SlideShare ist ein Scribd-Unternehmen logo
1 von 24
Downloaden Sie, um offline zu lesen
Dr. Ahmed-Refat AG Refat   www.Slideshare.net/AhmedRefat Risk Management System, 2012




Risk Management System
       In Occupational Health Setting



                              ‫إدارة املخاطر‬
                     ‫يف جمال الصحة املهنية‬




          Dr. Ahmed-Refat AG Refat
               Prof. Occupational Medicine
                    Tibsah University, KSA
                                       2012
                                           1
Dr. Ahmed-Refat AG Refat   www.Slideshare.net/AhmedRefat Risk Management System, 2012


Basic Concepts and Definitions


1- Hazard and Risk


Hazard

    A source of potential harm
    Anything that has the potential to
     cause harm
    A factor or exposure that may
     adversely affect health.
Risk

Risk = The probability that an adverse event will
             occur

Risk = The chance of something happening that
             will have an impact on objectives.

            Risk was measured in terms of
         Consequences and the Likelihood

                                           2
Dr. Ahmed-Refat AG Refat   www.Slideshare.net/AhmedRefat Risk Management System, 2012

2 - Risk Management System " RMS"
    RMS is an ongoing process of identifying,
       quantifying and ranking risks and their
       associated losses, and developing cost
       effective management strategies to
       eliminate or control the risks.



Risk Evaluation = identifying risks, setting
   priorities commissioning and reviewing
                           risk assessment .




   Risk Assessment = combination of Risk
       identification, risk analysis and risk
                                 evaluation




                                           3
Dr. Ahmed-Refat AG Refat   www.Slideshare.net/AhmedRefat Risk Management System, 2012

 Steps of Risk Management Process

The risk management process consists of a
series of steps that, when undertaken in
sequence, enable continual improvement in
decision-making.


   1. Establish the context

   2. Identify hazards

   3. Analyse risks that may result because of the
       hazard

   4. Evaluate the risks

   5. Treat the risks

   6. Review and Monitor the risk




                                           4
Dr. Ahmed-Refat AG Refat   www.Slideshare.net/AhmedRefat Risk Management System, 2012




                                           5
Dr. Ahmed-Refat AG Refat   www.Slideshare.net/AhmedRefat Risk Management System, 2012




Step 1 Establish the context

The first step in managing risk is to gather
background             information             which       relates       to     the
organization as a whole as well as the particular risk
management study. This establishes the context
within which OHS risks are managed.



                                           6
Dr. Ahmed-Refat AG Refat   www.Slideshare.net/AhmedRefat Risk Management System, 2012

Step 2 Hazard Identification

Risk cannot be managed unless it is first
identified.
The aim of risk identification is to identify
possible risks that may affect, either negatively
or positively, the objectives of the organization
and the activity under analysis. .


Identifying retrospective risks


Retrospective risks are those that have
previously occurred.


There are many sources of information about
retrospective risk. These include:
• hazard or incident logs or registers
• audit reports
• customer complaints
• accreditation documents and reports

                                           7
Dr. Ahmed-Refat AG Refat   www.Slideshare.net/AhmedRefat Risk Management System, 2012

• past staff or client surveys
• newspapers or professional media, such as
journals or websites.


Identifying prospective risks


Prospective risks are often harder to identify. These
are things that have not yet happened, but might
happen some time in the future.


Identification should include all risks, whether or not
they are currently being managed.
Methods for identifying prospective risks:
• brainstorming with staff
• researching the economic, political,
     legislative and operating environment
• conducting interviews with relevant people
     and/or organisations
• undertaking surveys of staff or clients .
• flow charting a process


                                           8
Dr. Ahmed-Refat AG Refat   www.Slideshare.net/AhmedRefat Risk Management System, 2012




When
    When a job is first undertaken
    When a new piece of equipment is installed
    When new or relevant information regarding health
       and safety becomes available from an authoritative
       source
    When substantial changes are made to a system of
       work
    When there has been an injury to a person
       undertaking a job or to a person near where a job is
       being performed
    Following an accident that did not result in an injury
       or damage


                                           9
Dr. Ahmed-Refat AG Refat   www.Slideshare.net/AhmedRefat Risk Management System, 2012
    When there is evidence to suggest that a current risk
       assessment is no longer valid
    When hazardous substances and/or dangerous goods
       are introduced into the workplace
    As part of the design and construction of a new
       facility
    Prior to conducting an experiment
    As part of developing and designing a new subject,
       unit or course outline
    Prior to conducting a field trip




Step 3. Analyse the risks

Risk analysis involves combining the possible
consequences, or impact, of an event, with the
likelihood of that event occurring. The result is a
‘level of risk’. That is:



       Risk = consequence x likelihood




                                          11
Dr. Ahmed-Refat AG Refat   www.Slideshare.net/AhmedRefat Risk Management System, 2012

Elements of risk analysis
The elements of risk analysis are as follows:
1. Identify existing strategies and controls that act to
    minimise negative risk and enhance pportunities.
2. Determine the consequences of a negative impact
    or an opportunity
3. Determine the likelihood of a negative
    consequence or an opportunity.
4. Estimate the level of risk by combining
consequence and likelihood.
5. Consider and identify any uncertainties in the
estimates.


Types of analysis
Three categories or types of analysis can be used to
determine level of risk:
       • Qualitative
       • Semi-quantitative
       • Quantitative.




                                          11
Dr. Ahmed-Refat AG Refat   www.Slideshare.net/AhmedRefat Risk Management System, 2012

A- Qualitative risk analysis
Qualitative risk analysis is simple and easy to
understand. Disadvantages include the fact that it is
subjective and is based on insight, which can lead
to the forming of bias and can degrade the validity
of the results.
Methods for qualitative risk analysis include:
• brainstorming
• evaluation using multi-disciplinary groups
• specialist and expert judgement
• structured interviews and/or questionnaires
• word picture descriptors and risk categories.

                      Items in risk analysis

Risk = likelihood x consequence




                                          12
Dr. Ahmed-Refat AG Refat   www.Slideshare.net/AhmedRefat Risk Management System, 2012

 Likelihood




                                          13
Dr. Ahmed-Refat AG Refat   www.Slideshare.net/AhmedRefat Risk Management System, 2012




                                          14
Dr. Ahmed-Refat AG Refat   www.Slideshare.net/AhmedRefat Risk Management System, 2012

 B- Consequences




                                          15
Dr. Ahmed-Refat AG Refat    www.Slideshare.net/AhmedRefat Risk Management System, 2012




Step 4. Evaluate the risks

Risk evaluation involves comparing the level of risk
  found during the analysis process with previously
established risk criteria, and deciding whether these
                           risks require treatment.


 The result of a risk evaluation is a prioritised list of
                 risks that require further action.


