID FLOW IN HORIZONTAL TUBE INSER...HEAT TRANSFER AUGMENTATION OF LAMINAR NANOFLUID FLOW IN HORIZONTAL TUBE INSER...
HEAT TRANSFER AUGMENTATION OF LAMINAR NANOFLUID FLOW IN HORIZONTAL TUBE INSER...IAEME Publication
 
Isokern Celsius stove system installation instructions
Isokern Celsius stove system installation instructionsIsokern Celsius stove system installation instructions
Isokern Celsius stove system installation instructionsSchiedel UK
 
Smt vacuum void_reduction_sept2012
Smt vacuum void_reduction_sept2012Smt vacuum void_reduction_sept2012
Smt vacuum void_reduction_sept2012PSKing1
 
Industrial Insulation Materials By Sheth Insulations Private Limited
Industrial Insulation Materials By Sheth Insulations Private LimitedIndustrial Insulation Materials By Sheth Insulations Private Limited
Industrial Insulation Materials By Sheth Insulations Private LimitedIndiaMART InterMESH Limited
 

Ähnlich wie GERES presentation (20)

AWS Profile EN IR
AWS Profile EN IRAWS Profile EN IR
AWS Profile EN IR
 
Ceramic Brochure
Ceramic BrochureCeramic Brochure
Ceramic Brochure
 
Microtherm For Pipework
Microtherm For PipeworkMicrotherm For Pipework
Microtherm For Pipework
 
Final grouting freezing
Final grouting freezingFinal grouting freezing
Final grouting freezing
 
DMUG 2016 - Bethan Tuckett-Jones, WSP Parsons Brinkerhoff
DMUG 2016 - Bethan Tuckett-Jones, WSP Parsons BrinkerhoffDMUG 2016 - Bethan Tuckett-Jones, WSP Parsons Brinkerhoff
DMUG 2016 - Bethan Tuckett-Jones, WSP Parsons Brinkerhoff
 
Thermobreak Solar - Brochure 230914 D
Thermobreak Solar - Brochure 230914 DThermobreak Solar - Brochure 230914 D
Thermobreak Solar - Brochure 230914 D
 
Study On The External Gas-Assisted Mold Temperature Control For Thin Wall Inj...
Study On The External Gas-Assisted Mold Temperature Control For Thin Wall Inj...Study On The External Gas-Assisted Mold Temperature Control For Thin Wall Inj...
Study On The External Gas-Assisted Mold Temperature Control For Thin Wall Inj...
 
Empur preisliste 2014_2015
Empur preisliste 2014_2015Empur preisliste 2014_2015
Empur preisliste 2014_2015
 
The art of troubleshooting mist eliminators - Begg Cousland - COBRAS 2015
The art of troubleshooting mist eliminators - Begg Cousland - COBRAS 2015The art of troubleshooting mist eliminators - Begg Cousland - COBRAS 2015
The art of troubleshooting mist eliminators - Begg Cousland - COBRAS 2015
 
GERES Heat Exchanger Cluster
GERES Heat Exchanger ClusterGERES Heat Exchanger Cluster
GERES Heat Exchanger Cluster
 
Thermobreak Tube - Brochure 230914 D
Thermobreak Tube - Brochure 230914 DThermobreak Tube - Brochure 230914 D
Thermobreak Tube - Brochure 230914 D
 
Gyromat in tunnelling practice
Gyromat in tunnelling practiceGyromat in tunnelling practice
Gyromat in tunnelling practice
 
Experimental Investigation of Reinforced Concrete Beam with Opening for Combi...
Experimental Investigation of Reinforced Concrete Beam with Opening for Combi...Experimental Investigation of Reinforced Concrete Beam with Opening for Combi...
Experimental Investigation of Reinforced Concrete Beam with Opening for Combi...
 