      This step is about deciding whether risks are
                   acceptable or need treatment.
                                           16
Dr. Ahmed-Refat AG Refat   www.Slideshare.net/AhmedRefat Risk Management System, 2012



Methods of Risk Ranking
1- A qualitative ( subjective ) method : Risk
        ranking Matrix.
2- A semi quantitative method by using : Fine
        Risk Score Calculator
3- A semi quantitative method by using : Risk
        Nomogram


Risk Ranking Matrix




                                          17
Dr. Ahmed-Refat AG Refat   www.Slideshare.net/AhmedRefat Risk Management System, 2012




                                          18
Dr. Ahmed-Refat AG Refat   www.Slideshare.net/AhmedRefat Risk Management System, 2012

Risk acceptance

Low or tolerable risks may be accepted.
‘Acceptable’ means the business chooses to
‘accept’ that the risk exists, either because the risk
is at a low level and the cost of treating the risk will
outweigh the benefit, or there is no reasonable
treatment that can be implemented. This is also
known as ALARP (as low as reasonably practicable).


A risk may be accepted for the following reasons:
• The cost of treatment far exceeds the benefit, so
that acceptance is the only option (applies
particularly to lower ranked risks)
• The level of the risk is so low that specific
treatment is not appropriate with available
resources
• The opportunities presented outweigh the threats
to such a degree that the risk is justified
• The risk is such that there is no treatment
available, for example the risk that the business may
suffer storm damage.

                                          19
Dr. Ahmed-Refat AG Refat   www.Slideshare.net/AhmedRefat Risk Management System, 2012

 Other Methods of Risk Ranking


2- A semi quantitative method by using :
      Fine         Risk Score Calculator




                                          21
Dr. Ahmed-Refat AG Refat   www.Slideshare.net/AhmedRefat Risk Management System, 2012

3- A semi quantitative: Risk Nomogram




Step 5. Treat and control the risks

Risk treatment involves identifying options for
treating or controlling risk, in order to either reduce
or eliminate negative consequences, or to reduce
the likelihood of an adverse occurrence. Risk
treatment should also aim to enhance positive
outcomes.


It is often either not possible or cost-effective to
implement all treatment strategies.

                                          21
Dr. Ahmed-Refat AG Refat   www.Slideshare.net/AhmedRefat Risk Management System, 2012

                  Hierarchy of control




                                          22
Dr. Ahmed-Refat AG Refat   www.Slideshare.net/AhmedRefat Risk Management System, 2012

Options for risk treatment

Avoid the risk

One method of dealing with risk is to avoid the risk
by not proceeding with the activity likely to generate
the risk. Risk avoidance should only occur when
control measures do not exist or do not reduce the
risk to an acceptable level.


Change the likelihood of the occurrence


This option enhances the likelihood of beneficial
outcomes and reduces the possibility of loss.


Change the consequences


This will increase the size of gains and reduce the
size of losses. This may include business continuity
plans, and emergency and contingency plans.




                                          23
Dr. Ahmed-Refat AG Refat   www.Slideshare.net/AhmedRefat Risk Management System, 2012

Share the risk


Part or most of a risk may be transferred to another
party so that they share responsibility.
Mechanisms for risk transfer include contracts,
insurance, partnerships and business alliances.


Retain the risk


After risks have been reduced or transferred,
residual risk may be retained if it is at an acceptable
level.

Step 6- Monitor and review

Monitor and review is an essential and integral step
in the risk management process.
Risks need to be monitored periodically to ensure
changing circumstances do not alter the risk
priorities. Very few risks will remain static, therefore
the risk management process needs to be regularly
repeated, so that new risks are captured in the
process and effectively managed.

                                          24

Weitere ähnliche Inhalte

Was ist angesagt?

Occupational health and safety implementation
Occupational health and safety implementationOccupational health and safety implementation
Occupational health and safety implementationDr Madhu Aman Sharma
 
what is Hazard..?
what is Hazard..?what is Hazard..?
what is Hazard..?CHMURLIDHAR
 
Topic no.1 occupationa health
Topic no.1  occupationa healthTopic no.1  occupationa health
Topic no.1 occupationa healthEiyla Hamdan
 
Safety and you
Safety and youSafety and you
Safety and youAnbr Cama
 
قانون العمل المصري الكتاب الخامس (1)
قانون العمل المصري الكتاب الخامس (1)قانون العمل المصري الكتاب الخامس (1)
قانون العمل المصري الكتاب الخامس (1)مصطفى حافظ الجندى
 
4 basic cargo occupational safety
4   basic cargo occupational safety4   basic cargo occupational safety
4 basic cargo occupational safetyMohamed Tayfour
 
Behavior And Safety
Behavior And SafetyBehavior And Safety
Behavior And Safetyguestbc6b08
 
Risk Assessment: Creating a Risk Matrix
Risk Assessment: Creating a Risk MatrixRisk Assessment: Creating a Risk Matrix
Risk Assessment: Creating a Risk MatrixEtQ, Inc.
 
Accident Investigation Training by Construction Compliance Training Center
Accident Investigation Training by Construction Compliance Training CenterAccident Investigation Training by Construction Compliance Training Center
Accident Investigation Training by Construction Compliance Training CenterAtlantic Training, LLC.
 
Chapter4 emergency preparedness
Chapter4 emergency preparednessChapter4 emergency preparedness
Chapter4 emergency preparednesspokjak80
 
Identification of hazard industry and risk assessment
Identification of hazard industry and risk assessment Identification of hazard industry and risk assessment
Identification of hazard industry and risk assessment NishanPrasad1
 
Emba hsem ppt hazard id.ev.sg_20104006-8-9_16-9
Emba hsem ppt hazard id.ev.sg_20104006-8-9_16-9Emba hsem ppt hazard id.ev.sg_20104006-8-9_16-9
Emba hsem ppt hazard id.ev.sg_20104006-8-9_16-9Sarjeevan Sainbhi
 
Industry risk assessment and risk managemnt
Industry risk assessment and risk managemntIndustry risk assessment and risk managemnt
Industry risk assessment and risk managemntMd Niamul Islam
 
Risk management intruduction part 1
Risk management intruduction  part 1Risk management intruduction  part 1
Risk management intruduction part 1MEEQAT HOSPITAL
 

Was ist angesagt? (20)

نموذج تقييم الحوادث
نموذج تقييم الحوادثنموذج تقييم الحوادث
نموذج تقييم الحوادث
 
Occupational health and safety implementation
Occupational health and safety implementationOccupational health and safety implementation
Occupational health and safety implementation
 
Risk assessment-training
Risk assessment-trainingRisk assessment-training
Risk assessment-training
 
what is Hazard..?
what is Hazard..?what is Hazard..?
what is Hazard..?
 
Topic no.1 occupationa health
Topic no.1  occupationa healthTopic no.1  occupationa health
Topic no.1 occupationa health
 
Safety and you
Safety and youSafety and you
Safety and you
 
قانون العمل المصري الكتاب الخامس (1)
قانون العمل المصري الكتاب الخامس (1)قانون العمل المصري الكتاب الخامس (1)
قانون العمل المصري الكتاب الخامس (1)
 
4 basic cargo occupational safety
4   basic cargo occupational safety4   basic cargo occupational safety
4 basic cargo occupational safety
 
Behavior And Safety
Behavior And SafetyBehavior And Safety
Behavior And Safety
 
Risk Assessment: Creating a Risk Matrix
Risk Assessment: Creating a Risk MatrixRisk Assessment: Creating a Risk Matrix
Risk Assessment: Creating a Risk Matrix
 
Accident Investigation Training by Construction Compliance Training Center
Accident Investigation Training by Construction Compliance Training CenterAccident Investigation Training by Construction Compliance Training Center
Accident Investigation Training by Construction Compliance Training Center
 
Chapter4 emergency preparedness
Chapter4 emergency preparednessChapter4 emergency preparedness
Chapter4 emergency preparedness
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
INDUSTRIAL SAFETY
INDUSTRIAL SAFETYINDUSTRIAL SAFETY
INDUSTRIAL SAFETY
 
Identification of hazard industry and risk assessment
Identification of hazard industry and risk assessment Identification of hazard industry and risk assessment
Identification of hazard industry and risk assessment
 
Emba hsem ppt hazard id.ev.sg_20104006-8-9_16-9
Emba hsem ppt hazard id.ev.sg_20104006-8-9_16-9Emba hsem ppt hazard id.ev.sg_20104006-8-9_16-9
Emba hsem ppt hazard id.ev.sg_20104006-8-9_16-9
 
Introduction to Risk Management
Introduction to Risk ManagementIntroduction to Risk Management
Introduction to Risk Management
 
Industry risk assessment and risk managemnt
Industry risk assessment and risk managemntIndustry risk assessment and risk managemnt
Industry risk assessment and risk managemnt
 
Risk management intruduction part 1
Risk management intruduction  part 1Risk management intruduction  part 1
Risk management intruduction part 1
 
risk assessment
 risk assessment risk assessment
risk assessment
 

Andere mochten auch

Monitoring Occupational Environment
Monitoring  Occupational EnvironmentMonitoring  Occupational Environment
Monitoring Occupational EnvironmentAhmed-Refat Refat
 
بحث تقديم خدمات الصحة المهنية بالجامعات العربية
بحث تقديم خدمات الصحة المهنية بالجامعات العربيةبحث تقديم خدمات الصحة المهنية بالجامعات العربية
بحث تقديم خدمات الصحة المهنية بالجامعات العربيةAhmed-Refat Refat
 
نحو منشآت تعليمية و مستشفيات جامعية خالية من الزئبق
نحو منشآت تعليمية و مستشفيات جامعية  خالية من الزئبقنحو منشآت تعليمية و مستشفيات جامعية  خالية من الزئبق
نحو منشآت تعليمية و مستشفيات جامعية خالية من الزئبقAhmed-Refat Refat
 
مقالات في جريدة الأهرام
مقالات في جريدة الأهرام مقالات في جريدة الأهرام
مقالات في جريدة الأهرام Ahmed-Refat Refat
 
Environmental health-indicators-models-mc qs
Environmental health-indicators-models-mc qsEnvironmental health-indicators-models-mc qs
Environmental health-indicators-models-mc qsAhmed-Refat Refat
 
Medical Research Ethics-in Arabic
Medical Research Ethics-in ArabicMedical Research Ethics-in Arabic
Medical Research Ethics-in ArabicAhmed-Refat Refat
 
Glossary of Basic Public Health Terms معجم مصطلحات الصحة العامة الأساسية
Glossary of Basic Public Health Terms  معجم مصطلحات الصحة العامة الأساسية Glossary of Basic Public Health Terms  معجم مصطلحات الصحة العامة الأساسية
Glossary of Basic Public Health Terms معجم مصطلحات الصحة العامة الأساسية Ahmed-Refat Refat
 
Sustainable development-and-education
Sustainable development-and-educationSustainable development-and-education
Sustainable development-and-educationAhmed-Refat Refat
 
Install custom recovery
Install custom recoveryInstall custom recovery
Install custom recoveryIfah Anwar
 
Book of English for Public Health
Book of English for Public HealthBook of English for Public Health
Book of English for Public HealthIfah Anwar
 
Indicators of health
Indicators of healthIndicators of health
Indicators of healthPOOJA KUMAR
 
Health indicators an overview
Health indicators an overviewHealth indicators an overview
Health indicators an overviewAhmed-Refat Refat
 
presentation in JCIA awareness week
presentation in JCIA awareness weekpresentation in JCIA awareness week
presentation in JCIA awareness weekDralaa Holiel , Ph.D
 
Mysterious Epidemics الأوبئة الغامضة - قصص مثيرة لأشهر الأوبئة حول العالم
Mysterious Epidemics الأوبئة الغامضة - قصص مثيرة لأشهر الأوبئة حول العالمMysterious Epidemics الأوبئة الغامضة - قصص مثيرة لأشهر الأوبئة حول العالم
Mysterious Epidemics الأوبئة الغامضة - قصص مثيرة لأشهر الأوبئة حول العالمAhmed-Refat Refat
 
airway management data show by alaa holiel summary
airway management data show by alaa holiel summaryairway management data show by alaa holiel summary
airway management data show by alaa holiel summaryDralaa Holiel , Ph.D
 
JCI North Jersey 2016 Year End Awardees
JCI North Jersey 2016 Year End AwardeesJCI North Jersey 2016 Year End Awardees
JCI North Jersey 2016 Year End AwardeesJoyce Andes
 
وباء الإغماء الجماعي في المدارس المصرية : أبريل 1993
وباء الإغماء الجماعي في المدارس المصرية : أبريل 1993وباء الإغماء الجماعي في المدارس المصرية : أبريل 1993
وباء الإغماء الجماعي في المدارس المصرية : أبريل 1993Ahmed-Refat Refat
 

Andere mochten auch (20)

Monitoring Occupational Environment
Monitoring  Occupational EnvironmentMonitoring  Occupational Environment
Monitoring Occupational Environment
 
بحث تقديم خدمات الصحة المهنية بالجامعات العربية
بحث تقديم خدمات الصحة المهنية بالجامعات العربيةبحث تقديم خدمات الصحة المهنية بالجامعات العربية
بحث تقديم خدمات الصحة المهنية بالجامعات العربية
 
نحو منشآت تعليمية و مستشفيات جامعية خالية من الزئبق
نحو منشآت تعليمية و مستشفيات جامعية  خالية من الزئبقنحو منشآت تعليمية و مستشفيات جامعية  خالية من الزئبق
نحو منشآت تعليمية و مستشفيات جامعية خالية من الزئبق
 
مقالات في جريدة الأهرام
مقالات في جريدة الأهرام مقالات في جريدة الأهرام
مقالات في جريدة الأهرام
 
Environmental health-indicators-models-mc qs
Environmental health-indicators-models-mc qsEnvironmental health-indicators-models-mc qs
Environmental health-indicators-models-mc qs
 