Thermobreak Thermacoil - Brochure 270814 D
Thermobreak Thermacoil - Brochure 270814 DThermobreak Thermacoil - Brochure 270814 D
Thermobreak Thermacoil - Brochure 270814 D
 
BORED pile and pile cap design.ppt
BORED pile and pile cap design.pptBORED pile and pile cap design.ppt
BORED pile and pile cap design.ppt
 
HEAT TRANSFER AUGMENTATION OF LAMINAR NANOFLUID FLOW IN HORIZONTAL TUBE INSER...
HEAT TRANSFER AUGMENTATION OF LAMINAR NANOFLUID FLOW IN HORIZONTAL TUBE INSER...HEAT TRANSFER AUGMENTATION OF LAMINAR NANOFLUID FLOW IN HORIZONTAL TUBE INSER...
HEAT TRANSFER AUGMENTATION OF LAMINAR NANOFLUID FLOW IN HORIZONTAL TUBE INSER...
 
Isokern Celsius stove system installation instructions
Isokern Celsius stove system installation instructionsIsokern Celsius stove system installation instructions
Isokern Celsius stove system installation instructions
 
Smt vacuum void_reduction_sept2012
Smt vacuum void_reduction_sept2012Smt vacuum void_reduction_sept2012
Smt vacuum void_reduction_sept2012
 
Industrial Insulation Materials By Sheth Insulations Private Limited
Industrial Insulation Materials By Sheth Insulations Private LimitedIndustrial Insulation Materials By Sheth Insulations Private Limited
Industrial Insulation Materials By Sheth Insulations Private Limited
 
CATALOGE-PP AQUATECH.jpg
CATALOGE-PP AQUATECH.jpgCATALOGE-PP AQUATECH.jpg
CATALOGE-PP AQUATECH.jpg
 

Kürzlich hochgeladen

20200723_insight_release_plan_v6.pdf20200723_insight_release_plan_v6.pdf
20200723_insight_release_plan_v6.pdf20200723_insight_release_plan_v6.pdf20200723_insight_release_plan_v6.pdf20200723_insight_release_plan_v6.pdf
20200723_insight_release_plan_v6.pdf20200723_insight_release_plan_v6.pdfJamie (Taka) Wang
 
Babel Compiler - Transforming JavaScript for All Browsers.pptx
Babel Compiler - Transforming JavaScript for All Browsers.pptxBabel Compiler - Transforming JavaScript for All Browsers.pptx
Babel Compiler - Transforming JavaScript for All Browsers.pptxYounusS2
 
AI Fame Rush Review – Virtual Influencer Creation In Just Minutes
AI Fame Rush Review – Virtual Influencer Creation In Just MinutesAI Fame Rush Review – Virtual Influencer Creation In Just Minutes
AI Fame Rush Review – Virtual Influencer Creation In Just MinutesMd Hossain Ali
 
RAG Patterns and Vector Search in Generative AI
RAG Patterns and Vector Search in Generative AIRAG Patterns and Vector Search in Generative AI
RAG Patterns and Vector Search in Generative AIUdaiappa Ramachandran
 
Spring24-Release Overview - Wellingtion User Group-1.pdf
Spring24-Release Overview - Wellingtion User Group-1.pdfSpring24-Release Overview - Wellingtion User Group-1.pdf
Spring24-Release Overview - Wellingtion User Group-1.pdfAnna Loughnan Colquhoun
 
UiPath Studio Web workshop series - Day 8
UiPath Studio Web workshop series - Day 8UiPath Studio Web workshop series - Day 8
UiPath Studio Web workshop series - Day 8DianaGray10
 
Basic Building Blocks of Internet of Things.
Basic Building Blocks of Internet of Things.Basic Building Blocks of Internet of Things.
Basic Building Blocks of Internet of Things.YounusS2
 
Meet the new FSP 3000 M-Flex800™
Meet the new FSP 3000 M-Flex800™Meet the new FSP 3000 M-Flex800™
Meet the new FSP 3000 M-Flex800™Adtran
 
UiPath Studio Web workshop series - Day 6
UiPath Studio Web workshop series - Day 6UiPath Studio Web workshop series - Day 6
UiPath Studio Web workshop series - Day 6DianaGray10
 
UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...
UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...
UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...UbiTrack UK
 