Medical Research Ethics-in Arabic
Medical Research Ethics-in ArabicMedical Research Ethics-in Arabic
Medical Research Ethics-in Arabic
 
Glossary of Basic Public Health Terms معجم مصطلحات الصحة العامة الأساسية
Glossary of Basic Public Health Terms  معجم مصطلحات الصحة العامة الأساسية Glossary of Basic Public Health Terms  معجم مصطلحات الصحة العامة الأساسية
Glossary of Basic Public Health Terms معجم مصطلحات الصحة العامة الأساسية
 
Sustainable development-and-education
Sustainable development-and-educationSustainable development-and-education
Sustainable development-and-education
 
Install custom recovery
Install custom recoveryInstall custom recovery
Install custom recovery
 
Book of English for Public Health
Book of English for Public HealthBook of English for Public Health
Book of English for Public Health
 
Brochure pas a_pas
Brochure pas a_pasBrochure pas a_pas
Brochure pas a_pas
 
Indicators of health
Indicators of healthIndicators of health
Indicators of health
 
Health Indicators.. Dr.Padmesh
Health Indicators.. Dr.PadmeshHealth Indicators.. Dr.Padmesh
Health Indicators.. Dr.Padmesh
 
Health indicators an overview
Health indicators an overviewHealth indicators an overview
Health indicators an overview
 
presentation in JCIA awareness week
presentation in JCIA awareness weekpresentation in JCIA awareness week
presentation in JCIA awareness week
 
Mysterious Epidemics الأوبئة الغامضة - قصص مثيرة لأشهر الأوبئة حول العالم
Mysterious Epidemics الأوبئة الغامضة - قصص مثيرة لأشهر الأوبئة حول العالمMysterious Epidemics الأوبئة الغامضة - قصص مثيرة لأشهر الأوبئة حول العالم
Mysterious Epidemics الأوبئة الغامضة - قصص مثيرة لأشهر الأوبئة حول العالم
 
airway management data show by alaa holiel summary
airway management data show by alaa holiel summaryairway management data show by alaa holiel summary
airway management data show by alaa holiel summary
 
Airway management data show
Airway management data show Airway management data show
Airway management data show
 
JCI North Jersey 2016 Year End Awardees
JCI North Jersey 2016 Year End AwardeesJCI North Jersey 2016 Year End Awardees
JCI North Jersey 2016 Year End Awardees
 
وباء الإغماء الجماعي في المدارس المصرية : أبريل 1993
وباء الإغماء الجماعي في المدارس المصرية : أبريل 1993وباء الإغماء الجماعي في المدارس المصرية : أبريل 1993
وباء الإغماء الجماعي في المدارس المصرية : أبريل 1993
 

Ähnlich wie Risk Analysis in Occupational Health Setting

RISK MANAGEMENT.pptx
RISK MANAGEMENT.pptxRISK MANAGEMENT.pptx
RISK MANAGEMENT.pptxssuser107f14
 
Risk Management (1) (1).ppt
Risk Management (1) (1).pptRisk Management (1) (1).ppt
Risk Management (1) (1).pptAjjuSingh2
 
Chapter2 risk management process
Chapter2  risk management processChapter2  risk management process
Chapter2 risk management processDr Riyaz Muhmmad
 
project risk management
project risk managementproject risk management
project risk managementAshima Thakur
 
Risk Management and Risk Transfer
Risk Management and Risk TransferRisk Management and Risk Transfer
Risk Management and Risk TransferCBIZ, Inc.
 
Risk Assessment.pptx
Risk Assessment.pptxRisk Assessment.pptx
Risk Assessment.pptxDivyesh Jha
 
Information Security Risk Management
Information Security Risk ManagementInformation Security Risk Management
Information Security Risk ManagementNikhil Soni
 
Everything you need to know about Risk Management
Everything you need to know about Risk ManagementEverything you need to know about Risk Management
Everything you need to know about Risk ManagementITM Platform
 
ToTCOOP+i O3 o4 unit-9_final_version_en
ToTCOOP+i O3 o4 unit-9_final_version_enToTCOOP+i O3 o4 unit-9_final_version_en
ToTCOOP+i O3 o4 unit-9_final_version_enToTCOOPiTech
 
Safety training: Risk Assessment & Job Safety Analysis
Safety training: Risk Assessment & Job Safety AnalysisSafety training: Risk Assessment & Job Safety Analysis
Safety training: Risk Assessment & Job Safety AnalysisC.P Prasanth
 
Risk Management as a Safety Program Tool
Risk Management as a Safety Program ToolRisk Management as a Safety Program Tool
Risk Management as a Safety Program ToolAtlantaSafetyCouncil
 
Risk Management Process.ppt
Risk Management Process.pptRisk Management Process.ppt
Risk Management Process.pptUday Nayakwadi
 

Ähnlich wie Risk Analysis in Occupational Health Setting (20)

RISK MANAGEMENT.pptx
RISK MANAGEMENT.pptxRISK MANAGEMENT.pptx
RISK MANAGEMENT.pptx
 
Risk Management (1) (1).ppt
Risk Management (1) (1).pptRisk Management (1) (1).ppt
Risk Management (1) (1).ppt
 
Healthcare Risk Management
Healthcare Risk Management  Healthcare Risk Management
Healthcare Risk Management
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
Chapter2 risk management process
Chapter2  risk management processChapter2  risk management process
Chapter2 risk management process
 
8. project risk management
8. project risk management8. project risk management
8. project risk management
 
Reliability
ReliabilityReliability
Reliability
 
11 risk management
11 risk management11 risk management
11 risk management
 
project risk management
project risk managementproject risk management
project risk management
 
Risk Management and Risk Transfer
Risk Management and Risk TransferRisk Management and Risk Transfer
Risk Management and Risk Transfer
 
Risk.pdf
Risk.pdfRisk.pdf
Risk.pdf
 
Risk management standard 030820
Risk management standard 030820 Risk management standard 030820
Risk management standard 030820
 
Risk Assessment.pptx
Risk Assessment.pptxRisk Assessment.pptx
Risk Assessment.pptx
 
Information Security Risk Management
Information Security Risk ManagementInformation Security Risk Management
Information Security Risk Management
 
Everything you need to know about Risk Management
Everything you need to know about Risk ManagementEverything you need to know about Risk Management
Everything you need to know about Risk Management
 
ToTCOOP+i O3 o4 unit-9_final_version_en
ToTCOOP+i O3 o4 unit-9_final_version_enToTCOOP+i O3 o4 unit-9_final_version_en
ToTCOOP+i O3 o4 unit-9_final_version_en
 
Safety training: Risk Assessment & Job Safety Analysis
Safety training: Risk Assessment & Job Safety AnalysisSafety training: Risk Assessment & Job Safety Analysis
Safety training: Risk Assessment & Job Safety Analysis
 
Risk Management as a Safety Program Tool
Risk Management as a Safety Program ToolRisk Management as a Safety Program Tool
Risk Management as a Safety Program Tool
 
Risk Management Process.ppt
Risk Management Process.pptRisk Management Process.ppt
Risk Management Process.ppt
 
ICH Q9 Quality Risk Management
ICH Q9 Quality Risk ManagementICH Q9 Quality Risk Management
ICH Q9 Quality Risk Management
 

Mehr von Ahmed-Refat Refat

Academic Integrity and Gen AI -Basic Concepts and Skills
Academic Integrity and Gen AI -Basic Concepts and SkillsAcademic Integrity and Gen AI -Basic Concepts and Skills
Academic Integrity and Gen AI -Basic Concepts and SkillsAhmed-Refat Refat
 
Workplace Well-Being-AhmedRefat.pdf
Workplace Well-Being-AhmedRefat.pdfWorkplace Well-Being-AhmedRefat.pdf
Workplace Well-Being-AhmedRefat.pdfAhmed-Refat Refat
 
Health System Management.pdf
Health System Management.pdfHealth System Management.pdf
Health System Management.pdfAhmed-Refat Refat
 
Individualistic and collectivist cultures public health implications
Individualistic and collectivist cultures  public health implicationsIndividualistic and collectivist cultures  public health implications
Individualistic and collectivist cultures public health implicationsAhmed-Refat Refat
 
emergency manual -ahmed refat
emergency manual -ahmed refatemergency manual -ahmed refat
emergency manual -ahmed refatAhmed-Refat Refat
 
Open access and education to achieve sdg
Open access and education to achieve sdgOpen access and education to achieve sdg
Open access and education to achieve sdgAhmed-Refat Refat
 
The first-ever-infodemilogical-study-1993
The first-ever-infodemilogical-study-1993The first-ever-infodemilogical-study-1993
The first-ever-infodemilogical-study-1993Ahmed-Refat Refat
 
Misinformation management-tools
Misinformation management-toolsMisinformation management-tools
Misinformation management-toolsAhmed-Refat Refat
 
Infodemic in-mass-fainting-epidemic-1993
Infodemic in-mass-fainting-epidemic-1993Infodemic in-mass-fainting-epidemic-1993
Infodemic in-mass-fainting-epidemic-1993Ahmed-Refat Refat
 
Public health policy and legislations refat2021
Public health  policy and legislations refat2021Public health  policy and legislations refat2021
Public health policy and legislations refat2021Ahmed-Refat Refat
 
HOW TO FIND INFORMATION ON THE INTERNET
HOW TO FIND INFORMATION ON THE INTERNETHOW TO FIND INFORMATION ON THE INTERNET
HOW TO FIND INFORMATION ON THE INTERNETAhmed-Refat Refat
 
Formulating an Effective Search Query
Formulating an Effective Search QueryFormulating an Effective Search Query
Formulating an Effective Search QueryAhmed-Refat Refat
 
Computer and internet applications in medicine
Computer and internet applications in medicineComputer and internet applications in medicine
Computer and internet applications in medicineAhmed-Refat Refat
 
Risk communication in crisis -part-i
Risk communication in crisis -part-iRisk communication in crisis -part-i
Risk communication in crisis -part-iAhmed-Refat Refat
 

Mehr von Ahmed-Refat Refat (20)

Academic Integrity and Gen AI -Basic Concepts and Skills
Academic Integrity and Gen AI -Basic Concepts and SkillsAcademic Integrity and Gen AI -Basic Concepts and Skills
Academic Integrity and Gen AI -Basic Concepts and Skills
 
Workplace Well-Being-AhmedRefat.pdf
Workplace Well-Being-AhmedRefat.pdfWorkplace Well-Being-AhmedRefat.pdf
Workplace Well-Being-AhmedRefat.pdf
 
Health System Management.pdf
Health System Management.pdfHealth System Management.pdf
Health System Management.pdf
 
Individualistic and collectivist cultures public health implications
Individualistic and collectivist cultures  public health implicationsIndividualistic and collectivist cultures  public health implications
Individualistic and collectivist cultures public health implications
 
emergency manual -ahmed refat
emergency manual -ahmed refatemergency manual -ahmed refat
emergency manual -ahmed refat
 
Open access and education to achieve sdg
Open access and education to achieve sdgOpen access and education to achieve sdg
Open access and education to achieve sdg
 
Learn to do
Learn to doLearn to do
Learn to do
 
Risk assessment process
Risk assessment processRisk assessment process
Risk assessment process
 
Crisis communication-skills
Crisis communication-skillsCrisis communication-skills
Crisis communication-skills
 
The first-ever-infodemilogical-study-1993
The first-ever-infodemilogical-study-1993The first-ever-infodemilogical-study-1993
The first-ever-infodemilogical-study-1993
 
Misinformation management-tools
Misinformation management-toolsMisinformation management-tools
Misinformation management-tools
 
Infodemic in-mass-fainting-epidemic-1993
Infodemic in-mass-fainting-epidemic-1993Infodemic in-mass-fainting-epidemic-1993
Infodemic in-mass-fainting-epidemic-1993
 
Public health legislations
Public health legislations Public health legislations
Public health legislations
 
Precautionary principle pp
Precautionary principle ppPrecautionary principle pp
Precautionary principle pp
 
Environmental toxicology
Environmental toxicologyEnvironmental toxicology
Environmental toxicology
 
Public health policy and legislations refat2021
Public health  policy and legislations refat2021Public health  policy and legislations refat2021
Public health policy and legislations refat2021
 
HOW TO FIND INFORMATION ON THE INTERNET
HOW TO FIND INFORMATION ON THE INTERNETHOW TO FIND INFORMATION ON THE INTERNET
HOW TO FIND INFORMATION ON THE INTERNET
 
Formulating an Effective Search Query
Formulating an Effective Search QueryFormulating an Effective Search Query
Formulating an Effective Search Query
 
Computer and internet applications in medicine
Computer and internet applications in medicineComputer and internet applications in medicine
Computer and internet applications in medicine
 
Risk communication in crisis -part-i
Risk communication in crisis -part-iRisk communication in crisis -part-i
Risk communication in crisis -part-i
 

Kürzlich hochgeladen

Aspirin presentation slides by Dr. Rewas Ali
Aspirin presentation slides by Dr. Rewas AliAspirin presentation slides by Dr. Rewas Ali
Aspirin presentation slides by Dr. Rewas AliRewAs ALI
 
Call Girls Whitefield Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Whitefield Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls Whitefield Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Whitefield Just Call 7001305949 Top Class Call Girl Service Availablenarwatsonia7
 
Call Girls ITPL Just Call 7001305949 Top Class Call Girl Service Available
Call Girls ITPL Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls ITPL Just Call 7001305949 Top Class Call Girl Service Available
Call Girls ITPL Just Call 7001305949 Top Class Call Girl Service Availablenarwatsonia7
 