GenAI and AI GCC State of AI_Object Automation Inc
GenAI and AI GCC State of AI_Object Automation IncGenAI and AI GCC State of AI_Object Automation Inc
GenAI and AI GCC State of AI_Object Automation IncObject Automation
 
Artificial Intelligence & SEO Trends for 2024
Artificial Intelligence & SEO Trends for 2024Artificial Intelligence & SEO Trends for 2024
Artificial Intelligence & SEO Trends for 2024D Cloud Solutions
 
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCostKubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCostMatt Ray
 
Designing A Time bound resource download URL
Designing A Time bound resource download URLDesigning A Time bound resource download URL
Designing A Time bound resource download URLRuncy Oommen
 
Cybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptxCybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptxGDSC PJATK
 
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesHow to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesThousandEyes
 
Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024SkyPlanner
 
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve DecarbonizationUsing IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve DecarbonizationIES VE
 
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdfIaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdfDaniel Santiago Silva Capera
 
Computer 10: Lesson 10 - Online Crimes and Hazards
Computer 10: Lesson 10 - Online Crimes and HazardsComputer 10: Lesson 10 - Online Crimes and Hazards
Computer 10: Lesson 10 - Online Crimes and HazardsSeth Reyes
 

Kürzlich hochgeladen (20)

20200723_insight_release_plan_v6.pdf20200723_insight_release_plan_v6.pdf
20200723_insight_release_plan_v6.pdf20200723_insight_release_plan_v6.pdf20200723_insight_release_plan_v6.pdf20200723_insight_release_plan_v6.pdf
20200723_insight_release_plan_v6.pdf20200723_insight_release_plan_v6.pdf
 
Babel Compiler - Transforming JavaScript for All Browsers.pptx
Babel Compiler - Transforming JavaScript for All Browsers.pptxBabel Compiler - Transforming JavaScript for All Browsers.pptx
Babel Compiler - Transforming JavaScript for All Browsers.pptx
 
AI Fame Rush Review – Virtual Influencer Creation In Just Minutes
AI Fame Rush Review – Virtual Influencer Creation In Just MinutesAI Fame Rush Review – Virtual Influencer Creation In Just Minutes
AI Fame Rush Review – Virtual Influencer Creation In Just Minutes
 
RAG Patterns and Vector Search in Generative AI
RAG Patterns and Vector Search in Generative AIRAG Patterns and Vector Search in Generative AI
RAG Patterns and Vector Search in Generative AI
 
Spring24-Release Overview - Wellingtion User Group-1.pdf
Spring24-Release Overview - Wellingtion User Group-1.pdfSpring24-Release Overview - Wellingtion User Group-1.pdf
Spring24-Release Overview - Wellingtion User Group-1.pdf
 
UiPath Studio Web workshop series - Day 8
UiPath Studio Web workshop series - Day 8UiPath Studio Web workshop series - Day 8
UiPath Studio Web workshop series - Day 8
 
Basic Building Blocks of Internet of Things.
Basic Building Blocks of Internet of Things.Basic Building Blocks of Internet of Things.
Basic Building Blocks of Internet of Things.
 
Meet the new FSP 3000 M-Flex800™
Meet the new FSP 3000 M-Flex800™Meet the new FSP 3000 M-Flex800™
Meet the new FSP 3000 M-Flex800™
 
UiPath Studio Web workshop series - Day 6
UiPath Studio Web workshop series - Day 6UiPath Studio Web workshop series - Day 6
UiPath Studio Web workshop series - Day 6
 
UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...
UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...
UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...
 
GenAI and AI GCC State of AI_Object Automation Inc
GenAI and AI GCC State of AI_Object Automation IncGenAI and AI GCC State of AI_Object Automation Inc
GenAI and AI GCC State of AI_Object Automation Inc
 
Artificial Intelligence & SEO Trends for 2024
Artificial Intelligence & SEO Trends for 2024Artificial Intelligence & SEO Trends for 2024
Artificial Intelligence & SEO Trends for 2024
 
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCostKubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
 
Designing A Time bound resource download URL
Designing A Time bound resource download URLDesigning A Time bound resource download URL
Designing A Time bound resource download URL
 
Cybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptxCybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptx
 
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesHow to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
 
Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024
 
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve DecarbonizationUsing IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
 
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdfIaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
 
Computer 10: Lesson 10 - Online Crimes and Hazards
Computer 10: Lesson 10 - Online Crimes and HazardsComputer 10: Lesson 10 - Online Crimes and Hazards
Computer 10: Lesson 10 - Online Crimes and Hazards
 

GERES presentation

  • 2. ©  GERES  GmbH,  Meine,  An  der  Feuerwehr  11,  38527  Meine,  Tel.  05304  -­‐  90  12  31,  info@geres-­‐gmbh.com 1hIp://geres-­‐gmbh.com InhalteInhalte 1. The coiled GERES® heat exchanger 2. Focus in the development of the system 3. Pipe properties 4. Ground probe details (Dimensions und weights) 5. The ground probe in the borehole 6. Comparing ground probe systems 7. Workflow with the GERES® -ground probe system 8. Heat Exchanger Cluster - A new development 9. Heat Exchanger Cluster - Applications 10. Conclusion
  • 3. ©  GERES  GmbH,  Meine,  An  der  Feuerwehr  11,  38527  Meine,  Tel.  05304  -­‐  90  12  31,  info@geres-­‐gmbh.com 2hIp://geres-­‐gmbh.com The coiled GERESThe coiled GERES®® heat exchangerheat exchanger  Which solution does the GERES system offer?  Confronting depth delimitations, a solution until 35 m [115 ft] maximum depth  Best utilization of the energy in the geology  Robust pipe material  Multi-purpose heat exchanger, can be used in a different medium as in the geology (see, river, lake, sewage treatment plant)  Low compression effort  Low effort laying and connecting the pipes  Facing volume delimitations - saving 60% glycol-mixture  100% impermeability against gases in the soil  This properties are the best investment protection,  the reducing of guarantee risk,  and best possible protection of the geology
  • 4. ©  GERES  GmbH,  Meine,  An  der  Feuerwehr  11,  38527  Meine,  Tel.  05304  -­‐  90  12  31,  info@geres-­‐gmbh.com 3hIp://geres-­‐gmbh.com Focus in the development of the systemFocus in the development of the system  Which was the focus GERES ® had in the development of the system? 1. Security:  From the beginning GERES was looking for a composite pipe. Why? Applications of force or punctual pressure on the pipe are well absorbed, because the pressure on the exterior layer is distributed on a larger surface in the next layer. A further characteristics of the pipe, it expands minimal under pressure and have no crack propagation.  The ground probe consists out of one pipe, which means you have no joints in the soil  The ground probe is 100% impermeable against gases in the soil  Die GERES® -ground probe can be sinked unfilled, which minimize the the arising forces during the sinking process and prevent damages on the ground probe 2. Optimal energy absorption:  Good thermal conductivity of the pipe  By the coil form we achieve a turbulent-similar flow in the ground probe  The coil of the ground probe is adjustable and thus you can adapt the ground probe to the individual geology to obtain the optimal energy extraction  By the spiral form, the influence of the “cold” conductor on the “heated” conductor is minimized 3. Optimization in the workflow:  The GERES® -ground probe can be sinked unfilled  For connecting pipes we use a press-fitting-system which make you independent from meteorological conditions  Reducing the compression effort because the pipe expands under pressure very minimal  The calculation of loss pressure is simplified because the ground probes have standard dimensions
  • 5. ©  GERES  GmbH,  Meine,  An  der  Feuerwehr  11,  38527  Meine,  Tel.  05304  -­‐  90  12  31,  info@geres-­‐gmbh.com 4hIp://geres-­‐gmbh.com Pipe propertiesPipe properties A confrontation 100 Years / 30 bar100 Years / 15 bar100 Years / 15,7 barat 20°C [68°F] 100 Years / 26 bar100 Years / 13,3 bar50 Years / 13,5 barat 30°C [86°F] 100 Years / 22 bar100 Years / 11,8 bar50 Years / 11,6 barat 40°C [104°F] 100 Years / 20 bar100 Years / 10,5 bar15 Years / 10,4 barat 50°C [122°F] 0,025 mm / (m*K) [0.00098*10-6 in / in *°F] 0,15 mm / (m*K) [0.0059*10-6 in / in *°F] 0,20 mm / (m*K) [0.0787*10-6 in / in *°F] Coefficient of linear thermal expansion No malfunctionNo malfunction200 - 2000 hCrack propagation 50 Years / 14 bar--at 95°C [203°F] 0,0004 mm [0.000015 in] 0,007 mm [0.0027 in] 0,04 mm [0.0014 in] Surface roughness 50 Years / 16 bar15 Years / 6,9 bar-at 90°C [194°F] at 80°C [176°F] at 70°C [158°F] at 60°C [140°F] Creep values 25 Years / 20 bar25 Years / 7,6 bar- 50 Years / 18 bar50 Years / 8,5 bar2 Years / 6,2 bar 50 Years / 20 bar50 Years / 9,5 bar5 Years / 7,5 bar PE-RT - AL - PE-RT (GERES®-probe)PE-XaPE-100
  • 6. ©  GERES  GmbH,  Meine,  An  der  Feuerwehr  11,  38527  Meine,  Tel.  05304  -­‐  90  12  31,  info@geres-­‐gmbh.com 5hIp://geres-­‐gmbh.com Ground probe detailsGround probe details a.) 600 L/h at 300 mbar [131.98 gal/h ] b.) 480 L/h at 250 mbar [105.58 gal|h] a.) 540 L/h at 300 mbar [118.78 gal/h] b.) 460 L/h at 250 mbar [101.18 gal/h] c.) 360 L/h at 200 mbar [79.18 gal/h] a.) 600 L/h at 300 mbar [131.98 gal/h ] b.) 700 L/h at 400 mbar [153.97 gal/h] Flow rate (Water/Glycol-mixture 27%) 14 L [3.07 gal]14 L [3.07 gal]32 L [7.03 gal]Glycol-mixture 55 m [180 ft]55 m [180 ft]93 m [305 ft]Pipe length --20 kg [44 lb]Additional weight 22,5 kg [49.6 lb]35,5 kg [78.2 lb]78 kg [172 lb]Entire weight -13 kg [28.6 lb]10 kg [22 lb]Casted weight 8,5 kg [18,73 lb]8,5 kg [18,73 lb]16 kg [35.27 lb]Pipe weight 300 mm [11.8 in ]125 mm - 130 mm [4.9 in - 5.1 in ]150 mm - 155 mm [5.9 in - 6.1 in]Ground probe diameter 3 m - 8 m [10 ft - 26 ft]6 m - 23 m [19 ft - 75 ft]10 m - 34 m [32 ft - 111 ft]Telescopic (installation depth) 10 m [32 ft]23 m [75 ft]36 m [118 ft] (+ add. Weight)Depth 22 mm x 2,0 mm [0.86 in x 0.078 in]22 mm x 2,0 mm [0.86 in x 0.078 in]25 mm x 2,0 mm [0.98 in x 0.078 in]Pipe dimension Energy pile 10 m [32 ft]Ground probe 23 m [75 ft]Ground probe 35 m [115 ft]Properties
  • 7. ©  GERES  GmbH,  Meine,  An  der  Feuerwehr  11,  38527  Meine,  Tel.  05304  -­‐  90  12  31,  info@geres-­‐gmbh.com 6hIp://geres-­‐gmbh.com The ground probe in the boreholeThe ground probe in the borehole GERES® -ground probe (35 m - 115 ft) and additional weight Parts of the ground probe: a) 1 x pipe b) Casted weight c) 1 x additional weight Facts about the ground probe in the borehole:  First 5 m [16 ft] no coils  Between 5 m and 34 m [16 ft - 111.5 ft] coiled ground probe  The coiled part of the ground probe is at the exterior part of the borehole, which improve the energy absorption Facts borehole (in some countries very relevant aspects for authorities):  At the first 5 m [16 ft] are used 2 m [6.5 ft] pipe/meter  Between 5 m and 34 m [16 ft - 111.5 ft], are used 2,75 m [9 ft] pipe/meter  Between the spreaded coils the grouting material can be better distributed  More grouting material as used at a Duplex ground probe, which makes the filled borehole more stable  The composite pipe expands very low under pressure, which cause less motion in the filled and cured borehole and makes the cured borehole more stable  By the spiral form is the ground probe more in the exterior part of the borehole which offer a more homogenous cured borehole, because of the more of grouting material in the interior of the borehole which is seamless connected to the grouting material between the coils unto the borehole wall  4 walls to the geology (3 layers of the composite pipe and the cured borehole)  1 pipe, no joints  Minimal reciprocal influence  Turbulent-similar flow  Can be unfilled sinked  100% impermeability against gases Switching arc in the casted weight Distance between the spreaded coils, 25 - 30 cm [9 in - 11.8 in] Additional weight