High Profile Call Girls Jaipur Vani 8445551418 Independent Escort Service Jaipur
High Profile Call Girls Jaipur Vani 8445551418 Independent Escort Service JaipurHigh Profile Call Girls Jaipur Vani 8445551418 Independent Escort Service Jaipur
High Profile Call Girls Jaipur Vani 8445551418 Independent Escort Service Jaipurparulsinha
 
Call Girls In Andheri East Call 9920874524 Book Hot And Sexy Girls
Call Girls In Andheri East Call 9920874524 Book Hot And Sexy GirlsCall Girls In Andheri East Call 9920874524 Book Hot And Sexy Girls
Call Girls In Andheri East Call 9920874524 Book Hot And Sexy Girlsnehamumbai
 
call girls in Connaught Place DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in Connaught Place  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...call girls in Connaught Place  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in Connaught Place DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...saminamagar
 
Call Girls Hebbal Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hebbal Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls Hebbal Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hebbal Just Call 7001305949 Top Class Call Girl Service Availablenarwatsonia7
 
Glomerular Filtration and determinants of glomerular filtration .pptx
Glomerular Filtration and  determinants of glomerular filtration .pptxGlomerular Filtration and  determinants of glomerular filtration .pptx
Glomerular Filtration and determinants of glomerular filtration .pptxDr.Nusrat Tariq
 
Low Rate Call Girls Pune Esha 9907093804 Short 1500 Night 6000 Best call girl...
Low Rate Call Girls Pune Esha 9907093804 Short 1500 Night 6000 Best call girl...Low Rate Call Girls Pune Esha 9907093804 Short 1500 Night 6000 Best call girl...
Low Rate Call Girls Pune Esha 9907093804 Short 1500 Night 6000 Best call girl...Miss joya
 
Call Girl Service Bidadi - For 7001305949 Cheap & Best with original Photos
Call Girl Service Bidadi - For 7001305949 Cheap & Best with original PhotosCall Girl Service Bidadi - For 7001305949 Cheap & Best with original Photos
Call Girl Service Bidadi - For 7001305949 Cheap & Best with original Photosnarwatsonia7
 
Mumbai Call Girls Service 9910780858 Real Russian Girls Looking Models
Mumbai Call Girls Service 9910780858 Real Russian Girls Looking ModelsMumbai Call Girls Service 9910780858 Real Russian Girls Looking Models
Mumbai Call Girls Service 9910780858 Real Russian Girls Looking Modelssonalikaur4
 
Call Girls Hosur Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hosur Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls Hosur Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hosur Just Call 7001305949 Top Class Call Girl Service Availablenarwatsonia7
 
Call Girls Jp Nagar Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Jp Nagar Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls Jp Nagar Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Jp Nagar Just Call 7001305949 Top Class Call Girl Service Availablenarwatsonia7
 
See the 2,456 pharmacies on the National E-Pharmacy Platform
See the 2,456 pharmacies on the National E-Pharmacy PlatformSee the 2,456 pharmacies on the National E-Pharmacy Platform
See the 2,456 pharmacies on the National E-Pharmacy PlatformKweku Zurek
 
Call Girls Kanakapura Road Just Call 7001305949 Top Class Call Girl Service A...
Call Girls Kanakapura Road Just Call 7001305949 Top Class Call Girl Service A...Call Girls Kanakapura Road Just Call 7001305949 Top Class Call Girl Service A...
Call Girls Kanakapura Road Just Call 7001305949 Top Class Call Girl Service A...narwatsonia7
 
VIP Call Girls Pune Vrinda 9907093804 Short 1500 Night 6000 Best call girls S...
VIP Call Girls Pune Vrinda 9907093804 Short 1500 Night 6000 Best call girls S...VIP Call Girls Pune Vrinda 9907093804 Short 1500 Night 6000 Best call girls S...
VIP Call Girls Pune Vrinda 9907093804 Short 1500 Night 6000 Best call girls S...Miss joya
 
Low Rate Call Girls Mumbai Suman 9910780858 Independent Escort Service Mumbai
Low Rate Call Girls Mumbai Suman 9910780858 Independent Escort Service MumbaiLow Rate Call Girls Mumbai Suman 9910780858 Independent Escort Service Mumbai
Low Rate Call Girls Mumbai Suman 9910780858 Independent Escort Service Mumbaisonalikaur4
 
Call Girl Lucknow Mallika 7001305949 Independent Escort Service Lucknow
Call Girl Lucknow Mallika 7001305949 Independent Escort Service LucknowCall Girl Lucknow Mallika 7001305949 Independent Escort Service Lucknow
Call Girl Lucknow Mallika 7001305949 Independent Escort Service Lucknownarwatsonia7
 
Book Call Girls in Kasavanahalli - 7001305949 with real photos and phone numbers
Book Call Girls in Kasavanahalli - 7001305949 with real photos and phone numbersBook Call Girls in Kasavanahalli - 7001305949 with real photos and phone numbers
Book Call Girls in Kasavanahalli - 7001305949 with real photos and phone numbersnarwatsonia7
 
Ahmedabad Call Girls CG Road 🔝9907093804 Short 1500 💋 Night 6000
Ahmedabad Call Girls CG Road 🔝9907093804  Short 1500  💋 Night 6000Ahmedabad Call Girls CG Road 🔝9907093804  Short 1500  💋 Night 6000
Ahmedabad Call Girls CG Road 🔝9907093804 Short 1500 💋 Night 6000aliya bhat
 

Kürzlich hochgeladen (20)

Aspirin presentation slides by Dr. Rewas Ali
Aspirin presentation slides by Dr. Rewas AliAspirin presentation slides by Dr. Rewas Ali
Aspirin presentation slides by Dr. Rewas Ali
 
Call Girls Whitefield Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Whitefield Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls Whitefield Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Whitefield Just Call 7001305949 Top Class Call Girl Service Available
 
Call Girls ITPL Just Call 7001305949 Top Class Call Girl Service Available
Call Girls ITPL Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls ITPL Just Call 7001305949 Top Class Call Girl Service Available
Call Girls ITPL Just Call 7001305949 Top Class Call Girl Service Available
 
High Profile Call Girls Jaipur Vani 8445551418 Independent Escort Service Jaipur
High Profile Call Girls Jaipur Vani 8445551418 Independent Escort Service JaipurHigh Profile Call Girls Jaipur Vani 8445551418 Independent Escort Service Jaipur
High Profile Call Girls Jaipur Vani 8445551418 Independent Escort Service Jaipur
 
Call Girls In Andheri East Call 9920874524 Book Hot And Sexy Girls
Call Girls In Andheri East Call 9920874524 Book Hot And Sexy GirlsCall Girls In Andheri East Call 9920874524 Book Hot And Sexy Girls
Call Girls In Andheri East Call 9920874524 Book Hot And Sexy Girls
 
call girls in Connaught Place DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in Connaught Place  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...call girls in Connaught Place  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in Connaught Place DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
 
Call Girls Hebbal Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hebbal Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls Hebbal Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hebbal Just Call 7001305949 Top Class Call Girl Service Available
 
Glomerular Filtration and determinants of glomerular filtration .pptx
Glomerular Filtration and  determinants of glomerular filtration .pptxGlomerular Filtration and  determinants of glomerular filtration .pptx
Glomerular Filtration and determinants of glomerular filtration .pptx
 
Low Rate Call Girls Pune Esha 9907093804 Short 1500 Night 6000 Best call girl...
Low Rate Call Girls Pune Esha 9907093804 Short 1500 Night 6000 Best call girl...Low Rate Call Girls Pune Esha 9907093804 Short 1500 Night 6000 Best call girl...
Low Rate Call Girls Pune Esha 9907093804 Short 1500 Night 6000 Best call girl...
 
Call Girl Service Bidadi - For 7001305949 Cheap & Best with original Photos
Call Girl Service Bidadi - For 7001305949 Cheap & Best with original PhotosCall Girl Service Bidadi - For 7001305949 Cheap & Best with original Photos
Call Girl Service Bidadi - For 7001305949 Cheap & Best with original Photos
 
Mumbai Call Girls Service 9910780858 Real Russian Girls Looking Models
Mumbai Call Girls Service 9910780858 Real Russian Girls Looking ModelsMumbai Call Girls Service 9910780858 Real Russian Girls Looking Models
Mumbai Call Girls Service 9910780858 Real Russian Girls Looking Models
 
Call Girls Hosur Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hosur Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls Hosur Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hosur Just Call 7001305949 Top Class Call Girl Service Available
 
Call Girls Jp Nagar Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Jp Nagar Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls Jp Nagar Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Jp Nagar Just Call 7001305949 Top Class Call Girl Service Available
 
See the 2,456 pharmacies on the National E-Pharmacy Platform
See the 2,456 pharmacies on the National E-Pharmacy PlatformSee the 2,456 pharmacies on the National E-Pharmacy Platform
See the 2,456 pharmacies on the National E-Pharmacy Platform
 
Call Girls Kanakapura Road Just Call 7001305949 Top Class Call Girl Service A...
Call Girls Kanakapura Road Just Call 7001305949 Top Class Call Girl Service A...Call Girls Kanakapura Road Just Call 7001305949 Top Class Call Girl Service A...
Call Girls Kanakapura Road Just Call 7001305949 Top Class Call Girl Service A...
 
VIP Call Girls Pune Vrinda 9907093804 Short 1500 Night 6000 Best call girls S...
VIP Call Girls Pune Vrinda 9907093804 Short 1500 Night 6000 Best call girls S...VIP Call Girls Pune Vrinda 9907093804 Short 1500 Night 6000 Best call girls S...
VIP Call Girls Pune Vrinda 9907093804 Short 1500 Night 6000 Best call girls S...
 
Low Rate Call Girls Mumbai Suman 9910780858 Independent Escort Service Mumbai
Low Rate Call Girls Mumbai Suman 9910780858 Independent Escort Service MumbaiLow Rate Call Girls Mumbai Suman 9910780858 Independent Escort Service Mumbai
Low Rate Call Girls Mumbai Suman 9910780858 Independent Escort Service Mumbai
 
Call Girl Lucknow Mallika 7001305949 Independent Escort Service Lucknow
Call Girl Lucknow Mallika 7001305949 Independent Escort Service LucknowCall Girl Lucknow Mallika 7001305949 Independent Escort Service Lucknow
Call Girl Lucknow Mallika 7001305949 Independent Escort Service Lucknow
 
Book Call Girls in Kasavanahalli - 7001305949 with real photos and phone numbers
Book Call Girls in Kasavanahalli - 7001305949 with real photos and phone numbersBook Call Girls in Kasavanahalli - 7001305949 with real photos and phone numbers
Book Call Girls in Kasavanahalli - 7001305949 with real photos and phone numbers
 
Ahmedabad Call Girls CG Road 🔝9907093804 Short 1500 💋 Night 6000
Ahmedabad Call Girls CG Road 🔝9907093804  Short 1500  💋 Night 6000Ahmedabad Call Girls CG Road 🔝9907093804  Short 1500  💋 Night 6000
Ahmedabad Call Girls CG Road 🔝9907093804 Short 1500 💋 Night 6000
 