  • 8. ©  GERES  GmbH,  Meine,  An  der  Feuerwehr  11,  38527  Meine,  Tel.  05304  -­‐  90  12  31,  info@geres-­‐gmbh.com 7hIp://geres-­‐gmbh.com Comparing ground probe systemsComparing ground probe systems A low thermal resistance in the drilled borehole, because the coiled segment is in the exterior part of the borehole. A high thermal resistance in the drilled borehole, because the pipes are in the middle of the borehole. If the ground probe is sinked unfilled, the probability of scoring the pipes are very low. If the ground probe face resistance in the borehole, the force effect is on the exterior layer (PE-RT) of the pipe. The force effect will be forwarded in reduced form, on a larger surface on the second layer (Al). The Aluminum layer which also absorb a part of the received force, will forward a lower part of the received force, on a larger surface to the interior layer (PE-RT). [A common characteristic of composite materials is to distribute the energy of arising forces on larger surfaces to incorporated layers. This characteristic prevent possible damages.] No score propagation. The pipe-material is sensitive to notches , scoring and crack propagation. 8 x lower dilatation: 0,025 mm / (m*K) [0.00098*10-6 in / in *°F] Coefficient of linear thermal Expansion: 0,20 mm / (m*K) [0.0787*10-6 in / in *°F] The coiled part of the ground probe cross just with the exterior part of the pipe the sharp edges. If the ground probe is sinked unfilled, it will slide and rotate along the edges because there is no weight behind. Arising scratches can be 2-4 mm length at the exterior part of the coiled part of the ground probe. Sharp edges in the borehole can damage the pipe material, along a big distance, because the pipe cross the edges during the complete sinking. The coils can be adjusted to the individual geology.Not adjustable to the geology. 100 % diffusion sealed against gases in the soil.Penetrable for gases in the soil. Because of the coiled construction, a turbulent similar flow.Because of the construction, a laminar flow in the pipe. Can be sinked without being filled.Can be sinked just filled. Low reciprocal influence, because the coil is in the external area of the borehole. The straight pipe segment, in the interior of the coil, cross the coiled segment at 3-4 points per meter. Reciprocal influence. 1 Pipe, no joints in the geology.4 Pipes, 4 joints in the geology. GERES ® -ground probeDuplex-ground probe
  • 9. ©  GERES  GmbH,  Meine,  An  der  Feuerwehr  11,  38527  Meine,  Tel.  05304  -­‐  90  12  31,  info@geres-­‐gmbh.com 8hIp://geres-­‐gmbh.com Workflow with the GERESWorkflow with the GERES®® -ground probe system-ground probe system - 10 Min. 10 bar (Temperature compensation), - 30 Min. 10 bar (Final compression check) - Simplified hydraulic calculation, since the probe length is always alike - Small filling and exhaust expenditure, due to smaller volume contents (only 40% of the volume of a PE 100 duplex probe) 6. Compression check of the entire installation - Connecting pipe is fast installable without the need of moldings, with small bending radii (5 x Ø) - Connecting pipe is fast installable with a press-fitting-system - Modular distributor 5. Connecting pipe transfer and distributor installation - No mounting of spacer, because the probe is inherently stable - The probe can be unfilled sinked - a weight is already installed in the factory - Insensitively to notches, scoring and crack propagation - Easily installation of a re-usable injection pipe/tube by the large interior of the probe 4. Sinking the probe - Adjusting the probe on the drilling depth - Visual check, no leakage test necessarily 3. Probe preparation for appropriate depth - Protection of deeper water layer - Minimized drilling risk, because the borehole is never deeper as 36 m [118 ft] 2. Drilling - Use of small drilling equipment; close space conditions are well attainable1. Setting up the installation site
  • 10. ©  GERES  GmbH,  Meine,  An  der  Feuerwehr  11,  38527  Meine,  Tel.  05304  -­‐  90  12  31,  info@geres-­‐gmbh.com 9hIp://geres-­‐gmbh.com Heat Exchanger Cluster - A new developmentHeat Exchanger Cluster - A new development Cluster short description Supporting construction out of stainless steel, Distributor square tube 40/40/3 mm [1.57/1.57/0.11 in], 6 angle supports, 36 tubular supports for the heat exchanger, 9 heat exchanger out of composite pipe Support material Stainless steel : 1.4571 Technical data heat exchanger Tube length / heat exchanger: 55 m [180 ft] Composite pipe: 22 x 2,0 mm [0.86 in x 0.078 in] Heat-abstraction capacity / cluster : 12,000 W at a temperature difference of 3 K to the medium in which the clusters are used Loss of pressure : 270 mbar at 4000 L/h [880 gal/h] Connections 18 Pressing connections 22 x 3/4" AG to the distributor Distributor : 1" AG Dimensions Width: 3000 mm [118 in] Height: 2200 - 3000 mm [86.6 - 118 in] Ø heat exchanger: 300 mm [1.18 in] The distributor tubes must be connected by the Tichelmann system.
  • 11. ©  GERES  GmbH,  Meine,  An  der  Feuerwehr  11,  38527  Meine,  Tel.  05304  -­‐  90  12  31,  info@geres-­‐gmbh.com 10hIp://geres-­‐gmbh.com Heat Exchanger Cluster - ApplicationsHeat Exchanger Cluster - Applications The heat exchangers used in the clusters are like the GERES® heat exchanger for geothermal use, out of the same composite pipe. The same composite pipe serves at this specific usage also for energy extraction out of clarified and unclarified liquids. The heat exchangers used in the GERES®-clusters are made out of one pipe and seamless in the used medium. PE-RT Adhesive Aluminium (centred; 0,3 mm - 11.8 th) Adhesive PE-RT There are many possibilities to obtain energy for solutions driven by heat pump technology! GERES® GmbH develop a cluster of heat exchangers which can be used in a liquid medium. Lakes, Rivers, Sea, Sewage treatment plants, Textile industry, Chemical industry, Food industry to name some of the possible opportunities, where the clustered heat exchanger offer a good and efficient service its operators. The particular advantage of the clusters is that reservoirs do not have to be rebuilt or modified, because the register fit into each bowl and do not need a clarified liquid. When used in unclarified liquids the cluster can be easily cleaned, using a high pressure lance, from the bowl edge. The clusters can be also used in aggressive media. In the case of specific use in an aggressive media, we recommend to contact us to adapt the material for the supporting construction to the specific requirements.
  • 12. ©  GERES  GmbH,  Meine,  An  der  Feuerwehr  11,  38527  Meine,  Tel.  05304  -­‐  90  12  31,  info@geres-­‐gmbh.com 11hIp://geres-­‐gmbh.com ConclusionConclusion  Does GERES ® offer more then a product? GERES® GmbH offer its customers, engineer-offices and drilling partners beside the optimized products reliable technology. Every customer of GERES will consider to plan his projects accurate, optimized in costs and benefit. But also being ambitious in delivering sustainable services. A system with good abstraction capabilities is one of the persistent impressions. The partner of GERES® focus their attention also at the business relevant aspects: 1. To install the ground probes easy as possible 2. So fast as possible. 3. The used material should exclude so good as possible guarantee claims. 4. GERES® GmbH offer its customer a multi-purpose system which can be used also in the sea, a river, a lake, or sewage treatment plant.