Risk Analysis in Occupational Health Setting

  • 1. Dr. Ahmed-Refat AG Refat www.Slideshare.net/AhmedRefat Risk Management System, 2012 Risk Management System In Occupational Health Setting ‫إدارة املخاطر‬ ‫يف جمال الصحة املهنية‬ Dr. Ahmed-Refat AG Refat Prof. Occupational Medicine Tibsah University, KSA 2012 1
  • 2. Dr. Ahmed-Refat AG Refat www.Slideshare.net/AhmedRefat Risk Management System, 2012 Basic Concepts and Definitions 1- Hazard and Risk Hazard  A source of potential harm  Anything that has the potential to cause harm  A factor or exposure that may adversely affect health. Risk Risk = The probability that an adverse event will occur Risk = The chance of something happening that will have an impact on objectives. Risk was measured in terms of Consequences and the Likelihood 2
  • 3. Dr. Ahmed-Refat AG Refat www.Slideshare.net/AhmedRefat Risk Management System, 2012 2 - Risk Management System " RMS"  RMS is an ongoing process of identifying, quantifying and ranking risks and their associated losses, and developing cost effective management strategies to eliminate or control the risks. Risk Evaluation = identifying risks, setting priorities commissioning and reviewing risk assessment . Risk Assessment = combination of Risk identification, risk analysis and risk evaluation 3
  • 4. Dr. Ahmed-Refat AG Refat www.Slideshare.net/AhmedRefat Risk Management System, 2012 Steps of Risk Management Process The risk management process consists of a series of steps that, when undertaken in sequence, enable continual improvement in decision-making. 1. Establish the context 2. Identify hazards 3. Analyse risks that may result because of the hazard 4. Evaluate the risks 5. Treat the risks 6. Review and Monitor the risk 4
  • 5. Dr. Ahmed-Refat AG Refat www.Slideshare.net/AhmedRefat Risk Management System, 2012 5
  • 6. Dr. Ahmed-Refat AG Refat www.Slideshare.net/AhmedRefat Risk Management System, 2012 Step 1 Establish the context The first step in managing risk is to gather background information which relates to the organization as a whole as well as the particular risk management study. This establishes the context within which OHS risks are managed. 6
  • 7. Dr. Ahmed-Refat AG Refat www.Slideshare.net/AhmedRefat Risk Management System, 2012 Step 2 Hazard Identification Risk cannot be managed unless it is first identified. The aim of risk identification is to identify possible risks that may affect, either negatively or positively, the objectives of the organization and the activity under analysis. . Identifying retrospective risks Retrospective risks are those that have previously occurred. There are many sources of information about retrospective risk. These include: • hazard or incident logs or registers • audit reports • customer complaints • accreditation documents and reports 7
  • 8. Dr. Ahmed-Refat AG Refat www.Slideshare.net/AhmedRefat Risk Management System, 2012 • past staff or client surveys • newspapers or professional media, such as journals or websites. Identifying prospective risks Prospective risks are often harder to identify. These are things that have not yet happened, but might happen some time in the future. Identification should include all risks, whether or not they are currently being managed. Methods for identifying prospective risks: • brainstorming with staff • researching the economic, political, legislative and operating environment • conducting interviews with relevant people and/or organisations • undertaking surveys of staff or clients . • flow charting a process 8
  • 9. Dr. Ahmed-Refat AG Refat www.Slideshare.net/AhmedRefat Risk Management System, 2012 When  When a job is first undertaken  When a new piece of equipment is installed  When new or relevant information regarding health and safety becomes available from an authoritative source  When substantial changes are made to a system of work  When there has been an injury to a person undertaking a job or to a person near where a job is being performed  Following an accident that did not result in an injury or damage 9
  • 10. Dr. Ahmed-Refat AG Refat www.Slideshare.net/AhmedRefat Risk Management System, 2012  When there is evidence to suggest that a current risk assessment is no longer valid  When hazardous substances and/or dangerous goods are introduced into the workplace  As part of the design and construction of a new facility  Prior to conducting an experiment  As part of developing and designing a new subject, unit or course outline  Prior to conducting a field trip Step 3. Analyse the risks Risk analysis involves combining the possible consequences, or impact, of an event, with the likelihood of that event occurring. The result is a ‘level of risk’. That is: Risk = consequence x likelihood 11
  • 11. Dr. Ahmed-Refat AG Refat www.Slideshare.net/AhmedRefat Risk Management System, 2012 Elements of risk analysis The elements of risk analysis are as follows: 1. Identify existing strategies and controls that act to minimise negative risk and enhance pportunities. 2. Determine the consequences of a negative impact or an opportunity 3. Determine the likelihood of a negative consequence or an opportunity. 4. Estimate the level of risk by combining consequence and likelihood. 5. Consider and identify any uncertainties in the estimates. Types of analysis Three categories or types of analysis can be used to determine level of risk: • Qualitative • Semi-quantitative • Quantitative. 11
  • 12. Dr. Ahmed-Refat AG Refat www.Slideshare.net/AhmedRefat Risk Management System, 2012 A- Qualitative risk analysis Qualitative risk analysis is simple and easy to understand. Disadvantages include the fact that it is subjective and is based on insight, which can lead to the forming of bias and can degrade the validity of the results. Methods for qualitative risk analysis include: • brainstorming • evaluation using multi-disciplinary groups • specialist and expert judgement • structured interviews and/or questionnaires • word picture descriptors and risk categories. Items in risk analysis Risk = likelihood x consequence 12
  • 13. Dr. Ahmed-Refat AG Refat www.Slideshare.net/AhmedRefat Risk Management System, 2012 Likelihood 13
  • 14. Dr. Ahmed-Refat AG Refat www.Slideshare.net/AhmedRefat Risk Management System, 2012 14
  • 15. Dr. Ahmed-Refat AG Refat www.Slideshare.net/AhmedRefat Risk Management System, 2012 B- Consequences 15
  • 16. Dr. Ahmed-Refat AG Refat www.Slideshare.net/AhmedRefat Risk Management System, 2012 Step 4. Evaluate the risks Risk evaluation involves comparing the level of risk found during the analysis process with previously established risk criteria, and deciding whether these risks require treatment. The result of a risk evaluation is a prioritised list of risks that require further action. This step is about deciding whether risks are acceptable or need treatment. 16
  • 17. Dr. Ahmed-Refat AG Refat www.Slideshare.net/AhmedRefat Risk Management System, 2012 Methods of Risk Ranking 1- A qualitative ( subjective ) method : Risk ranking Matrix. 2- A semi quantitative method by using : Fine Risk Score Calculator 3- A semi quantitative method by using : Risk Nomogram Risk Ranking Matrix 17
  • 18. Dr. Ahmed-Refat AG Refat www.Slideshare.net/AhmedRefat Risk Management System, 2012 18
  • 19. Dr. Ahmed-Refat AG Refat www.Slideshare.net/AhmedRefat Risk Management System, 2012 Risk acceptance Low or tolerable risks may be accepted. ‘Acceptable’ means the business chooses to ‘accept’ that the risk exists, either because the risk is at a low level and the cost of treating the risk will outweigh the benefit, or there is no reasonable treatment that can be implemented. This is also known as ALARP (as low as reasonably practicable). A risk may be accepted for the following reasons: • The cost of treatment far exceeds the benefit, so that acceptance is the only option (applies particularly to lower ranked risks) • The level of the risk is so low that specific treatment is not appropriate with available resources • The opportunities presented outweigh the threats to such a degree that the risk is justified • The risk is such that there is no treatment available, for example the risk that the business may suffer storm damage. 19
  • 20. Dr. Ahmed-Refat AG Refat www.Slideshare.net/AhmedRefat Risk Management System, 2012 Other Methods of Risk Ranking 2- A semi quantitative method by using : Fine Risk Score Calculator 21
  • 21. Dr. Ahmed-Refat AG Refat www.Slideshare.net/AhmedRefat Risk Management System, 2012 3- A semi quantitative: Risk Nomogram Step 5. Treat and control the risks Risk treatment involves identifying options for treating or controlling risk, in order to either reduce or eliminate negative consequences, or to reduce the likelihood of an adverse occurrence. Risk treatment should also aim to enhance positive outcomes. It is often either not possible or cost-effective to implement all treatment strategies. 21
  • 22. Dr. Ahmed-Refat AG Refat www.Slideshare.net/AhmedRefat Risk Management System, 2012 Hierarchy of control 22
  • 23. Dr. Ahmed-Refat AG Refat www.Slideshare.net/AhmedRefat Risk Management System, 2012 Options for risk treatment Avoid the risk One method of dealing with risk is to avoid the risk by not proceeding with the activity likely to generate the risk. Risk avoidance should only occur when control measures do not exist or do not reduce the risk to an acceptable level. Change the likelihood of the occurrence This option enhances the likelihood of beneficial outcomes and reduces the possibility of loss. Change the consequences This will increase the size of gains and reduce the size of losses. This may include business continuity plans, and emergency and contingency plans. 23
  • 24. Dr. Ahmed-Refat AG Refat www.Slideshare.net/AhmedRefat Risk Management System, 2012 Share the risk Part or most of a risk may be transferred to another party so that they share responsibility. Mechanisms for risk transfer include contracts, insurance, partnerships and business alliances. Retain the risk After risks have been reduced or transferred, residual risk may be retained if it is at an acceptable level. Step 6- Monitor and review Monitor and review is an essential and integral step in the risk management process. Risks need to be monitored periodically to ensure changing circumstances do not alter the risk priorities. Very few risks will remain static, therefore the risk management process needs to be regularly repeated, so that new risks are captured in the process and effectively managed. 24